Early-dismantling supporting structure and laterally-dismantled plate formwork supporting system

By connecting the inverted V-shaped support components with the clamping parts, the problems of low efficiency and high safety risks in the early dismantling process of existing building formwork support systems are solved. Stable and reliable support and simplified installation and dismantling are achieved, reducing material costs and weight, and it is suitable for various types of formwork.

CN120797961AActive Publication Date: 2025-10-17CHINA MCC5 GROUP CORP LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202510854616.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-06-25
Publication Date
2025-10-17
Estimated Expiration
2045-06-25

AI Technical Summary

Technical Problem

Existing building formwork support systems suffer from low efficiency, high safety risks, and low material utilization during early dismantling. In particular, in aluminum alloy formwork systems, the unidirectional connection of early dismantling nodes leads to a decrease in the rigidity of the frame, and traditional wooden formwork is heavy and difficult to transport.

Method used

An early-release support structure is used in conjunction with a back brace assembly, including an early-release head and a vertical telescopic support. The support assembly is connected to the clamping parts through an inverted V-shaped arrangement, which enables stable and reliable removal of the support assembly, reduces the number of locking parts, and simplifies the installation and disassembly process.

Benefits of technology

It improves the stability and dismantling efficiency of the support system, reduces material costs and labor intensity, increases the passage space below, is suitable for formwork projects with different floor heights and areas, is applicable to both wooden and plastic formwork, and reduces the amount and weight of aluminum used.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120797961A_ABST
    Figure CN120797961A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of formwork construction, and particularly discloses an early-dismantling supporting structure and a laterally-dismantled plate formwork supporting system.The early-dismantling supporting structure comprises an early-dismantling head and a vertical telescopic support connected with the early-dismantling head; the early dismounting head comprises a cross-shaped supporting assembly connected with the vertical telescopic support, and a clamping piece connected with the supporting assembly and the back ridge assembly. The sides, close to each other, of every two adjacent supporting assemblies form an inverted splayed shape. The invention further discloses a plate formwork supporting system based on the early-dismantling supporting structure. During early dismounting, the height of any component does not need to be adjusted, and the dismounting process is simple; compared with the traditional frame body, the mounting and dismounting speed of the formed frame body is greatly improved.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The present application relates to the technical field of formwork construction, in particular to an early-dismantling support structure and a laterally dismountable formwork support system. BACKGROUND

[0002] In the formwork construction process of the main structure of a building, the most commonly used support frame and formwork in China can be divided into three categories: the first category is a fastener type steel pipe scaffold with wooden formwork, the second category is a socket type disc fastener steel pipe scaffold with wooden formwork, and the third category is an aluminum alloy formwork system.

[0003] The fastener type scaffold and the disc fastener type scaffold are truss structures, which require multiple horizontal rods and diagonal bracing rods to be set to ensure the overall stability of the frame, but this will greatly increase the workload of setting up the frame and block the space below the frame, which hinders construction work and management; if early dismantling of the wooden formwork is to be achieved, the two types of frames need to be matched with adjustable jacks, which can adjust the height of the main beam and the secondary beam through threads, so that the wooden formwork can be separated from the frame and early dismantling can be achieved. Since the height of all adjustable jacks needs to be adjusted in sequence, the efficiency of early dismantling achieved through this component is relatively low.

[0004] In the aluminum alloy formwork system, the aluminum formwork itself can bear the concrete material and construction load, so the horizontal rods can be greatly simplified, thus forming an open lower space. At the same time, the early dismantling node of the clamping plate type can quickly complete the early dismantling operation by removing the pins. However, the early dismantling node is in the shape of a "one", which can only connect the main beam in a single direction, which is not conducive to the formation of an upper rigid layer of the frame, and the safety of the frame is reduced. At the same time, the aluminum alloy formwork has many non-standard parts, low reuse rate, high amortization cost, and its weight is heavier than that of traditional wooden formwork, making it difficult to transport and handle during construction.

