Sewing Management System and Sewing Management Methods
By identifying and adjusting the reduced capabilities of workers through the sewing management system, the problem of decreased productivity due to physical condition was solved, and reasonable production planning and improved operational efficiency were achieved.
Patent Information
- Application Number
- CN202610623835.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Priority Date
- 2025-05-09
- Filing Date
- 2026-05-08
- Publication Date
- 2026-11-10
AI Technical Summary
In sewing factories, workers' poor health can lead to decreased productivity and reduced output.
The sewing management system calculates the workers' standard and current capabilities, determines the state of reduced capabilities, and outputs notification data to adjust the workload and assign tasks.
Identify and adjust the reduced capabilities of operators to prevent productivity decline, develop reasonable production plans, and improve operational efficiency.
Smart Images

Figure CN123070513A_ABST
Abstract
Description
Technical Field
[0001] The technology disclosed in this specification relates to sewing management systems and sewing management methods. Background Technology
[0002] In the technical field of sewing management systems, sewing management systems such as those disclosed in Patent Document 1 are known. In Patent Document 1, the sewing management system estimates the operator's sewing skills based on production management information and estimates the operator's productivity based on physical condition management information.
[0003] Patent Document 1: Japanese Patent Application Publication No. 2021-117815
[0004] In a sewing factory, workers use sewing machines. For example, due to poor health, a worker may be unable to perform at their usual level. If this decline in worker performance is ignored, the sewing factory's productivity may decrease. Summary of the Invention
[0005] The purpose of the technology disclosed in this specification is to identify the current operational capabilities of an operator.
[0006] This specification discloses a sewing management system. The sewing management system includes: a standard capability calculation unit that calculates a standard capability representing the operator's standard working capability based on the operator's working capability in a first period using a sewing machine; a current capability acquisition unit that acquires the current capability representing the operator's working capability in a second period following the first period; a determination unit that determines whether the operator is in a capability reduction state where the current capability is lower than the standard capability and the difference between the standard capability and the current capability is greater than or equal to a first predetermined amount; and an output unit that, when it is determined that the operator is in a capability reduction state, causes a notification device to output notification data.
[0007] The effects of the invention
[0008] The technology disclosed in this specification enables the identification of an operator's current work capacity. Attached Figure Description
[0009] Figure 1 This is a schematic diagram illustrating the sewing management system involved in the implementation method.
[0010] Figure 2 This is a block diagram illustrating the sewing machine, management device, and information terminal involved in the implementation method.
[0011] Figure 3 This is a diagram used to explain the calculation method of the standard capability involved in the implementation method.
[0012] Figure 4 This is a diagram used to illustrate the current capabilities involved in the implementation method.
[0013] Figure 5 It is a diagram used to illustrate the relationship between the standard production quantity, target production quantity, and current production quantity involved in the implementation method.
[0014] Figure 6 This is a flowchart illustrating the sewing management method involved in the implementation method.
[0015] Figure 7 This is a flowchart illustrating the sewing management method involved in the implementation method. Detailed Implementation
[0016] The embodiments of this technology will now be described with reference to the accompanying drawings, but this technology is not limited to these embodiments. The structural elements of the embodiments described below can be appropriately combined. In addition, some structural elements may not be used at times.
[0017] [Sewing Management System]
[0018] Figure 1 This diagram schematically illustrates a sewing management system 1 according to an embodiment. The sewing management system 1 manages a sewing factory that produces sewn products Pb. A sewing machine 2 is installed in the sewing factory. The sewing machine 2 operates within the sewing factory. The sewing machine 2 is an industrial sewing machine. The sewing machine 2 sews a sewing object Pa. By sewing the sewing object Pa with the sewing machine 2, sewn products Pb are produced. Fabric is shown as the sewing object Pa. Garment is shown as the sewn product Pb.
[0019] Multiple sewing machines 2 are installed in the sewing factory. The sewn product Pb is produced through the coordinated operation of the multiple sewing machines 2. Multiple types of sewing machines 2 corresponding to different uses can also be installed in the sewing factory. Examples of types of sewing machines 2 include a flat sewing machine for sewing garment bodies, a button sewing machine for sewing buttons onto garment bodies, and a pocket sewing machine for sewing pockets onto garment bodies. Furthermore, for simplicity, in this embodiment, it is assumed that three sewing machines 2 are installed in the sewing factory. The sewing machines 2 include a first sewing machine 2A, a second sewing machine 2B, and a third sewing machine 2C.
[0020] Manager Ma, operator Mb, and inspector Mc work in a sewing factory. Manager Ma manages sewing machine 2, operator Mb, and inspector Mc. Operator Mb operates sewing machine 2. Operator Mb uses sewing machine 2 to perform tasks. Operator Mb uses sewing machine 2 to sew object Pa.
[0021] Multiple workers Mb each use sewing machine 2 to perform their work. Furthermore, for simplicity, in this embodiment, it is assumed that there are three workers Mb working in the sewing factory. Workers Mb include worker Mb1, worker Mb2, and worker Mb3. Worker Mb1 uses sewing machine 2A to perform the first sewing process. Worker Mb2 uses sewing machine 2B to perform the second sewing process. Worker Mb3 uses sewing machine 2C to perform the third sewing process.
