Stamping standard man-hour system construction and application method, device, equipment and medium

By constructing the basic process and basic process hours for stamping parts standardization, combined with the reference time magnification, the accuracy and efficiency of working hours statistical calculations under the personalized needs of light commercial vehicles are solved, and real-time calculation and accurate estimation of working hours are achieved.

CN120450280APending Publication Date: 2025-08-08DONGFENG AUTOMOBILE COMPANY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510455617.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-04-11
Publication Date
2025-08-08

AI Technical Summary

Technical Problem

In the prior art, light commercial vehicles have high personalized demand and complex product types, resulting in low accuracy in stamping working hours. There is a large difference in working hours calculation and manual calculation, so accurate estimation cannot be made.

Method used

To build the basic process and basic process hours for stamping parts standardization, by calculating the process beat and number of staff of the basic process, combined with the reference time magnification, the total stamping working hours calculation logic is constructed to realize the standardized definition of working hours and real-time calculation of working hours.

Benefits of technology

It improves the accuracy and calculation efficiency of working hours calculation, solves the lag problem of working hours calculation, and realizes real-time push and accurate estimation of working hours.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120450280A_ABST
    Figure CN120450280A_ABST
Patent Text Reader

Abstract

The invention discloses a stamping standard man-hour system construction and application method, device, equipment and medium, and relates to the technical field of vehicle production and manufacturing, and the method comprises the following steps: carrying out standardized definition on basic processes of stamping parts and basic process man-hours; basic process working hours of the basic processes are obtained through calculation on the basis of the process takt and the number of workers of the basic processes, and the total stamping working hour calculation logic of the stamping part is constructed according to the sum of the basic process working hours of all the basic processes of the stamping part and the reference time multiplying power corresponding to the stamping part; and constructing a standard man-hour system according to the total stamping man-hour calculation logic, and calculating the total stamping man-hour of the current stamping part on the basis of the standard man-hour system in combination with the basic process of the current stamping part. According to the method, the standard basic procedures and the basic procedure working hours of the stamping parts are constructed, so that the working hour accuracy and the measurement and calculation efficiency can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of vehicle production and manufacturing, and specifically to a method, device, equipment and medium for constructing and applying a standard stamping working time system. Background Art

[0002] Due to the high demand for individualization and the wide variety of light commercial vehicles, including 16 main body series and hundreds of variants, stamping man-hour statistics are currently calculated manually offline. The accuracy of man-hour calculations depends primarily on the skill level of the personnel, and manual offline calculations can easily lead to inaccurate calculations. The main issues are:

[0003] (1) In traditional methods, working hours are calculated manually offline, which is not very accurate and requires dedicated personnel to calculate and maintain working hours;

[0004] (2) There is a lag in the calculation of working hours. Often, after the production of a model is completed and there is a need for work report settlement, the staff will calculate the working hours and submit the electronic calculation form;

[0005] (3) Due to the large variety of products and the rapid iteration of complete vehicles, there are cases of omissions and under-revisions when modifying and updating the working hours. Products with the same structure may be given different working hours. The manual measurement of working hours varies greatly and can only be obtained through actual measurement after production, and cannot be accurately estimated. Summary of the Invention

[0006] The present application provides a method, device, equipment and medium for constructing and applying a standard stamping working time system. By constructing standardized basic processes and basic process working times for stamping parts, it can not only improve the accuracy of working times but also improve the measurement efficiency.

[0007] In a first aspect, an embodiment of the present application provides a method for constructing and applying a standard stamping time system, the method comprising:

[0008] Standardize the basic processes and working hours of stamping parts. The forming process of stamping parts includes blanking, automatic or manual shearing, blank packaging, and stamping, and each forming process corresponds to a basic process.

[0009] Based on the process rhythm and number of staff of the basic process, the basic process working hours of the basic process are calculated. According to the sum of the basic process working hours of all basic processes of the stamping parts and the corresponding benchmark time multiplier of the stamping parts, the total stamping working hours calculation logic of the stamping parts is constructed;

[0010] A standard working time system is constructed according to the total stamping working time calculation logic. Based on the standard working time system and combined with the basic process of the current stamping part, the total stamping working time calculation of the current stamping part is realized.

