Splicing type steel-concrete composite structure
By setting widened flange plates and haunches in the splice joint area of steel beams, combined with Z-shaped staggered lap joint structure and buffer components, the stress concentration and insufficient bearing capacity of steel beam splice joints were solved, thereby improving seismic performance and reducing seismic load.
Patent Information
- Application Number
- CN202511746787.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-11-26
- Publication Date
- 2026-03-24
AI Technical Summary
Existing steel beam splice joints in large-span structures suffer from stress concentration, brittle failure, and insufficient bearing capacity. Furthermore, traditional reinforcement schemes increase the structure's self-weight and raise the risk of seismic loads.
Widened flange plates and haunches are installed in the splicing joint area of steel beams. Combined with Z-shaped staggered lap joint structure, buffer components and threaded steel sleeve connection, a steel-concrete composite structure is formed to enhance the bearing capacity of steel beams and reduce seismic loads.
It effectively improves the load-bearing capacity of steel beams, reduces the risk of stress concentration and brittle failure at joints, reduces seismic loads, improves seismic performance, and reduces construction and operation and maintenance costs.
Smart Images

Figure CN121719307A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of civil engineering structures, and more particularly to a spliced steel-concrete composite structure. Background Technology
[0002] In steel structure construction, I-beams and H-beams are widely used due to their excellent load-bearing performance. For large-span structures, due to transportation and hoisting limitations, steel beams need to be manufactured in sections in the factory and then transported to the site for splicing. Currently, most steel beam splicing joints adopt the form of direct flange butt welding and web bolt connection. This structure has obvious defects: stress concentration is significant at the flange butt weld, making it prone to brittle failure under load; the joint bearing capacity is insufficient under heavy load conditions, requiring additional stiffening ribs, which increases processing and installation costs. In addition, as a critical load-bearing part of the structure, the splicing joint itself has a complex stress state, especially when subjected to negative bending moments.
[0003] In critical functional floors of important public buildings in earthquake-prone areas, the requirements for structural seismic safety are extremely high. Traditional reinforcement methods using thickened steel beams significantly increase the overall structural weight, thereby increasing the seismic load on the building and exacerbating the risk during earthquakes. Seismic loads are dynamic additional forces acting on buildings, structures, or engineering structures caused by ground vibrations during an earthquake; essentially, they are the inertial forces generated by ground movement. Therefore, a reinforcement structure is needed for such buildings that ensures uninterrupted functionality during earthquakes and prevents progressive collapse, effectively increasing the load-bearing capacity of the steel beams without increasing the overall seismic load. Summary of the Invention
[0004] The technical problem to be solved by this invention is: how to provide a spliced steel-concrete composite structure that can effectively improve the load-bearing capacity of steel beams without increasing the overall seismic load.
[0005] To solve the above-mentioned technical problems, the technical solution adopted by the present invention is as follows: A spliced steel-concrete composite structure includes at least two beam segments and a splicing node; the splicing node has a steel column and a first steel beam, the steel column is welded to the first steel beam, the upper flange of the first steel beam is provided with a widened flange plate, and the lower flange of the first steel beam is provided with a haunch plate.
[0006] The beneficial effects of this invention are as follows: In the splicing node area, a widened flange plate is provided on the upper flange of the steel beam, and a haunch plate is provided on the lower flange. Widening the upper flange strengthens the cross-section and disperses stress, reducing stress concentration at the node and increasing the bending stiffness at the beam end. Widening the upper flange is equivalent to locally increasing the beam's section modulus, allowing the beam end to withstand greater seismic bending moments and reducing the proportion of bending moment transmission in the node's core area. The widened flange makes the stress distribution at the beam end more uniform, avoiding stress concentration at the weld between the beam flange and column in traditional nodes, indirectly reducing the actual seismic impact on the node. The lower flange haunch guides the plastic hinge outward, allowing the beam end to dissipate energy first. The core function of the haunch is to move the plastic hinge away from the node region. The haunch section is equivalent to locally strengthening the lower flange cross-section of the beam, causing the weak area of the beam to shift from the node weld to the beam body at the end of the haunch section. During an earthquake, the plastic hinge first forms and undergoes ductile deformation in the beam body outside the haunch section, dissipating seismic energy through the plastic deformation of the steel, thereby reducing the seismic load transmitted to the node. Attached Figure Description
[0007] Figure 1 This is a schematic diagram of the overall structure of the present invention; Figure 2 This is a schematic diagram of the pure steel section of the present invention without concrete. Figure 3 This is a schematic diagram of the single-direction structure of the present invention; Figure 4 This is a schematic diagram of the splicing point of the present invention; Figure 5 This is a schematic diagram of the buffer component of the present invention; Figure 6 This is a schematic diagram of the buffer component of the present invention after being disassembled. Figure 7 This is a schematic diagram of the threaded steel bar configuration of the present invention.
