Test device and method for simulating tunnel excavation deformation damage in complex stress state

By modularly modifying the uniaxial testing machine and combining it with a loading unit and intelligent control system, the biaxial compression and shear characteristics test of rock was integrated, solving the problem of the single function of existing equipment, improving the accuracy and efficiency of the test, and realistically simulating the deformation of surrounding rock during tunnel excavation.

CN121954458APending Publication Date: 2026-05-01NANTONG UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202610215371.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-02-14
Publication Date
2026-05-01

AI Technical Summary

Technical Problem

Existing geotechnical mechanics experimental equipment cannot simultaneously simulate the biaxial compression and shear characteristics of rock on a single device, and traditional testing methods cannot accurately reflect the deformation and failure mechanism of surrounding rock induced by tunnel excavation, resulting in inaccurate test results.

Method used

Modular modification of the uniaxial testing machine, combined with transverse and longitudinal loading units, tunnel excavation simulation units, intelligent control systems and data acquisition systems, enables rapid switching between biaxial compression tests and direct shear tests and real-time data monitoring.

Benefits of technology

It realizes a high-precision biaxial loading environment at low cost, improves test efficiency, and realistically reproduces the deformation and failure mechanism of surrounding rock during tunnel excavation, providing more accurate data support for geotechnical engineering.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN121954458A_ABST
    Figure CN121954458A_ABST
Patent Text Reader

Abstract

The invention discloses a test device capable of simulating tunnel excavation deformation damage in a complex stress state, and belongs to the technical field of geotechnical engineering tests. The device comprises a base frame, a servo pressure pump, a rolling shaft, various movable loading plates, a sliding rail, a sliding drill bit and the like, wherein a base is connected with a base of a uniaxial testing machine through a positioning pin. The device is modified on the basis of a uniaxial testing machine, and a servo pressure pump and a uniaxial loading head are used for constructing a biaxial stress field; through cooperation of the sliding rail and the sliding drill bit, real-time accurate drilling can be performed on a sample in a stress loading state, and the tunnel excavation unloading process is simulated; a transverse lap joint loading plate is replaced by a direct shear silica gel movable loading plate, and a direct shear test mode can be quickly switched. The device has the advantages of being high in modularization degree, good in function integration degree and the like, can eliminate loading blind areas and collect multi-dimensional parameters such as drilling resistance in real time, and is suitable for tunnel surrounding rock stability and rock mechanical property research.
Need to check novelty before this filing date? Find Prior Art

Description

Experimental apparatus and method for simulating tunnel excavation deformation and failure under complex stress conditions Technical Field

[0001] This invention relates to the field of geotechnical engineering testing technology, specifically to a testing device and method for simulating tunnel excavation deformation and failure under complex stress conditions. Background Technology

[0002] With the deepening development of underground space, tunnel engineering faces increasingly complex geological environments. In geotechnical mechanics research, accurately simulating the mechanical behavior of deep rock masses under complex geostress states and their excavation unloading response is crucial. Currently, conventional laboratory uniaxial testing machines have limited functionality, capable only of performing simple uniaxial compression tests and unable to simulate the high confining pressure and multiaxial stress environments of deep strata. Although existing true triaxial or biaxial testing machines can provide multiaxial loading, these devices are typically expensive, bulky, and have relatively fixed functions, making it difficult to simultaneously test the biaxial compression and shear properties of rock on a single machine.

[0003] More importantly, existing tunnel model tests typically employ a loading path of "pre-fabricating the boreholes first, then applying stress," or perform physical excavation under stress-free conditions. This deviates significantly from the mechanical path in actual engineering, where "ground stress exists first, followed by excavation and unloading." This static simulation method ignores the dynamic evolution of stress redistribution in the surrounding rock during excavation, making it difficult for test results to accurately reflect the deformation and failure mechanism of the surrounding rock induced by tunnel excavation.

[0004] Furthermore, traditional direct shear tests often require a separate direct shear apparatus, which is incompatible with compression testing equipment. When conducting research on tunnel surrounding rock stability, researchers frequently need to transfer samples between different devices, which is not only inefficient but also leads to errors in the correlation analysis between compression and shear parameters due to differences in equipment stiffness and boundary conditions. Therefore, there is an urgent need to develop a comprehensive testing device that can be developed based on existing general-purpose equipment with low-cost modifications, capable of accurately applying complex ground stresses and performing real-time physical excavation simulations, while also quickly switching to direct shear mode. Summary of the Invention

[0005] The purpose of this invention is to provide a test device and method that can simulate the deformation and failure of tunnel excavation under complex stress conditions. It is based on a common uniaxial testing machine and is modularly modified, with extremely high functional integration and cost-effectiveness.

[0006] To achieve the above objectives, the present invention proposes the following technical solution: a test device for simulating tunnel excavation deformation and failure under complex stress conditions, comprising: a base frame rigidly connected to the base of a uniaxial testing machine; a transverse loading unit comprising a servo pressure pump and two opposing transverse movable loading plates, wherein the servo pressure pump is mounted on the base frame, and the transverse movable loading plates are connected to the servo pressure pump via rollers for applying transverse stress to the specimen; a longitudinal loading unit comprising two opposing longitudinal movable loading plates, wherein the longitudinal movable loading plates are connected to a uniaxial compression loading head via rollers for applying longitudinal stress to the specimen; the two transverse movable loading plates and the two longitudinal movable loading plates are arranged around the specimen in an alternating covering manner; a tunnel excavation simulation unit comprising a slide rail and a sliding drill bit, wherein the sliding drill bit is slidably mounted on the slide rail for drilling and excavating the specimen; an intelligent control system electrically connected to the servo pressure pump, the slide rail, and the sliding drill bit; and a data acquisition and recording system for acquiring data on loading force, displacement, and drilling resistance.

[0007] Furthermore, in this invention, the transverse movable loading plate includes a transverse overlapping movable loading plate, a transverse movable loading plate, and a direct shear silicone movable loading plate. The transverse overlapping movable loading plate and the direct shear silicone movable loading plate are interchangeably installed at the output end of the servo pressure pump to realize the switching between biaxial compression test and direct shear test modes. The transverse overlapping movable loading plate and the transverse movable loading plate are arranged opposite to each other on both sides of the base frame.

[0008] Furthermore, in this invention, the front end of the servo pressure pump is provided with a bolt groove, and the transverse overlapping movable loading plate or the straight shear silicone movable loading plate is detachably connected to the bolt groove via a roller; the transverse overlapping movable loading plate is provided with movable bolts for positioning and fixing in the non-loaded state.

[0009] Furthermore, in this invention, the panel of the direct shear silicone movable loading plate that contacts the sample is divided into a rigid area and a flexible area. The flexible area is provided with a groove and a silicone pad. The flexible areas of the two pairs of direct shear silicone movable loading plates are arranged in opposite directions, so that the contact surfaces on both sides of the sample have a difference in stiffness.

