Sewage intercepting, desilting and plugging integrated device for pipeline inspection well and construction method
By combining the limiting block and limiting plate, using the slag collection design of the inclined plate U-shaped filter and cylindrical filter, and the intelligent monitoring of the airbag sealing and alarm transmitter, the problem of garbage accumulation in inspection wells has been solved, and intelligent early warning and safe and efficient dredging process have been achieved.
Patent Information
- Application Number
- CN202510975354.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-07-15
- Publication Date
- 2025-10-17
AI Technical Summary
Existing inspection wells cannot determine the cleaning time when garbage accumulates, the filter structure cannot effectively handle silt, have poor applicability, and the cleaning process is time-consuming, labor-intensive, and poses safety hazards.
The system employs a combination of limit blocks and limit plates to reduce swaying, combines inclined U-shaped filters and cylindrical filters for slag collection, uses airbags to seal the pipeline, and monitors the water level height via an alarm transmitter for intelligent early warning.
It has achieved intelligent monitoring and early warning, reduced the impact of garbage blockage, saved dredging time, improved safety, and simplified construction operations.
Smart Images

Figure CN120797737A_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The application belongs to the technical field of municipal drainage pipeline, more specifically, relates to a pipeline inspection well sewage intercepting and dredging plugging integrated device and a construction method. BACKGROUND
[0002] In the urban drainage system, especially in the urban drainage pipeline, a certain amount of garbage and sundries are often carried, including street life garbage and surrounding washed leaves, etc. The sewage interception and plugging technology of the inspection well as a key node plays a crucial role in maintaining the normal operation of the drainage pipe network, preventing sewage overflow and environmental pollution. The inspection well is often set at the intersection of the pipeline, the turning place, the change of pipe diameter or slope, and every certain distance on the straight pipe section, which plays the role of connection, cleaning, and inspection of the pipeline, as well as the special role of changing the direction of water flow (elbow), converging (three-way), and changing the diameter.
[0003] At present, most inspection wells may have sludge and other objects flowing through during use, increasing the cleaning burden of the user, consuming a large amount of manpower and material resources, and being not conducive to the stable use of the drainage system. At the same time, when the garbage in the inspection well accumulates too much, it is not clear when to clean it in time, which is not intelligent enough. Secondly, the current urban sewage adopts a decentralized collection and centralized treatment operation and management mode, and the composition of sewage is becoming more and more complex and variable. Especially for the combined sewerage system in the city, the sundries carried by rainwater and sewage often cause blockage of the main pipe network, and affect the operation and management of the urban sewage treatment plant. For example, patent document CN218814238U discloses a sewage inspection well. Garbage enters the well shaft through the water inlet from the water inlet pipe, and after being filtered by the first filter screen, the water flow and garbage are left on the first filter screen. The water flow passes through the first filter screen and enters the bottom of the well shaft, reducing the risk of the water outlet of the inspection well being blocked. Since the first filter screen is inclined, when the garbage is intercepted to the first filter screen, large pieces of garbage will move away from the water outlet in the direction of the inclination of the first filter screen under the action of their own gravity, reducing the risk of the water inlet of the inspection well being blocked.
[0004] However, the technical solution disclosed in patent document CN218814238U still has the following technical problems: (1) when the garbage accumulates too much, it is not clear when to clean it; (2) the filter screen structure can only separate the garbage that cannot pass through the filter screen, and the sludge will still sink to the bottom of the well; (3) it is suitable for sewage inspection wells with the same cross section, and the applicability is not strong for variable cross section inspection wells; (4) it is suitable for inspection wells with obvious height difference between upstream and downstream pipes, and the applicability is not strong for inspection wells with no obvious height difference between upstream and downstream pipes. SUMMARY
[0005] In view of the above defects or improvement needs of the prior art, the present application provides a pipeline inspection well sewage interception, dredging and plugging integrated device and a construction method. Through the joint action of the limiting block and the limiting plate installed on the limiting block, the left and right shaking occurring during sewage interception is reduced, and the influence of the shaking on sewage interception is reduced. Through the combined slag collecting and dredging technical means of the inclined plate U-shaped filter screen, the cylindrical filter screen and the closure plate on the garbage and sundries in the upstream pipeline, the problems of drainage inspection well and downstream pipeline blockage and inability to collect sludge are solved, the effect of avoiding the influence of garbage and sundries on the water section due to the blockage of the pipeline and the effect of cleaning the sludge in the well out of the well are achieved, the inflatable device is installed on the outer sliding groove metal hollow rod, the inflatable device is used to pressurize and inflate to plug the pipeline, and the effect that the plugging can be removed by pressure relief and deflation is achieved, the water level height of the inspection well is monitored by the alarm transmitter, so that the accumulation condition in the inspection well is judged, the intelligent monitoring and early warning of the accumulation condition in the inspection well are realized, and the effect of determining whether to dredge according to the warning condition is achieved.
