Network reliability improvement method based on coordination of network-constructed energy storage and distributed power supply

By identifying the local effective support range of grid-type energy storage and verifying the status after recovery, the problem of support range shrinkage in the existing power supply recovery control of distribution networks is solved, and efficient and reliable power supply recovery is achieved after a distribution network fault.

CN122418652APending Publication Date: 2026-07-17ECONOMIC TECH RES INST OF STATE GRID ANHUI ELECTRIC POWER

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
ECONOMIC TECH RES INST OF STATE GRID ANHUI ELECTRIC POWER
Filing Date
2026-06-16
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

Existing power supply restoration control methods for distribution networks fail to effectively assess changes in the support status of grid-based energy storage after distributed power sources re-enter or power supply objects are restored, which may lead to power loss again for restored power supply objects, especially affecting the power supply reliability of critical protection objects.

Method used

By identifying the local effective support range of grid-type energy storage, the support limitation state after the restoration action is deduced, and the restored power supply objects are covered and verified to select executable restoration actions. This ensures that grid-type energy storage gradually expands the power supply restoration range after fault isolation and avoids the shrinkage of the support range.

Benefits of technology

It improves the efficiency and reliability of power restoration after a distribution network fault, ensures continuous power supply to critical infrastructure, and avoids further power outages caused by improper restoration actions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122418652A_ABST
    Figure CN122418652A_ABST
Patent Text Reader

Abstract

本发明公开了基于构网储能与分布式电源协同的配网可靠性提升方法,涉及配电网技术领域,包括以下步骤:确定构网型储能的局部构网有效支撑范围,并生成候选恢复动作;推演候选恢复动作执行后构网型储能是否由正常构网状态转入支撑受限状态,并确定局部构网有效支撑范围;基于局部构网有效支撑范围,对目标保障对象进行覆盖校核,筛选出可执行动作;执行可执行动作,并将执行后的局部构网有效支撑范围作为下一候选恢复动作推演及覆盖校核的基础。本发明通过识别构网型储能局部有效支撑范围并对恢复动作执行后的支撑受限状态进行覆盖校核,以解决现有恢复方法忽略变流器限流及阻抗抬升约束而导致支撑范围收缩的问题。