[0010] Furthermore, in this invention, the roller includes a plurality of parallel-arranged roller bodies and roller seats. The roller bodies are rotatably mounted in the roller seats to transmit loads and constrain the movement trajectory of the loading plate by means of rolling friction.

[0011] Furthermore, in this invention, the intelligent control system includes a confining pressure parameter preset module, a dynamic compensation module, and a closed-loop control module; the data acquisition and recording system collects drilling resistance data in real time and feeds it back to the intelligent control system for dynamically correcting the feed parameters of the sliding drill bit.

[0012] A testing method using the above-mentioned device includes the following steps: Device assembly: connecting the base frame to the base of the uniaxial testing machine, and installing the transverse movable loading plate and the longitudinal movable loading plate; Specimen installation and parameter setting: placing the specimen within the loading space enclosed by the loading plates, and setting the stress parameters and drilling path through the intelligent control system; Biaxial stress loading: applying transverse stress and longitudinal stress respectively through a servo pressure pump and a uniaxial compression loading head; Tunnel excavation simulation: controlling the sliding drill bit to drill and excavate the specimen along a preset path under the condition of maintaining stress boundary; Data acquisition and analysis: collecting data throughout the process through a data acquisition and recording system and generating force-displacement-time curves.

[0013] Furthermore, in this invention, the test method also includes a test mode switching step: replacing the transversely overlapping movable loading plate with a straight-shear silicone movable loading plate, adjusting the position of the silicone pads on both sides of the loading plate so that they are arranged in opposite directions, and switching to the straight-shear test mode.

[0014] Furthermore, in this invention, during the biaxial stress loading step, the edge of the transversely overlapping movable loading plate overlaps and covers the outer side of the longitudinally overlapping movable loading plate, achieving full coverage of the sample without blind spots; the roller transmits the load through rolling friction and eliminates the contact force between the loading plates.

[0015] Furthermore, in this invention, during the tunnel excavation simulation step, the intelligent control system dynamically adjusts the feed rate of the sliding drill bit based on the drilling resistance data fed back by the data acquisition and recording system: when the drilling resistance exceeds a threshold, the feed rate is reduced; when the drilling resistance is below the threshold, the preset feed rate is restored.

[0016] Beneficial effects: The technical solution of this application has the following technical effects: The present invention controls the base frame, servo pressure pump, drill bit and single-axis loading head in series, so as to achieve overall collaborative work in terms of function, and build a high-precision biaxial loading environment at low cost; the modular design allows the device to quickly switch from biaxial compression mode to direct shear test mode without disassembling the core components by replacing the direct shear silicone movable loading plate, which greatly improves the test efficiency and realizes the testing of rock uniaxial, biaxial and shear mechanics and tunnel excavation simulation test by a single device.

[0017] This invention innovatively integrates a tunnel excavation simulation module. Utilizing the cooperation of a sliding rail and a sliding drill bit, it enables real-time, precise drilling operations while maintaining high ground stress loading on the sample. This design overcomes the limitations of traditional "pre-drilled holes" or "unpressurized excavation" tests, realistically replicating the complete engineering path of "ground stress presence - excavation unloading - stress redistribution." Combined with an intelligent control system and data acquisition system, it can not only monitor conventional stress and strain but also capture drilling resistance and microcrack initiation information during the excavation process, providing a more practical experimental method for studying the dynamic response of surrounding rock in deep tunnels.

[0018] Furthermore, this device employs an optimized loading transfer structure. By utilizing rollers to replace sliding friction with rolling friction, frictional resistance during multi-directional loading is effectively reduced. Combined with a staggered loading plate design, the mechanical loading blind zone at the specimen corners, common in traditional tests, is eliminated, ensuring the uniformity of the stress field. Simultaneously, the data acquisition system can continuously record multi-dimensional correlation curves such as force-displacement-time-drilling resistance, significantly improving the accuracy and richness of the experimental data and providing reliable data support for theoretical analysis in geotechnical engineering.

[0019] It should be understood that all combinations of the foregoing concepts and the additional concepts described in more detail below can be considered part of the inventive subject matter of this disclosure, provided that such concepts do not contradict each other.

[0020] The foregoing and other aspects, embodiments, and features of the teachings of the present invention will be more fully understood from the following description in conjunction with the accompanying drawings. Other additional aspects of the invention, such as features and / or beneficial effects of exemplary embodiments, will become apparent from the following description or may be learned through practice of specific embodiments according to the teachings of the present invention. Attached Figure Description

[0021] The accompanying drawings are not intended to be drawn to scale. In the drawings, each identical or nearly identical component shown in the various figures may be denoted by the same reference numeral. For clarity, not every component is labeled in each figure. Embodiments of various aspects of the invention will now be described by way of example and with reference to the accompanying drawings, in which: Figure 1 is a schematic structural diagram of a tunnel excavation simulation test under complex geostress conditions based on a uniaxial testing machine according to the present invention.

[0022] Figure 2 is a schematic diagram of the structure of a direct shear loading test device based on a uniaxial testing machine according to the present invention.

[0023] Figure 3 is a partial cross-sectional view of the drilling operation.

[0024] Figure 4 is a schematic diagram of the roller.

[0025] Figure 5 is a schematic diagram of the front groove of the servo pressure pump and the horizontally overlapping loading plate.

[0026] Figure 6 is a schematic diagram of hydraulic and pneumatic operation.

[0027] Figure 7 is a detailed structural diagram of the silicone plate.

[0028] In the figure, the meanings of the various reference numerals are as follows: 1. Base frame; 2. Servo pressure pump; 3. Roller; 4. Lateral overlapping movable loading plate; 5. Lateral movable loading plate; 6. Longitudinal movable loading plate; 7. Straight shear silicone movable loading plate; 8. Sample; 9. Single-axis compression loading head; 10. Oil tank; 11. Oil pump; 12. Slide rail; 13. Sliding drill bit; 14. Intelligent control system; 15. Data acquisition and recording system; 16. Bolt groove; 17. Sliding drill bit slide rail; 18. Air source interface; 19. One-way valve; 20. Booster cylinder; 21. Drive chamber; 22. Servo valve; 23. Pneumatic directional valve; 24. Drive port; 25. Pressure sensor; 26. Outlet; 27. Silicone pad. Detailed Implementation

[0029] The embodiments of the invention are described in detail below with reference to the accompanying drawings to clearly illustrate the structure, purpose, advantages, positional relationships, and connection methods of each component. It should be noted that the directional indications (such as "front," "rear," "up," and "down") involved in this embodiment are based on the posture shown in the drawings and are only used to describe the relative positional relationships and movement of the components. If the posture changes, the directional indications will be adjusted accordingly. The term "connection" includes mechanical connections and electrical connections, and can be fixed connections, detachable connections, or indirect connections through an intermediate medium. The specific meaning is understood by those skilled in the art based on the context. Embodiments

[0030] As shown in Figures 1 to 7, this embodiment provides a test device and method for simulating tunnel excavation deformation and failure under complex stress states. The device is based on an existing uniaxial testing machine and is modified and expanded. Its core design concept is to expand the functionality of a general-purpose uniaxial testing machine in a low-cost and modular manner to achieve integrated testing of biaxial compression, real-time excavation simulation, and direct shear testing. As shown in Figure 1, the device mainly includes a base fixing module, a complex ground stress loading module, a tunnel excavation simulation module, a direct shear loading system (optional component), an intelligent control module, and a data acquisition and processing system.

