Efficient combustion smelting device for aluminum material recycling
By using an annular gas guide pipe and a steam vibration mechanism, the problem of low preheating efficiency of high-temperature waste gas in aluminum recycling and smelting equipment was solved, achieving uniform preheating of aluminum materials in the preheating kiln and efficient utilization of thermal energy.
Patent Information
- Application Number
- CN202511325532.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-09-17
- Publication Date
- 2025-11-18
AI Technical Summary
In existing aluminum recycling and smelting equipment, the preheating efficiency of high-temperature waste gas is low, especially the preheating efficiency of aluminum near the side wall of the preheating kiln, resulting in poor utilization of thermal energy resources.
By employing a ring-shaped distribution of air guide pipes and air guide pipes made of metal with good thermal conductivity, combined with a steam vibration mechanism, the preheating efficiency and thermal energy utilization rate of aluminum materials in the preheating kiln are improved.
By using the annular distribution of the gas guide pipe and the vibration of water vapor, uniform preheating of aluminum materials in the preheating kiln is achieved, which improves preheating efficiency and heat energy utilization efficiency, and avoids heat loss and aluminum material melting and adhesion problems.
Smart Images

Figure CN120970260A_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The present application relates to the technical field of aluminum material smelting, in particular to a high-efficiency combustion smelting device for aluminum material recycling. BACKGROUND
[0002] Aluminum material is an extremely important metal resource in modern society, which has the advantages of small density, high strength, corrosion resistance, easy processing, good thermal and electrical conductivity, non-toxicity and recyclability, and is widely used in transportation, construction, packaging and daily necessities fields;
[0003] And aluminum material is easy to recycle, so after use, it can be crushed into small pieces and smelted, the pollutants and coatings on the surface of the aluminum material are removed, and the shape is reshaped to become new aluminum products. When recycling and smelting aluminum material, a smelting furnace is generally used for smelting. When smelting aluminum material, the exhaust gas temperature of the smelting furnace is high. In order to utilize the heat energy, a preheating kiln is generally installed in the exhaust gas pipeline. New aluminum material is placed in the preheating kiln. When the smelting furnace smelts the aluminum material, the high-temperature exhaust gas passes through the aluminum material in the preheating kiln through the exhaust gas pipeline, and preheats the aluminum material in the preheating kiln, so that the efficiency of smelting the aluminum material in the preheating kiln is higher.
[0004] However, in actual use, the temperature of the high-temperature exhaust gas is still very high after preheating the aluminum material, and the preheating efficiency of the aluminum material is low due to the small heat capacity of the exhaust gas. Since the exhaust gas moves directly upward, the internal space of the preheating kiln is generally larger than that of the exhaust gas discharge pipeline, which results in that the preheating efficiency of the aluminum material close to the side wall of the preheating kiln is lower than that of the aluminum material close to the middle of the preheating kiln, resulting in low heat energy resource recycling effect. Therefore, we propose a high-efficiency combustion smelting device for aluminum material recycling. SUMMARY
[0005] The purpose of the present application is to provide a high-efficiency combustion smelting device for aluminum material recycling to solve the problems raised in the background art.
[0006] To achieve the above-mentioned purpose, the present application provides the following technical scheme: a high-efficiency combustion smelting device for aluminum material recycling, comprising a load-bearing seat, a smelting furnace is rotatably connected to the load-bearing seat, two ends of the smelting furnace are respectively provided with a combustion port and a feeding port, two symmetrical discharge ports are arranged on one side of the smelting furnace close to the combustion port, a mounting bracket is arranged on the side of the load-bearing seat close to the feeding port of the smelting furnace, a preheating kiln is fixedly connected to the mounting bracket, an exhaust pipe is fixedly connected between the bottom of the preheating kiln and the feeding port of the smelting furnace, a gas return pipe is fixedly connected to the bottom of the exhaust pipe, and the other end of the gas return pipe is fixedly connected to the side wall of the preheating kiln and communicates with each other.
[0007] The preheating kiln is respectively fixedly connected with a bottom frame and a top frame, the top of the bottom frame and the bottom of the top frame are both provided with a plurality of annularly distributed sliding grooves, the sliding grooves are both slidably connected with mounting seats, the two sides of the mounting seats and the inner walls of the sliding grooves are both fixedly connected with limiting springs, the mounting seats on the bottom frame and the top frame are both fixedly connected with air guide pipes corresponding to each other, the mounting seats are all provided with communication grooves, the two ends of the air guide pipes are respectively in communication with the communication grooves of the mounting seats on the same side, the transverse width of the communication grooves is greater than the inner diameter of the air guide pipes, the bottom of the bottom frame is fixedly connected with a plurality of annularly distributed connecting pipes, the ends of the connecting pipes away from the bottom frame are all fixedly connected with the air return pipes and are in communication with each other, and the ends of the connecting pipes close to the bottom frame are in communication with the sliding grooves at the corresponding positions.
