A rail replacement vehicle for rail repair and its operating method
By designing a rail replacement vehicle for rail repair, the problems of high cost of hoisting long rails and poor adaptability to welding conditions of existing equipment have been solved. This has enabled efficient rail welding and replacement operations, adapting to more working conditions and reducing equipment costs and safety risks.
Patent Information
- Application Number
- CN202611474058.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-21
- Publication Date
- 2026-11-10
AI Technical Summary
Existing rail maintenance equipment suffers from drawbacks such as the large length of rails that can be lifted by gantry cranes, high costs, poor adaptability to welding conditions, and inability to meet the tight track maintenance windows of high-speed railway lines.
Design a rail replacement vehicle group for rail repair, including a tractor, a rail transport vehicle, a rail welding vehicle, and a rail unloading vehicle to form a work group. The rail welding vehicle and the rail transport vehicle have dual transport stations, and the two stations can alternately perform rail welding and weld treatment. The hoisting device can perform rail welding operations both online and offline. The auxiliary work trolley performs rail unloading, rail replacement, and rail collection auxiliary operations. The group has a high degree of integration and automation.
It improves welding efficiency, reduces the amount of equipment required, adapts to more working conditions, meets the needs of integrated rail welding, replacement and collection operations, and reduces labor intensity and safety risks.
Smart Images

Figure CN123064069A_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of rail maintenance technology, specifically to a rail replacement vehicle for rail repair and its operating method. Background Technology
[0002] Steel rails are a crucial component of the track structure, serving to guide wheels, support, and transmit loads. Seamless track is a long rail line formed by welding standard-length steel rails together. By eliminating numerous joints, seamless track improves ride smoothness and comfort, extends the lifespan of locomotives, rolling stock, and tracks, and reduces maintenance workload. When steel rails reach the end of their service life, they must be replaced to ensure the continued operation of locomotives and rolling stock.
[0003] The existing equipment that uses the method of unloading and welding simultaneously is mainly used for overhaul trains. The steel rails are welded in advance outside the maintenance window, and the welded long steel rails are hoisted onto the transport train by gantry crane. The complete set of equipment for overhaul trains is relatively long, which makes management difficult, requires a large number of personnel, and has a high cost. At the same time, it has high requirements for maintenance windows and is not suitable for busy lines.
[0004] Meanwhile, some equipment uses a method of unloading and welding simultaneously, or unloading first and then welding, or a combination of unloading and welding simultaneously and unloading first and then welding. This type of equipment does not have a long overhaul train length, and the number of personnel required at one time is reduced, and the management difficulty is reduced, but there is a certain shortage of personnel. After using vehicle-mounted welding to weld short rails into long rails, it is impossible to treat the weld seam after the rail joint welding. At the same time, the vehicle-mounted rail welding vehicle can only meet the welding mode on the vehicle, and the adaptability of welding conditions is poor.
[0005] The information disclosed in the background section is only intended to enhance the understanding of the background of this application, and therefore may contain information that is not part of the prior art known to those skilled in the art. Summary of the Invention
[0006] This application provides a rail replacement vehicle for rail repair, which solves the problems of existing vehicles using gantry cranes to lift long rails, which are characterized by large lengths, high costs, poor adaptability to welding conditions, and inability to meet the tight track maintenance windows of high-speed railway lines.
[0007] To achieve the above objectives, this application provides the following technical solution: A rail replacement vehicle group for rail repair includes a tractor, a rail transport vehicle, a rail welding vehicle and a rail unloading vehicle arranged longitudinally. The tractor is used to drive the work vehicle group to move longitudinally along the track. The rail transport vehicle is used to store and transport steel rails; The rail welding vehicle includes a rail welding vehicle body, which has a first rail conveying station welding device, a hoisting device, and a first weld treatment device. The first rail conveying station is located on both sides of the rail welding vehicle body and is used to carry out longitudinal conveying operations on the rails to be worked on. The hoisting device is used to hoist the welding device to carry out rail welding operations on the vehicle, on the line, and below the line. The rail unloading vehicle includes a rail unloading vehicle body, which has a second rail conveying station, a second weld treatment device, and several auxiliary operation trolleys. The second rail conveying station is located on both sides of the rail unloading vehicle body and is used to perform longitudinal conveying operations on the rails to be worked on. The second weld treatment device is located at one end of the rail welding vehicle. The auxiliary operation trolleys cooperate with the rail replacement operation group for rail repair to perform rail unloading, rail replacement, and rail collection operations.
[0008] This application also provides an operation method for a rail repair and rail replacement vehicle group based on any of the above embodiments, the method comprising: The tractor unit drives the train set along the track to the work area, and the rail unloading vehicle unloads the auxiliary work trolleys to the work positions on the track. Adjust the lateral and vertical positions of the rail guide wheel sets of each auxiliary operation trolley on the auxiliary operation trolley frame according to the single-sided or double-sided rail unloading method. The rail conveying station of the rail welding car and the rail unloading car sequentially conveys the first rail to be worked along the longitudinal direction, so that the first rail to be worked enters the rail guide wheel group of each of the auxiliary working trolleys in sequence, and continues to convey so that one end of the first rail to be worked falls to the ground and is fixed in a preset position. The tractor or rail welding vehicle drives the train set forward longitudinally to the end of the first rail to be worked, arrives at the welding station of the rail welding vehicle and stops. The rail welding vehicle transports the second rail to be worked to the welding station and welds the first rail and the second rail to be worked together. Repeat the alternating train running and welding processes until the entire rail to be worked is detached from the auxiliary work trolley and the rail is unloaded to the designated side of the track.
[0009] Compared with the prior art, the rail replacement vehicle and operation method for rail repair provided in this application have the following technical advantages: In this application, a tractor, rail transport vehicle, rail welding vehicle, and rail unloading vehicle form a work train. Both the rail welding vehicle and the rail transport vehicle have dual conveying stations, which can alternately perform rail welding and weld treatment to weld short rails into long rails. At the same time, before unloading, the long rails can be further welded by the rail welding vehicle, and after welding, the weld seam is treated by the second weld seam treatment device of the rail unloading vehicle. The alternating use of the dual stations for rail welding and weld treatment improves welding efficiency. The above welding process is carried out on the vehicle. The hoisting device can also hoist welding devices as needed to perform online and offline rail welding operations. This train set has a high degree of integration and automation, requires few operating equipment, and meets the needs of integrated rail welding, replacement, and collection operations. Secondly, auxiliary operations such as unloading, replacing, and retrieving rails are performed using an auxiliary work trolley. The position of the rail guide wheel assembly on the auxiliary work trolley frame is adjusted according to the unloading and retrieving positions of the rails to meet the position adjustment requirements of the rails in different operating conditions. Rail replacement is achieved through the linkage of the traction trolley and the auxiliary work trolley. The traction trolley and the auxiliary work trolley are miniaturized and can adapt to more working conditions compared to dedicated rail replacement equipment. Attached Figure Description
[0010] The accompanying drawings, which are included to provide a further understanding of this application and form part of this application, illustrate exemplary embodiments and are used to explain this application, but do not constitute an undue limitation of this application. In the drawings: Figure 1 This is a schematic diagram of the rail replacement vehicle assembly for rail repair according to an embodiment of this application; Figure 2 This is a schematic diagram of the rail-collecting operation of the rail-unloading vehicle according to an embodiment of this application; Figure 3 Figure 2 A top-view structural diagram; Figure 4 This is a schematic diagram of the structure of the rail unloading vehicle provided in the embodiments of this application; Figure 5 for Figure 4 A top-view structural diagram; Figure 6 This is a schematic diagram of the rail unloading operation of the rail unloading vehicle provided in the embodiments of this application; Figure 7 This is a schematic diagram of the auxiliary operation trolley provided in the embodiments of this application, with the trolley positioned vertically at a high position. Figure 8 A schematic diagram of the auxiliary operation trolley provided in this application embodiment with its vertical position at a low level; Figure 9 This is a schematic diagram of the front view of the auxiliary work vehicle according to an embodiment of this application; Figure 10 This is a top view of the auxiliary work trolley provided in an embodiment of this application; Figure 11 This is an axonometric structural diagram of the auxiliary work trolley provided in the embodiments of this application; Figure 12 This is a schematic diagram of the isometric structure of the rail guide wheel assembly provided in an embodiment of this application; Figure 13 for Figure 12 Front view structural diagram; Figure 14 This is a schematic front view of the rail welding vehicle body according to an embodiment of this application; Figure 15 for Figure 14 A top-view structural diagram; Figure 16 for Figure 14 A schematic diagram of the lateral structure; Figure 17 This is a schematic diagram of the installation structure of the hoisting device provided in the embodiments of this application; Figure 18 This is a schematic diagram of the onboard welding operation of the hoisting device provided in the first embodiment of this application; Figure 19 This is a schematic diagram of the onboard welding operation of the hoisting device provided in the second embodiment of this application; Figure 20 This is a schematic diagram of the railside welding operation of the rail welding vehicle body provided in an embodiment of this application; Figure 21 for Figure 20 A top-view structural diagram; Figure 22 This is a schematic diagram of the rail welding operation of the rail welding vehicle body provided in an embodiment of this application; Figure 23 for Figure 22 A top-view structural diagram; Figure 24 A top view of the rail replacement vehicle assembly for rail repair provided in an embodiment of this application; Figure 25 This is a schematic diagram of the structure of the rail-carrying vehicle provided in the embodiments of this application; Figure 26 This is a schematic diagram of the structure of the traction trolley provided in the embodiments of this application; Figure 27 This is a front view structural diagram of a single-sided rail to double-sided rail replacement provided in an embodiment of this application; Figure 28 A top view of the structure for replacing a single-sided rail with a double-sided rail, as provided in an embodiment of this application. Figure 29 This is a front view structural diagram of a single-sided rail replacing the opposite-sided rail provided in an embodiment of this application; Figure 30A top view of the structure for replacing a single-sided rail with a rail on the opposite side, provided in an embodiment of this application; Figure 31 This is a front view structural diagram of a double-sided rail replacement provided in an embodiment of this application; Figure 32 A top view of the structure of replacing double-sided rails with double-sided rails provided in an embodiment of this application; Figure 33 This is a schematic diagram of the front view structure of a single-sided rail being replaced with a rail on the same side, provided in an embodiment of this application. Figure 34 This is a top view of the structure of a single-sided rail being replaced with a rail on the same side, as provided in an embodiment of this application.