[0022] Inspector Mc inspects the sewn object Pa after it has been sewn by sewing machine 2. The inspection of sewn object Pa includes: intermediate inspection, which is performed on sewn object Pa after a part of the sewing process is completed; and final inspection, which is performed on sewn product Pb after all sewing processes are completed.
[0023] The sewing management system 1 includes a management device 3 that manages at least the sewing machine 2 and the operator Mb. In one embodiment, the management device 3 is located in the sewing factory. Alternatively, the management device 3 may be located outside the sewing factory.
[0024] The management device 3 includes a display device 4 and an input device 5. The display device 4 displays display data. The display device 4 includes a flat panel display such as a liquid crystal display (LCD) or an organic EL display. The input device 5 is operated by the manager Ma, thereby generating input data. Alternatively, the input device 5 can also be operated by the operator Mb or the inspector Mc. The input device 5 includes a touch panel (touch sensor) configured on the display screen of the display device 4. Furthermore, the input device 5 can also be a computer keyboard, a mouse, or a voice input device.
[0025] The sewing machine 2 has an operation panel 6 and a controller 7. The operation panel 6 includes a display device and an input device. The display device of the operation panel 6 includes a flat panel display such as an LCD or an OLED display. The input device of the operation panel 6 includes at least one button, a computer keyboard, a touch panel (touch sensor), and a voice input device. The input device of the operation panel is operated by the operator Mb, thereby generating input data.
[0026] The inspector, Mc, possesses an information terminal 30. Examples of information terminals 30 include personal computers, tablet computers, and smartphones. The information terminal 30 includes a display device and an input device. The display device of the information terminal 30 includes a flat panel display such as a liquid crystal display (LCD) or an organic EL display. The input device of the information terminal 30 includes at least one of a touch panel (touch sensor), a computer keyboard, a mouse, and a voice input device. The input device of the information terminal 30 is operated by the inspector, Mc, thereby generating input data.
[0027] The management device 3 is shared by multiple sewing machines 2 and information terminals 30 in the sewing factory. The number of management devices 3 is less than the number of sewing machines 2. The management device 3 can communicate with each of the sewing machines 2 and the information terminals 30. The management device 3 can also communicate with the controller 7 and the information terminals 30.
[0028] [Sewing machine and management device]
[0029] Figure 2 This is a block diagram illustrating the sewing machine 2, management device 3, and information terminal 30 according to the embodiment. The management device 3 includes a computer. The management device 3 has: a processor 8 such as a CPU (Central Processing Unit); a main memory 9, which includes volatile memory such as RAM (Random Access Memory); a storage device 10, which includes non-volatile memory such as ROM (Read Only Memory); and an interface 11, which includes input / output circuitry. The functions of the processor 8 are stored as a computer program in the storage device 10. The processor 8 reads the computer program from the storage device 10 and expands it to the main memory 9, and executes the processing according to the computer program. In addition, the computer program can also be transmitted to the management device 3 via a network.
[0030] The sewing machine 2 has a controller 7, an operation panel 6, a sewing machine motor 12, a pedal 13, and a sensor 14. The controller 7 controls the sewing machine 2. The controller 7 includes a computer with a processor, main memory, storage, and an interface.
[0031] The information terminal 30 includes a computer, which has a processor, main memory, storage and interfaces.
[0032] The management device 3, controller 7, and information terminal 30 communicate via network 15. Examples of network 15 include local area network (LAN), wide area network (WAN), intranet, and the Internet. The management device 3, controller 7, and information terminal 30 can communicate wirelessly or via wired connection.
[0033] The sewing machine motor 12 is the main power source of the sewing machine 2. The sewing machine motor 12 drives the needle bar, take-up lever, and feeder of the sewing machine 2. The sewing machine needle, held by the needle bar, reciprocates in the up-down direction. The pedal 13 is operated by the operator's foot. Operating the pedal 13 drives the sewing machine motor 12. Releasing the pedal 13 stops the sewing machine motor 12. The sensor 14 detects the operating conditions of the sewing machine 2. An example of the sensor 14 is a rotation sensor that detects the rotational data of the sewing machine motor 12. The rotational data of the sewing machine motor 12 includes the number of revolutions or rotational speed of the sewing machine motor 12 per unit time.
[0034] The processor 8 has a standard capability calculation unit 21, a current capability acquisition unit 22, a judgment unit 23, a production planning unit 24, and an output unit 25.
[0035] The standard capability calculation unit 21 calculates the standard capability Ws, which represents the standard working capability of the operator Mb using the sewing machine 2. The standard capability Ws is the operator Mb's usual working capability. The standard capability Ws is the operator Mb's past standard working capability. The standard capability calculation unit 21 calculates the standard capability Ws based on the operator Mb's past working capability during the first period Ea.
