Automatic generation method, device and electronic equipment for inter-station track data of train control system
By acquiring train location information and static data configuration tables, the system automatically calculates and sends train data to the ATO, solving the problems of long processing time and high error rate in existing technologies, and achieving safety and accuracy in train operation.
Patent Information
- Application Number
- CN202510358460.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2025-03-25
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2045-03-25
AI Technical Summary
In the existing technology, the line data sent by the temporary speed limit server to the automatic train operation system is static data, which leads to long processing time and errors when running on complex lines and across scheduling boundaries, and cannot guarantee the continuity and consistency of train data.
By acquiring the current location information reported by the train and the pre-configured static data configuration table, the system automatically calculates the train data within the operating plan range and sends it to the automatic train operation system, thereby realizing the automatic generation and splicing of data.
It saves labor costs, reduces human error, ensures the safety and accuracy of train operation, and realizes the automatic calculation and continuity of train data.
Smart Images

Figure CN120646070B_ABST
Abstract
Description
Technical Field
[0001] This application belongs to the field of train control and information interaction, and in particular relates to a method, device and electronic equipment for automatically generating inter-station track data in a train control system. Background Technology
[0002] The track data in the Automatic Train Operation (ATO) system includes track gradient, track speed, station intervals, and temporary speed restrictions. According to the latest regulations from the China Railway Administration, the Temporary Speed Restriction Server (TSRS) is required to send train data to the ATO that is compatible with the operational plan range.
[0003] Currently, the line data sent by TSRS to ATO is static data, meaning that the data tool generates fixed data and then compiles it into the program. When the line is complex with many branches, all possible operation plans and transponders need to be manually listed to generate the relevant train data, which is time-consuming and prone to errors. Furthermore, when trains cross dispatch boundaries, the limited length of the configuration data in the local temporary speed limit server cannot guarantee the continuity of train data. Moreover, due to factors such as the modification of adjacent temporary speed limit servers, the consistency of train data between the local temporary speed limit server and the adjacent temporary speed limit server cannot be guaranteed. Summary of the Invention
[0004] This application aims to address at least one of the technical problems existing in the related art. To this end, this application proposes a method, apparatus, and electronic equipment for automatically generating inter-station track data in a train control system, which can automatically generate train data, save labor costs and human error, and ensure the safety and accuracy of train operation.
[0005] Firstly, this application provides a method for automatically generating inter-station tracks in a train control system. This method is applied in a Temporary Speed Limiting Server (TSRS) and includes:
[0006] Obtain the current location information reported by the train and the pre-configured static data configuration table, wherein the current location information includes the identifier of the first transponder of the first station that the train is currently passing through, and the static data configuration table contains static data between stations in each operation plan range;
[0007] The train data for the operational plan range is automatically calculated based on the identifier of the first transponder and the static data in the static data configuration table;
[0008] The train data is sent to the Automatic Train Operation (ATO) system to control the train to run according to the train data.
[0009] Secondly, this application provides an automatic station track generation device for a train control system, the device comprising:
[0010] The acquisition module is used to acquire the current location information reported by the train and a pre-configured static data configuration table. The current location information includes the identifier of the first transponder of the first station that the train is currently passing through, and the static data configuration table contains static data between stations in each operation plan range.
[0011] The calculation module is used to automatically calculate the train data for the operating plan range based on the identifier of the first transponder and the static data in the static data configuration table;
[0012] The transmitting module is used to send the train data to the Automatic Train Operation (ATO) system to control the train to run according to the train data.
[0013] Thirdly, this application provides an electronic device, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the computer program to implement the automatic generation method for inter-station tracks in the train control system as described in the first aspect above.
[0014] Fourthly, this application provides a non-transitory computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the automatic generation method for inter-station tracks in the train control system as described in the first aspect above.
[0015] Fifthly, this application provides a chip including a processor and a communication interface, the communication interface being coupled to the processor, the processor being used to run programs or instructions to implement the automatic generation method of inter-station lines in the train control system as described in the first aspect.
[0016] In a sixth aspect, this application provides a computer program product, including a computer program that, when executed by a processor, implements the automatic generation method for inter-station tracks in a train control system as described in the first aspect above.
[0017] The above-described one or more technical solutions in the embodiments of this application have at least the following technical effects:
[0018] The method, apparatus, and electronic equipment for automatically generating inter-station tracks in the train control system provided in this application obtain the current location information and static data configuration table reported by the train. Based on the identifier of the first transponder of the first station currently passed by the train in the current location information and the static data in the static data configuration table, the system automatically calculates the train data within the scope of the operation plan. Finally, the automatically calculated train data is sent to the ATO so that the ATO can control the train operation based on the train data. The system automatically calculates the train data required for train operation through TSRS without human intervention, which greatly saves manpower costs and human error, and ensures the safety and accuracy of train operation.
[0019] Additional aspects and advantages of this application will be set forth in part in the description which follows, and in part will be obvious from the description, or may be learned by practice of this application. Attached Figure Description
[0020] The above and / or additional aspects and advantages of this application will become apparent and readily understood from the description of the embodiments taken in conjunction with the following drawings, in which:
[0021] Figure 1 This is one of the flowcharts illustrating the automatic generation method for inter-station tracks in the train control system provided in this application embodiment;
[0022] Figure 2 This is a second schematic flowchart of the automatic generation method for inter-station tracks in the train control system provided in this application embodiment;
[0023] Figure 3 This is a schematic diagram illustrating the composition of each station within the scope of the operation plan provided in this application embodiment and the data between each station;
[0024] Figure 4 This is a schematic diagram of train data splicing between the current TSRS and adjacent TSRS provided in an embodiment of this application;
[0025] Figure 5 This is a schematic diagram of the structure of the automatic station track generation device of the train control system provided in the embodiments of this application;
[0026] Figure 6 This is a schematic diagram of the structure of the electronic device provided in the embodiments of this application. Detailed Implementation
[0027] The technical solutions of the embodiments of this application will be clearly described below with reference to the accompanying drawings. Obviously, the described embodiments are only some, not all, of the embodiments of this application. All other embodiments obtained by those skilled in the art based on the embodiments of this application are within the scope of protection of this application.
[0028] The terms "first," "second," etc., used in the specification and claims of this application are used to distinguish similar objects and not to describe a specific order or sequence. It should be understood that such use of data can be interchanged where appropriate so that embodiments of this application can be implemented in orders other than those illustrated or described herein, and the objects distinguished by "first," "second," etc., are generally of the same class and the number of objects is not limited; for example, a first object can be one or more. Furthermore, in the specification and claims, "and / or" indicates at least one of the connected objects, and the character " / " generally indicates that the preceding and following objects are in an "or" relationship.
[0029] The automatic generation method for inter-station tracks of the train control system, the automatic generation device for inter-station tracks of the train control system, the electronic equipment and the readable storage medium provided in this application will be described in detail below with reference to the accompanying drawings and through specific embodiments and application scenarios.
[0030] The automatic generation method for inter-station tracks in the train control system can be applied to the terminal, specifically executed by the hardware or software in the terminal. In particular, the terminal can be a Temporary Speed Limiting Server (TSRS).
