Super high-rise core tube structure steel reinforced concrete plate wall
By using the connector flare design and the technical means of driving the clamping components in the ultra-high-rise core cylinder structure, the problem of steel bar tilt caused by angle error during steel plate wall installation is solved, and the stable connection between the steel bar and the connector is achieved and the construction efficiency is improved.
Patent Information
- Application Number
- CN202510728207.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-06-03
- Publication Date
- 2025-07-01
- Estimated Expiration
- 2045-06-03
AI Technical Summary
In the core cylinder structure of super-high-rise buildings, steel plate walls are prone to angular errors during installation, resulting in inclination of steel bars and difficulty in accurately connecting with the connectors, affecting construction efficiency.
A super high-rise core cylinder structure steel concrete slab wall is designed, and the connector flare design and drive the clamping assembly to cohese to ensure the stable connection between the steel bars and the connectors, and the clamping assembly is pulled through the second steel wire to improve the clamping stability.
The inclination tolerance of steel bars is improved, the stable connection between steel bars and connectors is ensured, and the problem of cylindrical sleeves need to be cut and re-welded in the prior art is avoided, thereby improving the construction efficiency of steel-shaped concrete slab walls.
Smart Images

Figure CN120231397A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building construction, and in particular to a super high-rise core tube structure steel concrete slab wall. Background Art
[0002] The steel-concrete slab wall of the super-high-rise core tube structure is one of the core components of the core tube system. Its essence is the innovative application of steel-concrete composite structure in super-high-rise buildings. The core tube is located in the center of the building and is enclosed by auxiliary spaces such as elevator shafts, stairwells, and equipment pipe shafts. It is the "vertical skeleton" of super-high-rise buildings.
[0003] The structure of steel-concrete slab wall includes steel frame and outer concrete. The steel frame is the built-in H-steel, cross-shaped steel frame or steel plate wall, which is the main load-bearing component. The outer concrete is high-strength concrete wrapped around the steel to form an overall force-bearing system. It also includes a bidirectional steel mesh to enhance the shear and tensile properties. The steel and concrete work together to increase the lateral stiffness by 30%-50% compared with ordinary reinforced concrete shear walls, effectively resisting wind loads and earthquakes. The addition of steel delays concrete cracking, makes the hysteresis curve full, and increases the energy consumption capacity under earthquakes by more than 40%. It also has stronger fire resistance and corrosion resistance, extending the life of the structure. Welding nails and steel bar connectors are usually welded on the steel plate wall. The welding nails are used to enhance the bonding strength between the steel plate wall and concrete, and the steel bar connector is used to connect with the steel bar, so that adjacent steel plate walls are connected by steel bars, thereby enhancing the stability between the steel plate walls.
[0004] At present, the existing technology usually pours concrete on the steel plate wall to form a steel concrete plate wall. The connector on the steel plate wall is generally set as a circular sleeve with a thread on the inner wall, and the two ends of the steel bar are also provided with threads matching therewith, so that the two ends of the steel bar are respectively connected to the connector threads on the two adjacent steel plate walls. However, there is an angular error within a reasonable range during installation of the steel plate wall, which makes the two steel plate walls not completely parallel. As a result, when connecting the steel bars, the steel bars are tilted, and it is difficult to accurately connect with the connector at the other end. The connector needs to be cut off and re-welded, which easily affects the construction efficiency. Therefore, it does not meet the existing needs. In this regard, we propose a super-high-rise core tube structure steel concrete plate wall. Summary of the invention
[0005] The present invention provides a super high-rise core tube structure steel concrete slab wall. The super high-rise core tube structure steel concrete slab wall can be connected with the connector within a reasonable error range, thereby improving the construction efficiency. It solves the problem mentioned in the above background technology that the steel plate wall has an angle error within a reasonable range during installation, which makes the two steel plate walls not completely parallel, resulting in the steel bars being tilted when connecting them, making it difficult to accurately connect with the connector at the other end, and the connector needs to be cut off and re-welded, which easily affects the construction efficiency.
[0006] In order to achieve the above-mentioned purpose, the present invention provides a super-high-rise core tube structure steel concrete slab wall, including a steel plate wall, welding nails installed on the outside of the steel plate wall, steel bars and a concrete shell, a connector is installed on the outside of the steel plate wall, and a clamping assembly for fixing the steel bars is slidably provided on the side wall of the connector, and a driving assembly for driving the clamping assembly is provided on the side of the steel plate wall, and the driving assembly includes a first steel wire arranged on the side of the clamping assembly, and a clamping strip is rotatably provided on the inner side of the connector, and the clamping strip is used to engage with the thread of the end of the steel bar.
