A method and system for generating ecological dredging strategies for reservoirs
By reconstructing the terrain and calculating the flow field response, the impact of deep dredging of the main channel on the upstream sediment was quantified, and a corrected dredging strategy was generated. This solved the problem of source scouring caused by local deep dredging and ensured the ecological safety of the reservoir.
Patent Information
- Application Number
- CN202611342626.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-01
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2046-09-01
AI Technical Summary
The existing reservoir dredging strategy generation system lacks the ability to predict the associated damage caused by localized deep dredging leading to source erosion and subsequent suspension of sediment in upstream undredged areas. It also fails to quantify the associated impact of deep dredging of the main channel on the sediment in upstream undredged areas, resulting in overall ecological damage.
The terrain elevation heterogeneity difference is obtained by terrain reconstruction calculation, the bottom velocity increment is obtained by flow field response redistribution calculation, the sediment stress mapping calculation is performed, the sediment surface shear force increment is quantified, and dimensionality reduction adjustment is performed when risk is triggered to generate a corrected ecological dredging strategy.
This effectively prevents the scouring and suspension of heavy metal sediments from upstream, eliminates the risk of global ecological damage caused by local optimal strategies, and ensures the ecological safety of the reservoir.
Smart Images

Figure CN122864264B_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of data processing technology, and in particular to a method and system for generating ecological dredging strategies for reservoirs. Background Technology
[0002] Ecological dredging of reservoirs is an important means of maintaining reservoir capacity and water quality safety. Current reservoir dredging strategy generation systems typically rely on static data on the distribution of sediment accumulation, using greedy logic to mark the most severely silted areas as high-priority dredging grids and directly generate excavation commands.
[0003] However, the sludge-water system at the bottom of the reservoir constitutes a highly coupled overall flow field. If the local topography is altered, it will inevitably lead to a redistribution of the global flow field. In the scenario of local deep dredging in the main channel, the existing dredging strategy generation system only updates the elevation values of the dredging area grid, without associating the heterogeneous changes in elevation with the global hydrodynamic vector.
[0004] When the main channel was partially dredged, the deep pits caused a sudden increase in the flow velocity at the bottom, creating a scouring and pulling force upstream under the influence of water inertia. The historical sediments upstream, which were not included in the dredging plan and contained a large amount of heavy metals, were subjected to shear forces from the water flow far exceeding their original state due to the changes in the flow field caused by the local dredging.
[0005] Existing dredging strategy generation systems lack the ability to extrapolate spatial cascading effects, focusing only on local dredging progress and failing to quantify the consequential impacts of deep dredging in the main channel on sediment stress in upstream non-dredging areas. Upstream heavy metal sediments are washed away and suspended under the surge in water flow shear force, causing severe secondary pollution. Existing static optimization models cannot predict the risk of distant sediment instability caused by localized deep dredging operations, leading to localized dredging strategies becoming a cause of global ecological damage. Summary of the Invention
[0006] In view of the aforementioned problems, this application is hereby filed.
[0007] Therefore, this application provides a method and system for generating ecological dredging strategies for reservoirs, which can solve the problem of lack of prediction of the associated damage caused by the scouring and suspension of bottom sediment in upstream undredged areas due to the source scouring triggered by local deep dredging.
[0008] To solve the above-mentioned technical problems, this application provides the following technical solution: In a first aspect, this application provides a method for generating ecological dredging strategies for reservoirs, including: in response to a reservoir ecological dredging strategy generation instruction, acquiring gridded topographic elevation data of the reservoir's bottom layer and initial dredging operation grid location information; Based on the gridded topographic elevation data of the reservoir bottom layer and the location information of the initial dredging operation grid, the topographic reconstruction calculation is performed on the area corresponding to the location information of the initial dredging operation grid to obtain the topographic elevation heterogeneity difference of the non-dredging operation grid location. Based on the topographic elevation heterogeneity difference at the non-dredging grid location, the flow field response redistribution calculation is performed on the water flow vector distribution at the non-dredging grid location to obtain the bottom velocity increment at the non-dredging grid location. Based on the bottom velocity increment at the non-dredging operation grid location, the bottom sediment force mapping calculation is performed at the non-dredging operation grid location to obtain the bottom sediment surface shear force increment at the non-dredging operation grid location. In response to the risk trigger signal of sediment erosion, the initial dredging grid location information is adjusted by dimensionality reduction based on the increase of shear force on the sediment surface at non-dredging grid locations to obtain a corrected ecological dredging strategy.
[0009] Preferably, the step of performing terrain reconstruction calculations on the area corresponding to the initial dredging operation grid location information to obtain the terrain elevation heterogeneity difference values for non-dredging operation grid locations includes: In response to the terrain topology construction trigger signal, the water flow connectivity direction attribute of multiple adjacent grid nodes at the bottom layer of the reservoir and the historical siltation thickness distribution data of adjacent grid nodes are obtained. Based on the water flow connectivity direction attributes of multiple adjacent grid nodes at the bottom layer of the reservoir and the historical sedimentation thickness distribution data of the adjacent grid nodes, directed edge assignment and node state initialization operations are performed on multiple adjacent grid nodes at the bottom layer of the reservoir to obtain the data space topology map of the bottom layer of the reservoir. Based on the spatial topology map of the reservoir's bottom layer data and the initial dredging operation grid location information, the spatial difference extraction operation along the water flow direction is performed on the topographic elevation data of adjacent grid nodes to obtain the heterogeneous difference in topographic elevation at non-dredging operation grid locations.
[0010] Preferably, the flow field response redistribution calculation for the water flow vector distribution at non-dredging grid locations, to obtain the bottom layer velocity increment at non-dredging grid locations, includes: In response to the flow field redistribution trigger signal, the flow resistance coefficient and water flow boundary constraint parameters between each grid node in the bottom layer of the reservoir are obtained; Based on the flow resistance coefficients between the grid nodes at the bottom of the reservoir, the boundary constraint parameters of the water flow, and the topological map of the data space at the bottom of the reservoir, a flow field vector matrix construction operation is performed on each grid node at the bottom of the reservoir to obtain the flow field response distribution matrix. Based on the heterogeneous difference between the flow field response distribution matrix and the terrain elevation at the non-dredging grid location, the original velocity vector at the non-dredging grid location is superimposed along the tangential direction of the water flow to obtain the bottom velocity increment at the non-dredging grid location.
[0011] Preferably, the step of performing sediment force mapping calculations on the non-dredging grid locations based on the bottom flow velocity increment to obtain the sediment surface shear force increment at the non-dredging grid locations includes: In response to the force mapping trigger signal, the surface roughness characteristics of the bottom sediment and the interstitial water pressure data of the bottom sediment surface are obtained at the non-dredging operation grid location; Based on the surface roughness characteristics of the sediment at the non-dredging grid location, the interstitial water pressure data of the sediment surface layer, and the bottom velocity increment at the non-dredging grid location, the shear stress of the near-wall region at the non-dredging grid location is integrally solved along the water depth direction to obtain the integral result of the shear stress of the near-wall region. Based on the integral results of the water flow shear stress in the near-wall area, a mechanical equivalent conversion operation is performed on the stress state of the bottom sediment adhesion at the non-dredging grid location to obtain the incremental shear force on the bottom sediment surface at the non-dredging grid location.
[0012] Preferably, before adjusting the initial dredging grid location information based on the incremental shear force on the sediment surface at non-dredging grid locations in response to the sediment scour risk trigger signal, the method further includes: In response to the stress threshold calibration trigger signal, acquire the particle size distribution data and sediment moisture content data of the bottom sediment components at non-dredging operation grid locations; Based on the particle size distribution data and moisture content data of the sediment composition at the non-dredging grid location, the shear strength of the sediment at the non-dredging grid location is dynamically calibrated to obtain the critical starting stress of the sediment at the non-dredging grid location. Based on the incremental shear force on the bottom sediment surface at the non-dredging grid location and the critical initiation stress of the bottom sediment at the non-dredging grid location, a difference comparison operation is performed between the two to obtain the overflow amount of scour risk at the non-dredging grid location and generate a bottom sediment scour risk trigger signal.
[0013] Preferably, the step of adjusting the initial dredging grid location information based on the incremental shear force on the sediment surface at non-dredging grid locations to obtain a corrected ecological dredging strategy includes: In response to the dimension reduction adjustment execution signal, the original excavation depth data and the original dredging boundary contour data of the initial dredging operation grid position are obtained; Based on the overflow of scour risk at non-dredging grid locations and the original excavation depth data at the initial dredging grid locations, a dimensionality reduction operation is performed along the vertical direction on the original excavation depth data at the initial dredging grid locations to obtain the dimensionality-reduced excavation depth data. Based on the reduced dimensionality of the excavation depth data, the original dredging boundary contour data of the initial dredging operation grid position is reconstructed by shrinking inward to obtain a preliminary set of corrected dredging operation parameters.
[0014] Preferably, after obtaining the preliminary set of corrected dredging operation parameters, the method further includes: In response to the strategy iteration confirmation signal, a back-substitution calculation operation is performed on the preliminary revised dredging operation parameter set to obtain the updated topographic elevation heterogeneity difference and the updated bottom sediment surface shear force increment at non-dredging operation grid locations. Based on the updated sediment surface shear force increment at non-dredging grid locations and the critical initiation stress of sediment at non-dredging grid locations, a secondary judgment operation is performed on the overflow amount of scour risk to obtain the secondary judgment result; Based on the state that the incremental shear force on the surface of the bottom sediment at the non-dredging grid location is less than the critical starting stress of the bottom sediment at the non-dredging grid location, the state locking operation is performed on the preliminary modified dredging operation parameter set to obtain and confirm the modified ecological dredging strategy.