[0005] At the same time, in the prior art, when the formwork is early dismantled, the early dismantling head is usually controlled to descend to achieve the descent of the backrest assembly, so that the formwork supported by the backrest assembly is early dismantled. When the early dismantling head on one side of the backrest assembly is lowered and the early dismantling head on the other side is not lowered, the backrest assembly can only be connected to the early dismantling head that is lowered to form a cantilever member, which has the risk of falling of the backrest assembly and poses a safety risk. SUMMARY

[0006] The technical problem to be solved by the present application is to provide an early dismantling support structure and a laterally dismountable formwork support system. The solution adopted by the present application to solve the technical problem is: An early dismantling support structure, used in cooperation with a backrest assembly, comprises an early dismantling head and a vertical telescopic support connected to the early dismantling head. The early dismantling head comprises support assemblies in cross shape and connected with the vertical telescopic support, and clamping pieces respectively connected with the support assemblies and the backrest assembly; First, the early dismantling piece is installed at the top of the vertical telescopic support, then the length of the vertical telescopic support is adjusted according to the floor height, and after reaching the specified height, the backrest assembly is installed. In the middle span part, the two ends of the main beam piece in the backrest assembly are respectively connected with the two adjacent support assemblies through the clamping pieces on the side close to each other, and the inverted eight-shaped arrangement facilitates the separation of the backrest assembly and the early dismantling head, so that the early dismantling head will not descend during the whole dismantling process, and the supporting surface for the floor is also improved, so that the support is more stable and reliable.

[0007] In some possible embodiments, in order to effectively realize the connection of the support assembly and the vertical telescopic support and enable the position adjustment of the support assembly in the horizontal direction, the support assembly comprises a support head in cross shape, and a sleeve with an axis on the same straight line as the center of the support head and fitted with the vertical telescopic support; the sleeve is located at the bottom of the support head and is integrally formed with the support head.

[0008] In some possible embodiments, in order to effectively realize the connection of the support head and the backrest assembly through the clamping piece, the clamping piece is four groups and is used in cooperation with the early dismantling head; the clamping piece is four groups and is installed on the outer side of the support head; each group of the clamping piece comprises two groups of clamping plates connected with each other at one end and forming an L-shaped structure, and the two adjacent groups of clamping pieces form a clamping cavity for clamping the backrest assembly; the four groups of clamping cavities formed by the four groups of clamping pieces are in cross shape.

[0009] In some possible embodiments, grooves for installing the clamping plates are arranged on the outer side of the support head; the two groups of clamping plates in each group of clamping pieces are respectively connected with the backrest assembly through the locking piece at the end away from each other and passing through the corresponding grooves.

[0010] In some possible embodiments, in order to effectively control the position of the early dismantling head according to the floor height through the vertical telescopic support, the vertical telescopic support comprises an inner rod sleeved in the early dismantling head, an outer rod sleeved on the outer side of the inner rod and vertically telescopic with the inner rod, and a locking limiting piece for locking the outer rod and the inner rod.

[0011] A side dismantling plate mold support system comprises a backrest assembly for supporting the plate mold, and an early dismantling support structure as described above connected with the backrest assembly.

[0012] In some possible implementation manners, the back bracing assembly comprises a main beam connected with two adjacent support assemblies, and a secondary beam for connecting two parallel main beams; the top surface of the main beam is coplanar with the top surface of the support assembly; the formwork is a wooden formwork or a plastic formwork, which is installed on the secondary beam and coplanar with the top surface of the support assembly. The main beam is provided with an inclined surface I at one end close to the support assembly, which is in contact with the support assembly; and the main beam is provided with embedded grooves for installing clamps on both sides along the length direction of the main beam.

[0013] In some possible implementation manners, the side support structure for supporting the secondary beam is arranged on both sides of the main beam along the length direction of the main beam.

[0014] In some possible implementation manners, the side support structure is in L shape, comprising a vertical plate arranged vertically and connected with one side of the main beam, and a bottom plate connected with the bottom of the vertical plate and installed on the side of the main beam; the secondary beam is installed on the bottom plate and connected with the vertical plate.

[0015] In some possible implementation manners, the top surface of the bottom plate is an inclined surface II, which is arranged obliquely along the length direction of the secondary beam and forms an acute angle with the plane where the bottom of the secondary beam is located. The gasket with a flat top surface is installed on the bottom plate and connected with the bottom plate through a pin; the main beam installed on the bottom plate is located between the pin and the vertical plate; the bottom surface of the gasket is arranged obliquely and in contact with the top surface of the bottom plate.

