Methods and apparatus for calculating railway electrical test data
By constructing a correspondence between intelligent equipment agents and electrical calculation formulas, extracting compliance rules using a large model, and establishing a calculation-verification linkage equipment calculation library, the problems of accuracy and efficiency in calculating test parameters for railway electrical equipment have been solved, and the entire process has been automated and intelligently processed.
Patent Information
- Application Number
- CN202611040497.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-07-14
- Publication Date
- 2026-11-10
AI Technical Summary
The calculation of test parameters for railway electrical equipment suffers from problems such as poor accuracy, low efficiency, and insufficient intelligence and automation in the entire testing process. Existing spreadsheet tools cannot manage data uniformly and lack the ability to adapt to equipment, resulting in a high degree of manual intervention and errors in the calculation results.
The system establishes a correspondence between intelligent equipment agents and electrical calculation formulas, extracts compliance rules using a large model, generates parameter compliance rules, establishes a calculation-verification linkage equipment calculation library, automates the processing of test data and performs verification, and achieves fully automated management of the entire process.
It improves the accuracy and efficiency of railway electrical test parameter calculation, reduces manual intervention, realizes the intensive storage and intelligent management of test resources, and enhances the reliability of calculation results and operational efficiency.
Smart Images

Figure CN123069839A_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of railway equipment parameter calculation, specifically to a method and apparatus for calculating railway electrical test data. Background Technology
[0002] In the railway electrification operation and maintenance scenario, parameter calculation and test verification of electrical equipment such as transformers, high-voltage bushings, instrument transformers, surge arresters, and relay protection devices are routine test operations. The calculation of electrical indicators for various types of equipment relies on differentiated physical formulas, and is accompanied by the collection and calculation of multiple sources of factory parameters and on-site measured data. The manual calculation mode is easily affected by human error, and the calculation accuracy and work efficiency are difficult to guarantee. Currently, the industry generally uses spreadsheet tools to assist in the calculation of test data and parameters. While this has replaced manual calculations to some extent and optimized the efficiency of basic operations, this approach still has significant shortcomings: Firstly, test data is scattered across various independent forms, lacking a unified and standardized data archiving and related management system, making data traceability and cross-equipment reuse difficult. Secondly, spreadsheets lack the ability to automatically match equipment based on equipment model, service stage, and voltage specifications, failing to automatically match corresponding calculation formulas and compliance verification rules. Test personnel still need to manually select formulas and enter judgment criteria, resulting in a high proportion of manual intervention throughout the process. This leads to a large workload and frequent problems such as parameter mismatch and misuse of verification standards. Therefore, it is evident that the existing railway equipment test parameter calculation suffers from poor calculation accuracy, low operational efficiency, and insufficient intelligence and automation throughout the entire testing process. Summary of the Invention
[0003] To address the problems in the prior art, this application provides a method and apparatus for calculating railway electrical test data, which can effectively improve the calculation efficiency and accuracy of railway equipment electrical test data.
[0004] To solve at least one of the above problems, this application provides the following technical solution: Firstly, this application provides a method for calculating railway electrical test data, comprising: for each railway equipment, constructing an equipment intelligent agent corresponding to the electrical calculation target of the railway equipment information based on the electrical calculation target and electrical calculation formula of the railway equipment, and constructing a first correspondence between the equipment intelligent agent and the equipment factory indicators in the electrical calculation formula; extracting an initial parameter compliance rule set matching the electrical calculation target and the railway equipment information from railway equipment documents using a large model finely tuned in the railway field; performing fusion processing on the initial parameter compliance rule set based on the rule release time, applicable equipment operation stage, and rule level to generate parameter compliance rules; constructing a second correspondence between the parameter compliance rules, the railway equipment information, and the electrical calculation target, and constructing a calculation-verification linkage based on the second correspondence and the first correspondence. The system prepares a calculation library to obtain test equipment information, electrical test data output documents, and test calculation targets for the test railway equipment. Using the test calculation targets and the test equipment information, it retrieves the target equipment agent, target parameter compliance rules, and target equipment factory specifications from the equipment calculation library. It then obtains electrical calculation auxiliary parameters for the test railway equipment based on the target equipment factory specifications. These auxiliary parameters are corrected based on the current operating conditions of the test railway equipment to obtain the corrected electrical calculation auxiliary parameters. The target equipment agent extracts electrical test data from the electrical test data output document according to a preset data structure template and performs calculations on the electrical test data and the electrical calculation auxiliary parameters to obtain electrical calculation results. Finally, it stores the electrical calculation results according to the storage method corresponding to the verification results based on the target parameter compliance rules.
[0005] In some embodiments, the step of constructing a device intelligent agent corresponding to the electrical calculation target of the railway equipment information based on the electrical calculation target and electrical calculation formula of the railway equipment, and constructing a first correspondence between the device intelligent agent and the equipment factory indicators in the electrical calculation formula, includes: obtaining the electrical calculation target and railway equipment information of the railway equipment; determining the electrical calculation formula for calculating the electrical calculation target based on the electrical calculation target and the railway equipment information; parsing the variable parameter set, constant parameter set, and operational logic structure in the electrical calculation formula, wherein the variable parameter set includes the equipment factory indicators at the time of equipment delivery and the electrical data indicators during equipment operation; encapsulating the operational logic structure into an executable calculation unit of the device intelligent agent; mapping the variable parameter set into parameter inputs of the device intelligent agent represented by a preset data structure template; using the railway equipment information and the electrical calculation target of the railway equipment as railway equipment association indexes; parsing the equipment factory indicators belonging to the railway equipment from the variable parameter set; and constructing a first correspondence between the railway equipment association index, the equipment factory indicators, and the device intelligent agent.
[0006] In some embodiments, the step of extracting an initial set of parameter compliance rules matching the electrical calculation target and the railway equipment information from railway equipment documents using a large model fine-tuned for the railway domain, and then fusing the initial set of parameter compliance rules based on rule release time, applicable equipment operation stage, and rule level to generate parameter compliance rules, includes: concatenating the electrical calculation target and the railway equipment information into structured query hints; inputting the structured query hints and railway equipment documents into a large model fine-tuned for the railway domain; and using the large model to extract multiple candidate rule text fragments and text fragment attributes matching the structured query hints from the railway equipment documents. The text fragment attributes include text release time, text source, and text applicable stage. Each candidate rule text fragment is used for rule extraction to extract initial parameter compliance rules for verifying the compliance of the electrical calculation target. The publication time of the candidate rule text fragment is taken as the rule publication time of the initial parameter compliance rule, and the applicable stage of the candidate rule text fragment is taken as the applicable equipment operation stage of the initial parameter compliance rule. The rule level of the initial parameter compliance rule is determined based on the text source of the candidate rule text fragment. For each initial parameter compliance rule, the rule weight of the initial parameter compliance rule is calculated based on the rule publication time, equipment operation stage, and rule level. The initial parameter compliance rules are then merged based on the rule weights to generate parameter compliance rules.
[0007] In some embodiments, obtaining the electrical calculation auxiliary parameters of the test railway equipment for the target equipment's factory specifications, and correcting the electrical calculation auxiliary parameters based on the current operating conditions of the test railway equipment to obtain the corrected electrical calculation auxiliary parameters, includes: for the test railway equipment, obtaining the electrical calculation auxiliary parameters and factory operating conditions corresponding to the target equipment's factory specifications from the equipment's factory manual; obtaining the current operating conditions of the test railway equipment at the current moment, the current operating conditions including environmental information, equipment aging information, and equipment body operating environment information; using a multi-maintenance positive model to calculate the difference between the factory operating conditions and the current operating conditions to obtain an operating condition difference coefficient; correcting the electrical calculation auxiliary parameters based on the operating condition difference coefficient to obtain the corrected electrical calculation auxiliary parameters that conform to the current operating conditions; the multi-maintenance positive model is a functional relationship characterizing the degree of influence of multi-operating condition coupling effect on the baseline electrical calculation auxiliary parameters, obtained by fitting historical test data of the same type of equipment.
[0008] In some embodiments, the target device agent extracts electrical test data from the electrical test data output document according to a preset data structure template, calculates the electrical test data and the electrical calculation auxiliary parameters to obtain electrical calculation results, and stores the electrical calculation results in a storage method corresponding to the verification results of the electrical calculation results based on the compliance rules of the target parameters. This includes: the target device agent loading a built-in preset data structure template, extracting the electrical test data required by the preset data structure template from the electrical test data output document, and filling each electrical test data and the electrical calculation auxiliary parameters into the preset data structure template to obtain an input target data structure set; the target device agent utilizes... The target data structure set is processed using a built-in computational logic structure to obtain electrical calculation results. A test equipment association index is constructed based on the test equipment information and electrical test data. The electrical calculation results are verified using target parameter compliance rules. If the verification passes, a first data association relationship is constructed between the test equipment association index, the electrical calculation results, and the electrical test data, and this first data association relationship is stored in the standard result database. If the verification fails, a second data association relationship is constructed between the test equipment association index, the electrical calculation results, the electrical test data, the target parameter compliance rules, the electrical calculation auxiliary parameters, and the computational logic structure, and this second data association relationship is stored in the anomaly traceability database.
[0009] In some embodiments, the method further includes: obtaining a review instruction; obtaining review parameters from the anomaly tracing database based on the review test equipment association index of the review instruction; the review parameters include the electrical calculation result to be reviewed, the electrical test data to be reviewed, the compliance rules of the target parameter to be reviewed, the auxiliary parameters of the electrical calculation to be reviewed, and the operational logic structure to be reviewed; performing review calculations on the auxiliary parameters of the electrical calculation to be reviewed and the electrical test data to be reviewed based on the operational logic structure to be reviewed, obtaining a review calculation result; if the review calculation result is the same as the electrical calculation result to be reviewed, obtaining the set of operating conditions of the railway equipment to be reviewed within a preset time window corresponding to the review parameters, and utilizing the railway equipment to be reviewed... The dedicated equipment health assessment model corresponding to the equipment type processes the set of operating conditions to generate the equipment health confidence level of the railway equipment to be reviewed and tested. If the equipment health confidence level is lower than the preset health confidence level, an equipment defect alarm message is generated. If the equipment health confidence level is not lower than the preset health confidence level, a rule update confirmation instruction for the compliance rules of the target parameters to be reviewed is generated to update the compliance rules of the target parameters to be reviewed in the equipment calculation library based on the rule update confirmation instruction. If the review calculation result is different from the electrical calculation result to be reviewed, the operation logic structure of the equipment agent corresponding to the associated index of the equipment to be reviewed in the equipment calculation library is reset based on the operation logic structure to be reviewed.
[0010] In some embodiments, determining the electrical calculation formula for calculating the electrical calculation target based on the electrical calculation target and the railway equipment information, and parsing the variable parameter set, constant parameter set, and operational logic structure in the electrical calculation formula includes: if the railway equipment is a transformer, the railway equipment information is transformer parameter calculation, and the electrical calculation target is to calculate the phase resistance deviation value, then the electrical calculation formula is expressed as: converted resistance value = measured resistance value × (resistance temperature constant + phase factory temperature) / (resistance temperature constant + phase measured temperature), resistance deviation value = |factory resistance value - converted resistance value| ÷ [(factory resistance value + converted resistance value) ÷ 2] × 100%. The electrical calculation formula is parsed to obtain the variable parameter set composed of the measured resistance value, the phase factory temperature, the phase measured temperature, and the factory resistance value, and the constant parameter set composed of the resistance temperature constant and the percentage coefficient 100%. A directed acyclic graph representing the execution order of the electrical calculation formula is generated using the topological connection relationship of the abstract syntax tree, and the directed acyclic graph is used as the operational logic structure of the electrical calculation formula.
[0011] Secondly, this application provides a railway electrical test data calculation device, comprising: a construction unit, configured to, for each railway equipment, construct an intelligent device corresponding to the electrical calculation target of the railway equipment information based on the electrical calculation target and electrical calculation formula of the railway equipment, and construct a first correspondence between the intelligent device and the equipment factory indicators in the electrical calculation formula; extract an initial parameter compliance rule set matching the electrical calculation target and the railway equipment information from railway equipment documents using a large model finely tuned in the railway field; and perform fusion processing on the initial parameter compliance rule set based on the rule release time, applicable equipment operation stage, and rule level to generate parameter compliance rules; the construction unit is further configured to construct a second correspondence between the parameter compliance rules, the railway equipment information, and the electrical calculation target, and construct a calculation-calibration system based on the second correspondence and the first correspondence. The system includes a testing and verification linkage equipment calculation library. It acquires testing equipment information, electrical test data output documents, and test calculation targets for the test railway equipment. Using the test calculation targets and the testing equipment information, it retrieves the target equipment agent, target parameter compliance rules, and target equipment factory specifications from the equipment calculation library. An acquisition unit acquires electrical calculation auxiliary parameters for the test railway equipment based on the target equipment factory specifications. Based on the current operating conditions of the test railway equipment, it corrects the electrical calculation auxiliary parameters to obtain the corrected electrical calculation auxiliary parameters. The target equipment agent extracts electrical test data from the electrical test data output document according to a preset data structure template and calculates the electrical test data and the electrical calculation auxiliary parameters to obtain the electrical calculation result. The electrical calculation result is stored according to the storage method corresponding to the verification result based on the target parameter compliance rules.
