An internal circulation unit system for an emergency diesel generator set used in a nuclear power plant and its layout scheme.

By integrating fuel, cooling water, and lubricating oil systems into emergency diesel generator sets in nuclear power plants, deep synergy between systems is achieved, solving the problems of a large number of devices and complex pipelines, and improving the reliability and flexibility of the system.

CN123064549APending Publication Date: 2026-11-10WUXI BRACH 703TH RES INST OF CHINA SHIPBUILDING IND CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611456312.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-18
Publication Date
2026-11-10

AI Technical Summary

Technical Problem

In existing nuclear power plant emergency diesel generator sets, the lubricating oil preheating circuit, lubricating oil cooling circuit, and fuel cooling circuit are independent of each other, resulting in a large number of equipment, complex pipelines, and scattered maintenance and repair points, lacking deep coupling between systems based on operating condition switching.

Method used

By parallel coupling of high-temperature water heating pipelines, direct connection of lubricating oil preheater heat source and high-temperature water electric heater, and series path of low-temperature water bypass for simultaneous cooling of lubricating oil and fuel, deep synergy between systems under two operating conditions—hot standby heating and operating cooling—is achieved, and the fuel system, cooling water system and lubricating oil system are integrated into a common framework.

Benefits of technology

It reduces the number of equipment and pipelines, lowers pipeline complexity and installation and commissioning time, improves system reliability and flexibility, simplifies system architecture, and reduces the probability of failure and plant space occupation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123064549A_ABST
    Figure CN123064549A_ABST
Patent Text Reader

Abstract

This invention relates to an internal circulation unit system and its layout scheme for an emergency diesel generator set used in nuclear power plants. It includes a fuel system, a cooling water system, a lubricating oil system, piping, and related equipment. The fuel system includes a dual fuel filter, a standby fuel booster pump, a fuel return cooler, valves, and piping. The lubricating oil system includes a lubricating oil pre-supply pump, a standby lubricating oil pre-supply pump, a lubricating oil preheater, a lubricating oil cooler, a lubricating oil filter, a lubricating oil temperature control valve, and other valves and piping. The cooling water system includes a high-temperature water temperature control valve, a preheating unit, a low-temperature water temperature control valve, and other valves and piping. In the unit's hot standby state, the internal circulation unit heats the lubricating oil through heat exchange between high-temperature water and lubricating oil, ensuring the unit can be started at any time. In the unit's operating state, the internal circulation unit cools the lubricating oil and fuel, ensuring normal unit operation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of nuclear power plant diesel generator set technology, and in particular to an internal circulation unit system and its layout scheme for an emergency diesel generator set for nuclear power plants. Background Technology

[0002] The safety of nuclear power plants is of paramount importance, so avoiding accidents is an important part of safety design, and nuclear emergency diesel generator sets, as backup power sources, are one of the key components of the safety system.

[0003] Nuclear power plant emergency diesel generator sets are nuclear safety grade equipment. In the event of a power outage throughout the plant, the units are required to start quickly and reliably to provide emergency power for the dedicated safety facilities on the nuclear island.

[0004] The auxiliary system of a diesel generator set is crucial to its reliable operation. The internal circulation unit needs to heat the lubricating oil in the hot standby state of the unit to ensure that it can be started at any time, and cool the lubricating oil and fuel in the running state of the unit.

[0005] In existing emergency diesel generator sets, the lubricating oil preheating circuit, lubricating oil cooling circuit, and fuel cooling circuit are independent, with equipment distributed and numerous pipelines. Multiple independent circuits result in a large number of devices, complex base piping, heavy pipe loads, and dispersed maintenance and repair points. In recent years, technical solutions have emerged that integrate preheating equipment or fuel system equipment into a frame; however, existing integration solutions primarily address the issue of "centralized equipment layout," while the piping connections between functional circuits remain relatively independent, lacking deep coupling between systems based on operating condition switching. Summary of the Invention

[0006] To address the shortcomings of existing production technologies, the applicant provides an internal circulation unit system and its layout scheme for an emergency diesel generator set used in nuclear power plants. This system achieves deep synergy between the system under both hot standby heating and operational cooling conditions through specific parallel coupling of high-temperature water heating pipelines, direct connection between the lubricating oil preheater heat source and the high-temperature water electric heater, and a series path of low-temperature water bypass simultaneously cooling lubricating oil and fuel oil.

[0007] The technical solution adopted in this invention is as follows: An internal circulation unit system for an emergency diesel generator set used in a nuclear power plant includes an integrated fuel system, a cooling water system, and a lubricating oil system. The fuel system includes a dual fuel filter, a backup fuel booster pump, a fuel return cooler, and connecting pipes and valves; The lubricating oil system includes a lubricating oil pre-supply pump, a standby lubricating oil pre-supply pump, a lubricating oil preheater, a lubricating oil cooler, a lubricating oil filter, a lubricating oil temperature control valve, and connecting pipes and valves; The cooling water system includes a high-temperature water temperature control valve, a preheating unit, a low-temperature water temperature control valve, and connecting pipes and valves. The preheating unit includes a first high-temperature water pump, a second high-temperature water pump, and a high-temperature water electric heater. In the hot standby state of the unit, the lubricating oil pre-supply pump or the standby lubricating oil pre-supply pump draws out the lubricating oil from the diesel engine, heats it in the lubricating oil preheater, and returns it to the diesel engine. The lubricating oil preheater exchanges heat with the high-temperature water heated by the high-temperature water electric heater. When the unit is running, the lubricating oil is cooled by the lubricating oil cooler and filtered by the lubricating oil filter to cool the various parts of the diesel engine, and the fuel return oil is cooled by the fuel return oil cooler.