[0031] The automatic generation method for inter-station routes in a train control system provided in this application embodiment can be executed by an electronic device or a functional module or entity in an electronic device that can implement the automatic generation method for inter-station routes in the train control system. The electronic devices mentioned in this application embodiment include, but are not limited to, mobile phones, tablets, computers, cameras, and wearable devices. The automatic generation method for inter-station routes in a train control system provided in this application embodiment will be described below using an electronic device as the execution subject.
[0032] like Figure 1 As shown, the automatic generation method for inter-station tracks in this train control system, applied to the Temporary Speed Limiting Server (TSRS), includes:
[0033] S100, obtain the current location information reported by the train and the pre-configured static data configuration table, wherein the current location information includes the identifier of the first transponder of the first station currently passed by the train, and the static data configuration table contains static data between stations in each operation plan range.
[0034] S200, automatically calculate the train data for the operating plan range based on the identifier of the first transponder and the static data in the static data configuration table.
[0035] S300, the train data is sent to the Automatic Train Operation (ATO) system to control the train to run according to the train data.
[0036] The automatic station track generation method for the train control system provided in this application obtains the current location information and static data configuration table reported by the train. Based on the identifier of the first transponder of the first station currently passed by the train in the current location information and the static data in the static data configuration table, the method automatically calculates the train data within the operating plan range. Finally, the automatically calculated train data is sent to the ATO so that the ATO can control the train operation based on the train data. This method automatically calculates the train data required for train operation through TSRS without human intervention, which greatly saves manpower costs and human error, and ensures the safety and accuracy of train operation.
[0037] It should be noted that the static data configuration table is pre-configured. The static data configuration table can include a route data table, a speed data table, and a gradient data table. Alternatively, there can be only one static data configuration table, containing various data information from these tables. The route data table includes, but is not limited to, the identifier (number) of the transponder corresponding to each station within the operating plan range, the kilometer marker of each transponder, the identifier (number) of the next station corresponding to each transponder, the distance information between each transponder and the next station's transponder, the route number, and a transmission flag indicating whether train data is sent to the ATO (Automatic Train Operation). In some embodiments, the transponder at each station can include a reverse entry transponder, an exit transponder, and a departure transponder. The first station within the operating plan range may not have a corresponding exit transponder. The route data table may also include distance information between reverse entry transponders, between a reverse entry transponder and an exit transponder, and between a reverse entry transponder and a departure transponder. The speed data table includes, but is not limited to, the sequence number corresponding to each speed, the line segment corresponding to each speed, the speed value of each speed, and the length of the line segment corresponding to each speed; the gradient data table includes, but is not limited to, the sequence number corresponding to each gradient, the line segment corresponding to each gradient, the length of the line segment corresponding to each gradient, the gradient value and gradient identifier corresponding to each gradient, wherein the gradient value represents the angle of the gradient relative to the horizontal plane, and the gradient identifier represents uphill or downhill.
[0038] It is worth noting that the train data includes at least track distance data, gradient data, speed data, temporary speed limit data, station length data, and track splicing data.
[0039] In some embodiments, step S300 includes: packaging the train data according to the vehicle-to-ground protocol and sending it to the train ATO.
[0040] In some embodiments, the train data includes at least one of the following: track distance data, gradient data, speed data, temporary speed limit data, and track splicing data. For example... Figure 2 As shown, step S200 includes:
[0041] S210, based on the identifier of the first transponder, obtain the distance information between each transponder within the scope of the operation plan from the static data configuration table, and calculate the line distance data based on the distance information between each transponder.
[0042] Understandably, the existing static data configuration table can be used to obtain the distance information between the transponders corresponding to each station, and then the line distance data can be calculated based on the distance information between the transponders. This is simple and efficient. For example, the operation plan range consists of three stations, A, B, and C, and two sections between these three stations. (See...) Figure 3 As shown, the distance information D1 between the transponders at station A and station B can be obtained from the static data configuration table, and the distance information D3 between the transponders at station B and station C can be obtained. Then, the line distance data from station A to station C can be obtained by adding D1 and D3. Alternatively, the line distance data from station A to station C can be directly calculated from the kilometer markers of the transponders at station A and station C. The specific calculation depends on the static data contained in the static data configuration table and the definition of the line distance data from station A to station C.
[0043] S220, based on the route distance data, obtain the initial slope data and initial speed data of the matching route segment from the static data configuration table, and convert the initial slope data and initial speed data into the first slope data and first speed data within the current operation plan range, wherein the matching route segment is a route segment that overlaps with the current route segment corresponding to the route distance data.
[0044] Since the reference basis for static data given in the static data configuration table may differ from the reference basis for the operation plan range, it is necessary to convert the static data obtained from the static data configuration table into different formats, such as gradient data and speed data, so that they can be spliced with relevant train data in the adjacent TSRS and / or sent to the ATO. It is worth noting that the matched line segment is the line segment that overlaps with the current line segment corresponding to the line distance data, extracted from the static data configuration table. For example, if the current line segment is 3156m to 5500m, and the line segment corresponding to a certain speed or gradient is 3000m to 3500m, then the first matched line segment is 3156m to 3500m; or if the line segment corresponding to a certain speed or gradient is 4000m to 5000m, then the second matched line segment is 4000m to 5000m; or if the line segment corresponding to a certain speed or gradient is 5000m to 6000m, then the third matched line segment is 5000m to 5500m. It can be understood that the matched line segment in this embodiment may include the first, second, and third matched line segments.
[0045] S230, based on the line distance data, query the historical temporary speed limit data of the successfully executed temporary speed limit issued by the scheduling centralized system CTC to obtain the initial temporary speed limit data corresponding to the matching line segment, and convert the initial temporary speed limit data into the first temporary speed limit data in the current operation plan range.
[0046] Because the reference basis for historical temporary speed limit data issued by CTC may differ from that for the operational plan scope, it is necessary to convert the data format of the historical temporary speed limit data to avoid subsequent splicing with related train data in adjacent TSRS and / or sending train data to ATO. Understandably, the matching line segment in this embodiment has the same meaning as the aforementioned gradient or speed, the difference being that the line segment in this embodiment is extracted from the historical temporary speed limit data.
[0047] It is understandable that there is no specific order between steps S220 and S230.
[0048] S240: Obtain the second slope data, second speed data, and second temporary speed limit data from adjacent TSRSs; concatenate the first slope data and the second slope data to obtain concatenated slope data; concatenate the first speed data and the second speed data to obtain concatenated speed data; and concatenate the first temporary speed limit data and the second temporary speed limit data to obtain concatenated temporary speed limit data.
[0049] Based on the first gradient data, first speed data, and first temporary speed limit data obtained in the aforementioned steps S220 and S230, the second gradient data, second speed data, and second temporary speed limit data from the adjacent TSRS are obtained. Then, the corresponding data are spliced together to obtain the corresponding spliced data, so as to realize the automatic splicing of train data between the current TSRS and the adjacent TSRS when the train runs across dispatching stations, ensuring the continuity of train data.