[0012] Thirdly, this application provides an electronic device, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the program to implement the steps of the railway electrical test data calculation method.
[0013] Fourthly, this application provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the steps of the railway electrical test data calculation method described above.
[0014] Fifthly, this application provides a computer program product, including a computer program / instructions, which, when executed by a processor, implement the steps of the railway electrical test data calculation method described above.
[0015] As can be seen from the above technical solution, this application provides a method and device for calculating railway electrical test data. This solution customizes exclusive intelligent agents for different railway electrical equipment based on equipment information and calculation targets. It binds the equipment's factory baseline parameters through a first correspondence relationship. Simultaneously, it automatically extracts multi-source compliance rules from equipment documents using a fine-tuned industry model and obtains standardized judgment rules through multi-dimensional weight fusion. Then, it relies on a second correspondence relationship to associate rules, equipment information, and calculation targets, linking the two types of correspondence relationships to build an integrated equipment calculation library for calculation and verification. During on-site testing, only the information of the equipment under test, the test data file, and the calculation requirements need to be entered for rapid processing. The system quickly retrieves the corresponding intelligent agent, compliance rules, and factory parameters. After correcting environmental auxiliary parameters based on real-time on-site conditions, the intelligent agent automatically parses the test data, completes parameter calculations, and stores the results in a differentiated manner according to the verification conclusions. This approach eliminates the traditional fragmented management of tables and manual selection of formulas and verification standards, achieving full automation of formula matching, parameter correction, automatic calculation, compliance verification, and classification archiving. It avoids the problems of miscalculation and misjudgment caused by manual selection of formulas and review of standards, and achieves intensive storage of test resources. This significantly improves the accuracy of railway electrical test parameter calculations and the efficiency of test operations, and enhances the intelligence and automation level of the test process. Attached Figure Description
[0016] To more clearly illustrate the technical solutions in the embodiments of this application or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0017] Figure 1 This is a flowchart illustrating the railway electrical test data calculation method in the embodiments of this application; Figure 2 This is a schematic diagram of the preset data structure template of the device intelligence agent corresponding to the transformer's phase resistance deviation value in the embodiments of this application; Figure 3 This is a structural diagram of the railway electrical test data calculation device in the embodiments of this application. Detailed Implementation
[0018] To make the objectives, technical solutions, and advantages of the embodiments of this application clearer, the technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this application, not all embodiments. Based on the embodiments of this application, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this application.
[0019] The acquisition, storage, use, and processing of data in this application comply with relevant laws and regulations.
[0020] To improve the accuracy and efficiency of calculating railway equipment test parameters, this application provides an embodiment of a railway electrical test data calculation method, see [link to embodiment]. Figure 1 The method for calculating railway electrical test data specifically includes the following: Step S110: For each railway equipment, based on the electrical calculation target and electrical calculation formula of the railway equipment, construct the equipment intelligent agent corresponding to the electrical calculation target of the railway equipment information, and construct the first correspondence between the equipment intelligent agent and the equipment factory indicators in the electrical calculation formula. Using a large model finely tuned in the railway field, extract the initial parameter compliance rule set that matches the electrical calculation target and the railway equipment information from the railway equipment document. Based on the rule release time, applicable equipment operation stage and rule level, perform fusion processing on the initial parameter compliance rule set to generate parameter compliance rules.
[0021] Railway equipment refers to various power receiving devices participating in railway electrification system testing, such as transformers, circuit breakers, instrument transformers, surge arresters, bushings, and relay protection devices. Electrical calculation targets refer to the specific electrical parameter calculations required for a particular railway equipment, such as transformer winding DC resistance calculation, circuit breaker loop resistance calculation, insulation resistance absorption ratio or polarization index calculation, and turns ratio error calculation. Electrical calculation formulas refer to the physical quantity calculation expressions corresponding to the electrical calculation targets. Equipment intelligent agents are software-encapsulated calculation objects bound to specific railway equipment and electrical calculation targets, capable of autonomously completing electrical calculation target calculations. Each equipment intelligent agent corresponds one-to-one with a railway equipment type, belonging to a specific equipment type for railway equipment. Railway equipment information refers to structured data describing the identity and attributes of railway equipment, including at least the equipment type (indicating whether the railway equipment is a transformer, circuit breaker, cable, or other types of railway equipment), model, year of commissioning, service stage (newly installed, in operation, aging), associated factory manual number, equipment connection method, and equipment electrical parameter level. Equipment factory specifications refer to the benchmark technical parameters and material information of railway equipment provided by the manufacturer and written on the nameplate or factory manual when the equipment leaves the factory. Railway equipment documentation refers to unstructured or semi-structured documents containing information about railway equipment or industry standards, such as equipment factory manuals, scanned product nameplates, railway industry standard documents, and enterprise test procedures. A finely tuned large-scale model in the railway field refers to a model based on a general large-scale language model, further pre-trained or finely tuned using railway professional corpora (railway equipment documents, test report examples, etc.), capable of recognizing railway terminology (such as "DC resistance imbalance rate" and "absorption ratio"), understanding the correspondence between standard clauses and equipment types, and extracting compliance rule text related to "a certain equipment + a certain electrical calculation target" from long documents. The initial parameter compliance rule set refers to the original set of candidate compliance judgment rules extracted from railway equipment documents using the large-scale model. The rule release time is used to determine the timeliness of the rule. The applicable equipment operation stage refers to the service stage of the equipment to which the rule applies, such as new equipment commissioning tests, preventive tests, and late-stage aging special tests. Rule level refers to the authority level or the strength of the binding force of a rule. Parameter compliance rules refer to standardized compliance judgment criteria that have been deduplicated and conflict-selected through a three-dimensional fusion of timeliness, applicable stage, and authority level. These criteria are used by intelligent devices to verify whether electrical calculation results meet the standards.
[0022] Specifically, in the aforementioned step S110, the step of constructing a device intelligent entity corresponding to the electrical calculation target of the railway equipment information based on the electrical calculation target and electrical calculation formula of the railway equipment, and constructing a first correspondence between the device intelligent entity and the equipment factory indicators in the electrical calculation formula, includes: obtaining the electrical calculation target and railway equipment information of the railway equipment; determining the electrical calculation formula for calculating the electrical calculation target based on the electrical calculation target and the railway equipment information; parsing the variable parameter set, constant parameter set, and operational logic structure in the electrical calculation formula, wherein the variable parameter set includes the equipment factory indicators at the time of equipment delivery and the electrical data indicators during equipment operation; encapsulating the operational logic structure into an executable calculation unit of the device intelligent entity; mapping the variable parameter set into parameter entry points of the device intelligent entity represented by a preset data structure template; using the railway equipment information and the electrical calculation target of the railway equipment as railway equipment association indexes; parsing the equipment factory indicators belonging to the railway equipment from the variable parameter set; and constructing a first correspondence between the railway equipment association index, the equipment factory indicators, and the device intelligent entity.
[0023] The variable parameter set refers to the dynamically changing parameters in the electrical calculation formula, divided into parameters that change with the manufacturing of railway equipment (i.e., equipment factory specifications) and parameters that change with the operation of railway equipment (i.e., electrical data indicators). The constant parameter set refers to the fixed constants within the electrical calculation formula. The operational logic structure refers to the four arithmetic operations, functions, decision logic, conversion relationships, etc., of the calculation formula, which is the calculation kernel of the equipment intelligence agent. The executable calculation unit refers to the compiled and encapsulated operational logic structure into a callable code module within the intelligence agent, which can automatically calculate the calculation result upon receiving input parameters. The parameter entry refers to the standardized data access interface reserved by the equipment intelligence agent, which receives variable parameters in a fixed format according to a preset data structure template. The internal state attributes refer to the constant parameters being permanently stored locally on the equipment intelligence agent, which are not modified after instantiation and do not need to be repeatedly passed in from the outside. The railway equipment association index refers to the unique index code generated by concatenating railway equipment information and electrical calculation targets, which serves as the primary key for the association between the equipment intelligence agent, railway equipment, and equipment factory specifications.
[0024] For example, for a transformer of model SS11-M-2500, put into operation in 2019 and currently in service, the electrical calculation target is first identified as the calculation of the DC resistance imbalance rate of the windings. The corresponding electrical calculation formula is retrieved and its contents are broken down: the three-phase factory reference resistance in the formula belongs to the equipment factory index variable, the on-site measured three-phase DC resistance belongs to the operating electrical data variable, the 20℃ temperature conversion factor specified by the national standard is a fixed constant, and the calculation logic structure is the percentage conversion of the three-phase resistance range by the three-phase resistance average. By encapsulating this set of calculation logic structure into an executable calculation unit of the transformer's dedicated equipment intelligence, the variables are made into the intelligence parameter input entry according to the preset data structure template, the temperature conversion constant is solidified into the internal attribute of the intelligence, and then the railway equipment association index of the dedicated equipment type is generated by combining the transformer equipment information with the DC resistance imbalance rate calculation target. Based on the index, the three-phase factory reference resistance on the transformer nameplate is bound to the current intelligence, and the first correspondence relationship is established.
[0025] Therefore, by compiling the computational logic structure into executable computing units and mapping the variable parameter set and constant parameter set to standardized parameter entry points and internal state attributes respectively, the modular encapsulation of the calculation formula and the decoupling of the operating environment are effectively realized. This avoids the repeated transmission and parsing of constant parameters, significantly improving the computational execution efficiency and the convenience of instantiation deployment of the equipment intelligence agent. On the other hand, by constructing a first correspondence based on the railway equipment association index, the railway equipment type is precisely bound to the dedicated equipment intelligence agent. This not only establishes a strong semantic association between the calculation parameters and the calculation kernel, but also achieves fine-grained adaptation for the differences of different types of equipment. This enables the equipment intelligence agent to automatically obtain factory benchmarks and actual operating test data based on standardized parameter entry points, quickly and accurately complete the calculation tasks of specific electrical calculation targets, and greatly improve the automation level, calculation accuracy, and generalization application capability of railway electrical test data processing across equipment scenarios.
[0026] Specifically, in step S110, the step of extracting an initial parameter compliance rule set matching the electrical calculation target and the railway equipment information from railway equipment documents using a large model fine-tuned for the railway domain, and then fusing the initial parameter compliance rule set based on rule release time, applicable equipment operation stage, and rule level to generate parameter compliance rules, includes: concatenating the electrical calculation target and the railway equipment information into structured query hints; inputting the structured query hints and railway equipment documents into the large model fine-tuned for the railway domain; and using the large model to extract multiple candidate rule text fragments and text fragment attributes matching the structured query hints from the railway equipment documents. The text fragment attributes include text release time, text source, and text applicable level. The process involves: extracting rules from each candidate rule text fragment to identify initial parameter compliance rules that verify the compliance of the electrical calculation target; using the text publication time of the candidate rule text fragment as the rule publication time of the initial parameter compliance rule; using the text application stage of the candidate rule text fragment as the applicable equipment operation stage of the initial parameter compliance rule; determining the rule level of the initial parameter compliance rule based on the text source of the candidate rule text fragment; calculating the rule weight of each initial parameter compliance rule based on its rule publication time, equipment operation stage, and rule level; and fusing the initial parameter compliance rules based on their respective rule weights to generate a parameter compliance rule.