[0007] Optionally, the number of the welding nails is set to several, and the several welding nails are evenly arranged on the outside of the steel plate wall. The connector is set to a trumpet shape, the number of the connectors is the same as the number of the steel bars, the steel bars are inserted into the connectors, and the concrete shell is jointly wrapped around the steel plate wall, the welding nails and the outside of the connector to form a steel concrete plate wall.
[0008] Optionally, the clamping assembly includes a slide bar slidably plugged into the side wall of the connector, a universal ball mounted on the end of the slide bar, and a clamping plate rotatably sleeved on the outside of the universal ball; A group of the clamping assemblies is arranged on the side of one of the connectors, and the number of the clamping assemblies in a group is set to four. The clamping plate is located inside the connector, and the clamping plate is arranged to be an arc-shaped plate used in conjunction with the steel bars.
[0009] Optionally, the clamping assembly also includes a cavity opened on the inner side of the sliding rod, a piston used in conjunction with the cavity, a connecting rod slidably inserted into the end of the sliding rod and connected to the piston, a sealing film arranged in the cavity, a through hole jointly opened on the inner side of the sliding rod and the universal ball and connected to the cavity, and a coagulant filled between the piston and the sealing film.
[0010] Optionally, the driving assembly further includes a ring installed at the end of the connecting rod and a rotating nail rotatably arranged on the side of the steel plate wall. A plurality of the adapters are horizontally and evenly arranged on the outer side of the steel plate wall. The first steel wire sequentially passes through the rings on each group of the clamping assemblies. One end of the first steel wire is fixedly connected to one of the welding nails, and the other end of the first steel wire is fixedly connected to the rotating nail.
[0011] Optionally, a rotating cylinder is fixedly sleeved outside the rotating nail. A fixed cylinder is rotatably sleeved outside the rotating cylinder. The fixed cylinder is fixedly connected to the steel plate wall. A plurality of ratchet teeth are rotatably installed inside the fixed cylinder. The number of the ratchet teeth is set to be a plurality, and the plurality of ratchet teeth are circumferentially and evenly arranged inside the fixed cylinder. A first torsion spring is coaxially installed on the side of each ratchet tooth. One end of the first torsion spring is connected to the inner wall of the fixed cylinder, and the other end of the first torsion spring is connected to the ratchet tooth. A ratchet groove for cooperating with the ratchet tooth is formed on the side of the rotating cylinder. The number of the ratchet grooves is the same as the number of the ratchet teeth. A slot is formed at the end of the rotating nail.
[0012] Optionally, the number of the clamping strips is set to be a plurality. An activity groove is formed inside the adapter. The number of the activity grooves is the same as the number of the clamping strips. The plurality of clamping strips are rotatably arranged in the corresponding activity grooves. A rotating shaft is rotatably inserted into the side of each clamping strip. The end of the rotating shaft is fixedly connected to the activity groove. A second torsion spring is sleeved outside each rotating shaft. One end of the second torsion spring is connected to the inner wall of the adapter, and the other end of the second torsion spring is connected to the clamping strip.
[0013] Optionally, adjustment grooves are formed on both sides of the adapter. The clamping assemblies on both sides are respectively slidably inserted into the adjustment grooves on both sides. An arc rod is slidably inserted into the inner wall of the adapter. A slider is installed at the end of the arc rod. A chute for cooperating with the slider is formed on the side of the sliding rod close to the slider. The slider is slidably inserted into the chute. A first spring is arranged on the inner wall of the adapter. The two ends of the first spring are respectively connected to the inner wall of the adapter and the arc rod.
[0014] Optionally, a connection hole is formed in the inner wall of the adapter. The cross-section of the connection hole is "V"-shaped. One end of the connection hole is a double-hole end, and the other end of the connection hole is a single-hole end. The double-hole end of the connection hole is close to the clamping assembly. Second steel wires are installed on the outer sides of the sliding rods on both sides of the adapter. The ends of the two second steel wires respectively pass through the double-hole end of the connection hole and then commonly pass through the single-hole end of the connection hole. The ends of the second steel wires are located inside the adapter.
[0015] Optionally, a threaded barrel is rotatably arranged inside the connector, and the ends of the two second steel wires in the connector are connected to the threaded barrel, a screw is threadedly connected to the inner side of the threaded barrel, an extrusion sheet is installed at the end of the screw, a second spring is sleeved on the outer side of the screw, and the two ends of the second spring are respectively connected to the end of the threaded barrel and the extrusion sheet, a guide rod is installed on the outer side of the extrusion sheet, and a guide groove used in conjunction with the guide rod is opened on the inner wall of the connector, and the guide rod is slidably inserted in the guide groove.
[0016] Through the above technical scheme, when the super-high-rise core tube structure steel concrete slab wall provided by the present invention is in use: the design of the connector bell mouth improves the tolerance rate for the inclination of the steel bars, so that the steel bars can be docked with the connector within a reasonable inclination range, and the driving component drives the clamping component to gather inward to clamp and fix the steel bars, thereby ensuring the stability of the connection between the steel bars and the connector, and the second steel wire pulls the clamping component so that the clamping components on both sides of the connector have an upward lifting effect on the inclined steel bars and an circumferentially uniform clamping effect on the straight steel bars, further improving the stability of the clamping component in clamping the steel bars, thereby improving construction efficiency.
