Flexible photovoltaic steel cable laying construction equipment

Through mechanical automation laying of steel cables for cable delivery and traction equipment, the problems of inefficient and safety risks of artificial cable penetration in flexible photovoltaic projects are solved, efficient and safe steel cable laying is achieved, and the construction progress of the photovoltaic project is promoted.

CN120504214APending Publication Date: 2025-08-19TIANJIN JIANRONG TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510865722.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-06-26
Publication Date
2025-08-19

AI Technical Summary

Technical Problem

In flexible photovoltaic projects, artificial cable penetration has problems of inefficiency and safety risks, especially in complex terrain, where steel cable laying is difficult and dangerous.

Method used

The cable conveying equipment and traction equipment are used to automatically unfold and traction steel cables through mechanical equipment, replacing manual operations, including crawler conveyors, cable conveying generator sets, winding devices and traction hydraulic pump stations, and automatic laying of steel cables is realized.

Benefits of technology

It improves the efficiency of steel cable laying, reduces the labor intensity and safety risks of personnel, changes the construction rhythm of flexible photovoltaic projects, and promotes the early start of photovoltaic projects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120504214A_ABST
    Figure CN120504214A_ABST
Patent Text Reader

Abstract

The invention discloses steel cable laying construction equipment in a flexible photovoltaic system, relates to the technical field of mechanical equipment, and solves the problems that in a flexible photovoltaic project, manual cable penetrating has risks and is low in efficiency, a steel cable penetrates through a plurality of photovoltaic supports, one end of the steel cable is wound around cable feeding equipment, and the other end of the steel cable is wound around the cable feeding equipment; the other end of the steel cable is connected with a steel wire rope on traction equipment; the cable feeding equipment can automatically unfold a whole roll of steel strands (steel cables) according to a set speed; the main function of the traction equipment is that a matched traction rope (a flexible plastic-coated steel wire rope) is utilized to pull a steel rope from the head end to the tail end of the photovoltaic support according to set traction tension; mechanical equipment is used for replacing manual cable penetrating, and a worker only needs to operate the mechanical equipment to achieve the effects of assisting, monitoring and controlling; the cable feeding device and the traction device are adopted to replace manual cable penetrating, the cable distributing and penetrating efficiency is improved, and the labor intensity of workers and the safety risk are reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of mechanical equipment, and in particular to flexible photovoltaic steel cable laying construction equipment. Background Art

[0002] Currently, flexible photovoltaic projects use two parallel flexible steel cables (typically steel strands) to support and secure photovoltaic panels. The cables typically range in diameter from 8mm to 21.6mm. These cables are delivered to the photovoltaic project site in coils bound with steel straps. The coiled steel strands are manually routed and threaded through the photovoltaic support system's side posts, multiple intermediate supports, and finally the terminal side posts. The entire span, which ranges from over 100 meters to over 1,000 meters, is manually dragged and pulled. The heavy weight and high rigidity of the steel cables make manual dragging difficult. Furthermore, photovoltaic projects are often constructed in mountainous areas or in the wild, creating complex terrain, further increasing the difficulty and safety risks of manual cable threading. Furthermore, the cables must be threaded through fixed slots / holes at the top of the support, which typically range from 2 meters to 7.5 meters above the ground. Manual cable threading requires personnel to manually thread the cables at each support. Summary of the Invention

[0003] In view of the problem that manual cable laying is risky and inefficient in the above-mentioned flexible photovoltaic projects, the purpose of the present invention is to provide a flexible photovoltaic cable laying construction equipment.

[0004] In order to achieve the above object, the technical solution adopted by the present invention is:

[0005] A flexible photovoltaic steel cable laying construction equipment, which includes: a cable feeding device, a traction device, a steel cable and a photovoltaic bracket. One end of the steel cable is wound on the cable feeding device, and the other end of the steel cable is connected to the steel wire rope on the traction device; the cable feeding device transports the steel cable forward at a constant speed at the head end of the photovoltaic bracket, and the traction device provides traction through the steel wire rope at the tail end of the photovoltaic bracket to drag the steel cable, so that the steel cable passes through multiple photovoltaic brackets.

[0006] The cable feeding equipment includes: a crawler conveyor 1, a cable feeding generator set 3, a cable feeding hydraulic pump station 6 and a cable feeding walking chassis 9. The crawler conveyor 1, the cable feeding generator set 3 and the cable feeding hydraulic pump station 6 are all installed on the cable feeding walking chassis 9. The crawler conveyor 1 is used to feed the steel cable to the traction equipment, the cable feeding walking chassis 9 is used to drive the walking, the cable feeding generator set 3 is used to supply energy to all electrical mechanisms of the cable feeding equipment, and the cable feeding hydraulic pump station 6 is used to drive all hydraulic mechanisms of the cable feeding equipment;

[0007] The traction equipment includes: a winding device 10, a traction hydraulic pump station 11, a power distribution cabinet 12, a traction walking chassis 13, a wire arrangement mechanism mounting seat 14, a wire arrangement mechanism 15 and a traction generator set 16. The winding device 10, the traction hydraulic pump station 11, the power distribution cabinet 12, the wire arrangement mechanism mounting seat 14 and the traction generator set 16 are all installed on the traction walking chassis 13; the winding device 10 is used to wind the wire rope to pull the steel rope, and the wire arrangement mechanism 15 is slidably installed on the wire arrangement mechanism mounting seat 14; the wire arrangement mechanism 15 is used to adjust the winding position of the wire rope on the winding device 10; the traction hydraulic pump station 11 is used to drive all hydraulic mechanisms of the traction equipment, the traction generator set 16 is used to supply energy to all electrical mechanisms of the traction equipment, and the power distribution cabinet 12 is used to distribute electrical energy.

[0008] The above-mentioned flexible photovoltaic cable laying construction equipment, wherein the cable feeding walking chassis 9 includes: a cable feeding chassis steel frame 901, a cable feeding opening and closing telescopic oil cylinder 902, a cable feeding walking crawler 903, a cable feeding lifting oil cylinder 904, a cable feeding crawler bracket 905, a cable feeding crawler hydraulic motor 906, a cable feeding chassis mounting bracket 907 and a conveyor sliding track 908. The cable feeding chassis steel frame 901 is provided with two parallel outer sleeves, and the two cable feeding crawler brackets 905 are symmetrically arranged on the left and right. The two rectangular steel pipes of each cable feeding crawler bracket 905 are respectively inserted into an outer sleeve; the cylinder bodies of the four cable feeding opening and closing telescopic oil cylinders 902 are all installed on the cable feeding chassis steel frame 901 and are symmetrically arranged on the left and right. The cylinder rod ends of the two cable feeding opening and closing telescopic oil cylinders 902 on the same side are hinged to the cable feeding crawler bracket 905 on the same side. The two cable feeding opening and closing telescopic oil cylinders 902 located on the same side are used to drive the cable feeding crawler bracket 905 on the same side to move along the outer sleeve; the cable feeding chassis mounting bracket 907 is installed on the cable feeding chassis steel frame 901; the cable feeding chassis mounting bracket 907 is installed with a conveyor sliding track 908 for installing the crawler conveyor 1; the four corners of the cable feeding chassis steel frame 901 are installed with cable feeding lifting oil cylinders 904, and the four cable feeding lifting oil cylinders 904 are used to realize the lifting and lowering of the cable feeding chassis steel frame 901; each cable feeding crawler 903 is assembled on the driving wheel and the driven wheel of a cable feeding crawler bracket 905, and each cable feeding crawler bracket 905 is installed with a cable feeding crawler hydraulic motor 906, and the cable feeding crawler hydraulic motor 906 is used to drive the driving wheel to rotate and thereby realize the walking of the cable feeding crawler 903.