[0027] The structured query prompts refer to standardized question instructions in a regular format, composed of electrical calculation targets and railway equipment information. The large model is limited to extracting only content related to the structured query prompts, avoiding the extraction of irrelevant content. Initial parameter compliance rules are the original judgment rules extracted from candidate text fragments without deduplication and merging. The content is the parameter compliance limit requirements for the corresponding electrical calculation target. Multiple conflicting or overlapping initial parameter compliance rules often exist for the same electrical calculation target. Rule publication date refers to the official effective date of the corresponding standard or regulation, used to distinguish between new and old specifications and rules corresponding to obsolete or repealed documents. Applicable equipment operation stage refers to the test scenario defined by the rule, divided into new installation handover test, in-service preventive test, and late-stage aging special test. Different stages have different compliance thresholds. Rule level refers to the authority priority assigned based on the text source, with priority from highest to lowest being national standards > railway industry standards > enterprise internal test specifications. Rule weight is a numerical value quantified by combining three indicators: publication timeliness, applicable stage matching degree, and rule authority level. A higher weight indicates a higher priority for the adoption of this rule. Rule fusion refers to eliminating invalid, conflicting, and duplicate rules based on their weights, and selecting the best rule with the highest weight as the sole usable parameter compliance rule. Parameter compliance rules are the final judgment criteria after weighted fusion, ensuring no conflicts and adapting to the current equipment's service stage and type. These rules are used by the equipment agent to automatically verify whether the calculation results meet the standards. Parameter compliance rules correspond one-to-one with the equipment type carrying equipment attributes. Parameter compliance rules for different equipment attributes within the same equipment type can be the same or different. Equipment attributes include service stage and electrical attribute information. For example, if the railway equipment is a transformer, and the electrical calculation objective is to calculate the three-phase resistance deviation, and if the transformer's voltage level and neutral point lead-out method have different compliance verification standards for the three-phase resistance deviation, then for the transformer type, parameter compliance rules are constructed specifically for the equipment type carrying the voltage level and neutral point lead-out method. Parameter compliance rule one is that for three-phase transformers with a capacity of 1600kVA and below, when there is a neutral point lead-out, the allowable value for the three-phase resistance deviation between each phase winding is no greater than 4%. Compliance Rule 2 stipulates that for three-phase transformers with a capacity of 1600kVA and below, when there is no neutral point lead-out, the allowable deviation of the three-phase resistance between each winding shall not exceed 2%; Parameter Compliance Rule 3 stipulates that for three-phase transformers with a capacity greater than 1600kVA, when there is a neutral point lead-out, the allowable deviation of the three-phase resistance between each winding shall not exceed 2%; Parameter Compliance Rule 4 stipulates that for three-phase transformers with a capacity greater than 1600kVA, when there is no neutral point lead-out, the allowable deviation of the three-phase resistance between each winding shall not exceed 1%.
[0028] For example, using the SS11-M-2500 model transformer from the previous example, commissioned in 2019 and currently in operation, the electrical calculation target is the calculation of the winding DC resistance imbalance rate. The transformer equipment information and the DC resistance imbalance rate calculation target are concatenated to generate structured query prompts. These prompts, along with the transformer's manufacturer's manual, current railway testing standards, and the 2015 version of the company's outdated testing procedures, are then fed into the railway fine-tuning model. After searching the documents, the model extracts multiple candidate rule fragments, each with its publication time, source, and applicable stage attribute. The model then extracts three initial rules from these fragments. The first rule is the 2012 national standard, applicable to new installation and commissioning tests, with an imbalance rate ≤2%. The second rule is the 2018 railway industry standard, applicable to preventative testing, with an imbalance rate ≤4%. The third rule is the 2014 company procedure, applicable to preventative testing, with an imbalance rate ≤3%. Based on the source, the rule levels are divided as follows: national standard > industry standard > enterprise standard. Combined with the publication time to eliminate expired and invalid clauses and the current service stage of the railway equipment, the rule weights of the three initial rules are calculated respectively. The second rule has the highest rule weight and is used as the parameter compliance rule for the unbalance rate of the winding DC resistance of the transformer in operation.
[0029] Therefore, this solution constructs a structured query suggestion constraint model to extract rules in a targeted manner. It automatically labels the release time, applicable stage, and authority level of the rules based on the information contained in the document, and completes the fusion of multi-source rules in a multi-dimensional weighted manner. On the one hand, it solves the problems of low efficiency, easy omission of new standards, and misuse of obsolete clauses in the traditional manual screening of massive amounts of specifications. On the other hand, it accurately distinguishes the differentiated judgment thresholds of equipment at different service stages, automatically resolves conflicts between multiple versions of rules according to the authority level of the specification, and outputs a unified and reliable compliance judgment standard, ensuring that the subsequent parameter verification basis of the equipment agent is accurate and the compliance judgment result is credible.
[0030] Step S120: Construct a second correspondence between the parameter compliance rules, the railway equipment information, and the electrical calculation target; and construct a calculation-verification linkage equipment calculation library based on the second correspondence and the first correspondence; obtain the test equipment information, electrical test data output documents, and test calculation targets of the test railway equipment; and use the test calculation targets and the test equipment information to obtain the target equipment agent, target parameter compliance rules, and target equipment factory indicators from the equipment calculation library.
[0031] The first correspondence refers to the correspondence between the railway equipment association index (composed of railway equipment information and electrical calculation targets) and the equipment intelligent agent, as well as the correspondence with the equipment's factory specifications. The second correspondence refers to the correspondence between the railway equipment association index (composed of railway equipment information and electrical calculation targets) and the parameter compliance rules. The equipment calculation library is a structured resource library integrated based on the first and second correspondences. Using the railway equipment association index as the main index, the library stores the correspondence between equipment intelligent agents, equipment factory specifications, and parameter compliance rules, achieving integrated storage of calculation and calculation result compliance verification, i.e., realizing calculation-verification linkage. Test equipment information refers to structured data describing the identity and attributes of the test railway equipment, including at least the equipment type (indicating whether the railway equipment is a transformer, circuit breaker, cable, or other types of railway equipment), model, year of commissioning, service stage (newly installed, in operation, aging), associated factory manual number, equipment connection method, and equipment electrical parameter level. The electrical test data output document refers to the electrical data of the actual operation process exported from the test railway equipment during on-site test operation. The test calculation target refers to the specific electrical results that need to be calculated for the test railway equipment. The target equipment agent refers to the equipment agent matched from the equipment calculation library for calculating the type of railway equipment being tested, and for the equipment corresponding to the service stage of the tested railway equipment. The target parameter compliance rules are the judgment criteria used to verify the compliance of the calculation results of the target equipment agent. The target equipment factory specifications refer to the factory information of the tested railway equipment that the target equipment agent needs to obtain when calculating the test calculation targets.
[0032] Step S130: Obtain the electrical calculation auxiliary parameters of the test railway equipment for the factory specifications of the target equipment; correct the electrical calculation auxiliary parameters based on the current operating conditions of the test railway equipment to obtain the corrected electrical calculation auxiliary parameters; the target equipment agent extracts electrical test data from the electrical test data output document according to a preset data structure template, and calculates the electrical test data and the electrical calculation auxiliary parameters to obtain the electrical calculation result; and stores the electrical calculation result according to the storage method corresponding to the verification result of the verification of the electrical calculation result based on the compliance rules of the target parameters.
[0033] Among them, the electrical calculation auxiliary parameters refer to the benchmark indicators of the test railway equipment at the time of its manufacture, including the equipment's operating conditions, materials, and benchmark electrical parameters at the time of manufacture. Current operating conditions refer to the real-time operation and environmental conditions of the equipment at the test site at the current moment, including ambient temperature and humidity, equipment temperature and humidity, short-term energization, cold shutdown conditions, and test wiring conditions. Auxiliary parameter correction refers to converting and compensating for the originally collected electrical calculation auxiliary parameters based on current electrical conversion standards and the actual operating conditions of the equipment at the site, eliminating data deviations caused by environmental and on-site conditions. Corrected electrical calculation auxiliary parameters refer to standardized electrical calculation auxiliary parameters that meet the requirements for using the calculation formula after operating condition compensation, numerical conversion, and error correction. Preset data structure templates refer to a unified format template for the equipment intelligent agent parameter entry, specifying the fields, data types, and arrangement formats of the test data to facilitate automatic parsing, extraction, and calculation by the equipment intelligent agent. Electrical test data refers to the measured electrical values of the equipment extracted from the electrical test data output document of the test railway equipment, such as the measured DC resistance of each phase of the transformer and the measured insulation resistance, and other dynamic operating parameters. Electrical calculation results refer to the final index values (such as DC resistance imbalance rate values) obtained by the target device intelligent agent through calculation based on the built-in operation logic, using electrical calculation auxiliary parameters and electrical test data.
[0034] Specifically, in the aforementioned step S130, obtaining the electrical calculation auxiliary parameters of the test railway equipment for the target equipment's factory specifications, and correcting the electrical calculation auxiliary parameters based on the current operating conditions of the test railway equipment to obtain the corrected electrical calculation auxiliary parameters, includes: for the test railway equipment, obtaining the electrical calculation auxiliary parameters and factory operating conditions corresponding to the target equipment's factory specifications from the equipment's factory manual; obtaining the current operating conditions of the test railway equipment at the current moment, the current operating conditions including environmental information, equipment aging information, and equipment body operating environment information; using a multi-maintenance positive model to calculate the difference between the factory operating conditions and the current operating conditions to obtain the operating condition difference coefficient; and correcting the electrical calculation auxiliary parameters based on the operating condition difference coefficient to obtain the corrected electrical calculation auxiliary parameters that conform to the current operating conditions. The multi-maintenance positive model is a functional relationship characterizing the degree of influence of multi-operating condition coupling effect on the baseline electrical calculation auxiliary parameters, obtained by fitting historical test data of the same type of equipment.
[0035] Among them, the factory operating condition refers to the standard test environment and equipment state corresponding to the electrical calculation auxiliary parameters calibrated by the manufacturer when the test railway equipment leaves the factory. It is the benchmark standard operating condition for the electrical calculation auxiliary parameters at the time of factory delivery. The multi-maintenance positive model refers to a function model fitted based on a large amount of historical test data of similar equipment of the same type and model. It can quantify the degree of influence of the coupling effect of multiple operating conditions such as temperature, aging, and field environment on the electrical calculation auxiliary parameters. The operating condition difference coefficient is a quantitative coefficient calculated by the multi-maintenance positive model. It is used to characterize the degree of deviation between the current operating condition and the factory operating condition, and provides a quantitative basis for the correction of the electrical calculation auxiliary parameters. The corrected electrical calculation auxiliary parameters refer to the standardized auxiliary parameters that, after being compensated and corrected by the operating condition difference coefficient, are adapted to the actual field operating conditions and can be directly used in accurate electrical calculations.
[0036] For example, to calculate the DC resistance imbalance rate of a transformer of model X that is in operation, the electrical calculation auxiliary parameter of 20℃ (factory rated temperature) and the corresponding laboratory standard factory operating conditions are first obtained from the transformer's equipment manual. At the same time, the current operating conditions of this field test are collected, including the ambient temperature of 29℃, aging information of the equipment after 7 years of service, and the operating environment information of the equipment itself during the field cold static test. The factory operating conditions and the current measured operating conditions are input into a pre-trained multi-maintenance positive model. The model combines the coupling influence relationship fitted by historical test data of the same model transformer to calculate the operating condition difference coefficient of 0.8, which is the combined effect of temperature, aging, and field environment. This operating condition difference coefficient is used to compensate and correct the original 20℃ reference auxiliary parameter, and finally, the corrected temperature auxiliary parameter adapted to the actual operating conditions of this field test is 16℃, which eliminates the systematic error caused by the operating condition difference for subsequent accurate electrical calculations.
[0037] Therefore, this step no longer uses fixed standard operating condition parameters for direct calculation. Instead, it combines the equipment's factory operating condition with real-time multi-dimensional operating conditions on site. Through a data-driven multi-maintenance positive model, it quantifies the impact of differences in operating conditions and adaptively corrects the auxiliary parameters for electrical calculation. This effectively eliminates calculation deviations caused by the coupling of multiple factors such as ambient temperature, equipment aging, and on-site test environment, significantly improving the accuracy and adaptability of railway equipment electrical parameter calculations. It ensures that the electrical calculation results are consistent and comparable under different test times, service conditions, and on-site environments, providing a high-precision calculation foundation for subsequent parameter compliance verification.
[0038] Specifically, in the aforementioned step S130, the target device agent extracts electrical test data from the electrical test data output document according to a preset data structure template, calculates the electrical test data and the electrical calculation auxiliary parameters to obtain electrical calculation results, and stores the electrical calculation results according to the storage method corresponding to the verification results of the electrical calculation results based on the compliance rules of the target parameters. This includes: the target device agent loads the built-in preset data structure template, extracts the electrical test data required by the preset data structure template from the electrical test data output document, and fills each electrical test data and the electrical calculation auxiliary parameters into the preset data structure template to obtain the input target data structure set; the target device agent... The system utilizes its built-in computational logic structure to perform calculations on the target data structure set to obtain electrical calculation results. Based on the test equipment information and electrical test data, it constructs a test equipment association index and verifies the electrical calculation results using target parameter compliance rules. If the verification passes, it constructs a first data association relationship between the test equipment association index, the electrical calculation results, and the electrical test data, and stores the first data association relationship in the standard result library. If the verification fails, it constructs a second data association relationship between the test equipment association index, the electrical calculation results, the electrical test data, the target parameter compliance rules, the electrical calculation auxiliary parameters, and the computational logic structure, and stores the second data association relationship in the anomaly traceability library.