[0006] In order to achieve the above-mentioned purpose, according to the first aspect of the present application, a pipeline inspection well sewage interception, dredging and plugging integrated device is provided, comprising: A falling prevention grid net fixing mechanism, comprising a falling prevention grid net, a plurality of limiting blocks welded on the outer side of the falling prevention grid net, and an inspection well wall for limiting the falling prevention grid net, the falling prevention grid net is installed at the top of the inspection well to prevent accidental falling into the inspection well and protect the personal safety of the operator; A sewage interception mechanism connected to the outer side of the falling prevention grid net fixing mechanism, comprising a rope connected to one end of the outer side of the falling prevention grid net, a sliding block metal rod connected to the other end of the rope, and an outer sliding groove metal hollow rod connected to the sliding block metal rod, the sliding block metal rod is provided with a sliding block placed in the matching sliding groove of the outer sliding groove metal hollow rod; A plugging mechanism connected to the middle part of the sewage interception mechanism, comprising an air bag, an inflation pipe connected to one end of the outer sliding groove metal hollow rod, and an inflation device connected to the other end of the outer sliding groove metal hollow rod for air supply and air release, the air supply and air release of the air bag by the inflation device realizes the plugging function of the inspection well to the pipeline; An automatic alarm mechanism located below the falling prevention grid net fixing mechanism, comprising an alarm transmitter located below the falling prevention grid net, a reverse U-shaped insulated wire connected to both ends of the alarm transmitter respectively, and a conductive sheet arranged at the end of the reverse U-shaped insulated wire respectively, when the water surface contacts the conductive sheets at both ends, the automatic alarm mechanism forms a closed loop, and the alarm transmitter sends an alarm signal to the background.
[0007] Further, the falling prevention grid net fixing mechanism further comprises a limiting plate installed on the limiting block, and the limiting plate and the limiting block are connected by bolts.
[0008] Further, the sliding block metal rod is connected to the limiting plate, and through the cooperation of the limiting block and the limiting plate, the left and right shaking of the sliding block metal rod during the sewage interception process is reduced, and the influence of the shaking on the sewage interception is reduced.
[0009] Further, the sewage interception mechanism further comprises an upstream pipeline arranged outside the inspection well and a downstream pipeline arranged on the other side of the inspection well.
[0010] Further, the sewage interception mechanism further comprises a cylindrical filter screen connected to the bottom of the sliding block metal rod, a closing plate connected to the cylindrical filter screen, and an inclined plate U-shaped filter screen which is closed with the upstream pipeline and the cylindrical filter screen but is not fixedly installed, and through the collection of garbage and sundries by the cylindrical filter screen, the inclined plate U-shaped filter screen and the closing plate, the dredging effect of the sewage interception mechanism is realized.
[0011] Further, the cylindrical filter screen on one side of the upstream pipeline is provided with an upstream channel.
[0012] Further, the plugging mechanism further comprises a road surface and a well cover located on the ground and the top of the inspection well.
[0013] Further, the air bag is connected to one end of the sliding block metal rod, and by pulling the rope upward, the air bag can be installed and removed outside the inspection well.
[0014] Further, the alarm water level is the water level in the inspection well which connects the two conductive sheets and forms a closed loop.