[0031] Specifically, the base frame 1, serving as the main support structure of the entire device, is designed as a highly rigid rectangular hollow frame. Its bottom is rigidly connected to the existing uniaxial testing machine base via high-precision positioning pins. This connection method not only ensures the stability of the device during loading but also effectively transmits the axial reaction force of the uniaxial testing machine. The servo pressure pump 2 is installed and fixed to the inner left side of the base frame 1. As the power source for lateral loading, it can output precise and controllable hydraulic thrust.

[0032] As shown in Figure 1, to simulate the bidirectional stress environment in deep strata, the device is equipped with a transversely overlapping movable loading plate 4, a transversely overlapping movable loading plate 5, and a longitudinally overlapping movable loading plate 6. The transversely overlapping movable loading plate 5 is fixed to the inner right wall of the base frame 1, forming a transverse loading path together with the servo pressure pump 2 on the left and the transversely overlapping movable loading plate 4. The longitudinally overlapping movable loading plate 6 is located at the upper and lower ends of the sample 8, directly bearing the axial load of the uniaxial compression loading head 9. Crucially, the outer sides of all loading plates are in contact with the roller 3.

[0033] Roller 3 consists of multiple sets of parallel high-strength steel rollers, serving two main functions: first, replacing sliding friction with rolling friction, significantly reducing frictional resistance during loading and improving load transfer efficiency; second, acting as a guiding mechanism, constraining the loading plate to translate only along a preset X-axis or Y-axis trajectory, preventing deflection of the loading plate due to uneven specimen deformation. Furthermore, the transverse and longitudinal loading plates are arranged in a staggered, overlapping pattern, with one edge extending to cover the end of the other. This design cleverly eliminates the "mechanical blind spot" at the corners of the specimen, ensuring that the stress field uniformly covers the entire surface of the specimen.

[0034] Furthermore, the roller 3 is used in conjunction with the staggered covering loading plates to reduce frictional resistance during the relative movement of the loading plates. During loading, when slight slippage occurs between the transversely overlapping movable loading plate 4 and the longitudinal movable loading plate 6, the roller 3 can reduce jamming and improve the uniformity of load transfer, thereby helping to eliminate mechanical blind spots. To address potential issues caused by drilling dust, a dust cover is installed on the outside of the roller 3 to prevent drilling dust and debris from causing jamming and ensure the stability of the test process.

[0035] To realistically reproduce the unloading effect of tunnel excavation, a precision slide rail 12 is laid at the bottom of the base frame 1 in this embodiment. A sliding drill bit 13 is located on the side of the specimen 8 and is driven by a servo motor. The sliding drill bit 13 is mounted on a slide rail 17, which is arranged vertically to drive the sliding drill bit 13 to move between different height positions on the specimen 8. The function of this module is that when the specimen 8 is in a biaxial high-stress equilibrium state, the sliding drill bit 13 can perform solid drilling on the specimen according to the path and rate set by the intelligent control system 14. This process, accompanied by material removal and stress release, can physically simulate the formation process of the tunnel cross-section and capture the real surrounding rock response, rather than the static simulation of "pre-drilled holes" in traditional tests.

[0036] Furthermore, the sliding drill bit 13 is positioned below the sample 8 and is positioned in-plane via the slide rail 12. During drilling, the drill bit feeds vertically from bottom to top to complete the excavation. To ensure compatibility between drilling and loading, pre-drilled holes are provided at the lower longitudinal movable loading plate 6 or the base frame 1 to prevent the drill bit from interfering with the loading plate and to ensure drilling position accuracy. A chip removal structure is provided in the drilling area, and the slide rail 12 is protected against dust to prevent debris from causing jamming.

[0037] As shown in Figure 2, this device has the ability to quickly switch to the direct shear test mode. This is achieved by disassembling the transversely overlapping movable loading plate 4 and replacing it with a specially made direct shear silicone movable loading plate 7. The front end of the servo pressure pump 2 is provided with a bolt groove 16, which, together with the movable bolt, achieves precise positioning and rigid locking of the loading plate, ensuring convenient disassembly and assembly and a stable connection.

[0038] The movable loading plate 4 is provided with a movable bolt that locks the bolt groove 16. The movable loading plate 4 has a bolt groove that matches the bolt groove 16 to prevent the movable loading plate 4 from falling off before the test. The movable bolt is removed after the test begins.

[0039] The direct shear silicone movable loading plate 7 features a unique panel design, with a groove on its upper half filled with a silicone pad of specific stiffness. During testing, by swapping the vertical positions of the silicone pads on both sides of the loading plate of the specimen 8 (e.g., left side on top, right side on bottom), the difference in contact stiffness between the flexible silicone and the rigid metal panel induces a shear couple within the specimen when axial pressure is applied by the uniaxial compression loading head 9, thus simulating shear failure. This design avoids the cost of purchasing a dedicated direct shear apparatus.

[0040] This embodiment further clarifies the mechanism of the direct-shear silicone movable loading plate 7. The contact panel between the direct-shear silicone movable loading plate 7 and the sample 8 is divided into a rigid zone and a flexible zone. The equivalent normal stiffness of the two zones under normal compression differs significantly. Under conditions of small deformation and approximately uniform contact pressure distribution, let the normal load on the contact zone be F, the pressure contact area be A, the equivalent thickness in the pressure direction be t, and the generated normal compressive displacement be δ. Then the average normal stress σ of the contact zone can be expressed as: σ = F / A, and its average normal strain ε = δ / t. When the material in the contact zone satisfies Hooke's law in the elastic stage, we have: σ = Eε, where E is the equivalent elastic modulus of the material. Combining the above relationships, we get F = EAδ / t. Then the equivalent normal stiffness k of the contact zone along the compression direction is the ratio of load to displacement, i.e.: k = F / δ = EA / t. By designing the hardness and thickness of the flexible silicone pad 27 and the groove size, the stiffness ratio λ = k between the flexible zone and the rigid zone is made. 柔 / k 刚 Within the preset range.

[0041] Furthermore, to ensure stability in the direct shear test, the direct shear silicone movable loading plate 7 is equipped with a centering and positioning structure so that it remains aligned with the specimen 8 after replacement and installation. The flexible area groove is used to assemble the silicone pad 27, and a limiting frame is provided around the groove to restrict the lateral expansion of the silicone pad. Furthermore, during the direct shear process, a guide and limiting structure is provided between the direct shear silicone movable loading plate 7 and the base frame 1, so that the loading plate only translates along a predetermined direction to avoid overturning or rotation affecting the direct shear effect.