[0016] Compared with the prior art, the present application has the following advantages: The main beam and the secondary beam of the present application do not have horizontal bars below, and the span between the two vertical telescopic supports can be up to 1.8 m, so the lower passing width is greatly increased, and the passing convenience is greatly improved. During the installation process, only 8 sets of locking pieces are needed to connect one mid-span frame unit, so the installation operation is greatly simplified; when early disassembly is needed, the height of any component does not need to be adjusted, and the early disassembly can be completed by removing only 8 sets of locking pieces, so the disassembly process is simple; the installation and disassembly speed of the formed frame is greatly improved compared with the traditional frame. The support structure in the present application is suitable for cast-in-place concrete floor and also suitable for prefabricated assembly type composite floor. The length-adjustable main beam and secondary beam are used in cooperation with the vertical telescopic support with adjustable height, which can be applied to different floor heights and different area formwork engineering; at the same time, the support structure can be used in cooperation with wooden formwork or plastic formwork. The wooden formwork and plastic formwork are easy to process and modify, which avoids the poor fault tolerance of customized metal formwork. In the application, only the main beam part, the secondary beam part and the early dismantling support structure adopt aluminum material support, so that the total aluminum material usage of the support system is reduced by about 60% compared with the aluminum mold, and the total weight is reduced by about 30% compared with the aluminum mold, so that the comprehensive labor intensity and material cost are greatly reduced. BRIEF DESCRIPTION OF DRAWINGS

[0017] Figure 1 The connection relationship of the support assembly and the clamping part in the application is shown in the schematic view Figure 2 The exploded view of the support assembly and the clamping part in the application is shown in the schematic view Figure 3 The front view of the main beam part in the application is shown in the schematic view Figure 4 The axial side view of the main beam part in the application is shown in the schematic view Figure 5 The structural schematic view of the backrest assembly in the application is shown in the schematic view Figure 6 The connection relationship of the main beam part, the support head and the C groove plate in the application is shown in the schematic view Figure 7 The connection relationship of the side supporting structure, the gasket, the secondary beam part and the main beam part in the application is shown in the schematic view Figure 8 The structural schematic view of the side dismantling plate mold support system in the application is shown in the schematic view 1, early dismantling head; 11, support assembly; 111, support head; 1111, groove; 112, sleeve; 12, clamping part; 121, clamping plate; 122, locking part; 13, clamping cavity; 2, vertical telescopic support; 21, inner rod; 22, outer rod; 23, locking limiting part; 3, backrest assembly; 31, main beam part; 311, inclined surface one; 312, embedded groove; 313, side supporting structure; 3131, vertical plate; 3132, bottom plate; 3133, support plate; 314, gasket; 32, secondary beam part; 10, beam mold; 101, C groove plate; 20, wall mold; 30, plate mold. DETAILED DESCRIPTION

[0018] In the present application, unless otherwise explicitly specified and limited, the terms "mounting", "connection", "connecting", "fixing" and the like should be understood in a broad sense, for example, can be fixed connection, can also be detachable connection, or integral; can be directly connected, or indirectly connected through an intermediate medium, can be the internal communication of two elements or the interaction relationship of two elements. The "first", "second" and similar words mentioned in the present application do not represent any order, quantity or importance, but only distinguish different components. Similarly, "one" or "a" and the like do not represent a quantity limit, but represent the existence of at least one. In the implementation of the present application, the association relationship of the associated objects is described as "and / or", which means that there can be three relationships, for example, A and / or B can represent: A exists alone, A and B exist together, and B exists alone. In the description of the embodiments of the present application, unless otherwise specified, the meaning of "multiple" is two or more. For example, multiple positioning columns refer to two or more positioning columns. For those skilled in the art, the specific meaning of the above terms in the present application can be understood according to the specific circumstances.

[0019] The present application will be described in detail below.