[0050] In some embodiments, the first transponder is a first anti-entry transponder, and step S200 further includes:
[0051] S250, obtain the kilometer marker of the first reverse entry transponder and the kilometer markers of the exit transponders of each station within the current operation plan range from the static data configuration table; calculate the inter-station length data between the first station and each station based on the kilometer marker of the first reverse entry transponder and the kilometer markers of the exit transponders of each station.
[0052] This embodiment enables automatic calculation of station length data, saving labor costs and human error, and ensuring the safety and accuracy of train operation.
[0053] refer to Figure 3If the first reverse entry transponder is the reverse entry transponder for station A, then to calculate the distance between stations A and B, the kilometer markers of the first reverse entry transponder and the exit transponder for station B are obtained from the static data configuration table. The distance between stations A and B is then obtained by subtracting the kilometer marker of the first reverse entry transponder from the kilometer marker of the exit transponder for station B. Figure 3 The length between stations is 1. Similarly, to calculate the length between stations A and C, the kilometer markers of the first reverse entry transponder and the exit transponder of station C are obtained from the static data configuration table. Then, the kilometer marker of the first reverse entry transponder is subtracted from the kilometer marker of the exit transponder of station C to obtain the length between stations A and C. Figure 3 The length between intermediate stations is 2.
[0054] In some embodiments, step S210 specifically includes:
[0055] Obtain the identifiers of the reverse entry transponders for each station within the scope of the operation plan, excluding the first station and the terminal station, and obtain the identifier of a departure transponder for the terminal station.
[0056] Based on the identifier of the first reverse entry transponder, the identifiers of the reverse entry transponders of each station, and the identifier of the departure transponder of the terminal station, the first distance information between each adjacent reverse entry transponder and the second distance information between the departure transponder of the terminal station and the reverse entry transponder of the previous station are obtained from the static data configuration table. The sum of each first distance information and the second distance information is calculated as the line distance data.
[0057] In this embodiment, the distance between the first reverse entry transponder of the first station within the operation plan range and the first departure transponder of the terminal station is used as the line distance data. Therefore, the identifiers of the reverse entry transponders of each station other than the first station and the terminal station within the operation plan range are obtained, and the identifier of the first departure transponder of the terminal station is obtained. The first distance information between each adjacent reverse entry transponder and the second distance information between the first departure transponder of the terminal station and the reverse entry transponder of the previous station are obtained from the static data configuration table. The sum of the first distance information and the second distance information is calculated to obtain the line distance data.
[0058] Understandably, this embodiment is only a relatively simple implementation method for calculating line distance data. Of course, the line distance data can also be calculated using the kilometer markers of the entry transponders at each station and the kilometer markers of the departure transponders at the terminal station, depending on the static data that can be provided by the static data configuration table.
[0059] In some embodiments, step S220 specifically includes:
[0060] Based on the route distance data, the initial slope data of at least one slope and the initial speed data of at least one speed in the matching route segment are obtained from the static data configuration table.
[0061] The distance between the starting point of the first slope and the first transponder is taken as the target slope distance of the first slope. The starting points of other slopes and the starting points of the previous slope are taken as the target slope distances of the corresponding slopes. The initial slope identifier and initial slope value in the initial slope data of each slope are taken as the target slope identifier and target slope value of the corresponding slope. The first slope data is obtained from the target slope distance, target slope identifier and / or target slope value of each slope.
[0062] The distance between the starting point of the first speed and the first transponder is taken as the target speed distance of the first speed. The distance between the starting point of other speeds and the starting point of the previous speed is taken as the target distance of the corresponding speed. The initial speed value in the initial speed data of each speed is taken as the target speed value of the corresponding speed. The first speed data is obtained from the target speed distance and target speed value of each speed.
[0063] Understandably, since the reference basis for static data given in the static data configuration table may differ from the reference basis for the operational plan range, it is necessary to convert the static data obtained from the static data configuration table. In this embodiment, if there are multiple slopes in the matching line segment, the distance between the starting point of the first slope and the first transponder is taken as the target slope distance of the first slope, which can be denoted as DL1; the distance between the starting point of the second slope and the starting point of the first slope is taken as the target slope distance of the second slope, which can be denoted as DL2; the distance between the starting point of the third slope and the starting point of the second slope is taken as the target slope distance of the third slope, which can be denoted as DL3, and so on, until the target slope distances of all slopes in the matching line segment have been calculated; at the same time, since the slope identifier and slope value of each slope do not change, the initial slope identifier and slope value of each slope obtained from the static data configuration table can be used as the target slope distance. The initial slope value serves as the target slope identifier and target slope value for each slope. The overlapping line segments of the initial slope length and line distance data for each slope are used as the target slope length for each slope. That is, the target slope identifier for the first slope is recorded as Q1, the target slope value as G1, and the target slope length as SQ1; the target slope identifier for the second slope is recorded as Q2, the target slope value as G2, and the target slope length as SQ2; the target slope identifier for the third slope is recorded as Q3, the target slope value as G3, and the target slope length as SQ3, and so on, until the target slope distance, target slope identifier, target slope value, and target slope length for all slopes in the matched line segment are recorded. This data is then used as the first slope data for the current TSRS.
[0064] Similarly, if there are multiple speeds in the matching line segment, the distance between the starting point of the first speed and the first transponder is taken as the target speed distance of the first speed, which can be denoted as DS1. The distance between the starting point of the second speed and the starting point of the first speed is taken as the target speed distance of the second speed, which can be denoted as DS2. The distance between the starting point of the third speed and the starting point of the second speed is taken as the target speed distance of the third speed, which can be denoted as DS3, and so on, until the target speed distances of all speeds in the matching line segment have been calculated. At the same time, since the speed values of each speed do not change, the initial speed values of each speed obtained from the static data configuration table can be taken as the target speed values corresponding to each speed. The overlapping line segments of the initial speed lengths of each speed in the static data configuration table and the line distance data are taken as the target speed lengths corresponding to each speed. That is, the target speed value of the first speed is denoted as V1 and the target speed length is denoted as SL1, the target speed value of the second speed is denoted as V2 and the target speed length is denoted as SL2, the target speed value of the third speed is denoted as V3 and the target speed length is denoted as SL3, and so on, until the target speed distances and target speed values of all speeds in the matching line segment have been recorded, which is taken as the first speed data of the current TSRS.
[0065] In some embodiments, step S230 specifically includes:
[0066] At least one initial temporary speed limit data corresponding to the matching line segment is obtained from the historical temporary speed limit data.
[0067] The distance between the starting point of each temporary speed limit and the first transponder is taken as the target speed limit distance of each temporary speed limit. The initial speed limit value in the initial temporary speed limit data of each temporary speed limit is taken as the target speed limit value of the corresponding temporary speed limit. The overlapping line segment of the initial speed limit length of each temporary speed limit and the line distance data is taken as the target speed limit length. The first temporary speed limit data is obtained from the target speed limit distance, target speed limit length and / or target speed limit value of each temporary speed limit.