[0011] In conjunction with the first aspect, in one embodiment,

[0012] The basic process of blanking includes overhead crane die change, package opening, uncoiling line and inspection;

[0013] The basic process of automatic or manual shearing includes shearing operation;

[0014] The basic process of blank packaging includes packaging;

[0015] The basic process of stamping forming includes stamping line and overhead crane die changing.

[0016] In conjunction with the first aspect, in one embodiment,

[0017] According to the process beat and number of staff for the overhead crane die change in the basic process of blanking, the basic process working hours of the overhead crane die change in the basic process of blanking are calculated;

[0018] According to the process rhythm and number of staff in the basic process of blanking, the basic process working hours of the package opening in the basic process of blanking are calculated;

[0019] According to the process beat and number of staff of the uncoiling line in the basic process of blanking, the basic process working hours of the uncoiling line in the basic process of blanking are calculated;

[0020] According to the process rhythm and number of staff for inspection in the basic process of blanking, the basic process working hours for inspection in the basic process of blanking are calculated.

[0021] In conjunction with the first aspect, in one embodiment,

[0022] The basic process working hours of the shearing operation in the basic process of automatic or manual shearing are calculated based on the process takt time and number of staff for automatic shearing, as well as the process takt time and number of staff for manual shearing;

[0023] According to the process rhythm and number of staff in the basic process of blank packaging, the basic process working hours of the basic process of blank packaging are calculated.

[0024] In conjunction with the first aspect, in one embodiment,

[0025] According to the process rhythm and staffing number of the press line in the basic process of stamping forming, the basic process working hours of the press line in the basic process of stamping forming are calculated;

[0026] According to the process rhythm and number of staff for the overhead crane die change in the basic process of stamping forming, the basic process working hours of the overhead crane die change in the basic process of stamping forming are calculated.

[0027] In combination with the first aspect, in one embodiment, the reference time multiplier is a parameter used to measure the performance of a production line, and the reference time multiplier of the stamping parts is calculated based on the actual total stamping working hours and the reference time of the stamping parts.

[0028] In conjunction with the first aspect, in one embodiment, the standard working time system is constructed according to the total stamping working time calculation logic, and based on the standard working time system and in combination with the basic process of the current stamping part, the total stamping working time calculation of the current stamping part is realized, specifically including:

[0029] Constructing a standard working time system based on the total stamping working time calculation logic;

[0030] Based on the constructed standard working time system and combined with the basic working procedures of the current stamping parts, the total stamping working time of the current stamping parts can be calculated;

[0031] Tasks are assigned based on the association of BOM data tasks. After the trial production of the entire vehicle, when the current stamping parts are generated, the total stamping hours of the current stamping parts are calculated and split to obtain the basic process hours of each basic process of the current stamping parts.

[0032] In a second aspect, an embodiment of the present application provides a device for constructing and applying a standard stamping time system, the device comprising:

[0033] A definition module is used to standardize the basic processes and working hours of stamping parts. The forming process of stamping parts includes blanking, automatic or manual shearing, blank packaging, and stamping, and each forming process corresponds to a basic process;

[0034] A construction module is used to calculate the basic process working hours of the basic process based on the process rhythm and number of staff of the basic process. The total stamping working hours calculation logic of the stamping part is constructed based on the sum of the basic process working hours of all basic processes of the stamping part and the benchmark time multiplier corresponding to the stamping part.

[0035] An execution module is used to construct a standard working time system according to the total stamping working time calculation logic, and based on the standard working time system and combined with the basic process of the current stamping part, realize the total stamping working time calculation of the current stamping part.

[0036] In the third aspect, an embodiment of the present application provides a stamping standard working time system construction and application device, which includes a processor, a memory, and a stamping standard working time system construction and application program stored on the memory and executable by the processor, wherein when the stamping standard working time system construction and application program is executed by the processor, the steps of the above-mentioned stamping standard working time system construction and application method are implemented.

[0037] In a fourth aspect, an embodiment of the present application provides a computer-readable storage medium, on which a stamping standard working time system construction and application program are stored, wherein when the stamping standard working time system construction and application program are executed by a processor, the steps of the above-mentioned stamping standard working time system construction and application method are implemented.