[0017] Other features and advantages of the present disclosure will be described in detail in the following detailed description. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] The accompanying drawings are used to provide a further understanding of the present disclosure and constitute a part of the specification. Together with the following specific embodiments, they are used to explain the present disclosure but do not constitute a limitation of the present disclosure. In the accompanying drawings: Figure 1 It is a schematic diagram of the three-dimensional structure of the present invention.
[0019] Figure 2 This is a schematic diagram of the structure of two steel plate walls connected by steel bars according to the present invention.
[0020] Figure 3 It is a schematic diagram of the three-dimensional structure of the connector of the present invention.
[0021] Figure 4 It is a schematic diagram of the internal three-dimensional structure of the present invention.
[0022] Figure 5 This is a schematic diagram of the front view and cross-section structure of the connector of the present invention in the first state.
[0023] Figure 6 For the present invention Figure 5 Enlarged structural diagram at A in the middle.
[0024] Figure 7 This is a schematic diagram of the front view and cross-section structure of the connector of the present invention in the second state.
[0025] Figure 8 Front view sectional structure diagram of the third state of the connector of the present invention.
[0026] Figure 9 Side view sectional structure diagram of the second state of the connector of the present invention.
[0027] Figure 10 Side view sectional structure diagram of the third state of the connector of the present invention.
[0028] Figure 11 Sectional structure diagram of the rotating nail of the present invention.
[0029] Figure 12 Schematic diagram of the staggered structure of the ratchet teeth and the ratchet groove of the present invention.
[0030] Figure 13 Schematic diagram of the engaged structure of the ratchet teeth and the ratchet groove of the present invention.
[0031] Figure 14 Schematic diagram of the three-dimensional structure of the concrete shell of the present invention.
[0032] Figure 15 Sectional structure diagram of the second torsion spring of the present invention.
[0033] Figure 16 Schematic diagram of the three-dimensional structure of the ratchet teeth of the present invention.
[0034] Explanation of reference numerals: 100, steel plate wall; 110, stud; 120, steel bar; 130, concrete shell; 140, connector; 150, clamping assembly; 151, sliding rod; 152, universal ball; 153, clamping plate; 154, cavity; 155, piston; 156, connecting rod; 157, sealing film; 158, through hole; 160, driving assembly; 161, first steel wire; 162, ring; 163, rotating nail; 164, rotating cylinder; 165, fixed cylinder; 166, ratchet teeth; 167, first torsion spring; 168, ratchet groove; 169, slot; 170, clamping strip; 171, moving slot; 172, second torsion spring; 180, adjusting slot; 181, arc rod; 182, slider; 183, sliding groove; 184, first spring; 190, connecting hole; 191, second steel wire; 200, threaded cylinder; 201, screw rod; 202, extrusion piece; 203, second spring; 204, guide rod; 205, guide groove. Detailed implementation mode
[0035] To make the above objects, features, and advantages of the present disclosure more apparent and understandable, the following provides a detailed description of the specific embodiments of the present disclosure with reference to the accompanying drawings. A lot of specific details are set forth in the following description to facilitate a full understanding of the present disclosure. However, the present disclosure can be implemented in many other ways different from those described herein, and those skilled in the art can make similar improvements without departing from the connotation of the present disclosure. Therefore, the present disclosure is not limited by the specific embodiments disclosed below.
[0036] In the description of the present disclosure, it should be understood that the orientation or positional relationships indicated by the terms "center", "longitudinal", "transverse", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", "axial", "radial", "circumferential", etc. are based on the orientation or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present disclosure and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus should not be construed as a limitation to the present disclosure. The terms "first", "second" used are for distinguishing one element from another, and do not have sequentiality and importance. In addition, in the following description when referring to the accompanying drawings, the same reference numerals in different drawings represent the same or similar elements, and the present disclosure will not repeat them here.
[0037] In the present disclosure, unless otherwise clearly specified and limited, the terms "mounted", "connected", "coupled", "fixed", etc. should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or integrated; it can be a mechanical connection, an electrical connection; it can be directly connected, or indirectly connected through an intermediate medium, and it can be the internal communication of two elements or the interaction relationship between two elements, unless otherwise clearly limited. For those of ordinary skill in the art, the specific meanings of the above terms in the present disclosure can be understood according to specific circumstances.