[0008] Preferably, the top of the top frame is fixedly connected with a plurality of mounting pipes, the bottom ends of the mounting pipes are all in communication with the sliding grooves at the corresponding positions on the top frame, the top ends of the mounting pipes are fixedly connected with an annularly structured air exhaust disc, the air exhaust disc and the mounting pipes are in communication with each other, and the top of the air exhaust disc is provided with an arc-shaped air guide groove.
[0009] Preferably, the top of the top frame is fixedly connected with an annularly structured water tank through a frame body, the water tank is located above the air exhaust disc, one side of the top of the water tank is fixedly connected with a steam pipe, and the end of the steam pipe away from the water tank penetrates through the preheating kiln and extends to the outside of the preheating kiln.
[0010] Preferably, one side of the steam pipe is fixedly connected with a mounting box in communication with each other, the mounting box is rotatably connected with a mounting rod, the bottom end of the mounting rod penetrates through the bottom of the mounting box, the side wall close to the top end of the mounting rod is fixedly connected with a plurality of uniformly distributed baffles, the baffles are all located in the mounting box, and a baffle plate is arranged in the steam pipe close to the mounting box.
[0011] Preferably, the side wall close to the bottom end of the mounting rod is fixedly connected with a plurality of fixed springs, the ends of the fixed springs away from the mounting rod are all fixedly connected with hammer heads, one side of the preheating kiln close to the mounting rod is fixedly connected with a fixing frame, and the mounting rod is rotatably installed on the fixing frame.
[0012] Preferably, the air guide pipes are fixedly connected with a fixing ring, one side of the fixing ring close to the mounting rod is fixedly connected with a connecting rod, and the end of the connecting rod away from the fixing ring penetrates through the preheating kiln and is fixedly connected with a butt joint, and the butt joint is located on one side of the mounting rod.
[0013] Preferably, the steam pipe is fixedly connected with an airtight box in communication with each other, the airtight box is rotatably connected with a sealing plate, the two sides of the airtight box are both fixedly connected with mounting rings, and the shaft rods on the two sides of the sealing plate are both fixedly connected with torsional springs between the inner walls of the mounting rings on the same side.
[0014] Preferably, the preheating kiln is fixedly connected with a discharge pipe on one side close to the smelting furnace, and a feed pipe is fixedly connected on one side of the top of the preheating kiln.
[0015] Preferably, the top of the bottom frame is provided with a guide inclined surface inclined towards the discharge pipe, a blocking net is fixedly connected between the inner walls of the bottom frame, a discharge hopper is fixedly connected between the inner walls of the top frame, and a telescopic plate is arranged between the mounting seat on the bottom frame and the inner walls of the chute.
[0016] Preferably, the load-bearing seat is provided with a mounting column on one side close to the combustion port of the smelting furnace, a combustion head is rotatably connected to the top of the mounting column through a support, the combustion head is in butt joint with the combustion port of the smelting furnace, and a plurality of gas pipes are in butt joint with the combustion head.
[0017] Compared with the prior art, the present application has the following beneficial effects:
[0018] 1. During smelting, the high-temperature waste gas enters the preheating kiln through the exhaust pipe and preliminarily preheats the aluminum materials in the preheating kiln, then the high-temperature waste gas enters the return pipe and the gas guide pipe, at this time, the high heat capacity and high heat conduction of the metal gas guide pipe can preheat the aluminum materials outside the preheating kiln for the second time, improve the preheating effect of the aluminum materials outside the preheating kiln, and through the annular distribution structure, the preheating kiln can be heat-insulated to avoid the heat loss of the high-temperature waste gas when it approaches the inner wall of the preheating kiln, effectively improving the preheating efficiency of the aluminum materials in the preheating kiln and the utilization efficiency of the heat energy in the high-temperature waste gas.
[0019] 2. After the high-temperature waste gas passes through the gas guide pipe, it enters the mounting pipe and is discharged through the exhaust disc to heat the water in the water tank, and after the water in the water tank is heated, water vapor is formed and flows along the steam pipe. Since the gas baffle is arranged at the position of the mounting box in the steam pipe, the water vapor can be blocked, so that the water vapor flows along the mounting box. In the flowing process, the mounting rod can be driven to rotate by cooperating with the baffle, so that the hammer head continuously strikes the joint, and the gas guide pipe forms a vibrating operation by cooperating with the limiting springs on both sides of the mounting seat. The force generated by the vibration of the gas guide pipe can displace the aluminum materials in contact with the gas guide pipe, so that the aluminum materials at different positions are in contact with the gas guide pipe in turn, improving the preheating uniformity of the aluminum materials around the gas guide pipe, avoiding the problem that the aluminum materials are melted and directly adhered to the gas guide pipe due to long-time contact with the gas guide pipe, and simultaneously, the force generated by the vibration of the gas guide pipe can also be used to scatter the accumulated aluminum materials, so that the aluminum materials are more easily slid into the smelting furnace.