[0011] Figure label: 100 auxiliary operation trolleys, 200 traction trolleys, 300 rail welding vehicles, 400 rail unloading vehicles, 500 rail transport vehicles, and 600 traction vehicles; Auxiliary operation trolley frame 11, rail guide wheel assembly 12, auxiliary operation trolley traveling device 13, limit clamp assembly 14, counterweight groove 15, frame body 111, transverse sliding groove 112, transverse fixing hole 113, upper traveling roller 131, traveling side roller 132, lower guide roller 121, guide side roller 122, rail guide wheel assembly transverse sliding seat 123, transverse fixing groove 1231, rail guide wheel assembly frame 124, upper guide side roller 1221, lower guide side roller 1222, base pulley 125; 21. Traction trolley frame; 22. Traction trolley winch device; 23. Traction trolley braking device; 24. Traction trolley running device; 25. Traction trolley power unit; 31. Rail welding car body; 32. Welding device; 33. Lifting device; 34. First weld seam treatment device; 35. Winching device; 36. Rail feeding device; 37. Auxiliary rail feeding device; 38. Intermediate support frame; 39. Welding machine support device; 39. Braking system; 390. Air cylinder; 391. Electrical system; 392. Welding machine pump station; 381. Cold water tank; 382. Medium frequency normalizing cabinet; 383. DC control cabinet; 384. DC-DC cabinet; 385. Air dryer and compressor; 386. Power battery; 387. Main hydraulic pump station; 388. Fan; 389. Generator set; 3891. Underframe; 311. Fixed cover; 312. Movable cover; 313. First rail conveying station; 314. 41. Rail unloading vehicle body; 42. Rail feeding device; 43. Rail shifting device; 44. Auxiliary rail feeding device; 45. Winching device; 46. Connecting rod; 47. Second weld treatment device. 51. Rail-carrying vehicle body; 52. Rail-bearing device; 53. Locking device; 54. Winch device; 55. Safety door; 56. Safety guard. Detailed Implementation
[0012] This invention discloses a rail replacement vehicle for rail repair, which solves the problems of existing vehicles using gantry cranes to lift long rails, which are characterized by large lengths, high costs, poor adaptability to welding conditions, and inability to meet the tight track maintenance windows of high-speed railway lines.
[0013] To make the technical solutions and advantages of the embodiments of this application clearer, the exemplary embodiments of this application will be described in further detail below with reference to the accompanying drawings. Obviously, the described embodiments are only a part of the embodiments of this application, and not an exhaustive list of all embodiments. It should be noted that, unless otherwise specified, the embodiments and features in the embodiments of this application can be combined with each other.
[0014] Please see Figure 1 In one specific embodiment, the rail replacement vehicle group for rail repair provided in this application includes a tractor, a rail transport vehicle, a rail welding vehicle, and a rail unloading vehicle arranged longitudinally. The rail transport vehicle and the rail unloading vehicle are preferably flatcars capable of passive movement on the track. The number of rail transport vehicles can be set as needed, such as 3-8 vehicles, and these vehicles are used for storing and transporting rails. The rail welding vehicle preferably has a powered running gear, enabling it to move autonomously on the track. The tractor is used to drive the entire vehicle group at high speed. The rail welding vehicle has a first rail conveying station on both sides and a first weld treatment device. When short rails need to be welded into long rails and stored in the rail transport vehicle, welding and weld treatment can be performed separately at the two stations. After the short rails are welded into long rails, they are transported to the rail transport vehicle for storage via the first rail conveying station. This enables on-vehicle welding of the rails, welding of short rails according to the storage length of the rail transport vehicle, while shortening the rail loading time and improving welding efficiency. Similarly, the rail unloading vehicle has a first rail conveying station on both sides and a second weld treatment device for conveying rails on both sides during rail unloading. During unloading, the rails on the rail transport vehicle are transported to the welding station via the first rail conveying station. The welding device conveys the first rail on one side to the welding station, and the first rail conveying station continues to convey the second rail on the same side until it is aligned with the end of the first rail. The first rail and the second rail are then welded together by the welding device. After welding, the first rail moves longitudinally to the second weld treatment device of the rail unloading vehicle for post-weld treatment. The first rail conveying station continues to convey the third rail and repeats the above steps to achieve welding and post-weld treatment. When the welding device finishes welding the first and second rails, the hoisting device hoists the welding device to weld the first and second rails on the other side of the rail welding vehicle. The welding and post-weld treatment are carried out alternately on both sides, thereby shortening the operation time and improving welding efficiency.
[0015] During transportation operations, the tractor serves as the power tractor, driving the rail-carrying car, rail-welding car, and rail-unloading car to the track operation position, providing power for the movement of the train set. During operation, the tractor can be selected as the power car to provide the driving force; or, in one embodiment, the rail-welding car has a power running device, enabling it to travel at low speed on the track. When unloading or collecting rails, the rail-carrying car, rail-welding car, rail-unloading car, and auxiliary operation trolley form a rail collection and unloading operation train set to carry out rail unloading operations. The rail-welding car provides power to the rail collection and unloading operation train set, thereby shortening the train length of the rail replacement operation train set for rail repair, reducing the overall train length, reducing the amount of operating equipment, and making it easier to replace rails on curved paths and curved lines.
[0016] Compared with the prior art, the rail replacement vehicle set for rail repair provided in this application has the following technical advantages: In this application, a tractor, a rail transport vehicle, a rail welding vehicle, and a rail unloading vehicle form a work train. Both the rail welding vehicle and the rail transport vehicle have dual conveying stations, which can alternately perform rail welding and weld treatment to weld short rails into long rails. At the same time, before unloading, the long rails can be further welded by the rail welding vehicle, and after welding, the weld seams are treated by the second weld seam treatment device of the rail unloading vehicle. The alternating use of the dual stations for rail welding and weld treatment improves welding efficiency. The above welding process is carried out on the vehicle. The hoisting device can also hoist welding devices as needed to perform online and offline rail welding operations. This train set has a high degree of integration and automation, requires few operating equipment, and meets the needs of integrated rail welding ring operation. Secondly, auxiliary operations such as unloading, replacing, and retrieving rails are performed using an auxiliary work trolley. The position of the rail guide wheel assembly on the auxiliary work trolley frame is adjusted according to the unloading and retrieving positions of the rails to meet the position adjustment requirements of the rails in different operating conditions. Rail replacement is achieved through the linkage of the traction trolley and the auxiliary work trolley. The traction trolley and the auxiliary work trolley are miniaturized and can adapt to more working conditions compared to dedicated rail replacement equipment.
[0017] The rail transport vehicle, rail welding vehicle, and rail unloading vehicle will be described in detail below through different embodiments.
[0018] Example 1 Please see Figure 1-13In one specific embodiment, the rail unloading vehicle provided in this application includes a rail unloading vehicle body 41 and several auxiliary operation trolleys 100. The rail unloading vehicle body 41 can travel on the track. Second rail conveying stations are respectively provided on both sides of the rail unloading vehicle body 41 for longitudinal conveying of the rails to be unloaded. The rail unloading vehicle body 41 has a self-propelled or track-traveling special vehicle chassis, and second rail conveying stations are provided on both sides of the track. The second rail conveying stations include roller sets, clamping devices, etc. It can independently complete the longitudinal conveying, pushing, or retrieval of a single rail. The simultaneous processing of left and right rails to be unloaded or retrieved through the double-sided second rail conveying stations improves operational efficiency. Simultaneously, the rail unloading vehicle body 41 serves as the main power platform for the auxiliary operation trolleys 100, providing them with traction and control.
[0019] Several auxiliary operation trolleys 100 can be housed within the rail unloading car body 41; each auxiliary operation trolley 100 includes an auxiliary operation trolley 100 frame and two sets of rail guide wheel sets 12. The auxiliary operation trolley 100 frame is arranged laterally along the track and can travel on the track; each rail guide wheel set 12 is slidably connected to the auxiliary operation trolley 100 frame and can be fixed to support the rail to be operated and guide it to adjust the lateral position of the rail to be operated relative to the track; the auxiliary operation trolleys 100 are connected to each other, and the rail unloading car body 41 is connected to the train of auxiliary operation trolleys 100 for rail unloading or rail collection operations.
[0020] The auxiliary work trolley 100 can travel on the track. The frame of the auxiliary work trolley 100 is arranged perpendicular to the track direction and straddles two steel rails, facilitating work on one or both sides of the rails. Preferably, running wheels are installed at the bottom, allowing it to roll forward on the existing track. The rail guide wheel assembly 12 supports the rail to be worked on and guides its longitudinal movement, preventing it from swaying or jamming. The rail guide wheel assembly 12 is slidably connected to the frame 11 of the auxiliary work trolley 100, allowing for lateral sliding and locking, enabling precise lateral movement of the rails. Positioning prevents lateral deviation of the rail to be worked. Before operation, the lateral position of the rail guide wheel group 12 on the frame 11 of the auxiliary operation trolley 100 can be adjusted and locked according to the rail replacement position of the rail to be worked. This enables the rail to be moved, such as moving the rail from the rail unloading car body 41 to one side of the track. The fixing structure can ensure that the rail does not move during operation through pins, clamping bolts, etc., improving construction accuracy. At the same time, the guiding function reduces the drag resistance of the rail, prevents twisting deformation, and ensures the geometric position of the rail.