[0038] According to some embodiments of the present disclosure, there is provided a steel reinforced concrete wall slab for a super high-rise core tube structure, with reference to Figure 1 — Figure 16As shown in the figure, the super high-rise core tube structure steel concrete slab wall includes a steel plate wall 100, welding nails 110 welded to the outside of the steel plate wall 100, steel bars 120 arranged between two steel plate walls 100, and a concrete shell 130 cast on the outside of the steel plate wall 100. A connector 140 is fixedly installed on the outside of the steel plate wall 100 by welding. The connector 140 is configured to be in a trumpet shape. A clamping assembly 150 for fixing the steel bar 120 is slidably provided on the side wall of the connector 140. A driving assembly 160 for driving the clamping assembly 150 is provided on the side of the steel plate wall 100. The driving assembly 160 includes a first steel wire 161 arranged on the side of the clamping assembly 150. A clamping strip 170 is rotatably provided on the inner side of the connector 140. The clamping strip 170 is used to engage with the thread at the end of the steel bar 120.
[0039] In this way, the design of the bell-mouth of the connector 140 improves the tolerance for the inclination of the steel bar 120, so that the steel bar 120 can be docked with the connector 140 within a reasonable inclination range, and then the driving assembly 160 drives the clamping assembly 150 to gather inward to clamp and fix the steel bar 120, thereby ensuring the stability of the connection between the steel bar 120 and the connector 140. The clamping strip 170 is engaged with the threaded groove at the end of the steel bar 120 to further improve the firmness of the connection of the steel bar 120, and the problem of the cylindrical sleeve in the prior art that often needs to be cut off and re-welded is avoided as much as possible, thereby effectively improving the efficiency of steel concrete slab wall construction.
[0040] In addition, the number of welding nails 110 is set to be several, and several welding nails 110 are evenly arranged on the outside of the steel plate wall 100. The number of connectors 140 is the same as the number of steel bars 120. The steel bars 120 are inserted into the connectors 140, and the concrete shell 130 is wrapped around the steel plate wall 100, the welding nails 110 and the outside of the connectors 140 to form a steel-concrete slab wall. Through the setting of numerous welding nails 110, the contact area between the steel plate wall 100 and the concrete shell 130 is increased, so that the combination of the concrete shell 130 and the steel plate wall 100 is more firmly combined, thereby improving the strength of the steel-concrete slab wall.
[0041] In some embodiments, in the embodiment where the clamping assembly 150 is disposed on the side of the connector 140, Figure 1 , Figure 3 , Figure 4 , Figure 5 , Figure 6 , Figure 9 and Figure 10As shown in the figure, the clamping assembly 150 includes a slide bar 151 slidably inserted into the side wall of the adapter 140, a universal ball 152 fixedly installed at the end of the slide bar 151, and a clamping plate 153 rotatably sleeved outside the universal ball 152. A set of clamping assemblies 150 is arranged on the side of one adapter 140, and the number of a set of clamping assemblies 150 is set to four. The clamping plate 153 is located inside the adapter 140, and the clamping plate 153 is an arc-shaped plate configured to cooperate with the steel bar 120; the clamping assembly 150 further includes a cavity 154 opened inside the slide bar 151, a piston 155 cooperating with the cavity 154, a connecting rod 156 slidably inserted into the end of the slide bar 151 and fixedly connected to the piston 155, a sealing film 157 fixedly arranged in the cavity 154, a through hole 158 jointly opened inside the slide bar 151 and the universal ball 152 and communicating with the cavity 154, and a solidifying agent filled between the piston 155 and the sealing film 157. The sealing film 157 is a plastic film, the clamping assembly 150 is a steel part, and the solidifying agent is a steel bonding adhesive.
[0042] In some embodiments, in the implementation manner where the driving assembly 160 is arranged on the side of the steel plate wall 100, referring to Figure 1 , Figure 2 , Figure 3 , Figure 7 , Figure 11 , Figure 12 and Figure 13 As shown in the figure, the driving assembly 160 further includes a ring 162 fixedly installed at the end of the connecting rod 156, and a rotating nail 163 rotatably arranged on the side of the steel plate wall 100. A plurality of adapters 140 are horizontally and evenly arranged outside the steel plate wall 100. The first steel wire 161 sequentially passes through the rings 162 on each set of clamping assemblies 150. One end of the first steel wire 161 is fixedly connected to one of the welding nails 110, and the other end of the first steel wire 161 is fixedly connected to the rotating nail 163.
[0043] Further, a rotating cylinder 164 is fixedly sleeved outside the rotating nail 163. A fixed cylinder 165 is rotatably sleeved outside the rotating cylinder 164. The fixed cylinder 165 is fixedly connected to the steel plate wall 100. A ratchet 166 is rotatably installed inside the fixed cylinder 165. The number of ratchets 166 is set to several, and several ratchets 166 are circumferentially and evenly arranged inside the fixed cylinder 165. A first torsion spring 167 is coaxially installed on the side of each ratchet 166. One end of the first torsion spring 167 is fixedly connected to the inner wall of the fixed cylinder 165, and the other end of the first torsion spring 167 is fixedly connected to the ratchet 166. A ratchet slot 168 for cooperating with the ratchet 166 is formed on the side of the rotating cylinder 164. The number of ratchet slots 168 is the same as the number of ratchets 166. A slot 169 is formed at the end of the rotating nail 163. The slot 169 is used for inserting the output shaft of the motor or for inserting the drill bit of the impact drill, facilitating the rapid rotation of the rotating nail 163, so that the first steel wire 161 can be quickly wound around the rotating nail 163.