[0068] Understandably, since the reference basis for historical temporary speed limit data issued by CTC may differ from the reference basis for the operational plan range, it is also necessary to convert the data format in the historical temporary speed limit data. In this embodiment, if there are multiple temporary speed limits in the matched line segment, the distance between the starting point of the first temporary speed limit and the first transponder is taken as the target speed limit distance of the first temporary speed limit, which can be denoted as S1 (understandably, if the starting point of the first temporary speed limit is before the operational plan range, then S1 = 0), the distance between the starting point of the second temporary speed limit and the first transponder is taken as the target speed limit distance of the second temporary speed limit, which can be denoted as S2, the distance between the starting point of the third temporary speed limit and the first transponder is taken as the target speed limit distance of the third temporary speed limit, which can be denoted as S3, and so on, until the target speed limit distance of all temporary speed limits in the matched line segment has been calculated; at the same time, since the speed limit value and speed limit length of each temporary speed limit are different... Since the speed limit remains constant, the initial speed limit value of each temporary speed limit obtained from historical temporary speed limit data can be used as the target speed limit value corresponding to each temporary speed limit. The overlapping line segment of the initial speed limit length of each temporary speed limit and the line distance data is used as the target speed limit length. That is, the target speed limit value of the first temporary speed limit is recorded as LV1 and the target speed limit length is L1, the target speed limit value of the second temporary speed limit is recorded as LV2 and the target speed limit length is L2, the target speed limit value of the third temporary speed limit is recorded as LV3 and the target speed limit length is L3, and so on, until the target speed limit distance and target speed limit value of all speeds in the matching line segment are recorded, which is used as the first speed data of the current TSRS.
[0069] In some embodiments, step S240, which involves concatenating the first slope data with the second slope data to obtain concatenated slope data, specifically includes:
[0070] Determine whether the target slope identifier and target slope value of the last slope in the current TSRS are consistent with the target slope identifier and target slope value of the first slope in the adjacent TSRS;
[0071] If they match, the slope length of the last slope in the current TSRS and the slope length of the first slope in the adjacent TSRS are taken as the slope length of the spliced slope. The number of slopes is updated to the sum of the number of slopes of the current TSRS and the adjacent TSRS minus one. The slope data of the spliced slope, the first slope data and the second slope data of each slope in the current TSRS and the adjacent TSRS, and the updated number of slopes are taken as the spliced slope data.
[0072] If they are inconsistent, the number of slopes will be updated to the sum of the number of slopes of the current TSRS and the adjacent TSRS, and the first slope data, the second slope data, and the updated number of slopes of each slope in the current TSRS and the adjacent TSRS will be used as the spliced slope data.
[0073] Understandably, when splicing the first slope data in the current TSRS with the second slope data in the adjacent TSRS, it is first determined whether the target slope identifier and target slope value of the last slope in the current TSRS are consistent with the target slope identifier and target slope value of the first slope in the adjacent TSRS. If they are consistent, it can be considered that the last slope in the current TSRS and the first slope in the adjacent TSRS are actually the same slope. Then, the sum of the slope length of the last slope in the current TSRS and the slope length of the first slope in the adjacent TSRS is used as the slope length of the spliced slope. The number of slopes is updated to the sum of the number of slopes in the current TSRS and the adjacent TSRS minus one. The slope data of the spliced slope, the first slope data and the second slope data of each slope in the current TSRS and the adjacent TSRS, and the updated number of slopes are used as the spliced slope data. If they are inconsistent, it can be assumed that the last slope in the current TSRS and the first slope in the adjacent TSRS are not the same slope. In this case, the number of slopes is updated to the sum of the number of slopes in the current TSRS and the adjacent TSRS. The first slope data, the second slope data, and the updated number of slopes in the current TSRS and the adjacent TSRS are then used as the spliced slope data.
[0074] Step S240, which involves concatenating the first speed data and the second speed data to obtain concatenated speed data, includes:
[0075] The sum of the speed counts of the current TSRS and the adjacent TSRS is used as the updated speed count, and the first speed data, second speed data, and updated speed count of each speed in the current TSRS and the adjacent TSRS are used as the splicing speed data.
[0076] Similar to the aforementioned slope stitching, the speed can change at any time. Since there are no identical speeds, the sum of the speeds of the current TSRS and the adjacent TSRS is used as the updated speed count. The first speed data, the second speed data, and the updated speed count of each speed in the current TSRS and the adjacent TSRS are used as the stitching speed data.
[0077] Step S240, which involves concatenating the first temporary speed limit data and the second temporary speed limit data to obtain concatenated temporary speed limit data, includes:
[0078] The sum of the number of temporary speed limits in the current TSRS and the adjacent TSRS is taken as the updated number of temporary speed limits, and the first temporary speed limit data, the second temporary speed limit data, and the updated number of temporary speed limits in the current TSRS and the adjacent TSRS are taken as the spliced temporary speed limit data.
[0079] Similar to the aforementioned speed concatenation, the sum of the number of temporary speed limits in the current TSRS and the adjacent TSRS can be used as the updated number of temporary speed limits. The first temporary speed limit data, the second temporary speed limit data, and the updated number of temporary speed limits in the current TSRS and the adjacent TSRS can then be used as the concatenated temporary speed limit data.
[0080] In some embodiments, step S240 further includes:
[0081] According to the train's cross-dispatch boundary operation plan, the identifiers of the adjacent TSRS of the current TSRS are obtained, and the second data to be spliced is periodically obtained from the adjacent TSRS according to the identifiers of the adjacent TSRS. The second data to be spliced includes second gradient data, second speed data and second temporary speed limit data.
[0082] Determine whether the second data to be spliced satisfies the CRC (Cyclic Redundancy Check) check and whether its data format is consistent with the format of the first data to be spliced in the current TSRS; wherein, the first data to be spliced includes first data slope data, first speed data and first temporary speed limit data;
[0083] If the CRC check is satisfied and the data format is consistent, then the step of concatenating the first data to be concatenated and the second data to be concatenated is executed;
[0084] If the CRC check is not met or the data formats are inconsistent, the step of concatenating the first data to be concatenated and the second data to be concatenated will not be executed.
[0085] When the current TSRS receives a train's cross-dispatch operation plan and needs to splice it with the second data to be spliced from the adjacent TSRS, a network connection can be established with the current TSRS via a wireless network. Then, the current TSRS periodically acquires the second data to be spliced from the adjacent TSRS according to a preset cycle to ensure that the second data to be spliced is real-time and valid. Then, a CRC check is performed on the acquired second data to ensure its integrity and correctness. At the same time, to avoid the situation where the data format of the second data to be spliced is different from that of the first data to be spliced (i.e., the reference basis when recording data, for example: if the first station is used as the reference starting point, the slope distance of a certain gradient is recorded as 5KM, but if the starting point of the line segment is used as the reference, the slope distance of the same gradient is recorded as 75KM), which would prevent splicing, it is necessary to determine whether the data format of the second data to be spliced is consistent with that of the first data to be spliced. Only when the CRC check is passed and the data format is consistent will the data splicing be performed. Data concatenation will not be performed if either the CRC check or the data format fails. Specifically, if the CRC check fails, a second set of data to be concatenated can be obtained. If the data formats are inconsistent, the data radical of the second set of data to be concatenated can be converted first, and then concatenated with the first set of data to be concatenated in the current TSRS.