[0042] The roller 3 plays a role in reducing frictional resistance and evenly distributing the load during force transmission. Because the loading plate and the roller are in rolling contact, when the longitudinal loading plate moves downwards to compress the specimen, the overlapping portion of the transversely overlapping movable loading plate 4 can slide freely along the outer surface of the longitudinal loading plate. Only a very small rolling friction force is generated between them, and there is no mutual interference between the transverse and longitudinal loading. At the same time, the multi-point contact of the roller evenly distributes the concentrated load to the surface of the loading plate, avoiding deformation of the loading plate or uneven stress on the specimen surface due to load concentration.

[0043] The staggered arrangement of the transversely overlapping movable loading plates 4 eliminates the mechanical blind spots of traditional loading methods. Because the upper and lower edges of the transversely overlapping movable loading plates 4 overlap and cover the outer sides of the upper and lower longitudinal movable loading plates 6, the four corner areas of the specimen 8 are always within the coverage of the loading plates, allowing for effective stress loading. Throughout the loading process, all points on the surface of the specimen 8 are subjected to uniform confining pressure, realistically simulating the stress state of the tunnel surrounding rock in the strata.

[0044] In terms of power, the device is equipped with an oil tank 10 and an oil pump 11. The oil pump 11 adopts the principle of gas-liquid boosting, converting the pressure energy of compressed air commonly used in the laboratory into the pressure energy of high-pressure hydraulic oil, providing stable power for the servo pressure pump 2. Furthermore, the oil pump 11 uses a gas-liquid boosting method to achieve gas-liquid power conversion. Compressed air is input through the air source interface 18, and drives the booster cylinder 20 to reciprocate through the pneumatic control directional valve 23, causing the hydraulic oil to be pressurized and output through the check valve 19; the pressurized oil is then regulated by the servo valve 22 and output through the outlet 26, and the pressure is detected in real time by the pressure sensor 25 and fed back to the intelligent control system 14 to achieve pressure stabilization. When unloading is required, the unloading channel is switched or opened through the pneumatic control directional valve 23 to depressurize the system and return oil, so as to ensure the safety of the test.

[0045] The intelligent control system 14, based on feedback from the pressure sensor 25, adjusts the opening of the servo valve 22 to achieve pressure stabilization control: when the output oil pressure is detected to be lower than the target value, the servo valve opening is increased or the driving frequency of the booster cylinder 20 is increased to improve oil supply; when the output oil pressure is detected to be higher than the target value, the servo valve opening is decreased and the pneumatic directional valve 23 can be controlled to switch to unloading mode, causing the booster cylinder 20 to stop pressurizing or releasing the drive chamber 21 to the low-pressure end, thereby achieving system unloading and safety protection. Preferably, a filter element and an overflow protection element (not shown) can be connected in series at the outlet 26 to improve oil cleanliness and limit the risk of extreme overpressure, thereby ensuring long-term stability and repeatability under complex stress loading.

[0046] The intelligent control system 14 is the core of the entire device. It includes a confining pressure parameter preset module, a dynamic compensation module, and a closed-loop control module. It is connected to the servo pressure pump 2, the sliding drill bit 13, and the data acquisition and recording system 15 via a bus communication connection. The intelligent control system 14 possesses a dynamic compensation algorithm, which is an adaptive drilling and confining pressure dynamic compensation based on mechanical specific energy. When the sliding drill bit 13 causes sample volume loss during drilling, it can automatically adjust the output of the servo pressure pump 2 to maintain stable confining pressure. Specifically, it presets a target confining pressure value and a confining pressure error tolerance threshold during the test. Before the sliding drill bit 13 starts drilling, it controls the servo pressure pump to stabilize the confining pressure at the target value. The control system 14 acquires the current confining pressure value at a frequency of 100Hz and calculates the deviation between the current confining pressure and the target confining pressure in real time. If the absolute value of the deviation is greater than the preset trigger threshold, it is determined that the confining pressure drop is due to sample volume loss, and the dynamic compensation control process is immediately triggered to adjust the output of the pressure pump. If the confining pressure deviation is within the threshold, the current output of the pressure pump is maintained, and the next acquisition cycle begins. Furthermore, the intelligent control system 14 employs a closed-loop control method for the lateral confining pressure loading. The system adjusts the output of the servo valve 22 or the servo pressure pump 2 based on the feedback signal from the pressure sensor 25, ensuring the confining pressure reaches and remains stably at the preset target value. When confining pressure fluctuations or loading instability are detected, the intelligent control system 14 automatically adjusts the control parameters to improve the pressure stabilization effect, thereby enhancing the repeatability of complex stress boundary conditions.

[0047] It also includes a drive port 24, which is the pneumatic control signal interface of the air-hydraulic booster system and is connected to the pneumatic directional valve 23. Its main function is to introduce pilot air pressure to control the directional valve to automatically switch the airflow direction, thereby driving the piston in the booster cylinder 20 to perform continuous reciprocating motion, realizing the process of converting compressed air into high-pressure hydraulic power.

[0048] Simultaneously, the data acquisition and recording system 15 connects to various sensors to collect signals such as loading force, specimen deformation displacement, servo pressure, and drilling resistance in real time, constructing a force-displacement-time correlation curve for subsequent analysis. Furthermore, the data acquisition and recording system 15 is used to simultaneously acquire signals such as loading force, displacement, and drilling resistance. Lateral confining pressure can be acquired by the pressure sensor 25 and used for closed-loop control; longitudinal load can be obtained from the force signal of the uniaxial compression loading head 9. Displacement signals are preferably measured by displacement gauges to measure the displacement of each movable loading plate relative to the base frame 1; drilling resistance signals can be characterized by motor current signals or axial thrust sensor signals. The above signals are recorded synchronously to obtain complete experimental process data.

[0049] Please refer to Figure 1. The test method is as follows: At the start of the test, the base frame 1 is first fixed on the single-axis machine, and the corresponding loading plate (biaxial or direct shear) is installed according to the test objective. The oil pump 11 and the intelligent control system 14 are started, and the target stress value is set. The servo pressure pump 2 and the single-axis compression loading head 9 apply pressure synchronously, and the roller 3 ensures that the load is smoothly transferred to the specimen 8 to establish the initial stress field. After the stress stabilizes, the intelligent control system 14 drives the sliding drill bit 13 to feed along the slide rail 12 to drill a hole in the compressed specimen, simulating excavation. During this process, the data acquisition system 15 records the changes in resistance experienced by the drill bit and the minute deformation of the specimen until drilling is completed or the specimen is destroyed. After the test, the system automatically unloads and saves the entire process data.