[0044] Specifically, the number of clamping strips 170 is set to several. An activity slot 171 is formed on the inner wall of the connector 140. The number of activity slots 171 is the same as the number of clamping strips 170. Several clamping strips 170 are respectively rotatably arranged in the corresponding activity slots 171. A rotating shaft is rotatably inserted into the side of each clamping strip 170. The end of the rotating shaft is fixedly connected to the activity slot 171. A second torsion spring 172 is sleeved outside each rotating shaft. One end of the second torsion spring 172 is fixedly connected to the inner wall of the connector 140, and the other end of the second torsion spring 172 is fixedly connected to the clamping strip 170.
[0045] Through the above technical solution, when the super high-rise core tube structure steel concrete slab wall provided by the present invention is used, one end of the steel bar 120 is firstly threadedly connected with the commonly used cylindrical sleeve on one side of the steel plate wall 100, and then the other end of the steel bar 120 is inserted into the corresponding connector 140. When the inclination angle of the steel bar 120 is large, the end of the steel bar 120 conflicts with the inner wall of the connector 140. When the inclination angle of the steel bar 120 is small or the inclination angle is negligible, the end of the steel bar 120 generates a thrust force on the clamping strip 170 into the connector 140. Since the movable groove 171 near the inner side of the connector 140 has a space for the clamping strip 170 to rotate, the clamping strip 170 can be rotated. The end of the reinforcing bar 120 rotates inwards, and the second torsion spring 172 is compressed at this time. When the end of the reinforcing bar 120 passes over the clamping strip 170, so that the clamping strip 170 corresponds to the thread groove at the end of the reinforcing bar 120, under the action of the rebound force of the second torsion spring 172, the clamping strip 170 is driven to rotate outwards and reset, so that the end of the clamping strip 170 and the thread groove at the end of the reinforcing bar 120 are mutually engaged. Since the movable groove 171 close to the outer side of the connector 140 is in contact with the clamping strip 170, the clamping strip 170 cannot rotate to the outside of the connector 140, thereby preventing the reinforcing bar 120 from falling off from the connector 140 as much as possible, and enhancing the firmness of the connection between the reinforcing bar 120 and the connector 140; Subsequently, the drill bit of the impact drill is clamped in the slot 169, so that the impact drill drives the rotating nail 163 to rotate, and the first steel wire 161 is wound around the rotating nail 163, thereby tightening the first steel wire 161 passing through the ring 162, so that the tightened first steel wire 161 produces an inward thrust on the clamping assembly 150, so that the clamping plate 153 is close to the steel bar 120, and the clamping plate 153 rotates during the process of contact with the steel bar 120, so that the clamping plate 153 can produce an adaptive angle of rotation adjustment for the steel bars 120 with different inclination angles, so that the clamping plate 153 is convenient for clamping on the steel bar 120. Moreover, when the first steel wire 161 continues to be tightened, the pressure generated by the ring 162 on the piston 155 is greater than the resistance to the rupture of the sealing film 157, so that the sealing film 157 is ruptured under the enhanced pressure, thereby causing the condensate in the cavity 154 to The solidifying agent flows into the gap between the universal ball 152 and the clamping plate 153 through the through hole 158, so that after the solidifying agent solidifies, the universal ball 152 and the clamping plate 153 are bonded and fixed, so that the clamping plate 153 can no longer rotate, thereby further improving the stability of the clamping plate 153 clamping the steel bar 120. In addition, when the rotating nail 163 rotates, the rotating nail 163 drives the rotating drum 164 to rotate. Through the coordinated use of the ratchet 166 and the ratchet groove 168, the rotating nail 163 can only rotate unidirectionally in the direction of winding the first steel wire 161, avoiding the problem of the rotating nail 163 reversing to loosen the first steel wire 161, thereby ensuring that the first steel wire 161 remains in a tightened state, so that the clamping assembly 150 always maintains the effect of clamping and fixing the steel bar 120, and the denser the ratchet grooves 168 are, the higher the accuracy of the tightening adjustment of the first steel wire 161. In summary, the design of the bell-mouth of the connector 140 improves the tolerance for the inclination of the steel bar 120, so that the steel bar 120 can be docked with the connector 140 within a reasonable inclination range, and then the driving component 160 drives the clamping component 150 to gather inward to clamp and fix the steel bar 120, thereby ensuring the stability of the connection between the steel bar 120 and the connector 140, and avoiding as much as possible the problem of the cylindrical sleeve in the prior art that often needs to be cut and re-welded, thereby effectively improving the efficiency of steel concrete slab wall construction.
