A method for spatial relationship detection and collaborative construction control of underground pipelines
By unifying the underground pipeline data of the construction area and generating spatially reliable segments, and combining the positioning of construction equipment and the attitude of working mechanisms, the problem of inconsistent underground pipeline positions in construction navigation was solved, and more accurate construction collaborative control and dynamic navigation were achieved.
Patent Information
- Application Number
- CN202611576304.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-13
- Publication Date
- 2026-11-10
AI Technical Summary
Existing technologies struggle to reflect reliable differences in the location data of underground pipelines from different sources in terms of lateral direction, burial depth, and extension direction during construction navigation. This leads to inconsistencies between the construction navigation boundary and the actual spatial relationship of the pipelines, and the lack of a predictive mechanism for continuous location changes and the next construction stage can easily cause construction risks.
By acquiring and unifying historical data, on-site detection data, and confirmed location data of underground pipelines in the construction area to the construction coordinate benchmark, pipeline segments are divided and reliable segments of underground pipeline space are generated. Combined with the positioning of construction equipment and the posture of working mechanism, the expected entry space is generated, and spatial relationship detection is carried out to screen navigation-permitted areas and update navigation positions.
It improves the availability and consistency of underground pipeline location data in construction navigation, reduces the risk of construction tools entering potential underground pipeline locations, and enhances the accuracy and adaptability during the construction process.
Smart Images

Figure CN123070286A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of underground pipeline construction navigation technology, and more specifically, to a method for detecting spatial relationships and coordinating construction control of underground pipelines. Background Technology
[0002] In the scenarios of municipal road renovation, underground utility tunnel construction and trench excavation, water supply, gas, communication and power pipelines are usually distributed in the construction area. Before construction, it is necessary to identify and confirm the plane position, burial depth, extension direction and adjacent spatial relationship of underground pipelines by combining historical pipeline data, on-site detection results and local confirmed positions, and to determine the spatial relationship between construction equipment, working mechanism and actual construction position and underground pipelines.
[0003] Existing solutions typically convert underground pipeline mapping results into two-dimensional or three-dimensional pipeline locations, and then combine the positioning results of construction equipment and preset safety distances to make proximity judgments, boundary crossing alarms, or construction avoidance. Some solutions also generate construction paths based on equipment posture and target construction areas to reduce the risk of accidentally hitting underground pipelines during excavation. Since underground pipelines are usually not in a state of direct and continuous observation before construction, existing historical pipeline data are mainly formed based on as-built measurement points, turning positions, and burial depth records. The pipeline positions between adjacent records need to be continuously expressed in combination with the extension direction.
[0004] On-site detection data determines the location and depth of underground targets through trenchless methods. The results are also affected by pipeline materials, burial depth, underground media and adjacent targets. Therefore, location data from different sources may differ in lateral location, burial depth and extension direction, and their reliability is not entirely consistent.
[0005] However, existing technologies in construction navigation typically still represent underground pipelines as spatial objects with fixed locations and boundaries, and use uniform or preset safety distances for risk assessment. This makes it difficult to reflect the reliable differences in the location of data from different sources in the lateral, burial depth, and extension directions. At the same time, most schemes mainly determine the distance relationship between the construction action point and the underground pipeline based on the current location of the construction action point, lacking a mechanism to make advance judgments based on continuous location changes and the possibility of the next construction stage entering the space. When new location evidence is obtained through pipeline exposure, supplementary detection, or confirmation of actual burial depth after construction progresses, existing schemes may still continue to use the original pipeline boundaries or uniformly update the location of the entire pipeline. It is difficult to accurately define the local pipeline segments that are truly affected by the new location evidence, and further simultaneously correct the corresponding spatial boundaries, navigation permission areas, and the next navigation location. This can easily lead to inconsistencies between the subsequent construction navigation results and the current actual spatial relationship of the underground pipeline. Summary of the Invention
[0006] To overcome the aforementioned deficiencies of the prior art, the following solution is proposed to address the problem of inconsistency between the construction navigation boundary and the actual pipeline spatial relationship caused by the uncertainty of the underground pipeline location in the aforementioned background art.
[0007] To achieve the above objectives, the present invention provides the following technical solution:
[0008] A method for detecting spatial relationships of underground pipelines and coordinating construction control includes the following steps:
[0009] S1. Obtain historical data, on-site detection data and confirmed location data of underground pipelines in the construction area, unify them to the construction coordinate benchmark, divide pipeline segments according to the continuity of pipeline extension and the reliability of directional location, determine the center position, extension direction, burial depth range and directional reliability boundary of each pipeline segment, and generate reliable spatial segments of underground pipelines.
[0010] S2. Obtain the location, orientation and working mechanism posture of the construction equipment, convert them to the current spatial position of the construction action point, determine the entry direction based on continuous position changes and the target construction position, and generate the expected entry space of the construction action point.
[0011] S3. Detect the spatial relationship between the expected entry space and the reliable segment of the underground pipeline space, and determine the safe passage relationship, reliable boundary approach relationship or reliable domain penetration relationship based on the positional change of their relative directional reliable boundary.
[0012] S4. Based on the spatial relationship detection results, filter the accessible directions that do not point to the inside of the directional reliable boundary, generate the navigation permission area and determine the next navigation position, and output the construction navigation instructions;
[0013] S5. During construction, obtain new location evidence that is inconsistent with the reliable segment of the underground pipeline space, identify the affected pipeline segment, correct its directional reliable boundary and verify the adjacent continuation relationship, generate the corrected reliable segment of the underground pipeline space, and redetermine the navigation permission area and the next navigation location.
[0014] Furthermore, the acquisition of historical data, on-site detection data, and confirmed location data of underground pipelines in the construction area, and their unification to the construction coordinate benchmark, specifically includes:
[0015] Obtain pipeline identification, planar location, historical burial depth and extension direction from historical underground pipeline data; obtain detection location, detection depth and detection extension direction from field detection data; and obtain confirmed location data verified on-site or confirmed by pipeline exposure.
[0016] Select a benchmark location within the construction area with definite plane coordinates and elevation, and convert the historical data of underground pipelines, on-site detection data, and confirmed location data to the construction coordinate benchmark corresponding to the benchmark location;
[0017] The converted data is assigned according to the pipeline identification. For data lacking pipeline identification, the corresponding underground pipeline is determined based on its spatial adjacency with the already assigned location, its extension direction connection status, and its burial depth connection status, thus forming a set of location data for each underground pipeline.
[0018] Confirmed location data is used as the location verification benchmark; when there is no confirmed location data, on-site detection data is used as the location verification benchmark. The consistency between historical underground pipeline data and on-site detection data and the location verification benchmark in the lateral, burial depth and extension directions is determined respectively, and the reliability of the directional location is determined accordingly.
[0019] Furthermore, the step of dividing the pipeline into segments based on the continuity of pipeline extension and the reliability of its direction and location, and determining the center position, extension direction, burial depth range, and directional reliability boundary of each pipeline segment, specifically includes:
[0020] The location data of underground pipelines are arranged sequentially along the extension direction. The continuity of pipeline extension data of adjacent locations is judged based on the preset continuous range of extension direction and the connection range of burial depth. Pipeline segment boundaries are formed at locations where adjacent location data do not meet the continuous range of extension direction or the connection range of burial depth.
[0021] The center location and extension direction are determined based on the location data within each pipeline segment, and the burial depth range is determined based on the burial depth distribution of the corresponding location data.
[0022] Based on the degree of confidence in the direction and location, determine the lateral confidence range, burial depth confidence range, and end extension confidence range of each pipeline segment in the lateral, burial depth, and end extension directions respectively.
[0023] The lateral confidence range and the burial depth confidence range are continuously extended along the extension direction of the pipeline segment, and the extension confidence range at both ends of the pipeline segment is extended and defined to form a directional confidence boundary jointly defined by the lateral confidence range, the burial depth confidence range and the end extension confidence range, thus generating a spatial confidence segment of the underground pipeline.
[0024] Furthermore, the acquisition of the construction equipment's location, orientation, and working mechanism posture, and the conversion to obtain the current spatial location of the construction action point, specifically includes:
[0025] Determine the positioning reference point of the construction equipment, and obtain the positioning position and orientation of the construction equipment under the construction coordinate reference point;
[0026] The current attitude of each working mechanism component, which is sequentially connected from the construction equipment body to the construction action point, is obtained to determine the positioning reference point, the connection position of each working mechanism component, and the spatial connection relationship between the construction action points.
[0027] Taking the location of the construction equipment as the starting point, the spatial connection relationship is converted to the construction coordinate reference according to the orientation of the equipment, and the current spatial position of the construction action point under the construction coordinate reference is determined according to the connection sequence of the working mechanism components.
[0028] The current spatial position of the construction action point is recorded according to the continuous acquisition time, forming a continuous position record used to characterize the continuous positional changes of the construction action point.
[0029] Furthermore, the step of determining the entry direction based on continuous position changes and the target construction position, and generating the expected entry space for the construction action point, specifically includes:
[0030] The current direction of movement is determined based on the current spatial position of the construction action point at adjacent acquisition times in the continuous location record, and the target entry direction from the current spatial position of the construction action point to the target construction position is determined.
[0031] Within the range of currently executable directions of the working mechanism, the direction that maintains the continuity of the current movement direction and is toward the target entry direction is determined as the entry direction;
[0032] Starting from the current spatial position of the construction action point, the forward position range is determined based on the direction of entry and the executable displacement range of the next construction stage.
[0033] Based on the lateral and depth ranges of the construction action point under the corresponding construction action, the forward position range is spatially expanded to generate the space into which the construction action point is expected to enter.
[0034] When continuous position changes cause a change in the current direction of movement, or when the target construction location changes, the entry direction is redefined and the expected entry space of the construction action point is updated.
[0035] Furthermore, the step of detecting the spatial relationship between the expected entry space and the reliable segment of the underground pipeline space, based on the positional change of their relative directional reliable boundary, specifically includes:
[0036] Determine the expected spatial coverage area of the construction action point and the corresponding reliable segment of underground pipeline space ahead along the direction of entry, and obtain the corresponding directional reliable boundary.
[0037] The boundary approach distance corresponding to the directional reliable boundary is determined based on the positioning error of the construction equipment and the range of single position change of the construction action point.
[0038] The detection system assesses the separation, proximity, and overlap between the expected entry point of the construction action and the directional reliable boundary, and determines the trend of positional change of the expected entry space relative to the directional reliable boundary based on the entry direction.
[0039] A safe passage relationship is determined when the expected entry space remains separated from the directional trusted boundary, and the positional change along the entry direction does not point to the interior of the directional trusted boundary.
[0040] When the expected entry space does not enter the interior of the directional trust boundary, the interval between it and the directional trust boundary is no greater than the boundary proximity distance, and the position change along the entry direction points towards the directional trust boundary, it is determined to be a trust boundary proximity relationship;
[0041] When the expected entry space overlaps with the interior of the directional trust boundary, or when a crossing occurs from the outside of the directional trust boundary to the inside along the entry direction, it is determined to be a trust domain crossing relationship.