[0050] In the biaxial compression test mode, the specimen 8 is placed in the center of the loading chamber, surrounded by a transversely overlapping movable loading plate 4, a transversely movable loading plate 5, and upper and lower longitudinally movable loading plates 6. The oil pump 11 is started, and compressed air enters the pump to pressurize the hydraulic oil in the oil tank 10 and deliver it to the servo pressure pump 2. The intelligent control system 14 controls the output pressure of the servo pressure pump 2 according to the preset confining pressure parameters. The servo pressure pump 2 pushes its piston rod to extend to the right, transmitting the pressure to the transversely overlapping movable loading plate 4 via the roller 3. The transversely overlapping movable loading plate 4 applies transverse pressure to the left surface of the specimen 8. The reaction force generated by the servo pressure pump 2 is transmitted to the uniaxial testing machine base through the left frame, the base frame 1, and the positioning pin, where the uniaxial testing machine base provides the supporting reaction force. Simultaneously, the transverse pressure on the specimen 8 is transmitted to the right frame through the right transverse movable loading plate 5, and the right frame also transmits the force to the uniaxial testing machine base through the base frame 1. This forms a complete closed-loop force transmission, ensuring the stable application of the transverse loading force.

[0051] While the lateral loading is applied, the loading head of the uniaxial testing machine moves downward, transmitting the longitudinal pressure to the upper longitudinal movable loading plate 6 via the uniaxial compression loading head 9 and roller 3. The upper longitudinal movable loading plate 6 applies longitudinal pressure to the upper surface of the specimen 8. The longitudinal pressure on the specimen 8 is transmitted to the bottom bearing plate of the base frame 1 via the lower longitudinal movable loading plate 6 and roller 3, and then to the base of the uniaxial testing machine. In this way, the specimen 8 simultaneously bears pressure in both the lateral and longitudinal directions, simulating the biaxial stress state of the surrounding rock of a tunnel. The vertical and lateral displacements and loads are recorded in real time during the test.

[0052] During the tunnel excavation simulation phase, the intelligent control system 14 maintains the lateral and longitudinal stress boundary conditions unchanged while simultaneously activating the tunnel excavation simulation system. The intelligent control system 14 retrieves pre-stored drilling path coordinate parameters and controls the slide rail 12 to drive the sliding drill bit 13 to the starting point of the preset excavation position for the sample 8. The sliding drill bit 13 activates the drilling drive motor to rotate the drill bit, and simultaneously activates the feed mechanism to feed the drill bit vertically upwards, drilling the sample 8. During drilling, the data acquisition and recording system 15 collects drilling resistance and drill bit displacement data in real time and feeds it back to the intelligent control system 14. When the drilling resistance exceeds a preset threshold, the intelligent control system 14 automatically reduces the feed rate to prevent drill bit damage or abnormal sample breakage due to excessive feed; when the drilling resistance is below the preset threshold, the intelligent control system 14 automatically increases the feed rate to the preset value to improve excavation efficiency. After drilling to one position, the slide rail 12 drives the sliding drill bit 13 to move to the next preset position to continue drilling until the entire tunnel cross-sectional outline is excavated.

[0053] During the tunnel excavation simulation phase, the intelligent control system 14 adjusts the drilling process based on borehole resistance signals. The borehole resistance can be characterized by the feed motor current, spindle motor current, or axial thrust sensor signal. During drilling, when the borehole resistance exceeds a preset threshold, the intelligent control system 14 reduces the drill bit feed rate; when the borehole resistance falls below the threshold, the feed rate is gradually restored. Furthermore, when the borehole resistance exceeds a safety threshold, the intelligent control system 14 performs a short-term drilling stop or cutter retraction operation to avoid drill jamming and reduce impact load. Through this feedback adjustment, the stability and repeatability of the borehole excavation process can be improved while maintaining the predetermined loading boundary conditions.

[0054] During tunnel excavation, the original stress balance is disrupted due to the removal of internal materials from the sample, causing stress to redistribute around the excavation face. The intelligent control system 14 maintains constant boundary stress conditions through dynamic compensation, allowing the sample to undergo a stress evolution process similar to that of actual tunnel excavation. The data acquisition and recording system 15 continuously acquires loading force, displacement, and deformation data throughout the entire process, recording the complete time-history curves of stress redistribution and surrounding rock deformation.

[0055] In the direct shear test mode, the transverse overlapping movable loading plate 4 is replaced with a direct shear silicone movable loading plate 7. With the silicone pads of the two sides of the direct shear silicone movable loading plates 7 positioned opposite each other, the target normal stress is applied first, followed by a transverse force until the specimen fails. At this point, the areas on both sides of the specimen in contact with the flexible silicone pads experience significant compressive deformation, while the areas in contact with the rigid surface experience less deformation. This asymmetrical deformation distribution generates shear stress within the specimen, achieving load failure under direct shear stress. During the test, the applied transverse force, transverse displacement, normal force, and directional displacement are recorded. By adjusting the magnitude of the longitudinal loading force, the normal stress on the shear surface can be changed. Combined with variations in the transverse loading force, the shear strength under different normal stress conditions can be obtained. The obtained test data are used to calculate the cohesion and internal friction angle of the specimen based on Mohr's coulomb.

[0056] This device, through the aforementioned testing process, enables single-device testing of uniaxial, biaxial, and shear mechanics of rock, as well as tunnel excavation simulation testing. It features comprehensive functionality, high precision, low cost, and convenient operation, and can be widely applied in indoor simulation testing research in fields such as tunnel engineering and rock and soil mechanics. Example

[0057] This embodiment, based on Embodiment 1, incorporates an advanced control algorithm module in the intelligent control system 14 to perform adaptive drilling and dynamic compensation for confining pressure based on mechanical specific energy. This method aims to address the problems of traditional constant-speed drilling's inability to adapt to the heterogeneity of deep rock masses and the lag in confining pressure fluctuations caused by borehole unloading.

[0058] The control method specifically includes the following three steps: Step one, real-time calculation of the mechanical energy specific to rock breaking (MSE). MSE refers to the mechanical energy consumed in breaking a unit volume of rock, and it is a key indicator for evaluating drilling efficiency and identifying changes in rock mechanical properties. Under complex stress conditions, the hardness and drillability of rock change with variations in confining pressure. By calculating MSE in real time, the system can dynamically sense the current "hardness" state of the rock, rather than relying solely on a single resistance value, thus providing a physical basis for subsequent drilling rate adjustments.

[0059] The intelligent control system 14 acquires the drilling parameters of the sliding drill bit 13 at a frequency of 50Hz~100Hz, and calculates the mechanical specific energy E in real time according to the following formula. s : Among them, E s (t): Mechanical specific energy at time t (MPa); F a (t): The axial thrust (N) of the drill bit at time t, collected by a force sensor installed at the rear end of the sliding drill bit 13; T q (t): The rotational torque of the drill bit at time t (N·m), calculated from the servo motor current; N r(t): Drill bit rotation speed at time t (r / s); v f (t): Axial feed rate of the drill bit at time t (m / s); A b Cross-sectional area of ​​the drill bit (mm²) 2 This step couples drill pressure, torque, rotational speed, and feed rate together. When the drill bit encounters hard rock or the confining pressure increases, causing the rock to harden, T... q and F a It will rise significantly, leading to E s Elevation. The system monitors E s The rate of change can detect drill bit jamming risk or lithological abrupt interface earlier than simply monitoring the current.