[0015] Preferably, after obtaining confirmation and revising the ecological dredging strategy, the method further includes: In response to the timing arrangement trigger signal, acquire and confirm the spatial location interval data of adjacent dredging operation grids and the local flow field recovery time data in the ecological dredging strategy; Based on the spatial location interval data and local flow field recovery time data of adjacent dredging operation grids in the confirmed and corrected ecological dredging strategy, a directed graph topology sorting operation is performed on multiple dredging operation grids in the confirmed and corrected ecological dredging strategy to obtain the operation grid topology sorting results. Based on the topology sorting results of the work grid, the time sequence of multiple dredging work grids in the confirmed and modified ecological dredging strategy is staggered to obtain the time-staggered ecological dredging work sequence.
[0016] Preferably, the dynamic calibration of the shear strength of the sediment at the non-dredging grid location based on the particle size distribution data and moisture content data of the sediment at the non-dredging grid location, to obtain the critical initiation stress of the sediment at the non-dredging grid location, includes: In response to seasonal environmental change monitoring signals, data on the temperature and viscosity coefficient of the bottom water in the reservoir are obtained. Based on the water temperature and viscosity coefficient data of the bottom water of the reservoir, environmental parameter correction operations were performed on the particle size distribution data of bottom sediment components in non-dredging grid locations to obtain the corrected particle size distribution data of bottom sediment components. Based on the corrected particle size distribution data of the sediment components, a seasonal dynamic overwrite operation is performed on the critical initiation stress of the sediment at non-dredging grid locations to obtain the seasonally adaptive critical initiation stress of the sediment.
[0017] Secondly, this application also provides a reservoir ecological dredging strategy generation system, including: a terrain reconstruction calculation acquisition module, a bottom flow velocity increment acquisition module, a bottom sediment surface shear force increment acquisition module, and a modified ecological dredging strategy acquisition module; The terrain reconstruction calculation and acquisition module is used to respond to the reservoir ecological dredging strategy generation command, acquire the bottom gridded terrain elevation data of the reservoir and the initial dredging operation grid location information; based on the bottom gridded terrain elevation data of the reservoir and the initial dredging operation grid location information, perform terrain reconstruction calculation on the area corresponding to the initial dredging operation grid location information, and obtain the terrain elevation heterogeneity difference value of non-dredging operation grid location. The bottom velocity increment acquisition module is used to perform flow field response redistribution calculation on the water flow vector distribution at the non-dredging operation grid location based on the topographic elevation heterogeneity difference at the non-dredging operation grid location, and to obtain the bottom velocity increment at the non-dredging operation grid location. The bottom sediment surface shear force increment acquisition module is used to perform bottom sediment force mapping calculation on the bottom sediment at the non-dredging operation grid location based on the bottom flow velocity increment at the non-dredging operation grid location, and obtain the bottom sediment surface shear force increment at the non-dredging operation grid location. The modified ecological dredging strategy acquisition module is used to respond to the bottom sediment scour risk trigger signal. It performs dimensionality reduction adjustment on the initial dredging operation grid position information based on the incremental shear force on the bottom sediment surface at non-dredging operation grid positions to obtain the modified ecological dredging strategy.
[0018] Implementing this application will have the following beneficial effects: This application provides a method and system for generating ecological dredging strategies for reservoirs. It obtains the heterogeneous difference in topographic elevation through terrain reconstruction calculations, transforming the topographic changes caused by localized deep dredging into a global flow field response. The incremental shear force on the sediment surface is obtained based on the increase in bottom velocity, quantifying the source-tracing scouring force exerted by deep dredging of the main channel on the sediment in upstream undredged areas. When the incremental shear force on the sediment surface exceeds the standard and triggers a risk signal, the original dredging depth and boundaries are adjusted to reduce the source-tracing scouring force, preventing the suspension of heavy metal sediment from upstream and eliminating the risk of global ecological damage caused by locally optimal strategies. Attached Figure Description
[0019] To more clearly illustrate the technical solutions in the embodiments of this application or related technologies, the drawings used in the description of the embodiments of this application or related technologies will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this application. For those skilled in the art, other related drawings can be obtained based on these drawings without creative effort.
[0020] Figure 1 This is an overall flowchart of a method for generating ecological dredging strategies for reservoirs, which is involved in this application; Figure 2 This is an application environment diagram of a reservoir ecological dredging strategy generation method involved in this application; Figure 3 This is a schematic diagram illustrating the spatial cascading effect and scour risk caused by localized deep excavation in a reservoir ecological dredging strategy generation method involved in this application. Figure 3 (a) Three-dimensional distribution of topographic elevation heterogeneity differences. Figure 3 (b) Thermal diagram of bottom-layer velocity increment and backflow pull. Figure 3 (c) Contour distribution of scour risk spillover; Figure 4 This is a section adaptive threshold calibration and dimensionality reduction adjustment iterative convergence verification diagram of a reservoir ecological dredging strategy generation method involved in this application. Figure 4 (a) Seasonal adaptive response surface at critical starting stress. Figure 4 (b) Step-down dimensionality reduction and quadratic discriminant convergence curve.
[0021] Figure 5 This application relates to a multi-grid spatial interference topology and temporally displaced ecological dredging sequence for generating reservoir ecological dredging strategies. Figure 5 (a) Directed topological graph of spatial interference of dredging grid. Figure 5 Gantt chart of time-displaced ecological dredging operation sequence (b). Detailed Implementation
[0022] To make the objectives, technical solutions, and advantages of this application clearer, the following detailed description is provided in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative and not intended to limit the scope of this application.
[0023] Figure 1 This paper presents an overall flowchart of a method for generating ecological dredging strategies for reservoirs, which can be applied to... Figure 2 The application environment diagram shown includes: Step S1: In response to the reservoir ecological dredging strategy generation command, obtain the bottom gridded terrain elevation data of the reservoir and the initial dredging operation grid location information.
[0024] In this application, the gridded topographic elevation data of the reservoir bottom layer and the location information of the initial dredging operation grid are the cornerstones for subsequent topographic reconstruction and flow field inference.
[0025] It should be noted that the reservoir ecological dredging strategy generation command is issued by an external console and includes the operation area identifier. In response to the reservoir ecological dredging strategy generation command, a set of discrete water depth points covering the entire bottom of the reservoir is obtained through a multibeam echo sounder. Inverse distance weighted interpolation is then used to map these discrete points to a scale of [size missing]. On a two-dimensional grid, obtain the gridded topographic elevation data matrix of the reservoir's bottom layer. Each element in the matrix Representing the Line 1 The terrain elevation values of the grid nodes.
[0026] Simultaneously, based on the greedy strategy set in the historical siltation monitoring reports, grids with siltation thickness exceeding the safety threshold are extracted to form the initial set of grid location information for dredging operations. For example, in a reservoir dredging project, the bottom of the reservoir was divided into... The grid was constructed, and the current elevation of each grid node was obtained through sonar detection. The coordinates of 15 grid nodes with a sediment thickness exceeding 2 meters were stored in a set. As the initial dredging target.
[0027] It should be noted that this step provides an accurate initial spatial state for subsequent terrain reconstruction, ensuring that the spatial cascade effect simulation has an accurate data source and overcoming the drawback of existing technologies lacking global spatial data. In this embodiment, the safety threshold is obtained by calculating the difference between the reservoir's designed capacity and its current capacity, then calculating the average siltation thickness by multiplying this difference by the dredging area, and finally using the product of the average siltation thickness and a safety factor of 1.5 as the safety threshold.
[0028] Step S2: Based on the gridded topographic elevation data of the reservoir bottom layer and the initial dredging operation grid location information, perform topographic reconstruction calculation on the area corresponding to the initial dredging operation grid location information to obtain the topographic elevation heterogeneity difference value of the non-dredging operation grid location.
[0029] In this application, the preset excavation depth of the corresponding area is first deducted from the original elevation based on the initial dredging operation grid location information to simulate the terrain reconstruction state after local deep excavation; further, the underlying data spatial topology map is constructed through sub-steps S2.1 and S2.2 to determine the water flow connectivity logic; finally, through sub-step S2.3, the elevation difference of the non-dredging operation grid location before and after reconstruction is extracted along the water flow direction to obtain the terrain elevation heterogeneity difference, providing an accurate spatial driving source for subsequent flow field response calculation.
[0030] In a preferred embodiment, the step of performing terrain reconstruction calculations on the area corresponding to the initial dredging operation grid location information to obtain the terrain elevation heterogeneity difference value for non-dredging operation grid locations includes: Step S2.1: In response to the terrain topology construction trigger signal, obtain the water flow connectivity direction attributes of multiple adjacent grid nodes at the bottom layer of the reservoir and the historical siltation thickness distribution data of adjacent grid nodes.
[0031] Step S2.2: Based on the water flow connectivity direction attributes of multiple adjacent grid nodes at the bottom layer of the reservoir and the historical siltation thickness distribution data of the adjacent grid nodes, perform directed edge assignment and node state initialization operations on multiple adjacent grid nodes at the bottom layer of the reservoir to obtain the data space topology map of the bottom layer of the reservoir.
[0032] It should be noted that the bottom of the reservoir is a complex topography consisting of deep channels and shallow shoals. The direction of water flow is highly directional due to the topographic constraints. The headward scouring caused by local deep excavation can only be transmitted upstream along the water flow connection path. Therefore, it is necessary to construct a topological structure that reflects the actual water flow connection relationship.