[0015] According to the second aspect of the present application, a pipeline inspection well sewage interception and dredging integrated construction method is provided, which is realized by using a pipeline inspection well sewage interception and dredging integrated device, and comprises the following steps: S100: building a drainage inspection well, and after the building is completed, placing an inclined plate U-shaped filter screen, so that the high end of the inclined plate U-shaped filter screen abuts against the bottom of the upstream drainage pipeline, then placing a limiting block, connecting and fixing the external sliding groove metal hollow rod with the air bag, and placing the external sliding groove metal hollow rod and fixing it through bolts and the limiting block; S200: connecting the cylindrical filter screen and the sliding block metal rod together, connecting the closing plate and the cylindrical filter screen together, placing the sliding block in the sliding groove on the outer wall of the external sliding groove metal hollow rod, binding the top of the sliding block metal rod with the rope, placing the cylindrical filter screen at the bottom of the inspection well, connecting the inverted U-shaped insulating wire with the alarm transmitter, connecting the two sections at the bottom of the inverted U-shaped insulating wire with the two conductive sheets respectively, binding the inverted U-shaped insulating wire on the anti-falling grid, placing the anti-falling grid, suspending the rope on the anti-falling grid, and covering the well cover of the inspection well to complete the installation of the inspection well; S300: When the upstream garbage gradually enters the inspection well, it is collected on the closed plate by the inclined plate U-shaped filter screen and the cylindrical filter screen, and gradually accumulates, and when the garbage gradually accumulates to a certain extent, the water level in the inspection well gradually rises; S400: When the water level rises to the alarm water surface height, the two conductive sheets are just immersed in the water surface, prompting the automatic alarm signal emitting device to form a closed loop, thereby triggering the automatic alarm to send a signal to the background, and arranging personnel and machinery to clean up; S500: Before cleaning, open the anti-falling grid, take out the rope, and drive the sliding block metal rod to rise, and after lifting to the road surface, remove the sliding block metal rod, take out the cylindrical filter screen from the road surface, and pour out the garbage and other waste to the treatment site, and then repeat step 2, and the alarm dredging construction of the inspection well is completed; S600: The external sliding groove metal hollow rod is connected, and the air bag connected therewith is placed at the bottom of the well, the inflation device is connected with the external sliding groove metal hollow rod through the inflation pipe, the inflation device is started, the air bag is inflated by the external sliding groove metal hollow rod and the inflation pipe, and the air bag is fully expanded, and finally the effect of temporarily plugging the upstream or downstream pipeline of the inspection well is achieved; S700: When the plugging needs to be released, directly release the pressure to deflate, so that the air bag shrinks, and then the air bag is lifted to a certain height and fixed, and the temporary plugging construction of the inspection well is completed.
[0016] Overall, compared with the prior art, the above technical solutions conceived by the present application can achieve the following beneficial effects: 1. The device of the present application, through the combined action of the limiting block and the limiting plate installed on the limiting block, reduces the left and right shaking that occurs during pollution interception, reduces the influence of pollution caused by shaking, and solves the problems of drainage inspection well and downstream pipeline blockage and inability to collect silt through the joint silt collecting and dredging technology of the inclined plate U-shaped filter screen and the cylindrical filter screen and the closed plate. The effect of avoiding the influence of garbage blockage on the pipeline and the effect of cleaning the sludge in the well are achieved. By installing the air bag on the external sliding groove metal hollow rod, the effect of plugging the pipeline by using the inflation device to pressurize and inflate is achieved, and the effect of removing the plugging by releasing the pressure is achieved. The water level in the inspection well is monitored by the alarm emitter, so as to judge the siltation condition in the inspection well, and the effect of intelligent monitoring and early warning of the siltation condition in the inspection well is achieved, and the effect of determining whether to dredge according to the warning condition is achieved.
[0017] 2. The device of the present application, through the anti-falling grid installed below the inspection well cover, prevents the occurrence of the case of accidentally falling into the inspection well, protects the personal safety of the operator, and reduces the left and right shaking that occurs during pollution interception through the combined action of the limiting block and the limiting plate installed on the limiting block, and reduces the influence of pollution caused by shaking.
[0018] 3. The device of the present application solves the problems of drainage inspection well and downstream pipeline blockage and inability to collect silt by using the technical means of combined slag collection and silt collection of garbage and sundries in the upstream pipeline through the inclined plate U-shaped filter screen and the cylindrical filter screen and the closing plate, achieves the effects of avoiding the influence of garbage and sundries blockage on the water passage section and cleaning the sludge in the well out of the well, solves the problems of time-consuming and laborious operation of the operator and poisoning in the well by sliding the slider in the metal rod of the slider in the metal hollow rod outside the sliding chute, and achieves the effects of saving the time of cleaning the inspection well and avoiding safety accidents such as poisoning and suffocation of the operator caused by cleaning the well.
[0019] 4. The device of the present application avoids the operation of manually installing and dismounting the air bag in the well by installing the air bag on the metal hollow rod outside the sliding chute, simplifies the construction operation and avoids certain safety hazards, and achieves the effects of using the inflation device to pressurize and inflate to block the pipeline and releasing pressure to deflate to remove the blockage.