[0008] Labeling Explanation: 1. Steel column; 11. Steel column flange; 12. Steel column web; 2. First steel beam; 21. Upper flange of the first steel beam; 22. Web of the first steel beam; 23. Lower flange of the first steel beam; 24. Widened flange plate; 3. Second steel beam; 31. Upper flange of the second steel beam; 32. Web of the second steel beam; 33. Lower flange of the second steel beam; 4. Haunch plate; 5. Third connecting plate; 6. First connecting plate; 7. Second connecting plate; 8. Buffer group Components; 81. First hinge seat; 82. Second hinge seat; 83. Inner steel pipe; 84. Outer steel pipe; 85. End plate; 86. Elastic component; 9. Outer plate; 10. Diagonal brace; 13. Concrete protective layer; 14. Triangular web; 15. Mother seat; 16. Sleeve; 17. Reinforcing bar; 18. Stirrup; 19. Two-way inter-column stiffening rib; 41. Vertical stiffening rib plate; 42. Stiffening rib; 43. Fixing plate; 44. Bolt hole; 45. Bolt. Detailed Implementation
[0009] To explain in detail the technical content, objectives, and effects of the present invention, the following description is provided in conjunction with the embodiments and accompanying drawings.
[0010] Please refer to Figures 1 to 7 A spliced steel-concrete composite structure includes at least two beam segments and a splicing node; the splicing node has a steel column 1 and a first steel beam 2, the steel column 1 and the first steel beam 2 are welded together, the upper flange 21 of the first steel beam 2 is provided with a widened flange plate 24, and the lower flange 23 of the first steel beam 2 is provided with a haunch plate 4.
[0011] As can be seen from the above description, the beneficial effects of the present invention are as follows: in the splicing node area, the upper flange of the steel beam is provided with a widened flange plate and the lower flange is provided with a haunch plate, so that it is not necessary to thicken the flange or web of the entire steel beam, which can effectively improve the bearing capacity of the steel beam without increasing the overall seismic load.
[0012] The beam segment has a second steel beam 3, a first connecting plate 6 welded to one end of the lower flange 23 of the first steel beam, a second connecting plate 7 welded to one end of the upper flange 31 of the second steel beam 3, the first connecting plate 6 being connected to the lower flange 33 of the second steel beam 3 by bolts 45, and the second connecting plate 7 being connected to the upper flange 21 of the first steel beam by bolts 45; a third connecting plate 5 is provided, the third connecting plate 5 being connected to the web plate 22 of the first steel beam 2 and the web plate 32 of the second steel beam 3 by bolts 45.
[0013] As described above, the first steel beam 2 and the second steel beam 3 are spliced together with the steel beams by the interlocking of the connecting plates to form a Z-shaped staggered lap joint structure. Then, the weld is made to be inclined by bolt 45 locking, which avoids the stress abrupt change of traditional straight seam butt joint. The stress concentration coefficient is significantly reduced compared with straight seam joint, which effectively reduces the risk of brittle fracture. In addition, when assembling on the construction site, the Z-shaped splice can be directly spliced on the beam ends, reducing the time occupied by the tower crane.