[0020] 3、The present application is through the cooperation of the air-tight box and the sealing plate, the steam pipe is cut off, at this time, the water vapor evaporated from the water in the water tank will gather in the water tank and continuously accumulate, at this time, the air pressure in the water tank will become larger, when the air pressure exceeds the threshold value of the torsional spring, the sealing plate can be pushed away, and enter the installation box with a faster speed and a stronger impact force, at this time, the high-speed flowing water vapor can better push the baffle to rotate, and when the water vapor in the water tank loses a certain amount, the internal air pressure decreases, at this time, the torsional spring rebounds to reset the sealing plate, the steam pipe can be cut off through the air-tight box and the sealing plate again, so that the water vapor in the water tank re-gathers, and the auxiliary property of the device when the water vapor pushes the baffle to rotate is effectively improved. BRIEF DESCRIPTION OF DRAWINGS
[0021] Figure 1 It is the overall structure schematic diagram of the present application;
[0022] Figure 2 It is the structure schematic diagram of the mounting frame and its connecting parts of the present application;
[0023] Figure 3 It is the cross-section structure schematic diagram of the preheating kiln and the exhaust pipe of the present application;
[0024] Figure 4 It is the structure schematic diagram of the gas guide pipe of the present application;
[0025] Figure 5 It is the cross-section structure schematic diagram of the base frame of the present application;
[0026] Figure 6 It is the structure schematic diagram of the mounting seat of the present application;
[0027] Figure 7 It is the structure schematic diagram of the mounting pipe and the exhaust disc of the present application;
[0028] Figure 8 It is the cross-section structure schematic diagram of the water tank of the present application;
[0029] Figure 9 It is the cross-section structure schematic diagram of the steam pipe of the present application;
[0030] Figure 10 It is the cross-section structure schematic diagram of the air-tight box of the present application.
[0031] In the figure: 1, bearing seat; 11, smelting furnace; 12, discharge port; 2, mounting column; 21, combustion head; 22, gas pipe; 3, mounting frame; 31, preheating kiln; 32, exhaust pipe; 33, discharge pipe; 34, feeding pipe; 4, return air pipe; 41, bottom frame; 42, top frame; 43, chute; 44, mounting seat; 45, limit spring; 46, communication groove; 47, air guide pipe; 48, connecting pipe; 49, barrier net; 410, lower hopper; 411, expansion plate; 5, mounting pipe; 51, exhaust disc; 52, air guide groove; 6, water tank; 61, steam pipe; 62, mounting box; 63, mounting rod; 64, baffle; 65, air baffle; 66, fixing spring; 67, hammer head; 68, fixing frame; 7, air-tight box; 71, sealing plate; 72, mounting ring; 73, torsional spring; 8, fixing ring; 81, connecting rod; 82, butt joint. DETAILED DESCRIPTION
[0032] The technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those skilled in the art without creative work fall within the scope of protection of the present application.
[0033] Please refer to Figures 1-10 The present application provides a technical solution: an efficient combustion smelting device for aluminum material recycling, which comprises a bearing seat 1, the bearing seat 1 is rotatably connected with a smelting furnace 11, both ends of the smelting furnace 11 are respectively provided with a combustion port and a feeding port, the side of the smelting furnace 11 close to the combustion port is provided with two symmetrically distributed discharge ports 12, by providing two symmetrically distributed discharge ports 12, the problem that the discharge port of the smelting furnace 11 moves to the upper side during the rotation of the smelting furnace 11, resulting in the need to rotate the smelting furnace 11 by 180 degrees, can be avoided, by the two symmetrically distributed discharge ports 12, the angle that the smelting furnace 11 needs to rotate can be reduced, and the auxiliary nature during discharging can be improved, the bearing seat 1 is provided with a mounting column 2 close to the side of the combustion port of the smelting furnace 11, the top of the mounting column 2 is rotatably connected with a combustion head 21 through a support, a driving mechanism motor is arranged in the mounting column 2, the combustion head 21 can be driven to rotate through the driving mechanism, which facilitates the separation and butt joint of the combustion head 21 and the combustion port of the smelting furnace 11, and the like, the combustion head 21 is butt jointed with the combustion port of the smelting furnace 11, a plurality of gas pipes 22 are butt jointed on the combustion head 21, the gas pipes 22 are divided into pure oxygen pipes and natural gas pipes, by taking natural gas as the basic fuel and pure oxygen as the combustion aid, the smelting efficiency of the aluminum material can be improved.