[0020] 5. The device of the present application monitors the water level of the inspection well through the alarm transmitter to determine the accumulation in the inspection well, thereby realizing intelligent monitoring and early warning of the accumulation in the inspection well, and determining whether to clean the silt according to the warning condition. BRIEF DESCRIPTION OF DRAWINGS
[0021] Figure 1 It is a structure schematic view of the pipeline inspection well sewage interception, silt cleaning and blockage integrated device of the embodiment of the present application. Figure 2 It is a section view of the inclined plate U-shaped filter screen of the embodiment of the present application. Figure 3 It is a whole structure schematic view of the sewage interception mechanism at the cylindrical filter screen of the embodiment of the present application. Figure 4 It is a structure schematic view of the sewage interception mechanism at the upstream pipeline side of the cylindrical filter screen of the embodiment of the present application. Figure 5 It is a structure schematic view of the pipeline inspection well sewage interception, silt cleaning and blockage integrated device at the anti-falling grid net of the embodiment of the present application. Figure 6 It is a structure schematic view of the pipeline inspection well sewage interception, silt cleaning and blockage integrated device at the air bag of the embodiment of the present application. Figure 7 It is a structure schematic view of the pipeline inspection well sewage interception, silt cleaning and blockage integrated device at the metal hollow rod outside the sliding chute of the embodiment of the present application. Figure 8 It is a construction method flow chart of the pipeline inspection well sewage interception, silt cleaning and blockage integrated device of the embodiment of the present application.
[0022] In all the drawings, the same reference signs refer to the same technical features, specifically: 11 - fall arrest grid, 12 - limit block, 13 - bolt, 14 - inspection well wall, 15 - limit plate, 21 - rigging, 22 - external sliding groove metal hollow rod, 23 - sliding block metal rod, 24 - cylindrical filter screen, 25 - inclined plate U-shaped filter screen, 26 - upstream pipe, 27 - closure plate, 28 - downstream pipe, 29 - upstream channel, 31 - air bag, 32 - inflation device, 33 - inflation tube, 34 - manhole cover, 35 - road surface, 41 - alarm transmitter, 42 - conductive sheet, 43 - inverted U-shaped insulated wire, 44 - alarm water level. DETAILED DESCRIPTION
[0023] In order to make the objectives, technical solutions and advantages of the present application clearer, the present application will be further described in detail below with reference to the drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and should not be used to limit the present application. In addition, the technical features involved in the various embodiments of the present application described below can be combined with each other as long as they do not conflict with each other.
[0024] In the description of the embodiments of the present application, it should be noted that if the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer" and the like indicate the orientation or positional relationship shown in the drawings, or the orientation or positional relationship of the product in use, and are only for the convenience of describing the present application and simplifying the description, and therefore cannot be understood as indicating or implying that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore cannot be understood as limiting the present application. In addition, the terms "first", "second", "third" and the like are only used to distinguish the description and cannot be understood as indicating or implying relative importance.
[0025] In addition, if the terms "horizontal", "vertical", "overhanging" and the like appear, they do not mean that the component must be absolutely horizontal or overhanging, but can be slightly inclined. For example, "horizontal" only means that its direction is relatively more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but can be slightly inclined.
[0026] In the description of the embodiments of the present application, "a plurality of" represents at least 2.
[0027] In the description of the embodiments of the present application, it also needs to be explained that, unless otherwise explicitly specified and limited, if the terms "arrange", "install", "connect", "connect" appear, they should be understood in a broad sense, for example, can be fixedly connected, can also be detachably connected, or integrally connected; can be mechanically connected, can also be electrically connected; can be directly connected, can also be indirectly connected through an intermediate medium, can be the communication inside two elements. For those skilled in the art, the specific meaning of the above terms in the present application can be understood according to the specific circumstances.