[0021] like Figure 6As shown, during the rail unloading operation, the auxiliary operation trolleys 100 are connected to each other, such as by steel cables. The rail unloading car body 41 is connected to the train of auxiliary operation trolleys 100. The second rail conveying station on the rail unloading car body 41 conveys the rail to be operated to the rail guide wheel group 12 of the first group of auxiliary operation trolleys 100, and the rail is transferred through the auxiliary operation trolleys 100. The rail is then adjusted laterally by the rail guide wheel groups 12 of the subsequent groups of auxiliary operation trolleys 100, and the rail is moved from the middle of the track to one side of the track, and unloaded as needed.
[0022] like Figure 2-3 As shown, during rail collection operations, the auxiliary operation trolleys 100 are rigidly connected, for example, by using connecting rods 46. The auxiliary operation trolleys 100 and the rail unloading car body 41 are also rigidly connected by connecting rods 46. The rail guide wheel set 12 of the first auxiliary operation trolley 100 adjusts its position on the frame of the auxiliary operation trolley 100 according to the position of the rail to be worked. The position of the rail guide wheel set 12 of the last auxiliary operation trolley 100 corresponds to the two sets of second rail conveying stations on the rail unloading car body 41, so that the rails can be collected into the rail unloading car body 41. In the middle, the unloading car body 41 drives the auxiliary operation trolleys 100 to move to the track to be worked. The unloading car body 41 pushes each auxiliary operation trolley 100 to move. Due to the rigid connection, each auxiliary operation trolley 100 moves forward under the push of the unloading car body 41 at the end. The rail can be manually guided into the rail guide wheel group 12 of the auxiliary operation trolley 100 at the first end, and passes through each auxiliary operation trolley 100 in sequence. Under the push of the unloading car body 41, the auxiliary operation trolleys 100 shovel the rail until the rail enters the unloading car body 41.
[0023] When not in operation, the auxiliary work trolley 100 can be folded or embedded inside the vehicle body to save transportation space, avoid additional grouping, and improve relocation efficiency.
[0024] like Figure 5 As shown, in one embodiment, any second rail conveying station includes several auxiliary rail feeding devices 44, a rail feeding device 42, a rail shifting device 43, and a second weld treatment device 47. The rail feeding device 42 and the rail shifting device 43 are arranged opposite each other longitudinally. The rail feeding device 42 is located at one longitudinal end of the unloading car body 41 and is used to transport the rail to be worked. The rail shifting device 43 is used to adjust the lateral position of the rail to be worked. Several auxiliary rail feeding devices 44 are located between the rail feeding device 42 and the rail shifting device 43, and each auxiliary rail feeding device 44 is spaced apart longitudinally. The second weld treatment device 47 is located on both lateral sides of the unloading car body 41, corresponding to the second rail conveying station, and is used to grind the welded rail welds.
[0025] The rail feeding device 42 is located at one longitudinal end of the rail unloading car body 41, preferably near the rail welding car end; it actively pushes or pulls the rail to be worked, realizing the longitudinal movement of the rail; the rail feeding device 42 can be configured as a clamping push trolley, an active drive roller group, etc.; the rail shifting device 43 is arranged opposite to the rail feeding device 42 in the longitudinal direction, and the rail shifting device 43 can be set in the middle of the longitudinal direction of the rail unloading car body 41, and pushes the rail to move laterally through the lateral movement mechanism to realize the lateral fine adjustment of its relative to the center line of the track; each auxiliary rail feeding device 44 is arranged between the rail feeding device 42 and the rail shifting device 43, and is distributed at intervals in the longitudinal direction, providing intermediate support during the process of the rail being pushed by the rail feeding device 42 to prevent the middle part from deflecting due to its own weight; and guiding to avoid the rail from snaking or wobbling during long-distance transportation, the auxiliary rail feeding device 44 can be configured as a passive roller. In another embodiment, any second rail conveying station further includes a winch device 45, which is located at the top of both longitudinal ends of the rail unloading vehicle body 41 to assist the rail in longitudinal movement and can be configured as needed.
[0026] In another embodiment, the auxiliary operation trolleys 100 are arranged longitudinally on the track, and adjacent auxiliary operation trolleys 100 are rigidly connected. The rail unloading car body 41 is rigidly connected to the row of auxiliary operation trolleys 100 to push each auxiliary operation trolley 100 to shovel the rail. The rail after shoveling is guided by the rail guide wheel group 12 of the auxiliary operation trolley 100 to the rail unloading car body 41 for rail collection.
[0027] Each trolley is arranged at a certain distance along the track direction (the direction of track extension). The distance is set according to factors such as rail length, work cycle, and structural interference, such as 3-10 meters. Adjacent trolleys are connected by rigid connecting rods 46, pins, trusses, or fixed beams to improve thrust transmission efficiency and prevent trolleys from stacking or disengaging during the track pushing process. The unloading car body 41 serves as the power source and is connected to the auxiliary operation trolley 100 via a rigid traction rod. The old rail is inserted into the rail guide wheel set 12 of the auxiliary operation trolley 100. Under the push of the car body, the old rail is lifted and moved laterally out of the rail bearing groove. The shoveled old rail is supported and guided by the rail guide wheel set 12 on each auxiliary operation trolley 100. The guide wheel set not only supports the rail, but also gradually aligns the rail with the rail collection entrance on the unloading car body 41 through its adjustable lateral position. Finally, the rail is transported to the unloading car body 41 for recycling and storage. This method replaces the traditional manual pry bar and roller method, significantly reducing labor intensity and safety risks. The rigid car train ensures synchronous rail shoveling at multiple points, avoiding local jamming or breakage of the old rail. The rigid connection prevents the trolley from being compressed or deflected under thrust, ensuring consistent rail shoveling action. The guide wheel set not only bears the weight, but also automatically aligns the old rail with the entrance of the unloading car body 41 through its lateral adjustment function, preventing the rail from deviating from or colliding with the car body structure during transportation.
[0028] like Figure 7-8As shown, the rail guide wheel assembly 12 is vertically adjustable relative to the auxiliary operation trolley 100; the height of the rail guide wheel assembly 12 of the auxiliary operation trolley 100 near the rail unloading car body 41 is lower than the height of the second rail conveying station, and higher than the height of the rail guide wheel assembly 12 of the adjacent auxiliary operation trolley 100.
[0029] To ensure smooth transport of the rails from the track to the unloading car body 41, the rail guide wheel assembly 12 on each auxiliary trolley 100 can be vertically adjusted using hydraulic cylinders, screw mechanisms, or pin hole positioning. During the rail-shoveling stage, the height is lowered to facilitate insertion into the rail base; during the transport stage, it is raised to match the height of adjacent trolleys or the car body entrance. Assuming the auxiliary trolleys 100 are arranged from closest to farthest from the unloading car body 41 as follows: trolley A (closest), trolley B, and trolley C (farthest), then: the guide wheel assembly height of trolley A is lower than the height of the second rail transport station on the unloading car body 41; and higher than the guide wheel assembly height of its adjacent trolley (i.e., trolley B), forming a sloping transport channel that gradually rises towards the car body.
[0030] The specific working process is as follows: each trolley guide wheel group is adjusted to a low position suitable for shoveling the rail (especially the far end trolley is close to the rail surface); the old rail is inserted into the rail guide wheel group 12 of the front end trolley; the unloading car body 41 pushes the trolley train forward, and the old rail is gradually lifted; at the same time, each trolley can lift the rail guide wheel group 12 synchronously or step by step, so that the rail rises along the preset slope.
[0031] Because trolley A, located closer to the car body, is at a higher position, the rails naturally form an upward slope towards the car body during transport. This helps prevent rail slippage using the component of gravity and allows for a smooth transition to the transport station at a higher position on the car body. The guide wheel assembly of trolley A is slightly lower than the transport station on the car body, creating a minor drop or smooth connection. The rails smoothly enter the car body and are pulled into the storage area by the rail feeding device 42. This achieves a smooth lifting and transport of the rails from a low starting point to a high ending point, reducing drag resistance and protecting the rail base and rail head surfaces. It also prevents rail slippage and improves the reliability of rail collection. Furthermore, the rail unloading can be reversed to a low slope for easier rail placement.
[0032] like Figure 9-13 As shown, in one embodiment, the rail guide wheel assembly 12 includes a lower guide roller 121 and a pair of guide side rollers 122 arranged opposite to each other along the length direction of the auxiliary operation trolley frame 11. The lower guide roller 121 is used to support the bottom of the rail to be operated, and the rotation axis of the pair of guide side rollers 122 is arranged vertically for rolling connection with the rail to be operated for guidance.
[0033] The guide roller 121 supports the bottom of the rail to be worked, bears the main gravity load of the rail, prevents the rail from sagging, and can rotate around the horizontal axis to achieve rolling support and reduce longitudinal drag resistance. There are two guide rollers, which are set opposite each other along the length of the auxiliary working trolley frame 11. The rotation axis of the guide roller is set in the vertical direction, that is, the circumferential surface of the roller is a horizontal plane, which contacts the side of the rail head or the side of the rail web, restricting the lateral (horizontal) displacement of the rail, while allowing it to move freely in the longitudinal direction.
[0034] The lateral position of the rail guide roller group 12 is adjusted as needed. When the rail to be worked on (new or old rail) is placed on the rail guide roller group 12: the lower guide roller 121 supports the rail bottom from below and bears the vertical load; the two left and right guide side rollers 122 lightly press the rail web or rail head side from both sides; when the auxiliary working trolley 100 moves longitudinally along the track: the rail slides longitudinally relative to the rail guide roller group 12; because the axis of the guide side roller 122 is vertical, its circumferential surface forms a rolling friction pair with the side of the rail, allowing longitudinal movement; at the same time, the guide side roller 122 prevents the rail from shifting laterally, ensuring that it moves along the predetermined trajectory; through rolling friction, the drag resistance is reduced, and the rail bottom and rail web are prevented from being scratched or indented, ensuring the geometric accuracy of the new rail.