[0014] Furthermore, it also includes a buffer assembly 8, which has a first hinge seat 81, a second hinge seat 82, an inner steel tube 83, an outer steel tube 84, and an end plate 85; the first hinge seat 81 is welded to the steel column 1, the second hinge seat 82 is welded to one end of the inner steel tube 83, and the first hinge seat 81 and the second hinge seat 82 are connected by bolts 45; a bolt hole is opened at one end of the inner steel tube 83, and a groove is opened in the wall of the outer steel tube 84, and bolts 45 are used to connect the inner steel tube 83 and the outer steel tube 84 at the groove; an elastic element 86 is provided inside the outer steel tube 84, and one end of the elastic element 86 abuts against the inner steel tube 83; an end plate 85 is welded to one end of the outer steel tube 84, and the end plate 85 is locked onto the upper flange 31 of the second steel beam.
[0015] As described above, during an earthquake, the elastic element 86 can absorb tensile fluctuations, reduce structural vibration and stress concentration, and resist lateral forces from seismic loads. After the widening section and the haunch section fail, the buffer assembly 8 begins to bear force, bypassing complex force transmission paths and directly transferring the beam end shear force and bending moment to the column, thus avoiding progressive collapse caused by shear cracking of the steel beam web and crushing of the beam-column joint.
[0016] Furthermore, a mother seat 15 is welded to the upper flange 31 and the lower flange 33 of the second steel beam, and a sleeve 16 is welded to the mother seat 15; a reinforcing bar 17 is connected to the sleeve 16, and a corresponding stirrup 18 is set on the reinforcing bar 17; a concrete protective layer 13 is poured on the outside of the second steel beam 3.
[0017] As can be seen from the above description, after the threaded steel bar 17 is connected through the sleeve 16 on the female seat 15, the tensile and shear forces of the steel component can be transferred more evenly to the surrounding outer concrete structure, avoiding slippage between the steel beam and the concrete, allowing the steel and concrete materials to truly work together to bear the load, and improving the overall stress efficiency of the composite structure.
[0018] Furthermore, a triangular web 14 is provided on the haunch plate 4, and the triangular web 14 is welded to the haunch plate 4, the steel column 1 and the lower flange 23 of the first steel beam respectively.
[0019] As can be seen from the above description, the triangular web 14 can further improve the strength of the armhole plate 4.
[0020] Furthermore, a two-way inter-column stiffening rib 19 is provided on the web plate 12 of the steel column 1. The two-way inter-column stiffening rib 19 is respectively provided at the corresponding positions of the upper flange 21 and the lower flange 23 of the first steel beam. A vertical stiffening rib plate 41 is vertically provided in the middle of the two-way inter-column stiffening rib 19.
[0021] As described above, further limiting the deformation within the node region ensures sufficient overall stiffness within the node region while providing a welding position for the first steel beam.
[0022] Furthermore, the bidirectional intercolumnar stiffening rib 19 and the vertical stiffening rib plate 41 are welded to one end of the first steel beam 2.
[0023] As described above, the first steel beam 2 is welded to the steel column 1, which further improves the seismic performance of the joint.
[0024] Furthermore, an overhanging plate 9 is welded to the side of the upper flange 31 and the lower flange 33 of the second steel beam, respectively. An oblique brace 10 is locked onto the overhanging plate 9, and the oblique brace 10 connects two adjacent second steel beams 3.
[0025] As described above, the triangular bracing 10 added between nodes forms a stable triangular system with the beams and columns, which can effectively resist horizontal forces and convert them into axial forces of the bracing, greatly reducing the horizontal displacement and sway of the structure and avoiding instability and failure. During an earthquake, it can assist the flange in dissipating energy and serve as a backup force transmission path, improving the structural redundancy and resistance to progressive collapse. Moreover, it is more economical and efficient than increasing the cross-section of beams and columns, and it can also make the structural stress clear and simplify the design calculation.
