Transfer switching-on method and device

By obtaining the historical power value of the transfer line in the event of a fault and calculating the transfer load of the backup power supply, the judgment of transfer and closing is simplified, the grid safety and power supply reliability are improved, and the problem of high complexity of the existing methods is solved.

CN120546016APending Publication Date: 2025-08-26XUCHANG XUJI DRIESCHER WEGBERG ELECTRIC
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202510531580.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-04-25
Publication Date
2025-08-26

AI Technical Summary

Technical Problem

The existing transfer and closing methods are complex, and it is necessary to judge the load value and the status of the contact switch, resulting in high operating complexity.

Method used

By controlling the downstream protection device on the fault side to start up in the event of a fault, the power value of the transfer line before the set number of sampling periods is obtained, the transfer load can be calculated using the backup power capacity and the current power, and the contact switch is controlled to close when the transfer load is greater than the line power.

Benefits of technology

The transfer and closing method is simplified, the judgment accuracy and grid safety are improved, the backup power supply capacity meets the power supply demand of non-fault sections, and the risk of grid failure spreading is reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120546016A_ABST
    Figure CN120546016A_ABST
Patent Text Reader

Abstract

The invention relates to a transfer switching-on method and device, and belongs to the field of power distribution network automatic protection. The method comprises the following steps: when the power distribution network has a fault, controlling a protection device at the downstream of the fault side to start protection, and recording the starting time of the protection device; obtaining a power value of the wheeling line before a set number of sampling periods at the starting moment; determining a transfer load of the standby power supply according to the capacity of the standby power supply and the current power value of the standby power supply; and when the transfer load of the standby power supply is greater than the power value of the transfer line, controlling the standby power supply to switch on an interconnection switch for supplying power to the transfer line. According to the invention, the criterion for whether to carry out wheeling is only one of the power value of the wheeling line before the sampling period of the set number at the starting moment and the wheeling load of the standby power supply, so that compared with the prior art, the complexity of the wheeling switching-on method can be reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a power transfer closing method and device, and belongs to the field of power distribution network automation protection. Background Art

[0002] The power transfer closing method is a technology that transfers the load from the faulty line to the backup line to ensure the continuity and stability of power supply. It is usually used in distribution networks.

[0003] Feeder automation is a crucial component of smart distribution networks. It automatically locates, isolates, and restores power to faulty sections of distribution network lines. After successful fault isolation, the load capacity of the transfer line and the capacity of the backup power source must be considered. If the transfer line is overloaded (also known as overload), and the backup power source capacity cannot meet the power supply needs of the non-faulty sections, the tie switch in its off position should not be closed, and the non-faulty sections cannot be restored.

[0004] The Chinese invention patent application publication with application publication number CN113572258A discloses a distributed FA transfer method, system and storage medium that considers the line load capacity. The method locates the fault point, determines the upstream switch and downstream switch of the fault point to isolate the fault point; obtains the first load value before the downstream switch is opened, the power capacity of the selected transfer line and the second load value of its first switch; calculates the transfer allowable load value of the transfer line according to the power capacity of the transfer line and the second load value of its first switch; compares the first load value with the transfer allowable load value to determine whether the connecting switch corresponding to the transfer line is in a single-sided pressure loss state. If the first load value is less than or equal to the transfer allowable load value and the connecting switch is in a single-sided pressure loss state, the connecting switch is actuated to close. The present invention considers the carrying capacity of the distribution network line after the transfer, and then determines whether the connecting switch is actuated, thereby solving the overload problem of the transfer distribution network line caused by not considering the load carrying capacity of the transfer line.

[0005] Although this solution can solve the overload problem of the transfer distribution network line caused by not considering the load-bearing capacity of the transfer line, in this solution, since it is necessary to judge the size of the first load value and the transfer allowable load value, it is also necessary to judge whether the connecting switch corresponding to the transfer line is in a single-side pressure loss state in order to decide whether the connecting switch needs to perform an opening and closing action, there is a problem of complex transfer closing method. Summary of the Invention

[0006] The purpose of the present invention is to provide a power transfer closing method and device to solve the problem of complex power transfer closing methods in the prior art.