[0038] The beneficial effects of the technical solutions provided in the embodiments of the present application include:

[0039] (1) By establishing standardized basic processes and basic process hours for stamping parts, compared with the traditional electronic spreadsheet calculation and transmission method, it can not only improve the accuracy of working hours but also improve the efficiency of calculation;

[0040] (2) The work time task is changed from maintenance after the traditional production is completed to measurement at the beginning of product preparation, and tasks are pushed in real time in advance, and the process is maintained in real time, which effectively solves the lag problem of work time measurement;

[0041] (3) Introduce and construct the benchmark time multiplier of the working time series. The basic process working time of a single stamping part is automatically calculated and multiplied by the benchmark time multiplier of the part series. The total stamping working time is quickly calculated to solve the low efficiency problem of the traditional manual measurement method of each part and improve the efficiency of working time measurement. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] Figure 1 A flowchart of the construction and application method of the standard working time system for stamping for this application;

[0043] Figure 2 Schematic diagram of the functional modules of the construction and application device of the stamping standard working time system for this application;

[0044] Figure 3 Schematic diagram of the hardware structure of the standard working time system for stamping and application equipment for this application. DETAILED DESCRIPTION

[0045] In order to enable those skilled in the art to better understand the present invention, the following will clearly and completely describe the technical solutions in the embodiments of the present invention in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0046] First, some technical terms in this application are explained to facilitate those skilled in the art to understand this application.

[0047] BOM: The bill of materials data of a product is a set of technical documents that describe the structural attributes of a product and from which the manufacturing attributes, production attributes, cost attributes and sales attributes of the product can be derived.

[0048] Standard time: The working time required to complete the work in accordance with quality requirements under normal working conditions, using standard working methods, reasonable labor intensity and speed.

[0049] Benchmark time: refers to the technical unit of time corresponding to each demonstration standard operation based on the number of parts, part shape, number of fixing points, hole length, fixing method, etc., the design and construction style of the relevant assembly, and manual work as the premise, to create a demonstration standard operation.

[0050] Basic process working hours: The time determined during process design and set according to the work sheet is used to evaluate the quality of the production line structure determined by the process design.

[0051] In order to make the objectives, technical solutions and advantages of this application clearer, the implementation methods of this application will be further described in detail below with reference to the accompanying drawings.

[0052] On the first aspect, the embodiment of the present application provides a method for constructing and applying a standard stamping working time system. By defining the basic process, basic process working time, and benchmark time multiplier of the parts, the basic process working time of the stamping parts at the lower level is summed through the system hierarchical data structure. For newly added stamping parts, it is linked and interconnected with the stamping parts production preparation task notification, and tasks are pushed accurately in real time, and online working time maintenance is performed. After the maintenance is completed, the system performs calculations according to the defined rules of the process flow, thereby obtaining the total stamping working time of a single stamping part, thereby constructing the standardized working time of the stamping parts.

[0053] In one embodiment, referring to Figure 1 , Figure 1 This is a flow chart of the construction and application method of the stamping standard working time system for this application. Figure 1 As shown in the figure, the construction and application methods of the stamping standard working time system include:

[0054] S1: Standardize the basic processes and working hours of stamping parts. The forming process of stamping parts includes blanking, automatic or manual shearing, blank packaging, and stamping, and each forming process corresponds to a basic process.

[0055] S2: Based on the process rhythm and number of staff of the basic process, the basic process working hours of the basic process are calculated. According to the sum of the basic process working hours of all basic processes of the stamping parts and the benchmark time multiplier corresponding to the stamping parts, the total stamping working hours calculation logic of the stamping parts is constructed;

[0056] Specifically, for the current basic process, the process rhythm corresponding to the current basic process and the number of staff are multiplied to obtain the basic process working hours of the current basic process; for the current stamping part, the sum of all basic process working hours of all basic processes of the current stamping part is multiplied by the benchmark time multiplier of the current stamping part to calculate the total stamping working hours of the current stamping part;

[0057] S3: Construct a standard working time system according to the total stamping working time calculation logic, and based on the standard working time system and combined with the basic process of the current stamping part, realize the total stamping working time calculation of the current stamping part.