[0033] To address the issue of existing technologies neglecting spatial cascading effects, the water flow connectivity direction attributes of multiple adjacent grid nodes at the reservoir's bottom layer, as well as historical sedimentation thickness distribution data for these adjacent grid nodes, are prerequisites for constructing a directed topology. In response to the topology construction trigger signal, the water flow direction between adjacent grid nodes is extracted through water flow tracing experiments or two-dimensional shallow water equation simulations to obtain the water flow connectivity direction attributes; simultaneously, historical monitoring records are retrieved to obtain historical sedimentation thickness distribution data.
[0034] In one implementation, a directed edge weight matrix is defined. Define the node state vector Then, by performing directed edge assignment and node state initialization operations on multiple adjacent grid nodes at the bottom layer of the reservoir, the topological graph of the reservoir's bottom layer data space can be obtained. This can be achieved through the following specific calculation method: For any adjacent nodes and If the water flows from Flow direction Then assign the weight of the directed edge. ,in and They are nodes and The thickness of historical accumulation, To prevent extremely small constants with a denominator of zero; Simultaneously, the node status will be... Initialize to the elevation value of this node.
[0035] It should be noted that this operation transforms scattered elevation and sedimentation data into a reservoir bottom-layer data spatial topology map with physical flow direction constraints. The reservoir bottom-layer data spatial topology map strictly limits the directionality of material and energy transfer, ensuring that the extraction of terrain heterogeneity differences is strictly constrained to the actual upstream flow path. This avoids invalid calculations for disconnected areas and directly provides a directional constraint basis for solving the problem of missing predictions of the upstream ripple effects of local deep excavation.
[0036] Furthermore, when encountering a closed depression in the terrain that results in no outflow direction, the weight of all outgoing edges of the depression node is forcibly set to 0, and the state is marked as a water storage node to ensure that the topology graph does not generate a deadlock in the circulating water flow.
[0037] Step S2.3: Based on the spatial topology map of the reservoir bottom layer data and the initial dredging operation grid location information, perform spatial difference extraction operation on the topographic elevation data of adjacent grid nodes along the water flow direction to obtain the heterogeneous difference in topographic elevation at non-dredging operation grid locations.
[0038] In order to quantify the impact of deep dredging of the main channel on the sediment in the upstream non-dredging area, it should be pointed out that the difference in topographic elevation is the fundamental cause of the variation in the flow field.
[0039] It is important to understand that in the scenario of deep dredging in a localized part of the main channel, the sudden drop in elevation of the dredging area will change the local potential energy distribution. This change in potential energy will be transmitted upstream along the path of least flow resistance, causing the upstream non-dredging area to bear an additional hydraulic gradient.
[0040] In this application, a terrain elevation heterogeneous difference matrix is defined. In the initial state The matrix is composed of all zeros. Based on the directed edges in the reservoir's underlying data space topology graph, the initial set of dredging operation grid locations is calculated. Each node in Original elevation With preset excavation depth The difference is used to obtain the reconstructed elevation, at which point the local elevation change is calculated. .
[0041] Furthermore, traverse the non-dredging operation grid nodes in the opposite direction of the directed edges in the topological graph. Spatial difference extraction along the water flow direction is performed on the topographic elevation data of adjacent grid nodes to obtain heterogeneous topographic elevation differences at non-dredging grid locations, which satisfy the following relationship: .
[0042] In the formula, Non-dredging grid nodes The topographic elevation heterogeneity difference, in this application, refers to the difference in elevation between the downstream dredging pit and the node through hydraulic coupling. The resulting decrease in equivalent elevation; To indicate the direction of water flow to nodes in the topology graph The set of adjacent downstream nodes; For the node Pointing to node The weight of the directed edge; For nodes Grid distance to the nearest dredging grid; The spatial attenuation constant is 0.03, which is obtained by inversion from statistical data on the viscosity of bottom sediment in the reservoir.
[0043] It should be noted that by extracting spatial differences along the opposite direction of water flow, the pulling effect of the heterogeneous changes in elevation in the deep dredging area on each non-dredging grid upstream is accurately quantified. This transforms the local elevation drop into a global equivalent elevation heterogeneous distribution, breaking the static and isolated mode of existing technologies that only update the elevation of the dredging area. It provides an accurate driving input for the flow field response redistribution calculation and directly solves the technical pain point that existing dredging strategy generation systems cannot quantify the stress-related impact of deep dredging of the main channel on the bottom sediment in the upstream non-dredging area.
[0044] In another embodiment of this application, the spatial attenuation constant It can be dynamically adjusted according to the bed roughness of different reservoirs. When the bed roughness is greater than 0.05, A value of 0.05 is used to accelerate the decay of heterogeneous differences and prevent overestimation of distant effects.
[0045] Step S3: Based on the topographic elevation heterogeneity difference at the non-dredging grid location, perform flow field response redistribution calculation on the water flow vector distribution at the non-dredging grid location to obtain the bottom layer velocity increment at the non-dredging grid location.
[0046] It should be noted that the heterogeneous descent of the terrain inevitably disrupts the original energy balance of the water flow, forcing a redistribution of the velocity vector. This step first obtains the resistance parameters and constructs the flow field response distribution matrix through sub-steps S3.1 and S3.2. Then, through sub-step S3.3, the terrain difference is coupled and superimposed with the response matrix to calculate the bottom velocity increment at non-dredging grid locations. This explicitly maps local terrain changes into a surge in global hydrodynamics, providing crucial velocity input for subsequent sediment stress calculations.
[0047] In a preferred embodiment, the step of performing flow field response redistribution calculations on the flow vector distribution at non-dredging grid locations to obtain the bottom-layer velocity increment at non-dredging grid locations includes: Step S3.1: In response to the flow field redistribution trigger signal, obtain the flow resistance coefficient and water flow boundary constraint parameters between each grid node at the bottom layer of the reservoir.
[0048] Step S3.2: Based on the water flow resistance coefficients between each grid node at the bottom of the reservoir, the water flow boundary constraint parameters, and the topological map of the data space at the bottom of the reservoir, a flow field vector matrix construction operation is performed on each grid node at the bottom of the reservoir to obtain the flow field response distribution matrix.
[0049] It should be noted that the movement of water at the bottom of the reservoir is constrained by the resistance of the riverbed and the boundary of the bank slope. The redistribution of flow velocity caused by topographic changes is not uniformly transmitted, but is controlled by the local resistance distribution and boundary morphology.
[0050] To address the shortcomings of existing technologies that fail to correlate heterogeneous elevation changes with global hydrodynamic vectors, the flow resistance coefficients between grid nodes at the bottom of the reservoir are obtained in response to flow field redistribution trigger signals through Manning's formula inversion or sediment particle size analysis. ; Simultaneously, water flow boundary constraint parameters are extracted based on the location of the reservoir shoreline and obstacles, including the non-slip boundary of the shoreline and the free outflow boundary.
[0051] In one specific embodiment, a drag diagonal matrix is defined. Its diagonal elements are the product of the square of the corresponding node drag coefficient and the mesh area, defining the boundary constraint matrix. Set the value to 0 at the corresponding position of the shoreline boundary node and set the value to 1 at the internal node.
[0052] Furthermore, based on the adjacency relationships between the flow resistance coefficients, water flow boundary constraint parameters, and the data space topology of the reservoir's bottom layer grid nodes, a flow field vector matrix construction operation is performed on each grid node in the reservoir's bottom layer to obtain the flow field response distribution matrix. The response can be obtained by solving the following discretized water flow response equation: In the formula, This is the gradient operator matrix constructed based on the topological graph; The flow field response distribution matrix, in this application, represents the velocity response sensitivity of other nodes in the entire network when any node undergoes a unit elevation change.
[0053] It should be noted that the flow field response distribution matrix transforms complex flow field mechanical constraints into a computable mathematical mapping relationship, enabling elevation changes to be accurately converted into velocity responses. This provides a physical transfer matrix for calculating the underlying velocity increments, ensuring the mechanical rationality of flow field variation extrapolation. Furthermore, when the drag coefficient at a certain node is extremely small, leading to... In the case of singularity, force the addition of diagonal elements. This ensures that the matrix is invertible.
[0054] Step S3.3: Based on the heterogeneous difference between the flow field response distribution matrix and the terrain elevation at the non-dredging grid location, the original velocity vector at the non-dredging grid location is superimposed along the tangential direction of the water flow to obtain the bottom velocity increment at the non-dredging grid location.
[0055] It is important to emphasize that the heterogeneous difference in terrain elevation only provides a source of potential energy disturbance, which must be mapped into a substantial change in flow velocity through the flow field response distribution matrix.
[0056] Specifically, define the bottom-layer velocity increment vector at non-dredging operation grid locations. Define the heterogeneous difference vector of terrain elevation. It is a matrix The results are expanded column-wise. Based on the heterogeneous difference between the flow field response distribution matrix and the topographic elevation at the non-dredging grid locations, the original velocity vectors at the non-dredging grid locations are superimposed along the tangential direction of the water flow to obtain the bottom velocity increment at the non-dredging grid locations. This can be calculated as follows: In the formula, This indicates that the response components corresponding to non-dredging grid nodes are extracted from the full grid velocity response results. This is the unit direction vector along the tangent to the water flow; This represents element-wise multiplication. Bottom layer flow rate increment. The dimension of is meters per second, and in this application, it means the increase in local flow velocity at the bottom of the non-dredging area upstream due to the downstream dredging pit.
