A method for locating weak insulation sections in subway rails
By constructing an equivalent resistance network model and optimization algorithm for subways, the problem of locating weak sections of subway rail insulation was solved, enabling real-time and accurate location and suppression of stray currents, and reducing the corrosion risk of subway lines.
Patent Information
- Application Number
- CN202510879684.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2025-06-27
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2045-06-27
AI Technical Summary
Existing technologies cannot effectively locate weak sections of subway rail insulation, leading to increased stray current leakage and corrosion of subway metal structures and buried oil/gas pipelines. Furthermore, existing testing methods are inefficient and cannot specifically suppress stray currents.
By acquiring voltage and current data from trains and traction substations, an equivalent resistance network model of the metro is constructed. The Tellegen theorem and optimization algorithms are used to solve the equations for locating weak insulation sections. The search interval is dynamically narrowed by combining the bisection method and genetic algorithm to achieve accurate location of weak insulation sections.
It enables real-time and accurate location of weak insulation sections during train operation, reduces stray current leakage, provides targeted suppression measures, improves positioning resolution, and reduces the cost of transition resistance condition assessment for the entire line.
Smart Images

Figure CN120928123B_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the technical field of urban rail transit traction power supply systems, specifically relating to a method for locating weak insulation sections in subway rails. Background Technology
[0002] In my country, urban rail transit power supply systems generally use DC power. Trains obtain power from the overhead contact line and return it to the negative terminal of the traction substation via the rails. In actual engineering, the rails have longitudinal resistance, generating a potential to ground, and the rails cannot be completely insulated from the ground, causing some current to leak from the rails, i.e., stray current. This stray current corrodes not only the structural facilities of the urban rail transit system itself but also nearby buried metal pipelines, thus creating safety hazards.
[0003] Newly commissioned subway lines typically do not have sections with weak track-to-ground insulation, resulting in very low stray current leakage. However, after a period of operation, leakage sections will appear along the subway line. At this point, the insulation of the rail-to-ground transition resistance will deteriorate, leading to a sharp increase in stray current leakage. Excessive stray current not only accelerates the corrosion of the subway's metal structure but also causes corrosion perforation of buried oil / gas pipelines and triggers DC bias in the city's power grid transformer, posing serious threats to urban infrastructure.
[0004] Currently, the main measures to suppress stray currents are to increase the insulation level of the rails to ground, such as by applying insulating coatings. However, due to the high economic cost, these measures cannot be implemented along the entire line. Existing testing methods in engineering projects can only obtain a rough level of the rail-to-ground transition resistance and have low testing efficiency. Therefore, in actual engineering projects, the weak insulation sections of subways are not clearly identified, making it impossible to implement targeted stray current suppression measures.
[0005] Therefore, it is necessary to study the method of locating weak sections of subway rail insulation to guide the work of suppressing stray currents. Summary of the Invention
[0006] To address the aforementioned problems in existing technologies, this invention provides a method for locating weak insulation sections of subway rails, which at least achieves accurate positioning and solves the technical effect of stray current leakage.
[0007] The embodiments of this application disclose a method for locating weak insulation sections in subway rails, comprising the following steps:
[0008] When the subway train travels between the two traction substations, it obtains the voltage and current of the two traction substations and the train voltage and current, as well as the relevant parameters of the two traction substations and the relevant parameters of the power supply section between the two traction substations.
[0009] Set the resolution for locating the weak insulation section of the subway rail and initialize the relevant parameters of the search range for locating the weak insulation section of the subway rail, and update the set of boundary points of the subway rail section;
[0010] Construct the equivalent resistance network model of the subway based on the updated set of boundary points;
[0011] Based on the equivalent resistance network model of the subway, a set of equations for locating weak insulation sections of the subway is constructed based on Tellegen's theorem.
[0012] Solving the location equations for weak insulation sections in subways using an optimization algorithm;
[0013] Determine if the length of the search interval for the weak insulation section of the subway rail is less than the target resolution. If it is, output the location result; otherwise, update the search interval and return to construct the subway equivalent resistance network model.