[0034] Further, when the aluminum material is smelted, the crushed aluminum material is transported into the smelting furnace 11, and then the gas is transported into the combustion head 21 by the gas pipe 22. At this time, the combustion head 21 ignites the gas by the built-in ignition mechanism, and smelts the aluminum material in the smelting furnace 11 by the ejected flame. Meanwhile, the transmission mechanism is arranged on the bearing seat 1, which can drive the smelting furnace 11 to rotate, thereby improving the smelting efficiency of the aluminum material. The transmission mechanism on the bearing seat 1 and the driving mechanism in the mounting column 2 are both actual technical means, which will not be described in detail here.
[0035] Combining FIGS. 1-4 Figure 3 , Figure 4 , Figure 5 and Figure 6 , the mounting rack 3 is arranged on the side of the bearing seat 1 close to the inlet of the smelting furnace 11, and the preheating kiln 31 is fixedly connected to the mounting rack 3. The exhaust pipe 32 is fixedly connected between the bottom of the preheating kiln 31 and the inlet of the smelting furnace 11. The discharge pipe 33 is fixedly connected to the side of the preheating kiln 31 close to the smelting furnace 11. The inlet pipe 34 is fixedly connected to the top side of the preheating kiln 31. The bottom of the exhaust pipe 32 penetrates and is fixedly connected with the gas return pipe 4. The other end of the gas return pipe 4 is fixedly connected and communicates with the side wall of the preheating kiln 31. The bottom bracket 41 and the top bracket 42 are respectively fixedly connected in the preheating kiln 31. The top of the bottom bracket 41 and the bottom of the top bracket 42 are both provided with a plurality of annularly distributed sliding grooves 43. The mounting seat 44 is slidingly connected in the sliding groove 43. The limiting spring 45 is fixedly connected between the two sides of the mounting seat 44 and the inner wall of the sliding groove 43. The gas guide pipe 47 is fixedly connected between the mounting seats 44 corresponding to each other on the bottom bracket 41 and the top bracket 42. The gas guide pipe 47 is made of metal material, has high heat capacity, and has good heat conduction performance. The communication groove 46 is formed in the mounting seat 44. The two ends of the gas guide pipe 47 respectively communicate with the communication grooves 46 of the mounting seats 44 on the same side. The transverse width of the communication groove 46 is greater than the inner diameter of the pipe of the gas guide pipe 47. The bottom of the bottom bracket 41 is fixedly connected with a plurality of annularly distributed connecting pipes 48. The ends of the connecting pipes 48 away from the bottom bracket 41 are fixedly connected and communicated with the gas return pipe 4. The ends of the connecting pipes 48 close to the bottom bracket 41 are communicated with the sliding grooves 43 at the corresponding positions. The top of the bottom bracket 41 is provided with a guide inclined surface inclined toward the discharge pipe 33. The blocking net 49 is fixedly connected between the inner walls of the bottom bracket 41. The discharge hopper 410 is fixedly connected between the inner walls of the top bracket 42. The valves resistant to high temperature are arranged on the discharge pipe 33, the inlet pipe 34, and the discharge hopper 410. The telescopic plates 411 are arranged between the two sides of the mounting seat 44 on the bottom bracket 41 and the inner walls of the sliding grooves 43.
[0036] Further, during the smelting process of the aluminum material in the smelting furnace 11, the inlet of the smelting furnace 11 is connected with the exhaust pipe 32, then the new aluminum material is put into the feeding pipe 34, at this time, the valve of the feeding pipe 34 and the hopper 410 is opened, the aluminum material in the feeding pipe 34 will enter the preheating kiln 31 through the feeding pipe 34 and the hopper 410, and fall on the bottom frame 41, then the valve of the feeding pipe 34 and the hopper 410 is closed, at this time, during the smelting process of the aluminum material, the high-temperature waste gas will enter the exhaust pipe 32, and then enter the preheating kiln 31 along the exhaust pipe 32, to preliminarily preheat the aluminum material in the preheating kiln 31, then the high-temperature waste gas will enter the return air pipe 4 through the preheating kiln 31, and then enter the air guide pipe 47 along the return air pipe 4, the connecting pipe 48 and the communication groove 46 on the mounting seat 44 in the sliding groove 43 on the bottom frame 41, at this time, the heat conduction performance of the air guide pipe 47 can be used to preheat the aluminum material in the preheating kiln 31 for the second time, at the same time, since the air guide pipe 47 is annularly distributed near the inner wall of the preheating kiln 31, the aluminum material near the inner wall of the preheating kiln 31 can be heated, and the aluminum material in the preheating kiln 31 can also be provided with heat preservation work, when the smelting of the aluminum material in the smelting furnace 11 is completed, the driving mechanism in the mounting column 2 drives the combustion head 21 to rotate away from the combustion port of the smelting furnace 11, the transmission mechanism on the bearing seat 1 drives the smelting furnace 11 to rotate, so that one end of the combustion port is at a low position, and one end of the inlet is at a high position and connected with the discharge pipe 33, at this time, the discharge port 12 is opened, and the molten aluminum in the smelting furnace 11 is discharged, then the discharge port 12 is closed, then the valve on the discharge pipe 33 is opened, at this time, the aluminum material in the preheating kiln 31 is slid down along the top of the bottom frame 41 with a guide slope and falls into the smelting furnace 11, when the aluminum material in the preheating kiln 31 enters the smelting furnace 11, the transmission mechanism on the bearing seat 1 drives the smelting furnace 11 to return to the normal position, and the inlet of the smelting furnace 11 is connected with the exhaust pipe 32, then the driving mechanism in the mounting column 2 drives the combustion head 21 to rotate, so that the combustion head 21 is connected with the combustion port of the smelting furnace 11, then the valve on the discharge pipe 33 is closed, and the smelting of the aluminum material can be continued, and the valve of the feeding pipe 34 and the hopper 410 is opened, so that the new aluminum material enters the preheating kiln 31 for preheating work.