[0036] Figure 3 This diagram illustrates the calculation method for the standard capacity Ws involved in the implementation method. The standard capacity calculation unit 21 obtains the work capacity of operator Mb during the previous first period Ea. The first period Ea is arbitrarily determined. The first period Ea can be 1 week or 1 month.
[0037] The standard capacity calculation unit 21 obtains the work capacity for each unit time Ec of the first period Ea. The unit time Ec is shorter than the first period Ea. The unit time Ec is arbitrarily determined. The unit time Ec can be 10 minutes, 1 hour, or the operator Mb's 1-day work time (e.g., 8 hours).
[0038] Work capacity includes the amount of work that worker Mb can perform per unit of time Ec. Workers with high work capacity Mb perform more work. Workers with low work capacity Mb perform less work.
[0039] Furthermore, the workload may vary depending on the difficulty of the task. A lower difficulty level results in a higher workload, while a higher difficulty level results in a lower workload. Even for a worker with lower skill level (Mb), a lower workload may occur when the task is low-difficulty. Conversely, even for a worker with higher skill level (Mb), a lower workload may occur when the task is high-difficulty. Straight-line sewing is an example of a low-difficulty task. Curved-line sewing is an example of a high-difficulty task.
[0040] In this implementation, the workload of operator Mb is defined as the production quantity C, which represents the number of sewn objects Pa produced by operator Mb using sewing machine 2. Production quantity C is the number of sewn objects Pa produced per unit time Ec. When the difficulty of the work is the same or similar, operator Mb with higher work ability produces more production quantity C, while operator Mb with lower work ability produces less production quantity C.
[0041] In this implementation, the production quantity C of operator Mb is counted by inspector Mc. Inspector Mc counts the production quantity C of each of the multiple operators Mb (Mb1, Mb2, Mb3). Inspector Mc counts the production quantity C of each of the multiple operators Mb (Mb1, Mb2, Mb3) in each unit time Ec.
[0042] The inspector Mc operates the input device of the information terminal 30, inputting the production quantities C of each of the multiple operators Mb (Mb1, Mb2, Mb3) into the information terminal 30. The production quantities C input into the information terminal 30 are sent to the management device 3 via the network 15. The standard capacity calculation unit 21 obtains the production quantities C of each of the multiple operators Mb (Mb1, Mb2, Mb3) from the information terminal 30.
[0043] The standard capacity calculation unit 21 calculates the standard production quantity Cs of each of the multiple operators Mb (Mb1, Mb2, Mb3) during the first period Ea based on the production quantity C obtained from the information terminal 30, and uses this as the standard capacity Ws. The standard production quantity Cs is an example of the standard work quantity.
[0044] In this implementation, the standard production quantity Cs is the average of multiple production quantities C obtained in each unit time Ec during the first period Ea. The standard capacity calculation unit 21 calculates the average of multiple production quantities C obtained in each unit time Ec during the first period Ea and uses this average as the standard production quantity Cs for operator Mb.
[0045] In the first period, Ea contains N units of time Ec. When the production quantity C of each unit of time Ec is set as Ck, the standard production quantity Cs is expressed by the following formula (1).
[0046] Formula 1
[0047] Furthermore, the standard capacity calculation unit 21 can also exclude deviation values from the multiple production quantities C obtained in each unit time Ec during the first period Ea. The standard capacity calculation unit 21 can also calculate the average of the multiple production quantities C after excluding deviation values as the standard production quantity Cs for operator Mb. A deviation value refers to a value that deviates significantly from other values.
[0048] Furthermore, the standard production quantity Cs can also be the median value of multiple production quantities C obtained in each unit time Ec during period Ea in period 1. The standard capacity Ws can also be the median value of multiple production quantities C after excluding deviations.
[0049] The standard production quantity Cs of each of the multiple operators Mb (Mb1, Mb2, Mb3) calculated in the standard capacity calculation unit 21 is stored in the standard capacity storage unit 26 of the storage unit 10.
[0050] The current capability acquisition unit 22 acquires the current capability Wc, which represents the work capability of worker Mb in the second period Eb, which is later than the first period Ea. The second period Eb is an evaluation period for evaluating worker Mb's work capability. When evaluating worker Mb's work capability today, the second period Eb is at least a portion of today's period. When evaluating worker Mb's work capability at the current moment, the second period Eb is a period that includes the current moment. The second period Eb is shorter than worker Mb's daily working hours (e.g., 8 hours). The second period Eb is arbitrarily determined. The second period Eb can be 10 minutes or 1 hour.
[0051] In this implementation, the current capacity acquisition unit 22 acquires the production quantity C of operator Mb in the second period Eb, i.e., the current production quantity Cc, as the current capacity Wc. The current production quantity Cc is an example of the current workload. The current capacity acquisition unit 22 acquires the current production quantity Cc of each of the multiple operators Mb (Mb1, Mb2, Mb3).