[0028] The present application provides a pipeline inspection well intercepting and dredging integrated device. Figure 1 As shown, it comprises a falling prevention grid net fixing mechanism, an intercepting mechanism, a plugging mechanism and an automatic alarm mechanism, the falling prevention grid net fixing mechanism is located at the top of the inspection well, below the inspection well cover 34, the intercepting mechanism is located at the bottom of the inspection well, the plugging mechanism is located between the intercepting mechanism and the inspection well wall 14, and the automatic alarm mechanism is located directly below the falling prevention grid net fixing mechanism. The device of the present application, through the joint action of the limiting block and the limiting plate installed on the limiting block, reduces the left and right shaking during the intercepting process, reduces the influence of the shaking on the intercepting, and through the joint slag collecting and dredging technical means of the inclined plate U-shaped filter screen, the cylindrical filter screen and the closure plate on the garbage and sundries in the upstream pipeline, solves the problems of drainage inspection well and downstream pipeline blockage and inability to collect silt, achieves the effect of avoiding the influence of garbage and sundries on the pipeline and the effect of cleaning the sludge in the well out of the well, through installing the air bag on the external sliding groove metal hollow rod, realizes the effect of using the inflation equipment to pressurize and inflate the pipeline, and the effect of removing the plugging by pressure relief and deflation, through the alarm transmitter to monitor the water level height of the inspection well, to judge the siltation condition in the inspection well, to realize the intelligent monitoring and early warning of the siltation condition in the inspection well, and to determine whether to carry out dredging according to the early warning condition.
[0029] Specifically, as Figure 1 , Figure 5 , Figure 6As shown, the anti-falling grid net fixing mechanism comprises an anti-falling grid net 11, a limiting block 12, a bolt 13, a manhole wall 14 and a limiting plate 15, wherein the anti-falling grid net 11 is installed below the manhole cover 34 and above the automatic alarm mechanism, the two sides of the anti-falling grid net 11 are limited by the manhole wall 14, a plurality of limiting blocks 12 (four in this embodiment) are welded with the end of the anti-falling grid net 11 by welding process, corresponding screw hole positions are opened on the limiting plate 15 and the limiting block 12, the limiting plate 15 and the limiting block 12 are connected by the bolt 13, after the manhole cover 34 is opened, the anti-falling grid net 11 can prevent the operator from falling into the manhole by accident, protect the personal safety of the operator, the top of the external chute metal hollow rod 22 of the intercepting mechanism is installed on the limiting plate 15, the left and right shaking of the external chute metal hollow rod 22 during the intercepting process can be reduced by the joint action of the limiting plate 15 and the limiting block 12, and the influence of the intercepting caused by the shaking is reduced. The device of the present application prevents the operator from falling into the manhole by accident by the anti-falling grid net installed below the manhole cover, protects the personal safety of the operator, reduces the left and right shaking during the intercepting process by the joint action of the limiting block and the limiting plate installed on the limiting block, and reduces the influence of the intercepting caused by the shaking.
[0030] Specifically, as Figure 1 , Figure 2 , Figure 3 , Figure 7As shown, the sewage interception mechanism comprises a rope 21, an external sliding groove metal hollow rod 22, a sliding block metal rod 23, a cylindrical filter screen 24, an inclined plate U-shaped filter screen 25, an upstream pipeline 26, a closing plate 27, a downstream pipeline 28 and an upstream channel 29, wherein the top of the external sliding groove metal hollow rod 22 is mounted on the limiting plate 15, the sliding block in the sliding block metal rod 23 is placed in the sliding groove on the outer wall of the external sliding groove metal hollow rod 22, one end of the rope 21 is connected with the top of the sliding block metal rod 23, and the other end is connected on the anti-falling grid 11, so that the sliding block metal rod 23 is hung below the anti-falling grid 11, the cylindrical filter screen 24 is connected at the bottom of the sliding block metal rod 23, the closing plate 27 is connected with the cylindrical filter screen 24, the inclined plate U-shaped filter screen 25 is placed at the bottom of the upstream pipeline 26 and forms a closed structure with the cylindrical filter screen 24, but the inclined plate U-shaped filter screen 25 is not fixed, the downstream pipeline 28 is behind the cylindrical filter screen 24 on the other side, and the upstream channel 29 is opened on the cylindrical filter screen 24 on one side of the upstream pipeline 26, when the garbage and sundries in the upstream pipeline 26 need to be cleaned, the lifting rope 21 is lifted to drive the sliding block metal rod 23 to rise, after being lifted to the road surface 35, the sliding block metal rod 23 is unloaded, the cylindrical filter screen 24 is taken out of the road surface 35, and the garbage and sundries are poured out at the designated position, so that the inspection well dredging effect can be achieved. The device of the application solves the problems of drainage inspection well and downstream pipeline blockage and inability to collect silt through the technical means of combined silt collection and dredging of garbage and sundries in the upstream pipeline by the inclined plate U-shaped filter screen and the cylindrical filter screen and the closing plate, avoids the influence of garbage and sundries blockage on the water section and the effect of cleaning the sludge in the well out of the well, solves the problems of time-consuming and laborious operation of the operator, poisoning in the well, saves the inspection well dredging time, avoids the safety accidents such as poisoning and suffocation of the operator due to dredging in the well, and achieves the effect of saving the inspection well dredging time.