[0037] Combining the drawings Figure 3 , Figure 7 , Figure 8 and Figure 9As shown, the top of the top frame 42 is fixedly connected with several installation pipes 5, the bottom end of the installation pipe 5 is communicated with the corresponding position of the sliding groove 43 on the top frame 42, the top end of the installation pipe 5 is fixedly connected with the annular exhaust disc 51, the exhaust disc 51 is communicated with the installation pipe 5, the top of the exhaust disc 51 is provided with an arc-shaped air guide groove 52, the top of the top frame 42 is fixedly connected with the annular water tank 6 through the frame body, the water tank 6 is located above the exhaust disc 51, the water tank 6 is connected with the automatic water supplement mechanism, the top of the water tank 6 is fixedly connected with the steam pipe 61, the end of the steam pipe 61 away from the water tank 6 penetrates the preheating kiln 31 and extends to the outside, the side of the steam pipe 61 is fixedly connected with the installation box 62 which is communicated with each other, the installation rod 63 is rotatably connected in the installation box 62, the bottom end of the installation rod 63 penetrates the bottom of the installation box 62, the side wall close to the top end of the installation rod 63 is fixedly connected with several evenly distributed baffles 64, the baffle 64 is located in the installation box 62, the steam pipe 61 is provided with the air baffle 65 close to the installation box 62, the air baffle 65 is made of soft material, in the process of blocking the steam, the baffle 64 can directly push away the air baffle 65 in the rotating process, and after the baffle 64 passes through the air baffle 65, the air baffle 65 will rebound to the initial state, avoiding the problem that the air baffle 65 blocks the baffle 64 in the process of blocking the steam, causing the baffle 64 to be unable to rotate normally, the side wall close to the bottom end of the installation rod 63 is fixedly connected with several fixed springs 66, the end of the fixed spring 66 away from the installation rod 63 is fixedly connected with the hammer head 67, the side of the preheating kiln 31 close to the installation rod 63 is fixedly connected with the fixed frame 68, the installation rod 63 is rotatably installed on the fixed frame 68, the fixed ring 8 is fixedly connected between the air guide pipes 47, the side of the fixed ring 8 close to the installation rod 63 is fixedly connected with the connecting rod 81, the end of the connecting rod 81 away from the fixed ring 8 penetrates the preheating kiln 31 and is fixedly connected with the butt joint 82, the butt joint 82 is located on one side of the installation rod 63.
[0038] Further, after the high-temperature exhaust gas passes through the gas guide pipe 47, the high-temperature exhaust gas is transported into each mounting pipe 5 by the chute 43 of the top frame 42 and the communication groove 46 of the mounting seat 44 in the chute 43, and the high-temperature exhaust gas is discharged through the exhaust disc 51. At this time, the high-temperature exhaust gas heats the water tank 6 above the exhaust disc 51, causing the water in the water tank 6 to evaporate into water vapor. The water vapor moves towards the mounting box 62 through the steam pipe 61. At this time, the steam pipe 61 is provided with a gas baffle 65, so the steam moves along the mounting box 62 and pushes the baffle 64 to move, thereby completing the rotation of the mounting rod 63. At this time, the mounting rod 63 rotates with the fixed spring 66 and the hammer head 67, and the rotating hammer head 67 constantly strikes the joint 82 and transmits the striking force to the fixed ring 8 through the connecting rod 81, driving the gas guide pipe 47 and the mounting seat 44 to displace. The mounting seat 44 can contract and stretch the limiting springs 45 on both sides during displacement, and the rebounding characteristics of the limiting springs 45 drive the mounting seat 44 and the gas guide pipe 47 to move back and forth along the chute 43, thereby achieving the vibration of the gas guide pipe 47. During the vibration, the gas guide pipe 47 can displace the aluminum material in contact with it, so that the aluminum materials at different positions can be in contact with the gas guide pipe 47 in turn, avoiding the problem of uneven preheating caused by the long-term contact of the aluminum materials at the same position with the gas guide pipe 47. At the same time, during the transportation of the aluminum materials in the preheating kiln 31 into the smelting furnace 11, the constantly vibrating gas guide pipe 47 can scatter the aluminum materials accumulated on the chassis 41, avoiding the problem of not easily sliding into the smelting furnace 11 along the guide slope of the chassis 41. After the water vapor pushes the baffle 64 to rotate, it continues to enter the subsequent steam pipe 61. At this time, the steam can be used for heating and other work, improving the utilization efficiency of heat energy. The automatic water replenishing mechanism includes a water pump, a water delivery pipe, a water level sensor and other components, which are all prior art means, so they will not be described in detail.