[0052] In this implementation, the current production quantity Cc of operator Mb is counted by inspector Mc. Inspector Mc counts the current production quantity Cc of each of the multiple operators Mb (Mb1, Mb2, Mb3). In each second period Eb, inspector Mc counts the current production quantity Cc of each of the multiple operators Mb (Mb1, Mb2, Mb3).
[0053] Inspector Mc operates the input device of information terminal 30, inputting the current production quantity Cc of each of the multiple operators Mb (Mb1, Mb2, Mb3) into information terminal 30. The current production quantity Cc input into information terminal 30 is sent to management device 3 via network 15. Current capacity acquisition unit 22 obtains the current production quantity Cc of each of the multiple operators Mb (Mb1, Mb2, Mb3) from information terminal 30.
[0054] Figure 4 This is a diagram used to illustrate the current capability Wc involved in the implementation method. Figure 4 This graph represents the current production quantity Cc assuming worker Mb starts working with sewing machine 2 at 8:00 AM today. Figure 4 In the example shown, period 2, Eb, is 10 minutes. The current production quantity Cc for period 2, Eb, from 8:00 AM to 8:10 AM, is 10 pieces. The current production quantity Cc for period 2, Eb, from 8:10 AM to 8:20 AM, is 10 pieces. The current production quantity Cc for each of period 2, Eb, from 8:20 AM to 8:30 AM, from 8:30 AM to 8:40 AM, and from 8:40 AM to 8:50 AM, is 9 pieces. The current production quantity Cc for each of period 2, Eb, from 8:50 AM to 9:00 AM and from 9:00 AM to 9:10 AM, is 8 pieces. The current production quantity Cc for period 2, Eb, from 9:10 AM to 9:20 AM, is 7 pieces. The current production quantity of Eb, Cc, during the second period from 9:20 a.m. to 9:30 a.m. is 6 pieces.
[0055] Current Capability Acquisition Department 22 acquires Mb (Mb1, Mb2, Mb3) for multiple operators respectively. Figure 4 The current production quantity Cc is as shown.
[0056] The determination unit 23 determines whether an operator Mb is in a state of reduced capability, where the current capability Wc is lower than the standard capability Ws and the difference between the standard capability Ws and the current capability Wc is greater than or equal to a first predetermined amount Da. The first predetermined amount Da is a pre-determined value. The determination unit 23 determines whether multiple operators Mb (Mb1, Mb2, Mb3) are in a state of reduced capability.
[0057] An employee Mb deemed to be in a reduced capacity state is, for example, an employee Mb who is unable to perform at their usual work level due to poor physical condition. An employee Mb deemed not to be in a reduced capacity state is an employee Mb who is able to perform at their usual work level.
[0058] In the implementation, the determination unit 23 determines whether the operator Mb is in a capacity reduction state where the current production quantity Cc is lower than the standard production quantity Cs and the difference between the standard production quantity Cs and the current production quantity Cc is more than or equal to a first predetermined amount Da.
[0059] Furthermore, the first specified quantity Da can also be determined for each operator Mb. Alternatively, the first specified quantity Da determined for operators Mb with high standard capabilities Ws can be set to a small value, while the first specified quantity Da determined for operators Mb with low standard capabilities Ws can be set to a large value.
[0060] Furthermore, the first specified quantity Da can also be determined based on the difficulty of each task. Alternatively, the first specified quantity Da determined for the operator Mb performing a task with low difficulty can be set to a small value, while the first specified quantity Da determined for the operator Mb performing a task with high difficulty can be set to a large value.
[0061] The production planning unit 24 calculates the target workload allocated to each of the multiple operators Mb (Mb1, Mb2, Mb3) based on their respective standard capabilities Ws. In this embodiment, the production planning unit 24 calculates the target production quantity Cr allocated to each of the multiple operators Mb (Mb1, Mb2, Mb3) as the target workload. The target production quantity Cr calculated in the production planning unit 24 is stored in the target workload storage unit 27 of the storage unit 10.
[0062] Figure 5 This is a diagram used to illustrate the relationship between the standard production quantity Cs, the target production quantity Cr, and the current production quantity Cc involved in the implementation method. Figure 5 In the example shown, the standard production quantity Cs of operator 1 Mb1 is 60 pieces per hour (10 pieces per 10 minutes). The standard production quantity Cs of operator 2 Mb2 is 66 pieces per hour (11 pieces per 10 minutes). The standard production quantity Cs of operator 3 Mb3 is 54 pieces per hour (9 pieces per 10 minutes).
[0063] The production planning department 24 calculates the target production quantity Cr allocated to each of the multiple operators Mb (Mb1, Mb2, Mb3) based on their respective standard production quantities Cs. The production planning department 24 calculates the target production quantity Cr such that the target production quantity Cr does not exceed the standard production quantity Cs. Alternatively, the production planning department 24 may calculate the target production quantity Cr in a manner where the target production quantity Cr is the same as the standard production quantity Cs. The production planning department 24 may also calculate the target production quantity Cr in a manner where the target production quantity Cr is lower than the standard production quantity Cs and the difference between the standard production quantity Cs and the target production quantity Cr is lower than the first specified quantity Da. Figure 5 In the example shown, the target production quantity of Cr for operator Mb1 is 9 pieces per 10 minutes. The target production quantity of Cr for operator Mb2 is 10 pieces per 10 minutes. The target production quantity of Cr for operator Mb3 is 8 pieces per 10 minutes.