[0014] Through the technical solution of this invention, the invention has the following technical effects: This patent establishes an analytical relationship between transition resistance and measurable electrical quantities in the subway system based on Tellegen's theorem, and uses train-depot collaborative information to solve for the transition resistance, thereby achieving the location of weak insulation sections. First, compared with the traditional passive protection strategy to manage the hazards caused by stray current, this patent adopts an active strategy, that is, clearly identifying the location of stray current leakage sections and taking targeted suppression measures. This method directly reduces stray current leakage at the source. Second, this method only relies on measurable data from the train and traction depot, and does not require the installation of additional measuring devices in the subway system. Finally, this method can achieve real-time positioning during train operation, calculate and evaluate the transition resistance status of the entire line, and this patent combines the binary search method and genetic algorithm to dynamically narrow the positioning search interval, greatly improving the positioning resolution, thereby accurately locating specific weak insulation sections in real time, and providing great convenience for the suppression of stray current. Attached Figure Description
[0015] Figure 1 This is a flowchart illustrating the method for locating weak insulation sections in subways according to the present invention.
[0016] Figure 2 This is a schematic diagram of the equivalent resistance network structure for subways according to the present invention. Detailed Implementation
[0017] The present invention will be further described in detail below with reference to the accompanying drawings and specific implementation methods.
[0018] A flowchart of a method for locating weak insulation sections in subway rails according to the present invention is shown below. Figure 1 As shown, the details are as follows:
[0019] S1, when the metro train is running between the two traction substations, it obtains the voltage and current of the two traction substations and the train voltage and current, and obtains the relevant parameters of the two traction substations and the relevant parameters of the power supply section between the two traction substations.
[0020] S2, set the resolution for locating the weak insulation section of the subway rail and initialize the relevant parameters of the location search interval of the weak insulation section of the subway rail, and update the set of boundary points of the subway rail section;
[0021] S3, Construct the equivalent resistance network model of the subway based on the updated set of boundary points;
[0022] S4. Based on the equivalent resistance network model of the subway, a set of equations for locating weak insulation sections of the subway is constructed based on Tellegen's theorem.
[0023] S5, Solving the location equations for weak insulation sections in the subway based on optimization algorithms;
[0024] S6 determines whether the length of the search interval for the weak insulation section of the subway rail is less than the target resolution. If it is, the location result is output; otherwise, the search interval is updated and the equivalent resistance network model of the subway is constructed.
[0025] In one embodiment, the steps of acquiring the voltage and current of both traction substations and the train voltage and current when the subway train is traveling between the two traction substations, and acquiring relevant parameters of both traction substations and relevant parameters of the power supply section between the two traction substations, specifically include:
[0026] S1, Obtain the train's position x and train current I from the onboard recording equipment. d and voltage U l ;
[0027] S2, obtain the current I at both ends of the traction substation from the traction substation monitoring system. b with I q Voltage U of the two traction stations b with U q ;
[0028] S3, obtain the electrical parameters of the power supply section between the two traction substations, including: contact wire resistance r o Longitudinal resistance r of the rail r 1. Length L of the power supply section.
[0029] In one embodiment, the steps of setting the resolution for locating the weak insulation section of the subway rail and initializing the relevant parameters of the location search interval for the weak insulation section of the subway rail, and updating the set of boundary points for the subway rail section, specifically include:
[0030] S1, set the target positioning resolution as... The initial search interval is [Lmin ,L max The initial set of subway track section boundary point locations P={L} min ,L max}, where L min =0、L max =L, initial rail-to-ground transition resistance matrix ;
[0031] S2, at the boundary point L of set P. min and L max A new dividing point t is added in the middle, where ;
[0032] S3, divide the power supply interval between the two traction stations into Z sub-intervals using the dividing point in set P, and obtain the indices i1 and i2 corresponding to the two smallest elements in set {d(1),d(2),d(z)...,d(Z)}, where z represents the interval number;
[0033] Where Z = M-1, M is the number of elements in set P; the length of each subinterval is d(m-1) = P(m) - P(m-1), where m represents the boundary point index. .
[0034] It should be noted that the resolution mentioned The value is 15m.
[0035] In one embodiment, the step of constructing the subway equivalent resistance network model based on the updated set of boundary points specifically includes the following:
[0036] S1, the contact network and rail in each sub-section are equivalent to a resistor, the structure between the rail and the ground is adopted as the rail-to-ground transition resistance, and the power supply section between the two traction substations is equivalent to a resistor network structure.
[0037] S2, the two traction substations are equivalent to a current source and an equivalent resistor in parallel structure, and the train is equivalent to a current source; construct the equivalent resistance network model of the subway.