[0020] In one aspect, as shown in Figure 1 , Figure 2 , Figure 6 , Figure 8 A kind of early dismantling support structure, with main beam piece 31 in backrest component 3 cooperation, including early dismantling head 1, and with early dismantling head 1 the vertical telescopic support 2 of connection; The early dismantling head 1 includes support component 11 in the shape of cross and is connected with vertical telescopic support 2, and clamping piece 12 is connected with support component 11 and main beam piece 31 in backrest component 3 respectively;Two groups of support component 11 form inverted eight-shaped on the side close to each other; During installation, first, support component 11 is installed at the top of vertical telescopic support 2, then the length of vertical telescopic support 2 is adjusted according to the floor height, and after reaching the specified height, main beam piece 31 in backrest component 3 is installed; Two ends of main beam piece 31 in backrest component 3 will be connected with two groups of support component 11 on the side close to each other through clamping piece 12, and the inverted eight-shaped arrangement facilitates the separation of main beam piece 31 and support component 11, and the support component 11 will not be lowered during the entire demolition process, which improves the support surface of the floor and makes the support more stable and reliable.

[0021] In some possible implementation manners, in order to effectively realize the connection between the support assembly 11 and the vertical telescopic support 2 and enable the support assembly 11 to be adjusted in position in the horizontal direction, the support assembly 11 comprises a support head 111 in the shape of a cross and a sleeve 112, the axis of which is in line with the center of the support head 111 and is sleeved with the vertical telescopic support 2; the sleeve 112 is located at the bottom of the support head 111 and is integrally formed with the support head 111.

[0022] Specifically, the support head 111 in the shape of a cross is connected and fixed with the main beam member 31 through the clamping member 12, the sleeve 112 is installed at the bottom of the support head 111 and the axis thereof is in line with the center of the support head 111, and the sleeve 112 is sleeved with the outside of the vertical telescopic support 2, so that the stress of the support head 111 is more uniform. Through the sleeving of the sleeve 112 and the vertical telescopic support 2, the support head 111 can be rotated around the axis direction of the vertical telescopic support 2 during construction, so as to adjust the relative position of the support head 111 and facilitate the connection with the main beam member 31.

[0023] In some possible implementation manners, in order to effectively realize the connection between the support head 111 and the main beam member 31 in the backrest assembly 3 through the clamping member 12, the clamping member 12 is four groups and is installed on the outside of the support head 111; each group of the clamping member 12 comprises two groups of clamping plates 121 which are connected with each other at one end and form an L-shaped structure, two adjacent groups of the clamping member 12 form a clamping cavity 13 for clamping two groups of the main beam member 31, and four groups of the clamping member 12 form four groups of clamping cavities in the shape of a cross. Two groups of the clamping member 12 are connected with the corresponding main beam member 31 through a locking member 122; the two groups of clamping plates 121 of the same clamping member 12 are integrally formed, and the two groups of clamping plates 121 in each group of the clamping member 12 are connected perpendicularly to form an integral whole installed on the outside of the support head 111.

[0024] It should be noted that, when the main beam member 31 is connected with the support head 111, the two groups of clamping plates 121 in the two groups of the clamping member 12 are installed on the outside of the main beam member 31 in the backrest assembly 3, and then the main beam member 31 and the two groups of clamping plates 121 are connected to form an integral whole through the locking member 122, so that the main beam member 31 and the support head 111 are no longer inserted and matched, thereby eliminating the need to adjust the height position of the early dismantling head 1 when early dismantling, and greatly improving the construction efficiency.

[0025] Specifically, the locking member 122 comprises a pin and a pin piece, a round hole one is arranged on the clamping plate 121, and a round hole two is arranged on the main beam member 31 and used in cooperation with the round hole one, one end of the pin passes through one group of clamping plates 121, the main beam member 31 and the other group of clamping plates 121 in sequence, and the connection between the clamping member 12 and the main beam member 31 is realized through the inserted and matched cooperation of the pin and the pin piece.

[0026] In some possible embodiments, in order to facilitate the installation of the clamping member 12, so that the splint 121 and the support head 111 will not be separated after the assembly is completed, a groove 1111 for installing the splint 121 is provided on the outer side of the support head 111; the two groups of splints 121 in each group of clamping members 12 are connected to the main beam member 31 in the back rib assembly 3 through the corresponding groove 1111 at one end away from each other through the locking member 122.