[0035] Furthermore, the guide wheel assembly also includes a rail guide wheel assembly transverse shift seat 123, and a pair of oppositely arranged rail guide wheel assembly frames 124 are provided along the length direction, which are spaced apart to form a rail limiting space; each rail guide wheel assembly frame 124 is provided with a guide side roller 122; the guide lower roller 121 is located between the pair of rail guide wheel assembly frames 124 and is fixed to the rail guide wheel assembly transverse shift seat 123.
[0036] Two rail guide wheel frame groups 124 are arranged opposite each other along the length of the rail guide wheel set transverse shift seat 123, with a certain distance between them. The gap between them forms a rail limiting space to accommodate the rail to be worked. Each rail guide wheel frame group 124 is equipped with a guide side roller 122. The rail guide wheel frame group 124 serves to position, support, and protect the side rollers. The rail guide wheel set transverse shift seat 123 can be slidably connected to the auxiliary working trolley frame 11 as a whole for lateral position adjustment as needed. The guide lower roller 121 is located in the lower area between the two rail guide wheel frame groups 124, directly facing the bottom of the rail. It is directly fixed to the transverse shift seat body to ensure that the guide lower roller 121 is always located directly below the rail, providing stable vertical support. Integrating the lower roller and the side roller into the same transverse shift seat avoids misalignment caused by separate adjustment. The relative positions of the three rollers remain constant during transverse movement, ensuring consistent guidance. The rigid frame structure resists the lateral force of the rail and prevents deformation. The side frames not only install rollers, but also act as physical baffles to prevent the rails from accidentally coming off the guide wheel assembly when being dragged, vibrating, or passing through curves; especially under high-speed traction or steep gradient conditions, they significantly reduce safety risks.
[0037] Furthermore, any guide roller 122 includes: an upper guide roller 1221 and a lower guide roller 1222 arranged vertically in sequence, both of which are arranged horizontally; the upper guide roller 1221 is used for rolling contact with the head of the rail; the rim of the lower guide roller 1222 protrudes from the rim of the upper guide roller 1221 and is used for rolling contact with the neck of the rail.
[0038] Each guide roller 122 consists of two stacked rollers, arranged vertically in sequence as an upper guide roller 1221 and a lower guide roller 1222. The roller axes are all vertical, meaning the rollers rotate around a vertical axis, and their circumferential surfaces are horizontal, allowing for rolling contact with the rail side. The upper guide roller 1221 contacts the rail head side, providing upper lateral restraint to prevent the rail from tipping over or tilting. The lower guide roller 1222 contacts the rail neck, providing lower lateral restraint and the main guiding force. The flange of the lower guide roller 1222 protrudes further outward in the horizontal direction than the upper guide roller 1221, ensuring that the lower guide roller 1222 preferentially contacts or more closely adheres to the rail neck, forming a stable support base. When the rail to be worked is placed in the guide roller assembly: the upper guide roller 1221 is close to the side of the rail head, restricting the lateral sway of the top of the rail and preventing it from "nodding" or tipping over during movement; the lower guide roller 1222, due to its more convex flange, first contacts and adheres tightly to the rail neck (upper part of the rail web), bearing the main lateral guiding force; since the axes of both rollers are vertical, the rail can roll smoothly through during longitudinal dragging with low frictional resistance; the upper and lower double-point contact forms a "clamping" effect, realizing multi-point, layered lateral constraint of the rail, significantly improving guiding stability.
[0039] In another embodiment, the guide wheel assembly further includes base pulleys 125, located on both sides of the transverse shift seat 123 below the rail guide wheel assembly; the base pulleys 125 are located below the transverse shift seat 123 of the rail guide wheel assembly and on both sides of the transverse shift, i.e., arranged symmetrically from left to right; serving as support and rolling elements for the overall transverse movement of the guide wheel assembly; typically small-diameter rollers with bearings, with their axes set along the longitudinal direction (track direction), allowing them to roll laterally in the transverse shift groove 112. The auxiliary operation trolley frame 11 includes a frame body 111, which has a transverse shift groove 112 extending along its length, and the base pulleys 125 are located within the transverse shift groove 112 and can slide along the transverse shift groove 112. The base pulley 125 is embedded in the transverse sliding groove 112; when it is necessary to adjust the transverse position of the rail, the entire rail guide wheel assembly transverse sliding seat 123 slides laterally in the transverse sliding groove 112 through the base pulley 125; after sliding, the transverse sliding seat can be fixed to the frame by a locking mechanism (such as a pin or hydraulic clamp).
[0040] Before unloading or retrieving rails, operators need to fine-tune the lateral position of the rail to be worked on (such as aligning it with the rail support groove); after unlocking the transverse shift seat, apply lateral force (manual or hydraulic drive), and the base pulley 125 rolls in the transverse shift groove 112, driving the entire guide wheel assembly (including the upper and lower side rollers and the lower roller) to move smoothly laterally; after it is in place, the locking mechanism fixes the transverse shift seat to ensure that the rail does not move laterally during subsequent traction or dredging; due to the use of rolling friction, the required adjustment force is small and the operation is easy.
[0041] Furthermore, in order to fix the rail guide wheel assembly 12, the rail guide wheel assembly 12 also includes several transverse fixing grooves 1231, which are arranged along the length direction at the bottom of the transverse seat 123 of the rail guide wheel assembly; the frame body 111 is provided with several transverse fixing holes 113 in the length direction of the frame body 111, which are arranged in the length direction of the frame body 111 and correspond to the transverse fixing grooves 1231. The rail guide wheel assembly 12 and the frame body 111 are detachably fixedly connected by threaded fasteners, transverse fixing holes 113, and transverse fixing grooves 1231.
[0042] The transverse movement fixing groove 1231 is located at the bottom of the transverse movement seat 123 of the rail guide wheel set; it is arranged along the length direction of the transverse movement seat 123 of the rail guide wheel set (i.e., the transverse direction of the rail); there are several grooves, usually 4-10, spaced apart; they can be through grooves, countersunk grooves, or T-grooves, used to accommodate the head of threaded fasteners or to engage locking blocks. The transverse movement fixing hole 113 is located on the body of the auxiliary operation trolley frame 11; it is also arranged along the length direction of the frame; its position corresponds one-to-one with the transverse movement fixing groove 1231. When the transverse movement seat slides to any preset position, the fixing hole aligns with the fixing groove; it is usually a smooth hole or a threaded hole, used to pass through bolts or mounting screws. Threaded fasteners (such as bolts + nuts, hex socket head cap screws, etc.) are used; the fasteners pass through the transverse movement fixing hole 113 and the transverse movement fixing groove 1231 in sequence; after tightening, the transverse movement seat 123 of the rail guide wheel set is firmly locked on the frame body 111 to prevent lateral movement during operation. By combining multiple fixing holes and fixing slots, it supports multiple preset lateral positions, such as adapting to different line center distances or track gauges; the positioning is more reliable and the repeatability is higher.
[0043] In one embodiment, the auxiliary work trolley 100 further includes an auxiliary work trolley traveling device 13. The auxiliary work trolley traveling device 13 includes an auxiliary work trolley 100 traveling assembly, which is located on both sides opposite to each other below the auxiliary work trolley frame 11. Each auxiliary work trolley 100 traveling assembly includes an upper traveling roller 131 and a pair of traveling side rollers 132 arranged opposite each other along the length direction of the auxiliary work trolley frame 11. The upper traveling roller 131 is used to sit on the top of the track, and the traveling side rollers 132 are used for lateral limiting.
[0044] The auxiliary operation trolley frame 11 is arranged laterally, straddling two steel rails. A set of auxiliary operation trolley 100 traveling components is installed below each of the left and right ends of the auxiliary operation trolley frame 11. Each set of auxiliary operation trolley 100 traveling components includes an upper traveling roller 131 and a set of side traveling rollers 132. The upper traveling roller 131 sits on the top surface of the existing rail, bearing the main vertical load of the auxiliary operation trolley 100 and the rail it carries. It rotates around a transverse axis and rolls longitudinally along the rail with the trolley. The side traveling rollers 132 are arranged opposite each other along the length of the auxiliary operation trolley frame 11, with the two side rollers located on the inner and outer sides of the rail respectively, clamping the rail head. The side of the rail head makes rolling contact, providing lateral restraint and preventing the trolley from derailing or veering during operation. The lateral clamping of the side rollers forms a mechanical anti-derailment constraint, significantly improving operational safety.
[0045] To further prevent derailment, the auxiliary operation trolley 100 also includes a limiting clamp assembly 14, which is located at both ends of the auxiliary operation trolley frame 11 along its length. The limiting clamp assembly 14 includes a set of limiting clamps arranged opposite each other, forming a limiting cavity for clamping the head of the track, thereby limiting the upward movement of the auxiliary operation trolley 100.
[0046] A set of limiting clamp assemblies 14 is set at each of the left and right ends of the auxiliary operation trolley frame 11 to achieve synchronous limiting of the two rails. Each set of limiting clamp assemblies 14 contains two limiting clamps, which are arranged opposite each other and form a U-shaped cavity or C-shaped cavity with the opening facing downward. The shape of the limiting cavity matches the contour of the rail head (rail head) and can wrap around the rail head from above or from the side. The limiting clamps snap together from the upper sides of the rail head to form an "inverted U-shaped" limiting cavity, which "holds" the rail head and restricts the upward movement of the trolley. When the trolley attempts to lift, the inner wall of the limiting clamps presses against the lower jaw or side of the rail head to prevent it from leaving the track. This effectively prevents the auxiliary operation trolley 100 from jumping off the track and greatly improves the safety of operation.
[0047] Furthermore, the auxiliary work trolley 100 also includes a counterweight slot 15 located on the auxiliary work trolley frame 11 for detachable fixed connection with the auxiliary work trolley frame 11.