[0008] As a further improvement to the above technical solution: The fuel system includes a fuel inlet line. After passing through the first ball valve, the fuel inlet line is divided into a first fuel line and a second fuel line by a dual fuel filter. The first fuel line includes a first check valve and a second ball valve. The second fuel line is connected in series with a third ball valve, a second check valve, and a fourth ball valve. The fuel return line passes through a fuel return cooler. A fifth ball valve and a sixth ball valve are installed at both ends of the fuel return cooler.

[0009] The lubricating oil system includes a first lubricating oil pre-supply line, which is divided into two pre-supply lubricating oil pump lines and a backup pre-supply lubricating oil line. The pre-supply lubricating oil pump line is connected in series with a seventh ball valve, the lubricating oil pre-supply pump, a third check valve, and an eighth ball valve. The backup pre-supply lubricating oil line is connected in series with a ninth ball valve, a backup lubricating oil pre-supply pump, a fourth check valve, and a tenth ball valve. After passing through the lubricating oil pre-supply pump or the backup lubricating oil pre-supply pump, it is simultaneously connected to the second lubricating oil pre-supply line. One path then passes through the lubricating oil preheater, the eleventh ball valve, and the lubricating oil filter before entering the diesel engine. The lubricating oil preheater has a first shut-off valve connected in parallel at both ends, and the other path is connected to the second shut-off valve. The lubricating oil line passes through a fifth check valve, a lubricating oil temperature control valve, a lubricating oil cooler, and the lubricating oil filter before entering the diesel engine. A drain plug is also installed on the first lubricating oil pre-supply line.

[0010] The cooling water system includes high-temperature water pipelines, low-temperature water pipelines, and water supply and drain pipelines. The high-temperature water pipeline enters the radiator after passing through the sixth check valve and the high-temperature water temperature control valve. The high-temperature water temperature control valve has a bypass pipeline. The high-temperature water heating pipeline is connected in parallel to both ends of the sixth check valve. The high-temperature water heating pipeline is connected in series with the twelfth ball valve, the first high-temperature water pump, the seventh check valve, the thirteenth ball valve, the second high-temperature water pump, the eighth check valve, the high-temperature water electric heater, and the fourteenth ball valve. The low-temperature water pipeline enters the radiator after passing through the low-temperature water temperature control valve. The bypass of the low-temperature water temperature control valve enters the diesel engine after passing through the lubricating oil cooler. The lubricating oil cooler is connected in parallel to both ends with the sixteenth ball valve, the fuel return cooler, and the fifteenth ball valve. The water supply and drain pipelines are equipped with the third, fourth, and fifth shut-off valves.

[0011] In the hot standby state of the unit, the lubricating oil is drawn out by the lubricating oil pre-supply pump or the standby lubricating oil pre-supply pump, heated by the lubricating oil preheater, and then returned to the diesel engine; the high-temperature water is heated by the high-temperature water electric heater in the preheating unit, driven by the first high-temperature water pump and / or the second high-temperature water pump, and enters the diesel engine after exchanging heat with the lubricating oil preheater, ensuring that the unit can start quickly.

[0012] When the unit is in operation, during initial operation, the bypass is automatically opened by the high-temperature water temperature control valve and the low-temperature water temperature control valve. The high-temperature water and the low-temperature water are cooled and returned to the diesel engine after circulating internally through the internal circulation unit. When the unit reaches thermal equilibrium, the high-temperature water and the low-temperature water are automatically controlled by the high-temperature water temperature control valve and the low-temperature water are cooled and circulated through the external radiator before returning to the diesel engine.

[0013] The lubricating oil temperature control valve automatically adjusts the flow rate of lubricating oil through the lubricating oil cooler according to the lubricating oil temperature. When the lubricating oil temperature is lower than the set value, the lubricating oil temperature control valve closes the path to the lubricating oil cooler, and the lubricating oil directly enters the diesel engine through the lubricating oil filter. When the lubricating oil temperature is higher than the set value, the lubricating oil temperature control valve opens the path to the lubricating oil cooler, and the lubricating oil is cooled by the lubricating oil cooler before entering the diesel engine through the lubricating oil filter.

[0014] The fuel return cooler and the lubricating oil cooler share the same cooling water circuit of the low-temperature water pipeline. After passing through the low-temperature water temperature control valve, the low-temperature water first flows through the lubricating oil cooler to cool the lubricating oil, then flows through the fuel return cooler to cool the fuel return oil, and then returns to the diesel engine.

[0015] A layout scheme for the internal circulation unit system of an emergency diesel generator set for a nuclear power plant is proposed. The equipment, valves and pipelines of the fuel system, cooling water system and lubricating oil system adopt a modular design scheme and are integrated in a common frame. The fuel system, lubricating oil system and cooling water system pipelines and equipment are integrated in the common frame.