[0039] Combining the drawings Figure 8 , Figure 9 and Figure 10 As shown, the steam pipe 61 is fixedly connected with an airtight box 7 that is in communication with each other. The airtight box 7 is rotatably connected with a sealing plate 71. The airtight box 7 is fixedly connected with a mounting ring 72 on both sides. The shaft rod on both sides of the sealing plate 71 is fixedly connected with a torsional spring 73 between the inner wall of the mounting ring 72 on the same side.
[0040] Further, by the cooperation of the air-tight box 7 and the sealing plate 71, the steam pipe 61 can be blocked, so that the water vapor in the water tank 6 is continuously gathered, thereby increasing the air pressure in the water tank 6. When the air pressure in the water tank 6 exceeds the contraction threshold of the torsion spring 73, the water vapor will push open the air-tight box 7 and enter the subsequent steam pipe 61 and mounting box 62 at a high speed and impact force. At this time, the water vapor with improved speed and impact force can better push the baffle 64 to rotate. When the water vapor in the water tank 6 is discharged to a certain amount, the air pressure in the water tank 6 is lowered, the torsion spring 73 starts to rebound, and the sealing plate 71 is reset. At this time, the steam pipe 61 can be blocked again, and the water vapor can be gathered in the water tank 6 again.
[0041] Working principle: during the smelting process of the aluminum material in the smelting furnace 11, the inlet of the smelting furnace 11 is connected with the exhaust pipe 32, then the new aluminum material is put into the feeding pipe 34, at this time, the valve of the feeding pipe 34 and the hopper 410 is opened, the aluminum material in the feeding pipe 34 will enter the preheating kiln 31 through the feeding pipe 34 and the hopper 410, and fall on the bottom frame 41, then the valve of the feeding pipe 34 and the hopper 410 is closed, after the crushed aluminum material is transported into the smelting furnace 11, the gas pipe 22 is used to transport the gas into the combustion head 21, at this time, the combustion head 21 ignites the gas by the built-in ignition mechanism, and uses the ejected flame to smelt the aluminum material in the smelting furnace 11;
[0042] At this time, the high-temperature exhaust gas generated in the aluminum smelting process will enter the exhaust pipe 32, and then enter the preheating kiln 31 along the exhaust pipe 32, and preliminarily preheat the aluminum material in the preheating kiln 31, and then the high-temperature exhaust gas will enter the return air pipe 4 through the preheating kiln 31, and then enter the gas guide pipe 47 along the return air pipe 4, the connecting pipe 48 and the connecting groove 46 on the mounting seat 44 in the slide groove 43 on the bottom frame 41. At this time, the heat conduction performance of the gas guide pipe 47 can be used to preheat the aluminum material in the preheating kiln 31 twice, and at the same time, since the gas guide pipe 47 is annularly distributed near the inner wall of the preheating kiln 31, it can heat the aluminum material near the inner wall of the preheating kiln 31, and also provide heat preservation for the aluminum material in the preheating kiln 31. When the aluminum smelting in the smelting furnace 11 is completed, the driving mechanism in the mounting column 2 drives the combustion head 21 to rotate away from the combustion port of the smelting furnace 11, and the transmission mechanism on the supporting seat 1 drives the smelting furnace 11 to rotate, so that one end of the combustion port is at the low position, and the other end of the inlet is at the high position and is connected with the discharge pipe 33. At this time, the discharge port 12 is opened, and the molten aluminum in the smelting furnace 11 is discharged. Then the discharge port 12 is closed, and then the valve on the discharge pipe 33 is opened. At this time, the preheated aluminum material in the preheating kiln 31 will slide down along the top of the bottom frame 41 with a guide slope into the smelting furnace 11. When the aluminum material in the preheating kiln 31 enters the smelting furnace 11, the transmission mechanism on the supporting seat 1 drives the smelting furnace 11 to return to the normal position, and the inlet of the smelting furnace 11 is connected with the exhaust pipe 32. Then the driving mechanism in the mounting column 2 drives the combustion head 21 to rotate, so that the combustion head 21 is connected with the combustion port of the smelting furnace 11. Then the valve on the discharge pipe 33 is closed, and the smelting of the aluminum material is continued, and the valves of the feeding pipe 34 and the lower hopper 410 are opened, so that new aluminum material enters the preheating kiln 31 for preheating work;
[0043] And high-temperature exhaust gas after the guide tube 47, using the top frame 42 chute 43 and located in the installation seat 44 of the communication groove 46 will be transported to each installation tube 5 high-temperature exhaust gas, and make high-temperature exhaust gas through the exhaust disc 51, at this time the high-temperature exhaust gas will be located on the exhaust disc 51 above the water tank 6 heating, the water tank 6 in the water vapor into steam, steam will move towards the installation box 62 through the steam pipe 61, and at this time the steam pipe 61 due to the setting of the air baffle 65, therefore, steam will move along the installation box 62, and thus push the baffle 64 movement, and in the process, in the process, through the air-tight box 7 and sealing plate 71 cooperation, can be cut off the steam pipe 61, so that the water tank 6 in the water vapor gathering, thereby improving the water tank 6 in the air pressure, when the water tank 6 in the air pressure exceeds the contraction threshold of torsion spring 73, water vapor will push open the air-tight box 7, and with high speed and impact force into the subsequent steam pipe 61 and installation box 62, at this time the speed and impact force of the water vapor can better push the baffle 64 rotation, and when the water tank 6 in the water vapor is discharged after a certain amount, at this time the water tank 6 in the air pressure is low, the torsion spring 73 begins to rebound, and drive the sealing plate 71 reset, at this time can continue to cut off the steam pipe 61, and make the water vapor re-gather in the water tank 6;