[0048] The counterweight groove 15 can be configured as a groove, tray, bracket or platform with mounting holes. It mainly supports the detachable counterweight block. It has mounting holes that can be matched with the transverse moving fixing holes 113 of the auxiliary operation trolley frame 11 and fixed by bolts, pins or other means to realize the flexibility of adding or removing counterweight as needed; and prevent the auxiliary operation trolley 100 from overturning due to uneven load when the rail guide wheel group 12 is located on one side of the auxiliary operation trolley frame 11.
[0049] In one optional embodiment, the auxiliary operation trolley frame 11 is also provided with traction lugs at both ends, and a handle is provided at the bottom middle of the auxiliary operation trolley frame 11. The traction lugs and / or handle are connected to the unloading car body 41 via flexible connectors.
[0050] The traction lugs at both ends of the auxiliary work trolley frame 11 are connected to the unloading car body 41. The traction lugs are lugs, rings or pin seats with through holes, which serve as the main force connection points to transmit traction force. Because they are located at both ends of the frame, they can achieve multi-point balanced force and avoid frame twisting.
[0051] In another embodiment, a handle can be provided at the bottom middle of the auxiliary operation trolley frame 11 to assist in connecting the traction rope, making it convenient for on-site personnel to lift, position, or flip the trolley; the flexible connector can be connected to the traction lug, the handle, or both at the same time, and connected to the unloading car body winch device 45 (such as a drum or winch) to form a complete traction circuit.
[0052] In one specific embodiment, the auxiliary operation trolleys of the track replacement system provided in this application are all standardized units with the same structure and uniform specifications of core components. The number of trolleys can be flexibly increased or decreased according to the number of rails to be replaced and the limitations of the construction site. There is no need to design separate equipment for different working conditions, which greatly reduces the complexity of construction organization and is suitable for track replacement needs of various lines such as main lines, branch lines, and stations. Multi-scenario position adaptation: The rail guide wheel set can slide and adjust left and right along the frame of the auxiliary operation trolley, so that the placement position of the new rail and the old rail can be flexibly selected (single side outside the track, both sides outside the track, etc.), without being restricted by a fixed operation path. It can easily cope with complex track environments such as curves and near turnouts, solving the problem of the single operation scenario of traditional equipment.
[0053] Each auxiliary operation trolley uses a single crossbeam as its frame, making it smaller than existing equipment. It features a low rail lifting height and a small impact range on rail alignment, making it more adaptable to confined construction spaces in urban rail and subway systems. After operation, it can be retrieved into the rail-changing train, shortening the train length and adapting to more stations; the auxiliary operation trolley is also lightweight, making loading and unloading from transport vehicles more convenient.
[0054] Example 2 This embodiment provides a detailed description of the rail welding vehicle; please refer to the following text for specific details.
[0055] Please see Figure 14-24In one specific embodiment, the rail welding vehicle 300 provided in this application includes a rail welding vehicle body 31, which can travel on the track and has a self-propelled or track-traveling special vehicle chassis. A set of rail clamping, centering, and feeding mechanisms are provided on the left and right sides of the vehicle body, which can independently complete the longitudinal transport, positioning, and alignment of a single rail. It can simultaneously process left and right rails, improving welding efficiency. A welding device 32 and a hoisting device 33 are provided at one longitudinal end of the rail welding vehicle body 31. The welding device 32, such as a flash welder, aluminothermic welding equipment, or a mobile arc welding system, is used to weld the ends of two rails together. The hoisting device 33, such as a truck-mounted crane or a telescopic boom crane, is installed at the end of the vehicle body and can lift the welding device 32, realizing two operating modes: on-vehicle rail welding: the welding device 32 operates directly on the vehicle body platform; off-vehicle rail welding: the welding device 32 is hoisted to the ground or track bed position beside the track for operation. It breaks through the space limitations of the vehicle platform and adapts to complex environments such as bridges, tunnels, and turnout areas; a set of 32 welding devices can handle multiple working conditions, reducing equipment redundancy; it avoids the need for personnel to carry heavy welding machines, reducing the risk of work-related injuries.
[0056] The first weld treatment device 34 is set on the left and right sides, and corresponds one-to-one with the first rail conveying station 314. It is located on the rear side of the welding device 32 along the longitudinal direction. Welding and weld treatment are completed in the same work cycle without the need for secondary entry. It is matched with the double conveying station to keep the working rhythm of the left and right rails consistent.
[0057] In one embodiment, any first rail conveying station 314 includes: The system includes a rail feeding device 36 and several auxiliary rail feeding devices 37. The rail feeding device 36 is located longitudinally near the end of the winch device 35, and the auxiliary rail feeding devices 37 are spaced apart longitudinally. Further, any first rail conveying station 314 also includes a winch device 35, located at the other longitudinal end of the rail welding vehicle 31, opposite to the welding device, used to provide power for rail conveying. The winch device 35 serves as the main traction power source, pulling the rail longitudinally via flexible components such as wire ropes and chains. The rail feeding device 36, located near the winch device 35, serves as the main rail feeding actuator, generally including a clamping mechanism, a pushing trolley, or an active drive roller assembly, responsible for precise feeding, centering, and clamping of the rail. Its specific structure can be referenced from existing technologies and will not be elaborated here. Multiple auxiliary rail feeding devices 37 are distributed longitudinally at intervals on the rail welding car body 31. During the process of the rail being pulled by the winch device 35, they provide intermediate support, guidance, and anti-sagging functions; they can be passive roller sets, idlers, sliders, or low-speed drive wheels to ensure smooth rail passage. The rail feeding device 36 is located near the winch end, in the area of most stable traction force, which is conducive to achieving high repeatability positioning accuracy.
[0058] In another embodiment, the rail welding vehicle body 31 further includes: The intermediate support frame 38 is located in the middle of the rail welding car body 31 along the longitudinal direction. There is a gap between the bottom of the intermediate support frame 38 and the rail welding car body 31 to make way for the first rail conveying station 314. The intermediate support frame 38 is equipped with a hydraulic system and a power system.
[0059] The intermediate support frame 38 is located in the middle of the longitudinal direction of the rail welding car 300, in the central area between the front and rear ends of the car body. It is a rigid steel structure frame that can be fixedly connected to the main car body or connected through vibration damping elements. A certain vertical distance is maintained between its bottom and the main platform of the rail welding car body 31, forming a through channel below it to ensure that the rails on the left and right sides can be transported longitudinally without interference. The intermediate support frame 38 integrates a hydraulic system and a power system. The hydraulic system provides high-pressure hydraulic power for the welding device 32 (clamping / upsetting), the rail feeding device 36, the hoisting device 33, and the first weld treatment device 34. The power system includes a motor unit that provides electrical or mechanical energy to the entire vehicle. The heavy and bulky hydraulic station, engine, oil tank, and electrical control cabinet are centrally located on the central elevated platform, avoiding the long pipelines and maintenance difficulties caused by decentralized layout. At the same time, it frees up space under the car body to create the necessary channel for rail transportation. The centrally located heavy power system helps reduce the risk of off-center loading, improves the running stability of the rail welding vehicle 300 on the track, reduces vibration transmission between the front and rear ends of the car body, and improves welding accuracy.
[0060] In one embodiment, the welding auxiliary system includes a welding pump station 381, a chiller 382, a medium-frequency normalizing cabinet 383, a DC control cabinet 384, a DC-DC cabinet 385, a dryer, and a compressor 386. The welding pump station 381 provides high-pressure hydraulic power to the flash welder or mobile welder, driving actions such as clamping, upsetting, and slag removal. The chiller 382 circulates water to cool the welding transformer, electrodes, or medium-frequency coils to prevent overheating damage. The medium-frequency normalizing cabinet 383 controls the medium-frequency power supply to perform medium-frequency induction normalizing heat treatment on the welded joint, refining grains and eliminating stress. The DC control cabinet 384 provides a stable DC control power supply for powering control systems such as PLCs, sensors, and servo valves. The DC-DC cabinet 385 converts the main power supply to low-voltage DC to adapt to the needs of different electronic devices. The dryer provides clean, dry compressed air to the welding area or pneumatic components for slag removal, cooling, or pneumatic control. The compressor provides an air source for the air system, driving pneumatic clamps, dust removal devices, or the dryer.
[0061] The power system includes a power battery 387, a main hydraulic pump station 388, a fan 389, and a generator set 3891. The power battery 387 provides clean energy for the electric rail welding vehicle 300, supporting quiet operation and zero emissions, making it suitable for tunnels or environmentally sensitive areas. The main hydraulic pump station 388 provides hydraulic power for the rail delivery, hoisting device 33, and support legs. The fan 389 provides forced cooling for the engine compartment, electrical control cabinet, or hydraulic oil tank, ensuring continuous system operation. The generator set 3891 is an auxiliary power source, typically a diesel generator set 3891, which charges the power battery 387 when its charge is low. This system achieves independent energy supply for the entire welding process, eliminating reliance on external power grids or auxiliary vehicles, enabling independent operation, and enhancing environmental adaptability and operational flexibility.
[0062] In one embodiment, the rail welding vehicle body 31 further includes: The base frame 311, the fixed cover 312 and the movable cover 313 are arranged longitudinally along the rail welding vehicle body 31. The movable cover 313 is located near the end of the hoisting device 33 and is slidably connected to the base frame 311. It can slide towards the side closer to the fixed cover 312 to provide clearance space for the hoisting device 33.
[0063] The base frame 311 serves as the main load-bearing structure of the rail welding vehicle body 31, providing a track or guide rail for the movable cover 313. The fixed cover 312 is arranged longitudinally along the rail welding vehicle body 31, located away from the end of the hoisting device 33, and is used to enclose the welding device 32, power system, etc. The fixed cover 312 is rigidly connected to the base frame 311. The movable cover 313 is arranged longitudinally, located at the end close to the hoisting device 33, and is slidably connected to the base frame 311. It can be moved horizontally by rollers, sliders, or guide rails. It can slide towards the fixed cover 312 and into the fixed cover 312, forming a set structure, thereby opening a working window at the front end. When the hoisting device 33 needs to rotate or extend a large range or hoist the welding device 32 to the bottom of the vehicle, the movable cover 313 moves backward to avoid interference with the boom or welding device 32. The traditional fixed cover 312 restricts the range of motion of the boom, and collisions are likely to occur, especially when welding rails under the vehicle; after the movable cover 313 moves back, the front space is completely released, ensuring unobstructed operation of the lifting device 33.