[0058] As shown in Table 1 below, a single stamping part includes four forming processes during the stamping operation, namely blanking, automatic or manual shearing, blank packaging, and stamping. Each forming process has at least one basic process. Specifically, the basic process of blanking includes overhead crane die changing, package opening, uncoiling line, and inspection; the basic process of automatic or manual shearing includes shearing operation; the basic process of blank packaging includes packaging; the basic process of stamping includes stamping line and overhead crane die changing.

[0059] Table 1

[0060]

[0061] Through the above operations, the standardized definition of basic processes is achieved.

[0062] Furthermore, the standardized definition of the basic process working hours for each basic process is as follows:

[0063] According to the process beat and number of staff for the overhead crane die change in the basic process of blanking, the basic process working hours of the overhead crane die change in the basic process of blanking are calculated;

[0064] According to the process rhythm and number of staff in the basic process of blanking, the basic process working hours of the package opening in the basic process of blanking are calculated;

[0065] According to the process beat and number of staff of the uncoiling line in the basic process of blanking, the basic process working hours of the uncoiling line in the basic process of blanking are calculated;

[0066] According to the process rhythm and number of staff in the basic process of blanking, the basic process working hours of the inspection in the basic process of blanking are calculated;

[0067] The basic process working hours of the shearing operation in the basic process of automatic or manual shearing are calculated based on the process takt time and number of staff for automatic shearing, as well as the process takt time and number of staff for manual shearing;

[0068] According to the process rhythm and number of staff in the basic process of blank packaging, the basic process working hours of the basic process of blank packaging are calculated;

[0069] According to the process rhythm and staffing number of the press line in the basic process of stamping forming, the basic process working hours of the press line in the basic process of stamping forming are calculated;

[0070] According to the process rhythm and number of staff for the overhead crane die change in the basic process of stamping forming, the basic process working hours of the overhead crane die change in the basic process of stamping forming are calculated.

[0071] The following is a detailed explanation of the basic process hours.

[0072] Regarding the basic process labor hours for the overhead crane die change in the basic blanking process, each stamped part is stamped and formed by a different die. Therefore, the corresponding die needs to be replaced before the stamping part is produced. Each die change takes a long time and needs to be evenly distributed to each stamped part. For example, as shown in Table 2 below, the conventional die change time is 25 minutes, each die change requires the cooperation of 2 people, and the average production is 600 pieces. Therefore, the process tact time of the overhead crane die change = 25 / 600 = 0.042 minutes / piece, and the basic process labor hours are process tact time * staffing = 0.042*2 = 0.084 minutes / piece.

[0073] Table 2

[0074]

[0075] For the basic process working hours of unpacking in the basic process of blanking, the initial supply state of the raw materials for stamping parts is coil material, and the coil material packaging needs to be unpacked. For example, as shown in Table 3 below, the coil material unpacking time is 10 minutes, the average production is 550 pieces, and the staff is 1 person. The process rhythm = 10 / 550, and the basic process working hours = 10 / 550*1.

[0076] Table 3

[0077]

[0078]

[0079] Regarding the basic process hours of the unwinding line, a basic process in blanking, after the raw material coils of stamping parts are unpacked, they need to be cut into sheets of different sizes on the unwinding line. The unwinding line cycle time depends on the length of the stamping part blank, or the pitch. The pitch is divided into four categories: small pitch, medium pitch, large pitch, and special pitch. Each pitch type has a different number of pieces per minute. The process cycle time = 1 / SPM (number of cuts per minute). The basic process hours = process cycle time * staffing. See Table 4 below for details.

[0080] Table 4

[0081]

[0082] The basic process time required for blanking inspections involves checking the dimensions and appearance of the cut sheets, which also requires staffing. Inspection is typically performed on the first sheet after cutting. For example, as shown in Table 5 below, if a single unwinding cycle is 250 sheets, the process cycle time = 1 / 250 = 0.02, and the basic process time = 0.02 * 1 = 0.02.