[0031] Specifically, as Figure 1 、 Figure 6As shown, the plugging mechanism includes air bag 31, inflation device 32, inflation pipe 33, well lid 34 and road surface 35, wherein the air bag 31 is connected with one end of the inflation pipe 33 through the external sliding groove metal hollow rod 22, the other end of the inflation pipe 33 is connected with the inflation device 32, the inflation device 32 is placed on the road surface 35, the well lid 34 is installed on the road surface 35, when the upstream pipe 26 or the downstream pipe 28 of the inspection well needs to be plugged, the air bag 31 connected with the external sliding groove metal hollow rod 22 is placed at the bottom of the well by using the external sliding groove metal hollow rod 22, the inflation device 32 is used to pressurize and inflate the air bag 31 through the external sliding groove metal hollow rod 22 and the inflation pipe 33, so that the air bag 31 is fully expanded, since the air bag 31 is located between the cylindrical filter screen 24 and the inspection well wall 14, as the air bag 31 expands, the cylindrical filter screen 24 and the inspection well wall 14 will limit the air bag 31 to a certain extent, so that the air bag 31 tends to expand towards the pipe opening, thereby achieving the effect of temporarily plugging the upstream or downstream pipe of the inspection well, when it is necessary to remove the plugging, the air bag 31 is contracted by releasing the pressure of the inflation device 32, and then the air bag 31 is lifted to a fixed height to remove the plugging. The device of the application avoids the need for manual installation and removal of the air bag in the well, simplifies the construction operation and avoids certain safety hazards, and simultaneously realizes the effect of pressurizing and inflating the pipe by using the inflation device, and the plugging can be removed by releasing the pressure.
[0032] Specifically, as shown in the drawings, Figure 1 As shown, the automatic alarm mechanism includes alarm transmitter 41, conductive sheet 42, inverted U-shaped insulated wire 43 and alarm water level 44, wherein the alarm transmitter 41 is placed at the bottom of the anti-falling grid 11, the two ends of the alarm transmitter 41 are respectively connected with the inverted U-shaped insulated wire 43, the other end of the inverted U-shaped insulated wire 43 is respectively connected with each conductive sheet 42, as the garbage and sundries in the inspection well accumulate too much, the water level in the inspection well continues to rise, when the water level in the inspection well rises to the alarm water level 44, the two ends of the conductive sheet 42 are immersed in the water to form a closed loop, thereby triggering the automatic alarm and sending a signal to the background. The device of the application monitors the water level of the inspection well by using the alarm transmitter, thereby judging the siltation condition in the inspection well, and realizing the effect of intelligent monitoring and early warning of the siltation condition in the inspection well, and determining whether to carry out dredging according to the early warning condition.
[0033] As shown in the drawings, Figure 8 As shown in the drawings, in another embodiment of the application, a pipeline inspection well sewage interception and dredging plugging integrated construction method is provided, comprising the following steps: 1. Build the drainage inspection well, and after the completion of the masonry, place the inclined plate U-shaped filter screen, so that the high end of the inclined plate U-shaped filter screen abuts against the bottom of the upstream drainage pipeline, then place the limiting block, connect and fix the external sliding groove metal hollow rod with the air bag, and place the external sliding groove metal hollow rod and fix it with the limiting block through the bolts.
[0034] 2. Connect the cylindrical filter screen with the sliding block metal rod, connect the closure plate with the cylindrical filter screen, and place the sliding block in the sliding groove of the external sliding groove metal hollow rod. The top of the sliding block metal rod is tied with the rope, the cylindrical filter screen is placed at the bottom of the inspection well, the inverted U-shaped insulated wire is connected with the alarm transmitter, the bottom of the inverted U-shaped insulated wire is connected with two conductive sheets respectively, the inverted U-shaped insulated wire is tied on the anti-falling grid, the anti-falling grid is placed, the rope is hung on the anti-falling grid, and the inspection well cover is covered to complete the installation of the inspection well.