[0057] It should be noted that this step accurately transforms the spatial heterogeneous disturbance of the terrain into the velocity increment of each non-dredging grid through the physical laws of the flow field. This reveals the mechanical essence of the deep pit in the main channel causing a sudden increase in the bottom velocity and forming an upstream scouring and pulling force under the action of water inertia. It completely solves the technical defect of the existing system that cannot quantify the stress-related effects of the deep dredging of the main channel on the bottom sediment in the upstream non-dredging area, and provides accurate dynamic input for the force mapping of the bottom sediment.
[0058] For example, at a certain grid node, the calculation is as follows: The value is 0.15 meters per second, indicating that the flow velocity at the bottom of the node will increase by 0.15 meters per second due to the downstream excavation. In another embodiment of this application, the superposition calculation along the tangential direction of the water flow can also introduce a Coriolis force correction coefficient. For large-area reservoirs, this coefficient is 0.003, which is obtained by calculating based on the latitude of the reservoir, in order to correct the influence of the deflection effect on the direction of the flow velocity.
[0059] Step S4: Based on the bottom velocity increment at the non-dredging grid location, perform sediment force mapping calculation on the non-dredging grid location to obtain the sediment surface shear force increment at the non-dredging grid location.
[0060] It is important to understand that the velocity increment itself cannot directly determine whether the sediment is suspended; the velocity increment must be mapped to the shear force increment on the sediment surface. This step first obtains the sediment surface characteristics and performs near-wall integration through sub-steps S4.1 and S4.2, and then performs mechanical equivalent conversion through sub-step S4.3 to finally obtain the shear force increment on the sediment surface. This directly links the flow field variation with sediment instability, providing a mechanical basis for risk assessment.
[0061] In a preferred embodiment, the step of performing sediment force mapping calculations on the non-dredging grid locations based on the bottom flow velocity increment to obtain the sediment surface shear force increment at the non-dredging grid locations includes: Step S4.1: In response to the force mapping trigger signal, acquire the surface roughness characteristic data of the bottom sediment and the interstitial water pressure data of the bottom sediment at the non-dredging operation grid location.
[0062] Step S4.2: Based on the surface roughness characteristic data of the bottom sediment, the interstitial water pressure data of the bottom sediment surface, and the bottom flow velocity increment of the non-dredging grid location, perform an integral solution operation along the water depth direction for the near-wall shear stress of the non-dredging grid location to obtain the integral result of the near-wall shear stress.
[0063] It should be noted that the shearing effect of water flow on the bottom sediment is distributed within a certain water depth range in the near-wall area, and is affected by the surface roughness of the bottom sediment and the interstitial water pressure.
[0064] To address the lack of prediction regarding sediment scouring and suspension caused by a surge in water flow shear force, surface roughness data of sediment at locations outside the dredging grid are acquired through in-situ sampling or acoustic bottom probing, in response to a force mapping trigger signal. The value is 0.005, which is obtained by scanning the surface undulations with a laser particle size analyzer after sampling the bottom sediment on site. Furthermore, pore water pressure data of the sediment surface layer were obtained using a pore water pressure sensor. , with dimensions in Pascals.
[0065] Furthermore, based on the surface roughness characteristics of the sediment, the interstitial water pressure data of the sediment surface layer, and the velocity increment of the bottom layer, the shear stress of the near-wall region at non-dredging grid locations is integrally solved along the water depth direction to obtain the integral result of the shear stress of the near-wall region, which satisfies the following relationship: In the formula, The integral result of the shear stress of the water flow in the near-wall region is expressed in Newtons per meter. In this application, it means the cumulative shear force exerted by the water column on the bottom sediment surface in the near-wall region. The near-wall boundary layer thickness is 0.1 meters, obtained by fitting measured flow velocity profiles. The density of the water is taken as 1000 kg per cubic meter; The viscosity coefficient of water motion is given by [value]. square meters per second; This is the vertical distance from the surface of the bottom sediment; The velocity gradient is formed by the velocity increment of the underlying layer. Obtained by differentiating the logarithmic distribution within the boundary layer; Let be the function of influence of interstitial water pressure, when The function value is less than 1 when the time is greater than 1, and 1 otherwise. To prevent collapse, a minimum constant is used.
[0066] Understandably, this integration operation accurately reduces the water flow drag force distributed throughout the near-wall region to an equivalent force acting on the sediment surface. It also couples the impact of roughness on the velocity profile with the reduction of effective stress by interstitial water pressure, ensuring that the shear stress calculation closely matches the actual physical state of the reservoir sediment and providing accurate integral input for mechanical equivalent conversion. For example, when the interstitial water pressure is positive, the integration result... This will be significantly lower than the ideal state of gapless water pressure.
[0067] Step S4.3: Based on the bottom velocity increment at the non-dredging operation grid location, perform bottom sediment force mapping calculation on the non-dredging operation grid location to obtain the bottom sediment surface shear force increment at the non-dredging operation grid location.
[0068] Prior to this step, the bottom velocity increments at locations outside the dredging grid have been obtained. and the integral results of the water flow shear stress in the near-wall region The stress state of the bottom sediment is in the stage of waiting for accurate mapping.
[0069] To directly translate flow field variations into criteria for sediment instability risk, it is necessary to convert near-wall shear stress into the actual increase in shear force borne by the sediment surface. Since the flow regime at the bottom of a reservoir transitions from laminar to turbulent with changes in bottom velocity, the frictional characteristics of shear stress transmitted to the sediment surface differ fundamentally under different flow regimes.
[0070] Therefore, the following piecewise function is introduced to describe the nonlinear mapping. The equivalent conversion coefficient function is defined. ,in For local Reynolds numbers, This represents the median particle size of the sediment. Then, the increase in surface shear force of the sediment at locations outside the dredging grid is obtained. The calculation formula is: ; In the formula, This represents the increment of shear force on the sediment surface, in Pascals. To prevent the denominator from being a zero minimum constant; The slope of the linear interpolation in the transition region is 0.0001, which is obtained by linear interpolation calibration based on the critical Reynolds number interval.
[0071] when At this time, the bottom water flow is in a laminar state, the frictional resistance is inversely proportional to the Reynolds number, and the boundary is set according to the critical Reynolds number of laminar flow in classical fluid dynamics; when At this time, the water flow is in a transition state, and a linear transition is used to ensure continuity; when At this point, the water flow enters a turbulent state, following the Brassius law of turbulent friction. The boundary values 2000 and 4000 belong to the left closed interval and the right open interval, respectively.
[0072] For example, the velocity increment at the bottom layer of a non-dredging grid. It is 0.2 meters per second. It is 0.0005 meters, calculated as follows: It is located in the laminar flow region; if Reaching 8 meters per second, Then, entering the transition zone, the second branch is used for calculation.
[0073] Understandably, this application obtains the incremental shear force on the sediment surface that accurately reflects the physical properties of the flow regime through piecewise mapping. This increment directly quantifies the mechanical impact of the upstream sediment caused by the backflow scouring and pulling force triggered by local deep excavation, providing a direct disaster-causing factor for risk comparison and completely solving the problem that the existing system cannot quantify the force-related effects on the distant sediment.
[0074] It should be pointed out that, due to the high-frequency pulsating characteristics of bottom flow velocity increments during reservoir discharge scenarios in extreme rainstorms, simple calculations of time-averaged shear force can mask the risk of instantaneous extreme impacts. Therefore, when monitoring the intensity of flow velocity pulsations... At that time, if Then, a fluctuating additional term is superimposed on the turbulence bifurcation result. ,in The value is set to 0.5, obtained through turbulent fluctuation spectrum analysis; if Then multiply the laminar flow or transition region result by the amplification factor. This is to cover the risk of instantaneous extreme shear forces. In another embodiment of this application, the exponent of the turbulent branch can be an empirical value based on a specific roughness of the reservoir sediment, with the value range adjusted to -0.3.
[0075] In a preferred embodiment, before adjusting the initial dredging grid location information based on the incremental shear force on the sediment surface at non-dredging grid locations in response to the sediment scour risk trigger signal, the method further includes: Step S4.4: In response to the stress threshold calibration trigger signal, acquire the particle size distribution data and water content data of the bottom sediment components at the non-dredging operation grid locations.
[0076] It should be noted that, in response to the stress threshold calibration trigger signal, the system automatically starts the bottom sediment data collection process in the non-dredging operation area. First, it uses a preset gridded geographic information system (GIS) to lock the specific coordinate range of the current non-dredging operation grid to ensure that the data collection area does not overlap with the dredging operation area. Furthermore, the laser particle size analyzer and high-frequency moisture content sensor mounted on an unmanned measurement platform (such as an autonomous underwater vehicle (AUV) or remotely operated vehicle (ROV)) are used to perform a full-coverage scan of the target grid area at a sampling density of 5 meters × 5 meters. During the data acquisition process, the working status of the sensors is monitored in real time. When an abnormal signal occurs (such as the laser receiving intensity being lower than the threshold or poor contact of the moisture content probe), the supplementary measurement mechanism is automatically triggered and the coordinates of the abnormal point are recorded. Furthermore, after the data collection is completed, the original particle size distribution data (content of each particle size class of 0-2mm, 2-5mm, 5-10mm, 10-20mm, and >20mm expressed as volume percentage) and the moisture content data (in %, accurate to two decimal places) are transmitted to the shore-based data processing center through an underwater acoustic communication module. At the same time, metadata tags containing sampling time, latitude and longitude, water depth, and sensor number are generated to ensure data traceability. Furthermore, the received dataset is preprocessed to remove invalid values that exceed the instrument's measurement range (such as abnormal data with moisture content >100% or <0%), and Kriging interpolation is used to perform gridded interpolation on the discrete sampling point data to form a two-dimensional distribution map of the particle size distribution and moisture content of the sediment composition with a resolution of 1 m × 1 m, providing spatially continuous basic data support for subsequent stress threshold calculation.