[0083] Table 5

[0084]

[0085] For the basic process working hours of the basic process cutting operation in automatic or manual cutting, after the stamping parts are uncoiled, some stamping parts cannot be cut into place in one time and require automatic or manual secondary cutting. For example, as shown in Table 6 below, the automatic cutting SPM is 2, the process takt is 0.5, and the manpower is 2, then the basic process working hours of automatic cutting = 0.5*2=1; the manual cutting SPM is 4, the process takt is 0.25, then the basic process working hours of manual cutting = 0.25*2=0.5. SPM in this application refers to standard production minutes.

[0086] Table 6

[0087]

[0088] Regarding the basic process working hours for packaging of blanks, the sheets need to be packaged after being cut. For example, as shown in Table 7 below, it takes one person 3 minutes to complete the packaging of a stack of materials. Therefore, the packaging process rhythm = 3 / 250 = 0.012, and the basic process working hours = 0.012*1 = 0.012.

[0089] Table 7

[0090]

[0091] Regarding the basic process hours for the press line, which is a basic process in stamping, the packaged sheets need to go through the stamping process before they can be transformed into stamped parts for welding. The press line forms the sheets through a series of dies into stamped parts. Due to the different specifications and structures of stamped parts, the process takt time and staffing for each stamping part are different. Based on the existing product types and structures, stamping parts are divided into seven types (see Table 8 below). The specific process takt time, staffing, and basic process hours are shown in Table 9 below.

[0092] Table 8

[0093] Serial number property Stamping part type 1 Oversized items Half row side panels, double row side panels, half row top panels, corrugated boards 2 Large items Side rear outer panel, single row side panel, 3 Suite 1 B19 door outer panel kit, 4 pieces per mold, 4 Suite Class 2 A08 side rear outer panel, 3 pieces per mold, longitudinal beam 5 Medium-sized piece 1 Front floor, single-row roof, door panels, fenders 6 Medium sized piece 2 Front panel, rear panel, rear floor, engine hood cover 7 Small items Other items

[0094] Table 9

[0095]

[0096]

[0097] Regarding the basic process hours for overhead crane die change in stamping, each stamping part has a corresponding forming die. The die needs to be changed before each stamping part is produced. The die change time is related to its storage location. A die change in the same bay takes 50 minutes, while a die change in a non-span takes 90 minutes. An average of 350 pieces can be produced with one die change. For example, Table 10 below shows this.

[0098] Table 10

[0099]

[0100] Furthermore, the benchmark time multiplier is a parameter used to measure the performance of the production line. Based on the measured total stamping working hours and the benchmark time of the stamping parts, the benchmark time multiplier of the stamping parts is calculated. The basic process working hours in this application are the time under theoretical conditions. There is waste of working time in actual production, such as the lack of work content and insufficient work of personnel, the addition of multiple inspections to the process to ensure quality, and the improvement of personnel product skills. Therefore, according to the characteristics of product molding, the basic series is sorted out, summarized and defined. The benchmark time multiplier of the basic series is obtained by measuring the working hours of the basic series parts and dividing them by the benchmark time of the series parts. As shown in Table 11 below, for the B19 supplementary series, the benchmark time multiplier of the left side outer panel of the stamping part 5401071-G0**** is 1.083. The subsequent stamping parts belonging to the B19 supplementary series all have a benchmark time multiplier of 1.083, thereby realizing the rapid measurement of the working hours of batch stamping parts.

[0101] Table 11

[0102]

[0103] Furthermore, in one embodiment, a standard working time system is constructed according to the total stamping working time calculation logic. Based on the standard working time system and in combination with the basic process of the current stamping part, the total stamping working time calculation of the current stamping part is realized, specifically including:

[0104] S301: Constructing a standard working hour system according to the total stamping working hour calculation logic;

[0105] S302: Based on the constructed standard working time system and combined with the basic process of the current stamping part, the total stamping working time of the current stamping part is calculated;

[0106] S303: BOM data tasks are associated to perform task dispatching. After the trial production of the whole vehicle, when the current stamping part is generated, the total stamping working hours of the current stamping part are obtained by calculation, and the basic process working hours of each basic process of the current stamping part are obtained by splitting.