[0086] It is understood that in some embodiments, the inter-station length data in the current TSRS can be spliced with the inter-station length data in the adjacent TSRS. During splicing, the inter-station length data between each station can be obtained by calculating based on the kilometer markers of the reverse entry transponders and / or the exit transponders of each station in the current TSRS and the kilometer markers of the reverse entry transponders and / or the exit transponders of each station in the adjacent TSRS.
[0087] The following sections will discuss the combination of... Figure 3 , 4 The provided embodiments provide a detailed description of the embodiments of this application.
[0088] like Figure 3 As shown, the operational plan covers three stations (A, B, and C) and two sections between them. The static data configuration table includes the contents of Tables 1-3 below. When automatically calculating the line distance data for trains within this operational plan range, the distance information D1 between the reverse entry transponder at station A and the reverse entry transponder at station B can be obtained from the line data table. Then, the distance information D4 between the reverse entry transponder at station B and the departure transponder at station C can be obtained. Finally, the line distance data from station A to station C can be obtained by adding D1 and D4.
[0089] When automatically calculating the first speed data of the train within the operating plan range, the matching line segments that overlap with the entire line are first determined. As shown in Table 1, the line segment range of the operating plan range is 3156m to 5500m. From Table 2, the matching line segment is 3156m to 5500m (the line segment that overlaps with 0 to 10328m and 3156m to 5500m). There is only one speed of 80 km / h. Therefore, this speed of 80 km / h is used as the initial speed data, and the distance between the starting point of this speed and the reverse entry transponder B1 is used as the target speed distance. It can be understood that in this embodiment, the distance between this speed and the reverse entry transponder B1 is 0. The target speed distance is recorded as DS1 = 0, and the initial speed value is used as the target speed value, recorded as V1 = 80 km / h. The target speed length is SL1 (3156m to 5500m).
[0090] When automatically calculating the first gradient data of the train within the operating plan range, Tables 1 and 3 show that there is only one gradient in the matching line segment 3156m~5500m (the line segment overlapping with 3150m~27658m), and the gradient value of this gradient is 5‰. It is understood that in this embodiment, the distance between this gradient and the reverse entry transponder B1 is 0. The initial gradient value of 5‰ is taken as the target gradient value. Since there is no gradient identifier in the gradient data table, the gradient identifier is not obtained. Understandably, to obtain the slope length, the initial slope length of each slope is first obtained from the static data configuration table. The target slope length of each slope is then obtained based on the initial slope length of each slope and the line distance data within the operation plan range. If the initial slope length of a slope is completely within the line distance data, then the initial slope length is the target slope length of that slope. If the initial slope length of a slope is not completely within the line distance data, then the overlapping line segment between the initial slope length and the line distance data is taken as the target slope length of that slope. For example, in Table 3, if the starting point of a slope with a gradient of 5‰ is 3150m and the ending point is 3500m (the initial slope length is 3500m-3150m=350m), then the target slope length is 344m (3500m-3156m=344m); if the starting point of the slope is 3500m and the ending point is 4500m, which is completely within the distance data of the line (3156m~5500m), then the target slope length is 1000m (4500m-3500m=1000m).
[0091] When automatically calculating the first temporary speed limit data for the train within the scope of the operation plan, the temporary speed limit existing in the matching route segment from 3156m to 5500m is obtained from the historical temporary speed limit data that was successfully executed by the CTC. Assuming the speed limit value is 50 km / h and the speed limit length is 3000m, if the starting point of the temporary speed limit is 3200m, then its target speed limit distance is 44m (3200m-3156m=44m), and its target speed limit value is 50 km / h and the target speed limit length is 2300m (5500m-3200m=2300m).
[0092] Table 1 Line Data Table
[0093]
[0094] Note: 1. Kilometer mark on the transponder: the location of the transponder on the line; 2. K represents kilometers: K3+156 means the transponder is located at 3156 meters on the line; 3. Subtracting the kilometer marks gives the length, excluding cases of long and short chains; 4. The "Send Line Data" flag indicates whether train data is sent to the ATO.
[0095] Table 2 Speed Data for the Entire Route
[0096] Serial Number speed length End kilometer marker Remark 1 80 10328 K10+328 K0+000, the starting kilometer marker of the line 2 160 17330 K27+658
[0097] Note: Table 2 shows the speed data for the entire route. The first row represents the maximum speed of 80 km / h from the starting point (0 meters) to the ending point (10328 meters), and the length is 10328 meters. The second row represents the maximum speed of 160 km / h from the starting point (10328 meters) to the ending point (27658 meters), and the length is 17330 meters.
[0098] Table 3 Gradient data for the entire route
[0099]
[0100]
[0101] Note: Table 3 shows the gradient data for the entire route. The first row represents the distance from the starting point (0 meters) to the ending point (1750 meters), with a gradient of 0 and a length of 1750 meters. The second row represents the distance from the starting point (1750 meters) to the ending point (2750 meters), with a gradient of 10 and a length of 1000 meters. The third row is the same as the second row, with the starting point being the ending point of the second row.
[0102] like Figure 4As shown, when stitching train data between the current TSRS (TSRA-A) and the adjacent TSRS (TSRA-B), the train data in TSRA-A is recorded only up to the main control boundary, i.e., before station B1, while the train data in TSRA-B is recorded starting from station B1. Therefore, various train data (speed, gradient, temporary speed limit, track distance, station length, etc.) from TSRA-A and TSRA-B are stitched together to obtain continuous train data. During data stitching, TSRA-A and TSRA-B establish a communication connection. TSRA-A periodically receives train data sent by TSRA-B and performs CRC checks and data format verification on the train data. Stitching only occurs when the CRC check is passed and the data format is consistent with the data format in TSRA-A, ensuring the integrity and correctness of the stitched data.
[0103] The automatic inter-station route generation method for train control systems provided in this application can be executed by an automatic inter-station route generation device for train control systems. This application uses the example of an automatic inter-station route generation device for train control systems executing the automatic inter-station route generation method to illustrate the automatic inter-station route generation device for train control systems provided in this application.
[0104] like Figure 5 As shown in the figure, this application embodiment also provides an automatic station track generation device for a train control system, including...
[0105] The acquisition module 100 is used to acquire the current location information reported by the train and a pre-configured static data configuration table. The current location information includes the identifier of the first transponder of the first station that the train is currently passing through, and the static data configuration table contains static data between stations in each operation plan range.
[0106] The calculation module 200 is used to automatically calculate the train data for the operating plan range based on the identifier of the first transponder and the static data in the static data configuration table.
[0107] The sending module 300 is used to send the train data to the Automatic Train Operation (ATO) system to control the train to run according to the train data.
[0108] According to the automatic station track generation device of the train control system provided in this application embodiment, by acquiring the current location information and static data configuration table reported by the train, the device automatically calculates the train data within the operation plan range based on the identifier of the first transponder of the first station currently passed by the train in the current location information and the static data in the static data configuration table. Finally, the automatically calculated train data is sent to the ATO so that the ATO can control the train operation based on the train data. This device automatically calculates the train data required for train operation through TSRS without human intervention, which greatly saves manpower costs and human error, and ensures the safety and accuracy of train operation.