[0044] And the steam in the baffle 64 movement, can use the baffle 64 drive installation rod 63 work, at this time the installation rod 63 will drive the fixed spring 66 and hammer head 67 rotation, and use the rotating hammer head 67 constantly knocking on the joint 82, and the knocking force through the connecting rod 81 to the fixed ring 8, and drive the guide tube 47 and installation seat 44 displacement, and the installation seat 44 in the process of displacement, can make its both sides of the limiting spring 45 shrink and stretch, and use the rebound characteristics of the limiting spring 45, drive the installation seat 44 and guide tube 47 along the chute 43 constantly back and forth movement, so as to make the guide tube 47 vibration work, and the guide tube 47 in the process of vibration, can drive the aluminum material in contact with it displacement, can make the aluminum material in different positions in turn with the guide tube 47 contact, avoid the same place of aluminum material long-term contact with the guide tube 47, cause the part of the aluminum material to accept too much heat, cause the problem of uneven preheating, at the same time in the process of conveying the aluminum material in the preheating kiln 31 into the smelting furnace 11, through the constantly vibrating guide tube 47 can make the aluminum material accumulated on the chassis 41 scattering work, avoid the aluminum material accumulated together, cause the problem of not easy along the guide slope of the chassis 41 into the smelting furnace 11, at the same time the steam in the baffle 64 rotation, it will continue to enter the subsequent steam pipe 61, at this time can be used for heating and other work of this part of the steam.
[0045] It is to be understood that the terminology used herein is for the purpose of describing particular embodiments only and is not intended to be limiting; it is not intended to exclude myriad other embodiments of the present application that other inventors can develop based on the same general inventive concepts embodied by the described embodiments. That is, although the present application is described in terms of particular embodiments and illustrative figures, it should be apparent that the scope of the present application is not limited to these specific embodiments.
[0046] While the embodiments of the application have been shown and described herein, it will be understood by those skilled in the art that many changes, modifications, substitutions and alterations to these embodiments can be made without departing from the principles and spirits of the application, and it is intended that the scope of the application be limited solely by the scope of the appended claims and the equivalents thereof.
Claims
1. A high-efficiency combustion smelting device for aluminum recycling, comprising a support base (1), a smelting furnace (11) rotatably connected to the support base (1), a combustion port and a feed port respectively opened at both ends of the smelting furnace (11), two symmetrically distributed discharge ports (12) provided on the side of the smelting furnace (11) near the combustion port, a mounting frame (3) provided on the side of the support base (1) near the feed port of the smelting furnace (11), a preheating kiln (31) fixedly connected to the mounting frame (3), and an exhaust pipe (32) fixedly connected between the bottom of the preheating kiln (31) and the feed port of the smelting furnace (11), characterized in that: The bottom of the exhaust pipe (32) is fixedly connected to a return gas pipe (4), and the other end of the return gas pipe (4) is fixedly connected to the side wall of the preheating kiln (31) and interconnected with it. The preheating kiln (31) is fixedly connected to a base frame (41) and a top frame (42). Several annularly distributed sliding grooves (43) are provided on the top of the base frame (41) and the bottom of the top frame (42). Mounting seats (44) are slidably connected within each sliding groove (43). Limiting springs (45) are fixedly connected between the two sides of each mounting seat (44) and the inner wall of the sliding groove (43). Air guide pipes (47) are fixedly connected between corresponding mounting seats (44) on the base frame (41) and the top frame (42). The mounting seats (44) are... Each of the components is provided with a connecting groove (46). Both ends of the air guide pipe (47) are connected to the connecting groove (46) of the mounting base (44) on the same side. The width of the connecting groove (46) is greater than the inner diameter of the air guide pipe (47). Several annularly distributed connecting pipes (48) are fixedly connected to the bottom of the base frame (41). The end of the connecting pipe (48) away from the base frame (41) is fixedly connected to the return air pipe (4) and connected to each other. The end of the connecting pipe (48) close to the base frame (41) is connected to the corresponding sliding groove (43).