[0042] Furthermore, the step of filtering accessible directions that do not point inside the directional reliable boundary based on the spatial relationship detection results to generate a navigation permission area specifically includes:
[0043] Starting from the current spatial location of the construction action point, within the current executable direction range of the working mechanism, multiple candidate entry directions are generated around the direction toward the target construction location;
[0044] The current entry direction is replaced with each candidate entry direction to generate the corresponding construction action point's expected entry space, and the spatial relationship detection results corresponding to each candidate entry direction are determined according to the spatial relationship detection method.
[0045] Candidate entry directions whose corresponding spatial relationship detection results are trusted domain penetration relationships are excluded;
[0046] For candidate entry directions whose corresponding spatial relationship detection results are close to the credible boundary, the entry direction is adjusted to the side away from the interior of the corresponding directional credible boundary, the construction action point is regenerated and the spatial relationship detection is performed.
[0047] Candidate or adjusted entry directions that are safe to pass through spatial relationships are identified as accessible directions, and the continuous reachable spaces corresponding to each accessible direction are organized into navigation permission areas.
[0048] When there is no accessible direction, the current spatial position of the construction action point is determined as the navigation hold position.
[0049] Furthermore, the step of determining the next navigation location and outputting construction navigation instructions specifically includes:
[0050] Based on the feasible displacement range of each accessible direction and construction action point in the next construction stage, the corresponding candidate navigation positions are determined within the navigation permission area.
[0051] Compare each candidate navigation position with the target construction position, and retain the candidate navigation positions that can be shortened to the target construction position relative to the current spatial position of the construction action point, and whose corresponding subsequent construction action points are expected to enter the space without forming a reliable domain penetration relationship.
[0052] Among the remaining candidate navigation positions, the candidate navigation position that is directionally continuous with the current direction of entry is selected as the next navigation position.
[0053] A construction navigation instruction is generated based on the current spatial location of the construction point, the next navigation location, and the navigation permission area. The construction navigation instruction includes the direction of entry, the next navigation location, and the navigation permission area.
[0054] When the construction action point reaches the next navigation location, or when a reliable segment of underground pipeline space causes a change in the navigation permission area, the next navigation location is re-determined and the construction navigation instructions are updated.
[0055] Furthermore, during the construction process, new location evidence that is inconsistent with the credible segment of the underground pipeline space is obtained to determine the affected pipeline segment, specifically including:
[0056] Obtain the location of exposed pipelines, supplementary detection locations, or actual burial depths formed during construction, and convert them to the construction coordinate benchmark to form new location evidence;
[0057] The new location evidence is compared with the center location, extension direction, burial depth range and directional credible boundary of the corresponding underground pipeline spatial credible segment.
[0058] When the new location evidence is located outside the corresponding directional credible boundary, or when the extension direction or burial depth represented by the new location evidence does not satisfy the pipeline extension continuity of the corresponding underground pipeline space credible segment, it is determined that the new location evidence is inconsistent with the underground pipeline space credible segment.
[0059] Starting from the location corresponding to the new location evidence, along the forward and backward extension direction of the corresponding underground pipeline, we sequentially examine whether the center position, extension direction, and burial depth of the adjacent pipeline segments remain continuous with the location changes reflected by the new location evidence.
[0060] The affected pipeline segment is identified as the pipeline segment that maintains continuity with the positional change reflected by the new location evidence in the forward and backward extension directions, and the boundary of the affected pipeline segment is determined at the position where the continuity of the original pipeline extension is restored in the adjacent pipeline segment.
[0061] Furthermore, the directional reliability boundary is corrected and the adjacent continuation relationship is verified to generate a corrected reliable segment of underground pipeline space, and the navigation permission area and the next navigation location are redefined, specifically including:
[0062] The new location evidence is added to the location data corresponding to the affected pipeline segment, and the center position, extension direction and burial depth range of the affected pipeline segment are re-determined based on the new location evidence and the original location data of the affected pipeline segment.
[0063] Based on the redefined center location, extension direction, and burial depth range, the lateral confidence range, burial depth confidence range, and end extension confidence range of the affected pipeline segment are corrected, and the corrected directional confidence boundary is formed.
[0064] The connection status of the center position, the continuity of the extension direction, and the connection status of the burial depth between the two ends of the affected pipeline segment and the adjacent unaffected pipeline segment after correction are respectively tested.
[0065] For adjacent locations that meet the requirements for pipeline extension continuity, a direct connection relationship is established. For adjacent locations that do not meet the requirements for pipeline extension continuity, a transitional connection segment is formed based on the positional change between the corrected end of the affected pipeline segment and the end of the adjacent unaffected pipeline segment.
[0066] The corrected affected pipeline segments, transitional joint segments, and unaffected pipeline segments are organized according to the pipeline extension sequence to generate a corrected reliable segment of underground pipeline space.
[0067] Based on the corrected reliable segment of underground pipeline space, the spatial relationship detection of the expected entry space of the construction action point is re-executed, the accessible directions are re-screened, the navigation permission area and the next navigation location are determined, and the construction navigation instructions are updated.
[0068] The technical effects and advantages of the present invention, a method for detecting spatial relationships of underground pipelines and coordinating construction control:
[0069] This invention unifies historical data, field detection data, and confirmed location data of underground pipelines to a construction coordinate benchmark, and constructs a reliable spatial segment of underground pipelines based on the continuity of pipeline extension and the reliability of their positions in the lateral, burial depth, and extension directions. This allows underground pipelines to no longer be expressed according to a fixed centerline and uniform safety distance, but rather to represent the actual possible spatial range with reliable boundaries that have directional differences, thereby improving the availability and consistency of pipeline location data from different sources in construction navigation.
[0070] During construction navigation, the spatial location of the actual construction action point is determined by the positioning position of the construction equipment, the orientation of the equipment, and the posture of the working mechanism. Combined with continuous position changes and the target construction position, the expected entry space is generated. Based on the separation, approach, and penetration status between the expected entry space and the directional reliable boundary, the enterable direction is screened to form the navigation permission area and the next navigation position. This realizes the transformation from judging the spatial relationship of the current distance to predicting the next construction stage, and reduces the risk of construction tools entering the possible location of underground pipelines after continuing to move.
[0071] Meanwhile, when new pipeline exposure locations, supplementary detection locations, or actual burial depth locations are obtained during construction, only the affected pipeline segments are determined and the directional reliability boundaries and adjacent continuation relationships are locally corrected. The navigation permission area and the next navigation location are regenerated, avoiding indiscriminate updates of the entire pipeline caused by changes in the location of a single point. This improves the accuracy, continuity, and on-site adaptability of spatial detection, dynamic navigation, and construction collaborative control during the construction process near underground pipelines. Attached Figure Description
[0072] Figure 1 This is a flowchart illustrating a method for detecting spatial relationships and coordinating construction control of underground pipelines according to the present invention.
[0073] Figure 2 This is a schematic diagram illustrating the detection of spatial relationships of underground pipelines and the local correction of directional reliable boundaries according to the present invention. Detailed Implementation
[0074] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0075] In order to achieve the above objectives, Figure 1 A structural schematic diagram of a method for detecting spatial relationships and coordinating construction of underground pipelines according to the present invention is provided, which specifically includes the following steps;
[0076] S1. Obtain historical data, on-site detection data and confirmed location data of underground pipelines in the construction area, unify them to the construction coordinate benchmark, divide pipeline segments according to the continuity of pipeline extension and the reliability of directional location, determine the center position, extension direction, burial depth range and directional reliability boundary of each pipeline segment, and generate reliable spatial segments of underground pipelines.
[0077] S2. Obtain the location, orientation and working mechanism posture of the construction equipment, convert them to the current spatial position of the construction action point, determine the entry direction based on continuous position changes and the target construction position, and generate the expected entry space of the construction action point.
[0078] S3. Detect the spatial relationship between the expected entry space and the reliable segment of the underground pipeline space, and determine the safe passage relationship, reliable boundary approach relationship or reliable domain penetration relationship based on the positional change of their relative directional reliable boundary.
[0079] S4. Based on the spatial relationship detection results, filter the accessible directions that do not point to the inside of the directional reliable boundary, generate the navigation permission area and determine the next navigation position, and output the construction navigation instructions;
[0080] S5. During construction, obtain new location evidence that is inconsistent with the reliable segment of the underground pipeline space, identify the affected pipeline segment, correct its directional reliable boundary and verify the adjacent continuation relationship, generate the corrected reliable segment of the underground pipeline space, and redetermine the navigation permission area and the next navigation location.
[0081] S1. Generate a reliable segment of underground pipeline space. Specific implementation details include:
[0082] In this implementation, historical data, field detection data and confirmed location data of underground pipelines in the construction area are first obtained, and location data from different sources are unified to the same construction coordinate benchmark to eliminate the problem of incomparable locations caused by different surveying results, different detection batches and field verification results using different coordinate expression methods;
[0083] After the coordinates are unified, the underground pipelines are assigned to the data at each location, and the reliability of the directional location is determined based on the consistency between the location data from different sources in the lateral, burial depth and extension directions.
[0084] The pipeline is further divided into segments based on the continuity of pipeline extension, and the center position, extension direction, burial depth range and directional reliable boundary of each pipeline segment are determined. Finally, a spatially reliable segment of underground pipeline is generated for subsequent construction action point spatial relationship detection.
[0085] Specifically, historical data on underground pipelines can be obtained from existing underground pipeline completion data, underground pipeline survey results, or underground pipeline management databases in the construction area. It includes at least pipeline identification, planar location, historical burial depth, and extension direction. Among them, pipeline identification is used to distinguish different underground pipelines in the construction area, planar location is used to characterize the position of underground pipelines in ground projection coordinates, historical burial depth is used to characterize the depth position of underground pipelines relative to a given elevation benchmark, and extension direction is used to characterize the extension direction of pipelines between adjacent historical locations.
[0086] The on-site detection data is obtained by conducting underground pipeline detection in the construction-affected area before construction. It includes at least the detection location, detection depth, and detection extension direction. On-site detection can be completed by selecting the corresponding underground pipeline detection equipment according to the actual pipeline type in the construction area. This embodiment does not limit the specific detection equipment type, as long as the generated on-site detection data can determine the spatial location, depth, and continuous extension direction of the corresponding underground target.
[0087] Confirmed location data refers to data that can directly confirm the actual spatial location of underground pipelines. It can come from test pits or manual verification points set up before construction, or from pipeline locations that have been exposed and can be directly measured during construction. Confirmed location data includes at least the plane coordinates and confirmed burial depth of the confirmed location. When multiple confirmed locations can be continuously measured along the exposed pipeline, the confirmed extension direction of the corresponding pipeline is also determined based on the adjacent confirmed locations.