[0016] As a further improvement to the above technical solution: The common frame adopts a symmetrical pipeline layout structure, and two sets of mirror pipeline schemes can be designed for different factory buildings to meet the layout requirements of two mirror factory buildings, and the layout is flexible; the equipment and pipelines of the fuel system, cooling water system and lubricating oil system are integrated and installed in the common frame, reducing the number of external installation interfaces.

[0017] The beneficial effects of this invention are as follows: (1) The present invention achieves the sharing of high-temperature water pump and pipeline system between the preheating circuit and the main cooling circuit by parallel coupling of high-temperature water heating pipeline and high-temperature water pipeline, thereby reducing the number of equipment and pipelines in the independent preheating circuit.

[0018] In existing technologies, the lubricating oil preheating circuit typically consists of a separate preheating pump, heater, and pipeline, isolated from the cooling circuit during normal unit operation, resulting in a large number of devices and complex piping. This invention connects both ends of the high-temperature water heating pipeline to the two ends of a first check valve, creating a parallel coupling between the high-temperature water heating pipeline and the high-temperature water pipeline. In hot standby mode, high-temperature water is heated by the high-temperature water electric heater on the high-temperature water heating pipeline and then used for lubricating oil preheating; in operating mode, the high-temperature water circulates normally through the high-temperature water pipeline. Both operating conditions share the first and second high-temperature water pumps, eliminating the need for a separate circulation pump set for preheating, significantly reducing the number of devices and pipeline interfaces.

[0019] (2) The low-temperature water bypass of the present invention connects the lubricating oil cooler and the fuel return cooler in series on the same path, so that the same stream of low-temperature water can simultaneously complete the lubricating oil cooling and fuel cooling, thereby reducing the number of low-temperature water pipelines.

[0020] In existing technologies, the lubricating oil cooling circuit and the fuel cooling circuit are typically branched off independently from the cryogenic water main line, requiring two separate sets of cryogenic water branch pipes, valves, and return water interfaces. This invention redirects the bypass outlet of the cryogenic water temperature control valve sequentially through the lubricating oil cooler and the fuel return cooler before returning to the diesel engine. The cryogenic water first cools the lubricating oil and then the fuel, forming a series cooling path. The same cryogenic water flow rate serves both cooling needs simultaneously, reducing the number of cryogenic water branch pipes and valves, lowering the complexity of the piping layout, and reducing the load on the pipe inlets.

[0021] (3) The present invention achieves automatic switching between hot standby mode and operating mode without manual intervention by automatically switching between high temperature water temperature control valve and low temperature water temperature control valve.

[0022] The high-temperature water temperature control valve automatically controls the opening degree of the bypass pipeline based on the high-temperature water temperature, while the low-temperature water temperature control valve automatically controls the switching between the bypass and radiator paths based on the low-temperature water temperature. When the unit switches from hot standby to operating status, no manual valve operation is required; the temperature control valves automatically switch between internal circulation cooling and external radiator cooling based on water temperature changes. This automatic switching logic reduces the risk of human error and improves the reliability of nuclear safety-grade equipment operation.

[0023] (4) The fuel dual-stage fine filter of the present invention is provided with two parallel fuel lines at the outlet, and each line is equipped with a check valve and a ball valve to realize switching and online maintenance without stopping the machine.

[0024] The fuel lines are connected in parallel and each is equipped with multiple check valves and multiple ball valves. When the filter on one of the lines needs maintenance, the other line can be switched on via the valve, allowing the filter to be replaced or cleaned without stopping the unit, thus improving the continuity and maintainability of the unit's operation.

[0025] (5) The lubricating oil pre-supply pipeline of the present invention is equipped with two pre-supply lubricating oil pump pipelines that serve as backups for each other, thereby improving the reliability of lubricating oil pre-supply under hot standby conditions.

[0026] The pre-supply lubricating oil pump line and the standby pre-supply lubricating oil line serve as backups for each other, and each is connected in series with a ball valve and a check valve. When the lubricating oil pre-supply pump fails, it can be immediately switched to the standby lubricating oil pre-supply pump to ensure continuous circulation and heating of lubricating oil under hot standby conditions, and to avoid the unit being unable to start quickly due to the failure of a single pump.

[0027] (6) The present invention integrates the equipment, valves and pipelines of the fuel system, lubricating oil system and cooling water system into a common frame, reducing the amount of on-site installation work and the space occupied by the plant.

[0028] Existing emergency diesel generator set auxiliary system equipment is scattered, requiring separate installation of each system's equipment and connection of numerous pipelines on-site, resulting in long installation and commissioning cycles. This invention adopts a modular design, integrating the equipment, valves, and pipelines of the three systems into a shared frame. The pipelines within the frame are arranged according to functional zones, and each system connects to the diesel engine and external radiator via shared interface. On-site installation only requires positioning the shared frame and connecting a few interfaces, significantly shortening on-site installation and commissioning time and reducing plant space requirements.

[0029] (7) The present invention uses a shared frame to set up two sets of mirror-symmetrical pipe interface layouts, so that the same frame can be adapted to two mirror-arranged factory structures, thereby improving the flexibility and versatility of the layout scheme.

[0030] To address the mirrored layout requirements of different nuclear power plant buildings, the shared frame features two sets of mirror-symmetrical piping interface layouts. The same frame can select the appropriate piping interface connection method based on the building structure, eliminating the need to design two different frames and piping systems for each type of building. This design improves the versatility and interchangeability of the internal circulation unit, and reduces design, manufacturing, and spare parts management costs.