[0107] Specifically, a standard working time system based on standard processes is constructed. This application designs the standard working time system from two aspects. The first is the construction of the standard working time system to solve the problems of traditional offline calculation mode and accuracy; the second is to associate BOM data for task distribution to solve the lag.

[0108] A basic database is constructed with 4 forming processes and 8 basic working procedures. The staffing, process rhythm and SPM of the basic working procedures are maintained in the basic database in sequence. Then, the basic working procedures to which each stamping part belongs are judged and selected in turn to complete the construction of the total stamping working hours for each part.

[0109] Tasks are assigned by associating BOM data with tasks. Regular maintenance of working hours occurs after vehicle trial production, while ideally, maintenance is performed after the release of the part preparation notice. Once the stamped part is produced, the standard working time system automatically captures the time data for maintenance. To address this lag, it's necessary to first understand the typical business process: R&D design data → Release of document design notice → Release of part preparation notice → Release of part near-completion notice → Release of vehicle and part production notice. Vehicle trial production begins after the release of the part preparation notice, while mass production of the vehicle occurs after any issues with the vehicle trial production have been resolved and part preparation is complete. After vehicle trial production, the process verifies working hours and reports them using a spreadsheet. This time impacts worker wages, and due to the large volume of parts, process verification can lead to lags. The solution is to push tasks after the preparation notice is released. After the part preparation notice is released, the part route attributes from the vehicle data are identified. The standard working time system identifies the manufacturing and assembly routes and pushes attributes such as the part number and name to the primary process in real time. The process then assigns working hours to the basic process based on the basic forming process.

[0110] After the production preparation notice creates a labor task, it generates labor object maintenance parameters, such as maintenance parameters for part secondary shearing, step selection, part attribute selection, and base time multiplier. After the maintenance is completed, the total stamping labor time for the stamping part can be calculated.

[0111] In a second aspect, the embodiments of the present application also provide a stamping standard working time system construction and application device.

[0112] In one embodiment, referring to Figure 2 , Figure 2 This is a functional module diagram of the construction and application device of the stamping standard working time system for this application. Figure 2As shown, the construction and application device of the stamping standard working time system includes: a definition module, a construction module, and an execution module.

[0113] The definition module is used to standardize the basic processes and basic process working hours of stamping parts. The forming process of the stamping parts during stamping includes blanking, automatic or manual shearing, blank packaging, and stamping forming, and each forming process corresponds to a basic process; the construction module is used to calculate the basic process working hours of the basic process based on the process rhythm and number of staff of the basic process, and construct the total stamping working hour calculation logic of the stamping parts according to the sum of the basic process working hours of all basic processes of the stamping parts and the benchmark time multiplier corresponding to the stamping parts; the execution module is used to construct a standard working hour system according to the total stamping working hour calculation logic, and based on the standard working hour system and combined with the basic process of the current stamping parts, realize the calculation of the total stamping working hour of the current stamping parts.

[0114] On the third aspect, an embodiment of the present application provides a device for constructing and applying a stamping standard working time system. The device for constructing and applying a stamping standard working time system can be a personal computer (PC), a laptop computer, a server, or other device with data processing capabilities.

[0115] Reference Figure 3 , Figure 3 The hardware structure diagram of the device for constructing and applying the standard working time system for stamping involved in the embodiment of the present application is shown in FIG. In the embodiment of the present application, the device for constructing and applying the standard working time system for stamping may include a processor, a memory, a communication interface, and a communication bus.

[0116] The communication bus may be of any type and is used to interconnect the processor, memory, and communication interface.

[0117] Communication interfaces include input / output (I / O) interfaces, physical interfaces, and logical interfaces, which are used to interconnect components within the stamping standard time system and its application equipment, as well as interfaces used to interconnect the stamping standard time system and its application equipment with other devices (such as other computing devices or user devices). Physical interfaces can be Ethernet, fiber optic, or ATM interfaces, while user devices can be displays, keyboards, and other devices.

[0118] The memory can be various types of storage media, such as random access memory (RAM), read-only memory (ROM), non-volatile RAM (NVRAM), flash memory, optical storage, hard disk, programmable ROM (PROM), erasable PROM (EPROM), electrically erasable PROM (EEPROM), etc.