[0035] 3. When the upstream garbage gradually enters the inspection well, it is collected on the closure plate through the inclined plate U-shaped filter screen and the cylindrical filter screen, and gradually accumulates. When the garbage gradually accumulates to a certain extent, the water level in the inspection well gradually rises.
[0036] 4. When the water level rises to the alarm water surface height, the two conductive sheets are just immersed in the water surface, which forms a closed loop to trigger the automatic alarm to send a signal to the background, and personnel and machinery are arranged for cleaning.
[0037] 5. Before cleaning, open the anti-falling grid, take out the rope, and the rope drives the sliding block metal rod to rise. After lifting to the road surface, the sliding block metal rod is removed, the cylindrical filter screen is taken out of the road surface, the garbage and other waste are poured out and transported to the treatment site, and then step 2 is repeated, and the alarm and dredging construction of the inspection well is completed.
[0038] 6. The external sliding groove metal hollow rod is connected with the air bag, the air filling device is connected with the external sliding groove metal hollow rod through the inflation pipe, the air filling device is started, the air bag is inflated through the external sliding groove metal hollow rod and the inflation pipe, the air bag is fully expanded, and finally the effect of temporarily plugging the upstream or downstream pipeline of the inspection well is achieved.
[0039] 7. When the plugging needs to be removed, directly release the pressure to deflate the air bag, and then lift the air bag to a certain height for fixation, and the temporary plugging construction of the inspection well is completed.
[0040] In summary, the pipeline inspection well sewage interception, dredging and plugging integrated device and construction method can realize the integration of sewage interception, plugging, dredging and automatic alarm.
[0041] Those skilled in the art can understand that the above description is only the preferred embodiment of the present application, and is not intended to limit the present application. Any modification, equivalent replacement and improvement made within the spirit and principle of the present application should be included in the protection scope of the present application.
Claims
1. An integrated device for intercepting, desilting and plugging sewage in pipeline inspection wells, characterized in that: include: An anti-falling grille net fixing mechanism comprises an anti-falling grille net (11), a plurality of limiting blocks (12) welded to the outside of the anti-falling grille net (11), and an inspection well wall (14) for limiting the anti-falling grille net (11). By installing the anti-falling grille net (11) on the top of the inspection well, the operator is prevented from accidentally falling into the inspection well, thereby protecting the personal safety of the operator; A sewage interception mechanism connected to the outside of the anti-falling grille net fixing mechanism comprises a rope (21) connected to the outside of the anti-falling grille net (11) at one end, a slider metal rod (23) connected to the other end of the rope (21), and an external chute metal hollow rod (22) connected to the slider metal rod (23), wherein the slider metal rod (23) is provided with a slider placed in a matching chute provided on the external chute metal hollow rod (22); A blocking mechanism connected to the middle of the sewage interception mechanism comprises an air bag (31), an air filling tube (33) connected at one end to the metal hollow rod (22) of the external chute, and an air filling device (32) connected at the other end of the metal hollow rod (22) of the external chute for supplying and releasing air. The air filling device (32) releases air from the air bag (31) to achieve the blocking function of the inspection well on the pipeline. The automatic alarm mechanism is located below the anti-falling grille net fixing mechanism, and comprises an alarm transmitter (41) located below the anti-falling grille net (11), an inverted U-shaped insulated wire (43) connected to both ends of the alarm transmitter (41), and conductive sheets (42) respectively arranged at the ends of the inverted U-shaped insulated wire (43). When the water surface contacts the conductive sheets (42) at both ends, the automatic alarm mechanism forms a closed loop, and the alarm transmitter (41) sends an alarm signal to the backstage.
2. The integrated device for intercepting, desilting and plugging sewage in pipeline inspection wells according to claim 1, characterized in that: The anti-falling grille net fixing mechanism further comprises a limiting plate (15) mounted on the limiting block (12), and the limiting plate (15) is connected to the limiting block (12) by means of bolts (13).
3. The integrated sewage interception, silt removal and plugging device for pipeline inspection wells according to claim 1 or 2, characterized in that: The slider metal rod (23) is connected to the limit plate (15), and the limit block (12) and the limit plate (15) work together to reduce the left and right shaking of the slider metal rod (23) during the sewage interception process, thereby reducing the sewage interception impact caused by the shaking.