[0039] The preset data structure template refers to the standardized data format pre-set in the target equipment agent, specifying the field names, data types, and layout formats of various parameters to unify the data receiving specifications of the target equipment agent. The target data structure set refers to the structured dataset formed by uniformly filling the extracted measured electrical test data and corrected electrical calculation auxiliary parameters into the preset data structure template, serving as the input parameters for the target equipment agent's calculations. The electrical calculation result refers to the final index value output by the target equipment agent after substituting the structured data into the calculations. The test equipment association index is a unique index code generated by combining the test equipment information and the test calculation target of the target test equipment, used as the primary key for data archiving. This test equipment association index is also used to determine the specific railway equipment corresponding to the archived data. The standard result database is a database specifically storing verified and qualified test data. The anomaly traceability database is a database specifically storing all associated data of out-of-standard and unqualified tests, used for later fault tracing and review.
[0040] For example, for a transformer of model X that is in operation, the DC resistance imbalance rate is calculated. The target device agent loads a preset data structure template in a preset form format, automatically extracts electrical test data such as the measured winding resistance of the three phases A, B, and C from the test documents exported by the instrument, and then fills in the temperature conversion auxiliary parameters after operating condition correction to assemble a target data structure set. The target device agent calls the internally encapsulated imbalance rate calculation logic to complete the calculation and obtain the imbalance rate calculation result. The calculation is performed based on the limit of 4% in the target parameter compliance rules associated with the target device agent. If the calculated imbalance rate is 3.2%, it means that the verification is qualified. Then, the first data association relationship, which binds the test equipment association index, the calculation result, and the measured three-phase resistance, is generated and stored in the standard result library. If the calculated imbalance rate is 5.1%, it exceeds the standard and is unqualified. Then, the test equipment association index, electrical calculation result, electrical test data, target parameter compliance rules, electrical calculation auxiliary parameters, and calculation logic structure are all bound to generate a second data association relationship and archived in the anomaly traceability library.
[0041] Therefore, by relying on a unified preset data structure template, parameters are transmitted to the target device intelligent agent in a standard format, enabling the target device intelligent agent to perform automatic calculations. Data associations are constructed and stored separately according to the qualified and unqualified dual paths. Qualified data is streamlined and archived to save storage resources, while abnormal data is bound to all original calculation-related evidence throughout the entire chain. This not only achieves standardized classification and storage of test results, but also allows for complete backtracking of measured data, parameter correction, judgment criteria, and calculation logic when equipment parameters exceed the standard, relying on the abnormal traceability database to quickly locate the cause of the exceedance and greatly simplify the subsequent equipment fault investigation and test re-inspection work.
[0042] In some examples, the method further includes: obtaining a review instruction; obtaining review parameters from the anomaly tracing database based on the review test equipment association index of the review instruction; the review parameters include the electrical calculation result to be reviewed, the electrical test data to be reviewed, the compliance rules of the target parameter to be reviewed, the auxiliary parameters of the electrical calculation to be reviewed, and the operational logic structure to be reviewed; performing review calculations on the auxiliary parameters of the electrical calculation to be reviewed and the electrical test data to be reviewed based on the operational logic structure to be reviewed, obtaining the review calculation result; if the review calculation result is the same as the electrical calculation result to be reviewed, then obtaining the set of operating conditions of the railway equipment to be reviewed within a preset time window corresponding to the review parameters, and utilizing the railway equipment to be reviewed... The dedicated equipment health assessment model corresponding to the equipment type processes the set of operating conditions to generate the equipment health confidence level of the railway equipment to be reviewed and tested. If the equipment health confidence level is lower than the preset health confidence level, an equipment defect alarm message is generated. If the equipment health confidence level is not lower than the preset health confidence level, a rule update confirmation instruction for the compliance rules of the target parameters to be reviewed is generated to update the compliance rules of the target parameters to be reviewed in the equipment calculation library based on the rule update confirmation instruction. If the review calculation result is different from the electrical calculation result to be reviewed, the operation logic structure of the equipment agent corresponding to the associated index of the equipment to be reviewed in the equipment calculation library is reset based on the operation logic structure to be reviewed.
[0043] The review instruction refers to the operation instruction issued manually or through the platform for data review and fault tracing, carrying a unique index identifier that requires review. The review test equipment association index is a unique test equipment association index generated when abnormal data is archived, used to accurately locate a single abnormal test's full data within the abnormal traceability database. Review parameters refer to the full data of abnormal tests retrieved from the abnormal traceability database. Review calculation refers to using the operational logic in the review parameters to recalculate them a second time, verifying the accuracy of the initial calculation results. The review calculation result refers to the newly obtained electrical calculation result during the review. The preset time window refers to a fixed period (such as six months, one year, or other durations prior to the abnormal test date when the review parameter was entered into the abnormal traceability database) defined backwards from the date of the abnormal test, used to summarize the historical operating condition data of the railway equipment being reviewed. The operating condition set refers to the summarized dataset of environmental, aging, and operating conditions of all tests conducted on the railway equipment being reviewed within the preset time window. A dedicated equipment health assessment model refers to an assessment model trained and adapted to the deterioration patterns of different types of railway equipment. Inputting a set of operating conditions quantifies the health level of the railway equipment being reviewed. Equipment health confidence score refers to the quantitative score output by the dedicated equipment health assessment model, representing the overall health reliability of the railway equipment being reviewed when the review parameters are obtained. The lower the score, the higher the probability of equipment deterioration and defects. Equipment defect alarm information indicates that there are hidden faults or aging defects in the equipment itself. Rule update confirmation instructions are used to correct the original parameter compliance rules in the equipment calculation library corresponding to the equipment agent with the computational logic structure to be reviewed. Resetting the computational logic structure of the equipment agent means that if the two calculation results are inconsistent, it is determined that the built-in calculation formula of the equipment agent has a defect, and the computational logic of the corresponding agent in the equipment calculation library is replaced.
[0044] For example, the aforementioned SS11-M-2500 traction transformer previously had an imbalance rate of 5.1%. Records exceeding the standard are stored in the anomaly traceability database. The maintenance terminal issues a review instruction along with the corresponding review test equipment association index. The system uses the index to extract a complete set of review parameters from the anomaly traceability database: the original calculated result of 5.1%, the on-site measured three-phase resistance, the target compliance rule of 4% limit, the corrected temperature auxiliary parameters, and the original calculation logic of the unbalance rate. The original calculation logic is reused and historical parameters are substituted to perform review calculations. If the review result is also 5.1%, the full set of operating conditions for the 12 months prior to the transformer's anomaly test is extracted and sent to the transformer's dedicated equipment health assessment model. If the output health confidence is lower than the preset threshold, an alarm for transformer winding aging defects is automatically generated. If the confidence meets the standard and the equipment itself is fault-free, a rule update confirmation instruction is issued to revise and optimize the unbalance rate limit of the transformer model in operation in the equipment calculation database from 4%. If the review and recalculation result is inconsistent with the original 5.1%, it is determined that the intelligent agent's calculation logic is incorrect, and the calculation logic structure of the intelligent agent corresponding to the transformer is directly reset in the equipment calculation database.
[0045] Therefore, relying on the complete end-to-end data retained in the anomaly traceability database, automated review and verification are achieved. The source of the problem is distinguished through secondary recalculation: if the calculation is wrong, the intelligent agent's operation logic in the equipment's calculation database is corrected with one click; if the calculation is correct, the cause of the fault is identified based on the equipment's historical operating conditions and the dedicated health model. It distinguishes whether the problem is a defect in the equipment itself or an unreasonable setting of the original judgment rules, and triggers equipment fault alarms or rule iteration updates accordingly. This forms a self-optimization mechanism of test storage, anomaly archiving, review and source tracing, model evaluation, intelligent agent optimization, and rule closed-loop optimization, continuously iterating and improving the calculation logic and compliance standards of the equipment's calculation database, and gradually reducing the probability of misjudgment in subsequent electrical tests.
[0046] Specifically, in the aforementioned step S110, determining the electrical calculation formula for calculating the electrical calculation target based on the electrical calculation target and the railway equipment information, and parsing the set of variable parameters, the set of constant parameters, and the operational logic structure in the electrical calculation formula, includes: if the railway equipment is a transformer, the railway equipment information is transformer parameter calculation, and the electrical calculation target is to calculate the resistance deviation value of the phase, then the electrical calculation formula is expressed as: Converted resistance value = Measured resistance value × (Temperature constant of resistance + Phase factory temperature) / (Temperature constant of resistance + Phase measurement temperature) Resistance deviation = |Factory resistance value - Converted resistance value| ÷ [(Factory resistance value + Converted resistance value) ÷ 2] × 100% The electrical calculation formula is parsed to obtain a set of variable parameters consisting of the measured resistance value, the phase factory temperature, the phase measured temperature, and the factory resistance value, and a set of constant parameters consisting of the resistance temperature constant and the percentage coefficient 100%. A directed acyclic graph (DAG) representing the execution order of the electrical calculation formula is generated using the topological connection relationship of the abstract syntax tree, and this DAG serves as the operational logic structure of the electrical calculation formula. The preset data structure template in the device agent corresponding to the transformer's calculated phase resistance deviation value is as follows: Figure 2 As shown, I, II, III, IV, and V refer to the current tap position of the transformer. If the transformer is not in tap I, the set of variable parameters for calculating the resistance deviation value of the transformer phase also includes the transformer tap position. The measured parameters of the transformer phase are filled into the corresponding position of the specified tap position in the preset data structure template.
[0047] For example, if the railway equipment is a transformer, the railway equipment information is transformer parameter calculation, and the electrical calculation objective is to calculate the three-phase resistance deviation value, then the electrical calculation formula is expressed as: Three-phase resistance deviation = (maximum measured resistance value - minimum measured resistance value) ÷ minimum measured resistance value × 100% The electrical calculation formula is parsed to obtain a set of variable parameters consisting of the maximum and minimum measured resistance values, and a set of constant parameters consisting of a percentage coefficient of 100%. A directed acyclic graph representing the execution order of the electrical calculation formula is generated using the topological connection relationship of the abstract syntax tree, and the directed acyclic graph is used as the operational logic structure of the electrical calculation formula.
[0048] For example, if the railway equipment is a transformer, the railway equipment information is transformer parameter calculation, and the electrical calculation objective is to calculate the dielectric loss deviation, then the electrical calculation formula is expressed as: Absolute temperature difference = | Measured temperature 20℃ | When the measured temperature is greater than or equal to 20℃, the converted dielectric loss value = measured dielectric loss value ÷ 1.3^(absolute value of temperature difference / 10). When the measured temperature is less than 20℃, the converted dielectric loss value = measured dielectric loss value × 1.3^(absolute temperature difference / 10). Dielectric loss deviation = Factory dielectric loss value ÷ Dielectric loss conversion value × 100% The electrical calculation formula is parsed to obtain a set of variable parameters consisting of the measured temperature, the measured dielectric loss value, and the factory dielectric loss value, and a set of constant parameters consisting of 20℃, 1.3, and a percentage coefficient of 100%. A directed acyclic graph representing the execution order of the electrical calculation formula is generated using the topological connection relationship of the abstract syntax tree, and the directed acyclic graph is used as the operational logic structure of the electrical calculation formula.
[0049] For example, if the railway equipment is a bushing, the railway equipment information is bushing parameter calculation, and the electrical calculation objective is to calculate the capacitance deviation, then the electrical calculation formula is expressed as: Capacitance deviation = (Measured capacitance - Factory capacitance) ÷ Factory capacitance × 100% The electrical calculation formula is parsed to obtain a set of variable parameters consisting of the measured capacitance and the factory capacitance, and a set of constant parameters consisting of the percentage coefficient 100%. A directed acyclic graph representing the execution order of the electrical calculation formula is generated using the topological connection relationship of the abstract syntax tree, and the directed acyclic graph is used as the operation logic structure of the electrical calculation formula.
[0050] For example, if the railway equipment is a transformer, the railway equipment information is transformer parameter calculation, and the electrical calculation objective is to calculate the absorption ratio, then the electrical calculation formula is expressed as: The absolute value of the temperature difference at the first moment = |The measured temperature at the first moment 20℃ | The absolute value of the temperature difference at the second moment = |The measured temperature at the second moment 20℃ | When the measured temperature at the first moment is greater than or equal to 20℃, the converted insulation resistance at the first moment = measured insulation resistance at the first moment ÷ 1.5^(absolute value of temperature difference at the first moment / 10). When the measured temperature at the first moment is less than 20℃, the converted insulation resistance at the first moment = measured insulation resistance at the first moment × 1.5^(absolute value of temperature difference at the first moment / 10). When the measured temperature at the second moment is greater than or equal to 20℃, the converted insulation resistance at the second moment = measured insulation resistance at the second moment ÷ 1.5^(absolute value of temperature difference at the second moment / 10). When the measured temperature at the second moment is less than 20℃, the converted insulation resistance at the second moment = measured insulation resistance at the second moment × 1.5^(absolute value of temperature difference at the second moment / 10). Absorption ratio = (Converted insulation resistance at the first moment ÷ Converted insulation resistance at the second moment) × 100% The electrical calculation formula is analyzed to obtain a set of variable parameters consisting of the measured temperature at the first moment, the measured temperature at the second moment, the measured insulation resistance at the first moment, and the measured insulation resistance at the second moment, as well as a set of constant parameters consisting of 20℃, 1.5, and a percentage coefficient of 100%. A directed acyclic graph representing the execution order of the electrical calculation formula is generated using the topological connection relationship of the abstract syntax tree, and the directed acyclic graph is used as the operational logic structure of the electrical calculation formula.