[0031] (8) The present invention integrates a system to simultaneously heat the hot standby lubricating oil and cool the sliding oil-fuel mixture during operation, which simplifies the system architecture and improves the reliability of the unit.

[0032] In existing technologies, lubricating oil preheating, lubricating oil cooling, and fuel cooling are completed by separate circuits, resulting in a complex system architecture and dispersed failure points. This invention integrates these three functions into a single internal circulation unit through parallel coupling of high-temperature water heating pipelines, direct connection between the lubricating oil preheater and the high-temperature water-electric heater, and series connection of a low-temperature water bypass to the lubricating oil cooler and the fuel return cooler. A single system simultaneously meets the needs of both hot standby and operational conditions, reducing the number of independent circuits, simplifying the system architecture, lowering the probability of failure, and facilitating the meeting of reliability requirements for nuclear safety-grade equipment. Attached Figure Description

[0033] Figure 1 This is a schematic diagram of the fuel system of the internal circulation unit of the present invention.

[0034] Figure 2 This is a schematic diagram of the lubricating oil system of the internal circulation unit of the present invention.

[0035] Figure 3 This is a schematic diagram of the cooling water system of the internal circulation unit of the present invention.

[0036] Figure 4 This is a plan view of the arrangement scheme (I) of the internal circulation unit of the present invention.

[0037] Figure 5 This is a plan view of the arrangement scheme (II) of the internal circulation unit of the present invention.

[0038] Figure 6 This is a three-dimensional model schematic diagram of the arrangement scheme (I) of the inner circulation unit of the present invention.

[0039] in: 1. Dual-stage fine filter; 2. Backup fuel booster pump; 3. Fuel return cooler; 11. Fuel inlet line; 12. First fuel line; 13. Second fuel line; 14. Fuel return line; 101. First ball valve; 102. Third ball valve; 103. Second check valve; 104. Fourth ball valve; 105. First check valve; 106. Second ball valve; 107. Fifth ball valve; 108. Sixth ball valve; 4. Lubricating oil pre-supply pump; 5. Standby lubricating oil pre-supply pump; 6. Lubricating oil preheater; 7. Lubricating oil cooler; 8. Lubricating oil filter; 21. First lubricating oil pre-supply line; 22. Pre-supply lubricating oil pump line; 23. Backup pre-supply lubricating oil line; 24. Second lubricating oil pre-supply line; 25. Lubricating oil line 201. Seventh ball valve; 202. Drain plug; 203. Third check valve; 204. Eighth ball valve; 205. Second shut-off valve; 206. Ninth ball valve; 207. Fourth check valve; 208. Tenth ball valve; 209. First shut-off valve; 210. Eleventh ball valve; 211. Fifth check valve; 212. Lubricating oil temperature control valve; 9. Second high-temperature water pump; 10. First high-temperature water pump; 26. High-temperature water heater; 31. High-temperature water pipeline; 32. High-temperature water heating pipeline; 33. Bypass pipeline; 34. Water supply and discharge pipeline; 35. Low-temperature water pipeline; 301. Fifteenth ball valve; 302. Sixteenth ball valve; 303. Third shut-off valve; 304. Fourth shut-off valve; 305. Low-temperature water temperature control valve; 306. Fifth shut-off valve; 307. Fourteenth ball valve; 308. Thirteenth ball valve; 309. Twelfth ball valve; 310. Eighth check valve; 311. Seventh check valve; 312. Sixth check valve; 313. High-temperature water temperature control valve. Detailed Implementation

[0040] The specific embodiments of the present invention will now be described with reference to the accompanying drawings.

[0041] like Figures 1-6 As shown, the internal circulation unit system of the emergency diesel generator set for nuclear power plants in this embodiment includes an integrated fuel system, cooling water system and lubricating oil system; The fuel system includes a dual fuel filter 1, a backup fuel booster pump 2, a fuel return cooler 3, and connecting pipes and valves; The lubricating oil system includes a lubricating oil pre-supply pump 4, a standby lubricating oil pre-supply pump 5, a lubricating oil preheater 6, a lubricating oil cooler 7, a lubricating oil filter 8, a lubricating oil temperature control valve 212, and connecting pipes and valves; The cooling water system includes a high-temperature water temperature control valve 313, a preheating unit, a low-temperature water temperature control valve 305, and connecting pipes and valves. The preheating unit includes a first high-temperature water pump 10, a second high-temperature water pump 9, and a high-temperature water electric heater 26. In the hot standby state of the unit, the lubricating oil pre-supply pump 4 or the standby lubricating oil pre-supply pump 5 draws out the lubricating oil of the diesel engine, which is heated by the lubricating oil preheater 6 and then returned to the diesel engine. The lubricating oil preheater 6 exchanges heat with the high-temperature water heated by the high-temperature water electric heater 26. When the unit is running, the lubricating oil is cooled by the lubricating oil cooler 7 and filtered by the lubricating oil filter 8 to cool the diesel engine components, and the fuel return oil is cooled by the fuel return oil cooler 3.