[0064] In one optional embodiment, the rail welding vehicle body 31 further includes a braking system 390, an air cylinder 391, and an electrical system 392 located below the underframe 311. The braking system 390 is connected to the power running gear, and the air cylinder 391 and electrical system 392 are respectively connected to the braking system 390. A bogie and a power running gear are also provided to drive the rail welding vehicle body 31 to travel on the track. The braking system 390 is integrated on the bogie and may include an air brake system 390, etc., to control the deceleration, stopping, and anti-slip on slopes of the rail welding vehicle 300, ensuring operational and relocation safety. The air cylinder 391 is suspended or fixed to the bottom of the base frame 311, storing compressed air to provide a stable air source for the air braking system 390. The electrical system 392, such as the battery box and the car body sensors, centrally arranges heavy-duty, high-safety-requirement systems or systems that need to be close to the running gear under the base frame 311, which saves upper space and facilitates docking with standard interfaces of rail vehicles. This ensures that the rail welding car 300 has reliable braking capability when it is self-propelled or towed, especially on slopes, curves or in emergency situations, by lowering the brake, air source and some electrical equipment under the base frame 311 to free up upper space of the car body. This provides more ample installation area for core functional modules such as the welding device 32, the hoisting device 33, the operator's cab, and the power compartment.
[0065] In another embodiment, the welding device 32 and the hoisting device 33 are located laterally between the two first rail conveying stations 314; The rail welding vehicle body 31 also includes a welding machine support device 39, which is located on the base frame 311 and is positioned laterally between the two first rail conveying stations 314 to support the welding device 32.
[0066] The welding device 32 and the hoisting device 33 are arranged in the central area between the left and right workstations, that is, on or near the longitudinal centerline of the vehicle body; this allows the welding device 32 to simultaneously approach the left and right rails, facilitating switching or double-line operation. Meanwhile, to prevent the storage position of the welding device 32 from being affected by the first rail conveying workstations 314 on both sides, a welding machine support device 39 is installed between the two first rail conveying workstations 314, raising the welding machine's storage position so as not to occupy lateral space; this does not affect the smooth passage of rails from both sides, while also leaving overhead operating space for the hoisting device 33.
[0067] In one specific embodiment, the welding device 32 is arranged at the front of the vehicle, the hoisting device 33 and the first weld treatment device 34 are behind the welding device 32, the welding auxiliary system, cooling system and power system are arranged in the middle of the vehicle, the rail feeding device 36 and the hoisting device 35 are arranged at the rear, and two first rail conveying stations 314 are arranged on both sides, with auxiliary rail feeding devices 37 arranged along the passage. Each of the two rail conveying passages on both sides has its own rail feeding device 36 and auxiliary rail feeding device 37. In the middle of the two passages, a welding machine support device 39 is provided at the position where the welding device 32 is placed to support and fix the welding device 32, ensuring that it is firmly supported and fixed during transportation operations. A multi-machine telescopic hoisting device 33 or a multi-section folding arm hoisting device 33 is used; it can realize welding on the vehicle, welding below the line, and welding above the line. When welding on the vehicle, the first weld treatment device 34 can complete the weld treatment of the rail welding joint. A welding machine head is used. To improve welding efficiency, a welding device 32 can be arranged on each channel, for a total of two welding devices 32. The first weld treatment device 34 can be a small manual processing tool or an automated processing tool, such as a robot.
[0068] The specific welding process on the vehicle includes: The steel rails on both sides are transported to the welding station via the first steel rail conveying station 314; The hoisting device 33 hoists the welding device 32 to the transverse side to weld the rail joint and perform heat treatment. After welding, the welded rail is transported to the first weld treatment device 34 on the single side through the first rail conveying station 314. The first weld treatment device 34 grinds the welded rail weld. The hoisting device 33 hoists the welding device 32 to the welding station on the other side of the lateral side to weld the rail joint and perform heat treatment. After the welding is completed, the welded rail is transported to the first weld treatment device 34 on one side through the first rail conveying station 314. The first weld treatment device 34 grinds the welded rail weld. Repeat steps two and three above to weld the short rails into long rails, and then transport them to the rail transport vehicle for storage.
[0069] In another embodiment, the specific under-vehicle welding process includes: The rail welding vehicle 300 moves to the position to be welded; The movable cover 313 slides inward longitudinally, and the hoisting device 33 is activated to hoist the welding device 32 and rotate it. The welding device 32 is hoisted to the welding position under the vehicle, and the welding device 32 performs welding and heat treatment on the rail joint. After welding is completed, the hoisting device 33 hoists the welding device 32 onto the welding rail car body 31 and secures and locks it in place; The movable cover 313 moves to its initial position and drives away from the rail welding vehicle 300.
[0070] Example 3 like Figure 25 As shown in the figure, this embodiment provides a detailed description of the rail-carrying vehicle, and the specific details are as follows.
[0071] This application also provides a rail transport vehicle, which includes a rail transport vehicle body 51, and is provided with a plurality of rail supporting devices 52, locking devices 53 and hoisting devices 54. The rail supporting devices 52 are used to support the rails to be worked, the locking devices 53 are used to lock the rails to be worked, and the hoisting devices 54 are used to provide power for rail transport. Safety doors 55 and safety guards 56 are respectively provided at both longitudinal ends of the rail transport vehicle body 51, and the safety guards 56 are located on top of the safety doors 55.
[0072] The rail-supporting device 52 supports the rail to be operated and can also laterally move the rail. Specifically, it can be a combination of idlers, rubber pads, rail-supporting beams, and a lateral movement structure. The locking device 53 secures the rail to prevent it from shifting or moving laterally. It can be a mechanical clamping arm, a self-locking buckle, etc. The winch device 54 is used to pull the rail longitudinally during loading. It is preferably located at one end of the car body and changes the traction direction through a pulley system. The safety door 55 is a protective barrier against rail shifting. In the non-operating state, it closes the end of the car body to prevent personnel from accidentally entering or the rail from slipping out. It can be opened during operation to allow the rail to pass through or enter. The safety door 55 can be a double-leaf, top-opening, or sliding door and has a locking mechanism. The safety guard 56 is located on top of the safety door 55, covering it and extending outwards. It prevents falling objects from heights and provides head protection for operators. It can be made of steel plate, grating, or composite protective plate.
[0073] Example 4 like Figure 26-34 As shown in the figure, the embodiments of this application provide a detailed description of the track changing system formed by the traction trolley and the auxiliary operation trolley. For details, please refer to the following text.
[0074] The traction trolley 200 is used to travel on the track and includes a traction trolley frame 21, a traction trolley winch device 22, a traction trolley braking device 23, a traction trolley traveling device 24, and a traction trolley power unit 25. The traction trolley winch device 22 is mounted on the traction trolley frame 21 and is used to connect with the auxiliary work trolley 100. The traction trolley braking device 23 is located below the traction trolley frame 21 and is configured to be selectively fixed to the track. The auxiliary work trolleys 100 are connected in sequence, and the traction trolley winch device 22 is connected to the column of auxiliary work trolleys 100 to pull the entire column of auxiliary work trolleys 100 along the track for track changing operations.
[0075] The traction trolley winch device 22 is mounted on the traction trolley frame 21 and is used to connect the auxiliary work trolley 100. The winch device includes a motor, reducer, drum and wire rope, etc. The specific structure of the traction trolley winch device 22 can be set according to the existing technology to provide controllable tension. The front end of the wire rope is connected to the first auxiliary work trolley 100 to realize synchronous traction of the whole train. Meanwhile, in order to improve the traction force of the traction trolley 200 and prevent slippage, a traction trolley braking device 23 is installed below the traction trolley frame 21. It can actively clamp the rail and temporarily anchor the traction trolley 200, providing support for the train to overcome the rail guiding resistance. The auxiliary operation trolleys 100 can be connected in series by hinges, pins or flexible connectors to form a trolley train. The traction trolley 200 is located at one end and the entire train moves synchronously by a winch. At the same time, the auxiliary operation trolleys 100 move longitudinally relative to the rail to be operated by the rail guide wheel set 12. The rail to be operated overcomes its own weight and guiding resistance and changes direction on one or both sides of the track along the rail guide wheel set 12. For example, the rail guide wheel set 12 moves the new rail from the rail storage position to the rail bearing groove, and the old rail from the rail bearing groove to the rail storage position.
[0076] In another embodiment, the traction trolley braking device 23 includes: At least two sets of braking assemblies for the traction trolley 200 are symmetrically arranged on both sides of the lateral side of the traction trolley frame 21; the braking assemblies for the traction trolley 200 are brake calipers.
[0077] The traction trolley 200 has no fewer than two braking components, each of which acts independently on an existing track to achieve synchronous braking of the two tracks. The brake calipers achieve braking by clamping the track, such as hydraulic rail clamps or electric push rod type calipers. The calipers apply clamping force from both sides of the track head inward, relying on friction or mechanical engagement to anchor the traction trolley 200 to the track.
[0078] In one alternative embodiment, such as Figure 27-34 As shown, there are three auxiliary operation trolleys 100, which are arranged longitudinally along the track. The auxiliary operation trolley 100 at the front end has an auxiliary operation trolley traveling device 13 that travels on the old rail. Two sets of rail guide wheel sets 12 are fixed to one side of the auxiliary operation trolley 100 to support the new rail located on one side of the track. The auxiliary operation trolley 100 located in the middle has an auxiliary operation trolley traveling device 13 that travels on the old rail. Two sets of rail guide wheel sets 12 are fixed on the lateral sides of the auxiliary operation trolley 100 to transport the new rail to the preset position on the track. The auxiliary operation trolley 100 at the rear end has an auxiliary operation trolley traveling device 13 that travels on the new rail. Two sets of rail guide wheel sets 12 are fixed on one side of the auxiliary operation trolley 100 and are set on the same side as the rail guide wheel set 12 at the front end, for returning the old rail to one side of the track.