[0009] The above-mentioned flexible photovoltaic cable laying construction equipment, wherein the cable feeding equipment also includes: a grab jig 4, the cable feeding walking chassis 9 also includes: a grab jig walking screw 909, and two coaxially arranged grab jig walking screws 909 are installed on the cable feeding chassis mounting bracket 907; the grab jig 4 includes: a rotating shaft sleeve 401, a grab jig mounting seat 402, a support claw 403 and a limit plate 404, the two grab jig mounting seats 402 are symmetrically arranged front and rear, each grab jig mounting seat 402 is slidably installed on a grab jig walking screw 909 through a screw nut and a limiting slide rail, each limit plate 404 is rotatably installed on a grab jig mounting seat 402 through a rotating shaft sleeve 401, and the inner side of each limit plate 404 is installed with a support claw 403 for limiting the cable drum 5.

[0010] The above-mentioned flexible photovoltaic steel cable laying construction equipment, wherein the crawler conveyor 1 includes: a conveyor support frame, a conveyor upper crawler 101, a conveyor lower crawler 102, a conveyor lifting cylinder 103 and a conveyor limiting roller 104, the conveyor support frame is slidingly installed on the conveyor sliding rail 908; the conveyor upper crawler 101 and the conveyor lower crawler 102 are both installed on the conveyor support frame, and the conveyor upper crawler 101 is arranged above the conveyor lower crawler 102; the conveyor limiting roller 104 is installed on the conveyor support frame, and the conveyor limiting roller 104 is used to limit the steel cable, the steel cable is located between the conveyor upper crawler 101 and the conveyor lower crawler 102, and the conveyor upper crawler 101 and the conveyor lower crawler 102 are used to convey the steel cable.

[0011] The above-mentioned flexible photovoltaic steel cable laying construction equipment, wherein the clamping device 2 includes: a clamping device mounting seat 201, a lower clamping plate 202, an upper clamping plate 203, a micro-anisotropic oil cylinder 204 and a clamping device limiting roller 205, the clamping device mounting seat 201 is installed on the conveyor support frame, the micro-anisotropic oil cylinder 204 and the lower clamping plate 202 are both installed on the clamping device mounting seat 201, the upper clamping plate 203 is installed at the driving end of the micro-anisotropic oil cylinder 204 and is located above the lower clamping plate 202; the clamping device limiting roller 205 is installed on the clamping device mounting seat 201, the clamping device limiting roller 205 is used to limit the steel cable, and the steel cable is located between the upper clamping plate 203 and the lower clamping plate 202.

[0012] The above-mentioned flexible photovoltaic steel cable laying construction equipment, wherein the cable feeding equipment also includes: hydraulic scissors 7 and a main shaft variable frequency motor 8, the main shaft variable frequency motor 8 is used to drive the gripping jig 4 to drive the steel cable drum 5 to rotate, the cable feeding generator set 3, the cable feeding hydraulic pump station 6 and the hydraulic scissors 7 are all installed on the cable feeding chassis mounting bracket 907, and the hydraulic scissors 7 are used to cut the steel cable.

[0013] The above-mentioned flexible photovoltaic cable laying construction equipment, wherein the traction walking chassis 13 includes: a traction chassis steel frame 1301, a traction walking track 1302, a traction crawler bracket 1303, a traction opening and closing telescopic oil cylinder 1304, a traction jacking oil cylinder 1305 and a traction crawler hydraulic motor 1306, the traction chassis steel frame 1301 is provided with two parallel outer sleeves, the two traction crawler brackets 1303 are symmetrically arranged on the left and right, and the two rectangular steel pipes of each traction crawler bracket 1303 are respectively inserted into an outer sleeve; the cylinder bodies of the four traction opening and closing telescopic oil cylinders 1304 are all installed on the traction chassis steel frame 1301 and are symmetrically arranged on the left and right, and the two traction opening and closing telescopic oil cylinders 1304 on the same side The ends of the cylinder rods are hinged to the traction crawler bracket 1303 on the same side; the two traction opening and closing telescopic cylinders 1304 located on the same side are used to drive the traction crawler bracket 1303 on the same side to move along the outer casing; the four corners of the traction chassis steel frame 1301 are installed with traction jacking cylinders 1305, and the four traction jacking cylinders 1305 are used to realize the lifting and lowering of the traction chassis steel frame 1301; each traction walking crawler 1302 is assembled on the driving wheel and the driven wheel of a traction crawler bracket 1303, and each traction crawler bracket 1303 is installed with a traction crawler hydraulic motor 1306, which is used to drive the driving wheel to rotate and thereby realize the walking of the traction walking crawler 1302.

[0014] The above-mentioned flexible photovoltaic steel cable laying construction equipment, wherein the winding device 10 includes: a winding sliding seat 1001, a winding fixed seat 1002, a winding limit plate 1003, a roller 1004 and a winding mounting frame 1005, the winding mounting frame 1005 is installed on the traction chassis steel frame 1301, the winding fixed seat 1002 is installed on the winding mounting frame 1005, the winding sliding seat 1001 is slidably installed on the winding mounting frame 1005, and the winding fixed seat 1002 and the winding sliding seat 1001 are both equipped with rotatable winding limit plates 1003, the two winding limit plates 1003 are coaxially arranged, and the two winding limit plates 1003 are used to clamp and limit the roller 1004.

[0015] The above-mentioned flexible photovoltaic cable laying construction equipment, wherein the cable arrangement mechanism mounting seat 14 includes: a column 1401, a mounting plate 1402 and a cable arrangement displacement slide rail 1403, the lower ends of the two columns 1401 are connected to the traction chassis steel frame 1301, the two ends of the mounting plate 1402 are respectively connected to the upper ends of the two columns 1401, and the upper surface of the mounting plate 1402 is installed with a cable arrangement displacement slide rail 1403.