[0051] For example, if the railway equipment is a surge arrester, the railway equipment information is surge arrester parameter calculation, and the electrical calculation objective is to calculate the voltage deviation value, then the electrical calculation formula is expressed as: Voltage deviation = (Measured reference voltage - Factory reference voltage) ÷ Factory reference voltage × 100% The electrical calculation formula is parsed to obtain a set of variable parameters consisting of the measured reference voltage and the factory reference voltage, and a set of constant parameters consisting of a percentage coefficient of 100%. A directed acyclic graph representing the execution order of the electrical calculation formula is generated using the topological connection relationship of the abstract syntax tree, and the directed acyclic graph is used as the operation logic structure of the electrical calculation formula.
[0052] For example, if the railway equipment is a current transformer, the railway equipment information is current transformer parameter calculation, and the electrical calculation objective is to calculate the excitation parameters, which include excitation current and excitation voltage, then the electrical calculation formula is expressed as: , , Where Ie is the measured secondary current, Pe is the rated secondary load, and a and b are protection level parameters. To measure the secondary DC resistance, This is a preset parameter, and the preset parameter is equal to 0.15. For excitation current, The excitation voltage is used to analyze the electrical calculation formula to obtain a set of variable parameters consisting of measured secondary current, secondary rated load, and measured secondary DC resistance, and a set of constant parameters consisting of protection level parameters, preset parameters, and 100. The topological connection relationship of the abstract syntax tree is used to generate a directed acyclic graph that represents the execution order of the electrical calculation formula, and the directed acyclic graph is used as the operation logic structure of the electrical calculation formula.
[0053] For example, if the railway equipment is a cable, the railway equipment information is cable parameter calculation, and the electrical calculation objective is to calculate the series resonant withstand voltage frequency, then the electrical calculation formula is expressed as: Series resonant withstand voltage frequency = 1000 / [2π ], The electrical calculation formula is analyzed to obtain a set of variable parameters consisting of measured capacitance value and measured reactor inductance value, and a set of constant parameters consisting of 2π, 1000, and 0.5. A directed acyclic graph representing the execution order of the electrical calculation formula is generated using the topological connection relationship of the abstract syntax tree, and the directed acyclic graph is used as the operation logic structure of the electrical calculation formula.
[0054] For example, if the goal of the electrical calculation is to calculate the fault voltage and fault impedance values of the distance protection of railway equipment, then the electrical calculation formula is expressed as: θ = arctan(X / (X / tanφ+R)), If the fault impedance direction is positive When α = -10°, R1 = R, X1 = R tanα, When α<θ, R1=R tanφ / (tanφ-tanα), X1=R tanφ tanα / (tanφ-tanα), When α ≥ θ, R1 = X / tanα, X1 = X. If the fault impedance direction is reversed When α = 350°, R1 = R, X1 = R tanα, When α<θ, R1=R tanφ / (tanφ-tanα), X1=-R tanφ tanα / (tanφ-tanα) When α ≥ θ, R1 = X / tanα, X1 = -X. Z1=( + 0.5, U= Z1 I, Where θ is the maximum impedance angle, X is the measured reactance value, φ is the measured impedance angle, R is the measured resistance value, α is the fault impedance direction angle, I is the fault current, R1 is the converted resistance value, X1 is the converted reactance value, Z1 is the fault impedance value, and U is the fault voltage. The electrical calculation formula is analyzed to obtain a set of variable parameters consisting of the measured reactance value, measured impedance angle, measured resistance value, fault impedance direction angle, and fault current, and a set of constant parameters consisting of 0.5, -10°, and 350°. A directed acyclic graph representing the execution order of the electrical calculation formula is generated using the topological connection relationship of the abstract syntax tree, and the directed acyclic graph is used as the operation logic structure of the electrical calculation formula.
[0055] For example, if the railway equipment is an AT autotransformer, the railway equipment information is transformer parameter calculation, and the electrical calculation objective is to calculate differential protection parameters, then the electrical calculation formula is expressed as: ITa1m=(2Ira1+k1 Ira1 k1 Ir1+Id1) / 2, IFa1m=(2Ira1 k1 Ira1+k1 Ir1 Id1) / 2, ITb1m=(2Irb1+k1 Irb1 k1 Ir1+Id1) / 2, IFb1m=(2Irb1 k1 Irb1+k1 Ir1 Id1) / 2, ITa2m=(2Ira2+k2 Ira2 k2 Ir2+k1 Ir2 k1 Ir1+Id1) / 2, IFa2m=(2Ira2 k2 Ira2+k2 Ir2 k1 Ir2+k1 Ir1 Id1) / 2, ITb2m=(2Irb2+k2 Irb2 k2 Ir2+k1 Ir2 k1 Ir1+Id1) / 2, IFb2m=(2Irb2 k2 Irb2+k2 Ir2 k1 Ir2+k1 Ir1 Id1) / 2, Ira1s=|ITa1s+IFa1s| / 2,Ida1s=|ITa1s IFa1s|, Irb1s=|ITb1s+IFb1s| / 2,Idb1s=|ITb1s IFb1s|, Ira2s=|ITa2s+IFa2s| / 2,Ida2s=|ITa2s IFa2s|, Irb2s=|ITb2s+IFb2s| / 2,Idb2s=|ITb2s IFb2s|, k1s=|Idb1s Ida1s| / |Irb1s Ira1s|,k2s=|Idb2s Ida2s| / |Irb2s Ira2s|, Among them, the following parameters are differential protection parameters: the T-phase current ITa1m, F-phase current IFa1m, the T-phase current ITb1m, the F-phase current IFb1m, the T-phase current ITa2m, the F-phase current IFa2m, the T-phase current ITb2m, the F-phase current IFb2m, the differential current Ida1s, the braking current Ira1s, the differential current Idb1s, the braking current Irb1s, the differential current Ida2s, the braking current Ira2s, the differential current Idb2s, the braking current Irb2s, the actual braking coefficient k1s, and the actual braking coefficient k2s of the second stage. The electrical calculation formula is analyzed to obtain the differential operating current Id1, the braking current Ir1, the braking current Ir2, the braking coefficient k1, and the braking coefficient k2. The system consists of two sets of parameters: a set of simulated braking currents Ira1s (segment 1), Irb1s (segment 2), Ira2s (segment 1), and Irb2s (segment 2). It also includes a set of variable parameters consisting of the T-phase current ITa1s and F-phase current IFa1s (segment 1), the T-phase current ITb1s and F-phase current IFb1s (segment 2), the T-phase current ITa2s and F-phase current IFa2s (segment 1), and the T-phase current ITb2s and F-phase current IFb2s (segment 2). Finally, it generates a directed acyclic graph (DAG) representing the execution order of the electrical calculation formula using the topological connections of an abstract syntax tree. This DAG serves as the operational logic structure for the electrical calculation formula.
[0056] For example, if the railway equipment is a Vv / Vx connected transformer, the railway equipment information is transformer parameter calculation, and the electrical calculation objective is to calculate the differential protection parameters of the Vv / Vx connected transformer, then the electrical calculation formula is expressed as: If it is phase A or phase C, the phase A equilibrium coefficient Kpα = CTα UeL / (CTH UeH), IAa1m=(2Ira1+k1 Ira1 k1 Ir1+Id1) / 2, Iαa1m=(2Ira1 k1 Ira1+k1 Ir1 Id1) / (2Kpα), IAb1m=(2Irb1+k1 Irb1 k1 Ir1+Id1) / 2, Iαb1m=(2Irb1 k1 Irb1+k1 Ir1 Id1) / (2Kpα), IAa2m=(2Ira2+k2 Ira2 k2 Ir2+k1 Ir2 k1 Ir1+Id1) / 2, Iαa2m=(2Ira2 k2 Ira2+k2 Ir2 k1 Ir2+k1 Ir1 Id1) / (2Kpα), IAb2m=(2Irb2+k2 Irb2 k2 Ir2+k1 Ir2 k1 Ir1+Id1) / 2, Iαb2m=(2Irb2 k2 Irb2+k2 Ir2 k1 Ir2+k1 Ir1 Id1) / (2Kpα), Ira1s=(IAa1s+Kpα Iαa1s) / 2,Ida1s=IAa1s Kpα Iαa1s, Irb1s=(IAb1s+Kpα Iαb1s) / 2,Idb1s=IAb1s Kpα Iαb1s, Ira2s=(IAa2s+Kpα Iαa2s) / 2,Ida2s=IAa2s Kpα Iαa2s, Irb2s=(IAb2s+Kpα Iαb2s) / 2,Idb2s=IAb2s Kpα Iαb2s, k1s=(Idb1s Ida1s) / (Irb1s Ira1s), k2s=(Idb2s) Ida2s) / (Irb2s Ira2s), If the phase sequence is phase B, the phase A balance coefficient Kpα = CTα UeL / (CTH UeH), Phase B equilibrium coefficient Kpβ=CTβ UeL / (CTH UeH), IBa1m=(k1 Ira1 k1 Ir1+Id1+2Ira1) / 2, Iαβa1m=(k1 Ira1 k1 Ir1+Id1-2Ira1) / (2(Kpα+Kpβ)), IBb1m=(2Irb1+k1 Irb1 k1 Ir1+Id1) / 2, Iαβb1m=(k1 Irb1-2Irb1 k1 Ir1+Id1) / (2(Kpα+Kpβ)), IBa2m=(2Ira2+k2 Ira2 k2 Ir2+k1 Ir2 k1 Ir1+Id1) / 2, Iαβa2m=(k2 Ira2-2Ira2 k2 Ir2+k1 Ir2-k1 Ir1+Id1) / (2(Kpα+Kpβ)), IBb2m=(2Irb2+k2 Irb2 k2 Ir2+k1 Ir2 k1 Ir1+Id1) / 2, Iαβb2m=(k2 Irb2 k2 Ir2+k1 Ir2-2Irb2-k1 Ir1+Id1) / (2(Kpα+Kpβ)), Ira1s=(IBa1s-(Kpα+Kpβ)Iαβa1s) / 2,Ida1s=IBa1s+(Kpα+Kpβ)Iαβa1s, Irb1s=(IBb1s-(Kpα+Kpβ)Iαβb1s) / 2,Idb1s=IBb1s+(Kpα+Kpβ)Iαβb1s, Ira2s=(IBa2s-(Kpα+Kpβ)Iαβa2s) / 2,Ida2s=IBa2s+(Kpα+Kpβ)Iαβa2s, Irb2s=(IBb2s-(Kpα+Kpβ)Iαβb2s) / 2,Idb2s=IBb2s+(Kpα+Kpβ)Iαβb2s, k1s=(Idb1s Ida1s) / (Irb1s Ira1s),k2s=(Idb2s Ida2s) / (Irb2s Ira2s), Among them, the simulated phase currents at point 1A (IAa1m), Iαa1m, IAb1m, and Iαb1m at point 2A in simulation I; the simulated phase currents at point 2A (IAa2m), Iαa2m, IAb2m, and Iαb2m at point 2A in simulation II; the differential current at point 1 in actual operation I (Ida1s), the braking current at point 1 in actual operation I (Ira1s), the differential current at point 2 in actual operation I (Idb1s), the braking current at point 2 in actual operation I (Irb1s), the differential current at point 1 in actual operation I (Ida2s), and the braking current at point 1 in actual operation I (Ira2s) in actual operation I (Ira2s) in actual operation I (Idb1s). The differential current Idb2s at actual operating point 2 of stage II, the braking current Irb2s at actual operating point 2 of stage II, the actual braking coefficient k1s at stage I, the actual braking coefficient k2s at stage II, the phase B current IBa1m at simulated point 1 of stage I, the phase AB current Iαβa1m at simulated point 1 of stage I, the phase B current IBb1m at simulated point 2 of stage I, the phase AB current Iαβb1m at simulated point 2 of stage I, the phase B current IBa2m at simulated point 1 of stage II, the phase AB current Iαβa2m at simulated point 1 of stage II, the phase B current IBb2m at simulated point 2 of stage II, and the phase AB current Iαβb2m at simulated point 2 of stage II are all differential protection parameters of the transformer connected by Vv and Vx. The electrical calculation formula is analyzed to obtain the voltage U at the high-voltage side. eH, Low-voltage side rated voltage UeL, High-voltage side CT ratio CTH, Low-voltage side A-phase CT ratio CTα, Low-voltage side B-phase CT ratio CTβ, Stage I braking coefficient k1, Stage II braking coefficient k2, Ratio differential operating current Id1, Stage I braking current Ir1, Stage II braking current Ir2, Stage I simulated point 1 braking current Ira1, Stage I simulated point 2 braking current Irb1, Stage II simulated point 1 braking current Ira2, Stage II simulated point 2 braking current Irb2, Stage I actual operating point 1 A-phase current IAa1s, Stage I actual operating point 1 A-phase current Iαa1s, Stage I actual operating point 2 A-phase current IAb1s, Stage I actual operating point 2 A-phase current Iαb1s, Stage II actual operating point The set of variable parameters consisting of the phase current IAa2s of phase 1A, the phase current Iαa2s of phase 1A at the actual operating point of segment II, the phase current IAb2s of phase 2A at the actual operating point of segment II, the phase current Iαb2s of phase 2A at the actual operating point of segment II, the phase current IBa1s of phase 1B at the actual operating point of segment I, the phase current Iαβa1s of phase 1AB at the actual operating point of segment I, the phase current IBb1s of phase 2B at the actual operating point of segment I, the phase current Iαβb1s of phase 2AB at the actual operating point of segment I, the phase current IBa2s of phase 1B at the actual operating point of segment II, the phase current Iαβa2s of phase 1AB at the actual operating point of segment II, the phase current IBb2s of phase 2B at the actual operating point of segment II, and the phase current Iαβb2s of phase 2AB at the actual operating point of segment II, and the set of constant parameters consisting of the above two.A directed acyclic graph (DAG) representing the execution order of the electrical calculation formula is generated using the topological connections of the abstract syntax tree. This DAG serves as the operational logic structure of the electrical calculation formula.