[0042] The fuel system includes a fuel inlet line 11. After passing through a first ball valve 101, the fuel inlet line 11 passes through a dual fuel filter 1 and is divided into a first fuel line 12 and a second fuel line 13. The first fuel line 12 includes a first check valve 105 and a second ball valve 106. The second fuel line 13 is connected in series with a third ball valve 102, a second check valve 103, and a fourth ball valve 104. The fuel return line 14 passes through a fuel return cooler 3. A fifth ball valve 107 and a sixth ball valve 108 are installed at both ends of the fuel return cooler 3, respectively.

[0043] The lubricating oil system includes a first lubricating oil pre-supply line 21, which is divided into two pre-supply lubricating oil pump lines 22 and a standby pre-supply lubricating oil line 23. The pre-supply lubricating oil pump line 22 is connected in series with a seventh ball valve 201, a lubricating oil pre-supply pump 4, a third check valve 203, and an eighth ball valve 204. The standby pre-supply lubricating oil line 23 is connected in series with a ninth ball valve 206, a standby lubricating oil pre-supply pump 5, a fourth check valve 207, and a tenth ball valve 208. After passing through the lubricating oil pre-supply pump 4 or the standby lubricating oil pre-supply line... After pump 5, the second lubricating oil pre-supply line 24 is connected. Then, one path passes through the lubricating oil preheater 6, the eleventh ball valve 210, and the lubricating oil filter 8 before entering the diesel engine. The lubricating oil preheater 6 has a first shut-off valve 209 connected in parallel at both ends, and the other path is connected to the second shut-off valve 205. The lubricating oil line 25 passes through the fifth check valve 211, the lubricating oil temperature control valve 212, the lubricating oil cooler 7, and the lubricating oil filter 8 before entering the diesel engine. A drain plug 202 is also installed on the first lubricating oil pre-supply line 21.

[0044] The cooling water system includes a high-temperature water pipeline 31, a low-temperature water pipeline 35, and a water supply and drain pipeline 34. The high-temperature water pipeline 31 enters the radiator after passing through the sixth check valve 312 and the high-temperature water temperature control valve 313. The high-temperature water temperature control valve 313 is equipped with a bypass pipeline 33. The sixth check valve 312 is connected in parallel with a high-temperature water heating pipeline 32. The high-temperature water heating pipeline 32 is connected in series with the twelfth ball valve 309, the first high-temperature water pump 10, the seventh check valve 311, the thirteenth ball valve 308, and the second high-temperature water pump 10. The system includes a warm water pump 9, an eighth check valve 310, a high-temperature water heater 26, and a fourteenth ball valve 307; a low-temperature water pipeline 35 passes through a low-temperature water temperature control valve 305 and then enters the radiator. The low-temperature water temperature control valve 305 bypasses the oil cooler 7 and then enters the diesel engine. The oil cooler 7 is connected in parallel at both ends to a sixteenth ball valve 302, a fuel return cooler 3, and a fifteenth ball valve 301; and a water supply and drain pipeline 34 is equipped with a third shut-off valve 303, a fourth shut-off valve 304, and a fifth shut-off valve 306.

[0045] In the hot standby state of the unit, the lubricating oil is drawn out by the lubricating oil pre-supply pump 4 or the standby lubricating oil pre-supply pump 5, heated by the lubricating oil preheater 6, and then returned to the diesel engine; the high-temperature water is heated by the high-temperature water electric heater 26 in the preheating unit, driven by the first high-temperature water pump 10 and / or the second high-temperature water pump 9, and enters the diesel engine after exchanging heat with the lubricating oil preheater 6, ensuring that the unit can start quickly.

[0046] When the unit is in operation, during initial operation, the bypass is automatically opened by the high-temperature water temperature control valve 313 and the low-temperature water temperature control valve 305. The high-temperature water and low-temperature water are cooled and returned to the diesel engine after circulating through the internal circulation unit. When the unit reaches thermal equilibrium, the high-temperature water and low-temperature water are cooled and circulated through the external radiator and returned to the diesel engine by the automatic control of the high-temperature water temperature control valve 313 and the low-temperature water temperature control valve 305.

[0047] The lubricating oil temperature control valve 212 automatically adjusts the flow rate of lubricating oil through the lubricating oil cooler 7 according to the lubricating oil temperature. When the lubricating oil temperature is lower than the set value, the lubricating oil temperature control valve 212 closes the path to the lubricating oil cooler 7, and the lubricating oil directly enters the diesel engine through the lubricating oil filter 8. When the lubricating oil temperature is higher than the set value, the lubricating oil temperature control valve 212 opens the path to the lubricating oil cooler 7, and the lubricating oil is cooled by the lubricating oil cooler 7 and then enters the diesel engine through the lubricating oil filter 8.

[0048] The fuel return cooler 3 and the lubricating oil cooler 7 share the cooling water circuit of the low-temperature water pipeline 35. After passing through the low-temperature water temperature control valve 305, the low-temperature water first flows through the lubricating oil cooler 7 to cool the lubricating oil, then flows through the fuel return cooler 3 to cool the fuel return oil, and then returns to the diesel engine.

[0049] In this embodiment, the layout scheme of the internal circulation unit system of the emergency diesel generator set for nuclear power plants adopts a modular design scheme for the equipment, valves and pipelines of the fuel system, cooling water system and lubricating oil system, which are integrated and arranged in a common frame. The fuel system, lubricating oil system and cooling water system pipelines and equipment are integrated and arranged in the common frame.