[0038] refer to Figure 2 In one embodiment, the specific steps of constructing the location equations for weak insulation sections of the subway based on the equivalent resistance network model of the subway and Tellegen's theorem are as follows:
[0039] S1. Based on the equivalent resistance network model of the subway, the rail transition resistance branches are sorted and numbered and represented by y1, with their numbers ranging from 1 to M; the equivalent current source branches of the traction substation and the equivalent current source branches of the train are sorted and numbered and represented by y2, where the equivalent current source branches of the traction substation are numbered M+1 and M+2, and the equivalent current source branches of the train are numbered M+3.
[0040] S2, the current resistance network structure of the power supply section between the two traction substations is regarded as network N′, and the resistance network structure corresponding to the rail insulation to the ground in the power supply section between the two traction substations is regarded as network N. Then, based on Tellergen's theorem, the system of equations for locating the weak insulation section at any dividing point m of the train is written.
[0041] S3, construct a set of positioning equations for weak insulation sections when the train is traveling between the dividing point 1 and M, to form M sets of positioning equations for weak insulation sections of the subway.
[0042] In one embodiment, the specific steps for determining whether the search interval length of the weak insulation section of the subway rail is less than the target resolution are as follows: If so, the positioning result is output; otherwise, the search interval is updated and the process of constructing the subway equivalent resistance network model is returned.
[0043] S1. Based on the constructed system of M equations, establish the objective function for location-based solution;
[0044] S2, initialize the population size to n, and set the chromosome matrix to M1, M2, M... i ,…,M n The length is 2, the chromosome matrix values are random binary data, and each matrix corresponds to a set of ρ1 and ρ2 values;
[0045] S3, substitute any set of chromosome values ρ1 and ρ2, and calculate the rail-to-ground branch current and the equivalent current source branch voltage of the traction substation and train required to go from f(1) to f(M) in the corresponding objective function E. , and ;
[0046] S4, calculated by substituting any set of chromosomes. , and And what was obtained , According to equation (10), the corresponding objective function values are calculated as E1, E2, ... E i , ...E n ;
[0047] S5 optimizes ρ1 and ρ2 based on genetic algorithm, using a roulette wheel selection method with random traversal sampling. The population crossover probability is 0.6, the gene mutation probability is 0.2, the number of iterations is k, and after the iteration is completed, the ρ1 and ρ2 corresponding to the minimum objective function value are output.
[0048] S6, Determine If the condition is true, proceed to step S7; otherwise, proceed to step S9.
[0049] S7, Determine If true, update the search range, making L min =t, let , Conversely, update the search range, making L max =t, let , ;
[0050] S8, let ρ h =[ρ h (1:i1),0,ρ h [i2:Z], return to construct the equivalent resistance network model of the subway;
[0051] S9, judgment Is it true? If so, the interval? For sections with weak insulation in the subway rails, conversely, for sections with strong insulation... This is a section of the subway rail with weak insulation.
[0052] It should be noted that the initial population size is 100 in this example, and the number of iterations is determined based on the initial population size.
[0053] refer to Figures 1-2 The following is a detailed description through a specific embodiment:
[0054] Step 1: Query and obtain the voltage / current of the two traction substations and the train voltage / current when the subway train is running between the two traction substations, and obtain the relevant parameters of the two traction substations and the power supply section between the two traction substations;
[0055] S21. Obtain the train's position x and train current I from the onboard recording equipment. d and voltage U l The current I at both ends of the traction substation is obtained from the traction substation monitoring system. b with I q Voltage U of the two traction stations b with U q ;
[0056] S22. Obtain the electrical parameters of the power supply section between the two traction substations, including: contact network resistance r o Longitudinal resistance r of the rail r Length L of the power supply section;
[0057] Step 2: Set the positioning resolution for weak insulation sections of subway rails and initialize relevant parameters such as the positioning search interval for weak insulation sections of subway rails; set the target positioning resolution to... The initial search interval is [L min ,L max The initial set of subway track section boundary point locations P={L} min ,L max}, where L min =0、L max =L, initial rail-to-ground transition resistance matrix ;
[0058] Step 3: Update the set of boundary points of the subway rail sections, and construct the equivalent resistance network model of the subway accordingly;
[0059] S41. At the boundary point L of set P min and L max A new dividing point t is added in the middle, where ;
[0060] S42. Divide the power supply section between the two traction substations into Z sub-sections based on the boundary points in set P, where Z = M-1, and M is the number of elements in set P. The length of each sub-section is d(m-1) = P(m) - P(m-1), where m represents the boundary point number. Find the indices i1 and i2 of the two smallest elements in the set {d(1), d(2), d(z)..., d(Z)}, where z represents the interval index;
[0061] S43. The contact network and rail in each of the above sub-sections are equivalent to a resistor, and the structure between the rail and the ground is adopted as the rail-to-ground transition resistance, so that the power supply section between the two traction substations is equivalent to a resistor network structure.