[0027] Furthermore, the support head 111 includes four groups of support arms that are perpendicular to each other and form a cross shape, and two groups of grooves 1111 are provided on the outer side of each group of support arms. The two adjacent groups of grooves 1111 in two adjacent groups of support arms are connected to form an L-shaped installation groove for installing the clamping member 12; the free ends of the two groups of clamping plates 121 in each group of clamping members 12 will pass through the installation groove, so that a clamping cavity 13 for installing the main beam member 31 is formed between the two groups of clamping plates 121; the main beam member 31 located in the end clamping cavity 13 and the two groups of clamping plates 121 forming the clamping cavity 13 are respectively connected by locking members 122; the free end of the support arm is an inclined surface, and the two inclined surfaces of the two groups of support arms connected to the two ends of the same main beam member 31 will form an inverted eight-shaped structure, with the large end at the top and the small end at the bottom; The four groups of clamping parts 12 total eight groups of splints 121, and the eight groups of splints 121 form four groups of clamping cavities 13. The four groups of clamping cavities 13 correspond to the four groups of support arms, which are connected by four groups of locking parts 122. The eight groups of splints 121, the four groups of main beams 31, and the support head 111 with a groove 1111 are matched to form a stable overall structure.

[0028] In some possible embodiments, in order to effectively control the position of the early removal head 1 according to the floor height through the vertical telescopic support 2, the vertical telescopic support 2 includes an inner rod 21 sleeved inside the early removal head 1, an outer rod 22 sleeved outside the inner rod 21 and cooperating with the inner rod 21 along the vertical telescopic motion, and a locking limiter 23 for locking the outer rod 22 and the inner rod 21. One end of the inner rod 21 is sleeved in the outer rod 22, and the two are locked and fixed by the locking limiter 23. After the position of the inner rod 21 is adjusted into place, it can be fixed by the locking limiter 23; the sleeve 112 is sleeved on the end of the inner rod 21 away from the outer rod 22 and can rotate around the axis direction of the inner rod 21.

[0029] on the other hand: like Figures 1-8 As shown, a laterally disassembled plate formwork support system includes a back rib assembly 3 for supporting the plate formwork 30, and an early disassembly support structure connected to the back rib assembly 3 and as described above; the back rib assembly 3 is also connected to the beam formwork 10 and the wall formwork 20 to form a stable support system; The backrest assembly 3 and the early disassembly support structure are made of aluminum alloy material; In some possible embodiments, the backrest assembly 3 comprises a main beam 31 connected with two adjacent support assemblies 11, and a secondary beam 32 for connecting two adjacent and parallel main beams 31; the top surface of the main beam 31 is coplanar with the top surface of the support assembly 11; the plate mold 30 is installed on the secondary beam 32 and coplanar with the top surface of the support assembly 11; The main beam 31 is provided with an inclined surface 311 matched with the inclined surface of the support arm at one end close to the support assembly 11; the embedded groove 312 for installing the clamping piece 12 is arranged on both sides of the main beam 31 along the length direction; after the main beam 31 is installed, the embedded groove 312 is communicated with the groove 1111, so that the part of the clamping plate 121 not located in the groove 1111 is located in the embedded groove 312.

[0030] In some possible embodiments, the side support structure 313 for supporting the secondary beam 32 and allowing the secondary beam 32 to be disassembled from the side is arranged on both sides of the main beam 31 along the length direction; compared with the prior art, the secondary beam 32 is taken out from the side without controlling its upward movement and then taken out, which greatly improves the taking-out efficiency of the secondary beam 32.

[0031] In some possible embodiments, the side support structure 313 is L-shaped, comprising a vertical plate 3131 arranged vertically and connected with the main beam 31 on one side, and a bottom plate 3132 connected with the bottom of the vertical plate 3131 and installed on the side of the main beam 31; the secondary beam 32 is installed on the bottom plate 3132 and connected with the vertical plate 3131; the bottom plate 3132 of the L-shaped side support structure 313 is used for supporting the secondary beam 32; the vertical plate 3131 is used for limiting the movement of the secondary beam 32 in the horizontal direction; after the secondary beam 32 is installed, the top surface of the secondary beam 32 is not coplanar with the top surface of the main beam 31, forming an installation cavity for installing the plate mold 30, and the top surface of the plate mold 30 is coplanar with the top surface of the main beam 31 after installation.