[0064] The current capacity acquisition department 22 obtains the current production quantity Cc of each of the multiple operators Mb (Mb1, Mb2, Mb3). Figure 5 In the example shown, the current production quantity Cc of operator Mb1 is 7 pieces per 10 minutes. The current production quantity Cc of operator Mb2 is 10 pieces per 10 minutes. The current production quantity Cc of operator Mb3 is 8 pieces per 10 minutes.
[0065] The determination unit 23 determines whether the production capacity is in a reduced state where the current production quantity Cc is lower than the standard production quantity Cs and the difference between the standard production quantity Cs and the current production quantity Cc is greater than or equal to the first specified quantity Da. Figure 5 In the example shown, when the first specified quantity Da is set to 2, the determination unit 23 determines that the first operator Mb1 is in a state of reduced capability. The determination unit 23 determines that the second operator Mb2 and the third operator Mb3 are not in a state of reduced capability.
[0066] If the production planning department 24 determines that at least one of the multiple operators Mb (Mb1, Mb2, Mb3) is in a state of reduced capacity, it changes the target production quantity Cr, which is the target workload. The production planning department 24 changes the target production quantity Cr by decreasing the target production quantity Cr of the first operator Mb1 who is determined to be in a state of reduced capacity, and increasing the target production quantity Cr of at least one of the second operator Mb2 and the third operator Mb3 who are determined not to be in a state of reduced capacity.
[0067] When there are workers Mb whose current production quantity Cc is lower than the target production quantity Cr, the Production Planning Department 24 will change the target production quantity Cr by prioritizing the increase of the target production quantity Cr for workers Mb whose current production quantity Cc is lower than the target production quantity Cr. Figure 5 In the example shown, the current production quantity Cc of both operator Mb2 and operator Mb3 is lower than the target production quantity Cr. The production planning department 24 changes the target production quantity Cr to the target production quantity Ca by prioritizing the increase of the target production quantity Cr for both operators Mb2 and Mb3, whose current production quantity Cc is lower than the target production quantity Cr. When the target production quantity Cr is changed to the target production quantity Ca, the target production quantity Cr is updated to the target production quantity Ca in the target production quantity storage department 27.
[0068] Production Planning Department 24 changes the target production quantity Cr to target production quantity Ca such that the changed target production quantity Ca does not exceed the standard production quantity Cs. Alternatively, Production Planning Department 24 may change the target production quantity Cr to target production quantity Ca such that the changed target production quantity Ca exceeds the standard production quantity Cs and the difference between the standard production quantity Cs and the changed target production quantity Ca does not exceed a predetermined second specified quantity Db. The second specified quantity Db may be the same as or smaller than the first specified quantity Da.
[0069] When the output unit 25 determines that the operator Mb is in a reduced capacity state, it causes the notification device to output notification data. In this embodiment, the display device 4, the operation panel 6, and the information terminal 30 are each examples of a notification device. Causing the notification device to output notification data includes causing the display device 4 to display display data. Causing the notification device to output notification data includes causing at least one of the display devices of the operation panel 6 and the information terminal 30 to display display data. If at least one of the display device 4, the operation panel 6, and the information terminal 30 includes a sound output device, causing the notification device to output notification data includes causing the sound output device to output sound data.
[0070] The notification data includes recommendation data that suggests that the first operator, Mb1, who is determined to be in a reduced capacity state, should rest. The output unit 25, for example, causes the display device of the operation panel 6 of the first sewing machine 2A to display display data prompting the first operator, Mb1, to take a rest.
[0071] The notification data may also include: reducing the target production quantity Cr of operator Mb1, which is determined to be in a state of reduced capacity, and increasing the target production quantity Cr of at least one of operator Mb2 and operator Mb3, which is determined not to be in a state of reduced capacity.
[0072] For example, the display device 4 may display: instruction data indicating that the target production quantity Cr of the first operator Mb1 should be reduced, and instruction data indicating that the target production quantity Cr of at least one of the second operator Mb2 and the third operator Mb3 should be increased.
[0073] For example, the display device of the operation panel 6 of the first sewing machine 2A may display the changed target production quantity Ca of the first operator Mb1, the display device of the operation panel 6 of the second sewing machine 2B may display the changed target production quantity Ca of the second operator Mb2, and the display device of the operation panel 6 of the third sewing machine 2C may display the changed target production quantity Ca of the third operator Mb3.
[0074] The notification data may also include recommendation data that recommends assigning the work of operator Mb1, which is determined to be in a reduced capacity state, to at least one of operator Mb2 and operator Mb3, which is determined not to be in a reduced capacity state.