[0109] In some embodiments, the calculation module 200 is further configured to: obtain distance information between each transponder within the operational plan range from the static data configuration table based on the identifier of the first transponder; calculate the line distance data based on the distance information between each transponder; obtain initial slope data and initial speed data in a matching line segment from the static data configuration table based on the line distance data; and convert the initial slope data and initial speed data into first slope data and first speed data within the current operational plan range, wherein the matching line segment is a line segment that overlaps with the current line segment corresponding to the line distance data; and calculate the line distance data based on the distance information between each transponder. The road distance data is retrieved from the historical temporary speed limit data successfully executed by the scheduling centralized system CTC to obtain the initial temporary speed limit data corresponding to the matching line segment, and the initial temporary speed limit data is converted into the first temporary speed limit data within the current operation plan range; the second slope data, second speed data, and second temporary speed limit data in the adjacent TSRS are obtained, the first slope data and the second slope data are concatenated to obtain concatenated slope data, the first speed data and the second speed data are concatenated to obtain concatenated speed data, and the first temporary speed limit data and the second temporary speed limit data are concatenated to obtain concatenated temporary speed limit data.
[0110] In some embodiments, the transponder includes a reverse entry transponder and an exit transponder, the first transponder being a first reverse entry transponder, and the train data further includes inter-station length data; the calculation module 200 is further specifically configured to: obtain the kilometer marker of the first reverse entry transponder and the kilometer markers of the exit transponders of each station within the current operating plan range from the static data configuration table; and calculate the inter-station length data between the first station and each station based on the kilometer marker of the first reverse entry transponder and the kilometer markers of the exit transponders of each station.
[0111] In some embodiments, the transponder includes a reverse entry transponder and a departure transponder, wherein the first transponder is a first reverse entry transponder. The calculation module 200 is further specifically configured to: obtain the identifiers of the reverse entry transponders for each station within the scope of the operating plan, excluding the first station and the terminal station, and obtain the identifier of the departure transponder for the terminal station; based on the identifiers of the first reverse entry transponder, the identifiers of the reverse entry transponders for each station, and the identifier of the departure transponder for the terminal station, obtain from the static data configuration table first distance information between each adjacent reverse entry transponder, and second distance information between the departure transponder for the terminal station and the reverse entry transponder for the previous station, and calculate the sum of each of the first distance information and the second distance information as the line distance data.
[0112] In some embodiments, the calculation module 200 is further specifically configured to: obtain, from the static data configuration table, the initial slope data of at least one slope and the initial speed data of at least one speed in the matched line segment based on the line distance data; take the distance between the starting point of the first slope and the first transponder as the target slope distance of the first slope, take the starting point of other slopes and the starting point of the previous slope as the target slope distance of the corresponding slope, take the initial slope identifier and initial slope value in the initial slope data of each slope as the target slope identifier and target slope value of the corresponding slope, and obtain the first slope data from the target slope distance, target slope identifier, and target slope value of each slope; take the distance between the starting point of the first speed and the first transponder as the target speed distance of the first speed, and take the distance between the starting point of other speeds and the starting point of the previous slope as the target slope distance of the corresponding slope; take the initial slope identifier and initial slope value in the initial slope data of each slope as the target slope identifier and target slope value of the corresponding slope, and obtain the first slope data from the target slope distance, target slope identifier, and target slope value of each slope; take the distance between the starting point of the first speed and the first transponder as the target speed distance of the first speed, and take the initial speed distance between the starting point of other speeds and the starting point of the previous slope as the target slope distance of the first speed, and take the initial slope data ... The starting point of the previous speed is used as the target distance for the corresponding speed. The initial speed value in the initial speed data of each speed is used as the target speed value for the corresponding speed. The first speed data is obtained from the target speed distance and target speed value of each speed. At least one initial temporary speed limit data corresponding to the matching line segment is obtained from the historical temporary speed limit data. The distance between the starting point of each temporary speed limit and the first transponder is used as the target speed limit distance of each temporary speed limit. The initial speed limit speed value in the initial temporary speed limit data of each temporary speed limit is used as the target speed limit speed value for the corresponding temporary speed limit. The overlapping line segment of the initial speed limit length of each temporary speed limit and the line distance data is used as the target speed limit length. The first temporary speed limit data is obtained from the target speed limit distance, target speed limit length, and target speed value of each temporary speed limit.
[0113] In some embodiments, the calculation module 200 is further specifically configured to: determine whether the target slope identifier and target slope value of the last slope in the current TSRS are consistent with the target slope identifier and target slope value of the first slope in the adjacent TSRS; if consistent, then the sum of the slope length of the last slope in the current TSRS and the slope length of the first slope in the adjacent TSRS is used as the slope length of the spliced slope, the number of slopes is updated to the sum of the number of slopes of the current TSRS and the adjacent TSRS minus one, and the slope data of the spliced slope, the first slope data, the second slope data of each slope in the current TSRS and the adjacent TSRS, and the updated number of slopes are used as the spliced slope data; if inconsistent, then the number of slopes is updated to the sum of the number of slopes of the current TSRS and the adjacent TSRS, and the first slope data, the second slope data of each slope in the current TSRS and the adjacent TSRS, and the updated number of slopes are used as the spliced slope data. The sum of the speed counts of the current TSRS and the adjacent TSRS is used as the updated speed count. The first speed data, second speed data, and the updated speed count of each speed in the current TSRS and the adjacent TSRS are used as the stitched speed data. The sum of the temporary speed limits of the current TSRS and the adjacent TSRS is used as the updated temporary speed limit count. The first temporary speed limit data, second temporary speed limit data, and the updated temporary speed limit count of each temporary speed limit in the current TSRS and the adjacent TSRS are used as the stitched temporary speed limit data.
[0114] In some embodiments, the calculation module 200 is further specifically configured to: obtain the identifiers of adjacent TSRSs of the current TSRS according to the cross-scheduling boundary operation plan of the train; periodically obtain second data to be spliced from the adjacent TSRS according to the identifiers of the adjacent TSRS, wherein the second data to be spliced includes second gradient data, second speed data, and second temporary speed limit data; determine whether the second data to be spliced satisfies CRC verification and whether its data format is consistent with the first data to be spliced in the current TSRS; wherein the first data to be spliced includes first gradient data, first speed data, and first temporary speed limit data; if the CRC verification is satisfied and the data format is consistent, then the step of splicing the first data to be spliced and the second data to be spliced is executed; if the CRC verification is not satisfied or the data format is inconsistent, then the step of splicing the first data to be spliced and the second data to be spliced is not executed.
[0115] The automatic station route generation device of the train control system in this application embodiment can be an electronic device or a component of an electronic device, such as an integrated circuit or a chip. The electronic device can be a terminal or other devices besides a terminal. For example, the electronic device can be a mobile phone, tablet computer, laptop computer, handheld computer, vehicle electronic device, mobile internet device (MID), augmented reality (AR) / virtual reality (VR) device, robot, wearable device, ultra-mobile personal computer (UMPC), netbook or personal digital assistant (PDA), etc. It can also be a server, network attached storage (NAS), personal computer (PC), television (TV), ATM or self-service machine, etc. The embodiments of this application do not specifically limit it.