[0062] S44. The two traction substations are equivalent to a parallel structure of current sources and equivalent resistors, and the train is equivalent to a current source. Finally, the equivalent resistance network model of the subway is constructed by combining steps S43 and S44.
[0063] Step 4: Based on the equivalent resistance network model of the subway, construct a set of equations for locating weak insulation sections of the subway based on Tellegen's theorem;
[0064] S51. Based on the equivalent resistance network model of the subway, the rail transition resistance branches are sorted and numbered and represented by y1, with their numbers ranging from 1 to M; the equivalent current source branches of the traction substation and the equivalent current source branches of the train are sorted and numbered and represented by y2, where the equivalent current source branches of the traction substation are numbered M+1 and M+2, and the equivalent current source branches of the train are numbered M+3.
[0065] S52. Consider the current resistance network structure of the power supply section between the two traction substations as network N′, and the resistance network structure corresponding to the intact rail-to-ground insulation in the power supply section between the two traction substations as network N. Then, based on Tellegen's theorem, write the set of equations for locating the weak insulation section at any dividing point m where the train travels, as shown below:
[0066]
[0067] For formula (1), in network N′,
[0068] The resistance of the rail-to-ground branch in network N′ is expressed by equation (2), where r rs (z) represents the rail-to-ground transition resistance corresponding to sub-interval z, and the rail transition resistance r of the sub-interval within the search interval is located. rs (i1) and r rs (i2) is the variable to be solved. , The rail transition resistance r in sub-intervals other than the location search interval rs (z)=ρ h (z).
[0069]
[0070] The rail-to-ground branch current is determined by the voltage difference between the nodes at both ends of the branch. Divide by the resistance of that branch The calculations yielded the node voltages of the subway equivalent resistive network model. As expressed by equation (3), for The voltage difference between the two ends of the rail and the ground branch; in formula (3) This is the nodal admittance matrix corresponding to N′ in the equivalent resistance network model of the subway, where the contact wire resistance... and longitudinal resistance of rail The contact wire resistance r can be utilized o Longitudinal resistance r of the rail r The length d(z) of the sub-interval is calculated as shown in formulas (4) and (5). The equivalent resistances r1 and r2 of the two traction stations are obtained by formulas (6) and (7). The current source vector I in formula (3) is... (m) Based on the topology of the metro equivalent resistance network model and the node injection current obtained in step 1 when the train reaches node m, the node injection currents at the connection points between the two traction substation branches and the train branch and the overhead contact line branch are respectively: I B I Q -I d The injected currents at the junctions of the two traction substation branches and the train branch with the rail branch are respectively: -I B -I Q I d For I B I Q Calculated using formulas (8) and (9).
[0071]
[0072]
[0073]
[0074]
[0075]
[0076]
[0077]
[0078] The equivalent current source branch voltage of the traction substation and the train is taken as U, which is the voltage obtained in step S21 when the train reaches the m node position. b (m), U q (m) and U l (m);
[0079] Let I be the equivalent current source branch current of the traction substation and the train, where the equivalent current source branch current of the traction substation is taken as I. B (m), I Q (m), obtained from step S21, represents the I corresponding to the position of node m when the train reaches that node. b (m), I q (m) is calculated according to formulas (8) and (9). The equivalent current source branch current of the train is taken as I corresponding to the position of node m when the train runs to node m, which is obtained in step S21. d (m);
[0080] For formula (1), in network N,
[0081] The resistance of the rail-to-ground branch in network N is also expressed by equation (2), except that r rs (z) takes the value of 15Ω·km, where ;
[0082] The rail-to-ground branch current is determined by the voltage difference between the nodes at both ends of the branch. Divide by the resistance of that branch The calculated node voltages of the subway equivalent resistive network model are as follows: Similarly, it can be obtained from equation (3). for The voltage difference between the two ends of the rail-to-ground branch; where the nodal admittance matrix Y corresponding to the equivalent resistivity network model N of the subway is the same as that of network N′ except for the rail-to-ground branch resistance, and the current source vector I. (m) Same as network N′;
[0083] The equivalent current source branch voltage of the traction substation and train at node m in network N is obtained by... The voltage difference between the nodes at both ends of the equivalent current source branch of the train and traction substation is obtained;
[0084] S53. Construct a set of positioning equations for weak insulation sections when the train is traveling between the dividing point 1 and M, to form M sets of positioning equations for weak insulation sections of the subway.