[0075] [Sewing Management Methods]
[0076] Figure 6 and Figure 7 Each of these is a flowchart illustrating the sewing management method involved in the implementation method. Figure 6 This is a flowchart representing the standard capability calculation stage for calculating the standard capability Ws. Figure 7 This is a flowchart representing the current capability evaluation stage, which evaluates the current capability Wc based on the standard capability Ws.
[0077] While referring to Figure 6 , one The standard capacity calculation stage will be explained below. During the first period Ea of the standard capacity calculation stage, the standard capacity calculation unit 21 obtains the working capacity of operator Mb for each unit time Ec. In this embodiment, the standard capacity calculation unit 21 obtains the production quantity C of operator Mb for each unit time Ec. The standard capacity calculation unit 21 obtains the production quantity C of each of the multiple operators Mb (Mb1, Mb2, Mb3) (step SA1).
[0078] The standard capacity calculation unit 21 calculates the standard production quantity Cs based on the production quantity C of operator Mb in the first period Ea, and uses it as the standard capacity Ws of operator Mb. As shown in equation (1), the standard production quantity Cs can also be the average of multiple production quantities C obtained in each unit time Ec in the first period Ea (step SA2).
[0079] The standard capacity calculation unit 21 calculates the standard production quantity Cs for each of the multiple operators Mb (Mb1, Mb2, Mb3). The standard production quantity Cs of the operator Mb calculated in the standard capacity calculation unit 21 is stored in the standard capacity storage unit 26 of the storage unit 10 (step SA3).
[0080] Production Planning Department 24 calculates the target production quantity Cr allocated to each of the multiple operators Mb (Mb1, Mb2, Mb3) based on their respective standard production quantity Cs (step SA4).
[0081] The target production quantity Cr calculated in the production planning department 24 is stored in the target work quantity storage department 27 of the storage unit 10 (step SA5).
[0082] Next, while referring to Figure 7 , one The current capacity assessment stage will be explained below. The current capacity acquisition unit 22 acquires the current capacity Wc, representing the operational capacity of operator Mb in the second period Eb, which is later than the first period Ea. In this embodiment, the current capacity acquisition unit 22 acquires the current production quantity Cc of operator Mb in the second period Eb. The current capacity acquisition unit 22 acquires the current production quantity Cc of each of the multiple operators Mb (Mb1, Mb2, Mb3) (step SB1).
[0083] The determination unit 23 determines, for each of the multiple operators Mb (Mb1, Mb2, Mb3), whether they are in a capacity reduction state where the current production quantity Cc is lower than the standard production quantity Cs and the difference between the standard production quantity Cs and the current production quantity Cc is greater than or equal to a first predetermined quantity Da. That is, the determination unit 23 determines whether an operator Mb is in a capacity reduction state (step SB2).
[0084] If, in step SB2, it is determined that an operator Mb is in a state of reduced capacity (step SB2: Yes), the production planning department 24 changes the target production quantity Cr of each of the multiple operators Mb (Mb1, Mb2, Mb3) (step SB3).
[0085] Production Planning Department 24 changes the target production quantity Cr to target production quantity Ca by decreasing the target production quantity Cr of operators Mb determined to be in a state of reduced capacity, and increasing the target production quantity Cr of operators Mb determined not to be in a state of reduced capacity. If there are operators Mb whose current production quantity Cc is lower than the target production quantity Cr, Production Planning Department 24 changes the target production quantity Cr to target production quantity Ca by prioritizing the increase of the target production quantity Cr of operators Mb whose current production quantity Cc is lower than the target production quantity Cr. In the target production quantity storage department 27, the target production quantity Cr is updated to the target production quantity Ca.
[0086] When the output unit 25 determines that an operator Mb is in a reduced capacity state, it causes the notification device to output notification data (step SB4). The notification data includes recommendation data that suggests that the operator Mb determined to be in a reduced capacity state should take a break. For example, the output unit 25 causes the display device on the operation panel 6 of the sewing machine 2 to display display data prompting the operator Mb in a reduced capacity state to take a break. In addition, the notification data may also include: recommendation data that suggests reducing the target production quantity Cr of the operator Mb determined to be in a reduced capacity state, or recommendation data that suggests assigning the work of the operator Mb determined to be in a reduced capacity state to operators Mb determined not to be in a reduced capacity state.
[0087] If, in step SB2, it is determined that there is no worker Mb in a reduced capacity state (step SB2: No), the target production quantity Cr is not changed. Worker Mb continues to operate sewing machine 2 based on the target production quantity Cr.
[0088] [Effect]
[0089] As described above, according to the embodiment, the processor 8 of the management device 3 includes: a standard capability calculation unit 21, which calculates a standard capability Ws representing the standard capability of the operator Mb based on the operator capability of the operator Mb in the first period Ea when using the sewing machine 2; a current capability acquisition unit 22, which acquires the current capability Wc representing the operator Mb's current capability in the second period Eb, which is later than the first period Ea; a determination unit 23, which determines whether the current capability Wc is lower than the standard capability Ws and the difference between the standard capability Ws and the current capability Wc is greater than or equal to a first predetermined amount Da; and an output unit 25, which, when it is determined that the operator Mb is in a capability reduction state, causes the notification device to output notification data.