[0007] To achieve the above object, the solution of the present invention includes: A power transfer and closing method of the present invention comprises the following steps: Step 1): When a fault occurs in the distribution network, control the protection device downstream of the fault side to start protection and record the start time of the protection device; Step 2): Obtain the power value of the transfer line before the set number of sampling periods at the start time; Step 3): Determine the load that can be transferred by the backup power source based on the capacity of the backup power source and the current power value of the backup power source; Step 4): When the transferable load of the backup power supply is greater than the power value of the transfer line, the connecting switch used by the backup power supply to supply power to the transfer line is controlled to close.

[0008] Furthermore, the number is set to 3.

[0009] Furthermore, in step 2), the data sampling pointer at the start time is recorded; the voltage value and current value 3 sampling cycles ago in the buffer are obtained by pushing the sampling pointer forward 3 cycles or 3 sampling points from the start time, and the power value of the transfer line is calculated based on the obtained voltage value and current value.

[0010] Furthermore, step 2) further includes transmitting the power value of the transfer line to the primary switch protection device on the backup power supply side; In step 3), the first switch protection device on the backup power supply side determines the load that can be transferred by the backup power supply based on the capacity of the backup power supply and the current power value of the backup power supply; In step 4), when the transferable load of the backup power source is greater than the power value of the transfer line, the first switch protection device on the backup power source side sends a transfer permission signal to the tie switch to control the tie switch to close.

[0011] Furthermore, the transfer closing method also includes: transmitting the power value of the transfer line to the first switch protection device on the backup power supply side through the GOOSE network.

[0012] Furthermore, the transferable load of the backup power supply is the difference between the capacity of the backup power supply and the current power value of the backup power supply.

[0013] A power transfer closing device of the present invention includes a processor, which executes a computer program to implement the following method steps: Step 1): When a fault occurs in the distribution network, control the protection device downstream of the fault side to start protection and record the start time of the protection device; Step 2): Obtain the power value of the transfer line before the set number of sampling periods at the start time; Step 3): Determine the load that can be transferred by the backup power source based on the capacity of the backup power source and the current power value of the backup power source; Step 4): When the transferable load of the backup power supply is greater than the power value of the transfer line, the connecting switch used by the backup power supply to supply power to the transfer line is controlled to close.

[0014] Furthermore, the number is set to 3.

[0015] Furthermore, in step 2), the data sampling pointer at the start time is recorded; the voltage value and current value 3 sampling cycles ago in the buffer are obtained by pushing the sampling pointer forward 3 cycles or 3 sampling points from the start time, and the power value of the transfer line is calculated based on the obtained voltage value and current value.

[0016] Furthermore, it also includes transmitting the power value of the transfer line to the first switch protection device on the backup power supply side through the GOOSE network.

[0017] Furthermore, the transferable load of the backup power supply is the difference between the capacity of the backup power supply and the current power value of the backup power supply.

[0018] The beneficial effects of the present invention are as follows: as a pioneering invention, the present invention provides a transfer closing method and device, which first controls the protection device downstream of the fault side to start protection when a fault occurs in the distribution network, thereby isolating the power grid fault and reducing the further spread of the fault; then, by obtaining the power of the transfer line a set number of sampling cycles before the protection device starts, the power of the current transfer line can be accurately evaluated, which is beneficial to improving the accuracy of the judgment of whether it is overloaded and improving the safety of the power grid; then, the transferable load of the backup power supply is determined according to the capacity of the backup power supply and the current power value of the backup power supply; finally, when the transferable load of the backup power supply is greater than the power value of the transfer line, the connecting switch of the backup power supply used to supply power to the transfer line is controlled to close, so that when the remaining capacity of the backup power supply can meet the power supply demand of the non-fault section, the backup power supply can supply power to the transfer line, and when the remaining capacity of the backup power supply cannot meet the power supply demand of the non-fault section, the backup power supply does not supply power to the transfer line. While taking into account the overload problem of the transfer distribution network line caused by the load carrying capacity of the transfer line, the present invention only uses the criterion of the size between the power value of the transfer line a set number of sampling cycles before the start time and the transferable load of the backup power supply to decide whether to transfer. Therefore, compared with the existing technology, the present invention can reduce the complexity of the transfer closing method. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a flow chart of a power transfer and closing method provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0020] In order to make the objectives, technical solutions and advantages of the present invention more clear, the present invention is further described in detail below with reference to the accompanying drawings and embodiments.