[0032] Further, the support plate 3133 is arranged on the top of the vertical plate 3131, and the support plate 3133 is parallel to the bottom plate 3132, forming a Z-shaped structure; the top surface of the support plate 3133 is used for supporting the plate mold 30, greatly increasing the support area of the side support structure 313 for the plate mold 30 and increasing the support stability.

[0033] Further, to make the connection between the secondary beam 32 and the side support structure 313 more firm, the secondary beam 32 and the vertical plate 3131 are connected through the locking piece 122; the through holes are arranged on the vertical plate 3131 and the secondary beam 32 respectively, and the connection between the vertical plate 3131 and the secondary beam 32 is realized through the cooperation of the two groups of through holes and the locking piece 122.

[0034] In some possible embodiments, in order to facilitate the removal of the secondary beam 32, the top surface of the bottom plate 3132 is inclined and forms an acute angle with the plane on which the bottom of the secondary beam 32 is located along the length direction of the secondary beam 32; The gasket 314 is installed on the bottom plate 3132 and has a flat top surface and is connected to the bottom plate 3132 by a pin; the primary beam 31 installed on the bottom plate 3132 is located between the pin and the vertical plate 3131; the bottom surface of the gasket 314 is inclined and is in contact with the top surface of the bottom plate 3132.

[0035] Specifically, before the secondary beam 32 is installed, the gasket 314 is installed on the bottom plate 3132 and is fixed by the pin, and then the secondary beam 32 is installed and is supported by the gasket 314 after installation; when the secondary beam 32 is removed, the pin is removed first, the gasket 314 is removed, and a gap is formed between the secondary beam 32 and the bottom plate 3132, thereby facilitating the removal of the secondary beam 32 from the side; In order to facilitate the removal of the gasket 314, the gasket 314 has an L-shaped structure, including an upper plate installed on the bottom plate 3132 and a lower plate connected to the upper plate and located on the side of the bottom plate 3132 away from the primary beam 31 connected thereto; the vertical length of the lower plate is greater than the thickness of the bottom plate 3132, so that when the gasket 314 is removed, after the pin is removed, the gasket 314 is moved to the side of the length direction of the secondary beam 32 by hammering the lower plate, and the gasket 314 is removed; The bottom plate 3132 and the gasket 314 are respectively provided with through holes, and the pin is installed through the cooperation of the through holes.

[0036] In the mid-span position, the four groups of early-dismantling support structures are connected by the four groups of primary beams 31, and the four groups of primary beams 31 form a cavity, and the two ends of the secondary beam 32 are connected to two groups of parallel primary beams 31 by the side support structure 313; In the side-span position, the two groups of early-dismantling support structures are connected by one group of primary beams 31, and the side of the two groups of early-dismantling support structures close to the wall formwork 20 or the plate formwork 30 is connected by two groups of primary beams 31, and the primary beam 31 for connecting the two groups of early-dismantling support structures is connected to the beam formwork 10 or the wall formwork 20 by the secondary beam 32; The main beam member 31 connected with the wall formwork 20 or the slab formwork 30 is arranged in a telescopic structure, so that the length thereof can be adjusted according to the distance between the early-dismantling support structure and the wall formwork 20 or the slab formwork 30; the wall formwork 20 or the slab formwork 30 can be an aluminum alloy formwork, when the aluminum alloy formwork, the main beam member 31 and the secondary beam member 32 close to the aluminum alloy formwork are connected with the C-slot plate 101 in the aluminum alloy formwork through the pin; of course, the secondary beam member 32 can also be arranged in a telescopic structure, so that the telescopic secondary beam member 32 can be connected with the wall formwork 20 or the beam formwork 10 in parallel at the side span position.

[0037] It should be noted that, for the cast-in-place reinforced concrete floor, the slab formwork support system is installed, which specifically includes the following steps: According to the arrangement scheme, the position of the vertical telescopic support 2 is determined by wire laying; The vertical telescopic support 2 is installed; the height is adjusted according to the floor height; The early-dismantling head 1 is adjusted; the direction of the rotating adjustment support head 111 is adjusted, so that the support arm is consistent with the direction of the main beam member 31.