[0077] Step S4.5: Based on the particle size distribution data and moisture content data of the sediment composition at the non-dredging grid location, perform dynamic calibration of the shear strength of the sediment at the non-dredging grid location to obtain the critical starting stress of the sediment at the non-dredging grid location.
[0078] In a preferred embodiment, the dynamic calibration of the shear strength of the sediment at the non-dredging grid location based on the particle size distribution data and moisture content data of the sediment composition at the non-dredging grid location, to obtain the critical initiation stress of the sediment at the non-dredging grid location, includes: S4.51, responding to seasonal environmental change monitoring signals, acquires water temperature data and water viscosity coefficient data of the bottom water body of the reservoir.
[0079] S4.52, based on the water temperature data and water viscosity coefficient data of the bottom water body of the reservoir, performs environmental parameter correction operation on the particle size distribution data of bottom sediment components in non-dredging operation grid locations, and obtains the corrected particle size distribution data of bottom sediment components.
[0080] It should be noted that the critical initiation stress of the sediment is not a static constant, but a variable affected by the composition of the sediment and the dynamics of the seasonal environment. To address the problem that existing static optimization models cannot predict the risk of instability in distant sediments, it is necessary to first obtain and correct the shear strength parameters of the sediment.
[0081] In this application, in response to a stress threshold calibration trigger signal, sediment particle size distribution data of sediment components at non-dredging operation grid locations are obtained through sediment sampling and particle size analysis. Sediment moisture content data were obtained by drying. The dimension is percentage.
[0082] Simultaneously, in response to seasonal environmental change monitoring signals, temperature data of the bottom water body of the reservoir is obtained through temperature chains. The dimension is Celsius; the viscosity coefficient data of water is obtained through a viscometer. The dimension is Pascal-second. Based on the reservoir's bottom water temperature and viscosity coefficient data, an environmental correction factor is defined. To correct the particle size distribution data of sediment components in non-dredging grid locations, environmental parameters are adjusted to obtain the corrected particle size distribution data. This can be calculated as follows: In the formula, The median particle size of the sediment composition after correction; The temperature effect coefficient is 0.005 per degree Celsius and is obtained by calibration based on the rate of change of viscosity coefficient with temperature. The value of 0.1 represents the influence coefficient of moisture content, obtained by fitting the relationship between indoor shear strength and moisture content through experiments; 20 and 0.5 are the benchmark values for standard room temperature and typical moisture content, respectively.
[0083] It should be noted that this correction operation explicitly converts the implicit effects of seasonal changes in water viscosity coefficient and sediment moisture content on the binding force between sediment particles into changes in equivalent particle size. This allows the calculation of critical starting stress to dynamically adapt to seasonal changes, avoiding the risk of misjudgment caused by high viscosity in winter and low viscosity in summer. It provides input parameters that conform to the actual environmental conditions for accurately calibrating the critical starting stress of sediment.
[0084] Furthermore, when the water temperature Below 4 degrees Celsius, due to abnormal changes in water density, it is necessary to... Add anomaly density correction term to the calculation .
[0085] Step S4.53: Based on the corrected particle size distribution data of the sediment composition, perform a seasonal dynamic overwrite operation on the critical starting stress of the sediment at non-dredging grid locations to obtain the seasonally adaptive critical starting stress of the sediment.
[0086] It is important to understand that the critical initiation stress of sediment is the baseline for its erosion resistance, and is constrained by particle size and gradation. This application defines the critical initiation stress of sediment at locations outside the dredging grid as... The dimension is Pascal. Based on the corrected particle size distribution data of the sediment components. and A seasonal dynamic overwrite operation is performed on the critical initiation stress of bottom sediment at non-dredging grid locations to obtain the seasonally adaptive critical initiation stress of bottom sediment, which satisfies the following relationship: In the formula, The stability coefficient of the bed surface is 0.047, which is obtained by taking the value based on the startup phase of the Shields curve. The density of the sediment particles is taken as 2650 kg per cubic meter; The density of the water body; The acceleration due to gravity is taken as 9.81 meters per second squared. The reference value for the internal friction angle of the bottom mud is 32 degrees, which is obtained by measuring it through a direct shear test. This is a correction term for the gradation unevenness coefficient, reflecting the concealing effect of coarse particles on fine particles; To prevent collapse, a minimum constant is used.
[0087] It should be noted that by substituting the environmentally corrected particle size data into the critical initiation stress calculation formula, the seasonal dynamic overwrite of the sediment shear strength was achieved, enabling... Instead of a static, unchanging value, it uses a dynamic scour resistance threshold that fluctuates with water temperature and moisture content. This completely solves the shortcomings of existing systems that use fixed thresholds, leading to underestimation of scour risk during high-water-temperature periods and overestimation of risk during low-water-temperature periods. This ensures adaptive matching of risk assessment with the natural environment. For example, when summer water temperatures rise... When the equivalent reduction is achieved, the calculated result is... Consequently, the risk warning is more easily triggered as the angle decreases. In another embodiment of this application, the correction term for the internal friction angle of the sediment can be replaced with a logarithmic function. To adapt to bottom mud environments with extremely high sand content.
[0088] Step S4.6: Based on the incremental shear force on the bottom sediment surface at the non-dredging grid location and the critical starting stress of the bottom sediment at the non-dredging grid location, perform a difference comparison operation between the two to obtain the overflow amount of scour risk at the non-dredging grid location and generate a bottom sediment scour risk trigger signal.
[0089] It is important to emphasize that simple stress calculations cannot directly guide engineering decisions. The stress must be compared with the shear strength of the sediment itself to quantify the degree of risk spillover.
[0090] In this application, the amount of scour risk spillover is defined. Based on the increase in surface shear force of bottom sediment at non-dredging grid locations. Seasonally Adaptive Sediment Critical Starting Stress Perform a difference comparison operation on the two to obtain the scour risk overflow amount at non-dredging operation grid locations. This can be obtained through the following specific calculation method: In the formula, The amount of risk spillover is measured in Pascals. In this application, it means the portion of the shear force on the sediment in the upstream non-dredging area that exceeds its shear strength. A positive value indicates that the sediment has become unstable and suspended, while a zero value indicates safety. It is a function that maximizes the value if and only if At that time, a risk trigger signal for bottom sediment erosion is generated. ,otherwise .
[0091] It should be noted that this step involves a closed-loop comparison of complex dynamic calculations and soil mechanical properties, achieving for the first time a quantitative prediction of the scouring and suspension of heavy metal sediments in the upstream riverbed caused by deep dredging of the main channel. It directly reveals the critical conditions under which the local optimal strategy is transformed into a global ecological damage cause, providing clear triggering instructions and quantitative adjustment basis for performing dimensionality reduction adjustments. This eliminates the fatal flaw of the original system that only focuses on the local dredging progress while ignoring the global ecological damage.
[0092] For example, a certain grid It is 5.2 Pascals. If it is 3.1 Pascals, then A risk signal is triggered at a value of 2.1 Pascals. In another embodiment of this application, the risk signal generation condition can be supplemented with a time accumulation constraint, i.e., when... It is triggered only when the duration exceeds 24 hours, and the method of obtaining it is based on the statistical settings of the propagation time of the upstream flood peak to filter out instantaneous fluctuation interference.
[0093] Step S5: In response to the risk trigger signal of sediment scour, the initial dredging grid location information is adjusted by dimensionality reduction based on the increase of shear force on the sediment surface at non-dredging grid locations to obtain a corrected ecological dredging strategy.
[0094] In a preferred embodiment, the step of adjusting the initial dredging grid location information based on the incremental shear force on the sediment surface at non-dredging grid locations to obtain a corrected ecological dredging strategy includes: Step S5.1: In response to the dimension reduction adjustment execution signal, obtain the original excavation depth data and the original dredging boundary contour data of the initial dredging operation grid position.
[0095] Step S5.2: Based on the scour risk overflow amount at the non-dredging operation grid location and the original excavation depth data at the initial dredging operation grid location, perform a dimensionality reduction operation along the vertical direction on the original excavation depth data at the initial dredging operation grid location to obtain the dimensionality-reduced excavation depth data.
[0096] It should be noted that the root cause of the scouring force lies in the excessive depth of the downstream dredging pit, leading to a large potential energy difference. Therefore, reducing the depth is the most direct way to weaken the scouring force. In response to the dimensionality reduction adjustment execution signal, the original excavation depth data of the initial dredging operation grid position is retrieved. Simultaneously, extract the original dredging boundary contour data. It consists of the coordinates of a series of polygon vertices.
[0097] Furthermore, the spillover of scour risk based on non-dredging operation grid locations. With the original excavation depth Define a dimensionality reduction step size function to perform a vertical dimensionality reduction operation on the original excavation depth data at the initial dredging grid location, and obtain the dimensionality-reduced excavation depth data. The calculation formula is: ; In the formula, The data represents the depth of the data after dimensionality reduction; the four branch conditions are defined based on the proportion of the overflow of scour risk to the critical starting stress, which in this application means that the greater the risk, the greater the depth reduction; the boundary values belong to the left open interval and the right closed interval.
[0098] It should be noted that this piecewise function has step size jumps at the boundaries, which is a step-by-step penalty mechanism designed to quickly converge to a safe depth. For example, when It is 2.1 Pascals. With a depth of 3.1 Pascals and a ratio of approximately 0.68, falling into the third branch results in a 50% reduction in depth. This dimensionality reduction operation directly reduces the degree of local topographic heterogeneity caused by the deep pit, thereby proportionally weakening the increase in bottom flow velocity and the scouring force from the source. This ensures that the impact of dredging operations on the upstream is controlled within the allowable range of the bottom sediment shear strength, effectively preventing the suspension of upstream heavy metal bottom sediment.