[0026] Furthermore, two stiffening ribs 42 are provided on the steel column 1, and the stiffening ribs 42 are located at the corresponding positions of the first hinge seat 81; the stiffening ribs 42, the web plate 12 of the steel column, and the flange 11 of the steel column are perpendicular to each other; a fixing plate 43 is provided between the two stiffening ribs 42, and the fixing plate 43, the flange 11 of the steel column, and the stiffening ribs 42 are perpendicular to each other, and the first hinge seat 81 can also be welded to the fixing plate 43.
[0027] As can be seen from the above description, the stiffening rib 42 and the fixing plate 43 provide a connection position for the buffer assembly 8, thus preventing the buffer assembly 8 from acting directly on the web plate 12 of the steel column.
[0028] Furthermore, the stirrup 18 has threads that are compatible with the reinforcing bar 17, which are symmetrically arranged on the upper flange 31 and the lower flange 33 of the second steel beam.
[0029] As can be seen from the above description, the stirrups 18 can effectively fix the position of the reinforcing bars 17, and the symmetrically arranged threaded reinforcing bars 17 can disperse the local stress of the steel member to a larger area of concrete, reduce the stress peak at the weld and cross-sectional abrupt change of the steel member, and reduce the risk of joint fatigue failure.
[0030] Please refer to Figures 1 to 7 Embodiment 1 of the present invention is as follows: A spliced steel-concrete composite structure includes at least two beam segments and a splicing node. The splicing node has a steel column 1 and a first steel beam 2. The steel column 1 and the first steel beam 2 are welded together. The upper flange 21 of the first steel beam 2 is provided with a widened flange plate 24. The widened flange plate 24 is connected to the first steel beam 2 by a full penetration submerged arc weld. The widened flange plate 24 is welded to the flange 11 of the steel column by a butt penetration weld. According to the specification, the slope ratio of the widened part should be... The ratio is less than 1:4, with the length of the widened portion being 1 / 2 to 3 / 4 of the beam height, and the width of the widened portion being 1 / 3 to 1 / 4 of the original flange. The lower flange 23 of the first steel beam 2 is equipped with a haunch plate 4, which is welded to the steel column flange 11 using a full penetration weld. A triangular web 14 is added to the haunch plate 4 for reinforcement. The triangular web 14 is welded to the haunch plate 4, the steel column flange 11, and the lower flange 23 of the first steel beam using double-sided fillet welds. According to the specifications, the angle of the haunch plate 4 needs to be determined based on the stress characteristics. For nodes primarily bearing bending moments, the angle corresponding to the short side of the haunch is recommended to be controlled within 45°. When the node bears a large shear force, the angle can be appropriately increased to 45° to 60°. Material strength also affects the angle selection. Regarding construction feasibility, when the angle is less than 30°, the operating space is limited, and the installation space for bolt wrenches needs to be verified in advance. While ensuring ease of construction, a small-angle haunch plate is better suited to the bending capacity of the joint, increases the effective load-bearing length, can more evenly transfer bending moment, reduces stress concentration at the joint, improves fatigue resistance, and occupies less space on the column side. Therefore, the angle set in this invention is 16.7°.
[0031] Please refer to Figure 4 In this embodiment, the beam segment has a second steel beam 3. A first connecting plate 6 is welded to one end of the lower flange 23 of the first steel beam 2, and a bolt hole 44 is opened at one end of the upper flange 21 of the first steel beam 2. A second connecting plate 7 is welded to one end of the upper flange 31 of the second steel beam 3, and a bolt hole 44 is opened at one end of the lower flange 33 of the second steel beam 3. The first connecting plate 6 is connected to the lower flange 33 of the second steel beam with bolts 45, and the second connecting plate 7 is connected to the upper flange 21 of the first steel beam with bolts 45. A bolt hole 44 is opened at one end of the web 22 of the first steel beam 2, and a bolt hole 44 is opened at one end of the web 32 of the second steel beam 3. A third connecting plate 5 is provided, and bolts 45 are used to connect the third connecting plate 5, the web 22 of the first steel beam, and the web 32 of the second steel beam on both sides. All bolts 45 are high-strength bolts.