2. The high-efficiency combustion smelting device for aluminum recycling according to claim 1, characterized in that: The top of the top frame (42) is fixedly connected to several mounting pipes (5). The bottom ends of the mounting pipes (5) are all connected to the corresponding sliding grooves (43) on the top frame (42). The top ends of the mounting pipes (5) are fixedly connected to an annular exhaust plate (51). The exhaust plate (51) and the mounting pipes (5) are interconnected. The top of the exhaust plate (51) is provided with an arc-shaped air guide groove (52).
3. The high-efficiency combustion smelting device for aluminum recycling according to claim 2, characterized in that: The top of the top frame (42) is fixedly connected to a ring-shaped water tank (6) via the frame body. The water tank (6) is located above the exhaust plate (51). A steam pipe (61) is fixedly connected to one side of the top of the water tank (6). The end of the steam pipe (61) away from the water tank (6) passes through the preheating kiln (31) and extends to its outside.
4. The high-efficiency combustion smelting device for aluminum recycling according to claim 3, characterized in that: One side of the steam pipe (61) is fixedly connected to an interconnected mounting box (62). An mounting rod (63) is rotatably connected inside the mounting box (62). The bottom end of the mounting rod (63) penetrates the bottom of the mounting box (62). Several evenly distributed baffles (64) are fixedly connected to the side wall of the mounting rod (63) near the top. All baffles (64) are located inside the mounting box (62). A baffle plate (65) is provided inside the steam pipe (61) near the mounting box (62).
5. The high-efficiency combustion smelting device for aluminum recycling according to claim 4, characterized in that: The mounting rod (63) has several fixing springs (66) fixedly connected to the side wall near the bottom end. Each fixing spring (66) has a hammer (67) fixedly connected to the end away from the mounting rod (63). The preheating kiln (31) has a fixing frame (68) fixedly connected to the side near the mounting rod (63). The mounting rod (63) is rotatably mounted on the fixing frame (68).
6. The high-efficiency combustion smelting device for aluminum recycling according to claim 4, characterized in that: A fixing ring (8) is fixedly connected between the air guide pipes (47). A connecting rod (81) is fixedly connected to the side of the fixing ring (8) near the mounting rod (63). The end of the connecting rod (81) away from the fixing ring (8) passes through the preheating kiln (31) and is fixedly connected to a connector (82). The connector (82) is located on one side of the mounting rod (63).
7. The high-efficiency combustion smelting device for aluminum recycling according to claim 3, characterized in that: An airtight box (7) is fixedly connected to the steam pipe (61). A sealing plate (71) is rotatably connected inside the airtight box (7). Mounting rings (72) are fixedly connected to both sides of the airtight box (7). Torsion springs (73) are fixedly connected between the shafts on both sides of the sealing plate (71) and the inner wall of the mounting ring (72) on the same side.
8. The high-efficiency combustion smelting device for aluminum recycling according to claim 1, characterized in that: The preheating kiln (31) is fixedly connected to a discharge pipe (33) on the side near the melting furnace (11), and a feed pipe (34) is fixedly connected to the top side of the preheating kiln (31).
9. The high-efficiency combustion smelting device for aluminum recycling according to claim 8, characterized in that: The top of the base frame (41) is provided with a guide slope inclined toward the discharge pipe (33). A barrier net (49) is fixedly connected between the inner walls of the base frame (41). A discharge hopper (410) is fixedly connected between the inner walls of the top frame (42). Telescopic plates (411) are provided on both sides of the mounting seat (44) on the base frame (41) and between the inner wall of the chute (43).
10. The high-efficiency combustion smelting device for aluminum recycling according to claim 1, characterized in that: The load-bearing base (1) is provided with an installation column (2) on the side near the combustion port of the smelting furnace (11). The top of the installation column (2) is rotatably connected to a combustion head (21) via a bracket. The combustion head (21) is connected to the combustion port of the smelting furnace (11), and several gas pipes (22) are connected to the combustion head (21).