[0099] Furthermore, when the depth after cutting When the operating depth is less than 0.5 meters, the method of obtaining the water depth is calculated based on the minimum draft of the dredger and the bucket capacity, and then the dredging is forcibly... The depth is set at 0.5 meters to ensure the operability of the dredging equipment.
[0100] Step S5.3: Based on the reduced dimensionality excavation depth data, reconstruct the original dredging boundary contour data of the initial dredging operation grid position by shrinking it inward, and obtain a preliminary set of corrected dredging operation parameters.
[0101] The specific shrinkage process involves removing each grid point whose reduced depth is less than the minimum working depth from the initial dredging operation range, then refitting along the outer edge of the remaining working grid to generate a smooth closed contour, thereby correcting the boundary dimensions of the dredging range. Finally, the adjusted excavation depth and the reconstructed boundary contour are integrated to obtain a preliminary set of corrected dredging operation parameters.
[0102] In a preferred embodiment, after obtaining the preliminary modified dredging operation parameter set, the method further includes: S5.31, In response to the strategy iteration confirmation signal, perform back-substitution calculation on the preliminary modified dredging operation parameter set to obtain the updated topographic elevation heterogeneity difference and the updated bottom sediment surface shear force increment at the non-dredging operation grid locations; S5.32, Based on the updated bottom sediment surface shear force increment and the bottom sediment critical initiation stress at the non-dredging operation grid locations, perform a secondary discrimination operation on the scour risk overflow amount to obtain the secondary discrimination result.
[0103] Before executing this step set, a preliminary set of corrected dredging operation parameters (including the excavation depth after dimensionality reduction) has been obtained. With the contracted boundary It is necessary to verify whether this parameter set can truly eliminate the risk of instability in upstream sediment, and it is in a closed-loop parameter verification state.
[0104] It should be noted that, to address potential incompleteness in dimensionality reduction adjustments, the global impact of the corrected parameters must be recalculated. In response to the strategy iteration confirmation signal, the mined depth data after dimensionality reduction is... With contraction boundary As new input, these values are substituted back into the calculation logic of steps S2.3 and S4.3 to re-execute terrain reconstruction and flow field force mapping, obtaining the updated terrain elevation heterogeneity difference values for non-dredging operation grid locations. With the increase of surface shear force of updated sediment .
[0105] Furthermore, based on the updated sediment surface shear force increment Critical starting stress of bottom sediment Calculate and update the overflow of scour risk. This is used to perform a secondary judgment on the overflow of scouring risk, and obtain the secondary judgment result. :like ,but This signifies the elimination of risk; like ,but This means that risks still exist.
[0106] By using back-substitution and secondary discrimination, a closed-loop feedback mechanism for parameter adjustment and risk verification was constructed, ensuring the absolute reliability of the dimensionality reduction adjustment operation. This eliminated the risk of upstream heavy metal sediments still facing scouring and suspension due to blindly outputting strategies when a single adjustment fails to meet the standards, and completely eliminated the hidden danger of local dredging strategies causing global ecological damage.
[0107] It is understandable that, in multi-grid collaborative deep excavation scenarios, the scouring and pulling forces from multiple deep pits can have a cumulative effect at a certain upstream node. A single dimensionality reduction adjustment may not be able to eliminate all the cumulative risks simultaneously. Therefore, this application considers the secondary discrimination result... At that time, if This triggers a global forced dimensionality reduction, further reducing the depth of all dredging meshes by 20%; if Then, only the three dredging grids closest to the risk node will be subject to boundary reshuffling, with a shrinkage distance set to 1 meter. This distance is determined based on the operating radius of the dredging suction head, until... Alternatively, the maximum number of iterations can be reached, which is determined by a trade-off between the upper limit of computing power and real-time requirements. In another embodiment of this application, the maximum number of iterations can be dynamically set according to the reservoir size, and the calculation formula is as follows: Round up.
[0108] Step S5.33: Based on the state that the incremental change in shear force on the surface of the bottom sediment at the non-dredging operation grid location is less than the critical starting stress of the bottom sediment at the non-dredging operation grid location, the state locking operation is performed on the preliminary modified dredging operation parameter set to obtain and confirm the modified ecological dredging strategy.
[0109] It should be noted that after completing the secondary discrimination, the system will compare key parameters of all grid locations identified as non-dredging operations in the discrimination results. For these non-dredging grids, the system will extract the calculated value of the incremental shear force on the sediment surface under the action of the initially corrected set of dredging operation parameters. This calculated value is the dynamic shear force change of the sediment in the surrounding undredged area caused by the dredging construction disturbance, which is based on the hydraulic model simulation.
[0110] At the same time, the critical initiation stress data of the bottom sediment corresponding to these non-dredging grid locations were retrieved. This data was obtained through previous bottom sediment sampling experiments and indoor geotechnical tests, reflecting the minimum shear force threshold at which bottom sediment particles in this area begin to undergo suspension motion.
[0111] By comparing the calculated shear force increment of each non-dredging grid with the corresponding critical starting stress value one by one, if all non-dredging grids meet the condition of "shear force increment < critical starting stress", it indicates that the preliminarily corrected dredging operation parameters will not cause disturbances to the bottom sediment in the non-dredging area that exceed its tolerance during implementation, and will not cause secondary suspension pollution of bottom sediment in non-target areas.
[0112] At this point, the system triggers a state locking mechanism to solidify all parameters in the preliminary modified dredging operation parameter set (including dredging equipment type, operating depth, travel speed, suction flow rate, construction sequence, etc.), prohibiting any unauthorized parameter modification. The final parameter combination generated after parameter locking serves as the confirmed modified ecological dredging strategy. This strategy ensures that the dredging operation objectives are achieved while protecting the surrounding ecological environment, providing precise technical basis for the formulation of subsequent construction plans.
[0113] In a preferred embodiment, after obtaining confirmation and revising the ecological dredging strategy, the method further includes: Step S5.331: In response to the timing arrangement trigger signal, acquire the spatial location interval data and local flow field recovery time data of adjacent dredging operation grids in the confirmed and corrected ecological dredging strategy.
[0114] Step S5.332: Based on the spatial location interval data and local flow field recovery time data of adjacent dredging operation grids in the confirmed and corrected ecological dredging strategy, perform a directed graph topology sorting operation on multiple dredging operation grids in the confirmed and corrected ecological dredging strategy to obtain the operation grid topology sorting result.
[0115] Step S5.333: Based on the topology sorting results of the work grid, perform time-staggered arrangement operations on multiple dredging work grids in the confirmed and corrected ecological dredging strategy to obtain the time-staggered ecological dredging work sequence.
[0116] It should be noted that if spatially dispersed dredging grids operate simultaneously, the resulting upstream scouring and pulling forces will converge and superimpose, causing the downstream sediment to experience several times the shear force. Therefore, the operations must be staggered in time. In response to the temporal arrangement trigger signal, spatial location interval data of adjacent dredging operation grids in the ecological dredging strategy are obtained and confirmed through GIS spatial analysis. Local flow field recovery time data are obtained using empirical formulas for flow field relaxation time. The unit is hours, and the calculation formula is: ,in The length of the reservoir's backwater. This represents the average water depth.
[0117] Furthermore, based on the spatial location interval data of adjacent dredging operation grids and the local flow field recovery time data, a directed graph topology sorting operation was performed on multiple dredging operation grids in the confirmed and revised ecological dredging strategy to obtain... Figure 5 (a) The directed topological graph of the dredging grid spatial interference is defined as follows: the operation node graph is defined. Node set For dredging grids, edge assembly The construction rule is: if the spatial interval between two grids is... Then a directed edge is established. The weight of the edge is , For a safe interference distance, a value of 50 meters was used, which was obtained by statistical analysis based on the attenuation radius of the flow field disturbance.
[0118] Furthermore, after constructing the node graph for the dredging operation, the Kahn algorithm is used to perform topological sorting on the resulting directed graph.
[0119] The first step is to calculate the in-degree of each dredging operation grid node. The in-degree represents how many other dredging grids will cause flow field interference constraints to the current grid.
[0120] The second step is to add all job grids with an in-degree of zero to the processing queue. An in-degree of zero means that no other grid will interfere with the flow field of that grid, and that grid can be prioritized for dredging operations.
[0121] The third step involves retrieving a job grid from the queue and recording it in the job sorting results. Next, all outgoing connections of that grid are examined; for each job grid it points to, the corresponding interference count is reduced by one. If the interference count of a pointed-to job grid becomes zero after the reduction, that job grid is added to the processing queue.
[0122] The fourth step involves repeatedly retrieving grids, updating interference counts, and adding new grids to the queue until there are no more grids to be processed in the queue, thus obtaining the topological sorting result of all job grids.
[0123] After the above topology sorting process, the spatial flow field interference relationship between the original grids is transformed into the temporal constraint of job execution. Job grids that are too close in space and whose flow fields will interfere with each other will not be scheduled in the same batch of jobs due to the directional relationship of the graph, and will be forcibly assigned to different job time periods.
[0124] The sorted output sequence provides complete spatial constraints, which can be used to stagger the timing of dredging operations, avoid excavating multiple grids at the same time, and prevent the shear forces of the flow field caused by excavation from being superimposed and amplified.
[0125] It is important to note that if some job grids are not included in the sorting results after processing, it indicates that there are interfering closed loops between the job grids, requiring subsequent merging of these closed loops. The sorting results obtained here only represent the order of job operations; the actual start time for each grid needs to be calculated by combining this with the time required for flow field recovery.