[0016] The above-mentioned flexible photovoltaic cable laying construction equipment, wherein the cable arrangement mechanism 15 includes: a cable arrangement fixing plate 1501, a pressure wheel 1502, a positioning guide roller 1503, a damping wheel 1504 and a handle 1505, the cable arrangement fixing plate 1501 is slidably installed on the cable arrangement displacement slide rail 1403, and a positioning guide roller 1503 for limiting the wire rope is installed at both ends of the cable arrangement fixing plate 1501, two damping wheels 1504 are installed on the cable arrangement fixing plate 1501, and the two damping wheels 1504 are located below the wire rope, and the handle 1505 is installed on the cable arrangement fixing plate 1501 by threaded rotation, and the pressure wheel 1502 is installed at the lower end of the handle 1505, and the pressure wheel 1502 is located above the wire rope, and the pressure wheel 1502 is moved downward in the vertical direction by rotating the handle to compress the wire rope above the two damping wheels 1504.

[0017] Due to the adoption of the above technology, the present invention has the following positive effects compared with the prior art:

[0018] (1) In the present invention, a steel cable passes through multiple photovoltaic brackets, one end of the steel cable is wound on a cable feeding device, and the other end of the steel cable is connected to a steel wire rope on a traction device; the cable feeding device is capable of automatically unfolding a whole roll of steel strand (steel cable) according to a set speed; the main function of the traction device is to use a matching traction rope (flexible plastic-coated steel wire rope) to pull the steel cable from the head end to the tail end of the photovoltaic bracket according to a set traction force; mechanical equipment is used to replace manual cable threading, and personnel only need to operate the mechanical equipment to play the role of assistance, monitoring, and control;

[0019] (2) In the present invention, the cable feeding equipment and the pulling equipment are used to replace the manual cable threading, thereby improving the efficiency of cable laying and threading, reducing the labor intensity and safety risks of personnel, changing the overall construction rhythm of the new flexible photovoltaic project, improving the overall efficiency, and providing favorable support for the early commissioning of the photovoltaic project engineering equipment. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a schematic diagram of an implementation of a flexible photovoltaic cable laying construction equipment of the present invention.

[0021] Figure 2 It is a structural schematic diagram of a cable feeding device of a flexible photovoltaic steel cable laying construction equipment of the present invention.

[0022] Figure 3 yes Figure 2 Front view of the cable feeding equipment.

[0023] Figure 4 yes Figure 2 Top view of the cable feeding equipment.

[0024] Figure 5 yes Figure 2Schematic diagram of the structure of the cable feeding walking chassis of the mid-cable feeding equipment.

[0025] Figure 6 yes Figure 2 Schematic diagram of the assembly of the crawler conveyor, clamping device and grabbing jig of the cable feeding equipment on the cable feeding walking chassis.

[0026] Figure 7 yes Figure 6 Side view of .

[0027] Figure 8 yes Figure 6 Top view of .

[0028] Figure 9 It is a structural schematic diagram of a traction device of a flexible photovoltaic steel cable laying construction equipment of the present invention.

[0029] Figure 10 yes Figure 9 Top view of the traction equipment.

[0030] Figure 11 yes Figure 9 Assembly diagram of the cable arrangement mechanism of the traction equipment.

[0031] Figure 12 yes Figure 9 Schematic diagram of the structure of the traction walking chassis of the traction equipment.

[0032] In the attached figure: 1. crawler conveyor; 2. clamping device; 3. cable feeding generator set; 4. gripping fixture; 5. cable drum; 6. cable feeding hydraulic pump station; 7. hydraulic shears; 8. main shaft frequency conversion motor; 9. cable feeding chassis; 10. winding device; 11. traction hydraulic pump station; 12. power distribution cabinet; 13. traction chassis; 14. cable arrangement mechanism mounting base; 15. cable arrangement mechanism; 16. traction generator set; 101. conveyor Upper crawler belt; 102, conveyor lower crawler belt; 103, conveyor lifting cylinder; 104, conveyor limit roller; 201, clamping device mounting seat; 202, lower clamping plate; 203, upper clamping plate; 204, micro-heterogeneous oil cylinder; 205, clamping device limit roller; 401, rotating shaft sleeve; 402, gripper fixture mounting seat; 403, support claw; 404, limit plate; 901, cable feed chassis steel frame; 902, cable feed opening Telescopic oil cylinder; 903; Cable feeding crawler; 904, Cable feeding lifting oil cylinder; 905, Cable feeding crawler bracket; 906, Cable feeding crawler hydraulic motor; 907, Cable feeding chassis mounting bracket; 908, Conveyor sliding track; 909, Gripping jig walking screw; 1001, Winding sliding seat; 1002, Winding fixed seat; 1003, Winding limit plate; 1004, Roller; 1005, Winding mounting frame; 1301, Traction chassis steel frame; 1302, traction walking track; 1303, traction track bracket; 1304, traction opening and closing telescopic cylinder; 1305, traction lifting cylinder; 1306, traction track hydraulic motor; 1401, column; 1402, mounting plate; 1403, cable displacement slide rail; 1501, cable fixing plate; 1502, pressure wheel; 1503, positioning guide roller; 1504, damping wheel; 1505, handle. DETAILED DESCRIPTION

[0033] The present invention will be further described below with reference to the accompanying drawings and specific embodiments, but they are not intended to limit the present invention.

[0034] Please refer to Figures 1 to 12 The figure shows a flexible photovoltaic cable laying construction equipment. To free up manpower, mechanical equipment replaces manual cable threading. Personnel only need to operate the mechanical equipment to play the role of assistance, monitoring, and control. It includes: cable feeding equipment, traction equipment, steel cable and photovoltaic brackets. The steel cable passes through multiple photovoltaic brackets. One end of the steel cable is wrapped around the cable feeding equipment, and the other end is connected to the steel wire rope on the traction equipment. The cable feeding equipment is capable of automatically unwinding the entire coil of steel strand (steel cable) according to the set speed. The main function of the traction equipment is to use the matching traction rope (flexible plastic-coated steel wire rope) to pull the steel cable from the head end to the tail end of the photovoltaic bracket according to the set traction tension.

[0035] The cable feeding equipment includes: a crawler conveyor 1, a cable feeding generator set 3, a cable feeding hydraulic pump station 6 and a cable feeding walking chassis 9. The crawler conveyor 1, the cable feeding generator set 3 and the cable feeding hydraulic pump station 6 are all installed on the cable feeding walking chassis 9. The crawler conveyor 1 is used to feed the steel cable to the traction equipment, the cable feeding walking chassis 9 is used to drive the walking, the cable feeding generator set 3 is used to supply energy to all the electrical mechanisms of the cable feeding equipment, and the cable feeding hydraulic pump station 6 is used to drive all the hydraulic mechanisms of the cable feeding equipment; among them, the cable feeding equipment needs to solve the problem of controllable unwinding and unfolding of 4.5-ton steel strands. The size of the incoming coil of this steel strand is: 1.5 meters in diameter, 800 mm in width, about 800 mm in inner hollow diameter, and a total weight of about 4.5 tons. It is a hollow coil without a support reel; moreover, the steel strands The stranded wire itself has very high elasticity and hardness. After the trapped steel belt is cut off, the steel strand will pop out like a spring. Therefore, when unwinding, a device is needed to keep control of the continuously unfolded steel strand and control the linear speed of unwinding. When unwinding, the entire roll of steel strand also requires an external damping force to prevent the entire roll of steel strand from rotating freely, otherwise it will become loose during the unwinding process. In addition, after the steel strand is threaded, it is necessary to perform a tensioning action on the steel cable, that is, to tighten the entire threaded steel cable to a preset tension value, and then fix the steel cable with a locking clamp on the outside of the two side columns. Then during this tensioning process, the cable feeding equipment also needs to have a clamping function to firmly grasp the steel cable and provide a clamping force for the traction equipment at the tail end to tension the steel cable.