[0050] The common frame adopts a symmetrical pipeline layout structure, and two sets of mirror pipeline schemes can be designed for different factory buildings to meet the layout requirements of two mirror factory buildings, and the layout is flexible; the equipment and pipelines of the fuel system, cooling water system and lubricating oil system are integrated and installed in the common frame, reducing the number of external installation interfaces.

[0051] like Figures 1-3 As shown in this embodiment, the internal circulation unit system of the emergency diesel generator set for nuclear power plants has the following specific structure and function: This includes fuel system, cooling water system, and lubricating oil system piping and related equipment.

[0052] The fuel system includes a dual fuel filter 1, a standby fuel booster pump 2, a fuel return cooler 3, valves, and pipelines. The fuel system includes a fuel inlet line 11, which, after passing through a first ball valve 101, is divided into a first fuel line 12 and a second fuel line 13 by the dual fuel filter 1. The first fuel line 12 includes a first check valve 105 and a second ball valve 106. The second fuel line 13 is connected in series with a third ball valve 102, a second check valve 103, and a fourth ball valve 104. The fuel return line 14 passes through the fuel return cooler 3, and its two ends are respectively equipped with a fifth ball valve 107 and a sixth ball valve 108.

[0053] The lubricating oil system includes a lubricating oil pre-supply pump 4, a standby lubricating oil pre-supply pump 5, a lubricating oil preheater 6, a lubricating oil cooler 7, a lubricating oil filter 8, a lubricating oil temperature control valve 212, and other valves and pipelines. The lubricating oil system includes a first lubricating oil pre-supply line 21, which is divided into two pre-supply lubricating oil pump lines 22 and a standby pre-supply lubricating oil line 23. The pre-supply lubricating oil pump line 22 is connected in series with a seventh ball valve 201, a lubricating oil pre-supply pump 4, a third check valve 203, and an eighth ball valve 204. The standby pre-supply lubricating oil line 23 is connected in series with a ninth ball valve 206, a standby lubricating oil pre-supply pump 5, a fourth check valve 207, and a tenth ball valve 208. After passing through the lubricating oil pre-supply pump 4 or the standby lubricating oil pre-supply pump 5, it passes through the lubricating oil preheater 6, the eleventh ball valve 210, and the lubricating oil filter 8 before entering the diesel engine. The lubricating oil preheater 6 is connected in parallel with a first shut-off valve 209 at both ends. The lubricating oil line 25 passes through the fifth check valve 211, the lubricating oil temperature control valve 212, the lubricating oil cooler 7, and the lubricating oil filter 8 before entering the diesel engine.

[0054] The cooling water system includes a high-temperature water temperature control valve 313, a preheating unit (first high-temperature water pump 10 and second high-temperature water pump 9), a high-temperature water electric heater 26, a low-temperature water temperature control valve 305, and other valves and pipes. The cooling water system includes a high-temperature water pipeline 31, a low-temperature water pipeline 35, and a water supply and discharge pipeline 34. The high-temperature water pipeline 31 enters the radiator after passing through the sixth check valve 312 and the high-temperature water temperature control valve 313. The high-temperature water temperature control valve 313 has a bypass pipeline 33. The sixth check valve 312 is connected in parallel to two ends of a high-temperature water heating pipeline 32. The high-temperature water heating pipeline 32 is connected in series with the twelfth ball valve 309, the first high-temperature water pump 10, the seventh check valve 311, the thirteenth ball valve 308, and the second high-temperature water heater 26. The system includes a warm water pump 9, an eighth check valve 310, a high-temperature water heater 26, and a fourteenth ball valve 307; a low-temperature water pipeline 35 passes through a low-temperature water temperature control valve 305 and then enters the radiator. The low-temperature water temperature control valve 305 bypasses the lubricating oil cooler 7 and then enters the diesel engine. The lubricating oil cooler 7 is connected in parallel at both ends with a sixteenth ball valve 302, a fuel return cooler 3, and a fifteenth ball valve 301; and a water supply and drain pipeline 34 contains a third shut-off valve 303, a fourth shut-off valve 304, and a fifth shut-off valve 306.

[0055] In the hot standby state of the unit, lubricating oil from the diesel engine is drawn out by the lubricating oil pre-supply pump 4 or the standby lubricating oil pre-supply pump 5, heated by the lubricating oil preheater 6, and then returned to the diesel engine. The lubricating oil preheater 6 heats high-temperature water with the preheating oil through the high-temperature water electric heater 26. The high-temperature water is heated by the high-temperature water electric heater 26 in the preheating unit, driven by the first high-temperature water pump 10 and / or the second high-temperature water pump 9, and returns to the preheating unit after exchanging heat with the lubricating oil preheater 6, forming an internal circulation of high-temperature water.

[0056] During unit operation, the lubricating oil is cooled by the lubricating oil cooler 7 and filtered by the lubricating oil filter 8 before cooling various components of the diesel engine. When the unit is initially running, the bypass is automatically opened by the high-temperature water temperature control valve 313 and the low-temperature water temperature control valve 305, and the high-temperature water and low-temperature water are cooled and returned to the diesel engine after circulating internally through the internal circulation unit. When the unit reaches equilibrium, the high-temperature water temperature control valve 313 and the low-temperature water temperature control valve 305 are automatically controlled, and the high-temperature water and low-temperature water are cooled and circulated through the external radiator before returning to the diesel engine.