[0116] The automatic station track generation device of the train control system in this application embodiment can be a device with an operating system. This operating system can be a Microsoft (Windows) operating system, an Android operating system, an iOS operating system, or other possible operating systems; this application embodiment does not specifically limit it.
[0117] The automatic station route generation device for the train control system provided in this application embodiment can achieve… Figures 1 to 4 The various processes implemented in the method implementation examples will not be described again here to avoid repetition.
[0118] In some embodiments, such as Figure 6 As shown, this application embodiment also provides an electronic device 800, including a processor 801, a memory 802, and a computer program stored in the memory 802 and executable on the processor 801. When the program is executed by the processor 801, it implements the various processes of the above-described method embodiment for automatically generating inter-station lines in the train control system and achieves the same technical effect. To avoid repetition, it will not be described again here.
[0119] It should be noted that the electronic devices in the embodiments of this application include the mobile electronic devices and non-mobile electronic devices described above.
[0120] This application also provides a non-transitory computer-readable storage medium storing a computer program. When the computer program is executed by a processor, it implements the various processes of the above-described method embodiment for automatically generating inter-station lines in the train control system and achieves the same technical effect. To avoid repetition, it will not be described again here.
[0121] The processor is the processor in the electronic device described in the above embodiments. The readable storage medium includes computer-readable storage media, such as computer read-only memory (ROM), random access memory (RAM), magnetic disk, or optical disk.
[0122] This application also provides a computer program product, including a computer program that, when executed by a processor, implements the above-described method for automatically generating inter-station tracks in the train control system.
[0123] The processor is the processor in the electronic device described in the above embodiments. The readable storage medium includes computer-readable storage media, such as computer read-only memory (ROM), random access memory (RAM), magnetic disk, or optical disk.
[0124] This application embodiment also provides a chip, which includes a processor and a communication interface. The communication interface and the processor are coupled. The processor is used to run programs or instructions to implement the various processes of the above-described method embodiment for automatically generating inter-station lines in the train control system, and can achieve the same technical effect. To avoid repetition, it will not be described again here.
[0125] It should be understood that the chip mentioned in the embodiments of this application may also be referred to as a system-on-a-chip, system chip, chip system, or system-on-a-chip, etc.
[0126] It should be noted that, in this document, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such a process, method, article, or apparatus. Without further limitations, an element defined by the phrase "comprising one..." does not exclude the presence of other identical elements in the process, method, article, or apparatus that includes that element. Furthermore, it should be noted that the scope of the methods and apparatuses in the embodiments of this application is not limited to performing functions in the order shown or discussed, but may also include performing functions substantially simultaneously or in the reverse order, depending on the functions involved. For example, the described methods may be performed in a different order than described, and various steps may be added, omitted, or combined. Additionally, features described with reference to certain examples may be combined in other examples.
[0127] Through the above description of the embodiments, those skilled in the art can clearly understand that the methods of the above embodiments can be implemented by means of software plus necessary general-purpose hardware platforms. Of course, they can also be implemented by hardware, but in many cases the former is a better implementation method. Based on this understanding, the technical solution of this application, in essence, or the part that contributes to the related technology, can be embodied in the form of a computer software product. This computer software product is stored in a storage medium (such as ROM / RAM, magnetic disk, optical disk) and includes several instructions to cause a terminal (which may be a mobile phone, computer, server, or network device, etc.) to execute the methods described in the various embodiments of this application.
[0128] The embodiments of this application have been described above with reference to the accompanying drawings. However, this application is not limited to the specific embodiments described above. The specific embodiments described above are merely illustrative and not restrictive. Those skilled in the art can make many other forms under the guidance of this application without departing from the spirit and scope of the claims, and all of these forms are within the protection scope of this application.
[0129] In the description of this specification, the references to terms such as "one embodiment," "some embodiments," "illustrative embodiment," "example," "specific example," or "some examples," etc., indicate that a specific feature, structure, material, or characteristic described in connection with that embodiment or example is included in at least one embodiment or example of this application. In this specification, the illustrative expressions of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials, or characteristics described may be combined in any suitable manner in one or more embodiments or examples.
[0130] Although embodiments of this application have been shown and described, those skilled in the art will understand that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of this application, the scope of which is defined by the claims and their equivalents.
Claims
1. A method for automatically generating inter-station tracks in a train control system, characterized in that, Applied to Temporary Rate Limiting Servers (TSRS), including: Obtain the current location information reported by the train and a pre-configured static data configuration table, wherein the current location information includes at least the identifier of the first transponder of the first station currently passed by the train, and the static data configuration table contains static data between stations in each operation plan range; The train data for the operational plan range is automatically calculated based on the identifier of the first transponder and the static data in the static data configuration table; The train data is sent to the Automatic Train Operation (ATO) system to control the train to run according to the train data; The train data includes at least track distance data, gradient data, speed data, temporary speed limit data, and track splicing data; the automatic calculation of train data within the operating plan range based on the identifier of the first transponder and the static data in the static data configuration table includes: Based on the identifier of the first transponder, the distance information between each transponder within the scope of the operation plan is obtained from the static data configuration table, and the line distance data is calculated based on the distance information between each transponder; Based on the route distance data, the initial slope data and initial speed data of the matching route segment are obtained from the static data configuration table, and the initial slope data and initial speed data are converted into the first slope data and first speed data within the current operation plan range. The matching route segment is a route segment that overlaps with the current route segment corresponding to the route distance data. Based on the line distance data, the initial temporary speed limit data corresponding to the matching line segment is obtained from the historical temporary speed limit data successfully executed by the dispatching centralized system CTC, and the initial temporary speed limit data is converted into the first temporary speed limit data in the current operation plan range. Obtain the second slope data, second speed data, and second temporary speed limit data from adjacent TSRS. Concatenate the first slope data and the second slope data to obtain concatenated slope data. Concatenate the first speed data and the second speed data to obtain concatenated speed data. Concatenate the first temporary speed limit data and the second temporary speed limit data to obtain concatenated temporary speed limit data.
2. The method according to claim 1, characterized in that, The transponders include a reverse entry transponder and an exit transponder, with the first transponder being the first reverse entry transponder. The train data also includes inter-station length data. The step of automatically calculating the train data for the operating plan range based on the identifier of the first transponder and the static data in the static data configuration table further includes: Obtain the kilometer marker of the first reverse entry transponder and the kilometer markers of the exit transponders of each station within the current operation plan range from the static data configuration table; The distance between the first station and each station is calculated based on the kilometer markers of the first entry transponder and the kilometer markers of the exit transponders of each station.