4. A pipeline inspection well sewage interception, silt removal and plugging integrated device according to any one of claims 1 to 3, characterized in that: The sewage interception mechanism further comprises an upstream pipeline (26) provided on the outside of the inspection well and a downstream pipeline (28) provided on the other side of the inspection well.
5. The integrated sewage interception, silt removal and plugging device for pipeline inspection wells according to claim 4 is characterized in that: The sewage interception mechanism further comprises a cylindrical filter screen (24) connected to the bottom of the slider metal rod (23), a closing plate (27) connected to the cylindrical filter screen (24), and an inclined plate U-shaped filter screen (25) which is closed with the upstream pipe (26) and the cylindrical filter screen (24) but is not fixedly installed. The cylindrical filter screen (24), the inclined plate U-shaped filter screen (25) and the closing plate (27) collect garbage and debris, thereby achieving the dredging function of the sewage interception mechanism.
6. The integrated device for intercepting, desilting and plugging sewage in pipeline inspection wells according to claim 5, characterized in that: An upstream channel (29) is formed on the cylindrical filter screen (24) on one side of the upstream pipe (26).
7. A pipeline inspection well sewage interception, silt removal and plugging integrated device according to any one of claims 1 to 3, characterized in that: The blocking mechanism also includes a road surface (35) and a manhole cover (34) located on the ground and on the top of the inspection well.
8. A pipeline inspection well sewage interception, silt removal and plugging integrated device according to any one of claims 1 to 3, characterized in that: The airbag (31) is connected to one end of the slider metal rod (23), and the airbag (31) can be installed and removed outside the inspection well by pulling the rope (21) upward.
9. A pipeline inspection well sewage interception, silt removal and plugging integrated device according to any one of claims 1 to 3, characterized in that: The alarm water level (44) is the water level in the inspection well that connects the conductive plates (42) at both ends and forms a closed loop.
10. An integrated construction method for intercepting, desilting and plugging sewage in pipeline inspection wells, characterized in that: The invention is realized by using an integrated sewage interception, silt removal and plugging device for a pipeline inspection well according to any one of claims 1 to 9, comprising: S100: Build the drainage inspection well and install the inclined plate U-shaped filter after the masonry is completed, so that the upper end of the inclined plate U-shaped filter is against the bottom of the upstream drainage pipe. Then install the limit block, connect and fix the external chute metal hollow rod to the airbag, and install the external chute metal hollow rod and fix it with bolts and limit blocks; S200: Connect the cylindrical filter screen with the slider metal rod, connect the closing plate with the cylindrical filter screen, and place the slider in the slider metal rod into the outer wall groove of the external chute metal hollow rod. Tie the top of the slider metal rod to the rope. Place the cylindrical filter screen at the bottom of the inspection well, and connect the inverted U-shaped insulated wire to the alarm transmitter. The two bottom sections are connected to the two conductive sheets respectively. Then tie the inverted U-shaped insulated wire to the anti-fall grille net, install the anti-fall grille net, and hang the rope on the anti-fall grille net. Cover the inspection well cover to complete the installation of the inspection well. S300: When garbage and debris from upstream gradually enter the inspection well, they are collected on the closed plate through the inclined U-shaped filter and the cylindrical filter, and gradually accumulate. When the garbage and debris gradually accumulate to a certain level, the water level in the inspection well gradually increases; S400: When the water level rises to the alarm level, the two conductive sheets are immersed in the water, prompting the automatic alarm signal transmission device to form a closed loop, thereby triggering the automatic alarm to start sending a signal to the backend and arranging personnel and machinery for cleaning; S500: Before cleaning, open the anti-fall grid and lift the rope. The rope drives the metal rod of the slider to rise. After lifting it to the road surface, remove the metal rod of the slider and lift the cylindrical filter out of the road surface. Empty the garbage and debris and transport them to the disposal site. Then repeat step 2. The alarm desilting of the inspection well is completed. S600: Connect an external metal hollow rod to the chute and place the airbag connected to it at the bottom of the well. Connect the inflation device to the external metal hollow rod through the inflation tube. Start the inflation device, and the airbag is pressurized and inflated through the external metal hollow rod and the inflation tube to fully expand the airbag, ultimately achieving the effect of temporarily blocking the upstream or downstream pipeline of the inspection well. S700: When the blockage needs to be lifted, simply release the pressure and air to shrink the airbag, and then lift the airbag to a certain height and fix it. The temporary blockage of the inspection well is completed.
Citation Information
Patent Citations
A sewage inspection well
CN218814238U