[0021] The idea of ​​the present invention is to determine whether the first switch protection device on the backup power supply side needs to perform opening and closing actions based on the characteristic that the load on the downstream switch side of the fault side is equal to the total load of the lines in the non-fault area.

[0022] According to Kirchhoff's first law, when a fault occurs in the distribution network, the load on the downstream side of the fault area is equal to the load in the area to be transferred. Based on this feature, when a fault occurs, the power value of the normal operation of the downstream switch on the fault side is sent to the first switch protection device on the backup power supply side as the line's allowable transfer load. If the load that can be transferred by the first switch protection device on the backup power supply side is greater than the allowable transfer load received, the first switch protection device on the backup power supply side sends a transfer permission signal to the contact switch. When the contact switch in the open position receives the transfer permission signal, it closes and completes the fault recovery of the non-fault section. If the load that can be transferred by the first switch protection device is less than the allowable transfer load received, the first switch protection device on the backup power supply side does not send a transfer permission signal. The contact switch in the open position is no longer closed, and the fault in the non-fault section is no longer recovered.

[0023] The present invention provides a power transfer and closing method and device. In a distribution network, based on the characteristic that the load on the downstream switch side of the fault side is equal to the sum of the line loads in the non-fault area, when a distribution network line fails, the load on the downstream switch on the fault side is the actual load of the power transfer line. The first switch protection device on the backup power supply side can compare the transfer load with the line's allowed transfer load in advance to decide whether to send a transfer permission signal and whether the connecting switch should transfer and close.

[0024] Specifically: first, by controlling the protection device downstream of the fault side to start protection when a fault occurs in the distribution network, the grid fault can be isolated and the further spread of the fault can be reduced; then, by obtaining the power of the transfer line a set number of sampling cycles before the protection device starts, the power of the current transfer line can be accurately evaluated, which is conducive to improving the accuracy of the judgment of whether it is overloaded and improving the safety of the power grid; then, the transferable load of the backup power supply is determined according to the capacity of the backup power supply and the current power value of the backup power supply; finally, when the transferable load of the backup power supply is greater than the power value of the transfer line, the connecting switch of the backup power supply used to supply power to the transfer line is controlled to close, so that when the remaining capacity of the backup power supply can meet the power supply demand of the non-fault section, the backup power supply can supply power to the transfer line, and when the remaining capacity of the backup power supply cannot meet the power supply demand of the non-fault section, the backup power supply will not supply power to the transfer line.

[0025] An embodiment of a power transfer closing method: Figure 1 FIG. 1 is a flow chart of a power transfer and closing method provided by an embodiment of the present invention, such as Figure 1 As shown, the power transfer closing method includes the following steps 1) to 4).

[0026] Specifically, in step 1), when a fault occurs in the distribution network, the protection device downstream of the fault side is controlled to start protection, and the start time of the protection device is recorded.

[0027] When a fault occurs in the distribution network, the fault can be isolated by controlling the protection device downstream of the fault side to start protection.

[0028] Fault isolation can quickly remove the faulty area from the grid, preventing abnormal conditions like short-circuit currents and overvoltages from spreading to non-faulty areas. This reduces the risk of cascading equipment damage and maintains overall grid stability. By quickly locating and isolating the faulty section, normal power supply to non-faulty areas is maintained to the greatest extent possible, minimizing power outages and economic losses for users, and improving power supply reliability.

[0029] Step 2) Obtain the power value V of the transfer line before the number of sampling cycles set for the start time of the protection device. 转 .

[0030] Among them, the number of sampling periods can be set according to actual conditions, and the present invention does not impose any special restrictions on this. The power of the transfer line before the start-up moment of the protection device is unstable and cannot truthfully reflect the transfer load allowed by the transfer line under normal circumstances. If the power of the transfer line before the start-up moment of the protection device is directly used, the risk of misjudgment will increase, which may easily lead to power grid failure. Therefore, it is necessary to find the size of the transfer load allowed by the transfer line under normal circumstances in order to improve the accuracy of the transfer closing method. In general, the power value of the transfer line before a certain number of sampling periods at the start-up moment will be selected as the transfer load (i.e., power) of the transfer line to accurately reflect the transfer load allowed by the transfer line under normal circumstances. After repeated research, the power value V of the transfer line before 3 sampling periods is 转 Therefore, this embodiment will be described in detail below by taking the number of 3 as an example. 转 The acquisition can be carried out by directly acquiring the power value, or by first acquiring the voltage and current values ​​and then calculating the power value based on the voltage and current values, etc. The present invention does not make any special limitation on this. The following is an exemplary explanation using the method of first acquiring the voltage and current values ​​and then calculating the power value based on the voltage and current values.