[0079] The first-end auxiliary operation trolley 100 is used for the introduction of new rails. The first-end auxiliary operation trolley 100 runs on the existing old rails and serves as the traction front end. The guide wheel set is only installed on one side of the frame in two sets to support the new rails sent from the outside of the line, smoothly guide the new rails into the operation area, prevent them from sagging or swaying, avoid the new rails from dragging directly on the ground, and protect the rail bottom; and achieve the initial positioning of the new rails.
[0080] The central auxiliary operation trolley 100 is used for precise positioning of the new rail. The central auxiliary operation trolley 100 still runs on the old rail. The guide wheel group is set on the left and right sides of the frame to form a clamp and support for the new rail. The new rail is laterally adjusted from the single-side introduction state to the track design center line position. The tail-end auxiliary trolley 100 is used to remove and return the old rails to their original positions. It switches to run on the newly laid rails, with guide wheel sets located on the same side as the head trolley. These guide wheel sets support the old rails being pushed out. After the new rails are in place, the old rails are pushed further outwards to their designated storage location. This allows for continuous operation of "laying new rails while clearing old rails," preventing old rail accumulation from hindering subsequent processes. It can be understood that there can be one or two new rails. When there is only one new rail, one guide wheel set 12 is empty. When there are two new rails, each of the two guide wheel sets 12 holds one new rail. Similarly, when there is only one old rail, one guide wheel set 12 is empty. When there are two old rails, each of the two guide wheel sets 12 holds one old rail.
[0081] The specific workflow is as follows: Initial state: Three trolleys are stopped at the starting point of the track section to be replaced, and the new track is fed into the guide wheel set of the first trolley from the right side of the track; Traction start: The tractor 200 pulls the three trolleys forward in sync; New rail transport: The first trolley supports the front end of the new rail; the middle trolley receives the new rail and centers it laterally; Old rail removal: As the trolley moves forward, the old rail is gradually pushed away from the rail support groove by the guide structure of the tail trolley; the tail trolley completely moves the old rail to the outside of the track; New rail placement: After the middle trolley completes the adjustment, the new rail is placed into the rail support groove, and the rear trolley continues to move forward on the new rail; Cyclic advancement: The entire train moves forward continuously, achieving seamless track changing over long distances.
[0082] This enables integrated and continuous operation of new track laying and old track recycling, eliminating the need for phased construction and significantly shortening track maintenance windows; reducing manual intervention and increasing mechanization rate. Clear functional division enhances operational accuracy and efficiency: the initial stage focuses on track introduction; the middle stage on positioning; and the final stage on obstacle removal; all stages operate in parallel without functional redundancy or conflict.
[0083] The traction trolley 200 moves to the end of the rail replacement process, releases a steel cable to connect with the first auxiliary operation trolley 100, and the auxiliary operation trolleys 100 are connected in series by steel cables to form a trolley group. According to the positions of the new and old rails, the positions of the rail guide groups of each trolley are adjusted and fixed. When replacing rails on one side, a corresponding counterweight is placed on the opposite side. The auxiliary operation trolley 100 is moved to lift the new rails on the roadside and insert them into the rail guide wheel groups 12 of each trolley, and manually assists them to fall into the rail bearing groove. At the same time, the old rails are pulled out of the rail bearing grooves, lifted, inserted into the rail guide wheel groups 12 of the auxiliary operation trolley 100, and guided to the outside of the track. The traction trolley 200 pulls the auxiliary operation trolley 100 at a constant speed along the working direction by retracting the steel cable to achieve continuous rail replacement. After the replacement of the new and old rails is completed, the rails are manually assisted to slide out of the rail guide wheel groups 12 and fall to the preset positions. After the operation is completed, the auxiliary operation trolley group 100 drives away.
[0084] In another embodiment, there are two auxiliary operation trolleys 100, which are arranged longitudinally along the track. The auxiliary operation trolley 100 at the front end has an auxiliary operation trolley traveling device 13 that travels on the old rail, and two sets of rail guide wheel sets 12 are fixed on both sides of the auxiliary operation trolley 100 to support the new rail located on that side; the auxiliary operation trolley 100 at the rear end has an auxiliary operation trolley traveling device 13 that travels on the new rail, and two sets of rail guide wheel sets 12 are fixed on both sides of the auxiliary operation trolley 100 to support the old rail located on that side.
[0085] The auxiliary trolley 100 at the front runs on the existing old rails, serving as the traction front end; rail guide wheel sets 12 are located on both sides laterally, each used to clamp one rail. When there is only one new rail, one of the rail guide wheel sets 12 is left empty; when there are two new rails, the two sets of rail guide wheel sets 12 clamp one new rail each, thus achieving single-sided rail replacement; the auxiliary trolley 100 at the rear end is used for receiving and returning the old rails. The auxiliary trolley 100 at the rear end has been switched to run on the newly laid rails; it is arranged on both sides laterally of the frame to clamp the old rails that have been pushed out of the rail bearing slots. After the new rails are in place, it immediately receives the old rails, continuing to transport the old rails to the outside of the line to avoid accumulation on the line; thus achieving simultaneous "laying new rails and clearing old rails".
[0086] In one specific embodiment, the auxiliary trolleys of the track replacement system provided in this application are all standardized units with identical structures and uniform core component specifications. The number of trolleys can be flexibly increased or decreased according to the number of rails to be replaced and the limitations of the construction site, eliminating the need for separate equipment design for different working conditions, significantly reducing the complexity of construction organization, and adapting to the track replacement needs of various lines such as main lines, branch lines, and station yards. Multi-scenario position adaptation: The rail guide wheel set can slide left and right along the frame of the auxiliary trolley, allowing for flexible selection of the placement position of new and old rails (single side outside the track, both sides outside the track, etc.), without being limited by fixed working paths. It can easily cope with complex track environments such as curved sections and near turnouts, solving the problem of the single working scenario of traditional equipment. One traction trolley can drive the entire trolley group to move, eliminating the need for a large number of personnel to manually pull and push. Only a small number of personnel are needed to be responsible for adjusting the guide mechanism and safety monitoring, significantly reducing manpower input. The traction trolley replaces the railcar to provide track replacement traction force, avoiding the derailment risk caused by the railcar traveling on rails without fasteners. Each auxiliary trolley uses a single crossbeam as the frame, and its size is smaller than that of existing equipment. The low rail lifting height and small impact range of rail adjustment make it more adaptable to confined construction spaces such as urban rail and subway lines. The traction trolley replaces the railcar to provide traction force for rail replacement. After operation, the traction trolley can be retrieved into the rail replacement train, shortening the train length and adapting to more stations. The auxiliary operation trolley is lightweight, making it easier to load and unload from the transport vehicle.
[0087] Based on the rail replacement vehicle set for rail repair provided in the above embodiments, this application also provides an operation method for the rail replacement vehicle set for rail repair, the method comprising: S11: The tractor unit drives the train set along the track to the work area, and the rail unloading vehicle unloads each auxiliary work trolley to the work position on the track; Tow the train set to the work area, release the auxiliary work trolley manually or by towing, and move the auxiliary work trolley to the work position. Connect the tail end of the rail unloading car to the auxiliary work trolley, and connect the auxiliary work trolleys to each other, preferably by using steel cables. Connect the winch device on the rail welding car to the rail to be unloaded. S12: Adjust the lateral and vertical positions of the rail guide wheel sets of each auxiliary operation trolley on the auxiliary operation trolley frame according to the single-sided or double-sided rail unloading method; The rail guide wheel assembly selectively moves the rail from one side to the other, or from both sides to the outside, or does not move the rail at all; the vertical position is set according to the different longitudinal positions of the auxiliary operation trolley so that the rail to be unloaded can move smoothly. S13: The rail conveying station of the rail welding car and the rail unloading car sequentially conveys the first rail to be worked along the longitudinal direction, so that the first rail to be worked enters the rail guide wheel group of each auxiliary working trolley in sequence, and continues to convey so that one end of the first rail to be worked falls to the ground and is fixed in the preset position. Power is provided by the hoisting device and rail feeding device of the rail welding car and rail unloading car. The rails are moved longitudinally through the rail conveying station so that the first rail enters the rail guide wheel group of each auxiliary operation trolley in sequence. S14: The tractor or rail welding vehicle drives the train set to move forward longitudinally to the end of the first rail to be worked, arrives at the welding station of the rail welding vehicle and stops. The rail conveying station of the rail welding vehicle conveys the second rail to be worked to the welding station, and the first rail and the second rail to be worked are welded. During rail unloading operations, the power source for the train set can be provided by a rail welding vehicle or a tractor, preferably by a rail welding vehicle, thereby shortening the overall train set length and facilitating operations on curved sections. After welding the first and second rails to be worked, the hoisting device hoists the welding device to weld the first and second rails to be worked at the rail conveying station on the other side of the lateral direction, so as to achieve synchronous conveying operations at both stations. The conveying steps for the second rail can refer to the conveying steps for the first rail. S15: The tractor or rail welding vehicle continues to drive the train set forward longitudinally. The rail feeding device of the rail welding vehicle and the rail unloading vehicle is opened until the rail to be worked is detached from the auxiliary operation trolley. The long rail receiving and unloading system has multiple rails. The above steps S12-S15 can be repeated until all the transported rails are unloaded.