[0126] This sorting operation transforms spatial interference into temporal constraints, ensuring that work grids that are too close in space and have strong flow field interference are forcibly assigned to different time batches. This provides a strict spatial constraint sequence for time-staggered arrangement, fundamentally avoiding the risk of a surge in shear force caused by simultaneous excavation at multiple points.
[0127] In another preferred embodiment, when a directed cycle exists in the work node graph, the dredging work grid nodes constituting the directed cycle are merged into a single synchronous work area, and the dredging work grids in the synchronous work area undergo dimensionality reduction adjustment of their excavation depth. For multiple dredging work grids in the synchronous work area, flow field response redistribution calculations and sediment force mapping calculations are performed according to the dimensionality-reduced dredging work parameters to obtain the sediment surface shear force increment under synchronous work conditions. The sediment surface shear force increment is compared with the corresponding sediment critical initiation stress. When the sediment surface shear force increment is not less than the corresponding sediment critical initiation stress, the excavation depth of the dredging work grids in the synchronous work area is further reduced, and the flow field response redistribution calculation and sediment force mapping calculation are re-performed until the sediment surface shear force increment is less than the corresponding sediment critical initiation stress. When the synchronous work area satisfies the condition that the sediment surface shear force increment is less than the corresponding sediment critical initiation stress, the synchronous work area is used as a work node to replace the multiple dredging work grid nodes constituting the directed cycle, and the updated work node graph is re-performed with a topology sorting operation.
[0128] It should be noted that topological sorting only provides the sequential constraints, and these constraints still need to be mapped to specific job timelines.
[0129] In a preferred implementation, a time allocation matrix is defined based on the job grid topology sorting result. The unit is hours. To obtain a staggered ecological dredging operation sequence, multiple dredging operation grids in the confirmed and revised ecological dredging strategy are arranged according to their time order. This can be achieved as follows: Assign a start time to each operation grid in reverse topological sorting order, and for the grid at the beginning of the sequence... ,set up For any subsequent grid Its start time ,in For all pointers The predecessor node, For the local flow field recovery time, The hourly interval is a safety margin, which is obtained by statistically analyzing the time it takes for the positioning cable of the dredger to be deployed and retracted.
[0130] It should be noted that by staggering the operation schedule, the dredging operations that may cause flow field interference in space are spaced apart on the time axis. This ensures that after the previous deep pit is excavated, the flow field has enough time to redistribute and dissipate energy before the next deep pit is excavated. This completely avoids the surge in backflow scouring and pulling forces caused by the superposition of multiple excavations, eliminates the time-series risk of local dredging strategies turning into global ecological damage causes, and ultimately generates a time-staggered ecological dredging operation sequence that takes into account both dredging efficiency and ecological safety.
[0131] For example, if mesh A interferes with mesh B, and the completion time of A is 10 hours and the recovery time is 6 hours, then the start time of B is locked at 16.5 hours.
[0132] In another implementation, the topological sorting results can be input into a genetic algorithm, for example, using the shortest total construction period as the fitness function and the flow field recovery time as a hard constraint, to solve for the optimal time misalignment sequence.
[0133] like Figures 3 to 5 As shown, this application provides a full-link data verification chain for a reservoir ecological dredging strategy generation method, rigorously verifying the complete logical closed loop from spatial risk extrapolation and parameter adaptive correction to global temporal optimization. Figure 3 As shown in (a)-(c), the spatial cascading effect caused by localized deep excavation was quantified using three-dimensional curved surfaces and contour heatmaps. The data indicates that the downstream deep pit leads to significant topographic elevation heterogeneity differences and upstream backflow pull peaks in the upstream non-dredging area, causing the shear force increment on the bottom sediment surface to exceed the critical threshold. This accurately locates the high-risk instability region and verifies the physical authenticity of the flow field response redistribution calculation in this application. To address this risk, as... Figure 4 As shown in (a), a seasonally adaptive three-dimensional response surface for the critical initiation stress was constructed by combining water temperature and water content, realizing the dynamic overwriting of shear strength; Figure 4 The dual Y-axis convergence curve in (b) further demonstrates that the system performs a step-wise dimensionality reduction based on the proportion of risk spillover. After three iterations of back-substitution, the risk spillover strictly converges from 2.4 Pa to the 0 Pa safety threshold, proving the absolute reliability of the parameter correction closed loop. Based on this, as... Figure 5 As shown in (a), the system extracts the spatial interference directed topology between multiple grids and transforms the flow field recovery time into a temporal hard constraint; Figure 5 The Gantt chart data in (b) strictly follows the staggered arrangement rule of "precursor node completion time + flow field recovery time + safety margin" (e.g., G5 is forcibly locked to start 13.5 hours after the flow field recovery of G2), completely avoiding the risk of a surge in shear force caused by simultaneous excavation at multiple points. The three sets of data are progressively layered, which not only conforms to the actual hydrodynamic and soil mechanics physical rules, but also demonstrates the huge computational workload and significant beneficial effects of this application in solving the problem of the lack of prediction of global ecological damage caused by local dredging.
[0134] This embodiment also provides a reservoir ecological dredging strategy generation system, including: a terrain reconstruction calculation and acquisition module, a bottom flow velocity increment acquisition module, a bottom sediment surface shear force increment acquisition module, and a modified ecological dredging strategy acquisition module; The terrain reconstruction calculation and acquisition module is used to respond to the reservoir ecological dredging strategy generation command, acquire the bottom gridded terrain elevation data of the reservoir and the initial dredging operation grid location information; based on the bottom gridded terrain elevation data of the reservoir and the initial dredging operation grid location information, perform terrain reconstruction calculation on the area corresponding to the initial dredging operation grid location information, and obtain the terrain elevation heterogeneity difference value of non-dredging operation grid location. The bottom velocity increment acquisition module is used to perform flow field response redistribution calculation on the water flow vector distribution at the non-dredging operation grid location based on the topographic elevation heterogeneity difference at the non-dredging operation grid location, and to obtain the bottom velocity increment at the non-dredging operation grid location. The bottom sediment surface shear force increment acquisition module is used to perform bottom sediment force mapping calculation on the bottom sediment at the non-dredging operation grid location based on the bottom flow velocity increment at the non-dredging operation grid location, and obtain the bottom sediment surface shear force increment at the non-dredging operation grid location. The modified ecological dredging strategy acquisition module is used to respond to the bottom sediment scour risk trigger signal. It performs dimensionality reduction adjustment on the initial dredging operation grid position information based on the incremental shear force on the bottom sediment surface at non-dredging operation grid positions to obtain the modified ecological dredging strategy.
[0135] The above-mentioned unit modules can be embedded in the processor of the electronic device in hardware form or independent of it, or they can be stored in the memory of the electronic device in software form, so that the processor can call and execute the corresponding operations of the above modules.
[0136] The technical features of the above embodiments can be combined in any way. For the sake of brevity, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this application.
[0137] The embodiments described above are merely illustrative of several implementation methods of this application, and while the descriptions are specific and detailed, they should not be construed as limiting the scope of this patent application. It should be noted that those skilled in the art can make various modifications and improvements without departing from the concept of this application, and these all fall within the protection scope of this application. Therefore, the protection scope of this application should be determined by the appended claims.
Claims
1. A reservoir ecological dredging strategy generation method, characterized in that, include: In response to the command to generate a reservoir ecological dredging strategy, the underlying gridded topographic elevation data of the reservoir and the location information of the initial dredging operation grid are obtained. Based on the gridded topographic elevation data of the reservoir bottom layer and the location information of the initial dredging operation grid, the topographic reconstruction calculation is performed on the area corresponding to the location information of the initial dredging operation grid to obtain the topographic elevation heterogeneity difference of the non-dredging operation grid location. Based on the topographic elevation heterogeneity difference at the non-dredging grid location, the flow field response redistribution calculation is performed on the water flow vector distribution at the non-dredging grid location to obtain the bottom velocity increment at the non-dredging grid location. Based on the bottom velocity increment at the non-dredging operation grid location, the bottom sediment force mapping calculation is performed at the non-dredging operation grid location to obtain the bottom sediment surface shear force increment at the non-dredging operation grid location. In response to the risk trigger signal of sediment scour, the initial dredging grid location information is adjusted by dimensionality reduction based on the increase of shear force on the sediment surface at non-dredging grid locations to obtain a corrected ecological dredging strategy; Among them, the generation of sediment erosion risk trigger signals includes: In response to the stress threshold calibration trigger signal, acquire the particle size distribution data and sediment moisture content data of the bottom sediment components at non-dredging operation grid locations; Based on the particle size distribution data and moisture content data of the sediment composition at the non-dredging grid location, the shear strength of the sediment at the non-dredging grid location is dynamically calibrated to obtain the critical starting stress of the sediment at the non-dredging grid location. Based on the incremental shear force on the bottom sediment surface at the non-dredging grid location and the critical initiation stress of the bottom sediment at the non-dredging grid location, a difference comparison operation is performed between the two to obtain the overflow amount of scour risk at the non-dredging grid location and generate a bottom sediment scour risk trigger signal. The step of adjusting the initial dredging grid location information based on the incremental shear force on the sediment surface at non-dredging grid locations to obtain a corrected ecological dredging strategy includes: In response to the dimension reduction adjustment execution signal, the original excavation depth data and the original dredging boundary contour data of the initial dredging operation grid position are obtained; Based on the overflow of scour risk at non-dredging grid locations and the original excavation depth data at the initial dredging grid locations, a dimensionality reduction operation is performed along the vertical direction on the original excavation depth data at the initial dredging grid locations to obtain the dimensionality-reduced excavation depth data. Based on the reduced dimensionality of the excavation depth data, the original dredging boundary contour data of the initial dredging operation grid position is reconstructed by shrinking inward to obtain a preliminary set of corrected dredging operation parameters. After obtaining the preliminary set of corrected dredging operation parameters, the process also includes: In response to the strategy iteration confirmation signal, a back-substitution calculation operation is performed on the preliminary revised dredging operation parameter set to obtain the updated topographic elevation heterogeneity difference and the updated bottom sediment surface shear force increment at non-dredging operation grid locations. Based on the updated sediment surface shear force increment at non-dredging grid locations and the critical initiation stress of sediment at non-dredging grid locations, a secondary judgment operation is performed on the overflow amount of scour risk to obtain the secondary judgment result; Based on the state that the incremental shear force on the surface of the bottom sediment at the non-dredging grid location is less than the critical starting stress of the bottom sediment at the non-dredging grid location, the state locking operation is performed on the preliminary modified dredging operation parameter set to obtain and confirm the modified ecological dredging strategy.