[0046] It should be noted that the steel bonding glue is a two-component modified epoxy structural adhesive of A and B, which has the characteristics of strong bonding force, strong shear force, anti-aging, good acid and alkali resistance, strong impact resistance, room temperature curing, small shrinkage during hardening process, no flow during construction, no volatile solvents, non-toxicity and easy construction. Steel bonding glue and impact drill are well known in the field and will not be elaborated here.
[0047] In some embodiments of the present disclosure, reference Figure 3 , Figure 4 , Figure 5 , Figure 6 ,Figure 7 , Figure 8 , Figure 9 and Figure 10 As shown in Figure 7 , Figure 8 , Figure 9 and Figure 10 , adjustment grooves 180 are formed on both sides of the adapter 140. The clamping assemblies 150 on both sides are respectively slidably inserted into the adjustment grooves 180 on both sides. An arc rod 181 is slidably inserted into the inner wall of the adapter 140. A slider 182 is fixedly installed at the end of the arc rod 181. A chute 183 for cooperating with the slider 182 is formed on the side of the slide rod 151 near the slider 182. The slider 182 is slidably inserted into the chute 183, and the slider 182 is arranged as a trapezoidal block to prevent the slide rod 151 from separating and falling off from the arc rod 181. A first spring 184 is arranged in the inner wall of the adapter 140. The first spring 184 is sleeved outside the arc rod 181. The two ends of the first spring 184 are respectively fixedly connected with the inner wall of the adapter 140 and the arc rod 181.
[0048] A connection hole 190 is formed in the inner wall of the adapter 140. The cross-section of the connection hole 190 is arranged as a "V" shape. One end of the connection hole 190 is arranged as a double-hole end, and the other end of the connection hole 190 is arranged as a single-hole end. The hole end is the turning point of the connection hole 190. The double-hole end of the connection hole 190 is close to the clamping assembly 150. Second steel wires 191 are fixedly installed on the outer sides of the slide rods 151 located on both sides of the adapter 140. The ends of the two second steel wires 191 respectively pass through the double-hole end of the connection hole 190, and then commonly pass through the single-hole end of the connection hole 190, so that the ends of the two second steel wires 191 are both located inside the adapter 140.
[0049] A threaded cylinder 200 is rotatably arranged inside the adapter 140. The ends of the two second steel wires 191 located inside the adapter 140 are both fixedly connected with the outer wall of the threaded cylinder 200. A screw rod 201 is in threaded connection with the inner side of the threaded cylinder 200. An extrusion sheet 202 is fixedly installed at the end of the screw rod 201. A second spring 203 is sleeved outside the screw rod 201. The two ends of the second spring 203 are respectively connected with the end of the threaded cylinder 200 and the outside of the extrusion sheet 202. A guide rod 204 is fixedly installed on the outside of the extrusion sheet 202. A guide groove 205 for cooperating with the guide rod 204 is formed in the inner wall of the adapter 140. The guide rod 204 is slidably inserted into the guide groove 205.
[0050] Among them, the second steel wire 191 has different states in different situations.
[0051] For example, in some embodiments, referring to Figure 4 , Figure 5 , Figure 7 and Figure 9As shown, the second steel wire 191 can have a first state. The first state is when the second steel wire 191 is not in use. In the first state, the steel bar 120 inserted into the connector 140 has a large inclination, such that the end of the steel bar 120 abuts against the inner wall of the connector 140 and does not contact the pressing piece 202, thus being unable to generate a thrust on the pressing piece 202, causing the second steel wire 191 to remain stationary in its initial state. At this time, the clamping assemblies 150 on both sides of the connector 140 are still both in a lower position, which can not only hold and fix the end of the steel bar 120 that is inclined upward or downward, but also generate an upward lifting force on the inclined end of the steel bar 120. Therefore, when the connector 140 and the clamping assemblies 150 are used in combination, the stability of the connection of the inclined steel bar 120 is improved.
[0052] For example, in some embodiments, referring to Figure 3 , Figure 4 , Figure 8 and Figure 10 as shown, the second steel wire 191 can have a second state. The second state is when the second steel wire 191 is being pulled. In the second state, the second steel wire 191 is wound up by the rotating threaded cylinder 200, thereby pulling the second steel wire 191.