[0032] Please refer to Figures 5 to 6In this embodiment, a buffer assembly 8 is also included. The buffer assembly 8 has a first hinge seat 81, a second hinge seat 82, an inner steel tube 83, an outer steel tube 84, and an end plate 85. The first hinge seat 81 is welded to the steel column 1, and the second hinge seat 82 is welded to one end of the inner steel tube 83. The first hinge seat 81 and the second hinge seat 82 are fixed with bolt rods and locked with bolts 45. The inner steel tube 83 and the outer steel tube 84 have different diameters to ensure that the inner steel tube 83 can be inserted into the outer steel tube 84. A bolt hole 44 is opened at one end of the inner steel tube 83, and the outer steel tube 84 is closed at the other end. The steel pipe 84 has a groove in its wall, and the two are connected by a bolt rod. The bolt rod is then fixed with a bolt 45, allowing the two sections of steel pipe to slide relative to each other. An elastic element 86 is installed inside the outer steel pipe 84, with one end of the elastic element 86 abutting against the inner steel pipe 83. An end plate 85 is welded to one end of the outer steel pipe 84, and the end plate 85 is locked onto the upper flange 31 of the second steel beam 3. When a large displacement occurs between the steel column 1 and the steel beam, the buffer component 8 begins to bear force, pulling the steel column 1 and the steel beam to prevent them from collapsing due to excessively rapid failure.
[0033] Please refer to Figure 7 In this embodiment, female supports 15 are welded to the upper flange 31 and lower flange 33 of the second steel beam 3, respectively, and sleeves 16 are welded to the female supports 15 using double-sided fillet welds. Reinforcing bars 17 are connected to the sleeves 16, with threads rolled onto the ends of the reinforcing bars 17, which are then directly tightened to a sleeve 16 with internal threads, thus achieving the butt joint of the reinforcing bars 17. Corresponding stirrups 18 are provided on the reinforcing bars 17, with threads adapted to the reinforcing bars 17. The reinforcing bars 17 are symmetrically arranged on the upper flange 31 and lower flange 33 of the second steel beam 3. A concrete protective layer 13 is poured over the second steel beam 3.
[0034] In this embodiment, the armhole plate 4 of the splicing node is provided with a triangular web 14, and the triangular web 14 is welded to the armhole plate 4, the steel column 1, and the lower flange 23 of the first steel beam 2 respectively; the web 12 of the steel column 1 is provided with bidirectional inter-column stiffening ribs 19 corresponding to the upper flange 21 and the lower flange 23 of the first steel beam 2, and vertical stiffening rib plates 41 are vertically arranged in the middle of the bidirectional inter-column stiffening ribs 19, both of which are welded to one end of the first steel beam 2; the upper flange 3 of the second steel beam Extended plates 9 are welded to the sides of the lower flanges 33 of the first and second steel beams respectively. High-strength bolts 45 are used to lock the diagonal braces 10 on the extended plates 9 to connect the two adjacent second steel beams 3. At the same time, two stiffening ribs 42 are provided on the steel column 1 at the position corresponding to the first hinge seat 81. The stiffening ribs 42 are perpendicular to the web plate 12 and the flange 11 of the steel column. A fixing plate 43 is also provided between the two stiffening ribs 42. The fixing plate 43 is also perpendicular to the flange 11 and the stiffening ribs 42 of the steel column. The first hinge seat 81 can also be welded to the fixing plate 43.
[0035] In summary, the spliced steel-concrete composite structure provided by this invention, through widening the upper flange, adding haunches to the lower flange, and using a Z-shaped staggered lap joint, eliminates the need to thicken the flanges or webs of the entire steel beam. This effectively improves the load-bearing capacity of the steel beam, reduces stress concentration and the risk of brittle fracture, and does not increase the overall seismic load. Combined with triangular bracing, buffer components, and threaded steel sleeve connections, it enhances lateral stiffness, seismic redundancy, and force transmission efficiency, while the outer concrete casing achieves complementary performance of steel and concrete materials. Furthermore, it boasts advantages such as high factory prefabrication rate, low construction cost, convenient operation and maintenance, and adaptability to various working conditions, meeting the requirements for collapse resistance, seismic resistance, and complex cross-section splicing.