[0038] The main beam member 31 is installed; At the mid-span position, the main beam member 31 is placed between the two support heads 111, so that the embedded grooves 312 on both sides of the end of the main beam member 31 are aligned with the grooves 1111 on the corresponding support heads 111, the clamping plates 121 are installed on both sides of the main beam member 31, and the main beam member 31 and the support heads 111 are connected and integrated through the clamping plates 121 and the pins and pin plates; At the side span position, the main beam member 31 between the two groups of early-dismantling support structures is first installed, the main beam member 31 is placed between the two support heads 111, so that the embedded grooves 312 on both sides of the end of the main beam member 31 are aligned with the grooves 1111 of the support heads 111, the clamping plates 121 are installed on both sides of the main beam member 31, and the main beam member 31 and the support heads 111 are connected and integrated through the clamping plates 121 and the pins and pin plates; Then, the main beam member 31 connected with the early-dismantling support structure at one end and connected with the C-slot plate 101 in the wall formwork 20 or the beam formwork 10 at the other end is installed, wherein the connection mode at the one end connected with the early-dismantling support structure is the same as that at the mid-span position, and the pin is passed through the hole arranged on the main beam member 31 and the hole on the side surface of the C-slot plate 101 to connect the one end connected with the C-slot plate 101, and the pin plate is used for pinning; The secondary beam member 32 is installed; Firstly, the gasket 314 is placed on the side support structure 313, and the gasket 314 is fixed on the bottom plate 3132 by using the pin with the gasket 314; At the mid-span position, the two ends of the secondary beam member 32 are respectively placed on the corresponding bottom plates 3132 on the side close to each other of the two groups of main beam members 31, and the secondary beam member 32 is connected with the vertical plate 3131, that is, the installation is completed; In the side span part, one end of the secondary beam member 32 is placed on the bottom plate 3132, and the other end is connected with the C-slot plate 101 by a pin, thus completing the installation; The above steps are repeated to erect multiple frame body units; The plate mold 30 is laid on the secondary beam member 32, and the installation process is completed.

[0039] When the plate mold support system is disassembled, the steps include: The secondary beam member 32 is disassembled; For the mid-span part, the pin connecting the gasket 314 and the bottom plate 3132 is pulled out, the lower plate is hammered to make the gasket 314 come off, and then the secondary beam member 32 is taken out laterally; when the locking member 122 is used to connect the secondary beam member 32 and the side support structure 313, the locking member 122 should also be removed to disconnect the main beam member 31 and the secondary beam member 32; For the side span part, the pin in the C-slot plate 101 is pulled out first, then the other end pin and gasket 314 are removed, and then the secondary beam member 32 is taken out laterally; similarly, when the locking member 122 is used to connect the secondary beam member 32 and the side support structure 313, the locking member 122 should also be removed to disconnect the main beam member 31 and the secondary beam member 32; The main beam member 31 is disassembled; For the mid-span part, the locking member 122 and the clamping plate 121 are removed, and then the main beam member 31 is taken down; For the side span part, the pin in the C-slot plate 101 is pulled out first, then the other end pin and gasket 314 are removed, and then the secondary beam member 32 is taken out laterally; similarly, when the locking member 122 is used to connect the secondary beam member 32 and the side support structure 313, the locking member 122 should also be removed to disconnect the main beam member 31 and the secondary beam member 32;

[0040] The plate mold 30 is disassembled; with the help of tools such as crowbars, the plate mold 30 adhered to the bottom of the concrete floor is disassembled.

[0041] The vertical telescopic support 2 and the early disassembly head 1 are disassembled; when the concrete strength of the floor reaches 100%, the height of the middle screw of the vertical telescopic support 2 is adjusted to lower it, and the vertical telescopic support 2 and the early disassembly head 1 are collected, thus completing the disassembly process.

[0042] For the prefabricated assembly type composite floor slab, the installation process is basically the same as that of the cast-in-place reinforced concrete floor slab, but only the secondary beam member 32 and the plate mold 30 are installed at the cast-in-place slab belt, and the secondary beam member 32 and the plate mold 30 can not be installed in the coverage area of the composite slab. The composite slab can be directly placed on the main beam member 31; for the prefabricated assembly type composite floor slab, the disassembly process is the same as that of the cast-in-place reinforced concrete floor slab.