[0088] The aforementioned historical data, field detection data, and confirmed location data of underground pipelines reflect the spatial location of underground pipelines under different acquisition conditions. Among them, the historical data of underground pipelines is used to provide the existing location and overall extension relationship, the field detection data is used to verify the pipeline location in the current construction area, and the confirmed location data is used to provide the actual pipeline location that can be directly determined.
[0089] Because the three types of data differ in their formation time, acquisition method, and location accuracy, this implementation does not directly use location data from any single source as the definite location of the entire underground pipeline. Instead, it determines the reliability of the directional location in the lateral, burial depth, and extension directions by verifying the location between data from different sources, and constructs a directional reliability boundary accordingly.
[0090] Since historical data, field detection data and confirmed location data of underground pipelines may use different coordinate benchmarks, before performing subsequent location comparisons, a benchmark location with definite plane coordinates and elevations should be selected within the construction area. The benchmark location can be a control point in the construction control network whose coordinates have been verified, and a construction coordinate benchmark should be established based on the plane coordinate benchmark and elevation benchmark corresponding to the control point.
[0091] For historical data of underground pipelines, when the original coordinates are inconsistent with the construction coordinate reference, the historical plane position and historical burial depth are converted to the construction coordinate reference based on the corresponding coordinate reference information in the historical data and the known positions that can be identified in the construction area. For field detection data, after the field detection equipment completes the calibration of the construction control point position, the detection position and detection depth are directly expressed under the construction coordinate reference. For confirmed position data, the corresponding plane position and elevation are directly determined based on the construction coordinate reference during field measurement, and the confirmed burial depth is determined based on the top, center or pre-agreed pipeline position reference.
[0092] After unifying the coordinates, the underground pipelines are assigned to location data from different sources. Specific details include:
[0093] For location data that already contains clear pipeline identifiers, directly classify it into the location data set of the corresponding underground pipeline according to the pipeline identifier. For example, location data marked as water supply pipeline GS01 in historical data is directly classified into the location data set corresponding to GS01.
[0094] For data that can only identify the location of underground targets but cannot directly determine the pipeline identification during the on-site detection process, the corresponding underground pipeline is determined based on the spatial adjacency status, extension direction connection status, and burial depth connection status between the location data and the location data that has been assigned.
[0095] In practice, the location to be assigned is taken as the current location. The location data of underground pipelines that have been assigned nearby are searched. If the location to be assigned is distributed in front of or behind the original extension direction of an underground pipeline, and there is no abrupt change in distance between the location to be assigned and the adjacent assigned location that exceeds the allowable distance of the current pipeline construction scenario, then the two are determined to be in a spatial adjacency state. The extension direction of the detection corresponding to the location to be assigned is further compared with the extension direction of the adjacent assigned location. If the two can maintain a continuous transition, then the extension direction connection state is determined to be satisfied. The detection depth of the location to be assigned is compared with the burial depth of the adjacent assigned location. If the depth change between the two can be continuously connected by the spatial distance between the adjacent locations, then the burial depth connection state is determined to be satisfied.
[0096] When the spatial adjacency status, extension direction connection status, and burial depth connection status are all satisfied at the same time, the location to be assigned will be included in the location data set of the corresponding underground pipeline.
[0097] When multiple underground pipelines are located near the location to be assigned, the underground pipeline whose extension direction and burial depth can be continuously connected should be given priority as the assigned pipeline.
[0098] When a unique corresponding underground pipeline cannot be determined, the location data is not directly written into the location data set of any underground pipeline. Instead, it is retained until supplementary on-site detection or manual confirmation before assignment is performed to avoid subsequent directional reliable boundary shifts caused by incorrect assignment.
[0099] After assigning the data, the reliability of the directional location is further determined:
[0100] The reliability of the directional position is determined separately for the lateral direction, the burial depth direction, and the extension direction, so that a directional reliability boundary with different directional position ranges can be formed subsequently.
[0101] When confirmed location data exists within the corresponding pipeline segment, it is used as the location verification benchmark. The on-site detection data and historical underground pipeline data within the same area are compared with the confirmed location data to determine their consistency in the lateral, burial depth, and extension directions. The lateral consistency is determined based on the deviation of the corresponding location data from the confirmed location in the direction perpendicular to the pipeline extension. The burial depth consistency is determined based on the difference in burial depth between the corresponding location data and the confirmed location. The extension direction consistency is determined based on the directional change between the pipeline extension direction represented by the corresponding location data and the actual extension direction formed by adjacent confirmed locations.
[0102] For example, if the lateral deviation between the historical location and the confirmed location of a pipeline is 0.25m, while the burial depth deviation is only 0.06m, it indicates that the consistency of the historical data in the lateral direction is lower than that in the burial depth direction. When forming a directional confidence boundary, a larger spatial range is reserved for the lateral confidence range than for the burial depth confidence range.
[0103] When there is no confirmed location data for a certain area, the on-site detection data is used as the location verification benchmark. The historical data of underground pipelines are compared with the on-site detection data in the horizontal, burial depth and extension directions, respectively, and the reliability of the corresponding directional location is determined based on the consistency between the two.
[0104] When there are multiple field detection or confirmed locations for the same pipeline segment, the reliability of the direction and location of the entire pipeline segment is not determined directly by a single location data, but rather by comparing the location data point by point according to the arrangement of the location data along the pipeline extension direction.
[0105] When the positional deviations of multiple adjacent locations in a certain direction all remain within the allowable consistency range set before construction, that direction is determined to be positionally consistent; when positional deviations exceeding the allowable consistency range occur consecutively, the positional reliability of the corresponding direction is reduced.
[0106] The permissible range of consistency is determined before construction based on the accuracy of underground pipeline mapping, the calibration accuracy of on-site detection equipment, and pipeline construction safety requirements. For example, if the lateral calibration error of the on-site detection equipment is 0.10m, then the range for judging lateral position consistency should not be less than the corresponding detection error; the range for judging consistency in burial depth direction is determined according to the depth measurement error of the detection equipment. In this way, the reliability of directional position has a clear data source and judgment basis.
[0107] In practice, the lateral, burial depth, and extension directions can be divided into three location reliability levels: confirmed reliability, detection reliability, and historical reference. When confirmed location data exists in the corresponding direction and other location data fall within the allowable consistency range, it is determined to be confirmed reliable. When there is no confirmed location data but the field detection data continuously meets the allowable consistency range, it is determined to be detection reliable. When only historical data exists or the historical data exceeds the allowable consistency range with the field detection data, it is determined to be historical reference. When determining the reliability range, confirmed reliability is limited by the allowable error of the confirmation measurement, detection reliability is limited by the calibration error of the detection equipment in the corresponding direction, and historical reference is limited by the actual deviation range between the historical location and the adjacent detection location.
[0108] After determining the reliability of the direction and location, the location data of each underground pipeline are arranged sequentially along its extension direction, and the continuity of pipeline extension is judged according to the preset continuous range of extension direction and the burial depth connection range. Specifically, two adjacent location data are selected in sequence to determine the local extension direction from the previous location to the next location, and compared with the extension direction of the previous adjacent section.
[0109] When the local extension direction change is within the preset extension direction continuity range, and the burial depth change of adjacent positions is within the preset burial depth connection range, it is determined that the pipeline extension continuity is maintained at adjacent positions and they are included in the same pipeline segment.
[0110] When the extension direction changes beyond the preset continuous range, or the burial depth change between adjacent locations exceeds the preset burial depth connection range, a pipeline segment boundary is formed at the corresponding location.
[0111] For example, in straight-line laying areas, the allowable extension direction change can be set to no more than 8°, and the allowable burial depth change can be no more than 0.15m when the distance between adjacent positions is no more than 1m. The specific values can be set according to the pipeline laying method, detection point spacing and measurement accuracy in the construction area. For bends, turning points or obvious elevation changes that have been clearly recorded in historical data, even if the adjacent positions still meet the partial continuity condition, the corresponding positions can be directly determined as the pipeline segment boundary to ensure that the single pipeline segment has relatively stable extension characteristics.
[0112] After the pipeline segments are divided, the center position, extension direction and burial depth range are determined based on the location data within each pipeline segment. For pipeline segments containing confirmed location data, the center position of the corresponding area is determined first based on the confirmed location data. For parts where there is no direct measurement data between confirmed locations, the center position extension is determined based on the connection relationship between adjacent confirmed locations and field detection locations.
[0113] For pipeline segments where there is no confirmed location data but there is on-site detection data, the center location is determined using the on-site detection data;
[0114] For locations where only historical data is available, the historical location is used as the basis for determining the center location, provided that the pipeline extension is maintained in accordance with the previously determined locations.
[0115] The direction of extension is determined based on the directional relationship between the centers of the pipeline segments.
[0116] For curved pipeline segments, the corresponding local extension direction is formed according to the continuous position change, rather than simplifying the entire curved area into a single fixed direction.
[0117] The burial depth range is determined based on the burial depth distribution corresponding to the data at each location within the pipeline segment. That is, when the burial depth within the pipeline segment changes continuously with the direction of extension, the burial depth range changes continuously with the center position, thus enabling the characterization of underground pipelines with slopes or local undulations.
[0118] Based on this, according to the established confidence level of the directional location, the lateral confidence range, burial depth confidence range, and end extension confidence range of each pipeline segment are determined respectively.
[0119] The lateral confidence range is used to represent the possible distribution range of the actual underground pipeline relative to the current center position in the direction perpendicular to the pipeline extension; the burial depth confidence range is used to represent the possible distribution range of the actual underground pipeline relative to the current burial depth position in the vertical direction; the end extension confidence range is used to represent the spatial range that the end of the current pipeline segment may continue to extend due to detection interruption, data loss, or incomplete connection of adjacent pipeline segments.
[0120] Each confidence range is determined based on the deviation of the position data in the corresponding direction and the source of the position data;
[0121] For example, for areas with confirmed location data that are consistent with field detection data, a smaller lateral and burial depth confidence range can be determined based on the field measurement error and the spatial influence range corresponding to the pipeline outer diameter; for areas with only field detection data, the corresponding confidence range is expanded based on the calibration error of the detection equipment in the corresponding direction and the actual deviation between continuous detection positions; for areas with only historical underground pipeline data and significant positional differences between the historical data and adjacent field detection results, the corresponding confidence range is further expanded.
[0122] Taking a water supply pipeline as an example, when the allowable error of the on-site measurement of the confirmed location is 0.03m and the conversion error of the pipeline center position does not exceed 0.02m, the lateral confidence range of the corresponding confirmed area can be set to 0.05m on both sides of the center position; when the lateral calibration error of the on-site detection equipment in the area is 0.12m, the lateral confidence range of the area with only on-site detection data can be set to not less than 0.12m on both sides of the center position. The confidence range of burial depth and the confidence range of end extension are determined according to the same principle in combination with the measurement or detection error in the corresponding direction.
[0123] It should be noted that the above values are used to illustrate a specific implementation method and do not limit the present invention to using fixed values. Different construction projects can pre-determine corresponding reliable range configurations based on the accuracy of historical data, the accuracy of on-site detection equipment, the accuracy of confirmation measurement, and construction safety requirements.