[0057] The lubricating oil temperature control valve 212 automatically adjusts the flow rate of lubricating oil through the lubricating oil cooler 7 according to the lubricating oil temperature. When the lubricating oil temperature is lower than the set value, the lubricating oil temperature control valve 212 closes the path to the lubricating oil cooler 7, and the lubricating oil directly enters the diesel engine through the lubricating oil filter 8. When the lubricating oil temperature is higher than the set value, the lubricating oil temperature control valve 212 opens the path to the lubricating oil cooler 7, and the lubricating oil is cooled by the lubricating oil cooler 7 and then enters the diesel engine through the lubricating oil filter 8.

[0058] The fuel return cooler 3 and the lubricating oil cooler 7 share the cooling water circuit of the low-temperature water pipeline 35. After passing through the low-temperature water temperature control valve 305, the low-temperature water first flows through the lubricating oil cooler 7 to cool the lubricating oil, then flows through the fuel return cooler 3 to cool the fuel return oil, and then returns to the diesel engine.

[0059] This embodiment discloses a layout scheme for the internal circulation unit of an emergency diesel generator set used in a nuclear power plant, such as... Figure 4 , Figure 6 As shown, through modular design, the fuel system, lubricating oil system, and cooling water system are integrated into a single unit. This integrated system simultaneously achieves hot standby lubricating oil heating and lubricating oil-fuel cooling during operation, meeting the unit's operational functions. The equipment, valves, and pipelines of the fuel system, cooling water system, and lubricating oil system adopt a standardized design scheme and are integrated within a common frame. This common frame is divided into fuel system area, lubricating oil system area, and cooling water system area, with each system area separated by partitions. Pipelines are arranged along the inner wall of the frame and the partitions.

[0060] like Figure 5 As shown, the common frame adopts a symmetrical pipeline layout structure, and two sets of mirror pipeline schemes can be designed for different factory buildings to meet the layout requirements of the two mirror factory buildings; the equipment and pipelines of the fuel system, cooling water system and lubricating oil system are integrated and installed in the common frame to reduce the number of external installation interfaces.

[0061] The above description is an explanation of the present invention and not a limitation thereof. The scope of the present invention is defined by the claims. Within the scope of protection of the present invention, any form of modification may be made.

Claims

1. An internal circulation unit system for an emergency diesel generator set used in a nuclear power plant, characterized in that: This includes an integrated fuel system, cooling water system, and lubrication system; The fuel system includes a dual fuel filter (1), a backup fuel booster pump (2), a fuel return cooler (3), and connecting pipes and valves; The lubricating oil system includes a lubricating oil pre-supply pump (4), a standby lubricating oil pre-supply pump (5), a lubricating oil preheater (6), a lubricating oil cooler (7), a lubricating oil filter (8), a lubricating oil temperature control valve (212), and connecting pipes and valves; The cooling water system includes a high-temperature water temperature control valve (313), a preheating unit, a low-temperature water temperature control valve (305), and connecting pipes and valves. The preheating unit includes a first high-temperature water pump (10), a second high-temperature water pump (9), and a high-temperature water electric heater (26). In the hot standby state of the unit, the lubricating oil pre-supply pump (4) or the standby lubricating oil pre-supply pump (5) draws out the lubricating oil from the diesel engine, heats it through the lubricating oil preheater (6), and returns it to the diesel engine. The lubricating oil preheater (6) exchanges heat with the high-temperature water heated by the high-temperature water electric heater (26). When the unit is in operation, the lubricating oil is cooled by the lubricating oil cooler (7) and filtered by the lubricating oil filter (8) to cool the diesel engine components. The fuel return oil is cooled by the fuel return oil cooler (3).

2. The internal circulation unit system for an emergency diesel generator set in a nuclear power plant as described in claim 1, characterized in that: The fuel system includes a fuel inlet line (11). The fuel inlet line (11) passes through a first ball valve (101) and then through a dual fuel filter (1) to form a first fuel line (12) and a second fuel line (13). The first fuel line (12) includes a first check valve (105) and a second ball valve (106). The second fuel line (13) is connected in series with a third ball valve (102), a second check valve (103), and a fourth ball valve (104). The fuel return line (14) passes through a fuel return cooler (3). The fuel return cooler (3) is equipped with a fifth ball valve (107) and a sixth ball valve (108) at both ends.

3. The internal circulation unit system for an emergency diesel generator set in a nuclear power plant as described in claim 1, characterized in that: The lubricating oil system includes a first lubricating oil pre-supply line (21), which is divided into two pre-supply lubricating oil pump lines (22) and a backup pre-supply lubricating oil line (23). The pre-supply lubricating oil pump line (22) is connected in series with a seventh ball valve (201), a lubricating oil pre-supply pump (4), a third check valve (203), and an eighth ball valve (204). The backup pre-supply lubricating oil line (23) is connected in series with a ninth ball valve (206), a backup lubricating oil pre-supply pump (5), a fourth check valve (207), and a tenth ball valve (208). After passing through the lubricating oil pre-supply pump (4) or the backup lubricating oil pre-supply line, the lubricating oil system is further divided into two pre-supply lubricating oil pump lines (22) and a backup lubricating oil pre-supply line (23). After the pump (5) is connected, the second lubricating oil pre-supply line (24) is connected at the same time. Then, one line passes through the lubricating oil preheater (6), the eleventh ball valve (210), and the lubricating oil filter (8) before entering the diesel engine. The lubricating oil preheater (6) has a first shut-off valve (209) connected in parallel at both ends, and the other line is connected to the second shut-off valve (205). The lubricating oil line (25) passes through the fifth check valve (211), the lubricating oil temperature control valve (212), the lubricating oil cooler (7), and the lubricating oil filter (8) before entering the diesel engine. A drain plug (202) is also installed on the first lubricating oil pre-supply line (21).