[0060] The physical essence of this step lies in the law of conservation of energy and the theory of energy consumption in rock fracturing. Traditional drilling monitoring focuses only on a single threshold of axial force or torque, but this is easily affected by friction; for example, friction between the drill pipe and the borehole wall can increase torque without actually drilling. The MSE formula normalizes drill crushing and torque into "fracture energy per unit volume." Physically speaking, this shifts from monitoring the "appearance of force" to monitoring the "essence of energy." When confining pressure increases, the rock exhibits increased ductility and strength—the confining pressure effect—leading to a sharp increase in the energy required to fracture a unit volume of rock.

[0061] Step 1 acts as the "sensory nerve" of the entire intelligent control system. The calculated MSE value forms the basis for speed adjustment decisions in Step 2. If the MSE increases abnormally, it indicates that the drill bit has encountered an extremely difficult-to-break hard core or that excessive confining pressure has caused the rock to "lock in," requiring the system to reduce speed to prevent drill breakage. Simultaneously, the rate of change of MSE can serve as a trigger signal for PID parameter gain scheduling in Step 3, confining pressure compensation. For example, in hard rock sections, pressure fluctuations are more sensitive, necessitating a faster PID response.

[0062] Step one accurately identifies the "false hardness" and "true stress enhancement" of deep rocks. In conventional drilling, both drill bit dulling and rock hardening lead to increased resistance. However, analysis using the MSE formula shows that drill bit wear increases heat dissipation, resulting in low efficiency and a non-linear spike in MSE, while the increase in resistance due to rock stress enhancement is linear. This algorithm can distinguish between these two states, avoiding misjudgments. It can also detect precursors to "rockburst" or "brittle failure." Before high-stress rock fails, microcracks often appear, causing a sudden drop in the overall strength of the rock, resulting in a brief "negative pulse" or violent fluctuation in the MSE value. These are millisecond-level signals that conventional displacement or pressure sensors cannot capture.

[0063] Step Two: Adaptive Feed Rate Control Based on Nonlinear Damping. To simulate the working condition of a full-face tunnel boring machine (TBM) automatically adjusting its tunneling speed according to the cutterhead torque in actual engineering, while protecting the test equipment, this step abandons the traditional "step-like" speed regulation and adopts a nonlinear smooth speed regulation algorithm based on the Sigmoid function. This algorithm can ensure drilling efficiency while preventing impact disturbances to the specimen under high stress critical state caused by sudden speed changes.

[0064] The intelligent control system 14 calculates the torque T in real time. q (t) and the set safety threshold are used to calculate the target feed rate v at the next moment using the following formula. cmd (t+1): , where v cmd (t+1): The command feed rate for the next control cycle (mm / min); v max : Preset maximum allowable drilling rate (mm / min); λ: Speed ​​regulation sensitivity coefficient, a constant, λ>0, used to adjust the steepness of speed decay as resistance changes; T q (t): Current measured torque value (N·m); T limit : The set optimal operating torque threshold (N·m). When the measured torque T q (t) is much smaller than T limit When the function value approaches 1, the system approaches v. max High-speed and efficient drilling; when T q (t) close to T limit At that time, the feed rate decreases smoothly; T q (t) exceeds T limit At this point, the rate rapidly decays to near zero. This nonlinear control logic avoids the oscillations caused by hard threshold switching, making the stress release during drilling more consistent with the rheological properties of the rock mass.

[0065] This step is based on nonlinear control theory and a biomimetic tactile feedback mechanism. The Sigmoid function, commonly used as an activation function in neural networks, possesses smooth, continuous, and bounded characteristics. Applying it to motor speed control essentially constructs a "virtual variable damping system." When the load is low, the system exhibits low damping and a fast response; when the load approaches a critical value, the system displays high damping characteristics, much like a human hand instinctively applying slow pressure when drilling into a hard object. This control method aligns with the rheological properties in rock mechanics, providing sufficient time for stress redistribution and crack propagation in the rock, rather than causing the sample to crumble due to a hard impact.

[0066] Step two determines the action based on the rock condition calculated in step one. The real-time speed output in step two is the core input variable for calculating the volume loss rate in step three. Only by determining how fast the drilling is going can the rate of oil pressure drop be calculated. This achieves "impact-free excavation," greatly improving the survival rate of brittle rock samples. Traditional "threshold-stop" or "segmented speed regulation" strategies can cause sudden acceleration changes at the moment of speed switching, which is a fatal disturbance to samples in a critical equilibrium state under high confining pressure, easily inducing unexpected overall failure. Sigmoid smooth speed regulation eliminates sudden acceleration changes and maintains the relative continuity of the stress field. Step two realistically simulates the jamming and recovery conditions of a tunnel boring machine. Due to the nonlinear decay characteristics in the algorithm, it can automatically simulate the dynamic process of "no drilling - automatic retreat - re-cutting" in engineering sites, making the experimental data closer to actual engineering conditions.

[0067] Step 3: Dynamic compensation of confining pressure based on volume loss feedforward. Traditional confining pressure control is "posterior," meaning that pressurization only begins after a pressure drop is detected. This can lead to instantaneous "depressurization" in precision rock mechanics tests, affecting the accuracy of the test results. This invention utilizes the motion data of the slide rail 17 and the sliding drill bit 13 to introduce a "feedforward control" strategy. The system predicts the volume of rock to be removed, calculates the required hydraulic oil replenishment in advance, and superimposes it onto the control signal of the servo valve, thereby achieving a "zero-delay" pressure stabilization effect. The output control signal U of the servo pressure pump (2) pum p consists of a conventional PID feedback term and a volume feedforward compensation term: Among them, U pump (t): Control voltage / frequency signal of the servo valve or pump motor; e(t): Deviation between target confining pressure and measured confining pressure; K p K i K d : Proportional, integral, and derivative coefficients of the PID controller; α: Flow-to-pressure conversion gain coefficient, related to the characteristics of the hydraulic system; E oil : Bulk modulus of hydraulic oil (MPa); V sys Total volume of the hydraulic loading system (L); A b ⋅v f (t): Sample volume loss rate caused by drilling at the current moment (mm) 3 / s). The feedforward compensation term in the formula directly establishes the physical relationship between "drilling speed" and "pressure pump oil replenishment action". When the drill bit accelerates drilling, v f As the pressure increases, the system predicts that the sample volume loss will accelerate and the confining pressure will soon decrease. Therefore, it proactively increases the pump's output flow rate before the pressure sensor detects the pressure drop. This feedforward-feedback composite control strategy can control the confining pressure fluctuation error in tunnel excavation simulation under complex stress conditions to a very small range, greatly improving the accuracy of the experiment.