[0124] After determining the lateral confidence range, the burial depth confidence range, and the end extension confidence range, the lateral confidence range and the burial depth confidence range are continuously expanded along the current pipeline segment center position and extension direction, so that each center position corresponds to the confidence space in the lateral and burial depth directions; at both ends of the pipeline segment, the defined area is formed by continuing to extend towards the pipeline extension direction according to the end extension confidence range.
[0125] Therefore, the lateral confidence range, the burial depth confidence range, and the end extension confidence range together form the directional confidence boundary of the corresponding pipeline segment.
[0126] It should be noted that the directional credibility boundary in this implementation is not obtained by expanding outwards from the pipeline center position at a uniform fixed distance, but is limited by the lateral credibility range, the burial depth credibility range, and the end extension credibility range respectively. Therefore, in areas where the lateral error of historical data is large but the burial depth data is relatively accurate, the directional credibility boundary can be characterized by a wider lateral range and a narrower vertical range; in areas where the burial depth detection error is large, it can be characterized by an expanded vertical range. In this way, the directional credibility boundary can reflect the degree of uncertainty of the actual position of the underground pipeline in different directions.
[0127] Finally, the center location, extension direction, burial depth range and the directional reliable boundary of the same pipeline segment are associated to generate the corresponding underground pipeline spatial reliable segment, and the connection relationship between the underground pipeline spatial reliable segments is saved according to the underground pipeline identification and pipeline extension order.
[0128] After S1 is completed, the underground pipelines in the construction area, which were originally represented by discrete historical locations, on-site detection locations and confirmed locations, are transformed into underground pipeline spatial credibility segments with clear center locations, extension directions, burial depth ranges and directional credibility boundaries.
[0129] S2. Generate the expected entry point for construction action in the space. Specific implementation details include:
[0130] After completing the construction of the reliable segment of the underground pipeline space, the positioning location, orientation and attitude of the construction equipment are further obtained. The positioning reference of the construction equipment is converted to the current spatial position of the construction action point that actually participates in the construction. The entry direction is determined based on the continuous position change of the construction action point, the target construction position and the current executable range of the working mechanism. On this basis, the expected entry space of the construction action point corresponding to the next construction stage is generated.
[0131] Specifically, taking the excavation of underground trenches by a tracked excavator as an example, the front end of the bucket teeth currently participating in soil cutting is determined as the construction action point. For scenarios using drilling equipment, jacking equipment or other underground construction equipment, the front end of the drill bit, the front end of the jacking head or the end position that actually acts on the construction area can also be determined as the construction action point, and the processing procedure is the same as in this embodiment.
[0132] First, the positioning reference point of the construction equipment is determined. The positioning reference point is set on the construction equipment body and its position relative to the equipment body structure is kept fixed. The plane coordinates and elevation of the positioning reference point under the construction coordinate reference established in S1 are obtained by the positioning device configured on the construction equipment. At the same time, the current orientation of the construction equipment is obtained. The orientation of the equipment is used to determine the rotation relationship of the coordinate direction of the construction equipment body relative to the construction coordinate reference.
[0133] To ensure that the positioning results can be used in subsequent position conversions, the positioning device of the construction equipment is checked before construction begins to ensure that the position data output by the positioning device is consistent with the construction coordinate reference. The specific form of the positioning device is not limited. The corresponding positioning method can be selected according to the satellite signal conditions at the construction site, the construction accuracy, and the equipment configuration. It is only necessary to be able to continuously output the position of the positioning reference point under the construction coordinate reference.
[0134] Further information on the attitude of the working organization includes:
[0135] For excavators, the working mechanism includes, in sequence, the boom connected to the equipment body, the stick connected to the boom, and the bucket connected to the stick. The spatial dimension relationship between the positioning reference point and the boom connection position, the connection positions at both ends of the boom, the connection positions at both ends of the stick, and the bucket connection position and the front end of the bucket teeth is recorded in advance according to the structural parameters of the construction equipment.
[0136] During construction, the current posture of the boom, stick, and bucket is obtained. The current posture can be determined by the rotation position, connection angle, or detection results that can reflect the spatial posture of each working mechanism component.
[0137] Based on the equipment orientation, the spatial connection relationship of the working mechanism on the construction equipment body is converted to the construction coordinate reference. That is, in the conversion process, the positioning position of the construction equipment is used as the starting position. First, the spatial direction of the boom connection position in the construction coordinate reference is determined according to the equipment orientation. Then, the connection position of the other end of the boom is determined according to the current posture of the boom. Subsequently, the connection positions of the stick and the bucket are determined in the same way. Finally, the current spatial position of the construction action point is determined according to the current posture of the bucket and the fixed spatial relationship between the bucket and the front end of the bucket teeth.
[0138] During the specific conversion, the positioning reference point is used as the starting point. The spatial coordinates of the next connection position are determined in sequence according to the known length and current connection angle of the corresponding mechanism component, following the order from the positioning reference point to the boom connection position, from the boom connection position to the stick connection position, from the stick connection position to the bucket connection position, and from the bucket connection position to the front end of the bucket teeth. Each connection position obtained is used as the starting point for the position conversion of the next mechanism component until the spatial coordinates of the front end of the bucket teeth under the construction coordinate reference are obtained.
[0139] Therefore, the current spatial location of the construction action point is obtained by progressively converting the positioning position of the construction equipment, the orientation of the equipment, and the current posture of the working mechanism, so that the subsequent detection of the spatial relationship of underground pipelines corresponds to the actual construction end position close to the underground pipeline.
[0140] For example, if the current positioning reference point is located at position A in the construction coordinate reference, the equipment is facing the trench extension direction, the boom is currently in the lowered state, the stick is in the extended state, and the bucket is in the cutting posture, then after step-by-step conversion based on the spatial connection relationship between each working mechanism component, the current spatial position B of the construction action point corresponding to the front end of the bucket teeth can be obtained. All subsequent entry directions and expected entry spaces will be judged based on position B, rather than position A.
[0141] After determining the current spatial location of the construction action point, the location is recorded according to the continuous data acquisition time:
[0142] The location acquisition cycle can be set according to the actual operating speed and positioning update capability of the construction equipment. For example, during the normal trench excavation stage, the current spatial position of the construction action point can be obtained at a acquisition cycle of 0.1s, that is, 10 location records are formed per second. If the construction equipment enters the area near underground pipelines, the single displacement of the construction action can also be shortened, so that the continuous location records can more accurately reflect the positional changes of the construction action point.
[0143] The data collection cycle is a parameter configured before construction. Its setting should ensure that the position change of the construction action point within one data collection cycle does not exceed the allowable range of single position judgment in the current construction stage.
[0144] The current spatial location of the construction action point is saved in chronological order of collection time to form a continuous location record.
[0145] Then, the current direction of movement is determined based on the continuous changes in position.
[0146] Select the two or more most recent spatial locations with effective position changes in the continuous position record, and determine the current movement direction of the construction action point based on the direction from the previous spatial location to the next spatial location. When the movement directions of multiple consecutive locations are consistent, the current continuous movement direction is used as the basis for this judgment. When the construction action point is in a temporary stop state and the change of adjacent positions is less than the allowable error of the construction equipment positioning, the movement direction is not re-determined based on the position change, but the most recent effective movement direction before the stop is retained.
[0147] For example, if the continuous position of the construction action point moves from B1 to B2 and then from B2 to B3, and B1, B2 and B3 all move forward and downward in the trench, then the current direction of movement is determined to be forward and downward.
[0148] At the same time, the target construction location is determined based on the current construction tasks, including:
[0149] The target construction location is the position that the construction action point is required to gradually approach in the current construction stage. It can be determined based on the trench design outline, the current excavation segment, and the current construction depth. For example, when the current construction task is to continue excavating the current trench forward by 0.8m and downward by 0.3m, the target construction location corresponding to the next stage can be determined in the design trench space based on the current construction segment.
[0150] The direction of entry into the target is determined by the direction from the current spatial position of the construction point to the target construction position.
[0151] The current direction of movement reflects the actual movement trend of the construction equipment, while the target direction of entry reflects the target trend requiring the construction action point to continue advancing as required by the construction task. Since the working mechanism cannot change instantaneously in any direction, this embodiment does not directly use the target direction of entry as the actual direction of entry. Instead, it determines the direction within the current executable direction range of the working mechanism that can maintain the continuity of the current direction of movement and move towards the target direction of entry as the direction of entry.
[0152] Specifically, the current executable direction range of the working mechanism is determined based on the current posture of the working mechanism and the range of continued movement allowed for each working mechanism component. The current executable direction range is determined based on the current posture of each working mechanism component and the corresponding allowed movement boundary. When a working mechanism component continues to move in a certain direction and will exceed its allowed rotation position or allowed extension position, the corresponding entry direction generated by the movement of that mechanism is excluded from the current executable direction range. The remaining spatial directions that can be continuously reached by the current working mechanism posture are collectively determined as the current executable direction range.
[0153] For example, when the boom is close to its maximum extension position, it is no longer possible to select an entry direction that extends significantly forward; when the bucket is close to the current maximum allowable digging depth, it is also no longer possible to continue in the downward direction.
[0154] Within the range of currently executable directions, the change in direction from the current movement direction to the target entry direction is judged, and the direction that is continuous with the current movement direction and can shorten the distance from the construction point to the target construction position after moving through this direction is selected as the entry direction.
[0155] This process avoids sudden changes in the entry direction due to changes in the target construction location or limitations in the posture of construction equipment, ensuring that the subsequent expected entry space reflects the actual spatial movement that can occur in the next construction phase.
[0156] After determining the direction of entry, the current spatial position of the construction action point is taken as the starting position, and the forward position range is determined according to the direction of entry and the executable displacement range of the next construction stage.
[0157] The executable displacement range for the next construction stage is preset based on the current operating speed of the construction equipment, the position update cycle, the density of pipelines in the construction area, and the construction control precision. For example, when far from underground pipelines, the forward executable displacement within one navigation judgment cycle can be set to 0.30m; in areas adjacent to underground pipelines, it can be reduced to 0.10m or 0.15m. The specific values used are determined based on the actual construction speed of the construction equipment and on-site safety control requirements.
[0158] When the current direction of entry is determined, the forward position range is formed by extending forward from the current spatial position of the construction action point along the entry direction to the farthest position that can be reached in this construction stage. This forward position range represents the position interval that the construction action point may reach in the next construction stage along the current direction of entry.
[0159] Using only the forward position range cannot fully reflect the actual space occupied by the construction tool. For example, the bucket teeth of an excavator have a certain lateral arrangement width, and the bucket may also generate a certain cutting depth during the cutting process. Therefore, it is necessary to further expand the forward position range spatially based on the lateral and depth action range of the construction action point under the current construction action.