4. The internal circulation unit system for an emergency diesel generator set in a nuclear power plant as described in claim 1, characterized in that: The cooling water system includes a high-temperature water pipeline (31), a low-temperature water pipeline (35), and a water supply and discharge pipeline (34). The high-temperature water pipeline (31) enters the radiator after passing through the sixth check valve (312) and the high-temperature water temperature control valve (313). The high-temperature water temperature control valve (313) is equipped with a bypass pipeline (33). The high-temperature water heating pipeline (32) is connected in parallel at both ends of the sixth check valve (312). The high-temperature water heating pipeline (32) is connected in series with the twelfth ball valve (309), the first high-temperature water pump (10), the seventh check valve (311), the thirteenth ball valve (308), and the second high-temperature water pump (309). Water pump (9), eighth check valve (310), high temperature water heater (26), fourteenth ball valve (307); low temperature water pipeline (35) enters the radiator after passing through low temperature water temperature control valve (305), and the low temperature water temperature control valve (305) bypasses the lubricating oil cooler (7) and enters the diesel engine. The lubricating oil cooler (7) is connected in parallel at both ends with sixteenth ball valve (302), fuel return oil cooler (3), and fifteenth ball valve (301); the water supply and discharge pipeline (34) is equipped with third shut-off valve (303), fourth shut-off valve (304), and fifth shut-off valve (306).

5. The internal circulation unit system for an emergency diesel generator set in a nuclear power plant as described in claim 1, characterized in that: In the hot standby state of the unit, the lubricating oil is drawn out by the lubricating oil pre-supply pump (4) or the standby lubricating oil pre-supply pump (5), heated by the lubricating oil preheater (6), and then returned to the diesel engine; the high-temperature water is heated by the high-temperature water electric heater (26) in the preheating unit, driven by the first high-temperature water pump (10) and / or the second high-temperature water pump (9), and enters the diesel engine after exchanging heat with the lubricating oil preheater (6), so as to ensure that the unit can start quickly.

6. The internal circulation unit system for an emergency diesel generator set in a nuclear power plant as described in claim 1, characterized in that: When the unit is in operation, when the unit is initially running, the bypass is automatically opened by the high temperature water temperature control valve (313) and the low temperature water temperature control valve (305). The high temperature water and the low temperature water are cooled by internal circulation in the internal circulation unit and then return to the diesel engine. When the unit reaches thermal equilibrium, the high temperature water and the low temperature water are automatically controlled by the high temperature water temperature control valve (313) and the low temperature water temperature control valve (305). The high temperature water and the low temperature water are cooled by external radiator and then return to the diesel engine.

7. The internal circulation unit system for an emergency diesel generator set for a nuclear power plant as described in claim 1, characterized in that: The lubricating oil temperature control valve (212) automatically adjusts the flow rate of lubricating oil through the lubricating oil cooler (7) according to the lubricating oil temperature. When the lubricating oil temperature is lower than the set value, the lubricating oil temperature control valve (212) closes the path to the lubricating oil cooler (7), and the lubricating oil directly enters the diesel engine through the lubricating oil filter (8). When the lubricating oil temperature is higher than the set value, the lubricating oil temperature control valve (212) opens the path to the lubricating oil cooler (7), and the lubricating oil is cooled by the lubricating oil cooler (7) and then enters the diesel engine through the lubricating oil filter (8).

8. The internal circulation unit system for an emergency diesel generator set in a nuclear power plant as described in claim 1, characterized in that: The fuel return cooler (3) and the lubricating oil cooler (7) share the cooling water circuit of the low-temperature water pipeline (35). After passing through the low-temperature water temperature control valve (305), the low-temperature water first flows through the lubricating oil cooler (7) to cool the lubricating oil, then flows through the fuel return cooler (3) to cool the fuel return oil, and then returns to the diesel engine.

9. A layout scheme for an internal circulation unit system of an emergency diesel generator set for a nuclear power plant as described in claim 1, characterized in that: The equipment, valves, and pipelines of the fuel system, cooling water system, and lubricating oil system adopt a modular design scheme and are integrated and arranged in a common frame. The fuel system, lubricating oil system, and cooling water system pipelines and equipment are integrated and arranged in a common frame.

10. The arrangement scheme as described in claim 9, characterized in that: The common frame adopts a symmetrical pipeline layout structure, and two sets of mirror pipeline schemes can be designed for different factory buildings to meet the layout requirements of two mirror factory buildings, and the layout is flexible; the equipment and pipelines of the fuel system, cooling water system and lubricating oil system are integrated and installed in the common frame, reducing the number of external installation interfaces.