[0090] According to the implementation method, the processor 8 compares the standard capability Ws with the current capability Wc to determine whether there is an operator Mb whose capability is reduced and unable to perform normally. If there is an operator Mb whose capability is reduced and unable to perform normally, the processor 8 outputs notification data from the notification device. By outputting notification data from the notification device, at least one of the manager Ma, the operator Mb, and the inspector Mc can identify the current capability of the operator Mb. By identifying the existence of operators Mb with reduced capability, measures can be taken to suppress the decline in productivity in the sewing factory. For example, the operator Mb with reduced capability can be advised to take a break, or the workload of the operator Mb with reduced capability can be reduced, or the workload of the operator Mb whose capability is not reduced can be increased.
[0091] By calculating the standard capacity Ws of each of the multiple workers Mb, the production planning department 24 can calculate the target workload allocated to each worker Mb based on the standard capacity Ws. When formulating a production plan for sewn products Pb in a sewing factory, an appropriate production plan is formulated based on the standard capacity Ws of the workers Mb. For example, a production plan can be formulated such that the target workload allocated to workers Mb with high standard capacity Ws is increased, and the target workload allocated to workers Mb with low standard capacity Ws is decreased. Alternatively, a production plan can be formulated such that high-difficulty tasks are assigned to workers Mb with high standard capacity Ws, and low-difficulty tasks are assigned to workers Mb with low standard capacity Ws. For example, if a worker Mb with high standard capacity Ws is unable to perform at their usual capacity due to poor health, some or all of the work of the worker Mb who cannot perform at their usual capacity can be reassigned to other workers Mb, thereby preventing a decrease in the sewing factory's productivity.
[0092] [Other Implementation Methods]
[0093] In the above embodiment, the production quantity C of operator Mb is counted by inspector Mc. The production quantity C of operator Mb can also be counted by operator Mb. Alternatively, operator Mb can operate the input device of operation panel 6 to input their own production quantity C into operation panel 6. Alternatively, the production quantity C input to operation panel 6 can be sent to management device 3 via network 15.
[0094] In the above-described embodiment, the processor 8 can also calculate the workload of the operator Mb based on the detection data of the sensor 14. When the sensor 14 is a rotation sensor that detects the rotation data of the sewing machine motor 12, the processor 8 can calculate the workload of the operator Mb based on the detection data of the sensor 14. As described above, the rotation data of the sewing machine motor 12 includes the number of revolutions or rotational speed of the sewing machine motor 12 per unit time. When the sensor 14 detects the rotation of the sewing machine motor 12, the processor 8 can determine that the sewing machine motor 12 is being driven. The processor 8 can calculate the number of stitches of the sewing machine 2 based on the rotation data of the sewing machine motor 12 detected by the sensor 14. The number of stitches of the sewing machine 2 refers to the number of times the sewing machine needle, held by the needle bar and moving reciprocally in the up-down direction, passes through the sewing object Pa. The lower the number of revolutions or rotational speed of the sewing machine motor 12, the fewer the number of stitches in the sewing machine 2; the higher the number of revolutions or rotational speed of the sewing machine motor 12, the more the number of stitches in the sewing machine 2. The fewer the number of stitches in sewing machine 2, the less work the operator Mb needs; conversely, the more stitches in sewing machine 2, the more work the operator Mb needs. With relevant data representing the relationship between the rotation data of sewing machine motor 12, the number of stitches in sewing machine 2, and the work volume of operator Mb pre-extracted, processor 8 can calculate the work volume of operator Mb based on the detection data from sensor 14 and related data.
[0095] Furthermore, the rotation data of the sewing machine motor 12 detected by sensor 14 is correlated with the operating state of the pedal 13 operated by the operator Mb. The operating state of the pedal 13 includes the number of operations or the operation time. With relevant data representing the relationship between the rotation data of the sewing machine motor 12, the operating state of the pedal 13, and the workload of the operator Mb pre-extracted, the processor 8 can also calculate the workload of the operator Mb based on the detection data of sensor 14 and the relevant data.
[0096] In the above-described embodiment, when the worker Mb's work status is captured by a camera, the processor 8 can also calculate the workload of worker Mb based on the image data captured by the camera. By performing image processing on the image data, the processor 8 can determine whether worker Mb is sewing the object Pa.