[0160] The lateral effective range is determined based on the number of bucket teeth currently involved in the construction, the width of the bucket tooth distribution, or the actual cutting width of the bucket. For example, if the current effective cutting area width is 0.20m, then the corresponding effective range is extended to both sides of the forward position as the center.
[0161] The depth range is determined based on the allowable excavation or lifting depth in the next construction phase. For example, if the current construction control requires that the maximum excavation depth not exceed 0.12m within a navigation cycle, then the corresponding depth range is extended from the forward position range to the current cutting direction.
[0162] The forward position range, lateral action range, and depth action range are spatially combined to generate the expected entry space of the construction action point. The expected entry space of the construction action point is used to characterize the three-dimensional spatial region that the construction action point and its corresponding construction action range may enter in the next construction stage.
[0163] For example, if the front end of the bucket tooth is currently at position B, and the direction of entry is forward and downward, and the next construction stage allows for forward movement of 0.20m, the current effective lateral action width is 0.18m, and the downward cutting is allowed to be 0.10m, then a forward position range with a length of 0.20m is formed along the entry direction starting from position B, and the range is expanded according to the lateral action width and depth action range to form the corresponding construction action point expected entry space.
[0164] It should be noted that the expected entry space does not mean that the construction equipment must pass through all of its spaces, but rather that, based on the current location of the construction equipment, its movement trend, the construction objective, and the current executable state of the working mechanism, the range of spaces that may be affected by the construction action in the next construction phase.
[0165] Therefore, compared to judging the instantaneous distance between the construction action point and the underground pipeline based solely on the current spatial location of the construction action point, the expected entry space can reflect in advance the possible location reached after the current construction action continues and the actual range of action of the construction tools.
[0166] During construction, the direction of entry and the expected entry point into the space are continuously updated according to the construction status, specifically including:
[0167] When the continuous position record shows a change in the current direction of movement, the entry direction is re-determined based on the current direction of movement and the target construction position; when the progress of the construction task causes the target construction position to be updated, the target entry direction and entry direction are also re-determined.
[0168] In addition, when the change in the attitude of the working mechanism causes a change in the current executable direction range or the executable displacement range in the next construction stage, the corresponding forward position range and spatial expansion range are updated according to the new attitude of the working mechanism, and the construction action point is expected to enter the space again.
[0169] Through the above processing, S2 finally outputs the current spatial location of the construction action point, the direction of entry, and the expected entry space of the construction action point corresponding to the next construction stage.
[0170] S3. Determine the spatial relationship detection results. Specific implementation details include:
[0171] After the construction action point is generated in S2 and is expected to enter the space, the space is used as the space detection object of the current construction stage, and is matched with the underground pipeline space credibility segment generated in S1. By detecting the separation, approach and overlap state between the expected entry space and the directional credibility boundary, and combining the entry direction to judge the subsequent position change trend of the two, the safe passage relationship, credibility boundary approach relationship or credibility domain penetration relationship is determined.
[0172] Specifically, the reliable segments of underground pipelines that need to participate in spatial relationship detection are first determined based on the current spatial location of the construction action point, the expected coverage area of the space to be entered, and the direction of entry.
[0173] The current detection range is the spatial range of the space expected to be entered by the construction action point under the construction coordinate reference. At the same time, the reliable segments of underground pipeline space adjacent to the detection range are searched forward along the entry direction. For reliable segments of underground pipeline space that are far away from the expected entry space and are not located in front of the entry direction, spatial relationship detection is not performed in this navigation judgment. For reliable segments of underground pipeline space that are already covered by, adjacent to or located in front of the entry direction, the center position, extension direction, burial depth range and directional reliable boundary of the corresponding pipeline segment are read.
[0174] When multiple underground pipelines exist near the expected entry space, spatial relationship detection is performed on the reliable segments of each underground pipeline space, and the spatial relationship detection result with the highest degree of restriction is used as the determination result of the current entry direction. For example, if the same expected entry space forms a safe passage relationship with respect to the water supply pipeline, but forms a reliable boundary proximity relationship with respect to the gas pipeline, then the current entry direction is processed according to the reliable boundary proximity relationship.
[0175] After determining the reliable segment of the underground pipeline space to be detected, the boundary approach distance corresponding to the directional reliable boundary is further determined. The boundary approach distance is used to distinguish the state where the space to be entered has not yet entered the directional reliable boundary, but may approach the directional reliable boundary if it continues to move along the current entry direction. The boundary approach distance is determined based on the positioning error of the construction equipment and the range of single position change of the construction action point. The positioning error of the construction equipment is the position allowable error obtained after the current construction positioning device has been calibrated in the construction area. The range of single position change of the construction action point is determined based on the position acquisition cycle in S2, the current movement speed of the construction equipment, and the maximum displacement that may occur under the current posture of the working mechanism.
[0176] For example, if the allowable error in the positioning of the construction equipment is 0.04m, and the maximum possible displacement of the construction action point within the current acquisition cycle is 0.08m, then the spatial influence ranges corresponding to the two can be combined, and 0.12m can be determined as the boundary approach distance under the current construction state. When the construction equipment reduces its construction speed or the position acquisition cycle is shortened, resulting in a smaller range of single position changes, the corresponding boundary approach distance will decrease accordingly. When the positioning error increases or the range of single position changes of the construction action point increases, the corresponding boundary approach distance will increase accordingly.
[0177] After determining the boundary approach distance, the current positional relationship of the construction action point in the expected space relative to the directional reliable boundary is detected.
[0178] Specifically, based on the spatial positional relationship between the expected entry points of each outer boundary and the directional credible boundary, it is determined whether the two remain separated, whether they enter the boundary approach distance range, and whether spatial overlap occurs.
[0179] When the expected entry space is entirely located outside the directional reliable boundary, it is determined that the two are in a separated state, and the minimum spatial interval between the expected entry space and the directional reliable boundary is further determined. The minimum spatial interval is the shortest spatial distance that can be formed between the outer boundary of the expected entry space and the directional reliable boundary.
[0180] When the minimum spatial interval is greater than the boundary proximity distance, it indicates that the space to be entered is not currently approaching a reliable segment of underground pipeline space; when the minimum spatial interval is not greater than the boundary proximity distance, it indicates that the space to be entered has entered the adjacent range corresponding to the directional reliable boundary.
[0181] When any part of the expected entry space is located inside the directional credible boundary, it is determined that the two overlap spatially.
[0182] After obtaining the current positional relationship, it is also necessary to combine the entry direction to determine the expected positional change trend of the entered space relative to the directional confidence boundary, so as to avoid determining the relationship solely based on instantaneous distance. Specifically, this includes:
[0183] The next position change is generated by moving the current spatial position of the construction action point along the entry direction. The spatial interval between the expected entry space and the corresponding directional reliable boundary before and after the position change is compared. The next position change is limited by the executable displacement range of the next construction stage determined by S2. Specifically, the current spatial position of the construction action point is moved along the entry direction by a displacement allowed by the current navigation judgment cycle to generate a comparison position. The minimum spatial interval between the expected entry space and the directional reliable boundary before and after the movement is determined respectively. The position change trend is determined by the change of the two minimum spatial intervals.
[0184] If, after moving along the entry direction, the spatial interval between the entry space and the directional reliable boundary is expected to increase or remain unchanged, then the entry direction is determined not to point inside the directional reliable boundary; if, after moving along the entry direction, the spatial interval between the entry space and the directional reliable boundary is expected to continuously decrease, then the entry direction is determined to point to the directional reliable boundary.
[0185] For cases where the directional reliable boundary has a lateral reliable range, a burial depth reliable range, and an end extension reliable range, the main approaching boundary position is determined based on the current entry direction.
[0186] For example, when the construction action point mainly moves laterally along the direction perpendicular to the pipeline extension, the focus is on detecting its positional change relative to the lateral reliable boundary; when the construction action point performs excavation, the focus is on detecting its positional change relative to the reliable boundary in the burial depth direction; when the construction action point advances toward the end of the pipeline segment, the focus is on detecting its positional change relative to the boundary formed by the reliable range of the end extension.
[0187] Based on the current positional relationships and positional change trends described above, the spatial relationship detection results are determined in the following manner.
[0188] When the expected entry space of the construction action point remains separated from the directional reliable boundary, and the minimum spatial interval between the two is greater than the boundary approach distance, and continuing to move along the entry direction will not cause the expected entry space to point into the interior of the directional reliable boundary, it is determined that the current expected entry space and the corresponding underground pipeline space reliable segment form a safe passage relationship.
[0189] For example, if the excavation bucket is excavating forward in a direction that is basically parallel to the underground water supply pipeline, and the expected entry space is located 0.40m outside the credible lateral boundary of the water supply pipeline, and the current boundary proximity is 0.12m, and continuing to move in the current entry direction will not shorten the lateral distance between the two, then it is determined to be a safe passage relationship.
[0190] When the expected entry space has not yet entered the interior of the directional reliable boundary, and the minimum spatial interval between it and the directional reliable boundary is not greater than the boundary approach distance, and continuing to move along the entry direction will cause the spatial interval to continue to decrease, it is determined to be a reliable boundary approach relationship.
[0191] For example, if the expected distance of the construction action point to the lateral reliable boundary of the gas pipeline is 0.09m, the current boundary approach distance is 0.12m, and the current approach direction is lateral movement towards the gas pipeline, then it is determined to be a reliable boundary approach relationship. At this time, the construction tool has not yet entered the reliable segment of the underground pipeline space, but if it continues to execute the current approach direction, there is a possibility that it will enter the directional reliable boundary.
[0192] When the expected entry space and the interior of the directional reliable boundary have already overlapped, it is directly determined to be a reliable domain penetration relationship. In addition, when the expected entry space is currently still outside the directional reliable boundary, but according to the current entry direction and the displacement range that can be executed in the next construction stage, it is expected that the entry space will cross from outside the directional reliable boundary to its interior, it is also determined to be a reliable domain penetration relationship.
[0193] For example, if the current actual position of the bucket tooth is still 0.18m away from the credible boundary of the burial depth of a certain communication pipeline, but the expected downward extension of the space is 0.25m and has already covered the interior of the credible boundary of the burial depth, then even if the bucket tooth has not yet reached the corresponding position, it is determined to be a credible domain penetration relationship, thereby avoiding passive alarm after the construction action is executed.
[0194] When a construction action point is expected to enter a space that corresponds to multiple reliable segments of underground pipeline space, the current overall spatial relationship detection result is determined according to the restriction order of reliable domain penetration relationship, reliable boundary proximity relationship, and safe passage relationship. That is, as long as any reliable segment of underground pipeline space forms a reliable domain penetration relationship, the current entry direction is processed according to the reliable domain penetration relationship; if there is no reliable domain penetration relationship but there is a reliable boundary proximity relationship, it is processed according to the reliable boundary proximity relationship; only when all corresponding reliable segments of underground pipeline space satisfy the safe passage relationship is the current entry direction determined to be in a safe passage state.