[0053] Next, the present disclosure will introduce the winding and pulling of the second steel wire 191 in detail in combination with the above specific embodiments. Referring to Figure 3 , Figure 4 , Figure 5 , Figure 7 , Figure 8 , Figure 9 and Figure 10 as shown, when the steel bar 120 inserted into the connector 140 is almost straight and not inclined, the steel bar 120 is inserted deep into the connector 140, generating a thrust on the pressing piece 202, causing the pressing piece 202 to drive the screw rod 201 to move into the threaded cylinder 200. By the sliding of the guide rod 204 in the guide groove 205, the screw rod 201 can only move horizontally backward. At this time, the second spring 203 is compressed. Through the threaded cooperation of the backward-moving screw rod 201 and the threaded cylinder 200, the threaded cylinder 200 rotates, thereby winding and rolling up the second steel wire 191 fixed on the threaded cylinder 200, so that the second steel wire 191 generates a pulling force on the clamping assemblies 150 on both sides of the connector 140; The second steel wire 191 pulls the clamping assembly 150 upward. At the same time, the clamping assembly 150 drives the arc rod 181 to extend outward, and the first spring 184 is stretched, causing the second steel wire 191 to pull the two clamping assemblies 150 to move upward to the left and right sides of the connector 140 respectively, so as to clamp and fix the straight steel bar 120 in the connector 140 in a circumferentially uniform manner, enhancing the stability of the clamping of the steel bar 120 by the clamping assembly 150. When the steel bar 120 is removed from the connector 140, the thrust of the steel bar 120 on the pressing piece 202 is released. Under the action of the resilience of the first spring 184 and the second spring 203, the clamping assemblies 150 on both sides can be moved downward to reset.
[0054] The preferred embodiments of the present disclosure have been described in detail above in conjunction with the accompanying drawings. However, the present disclosure is not limited to the specific details in the above embodiments. Within the scope of the technical concept of the present disclosure, various simple modifications can be made to the technical solutions of the present disclosure, and these simple modifications all fall within the protection scope of the present disclosure.
[0055] In addition, it should be noted that, among the various specific technical features described in the above specific embodiments, they can be combined in any appropriate manner without conflict. To avoid unnecessary repetition, the present disclosure will not separately describe various possible combination methods.
[0056] In addition, any combination can be made between various different embodiments of the present disclosure, as long as it does not violate the idea of the present disclosure, it should also be regarded as the content disclosed by the present disclosure.
Claims
1. A steel reinforced concrete slab wall for a super high-rise core tube structure, comprising a steel plate wall (100), stud nails (110) installed on the outer side of the steel plate wall (100), steel bars (120) and a concrete shell (130), characterized in that: A coupler (140) is installed on the outer side of the steel plate wall (100). A clamping assembly (150) for fixing the steel bar (120) is slidably arranged on the side wall of the coupler (140). A driving assembly (160) for driving the clamping assembly (150) is arranged on the side of the steel plate wall (100). The driving assembly (160) includes a first steel wire (161) arranged on the side of the clamping assembly (150). A clamping bar (170) is rotatably arranged inside the coupler (140), and the clamping bar (170) is used for engaging with the thread at the end of the steel bar (120).
2. The steel reinforced concrete slab wall of the super high-rise core tube structure according to claim 1, wherein: The number of the stud nails (110) is set to be several. The several stud nails (110) are evenly arranged on the outer side of the steel plate wall (100). The coupler (140) is arranged in a flared shape. The number of the couplers (140) is the same as the number of the steel bars (120). The steel bars (120) are inserted into the couplers (140). The concrete shell (130) commonly wraps the outside of the steel plate wall (100), the stud nails (110) and the couplers (140) to form a steel reinforced concrete plate wall.
3. The steel reinforced concrete slab wall of the super high-rise core tube structure according to claim 1, characterized in that: The clamping assembly (150) includes a sliding rod (151) slidably inserted into the side wall of the coupler (140), a universal ball (152) installed at the end of the sliding rod (151), and a clamping plate (153) rotatably sleeved outside the universal ball (152); One group of the clamping assemblies (150) is arranged on the side of one coupler (140). The number of one group of the clamping assemblies (150) is set to be four. The clamping plate (153) is located inside the coupler (140), and the clamping plate (153) is an arc-shaped plate used in cooperation with the steel bar (120).
4. A steel reinforced concrete plate wall of a super high-rise core tube according to claim 3, characterized in that: The clamping assembly (150) further includes a cavity (154) opened inside the sliding rod (151), a piston (155) used in cooperation with the cavity (154), a connecting rod (156) slidably inserted into the end of the sliding rod (151) and connected to the piston (155), a sealing film (157) arranged in the cavity (154), through holes (158) commonly opened inside the sliding rod (151) and the universal ball (152) and communicated with the cavity (154), and a coagulant filled between the piston (155) and the sealing film (157).