[0068] The core principle of this step is the fluid bulk modulus characteristic and feedforward control theory. In a hydraulic system, pressure buildup depends on the fluid's compressibility. The drilling process essentially hollows out the solid portion of the sample, equivalent to a sudden increase in the control volume of the hydraulic cylinder as the loading plate moves inward to fill the gap. Traditional feedback control only starts accelerating to replenish oil after the volume increase has caused a drop in oil pressure and the sensor detects an error. This introduces an unavoidable lag. The feedforward control of this invention knows how much rock volume the drill bit removes for every 1mm of advance, therefore, simultaneously with the drill bit's movement, it instructs the oil pump to pre-output the corresponding volume of hydraulic oil. In control theory, this is the most efficient means of combating external disturbances.

[0069] Step three is a direct responder to step two. The faster the feed rate determined in step two, the larger the feedforward compensation term calculated in this step. The two are strictly synchronized on the time axis. Step three achieves true triaxial excavation simulation with "zero pressure drop" because the volume loss caused by drilling is a definite physical quantity. Through feedforward compensation, the oil pump's supply rate and the drill bit's cutting rate are effectively brought into "dynamic equilibrium" in terms of volume, offsetting the interference of volume changes on pressure. This solves the industry problem in rock mechanics testing where "containing pressure drops as soon as drilling begins; and surges again as soon as drilling stops."

[0070] Step three significantly improves the signal-to-noise ratio of data acquisition. This is because it eliminates the noise from the elastic deformation of the sample caused by confining pressure fluctuations, ensuring that the deformation data collected by the sensor is purely due to the "excavation unloading effect" rather than "unstable loading system pressure," thus guaranteeing the accuracy of scientific conclusions.

[0071] The dynamic compensation module and closed-loop control module of the intelligent control system 14 of the experimental apparatus in this embodiment include the following hardware configuration: 1. Intelligent sensing and data acquisition subsystem, which is responsible for providing high-frequency, low-noise raw physical quantity input for the MSE algorithm and is the "nerve ending" of intelligent control. It includes a drilling dynamics sensor group, a feed displacement monitoring unit, and a high-frequency pressure monitoring unit.

[0072] The drilling dynamics sensor assembly includes a miniature dynamic torque-axial force composite sensor and a photoelectric rotary encoder. The miniature dynamic torque-axial force composite sensor is mounted at the connection between the drive shaft and the drill pipe of the sliding drill bit 13. This sensor needs to have high-frequency response characteristics to directly measure the real-time torque T when the drill bit cuts the rock. q (t) and axial thrust F a (t), avoiding frictional errors caused by estimating motor current. A photoelectric rotary encoder, coaxially mounted at the rear end of the drill bit drive motor, has a resolution better than 1024 lines / revolution and is used to accurately feedback the real-time rotational speed N of the drill bit. r (t).

[0073] The feed displacement monitoring unit uses a magnetostrictive displacement sensor or a grating ruler, which is installed parallel to the side of the slide rail 17. The linear error across the entire range is ≤0.05%. It is used to monitor the axial feed position of the drill bit in real time with micron-level accuracy, and the feed rate vf(t) is obtained by differential calculation.

[0074] The high-frequency pressure monitoring unit uses a dynamic pressure transmitter, which is installed at the hydraulic outlet of the servo pressure pump 2. The response time is ≤2ms, and it is used to capture millisecond-level confining pressure fluctuation signals.

[0075] 2. Precision Excavation Execution Subsystem: This subsystem is responsible for executing nonlinear speed control commands and acts as the "nimble hand" of intelligent control. It includes a feed drive module, a cutting drive module, and a rigid guide mechanism. The feed drive module uses a servo electric cylinder instead of a conventional pneumatic or hydraulic cylinder, with an integrated ball screw. It is driven by a high-response AC servo motor that supports a hybrid "position / speed / torque" control mode to respond to smooth speed control commands from the Sigmoid function.

[0076] The cutting drive module uses a brushless DC torque motor as the main spindle power source for the sliding drill bit 13. BLDC was chosen because it can still output a constant large torque at low speeds, and has low electromagnetic interference, which is beneficial for weak signal acquisition.

[0077] The rigid guide mechanism uses heavy-duty linear guides and a pre-loaded slider design to eliminate radial clearance and ensure that the drilling trajectory does not deviate when the drill bit encounters hard rock and generates severe vibration.

[0078] 3. The rapid-response hydraulic loading subsystem is responsible for executing feedforward compensation commands to achieve "zero pressure drop" control, serving as the "powerful heart" of intelligent control. It includes a servo direct-drive pump control unit and a high-frequency electro-hydraulic servo valve. The servo direct-drive pump control unit uses a servo pressure pump, with its core component being a high-pressure plunger pump directly connected to a low-inertia servo motor. Unlike the passive pressure control of traditional "induction motor + relief valve," the servo pump can adjust the output flow and pressure within milliseconds by changing the motor speed, perfectly matching the high dynamic requirements of feedforward control. A high-frequency electro-hydraulic servo valve can be connected in series at the pump outlet, with a bandwidth of ≥50Hz, for secondary fine trimming of the pump's output pressure flow.

[0079] 4. Central Intelligent Control Subsystem: This subsystem runs the core algorithm, coordinates the actions of various hardware components, and is the "brain" of the intelligent control system. It includes a main controller and a synchronous acquisition card. The main controller uses an industrial control computer or an embedded real-time controller, requiring a dual-core or higher processor and running a real-time operating system. Unlike ordinary PLCs, this controller needs powerful floating-point arithmetic capabilities to complete MSE formula calculation, Sigmoid function mapping, and PID+feedforward composite calculations within a 10ms control cycle.

[0080] The synchronous acquisition card is a multi-functional data acquisition card that connects to the main controller via PCIe or EtherCAT bus to ensure the synchronous acquisition of multiple sensor signals such as force, displacement, and pressure, avoiding algorithm logic errors caused by signal asynchrony.

[0081] The workflow between hardware devices is as follows: the composite sensor and encoder on the drill bit will... q F a N r The signal is transmitted to the DAQ data acquisition card; the grating ruler on the slide rail transmits the position signal to the DAQ; the pressure transmitter in the hydraulic circuit transmits the P signal to the DAQ. The main controller reads the synchronization data from the DAQ, executes MSE calculation and feedforward algorithm, and generates two control commands: one is the speed command v. cmd The other path is the pressure / flow command U. pump v cmd The command is sent to the feed servo drive, which controls the servo electric cylinder to push the drill bit forward at a variable speed. pump The command is sent to the servo pump driver to control the servo motor to accelerate or decelerate, and to preemptively inject or discharge hydraulic oil to compensate for volume loss.

[0082] In summary, the experimental apparatus and method provided in this embodiment constitute a closed-loop intelligent control process. The specific working principle is as follows: 1. Initial state establishment and test commencement: The servo pressure pump and single-axis loading head work together to load the sample to a preset high-stress state in the deep formation, such as triaxial stress equivalent to a kilometer depth. At this time, the intelligent control system is in "pressure stabilization mode," relying on conventional PID feedback from the pressure sensor to maintain stress balance.