[0195] Through the above processing, S3 outputs the spatial relationship detection result corresponding to the current entry direction, and retains the underground pipeline spatial credibility segment that forms the detection result and its corresponding directional credibility boundary position. The spatial relationship detection result is not directly used to control the construction equipment to perform specific mechanical actions, but serves as a spatial constraint condition for screening the construction navigation direction.
[0196] S4. Generate the navigation permission area and determine the next navigation location. Specific implementation details include:
[0197] After S3 completes the spatial relationship detection between the expected entry space of the construction action point and the reliable segment of the underground pipeline space, it filters the candidate entry directions within the current executable direction range of the working mechanism based on the safe passage relationship, the reliable boundary approach relationship, or the reliable domain penetration relationship, and forms a navigation permission area based on the screening results; further, it determines the next navigation position by combining the target construction position, the executable displacement range of the next construction stage, and the subsequent spatial relationship detection results, and generates construction navigation instructions so that the construction action point can avoid the interior of the directional reliable boundary of the underground pipeline while maintaining its advancement toward the target construction position;
[0198] Specifically, the current spatial position of the construction action point obtained in S2 is first used as the starting point for direction screening, and the current executable direction range of the working mechanism is determined according to the current working mechanism posture of the construction equipment. The current executable direction range is used to limit the spatial movement direction that the boom, stick and bucket can continuously execute under the current posture, so as to avoid generating candidate directions that the current mechanism state of the construction equipment cannot reach.
[0199] Within the currently executable direction range, the direction from the current spatial position of the construction action point to the target construction position is used as the reference for generating candidate directions, and multiple candidate entry directions are generated within the vicinity of this reference direction.
[0200] For example, if the current target construction location is located in front of and below the construction action point, candidate entry directions can be generated within the allowable adjustment range of left, right and up and down of the target entry direction according to the preset directional interval. The directional interval is determined based on the motion accuracy of the construction equipment working mechanism, the current location acquisition accuracy, and the density of underground pipelines. In areas with dense underground pipelines, the directional interval can be reduced to increase the detail of the selection of possible entry directions.
[0201] For each candidate entry direction, the current entry direction is replaced by the candidate entry direction in accordance with the generation method of the expected entry space of the construction action point in S2, and the corresponding expected entry space of the construction action point is generated in combination with the executable displacement range, lateral action range and depth action range of the next construction stage.
[0202] Subsequently, according to the spatial relationship detection method described in S3, the spatial relationship between the expected entry space of the construction action point corresponding to each candidate entry direction and the reliable segment of the underground pipeline space is determined respectively.
[0203] When the spatial relationship detection result corresponding to a candidate entry direction is a credible domain penetration relationship, it means that after the construction action point continues to enter in that direction, its expected entry space will enter the interior of the directional credible boundary of the underground pipeline. Therefore, the candidate entry direction is directly excluded.
[0204] When the spatial relationship detection result corresponding to the candidate entry direction is a credible boundary proximity relationship, it indicates that the direction has not yet formed a credible domain penetration. However, continuing to move along the direction will cause the construction action point to approach the corresponding directional credible boundary in the expected space. At this time, based on the boundary proximity position retained by S3, it is determined which side of the expected space the construction action point is located on, and the candidate entry direction is adjusted to the side away from the inside of the directional credible boundary.
[0205] For example, if the current candidate entry direction causes the construction action point to move from the west side of the road toward the lateral reliable boundary of the gas pipeline, then the candidate entry direction will be adjusted step by step to the side away from the gas pipeline within the current executable direction range of the working mechanism. After each direction adjustment, the corresponding construction action point is regenerated and the spatial relationship detection is performed.
[0206] When the adjusted spatial relationship detection result changes to a safe passage relationship, the adjusted entry direction is retained as the accessible direction.
[0207] If, after the allowed adjustment range, the relationship remains a trust boundary proximity or transforms into a trust domain penetration relationship, then the candidate entry direction is excluded.
[0208] For candidate entry directions that establish a safe passage relationship upon initial detection, they are directly retained as enterable directions.
[0209] Therefore, all directions that do not point inside the directional trust boundary and whose spatial relationship detection results satisfy the safe passage relationship are formed into an accessible direction set.
[0210] Further, based on each accessible direction and the executable displacement range of the construction action point in the next construction stage, the continuous reachable space corresponding to each accessible direction is determined. The continuous reachable space represents the spatial range that the construction action point can continuously reach in the next construction stage from the current spatial position along the corresponding accessible direction without forming a reliable domain penetration relationship.
[0211] The continuous reachable spaces corresponding to adjacent accessible directions are organized according to spatial connectivity to form the navigation permission area for the current construction phase;
[0212] In specific organization, the system determines whether there are any excluded candidate entry directions between two adjacent accessible directions according to the order of the candidate entry directions. If there are no excluded candidate entry directions, the corresponding continuous reachable spaces are connected into the same continuous region. If there are excluded candidate entry directions, the corresponding continuous reachable spaces are divided into different regions, thereby obtaining one or more separate navigation permission regions.
[0213] Therefore, the navigation permission area is generated in real time based on the current spatial location of the construction action point, the current executable direction of the working mechanism, the target construction location, and the directional reliable boundary of the underground pipeline, and is updated as the construction location and the spatial reliable segment of the underground pipeline change.
[0214] For example, if there is a gas pipeline extending laterally in front of a construction site, the expected entry space corresponding to the original target entry direction forms a reliable domain penetration relationship, while several candidate entry directions to the left and right front form a safe passage relationship. Then, the corresponding continuous reachable spaces on the left and right sides together constitute the current navigation permission area, and the space where the original target entry direction is located is not included in the navigation permission area.
[0215] When all candidate entry directions are excluded, meaning there is no entry direction that can form a safe passage relationship, the current spatial position of the construction action point is determined as the navigation holding position, and no further navigation position is generated to continue advancing to the target construction position. At this time, the current position of the construction action point can be maintained, and navigation judgment can be re-executed after the target construction position is adjusted, new evidence of underground pipeline location is generated, or the reliable segment of underground pipeline space is updated.
[0216] When an accessible direction exists, the next navigation position is further determined. Specifically, based on each accessible direction and the allowable displacement range for the next construction stage, corresponding candidate navigation positions are formed within the navigation permission area. The candidate navigation positions are located in the continuous accessible space along the accessible direction from the current spatial position of the construction action point, and the distance between them and the current spatial position does not exceed the allowable displacement range for the next construction stage.
[0217] For each candidate navigation location, first compare its spatial distance from the target construction location;
[0218] If the distance from the construction point to the target construction location increases after the construction point moves from its current location to a candidate navigation location, it indicates that the candidate navigation location is not conducive to the progress of the current construction task and should be eliminated; candidate navigation locations that enable the construction point to continue to approach the target construction location should be retained.
[0219] Based on this, not only is it determined whether the candidate navigation location is within the navigation permit area, but the candidate navigation location is also used as the subsequent starting location to generate the expected space for subsequent construction action points according to the corresponding accessible direction and the executable status of the working mechanism.
[0220] If the subsequent expected entry into space immediately forms a trusted domain penetration relationship, it means that although the candidate navigation location is currently reachable, it cannot maintain the space permission to continue construction after arrival, so the candidate navigation location is excluded.
[0221] For the remaining candidate navigation positions, further determine their directional continuity with the current direction of entry, including:
[0222] When multiple candidate navigation positions exist that can shorten the distance to the target construction position and maintain subsequent navigation permission, the candidate navigation position with the smallest change from the current entry direction and the ability to maintain the continuity of construction movement should be selected as the next navigation position to reduce the frequent changes in the movement direction of the working mechanism.
[0223] For example, if there are three candidate navigation positions: left front, slightly left front, and right front, the position slightly left front can avoid the directional confidence boundary of underground pipelines and has the least change relative to the current entry direction. If we continue to advance towards the target construction position, then this position will be determined as the next navigation position.
[0224] Once the next navigation location is determined, construction navigation instructions are generated based on the current spatial location of the construction action point, the next navigation location, and the navigation permitted area.
[0225] The construction navigation instructions include at least the currently permitted entry direction, the next navigation position, and the permitted navigation area, which are used to provide the construction equipment control terminal with spatial navigation basis for the next construction stage. When the construction equipment performs the current construction action, it restricts the accessible range of the construction action point with the permitted navigation area and uses the next navigation position as the current navigation target.
[0226] During the execution of the construction equipment, the current spatial position of the construction action point is continuously acquired. When the construction action point reaches the next navigation position, the subsequent candidate entry direction and navigation permission area are regenerated with the new current spatial position, and the new next navigation position is determined, thus forming a continuous construction navigation process.
[0227] If the construction action point has not yet reached the next navigation position, but new evidence of underground pipeline location emerges during the construction process, causing a change in the credible segment of the underground pipeline space, then the original navigation permission area and the next navigation position will not be used. Instead, the directional credible boundary and adjacent connection relationship of the affected pipeline segment will be locally corrected.
[0228] S5. New location evidence triggers local correction of credible segments of underground pipeline space. Specific implementation details include:
[0229] Since it was impossible to achieve continuous direct observation of the entire underground pipeline before construction, S1 constructed a reliable spatial segment of the underground pipeline based on existing historical data, on-site detection data, and locally confirmed locations.
[0230] As construction progresses and new direct or supplementary location evidence is obtained, if this new location evidence exceeds the original directional credible boundary or cannot maintain the continuity of the original pipeline extension, it indicates that the local possible location range defined by the existing evidence before construction needs to be updated.
[0231] After generating the navigation permission area, determining the next navigation location, and outputting the construction navigation instruction in S4, the construction equipment continues to advance according to the construction navigation instruction. During the construction process, new location evidence that can reflect the actual spatial location of the underground pipeline is acquired simultaneously. When the new location evidence indicates that the underground pipeline spatial credibility segment established in S1 can no longer accurately cover the corresponding pipeline location, the affected pipeline segment is identified, its directional credibility boundary and adjacent continuation relationship are locally corrected, and spatial relationship detection and construction navigation are re-executed based on the corrected underground pipeline spatial credibility segment, so that the newly added actual location information during the construction process can be applied to the navigation results.
[0232] Specifically, new location evidence includes pipeline exposure locations, supplementary detection locations, or actual burial depth locations formed during construction. Among these, pipeline exposure locations are the physical locations of pipelines that can be directly observed and measured during trench excavation or exploratory excavation; supplementary detection locations are locations obtained through on-site supplementary detection when construction approaches underground pipelines or when there are doubts about the original location relationship; and actual burial depth locations are the pipeline depth locations that can be directly determined after pipeline exposure or on-site verification.
[0233] The new location evidence does not necessarily indicate that the historical data or field detection data of underground pipelines used before construction are incorrect. Rather, it is the new location evidence formed as the construction area is gradually excavated, exposing the locations of pipelines that were previously underground and could not be directly confirmed, or after further field detection conditions are available. The underground pipeline spatial credibility segment generated by S1 represents the possible spatial range of underground pipelines under the condition of existing location data before construction. When the new location evidence is still within the original directional credibility boundary and maintains the continuity of pipeline extension, the original underground pipeline spatial credibility segment is retained. When the new location evidence exceeds the original directional credibility boundary, or indicates that the original extension direction or burial depth connection relationship can no longer be established, it is determined that it is inconsistent with the original underground pipeline spatial credibility segment and a local correction is initiated.