[0085] Step 5: Solve the location equations for the weak insulation section of the subway rail based on the optimization algorithm, and further determine whether the length of the search interval for the weak insulation section of the subway rail is less than the target resolution. If it is, output the location result; otherwise, update the search interval and return to step 3.
[0086] S61. Based on the M equations constructed in step 4, establish the objective function for location-based solution, the specific formula of which is shown below.
[0087]
[0088] in, ;
[0089] S62. Initialize the population size to 100, and set the chromosome matrix to M1, M2, M... i ,…,M 100 The length is 2, the chromosome matrix values are random binary data, and each matrix corresponds to a set of ρ1 and ρ2 values;
[0090] S63. Substitute any set of chromosome values ρ1 and ρ2 to calculate the rail-to-ground branch current and the equivalent current source branch voltage of the traction substation and train required to move from f(1) to f(M) in the corresponding objective function E. , and In its f(m) , and The detailed calculation steps are as follows: Substitute the values ρ1 and ρ2 of the chromosome set, and let... , Then substitute the parameter d(z), I (m) r rs (z), r o r rFirst, calculate the network N′ and the node voltages in network N according to equation (7). and Extract the voltage difference between the two ends of the rail-to-ground branch in network N and network N′. , Divide by the resistance of that branch to obtain the rail-to-ground branch current. and Extract the voltage difference between the two ends of the equivalent current source branch of the traction substation and the train in network N. ;
[0091] S64, calculated by substituting any set of chromosomes. , and and the information obtained in step S52 , According to equation (10), the corresponding objective function values are calculated as E1, E2, ... E i , ...E 100 ;
[0092] S65. Optimize ρ1 and ρ2 using a genetic algorithm, employing a roulette wheel selection method with random traversal sampling. The population crossover probability is 0.6, the gene mutation probability is 0.2, and the number of iterations is 200. After the iterations, output the ρ1 and ρ2 corresponding to the minimum objective function values.
[0093] S71, Judgment If the condition is true, proceed to step S72; otherwise, proceed to step S74.
[0094] S72. Judgment If true, update the search range, making L min =t, let , Conversely, update the search range, making L max =t, let , ;
[0095] S73, let ρ h =[ρ h (1:i1),0,ρ h [i2:Z], return to step 3;
[0096] S74, Judgment Is it true? If so, the interval? For sections with weak insulation in the subway rails, conversely, for sections with strong insulation... This is a section of the subway rail with weak insulation.
Claims
1. A method for locating weak insulation sections in subway rails, characterized in that, Includes the following steps: When the subway train travels between the two traction substations, it obtains the voltage and current of the two traction substations and the train voltage and current, as well as the relevant parameters of the two traction substations and the relevant parameters of the power supply section between the two traction substations. Set the target positioning resolution for the weak insulation section of the subway rail and initialize the relevant parameters of the positioning search interval for the weak insulation section of the subway rail, and update the set of boundary points of the subway rail section; Specifically, it includes: Set the target positioning resolution to The initial search interval is [L min ,L max The initial set of subway track section boundary point locations P={L} min ,L max }, where L min =0、L max =L, initial rail-to-ground transition resistance matrix ; At the boundary point L of set P min and L max A new dividing point t is added in the middle, where ; Divide the power supply interval between the two traction substations into Z sub-intervals using the dividing point in set P, and obtain the indices i1 and i2 corresponding to the two smallest elements in set {d(1),d(2),d(z)...,d(Z)}, where z represents the interval number; Where Z = M-1, M is the number of elements in set P; the length of each subinterval is d(m-1) = P(m) - P(m-1), where m represents the boundary point index. ; Construct an equivalent resistance network model of the metro based on the updated set of boundary points of the metro rail sections; Based on the equivalent resistance network model of the metro, a set of equations for locating weak insulation sections of the metro is constructed based on Tellegen's theorem. Specifically, this includes: considering the resistance network structure of the power supply section between the two traction substations as network N′, and the resistance network structure corresponding to the intact rail-to-ground insulation in the power supply section between the two traction substations as network N. Then, based on Tellegen's theorem, a set of equations for locating weak insulation sections at any dividing point m is written. Separate sets of equations for locating weak insulation sections are constructed for the train's journey from dividing point 1 to M, forming M sets of equations for locating weak insulation sections of the metro. Solving