[0036] The traction equipment includes: a winding device 10, a traction hydraulic pump station 11, a power distribution cabinet 12, a traction traveling chassis 13, a wire arrangement mechanism mounting base 14, a wire arrangement mechanism 15, and a traction generator set 16. The winding device 10, the traction hydraulic pump station 11, the power distribution cabinet 12, the wire arrangement mechanism mounting base 14, and the traction generator set 16 are all mounted on the traction traveling chassis 13. The winding device 10 is used to wind the wire rope for traction. The wire arrangement mechanism 15 is slidably mounted on the wire arrangement mechanism mounting base 14. The wire arrangement mechanism 15 is used to adjust the winding position of the wire rope on the winding device 10. The traction hydraulic pump station 11 is used to drive all hydraulic mechanisms of the traction equipment. The traction generator set 16 is used to power all electrical mechanisms of the traction equipment. The power distribution cabinet 12 is used for power distribution. The main problems that need to be solved in the traction equipment are to provide controllable traction force and control the arrangement of the flexible traction wire rope during winding and unwinding. The final motor output torque is calculated based on the real-time winding radius and the set traction force. In addition, protection and alarm controls for special operating conditions such as overload and stall must also be considered.

[0037] Furthermore, because photovoltaic projects typically install panels in rows, flexible cables are also spaced apart. Both our cable delivery and traction equipment must be capable of autonomous mountaineering operations and independent power supply. Once a set of two cables is threaded and secured, the equipment moves to the next workstation to continue construction. This autonomous operation requires comprehensive consideration of mountain operations, climbing angles, stability on sloping surfaces, maneuverability, and rollover prevention.

[0038] Road transport of the equipment also required a solution. During transport, the maximum width of the equipment could not exceed 3.2 meters, and the height could not exceed 3 meters. However, considering the equipment's stability during tilting and the inherent layout limitations of the device, the crawler chassis needed to be designed with a retractable width. The feeder belt and clamping mechanism on the upper portion of the cable feeder were designed to ride on a set of retractable guide rails driven by pneumatic cylinders. During transport, both crawler tracks are retracted to their narrowest position, and the feeder belt and clamping mechanism are also retracted into the equipment by pneumatic cylinders for easy transportation.

[0039] Furthermore, due to the large span of the cable, which often crosses mountainous terrain and obstacles, and the need for real-time synchronization and coordination between the cable feeding and traction equipment, real-time wireless communication and data transmission between the host devices at both ends is required. Furthermore, all operations must be remotely controlled wirelessly by a host computer (a handheld mobile control terminal). The host computer can be held by the operator, allowing them to monitor the rigging's progress and the traction status in real time.

[0040] Furthermore, in a preferred embodiment, the cable feeding walking chassis 9 includes: a cable feeding chassis steel frame 901, a cable feeding opening and closing telescopic oil cylinder 902, a cable feeding walking crawler 903, a cable feeding lifting oil cylinder 904, a cable feeding crawler bracket 905, a cable feeding crawler hydraulic motor 906, a cable feeding chassis mounting bracket 907 and a conveyor sliding track 908. Two parallel outer sleeves are provided on the cable feeding chassis steel frame 901, and the two cable feeding crawler brackets 905 are symmetrically arranged on the left and right. The two rectangular steel pipes of each cable feeding crawler bracket 905 are respectively inserted into an outer sleeve; the cylinder bodies of the four cable feeding opening and closing telescopic oil cylinders 902 are all installed on the cable feeding chassis steel frame 901 and are symmetrically arranged on the left and right. The cylinder rod ends of the two cable feeding opening and closing telescopic oil cylinders 902 on the same side are hinged to the cable feeding crawler bracket 905 on the same side; The two cable feeding opening and closing telescopic oil cylinders 902 on the same side are used to drive the cable feeding crawler bracket 905 on the same side to move along the outer sleeve; the cable feeding chassis mounting bracket 907 is installed on the cable feeding chassis steel frame 901; the cable feeding chassis mounting bracket 907 is installed with a conveyor sliding track 908 for installing the crawler conveyor 1; the four corners of the cable feeding chassis steel frame 901 are installed with cable feeding lifting oil cylinders 904, and the four cable feeding lifting oil cylinders 904 are used to realize the lifting and lowering of the cable feeding chassis steel frame 901; each cable feeding walking crawler 903 is assembled on the driving wheel and the driven wheel of a cable feeding crawler bracket 905, and each cable feeding crawler bracket 905 is installed with a cable feeding crawler hydraulic motor 906, which is used to drive the driving wheel to rotate and thereby realize the walking of the cable feeding walking crawler 903.

[0041] Furthermore, in a preferred embodiment, the cable feeding device also includes: a grab-type jig 4, the cable feeding walking chassis 9 also includes: a grab-type jig walking screw 909, and two coaxially arranged grab-type jig walking screws 909 are installed on the cable feeding chassis mounting bracket 907; the grab-type jig 4 includes: a rotating shaft sleeve 401, a grab-type jig mounting seat 402, a support claw 403 and a limit plate 404, the two grab-type jig mounting seats 402 are symmetrically arranged front and rear, each grab-type jig mounting seat 402 is slidably installed on a grab-type jig walking screw 909 through a screw nut and a limiting slide rail, and each limiting plate 404 is rotatably installed on a grab-type jig mounting seat 402 through a rotating shaft sleeve 401, and a support claw 403 for limiting the cable drum 5 is installed on the inner side of each limiting plate 404.

[0042] Furthermore, in a preferred embodiment, the crawler conveyor 1 includes: a conveyor support frame, an upper conveyor belt 101, a lower conveyor belt 102, a conveyor lifting cylinder 103 and a conveyor limiting roller 104, and the conveyor support frame is slidingly installed on the conveyor sliding rail 908; the upper conveyor belt 101 and the lower conveyor belt 102 are both installed on the conveyor support frame, and the upper conveyor belt 101 is arranged above the lower conveyor belt 102; the conveyor limiting roller 104 is installed on the conveyor support frame, and the conveyor limiting roller 104 is used to limit the steel cable, and the steel cable is located between the upper conveyor belt 101 and the lower conveyor belt 102, and the upper conveyor belt 101 and the lower conveyor belt 102 are used to convey the steel cable.