[0083] 2. Drilling Start-up and Sensing: When the system issues the excavation command, the sliding drill bit begins to contact the sample. At this time, the data acquisition system synchronously acquires the drill bit's thrust, torque, rotational speed, and the current confining pressure of the sample at high frequency.

[0084] 3. Intelligent analysis and decision-making, state calculation: The controller uses the MSE formula from step one to instantly calculate the current rock drillability and energy consumption state. Speed ​​planning is then performed. Based on MSE or torque feedback, and using the Sigmoid function from step two, the controller plans the optimal feed rate for the current millisecond. If a hard node is encountered, the rate automatically and smoothly decreases; if resistance decreases, the rate smoothly recovers.

[0085] 4. Coordinated execution and compensation: The system simultaneously outputs two control signals in parallel: Path A, the drilling action, drives the slide rail motor at the planned speed v. cmd The drill bit is advanced, cutting through the rock. B-path feedforward compensation, while driving the drill bit, allows the controller to adjust according to v... cmd Calculate the volume that the sample will lose in the next instant, combine it with the fluid elastic modulus, and directly add an additional flow command to the servo pressure pump.

[0086] 5. Closed-loop correction: Before the pressure drops, the servo pressure pump "preemptively" injects hydraulic oil equal to the volume of rock cut away. Simultaneously, a conventional PID feedback loop acts as a "safety net," eliminating minor pressure deviations caused by calculation errors or leaks.

[0087] Through the above process, this device transforms the action of "drilling and excavation" from a simple mechanical destruction into a controllable, data-driven, fluid-solid-mechanical coupled system behavior. It not only physically digs a hole, but also, in terms of control logic, allows the confining pressure of the loading system and the drill bit of the excavation system to "communicate in real time" through algorithms, thereby perfectly reproducing the real evolution law of "stress-strain-energy" during deep tunnel excavation on a laboratory scale.

[0088] While the present invention has been disclosed above with reference to preferred embodiments, it is not intended to limit the invention. Those skilled in the art can make various modifications and refinements without departing from the spirit and scope of the invention. Therefore, the scope of protection of the present invention shall be determined by the claims.

Claims

1. A test apparatus for simulating tunnel excavation deformation and failure under complex stress conditions, characterized in that, include: The base frame (1) is rigidly connected to the base of the uniaxial testing machine; the transverse loading unit includes a servo pressure pump (2) and two opposing transverse movable loading plates. The servo pressure pump (2) is mounted on the base frame (1), and the transverse movable loading plates are connected to the servo pressure pump (2) via rollers (3) for applying transverse stress to the specimen (8); the longitudinal loading unit includes two opposing longitudinal movable loading plates (6). The longitudinal movable loading plates (6) are connected to the uniaxial compression loading head (9) via rollers (3) for applying transverse stress to the specimen (8). The longitudinal stress is applied; the two transverse movable loading plates and the two longitudinal movable loading plates (6) are arranged in an alternating covering manner around the specimen (8); the tunnel excavation simulation unit includes a slide rail (17) and a sliding drill bit (13), the sliding drill bit (13) is slidably installed on the slide rail (17) for drilling and excavating the specimen (8); the intelligent control system (14) is electrically connected to the servo pressure pump (2), the slide rail (17) and the sliding drill bit (13); the data acquisition and recording system (15) is used to collect data on loading force, displacement and drilling resistance.

2. The experimental apparatus according to claim 1, characterized in that, The transverse movable loading plate includes a transverse overlapping movable loading plate (4), a transverse movable loading plate (5), and a direct shear silicone movable loading plate (7). The transverse overlapping movable loading plate (4) and the direct shear silicone movable loading plate (7) can be interchangeably installed at the output end of the servo pressure pump (2) to realize the switching between biaxial compression test and direct shear test modes. The transverse overlapping movable loading plate (4) and the transverse movable loading plate (5) are arranged opposite to each other on both sides of the base frame (1).

3. The experimental apparatus according to claim 2, characterized in that, The front end of the servo pressure pump (2) is provided with a bolt groove (16). The transverse overlapping movable loading plate (4) or the straight shear silicone movable loading plate (7) is detachably connected to the bolt groove (16) via a roller (3). The transverse overlapping movable loading plate (4) is provided with movable bolts for positioning and fixing in the non-loaded state.

4. The test apparatus according to claim 2 or 3, characterized in that, The panel of the direct shear silicone movable loading plate (7) that contacts the sample (8) is divided into a rigid area and a flexible area. The flexible area is provided with a groove and a silicone pad. The flexible areas of the two pairs of direct shear silicone movable loading plates (7) are arranged in opposite directions, so that the contact surfaces on both sides of the sample (8) have a stiffness difference.

5. The test apparatus according to any one of claims 1-4, characterized in that, The roller (3) includes multiple parallel roller bodies and roller seats. The roller bodies are rotatably mounted in the roller seats to transmit loads and constrain the movement trajectory of the loading plate by means of rolling friction.

6. The test apparatus according to any one of claims 1-5, characterized in that, The intelligent control system (14) includes a confining pressure parameter preset module, a dynamic compensation module and a closed-loop control module; the data acquisition and recording system (15) collects drilling resistance data in real time and feeds it back to the intelligent control system (14) to dynamically correct the feed parameters of the sliding drill bit (13).

7. A test method using the apparatus according to any one of claims 2 to 6, characterized in that, The steps include: device assembly: connect the base frame (1) to the base of the uniaxial testing machine, and install the transverse movable loading plate and the longitudinal movable loading plate (6); specimen installation and parameter setting: place the specimen (8) in the loading space enclosed by the loading plate, and set the stress parameters and drilling path through the intelligent control system (14); Biaxial stress loading: Transverse stress and longitudinal stress are applied by a servo pressure pump (2) and a uniaxial compression loading head (9), respectively; Tunnel excavation simulation: Under the condition of maintaining stress boundary, the sliding drill bit (13) is controlled to drill and excavate the sample (8) along a preset path; Data acquisition and analysis: Data of the whole process is collected through the data acquisition and recording system (15) and force-displacement-time curve is generated.

8. The test method according to claim 7, characterized in that, The test method also includes a test mode switching step: replace the transverse overlapping movable loading plate (4) with the direct shear silicone movable loading plate (7), adjust the position of the silicone pads on both sides of the loading plate so that they are arranged in opposite directions, and switch to the direct shear test mode.

9. The test method according to claim 7 or 8, characterized in that, In the biaxial stress loading step, the edge of the transversely overlapping movable loading plate (4) overlaps and covers the outside of the longitudinally overlapping movable loading plate (6), achieving full coverage of the specimen (8) without blind spots; the roller (3) transmits the load by rolling friction and eliminates the contact force between the loading plates.

10. The test method according to any one of claims 7-9, characterized in that, In the tunnel excavation simulation step, the intelligent control system (14) dynamically adjusts the feed rate of the sliding drill bit (13) based on the drilling resistance data fed back by the data acquisition and recording system (15): when the drilling resistance exceeds the threshold, the feed rate is reduced, and when the drilling resistance is lower than the threshold, the preset feed rate is restored.