[0057] For example, if the railway equipment is an Ii and Iii connected transformer, the railway equipment information is transformer parameter calculation, and the electrical calculation objective is to calculate the differential protection parameters of the Ii and Iii connected transformer, then the electrical calculation formula is expressed as: Phase A equilibrium coefficient Kpα=CTα UeL / (CTH UeH), IAa1m=(2Ira1+k1 Ira1 k1 Ir1+Id1) / 2, Iαa1m=(2Ira1 k1 Ira1+k1 Ir1 Id1) / (2Kpα), IAb1m=(2Irb1+k1 Irb1 k1 Ir1+Id1) / 2, Iαb1m=(2Irb1 k1 Irb1+k1 Ir1 Id1) / (2Kpα), IAa2m=(2Ira2+k2 Ira2 k2 Ir2+k1 Ir2 k1 Ir1+Id1) / 2, Iαa2m=(2Ira2 k2 Ira2+k2 Ir2 k1 Ir2+k1 Ir1 Id1) / (2Kpα), IAb2m=(2Irb2+k2 Irb2 k2 Ir2+k1 Ir2 k1 Ir1+Id1) / 2, Iαb2m=(2Irb2 k2 Irb2+k2 Ir2 k1 Ir2+k1 Ir1 Id1) / (2Kpα), Ira1s=(IAa1s+Kpα Iαa1s) / 2,Ida1s=IAa1s Kpα Iαa1s, Irb1s=(IAb1s+Kpα Iαb1s) / 2,Idb1s=IAb1s Kpα Iαb1s, Ira2s=(IAa2s+Kpα Iαa2s) / 2,Ida2s=IAa2s Kpα Iαa2s, Irb2s=(IAb2s+Kpα Iαb2s) / 2,Idb2s=IAb2s Kpα Iαb2s, k1s=(Idb1s Ida1s) / (Irb1s Ira1s),k2s=(Idb2s Ida2s) / (Irb2s Ira2s), Among them, the simulated phase currents at point 1A (IAa1m), Iαa1m, IAb1m, and Iαb1m at point 2A in simulation I, the simulated phase currents at point 2A in simulation I, the simulated phase currents at point 2A in simulation I, the simulated phase currents at point 1A in simulation I, the simulated phase currents at point 2 ... db1s, the braking current Irb1s at the actual operating point 2 of stage I, the differential current Ida2s at the actual operating point 1 of stage II, the braking current Ira2s at the actual operating point 1 of stage II, the differential current Idb2s at the actual operating point 2 of stage II, the braking current Irb2s at the actual operating point 2 of stage II, the actual braking coefficient k1s of stage I, and the actual braking coefficient k2s of stage II are all Ii and Iii connected transformer differential protection parameters. The electrical calculation formula is analyzed to obtain the voltage rating UeH on the high-voltage side, the rated voltage UeL on the low-voltage side, and the voltage rating UeL on the high-voltage side. CT ratio CTH, low-voltage side A-phase CT ratio CTα, first-stage braking coefficient k1, second-stage braking coefficient k2, ratio differential operating current Id1, first-stage braking current Ir1, second-stage braking current Ir2, first-stage simulated point 1 braking current Ira1, first-stage simulated point 2 braking current Irb1, second-stage simulated point 1 braking current Ira2, second-stage simulated point 2 braking current Irb2, first-stage actual operating point 1 A-phase current IAa1s, first-stage actual operating point 1 A-phase current Iαa1s, first-stage actual operating point 2 A-phase current I The variable parameter set consisting of Ab1s, the actual operating point 2A phase current Iαb1s, the actual operating point 1A phase current IAa2s, the actual operating point 1A phase current Iαa2s, the actual operating point 2A phase current IAb2s, and the actual operating point 2A phase current Iαb2s, and the constant parameter set consisting of the above two; using the topological connection relationship of the abstract syntax tree, a directed acyclic graph representing the execution order of the electrical calculation formula is generated, and the directed acyclic graph is used as the operation logic structure of the electrical calculation formula.
[0058] For example, if the railway equipment is a YNd11 coupled traction system, the railway equipment information is transformer parameter calculation, and the electrical calculation objective is to calculate the YNd11 coupled traction differential protection parameters, then the electrical calculation formula is expressed as: If it is phase A or phase B, the phase A equilibrium coefficient Kpα = 3^0.5CTαUeL / (CTHUeH), IAa1m=3^0.5(2Ira1+k1 Ira1 k1 Ir1+Id1) / 2, Iαa1m=3^0.5(2Ira1 k1 Ira1+k1 Ir1 Id1) / (2Kpα), IAb1m=3^0.5(2Irb1+k1 Irb1 k1 Ir1+Id1) / 2, Iαb1m=3^0.5(2Irb1 k1 Irb1+k1 Ir1 Id1) / (2Kpα), IAa2m=3^0.5(2Ira2+k2 Ira2 k2 Ir2+k1 Ir2 k1 Ir1+Id1) / 2, Iαa2m=3^0.5(2Ira2 k2 Ira2+k2 Ir2 k1 Ir2+k1 Ir1 Id1) / (2Kpα), IAb2m=3^0.5(2Irb2+k2 Irb2 k2 Ir2+k1 Ir2 k1 Ir1+Id1) / 2, Iαb2m=3^0.5(2Irb2 k2 Irb2+k2 Ir2 k1 Ir2+k1 Ir1 Id1) / (2Kpα), Ira1s=(IAa1s+Kpα Iαa1s) / (2 3^0.5),Ida1s=(IAa1s Kpα Iαa1s) / 3^0.5, Irb1s=(IAb1s+Kpα Iαb1s) / (2 3^0.5), Idb1s=(IAb1s Kpα Iαb1s) / 3^0.5, Ira2s=(IAa2s+Kpα Iαa2s) / (2 3^0.5), Ida2s=(IAa2s Kpα Iαa2s) / 3^0.5, Irb2s=(IAb2s+Kpα Iαb2s) / (2 3^0.5), Idb2s=(IAb2s Kpα Iαb2s) / 3^0.5, k1s=(Idb1s Ida1s) / (Irb1s Ira1s), k2s=(Idb2s Ida2s) / (Irb2s Ira2s), If it is phase c, Phase A balance coefficient Kpα=3^0.5CTα UeL / (CTH UeH), Phase B balance coefficient Kpβ=3^0.5CTβ UeL / (CTH UeH), ICa1m=3^0.5(k1 Ira1 k1 Ir1+Id1+2Ira1) / 2, Iαβa1m=3^0.5(k1 Ira1 k1 Ir1+Id1-2Ira1) / (2(Kpα+Kpβ)), ICb1m=3^0.5(2Irb1+k1 Irb1 k1 Ir1+Id1) / 2, Iαβb1m=3^0.5(k1 Irb1-2Irb1 k1 Ir1+Id1) / (2(Kpα+Kpβ)), ICa2m=3^0.5(2Ira2+k2 Ira2 k2 Ir2+k1 Ir2 k1 Ir1+Id1) / 2, Iαβa2m=3^0.5(k2 Ira2-2Ira2 k2 Ir2+k1 Ir2-k1 Ir1+Id1) / (2(Kpα+Kpβ)), ICb2m=3^0.5(2Irb2+k2 Irb2 k2 Ir2+k1 Ir2 k1 Ir1+Id1) / 2, Iαβb2m=3^0.5(k2 Irb2 k2 Ir2+k1 Ir2-2Irb2-k1 Ir1+Id1) / (2(Kpα+Kpβ)), Ira1s=(ICa1s-(Kpα+Kpβ)Iαβa1s) / (2 3^0.5),Ida1s=[ICa1s+(Kpα+Kpβ)Iαβa1s] / 3^0.5, Irb1s=(ICb1s-(Kpα+Kpβ)Iαβb1s) / (2 3^0.5),Idb1s=[ICb1s+(Kpα+Kpβ)Iαβb1s] / 3^0.5, Ira2s=(ICa2s-(Kpα+Kpβ)Iαβa2s) / (2 3^0.5),Ida2s=[ICa2s+(Kpα+Kpβ)Iαβa2s] / 3^0.5, Irb2s=(ICb2s-(Kpα+Kpβ)Iαβb2s) / (2 3^0.5),Idb2s=[ICb2s+(Kpα+Kpβ)Iαβb2s] / 3^0.5, k1s=(Idb1s Ida1s) / (Irb1s Ira1s),k2s=(Idb2s Ida2s) / (Irb2s Ira2s), Where ^ represents exponentiation, and the following are the simulated phase currents at point 1A: IAa1m, Iαa1m, IAb1m, Iαb1m, IAa2m, IAb2m, Iαb2m, Iαb2m, Iαb2m, Iαb2m, Iαb2m, Iαb2m, Ida1s, Ida1s, Ira1s, and Ira1s. Dynamic current Idb1s, braking current Irb1s at actual operating point 2 of stage I, differential current Ida2s at actual operating point 1 of stage II, braking current Ira2s at actual operating point 1 of stage II, differential current Idb2s at actual operating point 2 of stage II, braking current Irb2s at actual operating point 2 of stage II, actual braking coefficient k1s at stage I, actual braking coefficient k2s at stage II, phase C current ICa1m at simulated point 1 of stage I, phase AB current Iαβa1m at simulated point 1 of stage I, phase C current ICb1m at simulated point 2 of stage I, phase AB current I at simulated point 2 of stage I αβb1m, Phase C current ICa2m at simulated point 1 of segment II, Phase AB current Iαβa2m at simulated point 1 of segment II, Phase C current ICb2m at simulated point 2 of segment II, Phase AB current Iαβb2m at simulated point 2 of segment II, Differential current Ida1s at actual operating point 1 of segment I, Braking current Ira1s at actual operating point 1 of segment I, Differential current Idb1s at actual operating point 2 of segment I, Braking current Irb1s at actual operating point 2 of segment I, Differential current Ida2s at actual operating point 1 of segment II, Braking current Ira2s at actual operating point 1 of segment II, and so on. The differential current Idb2s at actual operating point 2, the braking current Irb2s at actual operating point 2 in stage II, the actual braking coefficient k1s in stage I, and the actual braking coefficient k2s in stage II are all differential protection parameters of the YNd11 connected traction transformer. The electrical calculation formula is analyzed to obtain the following parameters: high-voltage side rated voltage UeH, low-voltage side rated voltage UeL, high-voltage side CT ratio CTH, low-voltage side A-phase CT ratio CTα, low-voltage side B-phase CT ratio CTβ, stage I braking coefficient k1, stage II braking coefficient k2, and ratio differential operating current Id1.Braking current Ir1 (Stage 1), Braking current Ir2 (Stage 2), Braking current Ira1 (Stage 1 Simulation Point 1), Braking current Irb1 (Stage 1 Simulation Point 2), Braking current Ira2 (Stage 2 Simulation Point 1), Braking current Irb2 (Stage 2 Simulation Point 2), Phase A current IAa1s (Stage 1 Actual Operating Point 1), Phase A current Iαa1s (Stage 1 Actual Operating Point 1), Phase A current IAb1s (Stage 1 Actual Operating Point 2), Phase A current Iαb1s (Stage 1 Actual Operating Point 2), Phase A current IAa2s (Stage 2 Actual Operating Point 1), Phase A current Iαa2s (Stage 2 Actual Operating Point 1), Phase A current IAb2s (Stage 2 Actual Operating Point 2), Phase C current (Stage 1 Actual Operating Point) The system comprises a set of variable parameters consisting of current ICa1s, the AB phase current Iαβa1s at actual operating point 1 of segment I, the C phase current ICb1s at actual operating point 2 of segment I, the AB phase current Iαβb1s at actual operating point 2 of segment I, the C phase current ICa2s at actual operating point 1 of segment II, the AB phase current Iαβa2s at actual operating point 1 of segment II, the C phase current ICb2s at actual operating point 2 of segment II, and the AB phase current Iαβb2s at actual operating point 2 of segment II; and a set of constant parameters consisting of 2, 0.5, and 3. A directed acyclic graph (DAG) representing the execution order of the electrical calculation formula is generated using the topological connection relationship of the abstract syntax tree, and this DAG serves as the operational logic structure of the electrical calculation formula.