[0043] Furthermore, in a preferred embodiment, the clamping device 2 includes: a clamping device mounting seat 201, a lower clamping plate 202, an upper clamping plate 203, a miniature anisotropic oil cylinder 204 and a clamping device limiting roller 205. The clamping device mounting seat 201 is installed on the conveyor support frame, the miniature anisotropic oil cylinder 204 and the lower clamping plate 202 are both installed on the clamping device mounting seat 201, the upper clamping plate 203 is installed at the driving end of the miniature anisotropic oil cylinder 204 and is located above the lower clamping plate 202; the clamping device limiting roller 205 is installed on the clamping device mounting seat 201, and the clamping device limiting roller 205 is used to limit the steel cable, and the steel cable is located between the upper clamping plate 203 and the lower clamping plate 202.

[0044] Furthermore, in a preferred embodiment, the cable feeding equipment also includes: hydraulic scissors 7 and a main shaft variable frequency motor 8, the main shaft variable frequency motor 8 is used to drive the gripping jig 4 to drive the steel cable drum 5 to rotate, the cable feeding generator set 3, the cable feeding hydraulic pump station 6 and the hydraulic scissors 7 are all installed on the cable feeding chassis mounting bracket 907, and the hydraulic scissors 7 are used to cut the steel cable.

[0045] Furthermore, in a preferred embodiment, the traction walking chassis 13 includes: a traction chassis steel frame 1301, a traction walking track 1302, a traction crawler bracket 1303, a traction opening and closing telescopic oil cylinder 1304, a traction jacking oil cylinder 1305 and a traction crawler hydraulic motor 1306. The traction chassis steel frame 1301 is provided with two parallel outer sleeves, and the two traction crawler brackets 1303 are symmetrically arranged on the left and right. The two rectangular steel pipes of each traction crawler bracket 1303 are respectively inserted into an outer sleeve; the cylinder bodies of the four traction opening and closing telescopic oil cylinders 1304 are all installed on the traction chassis steel frame 1301 and are symmetrically arranged on the left and right. The cylinder rods of the two traction opening and closing telescopic oil cylinders 1304 on the same side The ends are hinged to the traction crawler bracket 1303 on the same side; the two traction opening and closing telescopic cylinders 1304 located on the same side are used to drive the traction crawler bracket 1303 on the same side to move along the outer casing; the four corners of the traction chassis steel frame 1301 are equipped with traction jacking cylinders 1305, and the four traction jacking cylinders 1305 are used to realize the lifting and lowering of the traction chassis steel frame 1301; each traction walking crawler 1302 is assembled on the driving wheel and the driven wheel of a traction crawler bracket 1303, and each traction crawler bracket 1303 is installed with a traction crawler hydraulic motor 1306, which is used to drive the driving wheel to rotate and thereby realize the walking of the traction walking crawler 1302.

[0046] Furthermore, in a preferred embodiment, the winding device 10 includes: a winding sliding seat 1001, a winding fixed seat 1002, a winding limit plate 1003, a roller 1004 and a winding mounting frame 1005, the winding mounting frame 1005 is installed on the traction chassis steel frame 1301, the winding fixed seat 1002 is installed on the winding mounting frame 1005, the winding sliding seat 1001 is slidably installed on the winding mounting frame 1005, and the winding fixed seat 1002 and the winding sliding seat 1001 are both equipped with rotatable winding limit plates 1003, the two winding limit plates 1003 are coaxially arranged, and the two winding limit plates 1003 are used to clamp and limit the roller 1004.

[0047] Furthermore, in a preferred embodiment, the cable arrangement mechanism mounting seat 14 includes: a column 1401, a mounting plate 1402 and a cable arrangement displacement slide rail 1403, the lower ends of the two columns 1401 are connected to the traction chassis steel frame 1301, the two ends of the mounting plate 1402 are respectively connected to the upper ends of the two columns 1401, and the upper surface of the mounting plate 1402 is installed with a cable arrangement displacement slide rail 1403.

[0048] Furthermore, in a preferred embodiment, the wire arrangement mechanism 15 includes: a wire arrangement fixing plate 1501, a pressure wheel 1502, a positioning guide roller 1503, a damping wheel 1504 and a handle 1505. The wire arrangement fixing plate 1501 is slidably installed on the wire arrangement displacement slide rail 1403. A positioning guide roller 1503 for limiting the wire rope is installed at both ends of the wire arrangement fixing plate 1501. Two damping wheels 1504 are installed on the wire arrangement fixing plate 1501. The two damping wheels 1504 are located below the wire rope. The handle 1505 is installed on the wire arrangement fixing plate 1501 by threaded rotation. The pressure wheel 1502 is installed at the lower end of the handle 1505. The pressure wheel 1502 is located above the wire rope. The pressure wheel 1502 is moved downward in the vertical direction by rotating the handle to compress the wire rope above the two damping wheels 1504.

[0049] The above are only preferred embodiments of the present invention and are not intended to limit the implementation and protection scope of the present invention.

[0050] The present invention also has the following implementation modes based on the above:

[0051] In a further embodiment of the present invention, the cable-feeding walking chassis 9 and the traction walking chassis 13 adopt the same chassis design method, referring to the solution of the crawler chassis of the excavator, and taking advantage of the crawler chassis's high center bottom and good passability. At the same time, a new central load-bearing main beam is specially designed, equipped with 4 sets of jacking mechanisms and 4 sets of telescopic mechanisms. The function of the jacking mechanism is to use 4 sets of hydraulic cylinders to lift the entire crawler chassis together with the upper equipment off the ground, so as to facilitate the lateral telescopic adjustment of the width of the crawlers on both sides; the 4 sets of telescopic mechanisms are two crawlers on both sides, which are driven by two sets of telescopic hydraulic cylinders to move laterally and telescope as a whole. In order to ensure that the telescopic mechanism has sufficient load-bearing capacity, a square outer sleeve made of steel plates is used, and the interior is in the form of a rectangular square tube.

[0052] In a further embodiment of the present invention, the cable feed generator set 3 and the traction generator set 16 utilize the same power supply method, both of which are equipped with diesel generator sets, and the generator sets provide a unified power source. The power distribution control cabinet drives and controls the hydraulic pump station, variable frequency motor, valve body, cylinder, air pump, and other devices.

[0053] In a further embodiment of the present invention, the cable feeding device unwinds using a prefabricated gripper 4 with electrically openable and closed sides. The gripper 4 comprises six internal sets of support claws 403 and a limit plate 404. The limit plate 404 is made of steel plate, and the support claws 403 are welded from a square tube. The gripper 4 is entirely welded from a steel plate, a square tube, and a rotating sleeve 404. This provides clamping support and lateral fixation for the coiled steel strand (steel cable), preventing the strand from unwinding or becoming tangled during unwinding.