the location equations for weak insulation sections in subways using an optimization algorithm; Determine if the search interval length of the weak insulation section of the subway rail is less than the target positioning resolution. If so, output the positioning result; otherwise, update the search interval and return to construct the subway equivalent resistance network model; including: S1. Based on the constructed system of M equations, establish the objective function E for localization and solution; S2, initialize the population size to n, and set the chromosome matrix to M1, M2, M... i ,…,M n The length is 2, the chromosome matrix values are random binary data, and each matrix corresponds to a set of chromosome ρ1, ρ2 values; S3, Substitute any set of chromosome values ρ1 and ρ2 into the value set to calculate the required network N′ rail-to-ground branch current in the corresponding objective function E. And the current of the N rail to the ground branch of the network And the equivalent current source branch voltage of train N and traction substation ; S4, calculated by substituting any set of chromosomes. , and And the obtained network N′ traction substation equivalent current source branch and train equivalent current source branch voltages The equivalent current source branch of the N traction substation and the equivalent current source branch of the train. Calculate the corresponding objective function values E1, E2, ... E based on the objective function E. i , ...E n ; S5 optimizes ρ1 and ρ2 based on genetic algorithm, using a roulette wheel selection method with random traversal sampling. The population crossover probability is 0.6, the gene mutation probability is 0.2, the number of iterations is k, and after the iteration is completed, the ρ1 and ρ2 corresponding to the minimum objective function value are output. S6, Determine If the condition is true, proceed to step S7; otherwise, proceed to step S9. S7, Determine If true, update the search range, making L min =t, let , Conversely, update the search range, making L max =t, let , ; S8, let ρ h =[ρ h (1:i1),0,ρ h [i2:Z], return to construct the equivalent resistance network model of the subway; S9, judgment Is it true? If so, the interval? For sections with weak insulation in the subway rails, conversely, for sections with strong insulation... This is a section of the subway rail with weak insulation.
2. The method for locating weak insulation sections of subway rails according to claim 1, characterized in that, The steps for acquiring the voltage and current of both traction substations and the train's voltage and current, as well as relevant parameters of both traction substations and the power supply section between them, when the subway train is traveling between the two traction substations, specifically include: The train's position x and train current I are obtained from the onboard recording equipment. d and voltage U l ; The current I at both ends of the traction substation is obtained from the traction substation monitoring system. b with I q Voltage U of the two traction stations b with U q ; Obtain the electrical parameters of the power supply section between the two traction substations, including: contact wire resistance r. o Longitudinal resistance r of the rail r 1. Length L of the power supply section.
3. The method for locating weak insulation sections of subway rails according to claim 1, characterized in that, The steps for constructing the equivalent resistance network model of the subway based on the updated set of subway rail section boundary points specifically include the following: The contact network and rails in each sub-section are equivalent to a resistor, the structure between the rail and the ground is adopted as the rail-to-ground transition resistance, and the power supply section between the two traction substations is equivalent to a resistor network structure. The two traction substations are equivalent to a parallel structure of current source and equivalent resistance, and the train is equivalent to a current source; a subway equivalent resistance network model is constructed.
4. The method for locating weak insulation sections of subway rails according to claim 1, characterized in that, The specific steps for constructing the location equations for weak insulation sections of the subway based on the equivalent resistance network model and Tellegen's theorem are as follows: Based on the equivalent resistance network model of the subway, the rail transition resistance branches are sorted and numbered and represented by y1, with their numbers ranging from 1 to M; the equivalent current source branches of the traction substation and the equivalent current source branches of the train are sorted and numbered and represented by y2, where the equivalent current source branches of the traction substation are numbered M+1 and M+2, and the equivalent current source branches of the train are numbered M+3.
5. The method for locating weak insulation sections of subway rails according to claim 3, characterized in that, The target positioning resolution The value is 15m.
Citation Information
Patent Citations
Transformer station grounding grid partitional fault diagnosis method
CN105044559A
Corrosion diagnosis method for transformer station grounding network
CN105445615A