[0043] The present application is not limited to the foregoing specific embodiments. The present application extends to any novel feature or any new combination described in this specification, and any novel method or process step or any new combination disclosed.

Claims

1. An early dismantling support structure, used in conjunction with a back rib assembly, characterized in that: It includes an early removal head and a vertical telescopic support connected to the early removal head; The early disassembly head includes a cross-shaped support assembly connected to the vertical telescopic support, and a clamping member connected to the support assembly and the back rib assembly respectively; two adjacent groups of support assemblies are close to each other to form an inverted eight-shaped shape.

2. The early dismantling support structure according to claim 1, characterized in that: The support assembly includes a cross-shaped support head and a sleeve whose axis is in a straight line with the center of the support head and cooperates with the vertical telescopic support sleeve; the sleeve is located at the bottom of the support head and is integrally formed with the support head.

3. The early dismantling support structure according to claim 1, characterized in that: There are four groups of clamping parts and they are installed on the outside of the support head; each group of clamping parts includes two groups of clamping plates connected to each other at one end and forming an L-shaped structure, and the two adjacent groups of clamping parts form a clamping cavity for clamping the back rib assembly; the four groups of clamping cavities formed by the four groups of clamping parts are in a cross-shaped structure; the two groups of clamping parts are connected to the corresponding back rib assemblies through locking parts respectively.

4. The early dismantling support structure according to claim 3, characterized in that: A groove for installing a clamping plate is provided on the outer side of the support head; two groups of clamping plates in each group of clamping members are connected to the back rib assembly through a locking member at one end away from each other and pass through the corresponding groove.

5. The early dismantling support structure according to any one of claims 1 to 4, characterized in that: The vertical telescopic support includes an inner rod sleeved in the early disassembly head, an outer rod sleeved outside the inner rod and cooperating with the inner rod in vertical telescopic motion, and a locking limiter for locking the outer rod and the inner rod.

6. A laterally disassembled formwork support system, characterized in that: The invention comprises a back rib assembly for supporting a plate formwork, and an early dismantling support structure connected to the back rib assembly and according to any one of claims 1 to 5.

7. A laterally disassembled formwork support system according to claim 6, characterized in that: The back rib assembly includes a main beam connected to two adjacent groups of support assemblies, and a secondary beam used to connect the two groups of main beams parallel to each other; the top surface of the main beam is coplanar with the top surface of the support assembly; The formwork is mounted on the secondary beam and is coplanar with the top surface of the support assembly; An inclined surface 1 for contacting and cooperating with the support assembly is provided at one end of the main beam member close to the support assembly; and embedding grooves for installing the clamping member are provided on both sides of the main beam member along its length direction.

8. A laterally disassembled formwork support system according to claim 7, characterized in that: Side supporting structures for supporting secondary beams are provided in two groups along the length direction of the main beams.

9. A laterally disassembled formwork support system according to claim 8, characterized in that: The side support structure is L-shaped, including a vertical plate arranged along the vertical direction and connected to the main beam on one side, and a bottom plate connected to the bottom of the vertical plate and installed on the side of the main beam; the secondary beam is installed on the bottom plate and connected to the vertical plate.

10. A laterally disassembled formwork support system according to claim 9, characterized in that: The top surface of the bottom plate is a second inclined surface, which is inclined along the length direction of the secondary beam and forms an acute angle with the plane where the bottom of the secondary beam is located; A gasket having a flat top surface and connected to the bottom plate via pins is mounted on the bottom plate; The main beam member installed on the bottom plate is located between the pins and the vertical plate; the bottom surface of the gasket is inclined and fits with the top surface of the bottom plate.

Citation Information

Patent Citations

  • Combination frame module, component frame module and tool set structure and installing and dismantling method thereof

    CN103089004A

  • Quick-erected and quick-detached formwork support for construction

    CN204475843U

  • Floor slab bottom independent supporting system capable of being partially and early disassembled

    CN220521963U

  • A slab form system

    KR100859160B1