[0054] In a further embodiment of the present invention, the gripper jig 4 is rotatably mounted on a gripper jig mounting base 402 via a central rotating shaft sleeve 404 and an axis. The gripper jig mounting base 402 is mounted on a set of horizontally movable guide rails. The gripper jig mounting base 402 is capable of horizontal movement along the guide rails via a gripper jig travel screw 909 at its base and a drive motor, thereby enabling the gripper jig 4 to open and close. The gripper jig mounting base 402 on one side is equipped with a motor, a reducer, and a brake chuck that drive the limit plate 404. The gripper jig 4 drives the cable drum 5 through vector frequency conversion damping to passively unwind.

[0055] In a further embodiment of the present invention, in order to prevent the uncontrolled unwinding and ejection of the steel strand, a crawler conveyor 1 consisting of two groups of wide belts that can be opened and closed is also provided. The crawler conveyor 1 is composed of two upper and lower groups of wide belts that can rotate independently. The belts are driven by a motor and a reducer and can be frequency-controlled. The opening and closing of the belts are driven by a set of conveyor lifting cylinders 103. The upper belt bracket of the conveyor crawler 101 slides up and down on the plated round steel by two sets of guide bearings on the back to achieve positioning lifting and guiding. During operation, the upper and lower belts are driven by the conveyor lifting cylinders 103 to clamp the steel cable and provide unwinding traction. The entrance and exit of the crawler are provided with positioning and guiding guide rollers to control the feeding of the steel cable along the conveying direction of the crawler. Because the cable drum 5 is connected to the unwinding main shaft variable frequency motor 8 via the gripper jig 4, the unwinding variable frequency motor, controlled by the inverter, constantly provides a damping magnetic field to prevent the cable drum 5 from rotating. When the crawler conveyor is running, the belt provides a pulling force to the steel strands sufficient to overcome the damping magnetic field of the unwinding variable frequency motor. At this time, the steel strands are controlled to be unwound from the cable drum 5 in an orderly and constant speed, thus achieving constant and controllable cable feeding.

[0056] In a further embodiment of the present invention, the clamping device 2 comprises a micro-shaped hydraulic cylinder 204, a matching clamping device mounting base 201, upper and lower clamping plates, and a clamping device limiting roller 205. When the cable needs to be tensioned, the micro-shaped hydraulic cylinder 204 drives the upper clamping plate 203 downward, which cooperates with the lower clamping plate 202 to clamp the cable, thereby securing the cable to the cable feeding device. Because the cable feeding device is very heavy (over 10 tons), it provides sufficient overall clamping force to cooperate with the tail-end pulling device to tension the rigging.

[0057] In a further embodiment of the present invention, since the crawler conveyor 1 and the clamping device 2 must be arranged in sequence on a line and must be opposite to the center line of the cable drum 5, and ensure that there is a certain distance between the entrance of the crawler conveyor 1 and the edge of the cable drum 5, because the steel strand is particularly hard, the steel strand cannot be irreversibly bent due to excessive bending when it is unfolded; so the overall width of this combination in the working state will exceed the allowable transportation width of the equipment, so an independent set of brackets is used for the crawler conveyor and the clamping device, and a retractable guide rail is used to connect this bracket to the vehicle body bracket, and the extension and retraction are driven by the cable feeding opening and closing telescopic cylinder 902; it is unfolded in the working state and retracted in the transportation state.

[0058] In a further embodiment of the present invention, the traction device primarily rotates a welded drum 1004, driven by a variable frequency motor driving a reducer. A flexible steel wire rope is wound around drum 1004, the head end of which is secured to the inner wall of drum 1004. The traction force is provided by the rope wound around the drum. Vector control of the frequency converter, combined with a PLC's calculation of the real-time radius of the rope wound around drum 1004, generates a torque value that can be controlled in real time based on the tension set on the touchscreen.

[0059] In a further embodiment of the present invention, taking into account the different traction distances in the later stage, the drum 1004 for winding the traction rope is replaceable and detachable, so one end of the clamping drum 1004 is a winding sliding seat 1001 that can be opened horizontally, and the other side is a winding fixed seat 1002. After the winding sliding seat 1001 is opened, the drum 1004 can be completely removed.

[0060] In a further embodiment of the present invention, a cable arrangement mechanism 15 driven by a servo motor is provided to ensure that the traction ropes are neatly arranged when being retracted and released. The mechanism mainly comprises a servo motor, a precision ball screw, a guide linear bearing, a cable arrangement mechanism mounting base 14, a pressure wheel 1502, and a damping wheel 1504.

[0061] In a further embodiment of the present invention, the rotation of the drum 1004 can be jogged, and the forward / reverse jogging can enter the forward winding traction operation mode. In the operation mode, the drum drive inverter will switch to the torque mode; the real-time output is automatically controlled according to the set tension.

[0062] In a further embodiment of the present invention, the efficiency of cable laying and threading is improved, the labor intensity of personnel is reduced, and the safety risk is reduced.

[0063] In a further embodiment of the present invention, the overall construction rhythm of the new flexible photovoltaic project is changed, the overall efficiency is improved, and favorable support is provided for the early commissioning of the photovoltaic project engineering equipment.

[0064] In a further embodiment of the present invention, the grab jig 4 is slidably installed on the cable feeding walking chassis 9 by means of a screw nut, and the two grab jig walking screws 909 are driven to rotate separately by a motor to realize the approach and distance of the two grab jig mounting seats 402. When it is necessary to clamp the cable drum 5, the two grab jig mounting seats 402 first move away from each other. After the cable drum 5 is moved between the two limit disks 404, the two grab jig mounting seats 402 approach each other until the two limit disks 404 respectively rest against the front and rear end surfaces of the cable drum 5. The support claws 403 on the inner sides of the two limit disks 404 are used to support the cable drum 5 and cooperate with each other. The main shaft frequency conversion motor 8 is used to drive the two limit disks 404 and the cable drum 5 to rotate.

[0065] In a further embodiment of the present invention, the crawler conveyor 1 is slidably installed on the cable chassis mounting bracket 907 along the conveyor sliding track 908. During the rotation of the cable drum 5, the outer diameter of the cable drum 5 gradually decreases as the cable is gradually pulled out. The crawler conveyor 1 slides along the conveyor sliding track 908 to adapt to the cable drums 5 with different outer diameters.

[0066] In a further embodiment of the present invention, the steel cable is located between the upper conveyor belt 101 and the lower conveyor belt 102. The upper conveyor belt 101 and the lower conveyor belt 102 both adopt a single motor-driven crawler mechanism. The upper conveyor belt 101 and the lower conveyor belt 102 can work together to pull the steel cable. The upper conveyor belt 101 can be raised and lowered in the vertical direction under the joint action of the two conveyor lifting cylinders 103 to adjust the distance between the upper conveyor belt 101 and the lower conveyor belt 102, which is suitable for steel cables of different specifications.