[0031] Specifically, under normal circumstances, when the protection device is started, the sampling pointer also points to the starting moment of the protection device. The sampling pointer is pushed forward three cycles or three sampling points. The voltage value and current value three sampling cycles ago in the buffer zone are obtained by pushing the sampling pointer forward three cycles or three sampling points from the starting moment. The power value of the transfer line is calculated based on the obtained voltage value and current value.

[0032] By obtaining historical data and calculating the historical power values ​​of the transfer line, it can help identify abnormal conditions, reduce the probability of continuous failures, and prevent the occurrence of secondary failures.

[0033] As an optional implementation, the power value of the transfer line V 转 Transmitted to the primary switch protection device on the backup side.

[0034] Among them, the power value V of the transferred line 转 The method of transmitting to the first switch protection device on the backup power supply side can be through the GOOSE network or through hard wire, etc. The present invention does not specifically limit this. In order to simplify the secondary cable wiring of the substation, the transmission through the GOOSE network is used as an example for exemplary explanation.

[0035] The GOOSE network is primarily used to facilitate information transmission between multiple IEDs. It can transmit real-time information such as switch positions, blocking signals, and trip commands, meeting relay protection requirements. The GOOSE network utilizes Ethernet virtual local area networks and traffic prioritization technology to ensure that high-priority, real-time messages are transmitted first, thereby improving the reliability and real-time performance of the entire system.

[0036] The primary switch protection device is the first to activate when a power system fault occurs. In a complex power network, multiple protection devices may detect an anomaly simultaneously. The primary switch protection device is the first of these devices to identify and respond to the fault. Its correct operation is crucial to the stable operation of the power system, minimizing the impact of the fault on the system, preventing the fault from spreading, and avoiding chain reactions that could lead to wider power outages.

[0037] Step 3): According to the capacity of the backup power supply V d The transferable load V of the backup power supply is determined by the current power value S of the backup power supply.

[0038] Specifically, the transferable load V is the capacity of the backup power supply V d Subtract the difference of the current power value S of the backup power supply, that is, V=V d -S.

[0039] As an optional implementation, the first switch protection device on the backup power side may be configured to be calibrated according to the capacity V of the backup power supply. d The transferable load V of the backup power supply is determined by the current power value S of the backup power supply.

[0040] The transferable load V of the backup power supply is the transferable load of the first switch on the backup power supply side.

[0041] Step 4): Determine whether the transferable load V of the backup power supply is greater than the power value V of the transfer line 转 When it is greater than, transfer is allowed; when it is less than, transfer is not allowed.

[0042] The load V that can be transferred by the first switch is greater than or equal to the power value V of the transferred line 转 When the backup power supply capacity can meet the power supply demand of the non-fault section and there will be no overload, the power transfer is allowed and the connecting switch of the backup power supply used to supply power to the transfer line is closed.

[0043] The load V that can be transferred by the first switch is less than the power value V of the transferred line 转 When the backup power supply capacity cannot meet the power supply demand of the non-fault section, overload will occur. At this time, power transfer is not allowed. The contact switch in the open position used by the backup power supply to supply power to the transfer line continues to remain in the open state.

[0044] A tie switch is a switching device used in a dual power supply system to transfer the load from one power source to the remaining power source when one fails. This not only improves power supply reliability but also ensures continuity.

[0045] As an optional implementation, the opening and closing of the tie switch may be directly controlled.