5. The steel reinforced concrete slab wall of the super high-rise core tube structure according to claim 4, characterized in that: The driving assembly (160) further includes a ring (162) installed at the end of the connecting rod (156), and a rotating nail (163) rotatably arranged on the side of the steel plate wall (100). The several couplers (140) are horizontally and evenly arranged on the outer side of the steel plate wall (100). The first steel wire (161) sequentially passes through the rings (162) on each group of the clamping assemblies (150). One end of the first steel wire (161) is fixedly connected to one of the stud nails (110), and the other end of the first steel wire (161) is fixedly connected to the rotating nail (163).
6. The steel reinforced concrete slab wall of a super high-rise core tube structure according to claim 5, wherein: A rotating cylinder (164) is fixedly sleeved on the outside of the rotating nail (163). A fixed cylinder (165) is rotatably sleeved on the outside of the rotating cylinder (164). The fixed cylinder (165) is fixedly connected to the steel plate wall (100). A ratchet tooth (166) is rotatably installed on the inner side of the fixed cylinder (165). The number of the ratchet teeth (166) is set to be several, and several of the ratchet teeth (166) are circumferentially and evenly arranged on the inner side of the fixed cylinder (165). A first torsion spring (167) is coaxially installed on the side of each ratchet tooth (166). One end of the first torsion spring (167) is connected to the inner wall of the fixed cylinder (165), and the other end of the first torsion spring (167) is connected to the ratchet tooth (166). A ratchet slot (168) for cooperating with the ratchet tooth (166) is formed on the side of the rotating cylinder (164). The number of the ratchet slots (168) is the same as the number of the ratchet teeth (166). A slot (169) is formed at the end of the rotating nail (163).
7. The steel reinforced concrete slab wall of a super high-rise core tube structure according to claim 1, wherein: The number of the clamping strips (170) is set to be several. An activity slot (171) is formed on the inner wall of the adapter (140). The number of the activity slots (171) is the same as the number of the clamping strips (170). Several of the clamping strips (170) are rotatably arranged in the corresponding activity slots (171). A rotating shaft is rotatably inserted into the side of each clamping strip (170). The end of the rotating shaft is fixedly connected to the activity slot (171). A second torsion spring (172) is sleeved on the outside of each rotating shaft. One end of the second torsion spring (172) is connected to the inner wall of the adapter (140), and the other end of the second torsion spring (172) is connected to the clamping strip (170).
8. The steel reinforced concrete slab wall of a super high-rise core tube structure according to claim 3, characterized in that: Adjustment slots (180) are formed on both sides of the adapter (140). The two clamping assemblies (150) are respectively slidably inserted into the adjustment slots (180) on both sides. An arc rod (181) is slidably inserted into the inner wall of the adapter (140). A slider (182) is installed at the end of the arc rod (181). A chute (183) for cooperating with the slider (182) is formed on the side of the slide rod (151) close to the slider (182). The slider (182) is slidably inserted into the chute (183). A first spring (184) is arranged on the inner wall of the adapter (140). The two ends of the first spring (184) are respectively connected to the inner wall of the adapter (140) and the arc rod (181).
9. The steel reinforced concrete slab wall of a super high-rise core tube structure according to claim 8, wherein: A connection hole (190) is formed in the inner wall of the adapter (140). The cross-section of the connection hole (190) is set to be "V"-shaped. One end of the connection hole (190) is set as a double-hole end, and the other end of the connection hole (190) is set as a single-hole end. The double-hole end of the connection hole (190) is close to the clamping assembly (150). Second steel wires (191) are installed on the outer sides of the sliding rods (151) located on both sides of the adapter (140). The end parts of the two second steel wires (191) respectively pass through the double-hole end of the connection hole (190), and then jointly pass through the single-hole end of the connection hole (190). The end parts of the second steel wires (191) are located inside the adapter (140).
10. A steel reinforced concrete slab wall of a super high-rise core tube according to claim 9, characterized in that: A threaded cylinder (200) is rotatably arranged inside the adapter (140). The end parts of the two second steel wires (191) located inside the adapter (140) are both connected to the threaded cylinder (200). A screw rod (201) is threadedly connected to the inner side of the threaded cylinder (200). An extrusion piece (202) is installed at the end of the screw rod (201). A second spring (203) is sleeved on the outer side of the screw rod (201). The two ends of the second spring (203) are respectively connected to the end of the threaded cylinder (200) and the extrusion piece (202). A guide rod (204) is installed on the outer side of the extrusion piece (202). A guide groove (205) which is matched with the guide rod (204) is formed in the inner wall of the adapter (140). The guide rod (204) is slidably inserted into the guide groove (205).
Citation Information
Patent Citations
Intelligent connector mounting, measuring and positioning device for embedded steel bar construction and positioning and mounting method of intelligent connector mounting, measuring and positioning device
CN116290846A
Steel bar connection construction device and using method thereof
CN118639876A
Adjustable steel bar connector
CN219386881U
Reinforcing bar coupler
KR1020130143331A
The connecting tool for easy connect of Reinforcingbar
KR200353150Y1