[0067] In a further embodiment of the present invention, the upper clamping plate 203 and the lower clamping plate 202 cooperate with each other. Driven by the micro-anisotropic oil cylinder 204, the upper clamping plate 203 can press the steel cable onto the lower clamping plate 202 to achieve the clamping function.

[0068] In a further embodiment of the present invention, the steel cable is limited by providing a conveyor limiting roller 104 and a clamping device limiting roller 205 to ensure that the steel cable must pass through the crawler conveyor 1 and the clamping device 2 during the cable feeding process.

[0069] In a further embodiment of the present invention, the hydraulic scissors 7 are suspended on the cable feeding walking chassis 9 and driven to open and close by a hydraulic cylinder to achieve shearing of the steel cable.

[0070] In a further embodiment of the present invention, the cable fixing plate 1501 is slidably installed on the mounting plate 1402 through the cable displacement slide rail 1403, and the cable fixing plate 1501 is driven by a motor to reciprocate along the cable displacement slide rail 1403 to adjust the winding arrangement of the wire rope on the drum 1004.

[0071] In a further embodiment of the present invention, the cable arrangement mechanism 15 is as follows: Figure 11 As shown, the clamping wheel 1502 is located on the vertical symmetry line of the two damping wheels 1504. By rotating the handle 1505, the clamping wheel 1502 can be moved downward to compress the wire rope.

[0072] In a further embodiment of the present invention, the winding sliding seat 1001 adopts the same screw nut sliding mechanism as the gripping jig 4 to realize the sliding of the winding sliding seat 1001, and its cooperation with the winding fixed seat 1002 to load and unload the roller 1004 and drive the rotation is the same as the principle of loading and unloading and driving the rotation of the steel cable drum 5 by the gripping jig 4.

[0073] In a further embodiment of the present invention, Figure 1 As shown, during the installation process of the photovoltaic bracket, a steel wire rope is passed through it, one end of the steel wire rope is wound on the traction device, a steel cable drum 5 is installed on the cable feeding device, and the other end of the steel wire rope is connected to the steel cable of the steel cable drum 5. The cable feeding device is used to drive the steel cable drum 5 to unfold, and the cable feeding device is used to tighten the steel wire rope, pulling the steel cable of the steel cable drum 5 along the walking path of the steel wire rope to pass through the photovoltaic bracket in sequence until the cable insertion is completed, and the hydraulic scissors 7 cut the steel cable of the steel cable drum 5.

[0074] The above are only preferred embodiments of the present invention and do not limit the implementation mode and protection scope of the present invention. For those skilled in the art, it should be aware that all solutions obtained by equivalent substitutions and obvious changes made using the description and illustrations of the present invention should be included in the protection scope of the present invention.

Claims

1. A flexible photovoltaic cable laying construction equipment, characterized in that: include: Cable feeding equipment, traction equipment, steel cable and photovoltaic bracket, the steel cable passes through multiple photovoltaic brackets, one end of the steel cable is wrapped around the cable feeding equipment, and the other end of the steel cable is connected to the steel wire rope on the traction equipment; The cable feeding equipment comprises: a crawler conveyor (1), a cable feeding generator set (3), a cable feeding hydraulic pump station (6) and a cable feeding walking chassis (9); the crawler conveyor (1), the cable feeding generator set (3) and the cable feeding hydraulic pump station (6) are all installed on the cable feeding walking chassis (9); the crawler conveyor (1) is used to feed the steel cable to the traction equipment; the cable feeding walking chassis (9) is used to drive the traveling; the cable feeding generator set (3) is used to supply energy to all electrical mechanisms of the cable feeding equipment; and the cable feeding hydraulic pump station (6) is used to drive all hydraulic mechanisms of the cable feeding equipment; The traction equipment comprises: a winding device (10), a traction hydraulic pump station (11), a power distribution cabinet (12), a traction travel chassis (13), a wire arrangement mechanism mounting seat (14), a wire arrangement mechanism (15) and a traction generator set (16); the winding device (10), the traction hydraulic pump station (11), the power distribution cabinet (12), the wire arrangement mechanism mounting seat (14) and the traction generator set (16) are all mounted on the traction travel chassis (13); the winding device (10) is used to wind a steel wire rope to pull the steel rope, the wire arrangement mechanism (15) is slidably mounted on the wire arrangement mechanism mounting seat (14); the wire arrangement mechanism (15) is used to adjust the winding position of the steel wire rope on the winding device (10); the traction hydraulic pump station (11) is used to drive all hydraulic mechanisms of the traction equipment, the traction generator set (16) is used to supply energy to all electrical mechanisms of the traction equipment, and the power distribution cabinet (12) is used to distribute electrical energy.

2. The flexible photovoltaic steel cable laying construction equipment according to claim 1, characterized in that: The cable feeding walking chassis (9) comprises: a cable feeding chassis steel frame (901), a cable feeding opening and closing telescopic oil cylinder (902), a cable feeding walking crawler (903), a cable feeding lifting oil cylinder (904), a cable feeding crawler bracket (905), a cable feeding crawler hydraulic motor (906), a cable feeding chassis mounting bracket (907) and a conveyor sliding track (908). The cable feeding chassis steel frame (901) is provided with two parallel outer sleeves. The two cable feeding crawler brackets (905) are symmetrically arranged on the left and right. The two rectangular steel pipes of each cable feeding crawler bracket (905) are respectively inserted into one outer sleeve; the cylinder bodies of the four cable feeding opening and closing telescopic oil cylinders (902) are all installed on the cable feeding chassis steel frame (901) and are symmetrically arranged on the left and right. The cylinder rod ends of the two cable feeding opening and closing telescopic oil cylinders (902) on the same side are both hinged to the cable feeding crawler bracket (905) on the same side; the two cable feeding crawler brackets on the same side are respectively hinged to the cable feeding crawler bracket (905) on the same side. The cable opening and closing telescopic oil cylinder (902) is used to drive the cable feeding crawler bracket (905) on the same side to move along the outer sleeve; the cable feeding chassis mounting bracket (907) is mounted on the cable feeding chassis steel frame (901); a conveyor sliding track (908) for mounting the crawler conveyor (1) is mounted on the cable feeding chassis mounting bracket (907); the four corners of the cable feeding chassis steel frame (901) are all mounted with cable feeding lifting oil cylinders (904), and the four cable feeding lifting oil cylinders (904) are used to realize the lifting and lowering of the cable feeding chassis steel frame (901); each cable feeding crawler (903) is assembled on the driving wheel and the driven wheel of a cable feeding crawler bracket (905), and each cable feeding crawler bracket (905) is equipped with a cable feeding crawler hydraulic motor (906), and the cable feeding crawler hydraulic motor (906) is used to drive the driving wheel to rotate and thereby realize the walking of the cable feeding crawler (903).