[0046] As another optional implementation, the first switch protection device on the backup side can control the opening and closing of the tie switch. Specifically, when the load V that can be transferred by the first switch is greater than or equal to the power value V of the transferred line 转 When the first switch protection device on the standby side sends a signal to the tie switch that allows the transfer of power, the tie switch in the open position closes after receiving the signal, and the fault in the fault area is restored. When the load V that can be transferred by the first switch is less than the power value V of the transfer line 转 When the first switch protection device on the standby side does not send a signal to the contact switch to allow power transfer, the contact switch in the open position continues to maintain the open state, that is, in the open state.

[0047] A transfer closing method provided by an embodiment of the present invention first controls the protection device downstream of the fault side to start protection when a fault occurs in the distribution network, thereby isolating the power grid fault and reducing the further spread of the fault; then, by obtaining the power of the transfer line a set number of sampling cycles before the protection device starts, the power of the current transfer line can be accurately evaluated, which is beneficial to improving the accuracy of the judgment of whether it is overloaded and improving the safety of the power grid; then, the transferable load of the backup power supply is determined according to the capacity of the backup power supply and the current power value of the backup power supply; finally, when the transferable load of the backup power supply is greater than the power value of the transfer line, the connecting switch of the backup power supply used to supply power to the transfer line is controlled to close, so that when the remaining capacity of the backup power supply can meet the power supply demand of the non-fault section, the backup power supply can supply power to the transfer line, and when the remaining capacity of the backup power supply cannot meet the power supply demand of the non-fault section, the backup power supply will not supply power to the transfer line. While taking into account the overload problem of the transfer distribution network line caused by the load carrying capacity of the transfer line, the present invention only uses the criterion of the size between the power value of the transfer line a set number of sampling cycles before the start time and the transferable load of the backup power supply to decide whether to transfer. Therefore, compared with the existing technology, the present invention can reduce the complexity of the transfer closing method.

[0048] An embodiment of a power transfer closing device: An embodiment of the present invention provides a power transfer closing device, comprising a processor, wherein the processor executes a computer program to implement the method steps of a power transfer closing method.

[0049] Among them, regarding the "method steps of the power transfer and closing method", please refer to the relevant statements in the aforementioned "an embodiment of the power transfer and closing method", which will not be repeated here.

[0050] A power transfer and closing device provided in an embodiment of the present invention can achieve the same beneficial effects as the aforementioned power transfer and closing method, and will not be described in detail here.

Claims

1. A power transfer closing method, characterized in that: The steps include: Step 1): When a fault occurs in the distribution network, control the protection device downstream of the fault side to start protection and record the start time of the protection device; Step 2): Obtain the power value of the transfer line before the number of sampling periods set at the start time; Step 3): Determine the transferable load of the backup power supply according to the capacity of the backup power supply and the current power value of the backup power supply; Step 4): When the transferable load of the backup power supply is greater than the power value of the transfer line, the connecting switch of the backup power supply used to supply power to the transfer line is controlled to close.

2. The power transfer closing method according to claim 1, characterized in that: The set number is 3.

3. The power transfer closing method according to claim 2, characterized in that: In step 2), the data sampling pointer at the start time is recorded; the voltage value and current value three sampling cycles ago in the buffer are obtained by pushing the sampling pointer forward three cycles or three sampling points from the start time, and the power value of the transfer line is calculated based on the obtained voltage and current values.

4. The power transfer closing method according to claim 1, characterized in that: Step 2) further includes transmitting the power value of the transfer line to the first switch protection device on the backup power supply side; In step 3), the first switch protection device on the backup power supply side determines the load that can be transferred by the backup power supply according to the capacity of the backup power supply and the current power value of the backup power supply; In step 4), when the transferable load of the backup power supply is greater than the power value of the transfer line, the first switch protection device on the backup power supply side sends a transfer permission signal to the tie switch to control the tie switch to close.

5. The power transfer closing method according to claim 1, characterized in that: The transfer closing method further includes: transmitting the power value of the transfer line to the first switch protection device on the backup power supply side through the GOOSE network.

6. The power transfer closing method according to claim 1, characterized in that: The transferable load of the backup power supply is the difference between the capacity of the backup power supply and the current power value of the backup power supply.

7. A power transfer closing device, comprising a processor, characterized in that: The processor executes the computer program to implement the method steps of the power transfer and closing method according to claim 1, 2, 3, 5 or 6.

Citation Information

Patent Citations

  • Distributed FA transfer method and system considering line load capacity, and storage medium

    CN113572258A