[0036] The above description is merely an embodiment of the present invention and does not limit the patent scope of the present invention. Any equivalent modifications made based on the content of the present invention specification and drawings, or direct or indirect applications in related technical fields, are similarly included within the patent protection scope of the present invention.
Claims
1. A spliced steel-concrete composite structure, characterized in that, Includes at least two beam segments and one splice node; The splicing node has a steel column and a first steel beam. The steel column is welded to the first steel beam. The upper flange of the first steel beam is provided with a widened flange plate, and the lower flange of the first steel beam is provided with a haunch plate.
2. The spliced steel-concrete composite structure according to claim 1, characterized in that, The beam segment has a second steel beam. A first connecting plate is welded to one end of the lower flange of the first steel beam, and a second connecting plate is welded to one end of the upper flange of the second steel beam. The first connecting plate is bolted to the lower flange of the second steel beam, and the second connecting plate is bolted to the upper flange of the first steel beam. A third connecting plate is provided, which is bolted to the web of the first steel beam and the web of the second steel beam.
3. The spliced steel-concrete composite structure according to claim 2, characterized in that, It also includes a buffer assembly, which has a first hinge seat, a second hinge seat, an inner steel tube, an outer steel tube, and an end plate; the first hinge seat is welded to the steel column, the second hinge seat is welded to one end of the inner steel tube, and the first hinge seat and the second hinge seat are bolted together; a bolt hole is opened at one end of the inner steel tube, and a groove is opened in the wall of the outer steel tube, where the inner steel tube and the outer steel tube are bolted together; an elastic element is provided inside the outer steel tube, and one end of the elastic element abuts against the inner steel tube; the end plate is welded to one end of the outer steel tube, and the end plate is locked to the upper flange of the second steel beam.
4. A spliced steel-concrete composite structure according to claim 3, characterized in that, A female seat is welded to the upper flange and the lower flange of the second steel beam, and a sleeve is welded to the female seat; a reinforcing bar is connected to the sleeve, and corresponding stirrups are set on the reinforcing bar; a concrete protective layer is poured on the outside of the second steel beam.
5. A spliced steel-concrete composite structure according to claim 1, characterized in that, The armhole plate is provided with a triangular web, which is welded to the armhole plate, the steel column and the lower flange of the first steel beam respectively.
6. A spliced steel-concrete composite structure according to claim 1, characterized in that, A bidirectional intercolumn stiffening rib is provided on the web of the steel column. The bidirectional intercolumn stiffening rib is respectively provided at corresponding positions on the upper flange and the lower flange of the first steel beam. A vertical stiffening rib plate is vertically provided in the middle of the bidirectional intercolumn stiffening rib.
7. A spliced steel-concrete composite structure according to claim 6, characterized in that, The bidirectional intercolumn stiffening rib and the vertical stiffening rib plate are welded to one end of the first steel beam.
8. A spliced steel-concrete composite structure according to claim 7, characterized in that, Extended plates are welded to the sides of the upper flange and the lower flange of the second steel beam, respectively. Diagonal braces are locked onto the extended plates, and the diagonal braces connect two adjacent second steel beams.
9. A spliced steel-concrete composite structure according to claim 3, characterized in that, Two stiffening ribs are provided on the steel column, and the stiffening ribs are located at the corresponding positions of the first hinge seat; the stiffening ribs, the web of the steel column, and the flange of the steel column are perpendicular to each other; a fixing plate is provided between the two stiffening ribs, and the fixing plate, the flange of the steel column, and the stiffening ribs are perpendicular to each other; the first hinge seat can also be welded to the fixing plate.
10. A spliced steel-concrete composite structure according to claim 4, characterized in that, The stirrups have threads that are compatible with the reinforcing bars, and the reinforcing bars are symmetrically arranged on the upper flange and the lower flange of the second steel beam.
Citation Information
Cited By
Prestressed viscous energy dissipation type end plate connection hybrid joint