3. The method according to claim 1 or 2, characterized in that, The transponder includes a reverse entry transponder and a departure transponder, with the first transponder being the first reverse entry transponder; The step of obtaining the distance information between each transponder within the operational plan range from the static data configuration table based on the identifier of the first transponder, and calculating the line distance data based on the distance information between each transponder, includes: Obtain the identifiers of the reverse entry transponders for each station within the scope of the operation plan, excluding the first station and the terminal station, and obtain the identifier of a departure transponder for the terminal station; Based on the identifier of the first reverse entry transponder, the identifiers of the reverse entry transponders of each station, and the identifier of the departure transponder of the terminal station, the first distance information between each adjacent reverse entry transponder and the second distance information between the departure transponder of the terminal station and the reverse entry transponder of the previous station are obtained from the static data configuration table. The sum of each first distance information and the second distance information is calculated as the line distance data.
4. The method according to claim 1 or 2, characterized in that, The step of obtaining the initial gradient data and initial speed data of the matching line segment from the static data configuration table based on the line distance data, and converting the initial gradient data and initial speed data into the first gradient data and first speed data within the current operation plan range, includes: Based on the route distance data, the initial slope data of at least one slope and the initial speed data of at least one speed in the matching route segment are obtained from the static data configuration table. The distance between the starting point of the first slope and the first transponder is taken as the target slope distance of the first slope. The starting points of other slopes and the starting points of the previous slope are taken as the target slope distances of the corresponding slopes. The initial slope identifier and initial slope value in the initial slope data of each slope are taken as the target slope identifier and target slope value of the corresponding slope. The first slope data is obtained from the target slope distance, target slope identifier and / or target slope value of each slope. The distance between the starting point of the first speed and the first transponder is taken as the target speed distance of the first speed. The distance between the starting point of other speeds and the starting point of the previous speed is taken as the target distance of the corresponding speed. The initial speed value in the initial speed data of each speed is taken as the target speed value of the corresponding speed. The first speed data is obtained from the target speed distance and target speed value of each speed. The step of retrieving the initial temporary speed limit data corresponding to the matching line segment from the historical temporary speed limit data successfully executed by the Centralized Traffic Control (CTC) system based on the line distance data, and converting the initial temporary speed limit data into the first temporary speed limit data within the current operating plan range, includes: At least one initial temporary speed limit data corresponding to the matching line segment is obtained by querying historical temporary speed limit data; The distance between the starting point of each temporary speed limit and the first transponder is taken as the target speed limit distance of each temporary speed limit. The initial speed limit value in the initial temporary speed limit data of each temporary speed limit is taken as the target speed limit value of the corresponding temporary speed limit. The overlapping line segment of the initial speed limit length of each temporary speed limit and the line distance data is taken as the target speed limit length. The first temporary speed limit data is obtained from the target speed limit distance, target speed limit length and / or target speed limit value of each temporary speed limit.
5. The method according to claim 4, characterized in that, The step of concatenating the first slope data with the second slope data to obtain the concatenated slope data includes: Determine whether the target slope identifier and target slope value of the last slope in the current TSRS are consistent with the target slope identifier and target slope value of the first slope in the adjacent TSRS; If they match, the slope length of the last slope in the current TSRS and the slope length of the first slope in the adjacent TSRS are taken as the slope length of the spliced slope. The number of slopes is updated to the sum of the number of slopes of the current TSRS and the adjacent TSRS minus one. The slope data of the spliced slope, the first slope data and the second slope data of each slope in the current TSRS and the adjacent TSRS, and the updated number of slopes are taken as the spliced slope data. If they are inconsistent, the number of slopes will be updated to the sum of the number of slopes of the current TSRS and the adjacent TSRS, and the first slope data, the second slope data, and the updated number of slopes of each slope in the current TSRS and the adjacent TSRS will be used as the spliced slope data. The step of concatenating the first speed data and the second speed data to obtain the concatenated speed data includes: The sum of the number of velocities of the current TSRS and the adjacent TSRS is used as the updated number of velocities, and the first velocity data, second velocity data, and updated number of velocities of each velocity in the current TSRS and the adjacent TSRS are used as the splicing velocity data; The step of concatenating the first temporary speed limit data and the second temporary speed limit data to obtain concatenated temporary speed limit data includes: The sum of the number of temporary speed limits in the current TSRS and the adjacent TSRS is taken as the updated number of temporary speed limits, and the first temporary speed limit data, the second temporary speed limit data, and the updated number of temporary speed limits in the current TSRS and the adjacent TSRS are taken as the spliced temporary speed limit data.
6. The method according to claim 5, characterized in that, The acquisition of the second slope data, second speed data, and second temporary speed limit data from adjacent TSRS includes: According to the train's cross-dispatch boundary operation plan, the identifiers of the adjacent TSRS of the current TSRS are obtained, and the second data to be spliced is periodically obtained from the adjacent TSRS according to the identifiers of the adjacent TSRS. The second data to be spliced includes second gradient data, second speed data and second temporary speed limit data. Determine whether the second data to be spliced satisfies the CRC check and whether its data format is consistent with the format of the first data to be spliced in the current TSRS; wherein, the first data to be spliced includes first data slope data, first speed data and first temporary speed limit data; If the CRC check is satisfied and the data format is consistent, then the step of concatenating the first data to be concatenated and the second data to be concatenated is executed; If the CRC check is not met or the data formats are inconsistent, the step of concatenating the first data to be concatenated and the second data to be concatenated will not be executed.
7. An automatic station track generation device for a train control system, characterized in that, include: The acquisition module is used to acquire the current location information reported by the train and a pre-configured static data configuration table. The current location information includes the identifier of the first transponder of the first station that the train is currently passing through, and the static data configuration table contains static data between stations in each operation plan range. The calculation module is used to automatically calculate the train data for the operating plan range based on the identifier of the first transponder and the static data in the static data configuration table; The transmitting module is used to transmit the train data to the Automatic Train Operation (ATO) system to control the train to run according to the train data; The calculation module is further specifically configured to: obtain distance information between transponders within the operational plan range from the static data configuration table based on the identifier of the first transponder; calculate line distance data based on the distance information between the transponders; obtain initial slope data and initial speed data of the matching line segment from the static data configuration table based on the line distance data; and convert the initial slope data and initial speed data into first slope data and first speed data within the current operational plan range, wherein the matching line segment is a line segment that overlaps with the current line segment corresponding to the line distance data; and calculate the line distance data based on the line distance data. The system retrieves the initial temporary speed limit data corresponding to the matched line segment from the historical temporary speed limit data successfully executed by the Centralized Traffic Control (CTC) system, and converts the initial temporary speed limit data into the first temporary speed limit data within the current operating plan range. It then acquires the second gradient data, second speed data, and second temporary speed limit data from adjacent Transit Speed Control Systems (TSRS), concatenates the first gradient data with the second gradient data to obtain concatenated gradient data, concatenates the first speed data with the second speed data to obtain concatenated speed data, and concatenates the first temporary speed limit data with the second temporary speed limit data to obtain concatenated temporary speed limit data.
8. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that, When the processor executes the program, it implements the automatic generation method for inter-station routes of the train control system as described in any one of claims 1-6.
9. A non-transitory computer-readable storage medium having a computer program stored thereon, characterized in that, When executed by a processor, the computer program implements the automatic generation method for inter-station tracks in a train control system as described in any one of claims 1-6.
Citation Information
Patent Citations
Electronic map sending method capable of dynamically adjusting transmission rate
CN114148379A