[0059] In summary, this solution customizes dedicated intelligent agents for different railway electrical equipment based on equipment information and calculation objectives. It binds equipment factory baseline parameters through a first correspondence relationship, and automatically extracts multi-source compliance rules from equipment documentation using a finely tuned industry model. These rules are then integrated with multi-dimensional weights to obtain standardized judgment rules. A second correspondence relationship is then established to link these rules with equipment information and calculation objectives, creating an integrated equipment calculation library for calculation and verification. During on-site testing, only the information of the equipment under test, the test data file, and the calculation requirements need to be entered to quickly retrieve the corresponding intelligent agent, compliance rules, and factory parameters. After correcting environmental auxiliary parameters based on real-time on-site conditions, the intelligent agent automatically parses the test data, completes parameter calculations, and stores the results in differentiated categories according to the verification conclusions. This solution eliminates the traditional fragmented management of tables and the manual selection of formulas and verification standards, achieving full automation of formula matching, parameter correction, automatic calculation, compliance verification, and categorized archiving. It avoids the errors and misjudgments caused by manual formula selection and standard review, while also achieving centralized storage of test resources. This significantly improves the accuracy of railway electrical test parameter calculations and the efficiency of test operations, enhancing the intelligence and automation level of the test process.
[0060] To improve the efficiency and accuracy of railway equipment test parameter calculation, this application provides an embodiment of a railway electrical test data calculation device for implementing all or part of the aforementioned railway electrical test data calculation method. See [link to embodiment]. Figure 3 The railway electrical test data calculation device specifically includes the following components: The construction unit 10 is used to construct, for each railway equipment, an intelligent device corresponding to the electrical calculation target of the railway equipment information based on the electrical calculation target and electrical calculation formula of the railway equipment, and to construct a first correspondence between the intelligent device and the equipment factory indicators in the electrical calculation formula. Using a large model finely tuned in the railway field, it extracts an initial parameter compliance rule set that matches the electrical calculation target and the railway equipment information from the railway equipment document. Based on the rule release time, applicable equipment operation stage and rule level, it performs fusion processing on the initial parameter compliance rule set to generate parameter compliance rules.
[0061] The construction unit 10 is also used to construct a second correspondence between the parameter compliance rules, the railway equipment information, and the electrical calculation target, and to construct a calculation-verification linkage equipment calculation library based on the second correspondence and the first correspondence, to obtain the test equipment information, electrical test data output documents, and test calculation targets of the test railway equipment, and to obtain the target equipment intelligent agent, target parameter compliance rules, and target equipment factory indicators from the equipment calculation library using the test calculation targets and the test equipment information.
[0062] The acquisition unit 20 is used to acquire the electrical calculation auxiliary parameters of the test railway equipment for the factory specifications of the target equipment, correct the electrical calculation auxiliary parameters based on the current operating conditions of the test railway equipment, and obtain the corrected electrical calculation auxiliary parameters. The target equipment agent extracts electrical test data from the electrical test data output document according to a preset data structure template, and calculates the electrical test data and the electrical calculation auxiliary parameters to obtain the electrical calculation result. The electrical calculation result is stored in the storage method corresponding to the verification result of the verification of the electrical calculation result based on the compliance rules of the target parameters.
[0063] As described above, the railway electrical test data calculation device provided in this application embodiment customizes exclusive equipment intelligent agents for different railway electrical equipment based on equipment information and calculation targets. It binds the equipment's factory benchmark parameters through a first correspondence relationship, and automatically extracts multi-source compliance rules from equipment documents using a fine-tuned industry model, and obtains standardized judgment rules through multi-dimensional weight fusion. Then, it uses a second correspondence relationship to associate rules, equipment information, and calculation targets, linking the two types of correspondence relationships to build an integrated equipment calculation library that realizes calculation and verification. During on-site testing, only the information of the equipment under test, the test data file, and the calculation requirements need to be entered for quick retrieval. With the support of intelligent agents, compliance rules, and factory parameters, and after correcting environmental auxiliary parameters based on real-time on-site operating conditions, the intelligent agents automatically parse test data, complete parameter calculations, and then store the results in differentiated categories according to the verification conclusions. This approach eliminates the traditional fragmented management of tables and the manual selection of formulas and verification standards, achieving full automation of formula matching, parameter correction, automatic calculation, compliance verification, and classification archiving. It avoids the problems of miscalculation and misjudgment caused by manual selection of formulas and consulting standards, and achieves intensive storage of test resources. This significantly improves the accuracy of railway electrical test parameter calculations and the efficiency of test operations, and enhances the intelligence and automation level of the test process.
[0064] To further illustrate this solution, this application also provides a specific application example of using the aforementioned railway electrical test data calculation device to implement the railway electrical test data calculation method, which specifically includes the following: In some embodiments, the step of constructing a device intelligent agent corresponding to the electrical calculation target of the railway equipment information based on the electrical calculation target and electrical calculation formula of the railway equipment, and constructing a first correspondence between the device intelligent agent and the equipment factory indicators in the electrical calculation formula, includes: obtaining the electrical calculation target and railway equipment information of the railway equipment; determining the electrical calculation formula for calculating the electrical calculation target based on the electrical calculation target and the railway equipment information; parsing the variable parameter set, constant parameter set, and operational logic structure in the electrical calculation formula, wherein the variable parameter set includes the equipment factory indicators at the time of equipment delivery and the electrical data indicators during equipment operation; encapsulating the operational logic structure into an executable calculation unit of the device intelligent agent; mapping the variable parameter set into parameter inputs of the device intelligent agent represented by a preset data structure template; using the railway equipment information and the electrical calculation target of the railway equipment as railway equipment association indexes; parsing the equipment factory indicators belonging to the railway equipment from the variable parameter set; and constructing a first correspondence between the railway equipment association index, the equipment factory indicators, and the device intelligent agent.
[0065] In some embodiments, the step of extracting an initial set of parameter compliance rules matching the electrical calculation target and the railway equipment information from railway equipment documents using a large model fine-tuned for the railway domain, and then fusing the initial set of parameter compliance rules based on rule release time, applicable equipment operation stage, and rule level to generate parameter compliance rules, includes: concatenating the electrical calculation target and the railway equipment information into structured query hints; inputting the structured query hints and railway equipment documents into a large model fine-tuned for the railway domain; and using the large model to extract multiple candidate rule text fragments and text fragment attributes matching the structured query hints from the railway equipment documents. The text fragment attributes include text release time, text source, and text applicable stage. Each candidate rule text fragment is used for rule extraction to extract initial parameter compliance rules for verifying the compliance of the electrical calculation target. The publication time of the candidate rule text fragment is taken as the rule publication time of the initial parameter compliance rule, and the applicable stage of the candidate rule text fragment is taken as the applicable equipment operation stage of the initial parameter compliance rule. The rule level of the initial parameter compliance rule is determined based on the text source of the candidate rule text fragment. For each initial parameter compliance rule, the rule weight of the initial parameter compliance rule is calculated based on the rule publication time, equipment operation stage, and rule level. The initial parameter compliance rules are then merged based on the rule weights to generate parameter compliance rules.
[0066] In some embodiments, obtaining the electrical calculation auxiliary parameters of the test railway equipment for the target equipment's factory specifications, and correcting the electrical calculation auxiliary parameters based on the current operating conditions of the test railway equipment to obtain the corrected electrical calculation auxiliary parameters, includes: for the test railway equipment, obtaining the electrical calculation auxiliary parameters and factory operating conditions corresponding to the target equipment's factory specifications from the equipment's factory manual; obtaining the current operating conditions of the test railway equipment at the current moment, the current operating conditions including environmental information, equipment aging information, and equipment body operating environment information; using a multi-maintenance positive model to calculate the difference between the factory operating conditions and the current operating conditions to obtain an operating condition difference coefficient; correcting the electrical calculation auxiliary parameters based on the operating condition difference coefficient to obtain the corrected electrical calculation auxiliary parameters that conform to the current operating conditions; the multi-maintenance positive model is a functional relationship characterizing the degree of influence of multi-operating condition coupling effect on the baseline electrical calculation auxiliary parameters, obtained by fitting historical test data of the same type of equipment.
[0067] In some embodiments, the target device agent extracts electrical test data from the electrical test data output document according to a preset data structure template, calculates the electrical test data and the electrical calculation auxiliary parameters to obtain electrical calculation results, and stores the electrical calculation results in a storage method corresponding to the verification results of the electrical calculation results based on the compliance rules of the target parameters. This includes: the target device agent loading a built-in preset data structure template, extracting the electrical test data required by the preset data structure template from the electrical test data output document, and filling each electrical test data and the electrical calculation auxiliary parameters into the preset data structure template to obtain an input target data structure set; the target device agent utilizes... The target data structure set is processed using a built-in computational logic structure to obtain electrical calculation results. A test equipment association index is constructed based on the test equipment information and electrical test data. The electrical calculation results are verified using target parameter compliance rules. If the verification passes, a first data association relationship is constructed between the test equipment association index, the electrical calculation results, and the electrical test data, and this first data association relationship is stored in the standard result database. If the verification fails, a second data association relationship is constructed between the test equipment association index, the electrical calculation results, the electrical test data, the target parameter compliance rules, the electrical calculation auxiliary parameters, and the computational logic structure, and this second data association relationship is stored in the anomaly traceability database.
[0068] In some embodiments, the apparatus is further configured to: obtain a review instruction; obtain review parameters from the anomaly tracing database based on the review test equipment association index of the review instruction; the review parameters include the electrical calculation result to be reviewed, the electrical test data to be reviewed, the compliance rules of the target parameter to be reviewed, the auxiliary parameters of the electrical calculation to be reviewed, and the operational logic structure to be reviewed; perform review calculations on the auxiliary parameters of the electrical calculation to be reviewed and the electrical test data to be reviewed based on the operational logic structure to be reviewed, and obtain a review calculation result; if the review calculation result is the same as the electrical calculation result to be reviewed, obtain the set of operating conditions of the railway equipment to be reviewed in a preset time window corresponding to the review parameters, and utilize the railway equipment to be reviewed. The dedicated equipment health assessment model corresponding to the equipment type processes the set of operating conditions to generate the equipment health confidence level of the railway equipment to be reviewed and tested. If the equipment health confidence level is lower than the preset health confidence level, an equipment defect alarm message is generated. If the equipment health confidence level is not lower than the preset health confidence level, a rule update confirmation instruction for the compliance rules of the target parameters to be reviewed is generated to update the compliance rules of the target parameters to be reviewed in the equipment calculation library based on the rule update confirmation instruction. If the review calculation result is different from the electrical calculation result to be reviewed, the operation logic structure of the equipment agent corresponding to the associated index of the equipment to be reviewed in the equipment calculation library is reset based on the operation logic structure to be reviewed.
[0069] In some embodiments, determining the electrical calculation formula for calculating the electrical calculation target based on the electrical calculation target and the railway equipment information, and parsing the variable parameter set, constant parameter set, and operational logic structure in the electrical calculation formula includes: if the railway equipment is a transformer, the railway equipment information is transformer parameter calculation, and the electrical calculation target is to calculate the phase resistance deviation value, then the electrical calculation formula is expressed as: converted resistance value = measured resistance value × (resistance temperature constant + phase factory temperature) / (resistance temperature constant + phase measured temperature), resistance deviation value = |factory resistance value - converted resistance value| ÷ [(factory resistance value + converted resistance value) ÷ 2] × 100%. The electrical calculation formula is parsed to obtain the variable parameter set composed of the measured resistance value, the phase factory temperature, the phase measured temperature, and the factory resistance value, and the constant parameter set composed of the resistance temperature constant and the percentage coefficient 100%. A directed acyclic graph representing the execution order of the electrical calculation formula is generated using the topological connection relationship of the abstract syntax tree, and the directed acyclic graph is used as the operational logic structure of the electrical calculation formula.
[0070] This invention also provides a computer device, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the railway electrical test data calculation method.
[0071] This invention also provides a computer-readable storage medium storing a computer program that, when executed by a processor, implements the above-described railway electrical test data calculation method.