[0234] After obtaining new location evidence, coordinate transformation is performed on it according to the construction coordinate benchmark adopted by S1 so that the new location evidence is in the same coordinate system as the original reliable section of underground pipeline space. The underground pipeline corresponding to the new location evidence is determined according to pipeline identification, adjacent location and extension direction.
[0235] Subsequently, the new location evidence was compared with the center location, extension direction, burial depth range, and directional credible boundary of the corresponding underground pipeline spatial credible segment, including:
[0236] When the new location evidence is still within the original directional credible boundary, and the extension direction and burial depth it represents can maintain the pipeline extension continuity with the corresponding underground pipeline spatial credible segment, it means that the original underground pipeline spatial credible segment can still cover the currently confirmed actual pipeline location. At this time, the new location evidence is added to the corresponding location data, and the original navigation relationship is preserved.
[0237] If the new location evidence is located outside the original directional credible boundary, or if the extension direction and burial depth reflected by the new location evidence do not meet the pipeline extension continuity judgment conditions adopted by S1, then it is determined that the new location evidence is inconsistent with the original underground pipeline space credible section, and a local correction is initiated.
[0238] For example, if the center of the water supply pipeline, as indicated by the original spatial credibility segment of the underground pipeline, is located on one side of the trench, and the newly exposed actual pipeline location is offset by 0.18m relative to the original directional credibility boundary towards the construction area, and has exceeded the original lateral credibility range, then the exposed location is determined as new location evidence of spatial inconsistency.
[0239] After determining the inconsistency in spatial relationships, the location corresponding to the new location evidence is used as the starting location for determining the affected pipeline segment. Adjacent pipeline segments are then detected along the forward and backward extension directions of the corresponding underground pipeline. Specifically, the center position, extension direction, and burial depth range of adjacent pipeline segments are compared with the positional changes reflected by the new location evidence to see if they can remain continuous. If the adjacent pipeline segment still shows the same or continuous changes in lateral offset, extension direction, or burial depth as the new location evidence, it is considered that the adjacent pipeline segment is still affected by the inconsistency and is included in the affected pipeline segment.
[0240] When determining whether adjacent pipeline segments continue to be affected by inconsistent positions, the same continuous range of extension direction and burial depth connection range in S1 are used, and the offset state of the center position of adjacent pipeline segments relative to the original center position is compared at the same time; when the center position offset re-enters the original directional reliable boundary, and the extension direction and burial depth are restored to meet the original pipeline extension continuity conditions, it is determined that the continuous influence of the inconsistent position ends.
[0241] Continue testing along this direction until an adjacent pipeline segment again meets the conditions of connection of the center position of the original underground pipeline spatial credible segment, continuity of extension direction and connection of burial depth. Then, the corresponding restored position is determined as the boundary of the affected pipeline segment. After determining the boundary along the two extension directions respectively, the pipeline segments continuously affected by the new location evidence between the two boundaries constitute the affected pipeline segment.
[0242] In summary, only local pipeline segments that have a continuous influence relationship with the new location evidence are modified, without directly changing the spatial position of the entire underground pipeline due to a single piece of new location evidence.
[0243] After identifying the affected pipeline segment, the new location evidence is added to the location data corresponding to the affected pipeline segment. The center position, extension direction, and burial depth range are then re-determined by combining the original confirmed location data of the affected pipeline segment, on-site detection data, and historical data of underground pipelines. When the new location evidence is a pipeline exposure location or an actual burial depth location confirmed on-site, it is used as the location verification basis according to the processing method of the confirmed location data in S1. When it is a supplementary detection location, it is used for the location verification in the corresponding direction according to the processing method of the on-site detection data.
[0244] After redetermining the center location, extension direction, and burial depth range, the lateral confidence range, burial depth confidence range, and end extension confidence range of the affected pipeline segment are redefined according to the method for determining the confidence level and confidence range of the directional location in S1.
[0245] For example, if a newly exposed location proves that the original pipeline's actual location has shifted laterally, but the actual burial depth is still within the original credible burial depth range, then the focus should be on correcting the center location and the lateral credible range based on the new location evidence. The credible burial depth range should continue to be determined by combining the original burial depth data and the newly confirmed burial depth, so as to avoid unjustifiably expanding the credible range in other directions due to a change in location in a single direction.
[0246] The redefined lateral and burial depth confidence ranges are expanded along the corrected center position and extension direction, and combined with the end extension confidence range to form the corrected directional confidence boundary of the affected pipeline segment.
[0247] Subsequently, the connection relationship between the two ends of the corrected affected pipeline segment and the adjacent unaffected pipeline segment was verified.
[0248] Compare the connection status at the center position, the continuity of the extension direction, and the connection status at the burial depth between the two ends. If the corrected end of the affected pipeline segment can directly meet the pipeline extension continuity condition in S1 with the adjacent unaffected pipeline segment, then a continuation relationship is directly established.
[0249] If the corrected end of the affected pipeline segment and the adjacent unaffected pipeline segment cannot directly meet the pipeline extension continuity condition, but the on-site location data indicates that they still belong to the same underground pipeline, then a transitional connection segment is formed between them.
[0250] The transition section is determined based on the corrected end position of the affected pipeline section, the end position of the adjacent unaffected pipeline section, and the existing field detection or confirmed position between them, so that the center position, extension direction and burial depth position gradually transition from the corrected affected pipeline section to the unaffected pipeline section.
[0251] When forming the transition joint, the ends of the affected pipeline segment after correction, the field detection or confirmed positions in the transition area, and the ends of the adjacent unaffected pipeline segments are arranged in the order of extension. Continuous center positions are established between adjacent positions in sequence, and the local extension direction and burial depth change are determined according to the adjacent center positions, so that the two ends of the transition joint are connected to the corrected affected pipeline segment and the unaffected pipeline segment respectively.
[0252] For regions where there is insufficient location data to determine a continuous transition relationship, location data is obtained through supplementary detection before a transitional segment is formed, instead of directly forcing a connection based on unknown space.
[0253] For example, after correction, the affected pipeline segment is laterally offset by 0.20m relative to its original position, while the unaffected pipeline segment behind it remains in its original position. By using two supplementary detection positions in the middle, it can be confirmed that the lateral offset of the pipeline is gradually decreasing. Then, the center position of the continuous transition is formed according to the supplementary detection positions, and the corresponding directional reliable boundary is determined accordingly to form the transition continuation segment.
[0254] After completing the connection at both ends, the corrected affected pipeline segments, necessary transitional connection segments, and unaffected pipeline segments before and after are reorganized according to the original underground pipeline extension sequence, and the connection relationship between each pipeline segment is preserved to generate a corrected reliable underground pipeline spatial segment.
[0255] like Figure 2 As shown, after the location corresponding to the new location evidence is determined, the affected pipeline segment is determined along the forward and backward extension direction of the underground pipeline, and the directional credibility boundary of the affected pipeline segment is corrected. After the adjacent connection relationship is verified, the corrected underground pipeline spatial credibility segment is formed.
[0256] The corrected underground pipeline spatial credibility segment replaces the original corresponding local pipeline segment in subsequent spatial relationship detection, while other underground pipeline spatial credibility segments that are not affected by the new location evidence are retained, and data construction of irrelevant areas is not re-executed.
[0257] After the underground pipeline space credibility segment is corrected, the current spatial position of the construction action point of the construction equipment at the current moment is used as the new judgment starting point. The entry direction and the expected entry space of the construction action point that have been updated in S2 are called back, and the spatial relationship between the expected entry space and the corrected directional credibility boundary is re-detected according to S3.
[0258] If the original spatial relationship detection results change, S4 is re-executed according to the new safe passage relationship, trusted boundary approach relationship or trusted domain penetration relationship to screen candidate entry directions, update the navigation permission area and redetermine the next navigation position;
[0259] For example, if a certain next navigation position was located outside the original directional confidence boundary before the correction, and it was found during construction that the actual pipeline shifted towards that navigation position, causing the corrected directional confidence boundary to cover the expected access space corresponding to the original next navigation position, then the original next navigation position was canceled, and a new next navigation position was determined from the re-selected accessible directions, while the construction navigation instructions were updated.
[0260] Through the above processing, this embodiment limits the newly obtained evidence of the actual location of the pipeline during construction to the affected pipeline segment, and forms a corrected underground pipeline spatial credibility segment through directional credibility boundary correction, adjacent continuation relationship verification and transition continuation processing, so that subsequent construction navigation continues to correspond to the currently known actual spatial relationship of the underground pipeline.
[0261] The above embodiments can be implemented, in whole or in part, by software, hardware, firmware, or any other combination thereof. When implemented using software, the above embodiments can be implemented, in whole or in part, in the form of a computer program product.
[0262] Those skilled in the art will recognize that the modules and algorithm steps of the various examples described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are implemented in hardware or software depends on the specific application and design constraints of the technical solution. Those skilled in the art can use different methods to implement the described functions for each specific application, but such implementation should not be considered beyond the scope of this application.
[0263] In addition, the functional modules in the various embodiments of this application can be integrated into one processing module, or each module can exist physically separately, or two or more modules can be integrated into one module.
[0264] The above description is merely a specific embodiment of this application, but the scope of protection of this application is not limited thereto. Any variations or substitutions that can be easily conceived by those skilled in the art within the scope of the technology disclosed in this application should be included within the scope of protection of this application. Therefore, the scope of protection of this application should be determined by the scope of the claims.
[0265] In conclusion, the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.
Claims
1. A method for detecting spatial relationships and coordinating construction control of underground pipelines, characterized in that: The specific steps include: S1. Obtain historical data, on-site detection data and confirmed location data of underground pipelines in the construction area, unify them to the construction coordinate benchmark, divide pipeline segments according to the continuity of pipeline extension and the reliability of directional location, determine the center position, extension direction, burial depth range and directional reliability boundary of each pipeline segment, and generate reliable spatial segments of underground pipelines. S2. Obtain the location, orientation and working mechanism posture of the construction equipment, convert them to the current spatial position of the construction action point, determine the entry direction based on continuous position changes and the target construction position, and generate the expected entry space of the construction action point. S3. Detect the spatial relationship between the expected entry space and the reliable segment of the underground pipeline space, and determine the safe passage relationship, reliable boundary approach relationship or reliable domain penetration relationship based on the positional change of their relative directional reliable boundary. S4. Based on the spatial relationship detection results, filter the accessible directions that do not point to the inside of the directional reliable boundary, generate the navigation permission area and determine the next navigation position, and output the construction navigation instructions; S5. During construction, obtain new location evidence that is inconsistent with the reliable segment of the underground pipeline space, identify the affected pipeline segment, correct its directional reliable boundary and verify the adjacent continuation relationship, generate the corrected reliable segment of the underground pipeline space, and redetermine the navigation permission area and the next navigation location.