[0088] In another embodiment, after the tractor drives the train set along the track to the work area, and the unloading vehicle unloads the auxiliary trolleys to the work positions on the track, the method further includes: Adjust the lateral and vertical positions of the rail guide wheel sets of each auxiliary operation trolley on the auxiliary operation trolley frame according to the single-sided or double-sided rail winding method. The tractor pushes the train set with the rail unloading car as the lead car, pushing the auxiliary operation trolley at the front end to the end of the rail to be worked, and guiding the rail to be worked into the rail guide wheel set of the auxiliary operation trolley at the front end; The driving tractor pushes the train set to move longitudinally, so that the rails to be worked enter the guide wheel set of the auxiliary operation trolley at the rear end in sequence, and then enter the rail unloading car, rail welding car and rail transport car in sequence; so that the first rail passes through the conveying channels on both sides of the rail unloading car and rail welding car until the rails to be recovered are completely returned to the rail transport train set; the auxiliary operation trolley is recovered, the rails are fixed, and the vehicle drives out of the construction area.
[0089] Based on the rail replacement vehicle set for rail repair provided in the above embodiments, this application also provides an operation method for the rail replacement vehicle set for rail repair, the method comprising: S11: The tractor pulls the train set along the track to the work area. The unloading car unloads the tractor trolley and N sets of auxiliary work trolleys and moves them to the work position on the track. The tractor trolley is connected to the first auxiliary work trolley and each auxiliary work trolley by steel cable. S12: Adjust and fix the position of the rail guide wheel set of each auxiliary operation trolley relative to the frame of the auxiliary operation trolley according to the position of the new rail and the old rail; S13: Lift the new rail and pass it sequentially from the first group into the rail guide wheel group of the N-1 group of auxiliary operation trolleys. After passing through, the new rail falls into the rail bearing groove of the track. S14: Place the Nth group of auxiliary operation trolleys on the new rail, pull out the old rail from the rail bearing groove, lift it up and insert it into the rail guide wheel group of the Nth group of auxiliary operation trolleys, and guide it to the outside of the rail. S15: The traction trolley pulls each auxiliary trolley to move longitudinally for continuous track changing; S16: After the rail replacement is completed, the old rails are removed from the rail guide wheel sets of each auxiliary operation trolley and placed into the preset position on the rail.
[0090] Although preferred embodiments of this application have been described, those skilled in the art, upon learning the basic inventive concept, can make other changes and modifications to these embodiments. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments as well as all changes and modifications falling within the scope of this application.
[0091] Obviously, those skilled in the art can make various modifications and variations to this application without departing from the spirit and scope of this application. Therefore, if such modifications and variations fall within the scope of the claims of this application and their equivalents, this application also intends to include such modifications and variations.
Claims
1. A rail replacement vehicle for rail repair, characterized in that, It includes a tractor, a rail-carrying vehicle, a rail-welding vehicle, and a rail-unloading vehicle arranged longitudinally. The tractor is used to drive the work vehicle group to move longitudinally along the track. The rail transport vehicle is used to store and transport steel rails; The rail welding vehicle includes a rail welding vehicle body, which has a first rail conveying station welding device, a hoisting device, and a first weld treatment device. The first rail conveying station is located on both sides of the rail welding vehicle body and is used to carry out longitudinal conveying operations on the rails to be worked on. The hoisting device is used to hoist the welding device to carry out rail welding operations on the vehicle, on the line, and below the line. The rail unloading vehicle includes a rail unloading vehicle body, which has a second rail conveying station, a second weld treatment device, and several auxiliary operation trolleys. The second rail conveying station is located on both sides of the rail unloading vehicle body and is used to perform longitudinal conveying operations on the rails to be worked on. The second weld treatment device is located at one end of the rail welding vehicle. The auxiliary operation trolleys cooperate with the rail replacement operation group for rail repair to perform rail unloading, rail replacement, and rail collection operations.
2. The rail replacement vehicle for rail repair according to claim 1, characterized in that, The rail unloading vehicle also includes a traction trolley for traveling on the track and driving the auxiliary operation trolley to change the rail; the auxiliary operation trolley and the traction trolley can be housed in the rail unloading vehicle body; Each of the auxiliary operation trolleys includes an auxiliary operation trolley frame and two sets of rail guide wheel sets. The auxiliary operation trolley frame is arranged laterally along the track and can travel on the track. Each of the rail guide wheel sets is slidably connected to the auxiliary operation trolley frame and can be fixed to support the rail to be operated and guide it, so as to adjust the lateral position of the rail to be operated relative to the track.
3. The rail replacement vehicle for rail repair according to claim 2, characterized in that, The traction trolley includes: The traction trolley frame, the traction trolley winch device, and the traction trolley braking device are provided. The traction trolley winch device is mounted on the traction trolley frame and is used to connect with the auxiliary work trolley. The traction trolley braking device is located below the traction trolley frame and is configured to be selectively fixed to the track. The auxiliary operation workshops are connected in sequence, and the traction trolley winch device is connected to the auxiliary operation trolley to pull the entire auxiliary operation trolley along the track for track changing operations.
4. The rail replacement vehicle for rail repair according to claim 1, characterized in that, When in the rail-collecting operation state, the auxiliary operation trolleys are arranged longitudinally on the track and rigidly connected. The rail unloading car body is rigidly connected to the entire train of auxiliary operation trolleys and is used to push each of the auxiliary operation trolleys to scrape the rail. The scraped rails are guided by the rail guide wheel group of the auxiliary operation trolleys to the rail unloading car body for rail collection.
5. The rail replacement vehicle for rail repair according to claim 1, characterized in that, The rail welding vehicle also includes a power travel device for driving the rail welding vehicle to travel on the track; The welding device and the hoisting device are located at one longitudinal end of the rail welding vehicle body; The first weld seam treatment device is located on both sides of the rail welding vehicle body, corresponding to the first rail conveying station, and is used to grind the weld seam of the rail after welding.
6. The rail replacement vehicle for rail repair according to claim 1, characterized in that, The second weld treatment device is located on both sides of the rail unloading vehicle body, corresponding to the second rail conveying station, and is used to grind the welded rail weld. Any second rail conveying station includes a rail feeding device, a rail shifting device, and several auxiliary rail feeding devices; the rail feeding device and the rail shifting device are arranged opposite each other along the longitudinal direction, the rail feeding device is located at one longitudinal end of the rail unloading car body, and is used to transport the rail to be worked; the rail shifting device is used to adjust the lateral position of the rail to be worked; several auxiliary rail feeding devices are arranged between the rail feeding device and the rail shifting device, and each auxiliary rail feeding device is arranged at intervals along the longitudinal direction.
7. The rail replacement vehicle for rail repair according to claim 1, characterized in that, The rail-carrying vehicle includes: The rail transport vehicle is equipped with several rail-bearing devices, locking devices, and winch devices. The rail-bearing devices are used to support the rails to be transported, the locking devices are used to lock the rails to be transported, and the winch devices are used to provide power for transporting the rails. Safety doors and safety guards are respectively provided at both longitudinal ends of the rail transport vehicle body, with the safety guards located on top of the safety doors.
8. A method for operating a rail replacement vehicle for rail repair based on any one of claims 1-7, characterized in that, The method includes: The tractor unit drives the train set along the track to the work area, and the rail unloading vehicle unloads the auxiliary work trolleys to the work positions on the track. Adjust the lateral and vertical positions of the rail guide wheel sets of each auxiliary operation trolley on the auxiliary operation trolley frame according to the single-sided or double-sided rail unloading method. The rail conveying station of the rail welding car and the rail unloading car sequentially conveys the first rail to be worked along the longitudinal direction, so that the first rail to be worked enters the rail guide wheel group of each of the auxiliary working trolleys in sequence, and continues to convey so that one end of the first rail to be worked falls to the ground and is fixed in a preset position. The tractor or rail welding vehicle drives the train set forward longitudinally to the end of the first rail to be worked, arrives at the welding station of the rail welding vehicle and stops. The rail welding vehicle transports the second rail to be worked to the welding station and welds the first rail and the second rail to be worked together. Repeat the alternating train running and welding processes until the entire rail to be worked is detached from the auxiliary work trolley and the rail is unloaded to the designated side of the track.
9. The operating method of the rail replacement vehicle for rail repair according to claim 8, characterized in that, The tractor-trailer drives the train set along the track to the work area. After the rail unloading vehicle unloads each rail replacement trolley to the work position on the track, the method further includes: Adjust the lateral and vertical positions of the rail guide wheel sets of each auxiliary operation trolley on the auxiliary operation trolley frame according to the single-sided or double-sided rail winding method. The tractor or rail welding vehicle pushes the train set with the rail unloading vehicle as the lead vehicle, pushing the auxiliary operation trolley at the front end to the end of the rail to be worked, and guiding the rail to be worked into the rail guide wheel set of the auxiliary operation trolley at the front end; The driving tractor pushes the train set to move longitudinally, so that the rails to be worked enter the guide wheel set of the auxiliary working trolley at the rear in sequence, and then enter the rail unloading car, rail welding car and rail transport car in sequence to complete the rail collection operation.
10. A method for operating a rail replacement vehicle for rail repair based on any one of claims 1-7, characterized in that, The method includes: The tractor pulls the train set along the track to the work area. The rail unloading vehicle unloads the tractor trolley and N sets of auxiliary work trolleys and moves them to the work position on the track. The tractor trolley is connected to the first auxiliary work trolley and each auxiliary work trolley by steel cables. Based on the positions of the new and old rails, adjust and fix the position of the rail guide wheel sets of each auxiliary operation trolley relative to the frame of the auxiliary operation trolley; The new rail is lifted and sequentially inserted from the first group into the rail guide wheel group of the N-1 auxiliary operation trolley. After being inserted, the new rail falls into the rail bearing groove of the track. Place the Nth group of auxiliary operation trolleys on the new rails. The old rails are pulled out of the rail bearing grooves, lifted, and then inserted into the rail guide wheel group of the Nth group of auxiliary operation trolleys, and guided to the outside of the rails. The traction trolley pulls each auxiliary trolley to move longitudinally for continuous track changing; After the rail replacement is completed, the old rails are removed from the rail guide wheel sets of each auxiliary operation trolley and placed in the preset position on the rail.