3. The flexible photovoltaic steel cable laying construction equipment according to claim 2, characterized in that: The cable feeding device further comprises: a gripping jig (4); the cable feeding walking chassis (9) further comprises: a gripping jig walking screw (909); two coaxially arranged gripping jig walking screws (909) are installed on the cable feeding chassis mounting bracket (907); the gripping jig (4) comprises: a rotating shaft sleeve (401), a gripping jig mounting seat (402), a supporting claw (403) and a limiting plate (404); the two gripping jig mounting seats (402) are symmetrically arranged front and rear; each gripping jig mounting seat (402) is slidably mounted on a gripping jig walking screw (909) through a screw nut and a limiting slide rail; each limiting plate (404) is rotatably mounted on a gripping jig mounting seat (402) through a rotating shaft sleeve (401); and a supporting claw (403) for limiting the position of the cable drum (5) is installed on the inner side of each limiting plate (404).

4. The flexible photovoltaic steel cable laying construction equipment according to claim 3, characterized in that: The crawler conveyor (1) comprises: a conveyor support frame, an upper conveyor crawler (101), a lower conveyor crawler (102), a conveyor lifting cylinder (103) and a conveyor limiting roller (104); the conveyor support frame is slidingly mounted on a conveyor sliding track (908); the upper conveyor crawler (101) and the lower conveyor crawler (102) are both mounted on the conveyor support frame, and the upper conveyor crawler (101) is arranged above the lower conveyor crawler (102); the conveyor limiting roller (104) is mounted on the conveyor support frame, and the conveyor limiting roller (104) is used to limit the steel cable, and the steel cable is located between the upper conveyor crawler (101) and the lower conveyor crawler (102), and the upper conveyor crawler (101) and the lower conveyor crawler (102) are used to convey the steel cable.

5. The flexible photovoltaic steel cable laying construction equipment according to claim 4, characterized in that: The clamping device (2) comprises: a clamping device mounting seat (201), a lower clamping plate (202), an upper clamping plate (203), a micro-heterogeneous oil cylinder (204) and a clamping device limiting roller (205); the clamping device mounting seat (201) is mounted on a conveyor support frame; the micro-heterogeneous oil cylinder (204) and the lower clamping plate (202) are both mounted on the clamping device mounting seat (201); the upper clamping plate (203) is mounted on the driving end of the micro-heterogeneous oil cylinder (204) and is located above the lower clamping plate (202); the clamping device limiting roller (205) is mounted on the clamping device mounting seat (201); the clamping device limiting roller (205) is used to limit the position of the steel cable; the steel cable is located between the upper clamping plate (203) and the lower clamping plate (202).

6. The flexible photovoltaic steel cable laying construction equipment according to claim 5, characterized in that: The cable feeding equipment further comprises: a hydraulic scissors (7) and a main shaft variable frequency motor (8), wherein the main shaft variable frequency motor (8) is used to drive the gripping jig (4) to drive the steel cable drum (5) to rotate, and the cable feeding generator set (3), the cable feeding hydraulic pump station (6) and the hydraulic scissors (7) are all mounted on a cable feeding chassis mounting bracket (907), and the hydraulic scissors (7) are used to cut the steel cable.

7. The flexible photovoltaic steel cable laying construction equipment according to claim 1, characterized in that: The traction walking chassis (13) comprises: a traction chassis steel frame (1301), a traction walking crawler (1302), a traction crawler bracket (1303), a traction opening and closing telescopic oil cylinder (1304), a traction jacking oil cylinder (1305) and a traction crawler hydraulic motor (1306). The traction chassis steel frame (1301) is provided with two parallel outer sleeves. The two traction crawler brackets (1303) are symmetrically arranged on the left and right. The two rectangular steel pipes of each traction crawler bracket (1303) are respectively inserted into one outer sleeve; the cylinder bodies of the four traction opening and closing telescopic oil cylinders (1304) are all installed on the traction chassis steel frame (1301) and are symmetrically arranged on the left and right. The cylinder rod ends of the two traction opening and closing telescopic oil cylinders (1304) on the same side are both connected to the cylinder rods on the same side. The traction crawler bracket (1303) is hinged; the two traction opening and closing telescopic cylinders (1304) located on the same side are used to drive the traction crawler bracket (1303) on the same side to move along the outer casing; the four corners of the traction chassis steel frame (1301) are equipped with traction jacking cylinders (1305), and the four traction jacking cylinders (1305) are used to realize the lifting and lowering of the traction chassis steel frame (1301); each traction walking crawler (1302) is assembled on the driving wheel and the driven wheel of a traction crawler bracket (1303), and each traction crawler bracket (1303) is equipped with a traction crawler hydraulic motor (1306), and the traction crawler hydraulic motor (1306) is used to drive the driving wheel to rotate and thereby realize the walking of the traction walking crawler (1302).

8. The flexible photovoltaic steel cable laying construction equipment according to claim 7, characterized in that: The winding device (10) comprises: a winding sliding seat (1001), a winding fixed seat (1002), a winding limiting plate (1003), a roller (1004) and a winding mounting frame (1005); the winding mounting frame (1005) is mounted on a traction chassis steel frame (1301); the winding fixed seat (1002) is mounted on the winding mounting frame (1005); the winding sliding seat (1001) is slidingly mounted on the winding mounting frame (1005); the winding fixed seat (1002) and the winding sliding seat (1001) are both mounted with rotatable winding limiting plates (1003); the two winding limiting plates (1003) are coaxially arranged, and the two winding limiting plates (1003) are used to clamp and limit the roller (1004).

9. The flexible photovoltaic steel cable laying construction equipment according to claim 8, characterized in that: The cable arrangement mechanism mounting seat (14) comprises: a column (1401), a mounting plate (1402) and a cable arrangement displacement slide rail (1403), wherein the lower ends of the two columns (1401) are connected to the traction chassis steel frame (1301), the two ends of the mounting plate (1402) are respectively connected to the upper ends of the two columns (1401), and the cable arrangement displacement slide rail (1403) is installed on the upper surface of the mounting plate (1402).

10. The flexible photovoltaic steel cable laying construction equipment according to claim 9, characterized in that: The wire arrangement mechanism (15) comprises: a wire arrangement fixing plate (1501), a pressure wheel (1502), a positioning guide roller (1503), a damping wheel (1504) and a handle (1505). The wire arrangement fixing plate (1501) is slidably mounted on the wire arrangement displacement slide rail (1403). A positioning guide roller (1503) for limiting the position of the wire rope is mounted on each of the two ends of the wire arrangement fixing plate (1501). Two damping wheels (1504) are located below the steel wire rope. The handle (1505) is installed on the cable fixing plate (1501) by screw rotation. The pressure wheel (1502) is installed at the lower end of the handle (1505). The pressure wheel (1502) is located above the steel wire rope. By rotating the handle, the pressure wheel (1502) moves downward in the vertical direction to compress the steel wire rope located above the two damping wheels (1504).