2. The method for detecting spatial relationships and coordinating construction control of underground pipelines according to claim 1, characterized in that: The acquisition of historical data, on-site detection data, and confirmed location data of underground pipelines in the construction area, unified to the construction coordinate benchmark, specifically includes: Obtain pipeline identification, planar location, historical burial depth and extension direction from historical underground pipeline data; obtain detection location, detection depth and detection extension direction from field detection data; and obtain confirmed location data verified on-site or confirmed by pipeline exposure. Select a benchmark location within the construction area with definite plane coordinates and elevation, and convert the historical data of underground pipelines, on-site detection data, and confirmed location data to the construction coordinate benchmark corresponding to the benchmark location; The converted data is assigned according to the pipeline identification. For data lacking pipeline identification, the corresponding underground pipeline is determined based on its spatial adjacency with the already assigned location, its extension direction connection status, and its burial depth connection status, thus forming a set of location data for each underground pipeline. Confirmed location data is used as the location verification benchmark; when there is no confirmed location data, on-site detection data is used as the location verification benchmark. The consistency between historical underground pipeline data and on-site detection data and the location verification benchmark in the lateral, burial depth and extension directions is determined respectively, and the reliability of the directional location is determined accordingly.
3. The method for detecting spatial relationships and coordinating construction control of underground pipelines according to claim 2, characterized in that: The process of dividing pipeline segments based on the continuity of pipeline extension and the reliability of directional location, and determining the center position, extension direction, burial depth range, and directional reliability boundary of each pipeline segment, specifically includes: The location data of underground pipelines are arranged sequentially along the extension direction. The continuity of pipeline extension data of adjacent locations is judged based on the preset continuous range of extension direction and the connection range of burial depth. Pipeline segment boundaries are formed at locations where adjacent location data do not meet the continuous range of extension direction or the connection range of burial depth. The center location and extension direction are determined based on the location data within each pipeline segment, and the burial depth range is determined based on the burial depth distribution of the corresponding location data. Based on the degree of confidence in the direction and location, determine the lateral confidence range, burial depth confidence range, and end extension confidence range of each pipeline segment in the lateral, burial depth, and end extension directions respectively. The lateral confidence range and the burial depth confidence range are continuously extended along the extension direction of the pipeline segment, and the extension confidence range at both ends of the pipeline segment is extended and defined to form a directional confidence boundary jointly defined by the lateral confidence range, the burial depth confidence range and the end extension confidence range, thus generating a spatial confidence segment of the underground pipeline.
4. The method for detecting spatial relationships and coordinating construction control of underground pipelines according to claim 1, characterized in that: The process of obtaining the location, orientation, and working mechanism posture of the construction equipment, and converting them into the current spatial position of the construction action point, specifically includes: Determine the positioning reference point of the construction equipment, and obtain the positioning position and orientation of the construction equipment under the construction coordinate reference point; The current attitude of each working mechanism component, which is sequentially connected from the construction equipment body to the construction action point, is obtained to determine the positioning reference point, the connection position of each working mechanism component, and the spatial connection relationship between the construction action points. Taking the location of the construction equipment as the starting point, the spatial connection relationship is converted to the construction coordinate reference according to the orientation of the equipment, and the current spatial position of the construction action point under the construction coordinate reference is determined according to the connection sequence of the working mechanism components. The current spatial position of the construction action point is recorded according to the continuous acquisition time, forming a continuous position record used to characterize the continuous positional changes of the construction action point.
5. The method for detecting spatial relationships and coordinating construction control of underground pipelines according to claim 4, characterized in that: The process of determining the entry direction based on continuous position changes and the target construction position, and generating the expected entry space for the construction action point, specifically includes: The current direction of movement is determined based on the current spatial position of the construction action point at adjacent acquisition times in the continuous location record, and the target entry direction from the current spatial position of the construction action point to the target construction position is determined. Within the range of currently executable directions of the working mechanism, the direction that maintains the continuity of the current movement direction and is toward the target entry direction is determined as the entry direction; Starting from the current spatial position of the construction action point, the forward position range is determined based on the direction of entry and the executable displacement range of the next construction stage. Based on the lateral and depth ranges of the construction action point under the corresponding construction action, the forward position range is spatially expanded to generate the space into which the construction action point is expected to enter. When continuous position changes cause a change in the current direction of movement, or when the target construction location changes, the entry direction is redefined and the expected entry space of the construction action point is updated.
6. The method for detecting spatial relationships and coordinating construction control of underground pipelines according to claim 1, characterized in that: The process of detecting the spatial relationship between the expected entry space and the reliable segment of the underground pipeline space, based on the positional changes of their relative directional reliable boundaries, specifically includes: Determine the expected spatial coverage area of the construction action point and the corresponding reliable segment of underground pipeline space ahead along the direction of entry, and obtain the corresponding directional reliable boundary. The boundary approach distance corresponding to the directional reliable boundary is determined based on the positioning error of the construction equipment and the range of single position change of the construction action point. The detection system assesses the separation, proximity, and overlap between the expected entry point of the construction action and the directional reliable boundary, and determines the trend of positional change of the expected entry space relative to the directional reliable boundary based on the entry direction. A safe passage relationship is determined when the expected entry space remains separated from the directional trusted boundary, and the positional change along the entry direction does not point to the interior of the directional trusted boundary. When the expected entry space does not enter the interior of the directional trust boundary, the interval between it and the directional trust boundary is no greater than the boundary proximity distance, and the position change along the entry direction points towards the directional trust boundary, it is determined to be a trust boundary proximity relationship; When the expected entry space overlaps with the interior of the directional trust boundary, or when a crossing occurs from the outside of the directional trust boundary to the inside along the entry direction, it is determined to be a trust domain crossing relationship.
7. The method for detecting spatial relationships and coordinating construction control of underground pipelines according to claim 6, characterized in that: The step of filtering accessible directions that do not point to the interior of the directional reliable boundary based on the spatial relationship detection results to generate a navigation permission area specifically includes: Starting from the current spatial location of the construction action point, within the current executable direction range of the working mechanism, multiple candidate entry directions are generated around the direction toward the target construction location; The current entry direction is replaced with each candidate entry direction to generate the corresponding construction action point's expected entry space, and the spatial relationship detection result corresponding to each candidate entry direction is determined according to the spatial relationship detection method. Candidate entry directions whose corresponding spatial relationship detection results are trusted domain penetration relationships are excluded; For candidate entry directions whose corresponding spatial relationship detection results are close to the credible boundary, the entry direction is adjusted to the side away from the interior of the corresponding directional credible boundary, the construction action point is regenerated and the spatial relationship detection is performed. Candidate or adjusted entry directions that are safe to pass through spatial relationships are identified as accessible directions, and the continuous reachable spaces corresponding to each accessible direction are organized into navigation permission areas. When there is no accessible direction, the current spatial position of the construction action point is determined as the navigation hold position.
8. The method for detecting spatial relationships and coordinating construction control of underground pipelines according to claim 7, characterized in that: The process of determining the next navigation location and outputting construction navigation instructions specifically includes: Based on the feasible displacement range of each accessible direction and construction action point in the next construction stage, the corresponding candidate navigation positions are determined within the navigation permission area. Compare each candidate navigation position with the target construction position, and retain the candidate navigation positions that can be shortened to the target construction position relative to the current spatial position of the construction action point, and whose corresponding subsequent construction action points are expected to enter the space without forming a reliable domain penetration relationship. Among the remaining candidate navigation positions, priority is given to selecting the candidate navigation position that is directionally continuous with the current direction of entry as the next navigation position; A construction navigation instruction is generated based on the current spatial location of the construction point, the next navigation location, and the navigation permission area. The construction navigation instruction includes the direction of entry, the next navigation location, and the navigation permission area. When the construction action point reaches the next navigation location, or when a reliable segment of underground pipeline space causes a change in the navigation permission area, the next navigation location is re-determined and the construction navigation instructions are updated.
9. The method for detecting spatial relationships and coordinating construction control of underground pipelines according to claim 8, characterized in that: The acquisition of new location evidence during the construction process that is inconsistent with the reliable segment of the underground pipeline space, and the identification of the affected pipeline segment, specifically includes: Obtain the location of exposed pipelines, supplementary detection locations, or actual burial depths formed during construction, and convert them to the construction coordinate benchmark to form new location evidence; The new location evidence is compared with the center location, extension direction, burial depth range and directional credible boundary of the corresponding underground pipeline spatial credible segment; When the new location evidence is located outside the corresponding directional credible boundary, or when the extension direction or burial depth represented by the new location evidence does not satisfy the pipeline extension continuity of the corresponding underground pipeline space credible segment, it is determined that the new location evidence is inconsistent with the underground pipeline space credible segment. Starting from the location corresponding to the new location evidence, along the forward and backward extension direction of the corresponding underground pipeline, we sequentially examine whether the center position, extension direction, and burial depth of the adjacent pipeline segments remain continuous with the location changes reflected by the new location evidence. The affected pipeline segment is identified as the pipeline segment that maintains continuity with the positional change reflected by the new location evidence in the forward and backward extension directions, and the boundary of the affected pipeline segment is determined at the position where the continuity of the original pipeline extension is restored in the adjacent pipeline segment.
10. The method for detecting spatial relationships and coordinating construction control of underground pipelines according to claim 9, characterized in that: Correcting its directional reliability boundary and verifying adjacent continuation relationships, generating a corrected reliable segment of underground pipeline space, and redetermining the navigation permission area and the next navigation location, specifically including: The new location evidence is added to the location data corresponding to the affected pipeline segment, and the center position, extension direction and burial depth range of the affected pipeline segment are re-determined based on the new location evidence and the original location data of the affected pipeline segment. Based on the redefined center location, extension direction, and burial depth range, the lateral confidence range, burial depth confidence range, and end extension confidence range of the affected pipeline segment are corrected, and the corrected directional confidence boundary is formed. The connection status of the center position, the continuity of the extension direction, and the connection status of the burial depth between the two ends of the affected pipeline segment and the adjacent unaffected pipeline segment after correction are respectively tested. For adjacent locations that meet the requirements for pipeline extension continuity, a direct connection relationship is established. For adjacent locations that do not meet the requirements for pipeline extension continuity, a transitional connection segment is formed based on the positional change between the corrected end of the affected pipeline segment and the end of the adjacent unaffected pipeline segment. The corrected affected pipeline segments, transitional joint segments, and unaffected pipeline segments are organized according to the pipeline extension sequence to generate a corrected reliable segment of underground pipeline space. Based on the corrected reliable segment of underground pipeline space, the spatial relationship detection of the expected entry space of the construction action point is re-executed, the accessible directions are re-screened, the navigation permission area and the next navigation location are determined, and the construction navigation instructions are updated.