[0119] The processor may be a general-purpose processor that can call the stamping standard working time system construction and application program stored in the memory and execute the stamping standard working time system construction and application method provided in the embodiments of the present application. For example, the general-purpose processor may be a central processing unit (CPU). The method executed when the stamping standard working time system construction and application program is called can refer to the various embodiments of the stamping standard working time system construction and application method of the present application, and will not be repeated here.

[0120] Those skilled in the art will understand that Figure 3 The hardware structure shown in the figure does not constitute a limitation to the present application and may include more or fewer components than shown in the figure, or a combination of certain components, or a different arrangement of components.

[0121] In a fourth aspect, an embodiment of the present application also provides a computer-readable storage medium.

[0122] The computer-readable storage medium of the present application stores a stamping standard working time system construction and application program, wherein when the stamping standard working time system construction and application program are executed by the processor, the steps of the stamping standard working time system construction and application method as described above are implemented.

[0123] Among them, the methods implemented when the stamping standard working time system is constructed and the application is executed can refer to the various embodiments of the stamping standard working time system construction and application method of this application, and will not be repeated here.

[0124] The terms "including" and "having" and any variations thereof in the specification and claims of this application and the above-mentioned drawings are intended to cover non-exclusive inclusions. For example, a process, method, system, product or device that includes a series of steps or units is not limited to the listed steps or units, but optionally includes steps or units that are not listed, or optionally includes other steps or units inherent to these processes, methods, products or devices. The terms "first", "second" and "third" are used to distinguish different objects, etc., and do not represent a sequence, nor do they limit the "first", "second" and "third" to different types.

[0125] In the description of the embodiments of this application, the words "exemplary," "for example," or "for example" are used to indicate examples, illustrations, or descriptions. Any embodiment or design described as "exemplary," "for example," or "for example" in the embodiments of this application should not be construed as being preferred or advantageous over other embodiments or designs. Rather, the use of words such as "exemplary," "for example," or "for example" is intended to present the relevant concepts in a concrete manner.

[0126] In the description of the embodiments of the present application, unless otherwise specified, “ / ” means or, for example, A / B can mean A or B; “and / or” in the text is merely a description of the association relationship of associated objects, indicating that three relationships may exist, for example, A and / or B can mean: A exists alone, A and B exist at the same time, and B exists alone. In addition, in the description of the embodiments of the present application, “multiple” refers to two or more than two.

[0127] In some processes described in the embodiments of the present application, multiple operations or steps are included that appear in a specific order. However, it should be understood that these operations or steps may not be performed in the order in which they appear in the embodiments of the present application or may be performed in parallel. The sequence numbers of the operations are only used to distinguish between different operations, and the sequence numbers themselves do not represent any order of execution. In addition, these processes may include more or fewer operations, and these operations or steps may be performed in sequence or in parallel, and these operations or steps may be combined.

[0128] Through the description of the above implementation methods, those skilled in the art can clearly understand that the above-mentioned embodiment methods can be implemented by means of software plus the necessary general hardware platform, of course, it can also be implemented by hardware, but in many cases the former is a better implementation method. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art, can be embodied in the form of a software product, which is stored in a storage medium (such as ROM / RAM, magnetic disk, optical disk) as described above, and includes a number of instructions for enabling a terminal device to execute the methods described in each embodiment of the present application.

[0129] The above are only preferred embodiments of the present application and do not limit the patent scope of the present application. Any equivalent structure or equivalent process transformation made using the contents of the present application specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present application.

Claims

1. A method for constructing and applying a stamping standard working time system, characterized in that: The method for constructing and applying the stamping standard working time system includes: Standardize the basic processes and working hours of stamping parts. The forming process of stamping parts includes blanking, automatic or manual shearing, blank packaging, and stamping, and each forming process corresponds to a basic process. Based on the process rhythm and number of staff of the basic process, the basic process working hours of the basic process are calculated. According to the sum of the basic process working hours of all basic processes of the stamping parts and the corresponding benchmark time multiplier of the stamping parts, the total stamping working hours calculation logic of the stamping parts is constructed; A standard working time system is constructed according to the total stamping working time calculation logic. Based on the standard working time system and combined with the basic process of the current stamping part, the total stamping working time calculation of the current stamping part is realized.