2. The method as described in claim 1, characterized in that: The step of performing terrain reconstruction calculations on the area corresponding to the initial dredging operation grid location information to obtain the terrain elevation heterogeneity difference values for non-dredging operation grid locations includes: In response to the terrain topology construction trigger signal, the water flow connectivity direction attribute of multiple adjacent grid nodes at the bottom layer of the reservoir and the historical siltation thickness distribution data of adjacent grid nodes are obtained. Based on the water flow connectivity direction attributes of multiple adjacent grid nodes at the bottom layer of the reservoir and the historical sedimentation thickness distribution data of the adjacent grid nodes, directed edge assignment and node state initialization operations are performed on multiple adjacent grid nodes at the bottom layer of the reservoir to obtain the data space topology map of the bottom layer of the reservoir. Based on the spatial topology map of the reservoir's bottom layer data and the initial dredging operation grid location information, the spatial difference extraction operation along the water flow direction is performed on the topographic elevation data of adjacent grid nodes to obtain the heterogeneous difference in topographic elevation at non-dredging operation grid locations.
3. The method as described in claim 2, characterized in that: The flow field response redistribution calculation for the water flow vector distribution at non-dredging grid locations, to obtain the bottom layer velocity increment at non-dredging grid locations, includes: In response to the flow field redistribution trigger signal, the flow resistance coefficient and water flow boundary constraint parameters between each grid node in the bottom layer of the reservoir are obtained; Based on the flow resistance coefficients between the grid nodes at the bottom of the reservoir, the boundary constraint parameters of the water flow, and the topological map of the data space at the bottom of the reservoir, a flow field vector matrix construction operation is performed on each grid node at the bottom of the reservoir to obtain the flow field response distribution matrix. Based on the heterogeneous difference between the flow field response distribution matrix and the terrain elevation at the non-dredging grid location, the original velocity vector at the non-dredging grid location is superimposed along the tangential direction of the water flow to obtain the bottom velocity increment at the non-dredging grid location.
4. The method as described in claim 1, characterized in that: The method of calculating the sediment force mapping at non-dredging grid locations based on the bottom flow velocity increment to obtain the sediment surface shear force increment at these locations includes: In response to the force mapping trigger signal, the surface roughness characteristics of the bottom sediment and the interstitial water pressure data of the bottom sediment surface are obtained at the non-dredging operation grid location; Based on the surface roughness characteristics of the sediment at the non-dredging grid location, the interstitial water pressure data of the sediment surface layer, and the bottom velocity increment at the non-dredging grid location, the shear stress of the near-wall region at the non-dredging grid location is integrally solved along the water depth direction to obtain the integral result of the shear stress of the near-wall region. Based on the integral results of the water flow shear stress in the near-wall area, a mechanical equivalent conversion operation is performed on the stress state of the bottom sediment adhesion at the non-dredging grid location to obtain the incremental shear force on the bottom sediment surface at the non-dredging grid location.
5. The method as described in claim 4, characterized in that: After obtaining confirmation and revising the ecological dredging strategy, the process also includes: In response to the timing arrangement trigger signal, acquire and confirm the spatial location interval data of adjacent dredging operation grids and the local flow field recovery time data in the ecological dredging strategy; Based on the spatial location interval data and local flow field recovery time data of adjacent dredging operation grids in the confirmed and corrected ecological dredging strategy, a directed graph topology sorting operation is performed on multiple dredging operation grids in the confirmed and corrected ecological dredging strategy to obtain the operation grid topology sorting results. Based on the topology sorting results of the work grid, the time sequence of multiple dredging work grids in the confirmed and modified ecological dredging strategy is staggered to obtain the time-staggered ecological dredging work sequence.
6. The method as described in claim 5, characterized in that: The shear strength of the sediment at non-dredging grid locations is dynamically calibrated based on the particle size distribution and moisture content data of the sediment components. This process yields the critical initiation stress of the sediment at these locations, including: In response to seasonal environmental change monitoring signals, data on the temperature and viscosity coefficient of the bottom water in the reservoir are obtained. Based on the water temperature and viscosity coefficient data of the bottom water of the reservoir, environmental parameter correction operations were performed on the particle size distribution data of bottom sediment components in non-dredging grid locations to obtain the corrected particle size distribution data of bottom sediment components. Based on the corrected particle size distribution data of the sediment components, a seasonal dynamic overwrite operation is performed on the critical initiation stress of the sediment at non-dredging grid locations to obtain the seasonally adaptive critical initiation stress of the sediment.
7. A reservoir ecological dredging strategy generation system, employing the reservoir ecological dredging strategy generation method as described in any one of claims 1 to 6, characterized in that, include: Topography reconstruction calculation acquisition module, bottom velocity increment acquisition module, sediment surface shear force increment acquisition module, and modified ecological dredging strategy acquisition module; The terrain reconstruction calculation and acquisition module is used to respond to the reservoir ecological dredging strategy generation command, acquire the bottom gridded terrain elevation data of the reservoir and the initial dredging operation grid location information; based on the bottom gridded terrain elevation data of the reservoir and the initial dredging operation grid location information, perform terrain reconstruction calculation on the area corresponding to the initial dredging operation grid location information, and obtain the terrain elevation heterogeneity difference value of non-dredging operation grid location. The bottom velocity increment acquisition module is used to perform flow field response redistribution calculation on the water flow vector distribution at the non-dredging operation grid location based on the topographic elevation heterogeneity difference at the non-dredging operation grid location, and to obtain the bottom velocity increment at the non-dredging operation grid location. The bottom sediment surface shear force increment acquisition module is used to perform bottom sediment force mapping calculation on the bottom sediment at the non-dredging operation grid location based on the bottom flow velocity increment at the non-dredging operation grid location, and obtain the bottom sediment surface shear force increment at the non-dredging operation grid location. The modified ecological dredging strategy acquisition module is used to respond to the bottom sediment scour risk trigger signal, and adjust the initial dredging operation grid position information according to the bottom sediment surface shear force increment at non-dredging operation grid positions to obtain the modified ecological dredging strategy. Among them, the generation of sediment erosion risk trigger signals includes: In response to the stress threshold calibration trigger signal, acquire the particle size distribution data and sediment moisture content data of the bottom sediment components at non-dredging operation grid locations; Based on the particle size distribution data and moisture content data of the sediment composition at the non-dredging grid location, the shear strength of the sediment at the non-dredging grid location is dynamically calibrated to obtain the critical starting stress of the sediment at the non-dredging grid location. Based on the incremental shear force on the bottom sediment surface at the non-dredging grid location and the critical initiation stress of the bottom sediment at the non-dredging grid location, a difference comparison operation is performed between the two to obtain the overflow amount of scour risk at the non-dredging grid location and generate a bottom sediment scour risk trigger signal. The step of adjusting the initial dredging grid location information based on the incremental shear force on the sediment surface at non-dredging grid locations to obtain a corrected ecological dredging strategy includes: In response to the dimension reduction adjustment execution signal, the original excavation depth data and the original dredging boundary contour data of the initial dredging operation grid position are obtained; Based on the overflow of scour risk at non-dredging grid locations and the original excavation depth data at the initial dredging grid locations, a dimensionality reduction operation is performed along the vertical direction on the original excavation depth data at the initial dredging grid locations to obtain the dimensionality-reduced excavation depth data. Based on the reduced dimensionality of the excavation depth data, the original dredging boundary contour data of the initial dredging operation grid position is reconstructed by shrinking inward to obtain a preliminary set of corrected dredging operation parameters. After obtaining the preliminary set of corrected dredging operation parameters, the process also includes: In response to the strategy iteration confirmation signal, a back-substitution calculation operation is performed on the preliminary revised dredging operation parameter set to obtain the updated topographic elevation heterogeneity difference and the updated bottom sediment surface shear force increment at non-dredging operation grid locations. Based on the updated sediment surface shear force increment at non-dredging grid locations and the critical initiation stress of sediment at non-dredging grid locations, a secondary judgment operation is performed on the overflow amount of scour risk to obtain the secondary judgment result; Based on the state that the incremental shear force on the surface of the bottom sediment at the non-dredging grid location is less than the critical starting stress of the bottom sediment at the non-dredging grid location, the state locking operation is performed on the preliminary modified dredging operation parameter set to obtain and confirm the modified ecological dredging strategy.
Citation Information
Patent Citations
Integrated ecological desilting design method for large and medium-sized reservoirs
CN106638456A
Bottom mud ecological dredging device for river and lake ecological restoration engineering and using method thereof
CN120401407A