[0072] This invention also provides a computer program product, which includes a computer program that, when executed by a processor, implements the above-described railway electrical test data calculation method.
[0073] Those skilled in the art will understand that embodiments of the present invention can be provided as methods, systems, or computer program products. Therefore, the present invention can take the form of a completely hardware embodiment, a completely software embodiment, or an embodiment combining software and hardware aspects. Furthermore, the present invention can take the form of a computer program product embodied on one or more computer-usable storage media (including, but not limited to, disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0074] This invention is described with reference to flowchart illustrations and / or block diagrams of methods, apparatus (systems), and computer program products according to embodiments of the invention. It will be understood that each block of the flowchart illustrations and / or block diagrams, and combinations of blocks in the flowchart illustrations and / or block diagrams, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, special-purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, generate instructions for implementing the flowchart illustrations and / or block diagrams. Figure 1 One or more processes and / or boxes Figure 1 A device that provides the functions specified in one or more boxes.
[0075] These computer program instructions may also be stored in a computer-readable storage medium that can direct a computer or other programmable data processing device to function in a particular manner, such that the instructions stored in the computer-readable storage medium produce an article of manufacture including instruction means, which are implemented in a process Figure 1 One or more processes and / or boxes Figure 1 The function specified in one or more boxes.
[0076] These computer program instructions may also be loaded onto a computer or other programmable data processing equipment to cause a series of operational steps to be performed on the computer or other programmable equipment to produce a computer-implemented process, thereby providing instructions that execute on the computer or other programmable equipment for implementing the process. Figure 1 One or more processes and / or boxes Figure 1 The steps of the function specified in one or more boxes.
[0077] The specific embodiments described above further illustrate the purpose, technical solution, and beneficial effects of the present invention. It should be understood that the above descriptions are merely specific embodiments of the present invention and are not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the scope of protection of the present invention.
Claims
1. A method for calculating railway electrical test data, characterized in that, The method includes: For each railway equipment, an intelligent device corresponding to the electrical calculation target and electrical calculation formula of the railway equipment is constructed, and a first correspondence between the intelligent device and the equipment factory indicators in the electrical calculation formula is constructed. Using a large model finely tuned in the railway field, an initial parameter compliance rule set matching the electrical calculation target and the railway equipment information is extracted from the railway equipment document. The initial parameter compliance rule set is fused based on the rule release time, applicable equipment operation stage and rule level to generate parameter compliance rules. A second correspondence relationship is constructed between the parameter compliance rules, the railway equipment information, and the electrical calculation target. Based on the second correspondence relationship and the first correspondence relationship, a calculation-verification linkage equipment calculation library is constructed. The test equipment information, electrical test data output documents, and test calculation targets of the test railway equipment are obtained. The target equipment intelligent agent, target parameter compliance rules, and target equipment factory indicators are obtained from the equipment calculation library using the test calculation targets and the test equipment information. The process involves obtaining electrical calculation auxiliary parameters for the test railway equipment based on the factory specifications of the target equipment, correcting these parameters based on the current operating conditions of the test railway equipment, obtaining the corrected electrical calculation auxiliary parameters, extracting electrical test data from the electrical test data output document according to a preset data structure template, calculating the electrical test data and the electrical calculation auxiliary parameters to obtain the electrical calculation result, and storing the electrical calculation result in a storage method corresponding to the verification result based on the compliance rules of the target parameters.
2. The method for calculating railway electrical test data according to claim 1, characterized in that, The process of constructing an intelligent device corresponding to the electrical calculation target of the railway equipment based on the electrical calculation target and the electrical calculation formula, and establishing a first correspondence between the intelligent device and the equipment factory indicators in the electrical calculation formula, includes: The electrical calculation target and railway equipment information of the railway equipment are obtained. Based on the electrical calculation target and railway equipment information, the electrical calculation formula for calculating the electrical calculation target is determined. The set of variable parameters, the set of constant parameters and the operation logic structure in the electrical calculation formula are analyzed. The set of variable parameters includes the equipment manufacturing indicators at the time of equipment leaving the factory and the electrical data indicators during equipment operation. The computational logic structure is encapsulated as an executable computing unit of the device intelligence agent, the variable parameter set is mapped as the parameter entry of the device intelligence agent represented by a preset data structure template, and the constant parameter set is used as the internal state attribute of the device intelligence agent. Using the railway equipment information and the electrical calculation target as the railway equipment association index, the equipment manufacturing indicators belonging to the railway equipment are parsed from the variable parameter set, and a first correspondence relationship between the railway equipment association index, the equipment manufacturing indicators and the equipment intelligent agent is constructed.
3. The method for calculating railway electrical test data according to claim 1, characterized in that, The method utilizes a finely tuned large model in the railway field to extract an initial parameter compliance rule set from railway equipment documents that matches the electrical calculation target and the railway equipment information. Based on the rule release time, applicable equipment operation stage, and rule level, the initial parameter compliance rule set is fused to generate parameter compliance rules, including: The electrical calculation target and the railway equipment information are concatenated into structured query suggestions. The structured query suggestions and railway equipment documents are input into a large model that has been fine-tuned in the railway field. The large model is used to extract multiple candidate rule text fragments and text fragment attributes that match the structured query suggestions from the railway equipment documents. The text fragment attributes include text publication time, text source, and text applicable stage. Rule extraction is performed on each candidate rule text fragment to extract the initial parameter compliance rule for verifying whether the electrical calculation target is compliant. The text release time of the candidate rule text fragment is taken as the rule release time of the initial parameter compliance rule, and the text application stage of the candidate rule text fragment is taken as the applicable equipment operation stage of the initial parameter compliance rule. The rule level of the initial parameter compliance rule is determined based on the text source of the candidate rule text fragment. For each of the initial parameter compliance rules, the rule weight of the initial parameter compliance rule is calculated based on the rule release time, device operation stage and rule level. The initial parameter compliance rules are then merged based on the rule weights to generate parameter compliance rules.
4. The method for calculating railway electrical test data according to claim 1, characterized in that, The process of obtaining the electrical calculation auxiliary parameters of the test railway equipment for the target equipment's factory specifications, and correcting the electrical calculation auxiliary parameters based on the current operating conditions of the test railway equipment to obtain the corrected electrical calculation auxiliary parameters includes: For the test railway equipment, electrical calculation auxiliary parameters and factory operating conditions corresponding to the target equipment's factory specifications are obtained from the equipment's factory manual. The current operating conditions of the test railway equipment at the current moment are obtained, including environmental information, equipment aging information, and equipment body operating environment information. The difference between the factory operating condition and the current operating condition is calculated using a multi-maintenance positive model to obtain the operating condition difference coefficient. Based on the operating condition difference coefficient, the electrical calculation auxiliary parameters are corrected to obtain the corrected electrical calculation auxiliary parameters that conform to the current operating condition. The multi-maintenance positive model is a functional relationship that characterizes the influence of the multi-operating condition coupling effect on the baseline electrical calculation auxiliary parameters, obtained by fitting historical test data of the same type of equipment.
5. The method for calculating railway electrical test data according to claim 1, characterized in that, The target device agent extracts electrical test data from the electrical test data output document according to a preset data structure template, and performs calculations on the electrical test data and the electrical calculation auxiliary parameters to obtain electrical calculation results. The electrical calculation results are stored in a storage method corresponding to the verification results based on the target parameter compliance rules, including: The target device agent loads the built-in preset data structure template, extracts the electrical test data required by the preset data structure template from the electrical test data output document, and fills each of the electrical test data and the electrical calculation auxiliary parameters into the preset data structure template to obtain the input target data structure set; The target device intelligent agent uses its built-in operational logic structure to perform calculations on the target data structure set to obtain electrical calculation results; Based on the test equipment information and electrical test data, a test equipment association index is constructed. The electrical calculation results are verified using target parameter compliance rules. If the verification passes, a first data association relationship is constructed between the test equipment association index, the electrical calculation results, and the electrical test data, and the first data association relationship is stored in the standard result database. If the verification fails, a second data association relationship is constructed between the test equipment association index, the electrical calculation results, the electrical test data, the target parameter compliance rules, the electrical calculation auxiliary parameters, and the operation logic structure, and the second data association relationship is stored in the anomaly traceability database.
6. The method for calculating railway electrical test data according to claim 5, characterized in that, The method further includes: Obtain a review instruction, and based on the review test equipment association index of the review instruction, obtain review parameters from the anomaly traceability database. The review parameters include the electrical calculation results to be reviewed, the electrical test data to be reviewed, the compliance rules of the target parameters to be reviewed, the auxiliary parameters of the electrical calculation to be reviewed, and the logic structure of the operation to be reviewed. Based on the logic structure of the calculation to be reviewed, the auxiliary parameters of the electrical calculation to be reviewed and the electrical test data to be reviewed are used to perform the review calculation to obtain the review calculation result. If the review calculation result is the same as the electrical calculation result to be reviewed, the set of working conditions of the railway equipment to be reviewed in the preset time window corresponding to the review parameters is obtained. The set of working conditions is processed using the dedicated equipment health assessment model corresponding to the equipment type of the railway equipment to be reviewed, and the equipment health confidence of the railway equipment to be reviewed is generated. If the device health confidence level is lower than the preset health confidence level, a device defect alarm message is generated. If the device health confidence level is not lower than the preset health confidence level, a rule update confirmation instruction for the compliance rules of the target parameter to be reviewed is generated, so as to update the compliance rules of the target parameter to be reviewed in the device computing library based on the rule update confirmation instruction. If the reconstructed calculation result is different from the electrical calculation result to be reconstructed, then the operational logic structure of the device agent corresponding to the associated index of the reconstructed test device in the device calculation library is reset based on the operational logic structure to be reconstructed.
7. The method for calculating railway electrical test data according to claim 2, characterized in that, The process of determining the electrical calculation formula for calculating the electrical calculation target based on the electrical calculation target and the railway equipment information, and analyzing the set of variable parameters, the set of constant parameters, and the operational logic structure in the electrical calculation formula, includes: If the railway equipment is a transformer, the railway equipment information is transformer parameter calculation, and the electrical calculation objective is to calculate the phase resistance deviation value, then the electrical calculation formula is expressed as: Converted resistance value = Measured resistance value × (Temperature constant of resistance + Phase factory temperature) / (Temperature constant of resistance + Phase measurement temperature) Resistance deviation = |Factory resistance value - Converted resistance value| ÷ [(Factory resistance value + Converted resistance value) ÷ 2] × 100% The electrical calculation formula is analyzed to obtain a set of variable parameters consisting of the measured resistance value, the phase factory temperature, the phase measured temperature, and the factory resistance value, and a set of constant parameters consisting of the resistance temperature constant and the percentage coefficient 100%. A directed acyclic graph representing the execution order of the electrical calculation formula is generated using the topological connection relationship of the abstract syntax tree, and the directed acyclic graph is used as the operation logic structure of the electrical calculation formula.
8. A railway electrical test data calculation device, characterized in that, The device includes: The construction unit is used to construct, for each railway equipment, an intelligent device corresponding to the electrical calculation target of the railway equipment information based on the electrical calculation target and electrical calculation formula of the railway equipment, and to construct a first correspondence between the intelligent device and the equipment factory indicators in the electrical calculation formula. Using a large model finely tuned in the railway field, it extracts an initial parameter compliance rule set that matches the electrical calculation target and the railway equipment information from the railway equipment document. Based on the rule release time, applicable equipment operation stage and rule level, it performs fusion processing on the initial parameter compliance rule set to generate parameter compliance rules. The construction unit is also used to construct a second correspondence between the parameter compliance rules, the railway equipment information, and the electrical calculation target, and to construct a calculation-verification linkage equipment calculation library based on the second correspondence and the first correspondence, to obtain the test equipment information, electrical test data output documents, and test calculation targets of the test railway equipment, and to obtain the target equipment intelligent agent, target parameter compliance rules, and target equipment factory indicators from the equipment calculation library using the test calculation targets and the test equipment information; The acquisition unit is used to acquire the electrical calculation auxiliary parameters of the test railway equipment for the factory specifications of the target equipment, correct the electrical calculation auxiliary parameters based on the current operating conditions of the test railway equipment, and obtain the corrected electrical calculation auxiliary parameters. The target equipment agent extracts electrical test data from the electrical test data output document according to a preset data structure template, and calculates the electrical test data and the electrical calculation auxiliary parameters to obtain the electrical calculation result. The electrical calculation result is stored in the storage method corresponding to the verification result of the verification of the electrical calculation result based on the compliance rules of the target parameters.
9. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that, When the processor executes the program, it implements the steps of the railway electrical test data calculation method according to any one of claims 1 to 7.
10. A computer-readable storage medium having a computer program stored thereon, characterized in that, When executed by a processor, the computer program implements the steps of the railway electrical test data calculation method according to any one of claims 1 to 7.