2. A method for constructing and applying a stamping standard working time system according to claim 1, characterized in that: The basic process of blanking includes overhead crane die change, package opening, uncoiling line and inspection; The basic process of automatic or manual shearing includes shearing operation; The basic process of blank packaging includes packaging; The basic process of stamping forming includes stamping line and overhead crane die changing.

3. The method for constructing and applying a standard stamping time system according to claim 2, wherein: According to the process beat and number of staff for the overhead crane die change in the basic process of blanking, the basic process working hours of the overhead crane die change in the basic process of blanking are calculated; According to the process rhythm and number of staff in the basic process of blanking, the basic process working hours of the package opening in the basic process of blanking are calculated; According to the process beat and number of staff of the uncoiling line in the basic process of blanking, the basic process working hours of the uncoiling line in the basic process of blanking are calculated; According to the process rhythm and number of staff for inspection in the basic process of blanking, the basic process working hours for inspection in the basic process of blanking are calculated.

4. The method for constructing and applying a standard stamping time system according to claim 2, wherein: The basic process working hours of the shearing operation in the basic process of automatic or manual shearing are calculated based on the process takt time and number of staff for automatic shearing, as well as the process takt time and number of staff for manual shearing; According to the process rhythm and number of staff in the basic process of blank packaging, the basic process working hours of the basic process of blank packaging are calculated.

5. The method for constructing and applying a standard stamping time system according to claim 2, characterized in that: According to the process rhythm and staffing number of the press line in the basic process of stamping forming, the basic process working hours of the press line in the basic process of stamping forming are calculated; According to the process rhythm and number of staff for the overhead crane die change in the basic process of stamping forming, the basic process working hours of the overhead crane die change in the basic process of stamping forming are calculated.

6. The method for constructing and applying a standard stamping time system according to claim 1, characterized in that: The reference time multiplier is a parameter used to measure the performance of a production line. The reference time multiplier of a stamping part is calculated based on the actual total stamping working hours of the stamping part and the reference time.

7. The method for constructing and applying a standard stamping time system according to claim 1, wherein: The standard working time system is constructed according to the total stamping working time calculation logic. Based on the standard working time system and in combination with the basic process of the current stamping part, the total stamping working time calculation of the current stamping part is realized, specifically including: Constructing a standard working time system based on the total stamping working time calculation logic; Based on the constructed standard working time system and combined with the basic working procedures of the current stamping parts, the total stamping working time of the current stamping parts can be calculated; Tasks are assigned based on the association of BOM data tasks. After the trial production of the entire vehicle, when the current stamping parts are generated, the total stamping hours of the current stamping parts are calculated and split to obtain the basic process hours of each basic process of the current stamping parts.

8. A device for constructing and applying a stamping standard working time system, characterized in that: The stamping standard working time system construction and application device includes: A definition module is used to standardize the basic processes and working hours of stamping parts. The forming process of stamping parts includes blanking, automatic or manual shearing, blank packaging, and stamping, and each forming process corresponds to a basic process; A construction module is used to calculate the basic process working hours of the basic process based on the process rhythm and number of staff of the basic process. The total stamping working hours calculation logic of the stamping part is constructed based on the sum of the basic process working hours of all basic processes of the stamping part and the benchmark time multiplier corresponding to the stamping part. An execution module is used to construct a standard working time system according to the total stamping working time calculation logic, and based on the standard working time system and combined with the basic process of the current stamping part, realize the total stamping working time calculation of the current stamping part.

9. A stamping standard working time system construction and application equipment, characterized in that: The stamping standard working time system construction and application device includes a processor, a memory, and a stamping standard working time system construction and application program stored on the memory and executable by the processor, wherein when the stamping standard working time system construction and application program is executed by the processor, the steps of the stamping standard working time system construction and application method as described in any one of claims 1 to 7 are implemented.

10. A computer-readable storage medium, characterized in that The computer-readable storage medium stores a stamping standard working time system construction and application program, wherein when the stamping standard working time system construction and application program are executed by a processor, the steps of the stamping standard working time system construction and application method as described in any one of claims 1 to 7 are implemented.