[0097] In the above embodiment, the work capacity of operator Mb is defined as the production quantity C representing the workload of operator Mb. The work capacity of operator Mb can also be the defect rate F of the sewn object Pa after operator Mb uses sewing machine 2. The defect rate F refers to the proportion of defective products relative to the total number of sewn objects Pa sewn per unit time Ec. Operators Mb with high work capacity have low defect rate F, and operators Mb with low work capacity have high defect rate F. The defect rates F of multiple operators Mb can be counted by inspector Mc or by operators Mb. The standard capacity calculation unit 21 calculates the standard defect rate Fs and obtains it as the standard capacity Ws. The current capacity acquisition unit 22 obtains the current defect rate Fc and obtains it as the current capacity Wc. The current capacity Wc being lower than the standard capacity Ws means that the current defect rate Fc exceeds the standard defect rate Fs. The determination unit 23 determines whether the current non-conformance rate Fc exceeds the standard non-conformance rate Fs and the difference between the standard non-conformance rate Fs and the current non-conformance rate Fc is a predetermined third specified amount Dc or higher, indicating a reduced capacity state. If the production planning unit 24 determines that at least one operator Mb is in a reduced capacity state, it changes the target work quantity by reducing the target work quantity for operators Mb determined to be in a reduced capacity state and increasing the target work quantity for operators Mb determined not to be in a reduced capacity state. If the output unit 25 determines that operator Mb is in a reduced capacity state, it causes the notification device to output notification data.
[0098] In the above embodiments, the work capability of operator Mb is counted by inspector Mc and sent from information terminal 30 to management device 3. Alternatively, the manager Ma can count the work capability of operator Mb. Alternatively, the manager Ma can operate input device 5 to input the work capability of operator Mb to processor 8.
[0099] In the above implementation, standard work time can also be used as the standard capability Ws. Standard work time refers to the time spent by an operator with standard skill level performing work according to standard work sequence, method, and conditions. As the current capability Wc, the net time required for operator Mb to perform the work can also be used.
[0100] Explanation of the label
[0101] 1…Sewing Management System, 2…Sewing Machine, 2A…Sewing Machine No. 1, 2B…Sewing Machine No. 2, 2C…Sewing Machine No. 3, 3…Management Device, 4…Display Device, 5…Input Device, 6…Operation Panel, 7…Controller, 8…Processor, 9…Main Memory, 10…Storage, 11…Interface, 12…Sewing Machine Motor, 13…Pedal, 14…Sensor, 15…Network, 21…Standard Capacity Calculation Unit, 22…Current Capacity Acquisition Unit, 23…Judgment Unit, 24…Production Planning Unit, 25…Output Unit, 26…Standard Capacity Storage Unit, 27…Target Workload Storage Unit, 30…Information Terminal C…Production quantity, Ca…Target production quantity, Cc…Current production quantity, Cr…Target production quantity, Cs…Standard production quantity, Da…First specified quantity, Db…Second specified quantity, Dc…Third specified quantity, Ea…First period, Eb…Second period, Ec…Unit time, F…Non-conforming rate, Fc…Current non-conforming rate, Fs…Standard non-conforming rate, Ma…Manager, Mb…Operator, Mb1…First operator, Mb2…Second operator, Mb3…Third operator, Mc…Inspector, Pa…Sewing object, Pb…Sewing product, Wc…Current capability, Ws…Standard capability.
Claims
1. A sewing management system, comprising: The standard capability calculation unit calculates the standard capability representing the standard working capability of the operator based on the operator's working capability in the first period of using a sewing machine; The current capability acquisition unit acquires the current capability of the operator in the second period, which is later than the first period. The determination unit determines whether the current capability is lower than the standard capability and the difference between the standard capability and the current capability is greater than or equal to a first predetermined amount. as well as The output unit, when it determines that the operator is in a state of reduced capability, causes the notification device to output notification data.
2. The sewing management system according to claim 1, wherein, The notification data includes recommendations that suggest the worker take a break.
3. The sewing management system according to claim 1, wherein, The operators include a first operator determined to be in the reduced capacity state and a second operator determined not to be in the reduced capacity state. The notification data includes recommendation data, which recommends: reducing the target workload of the first operator and increasing the target workload of the second operator; or, assigning the first operator's workload to the second operator.
4. The sewing management system according to claim 1, wherein, The facility includes a production planning department that calculates the target workload allocated to each of the multiple operators based on the aforementioned standard capacity. If it is determined that at least one operator is in a state of reduced capacity, the production planning department will change the target workload.
5. The sewing management system according to claim 4, wherein, The production planning department changes the target workload by reducing the target workload for operators who are determined to be in a state of reduced capacity, and increasing the target workload for operators who are not in a state of reduced capacity.
6. The sewing management system according to claim 5, wherein, The current capacity includes the current workload of the operator. The production planning department changes the target workload by increasing the target workload for workers whose current workload is lower than the target workload.
7. The sewing management system according to claim 1, wherein, The standard capacity calculation unit obtains the operational capacity for each unit of time during the first period. The standard capability is the average or median value of the multiple operational capabilities obtained in each unit of time.
8. The sewing management system according to claim 1, wherein, The operational capacity includes at least one of the following: production quantity representing the number of sewn objects produced by the operator using the sewing machine, and the defect rate of sewn objects produced using the sewing machine.
9. A sewing management method, comprising the following steps: A standard ability representing the standard work ability of the operator is calculated based on the operator's work ability in the first period of the sewing machine operation; To obtain the current operational capability of the operator in the second period, which follows the first period; Determine whether the current capability is lower than the standard capability and the difference between the standard capability and the current capability is greater than or equal to a first predetermined amount; as well as If it is determined that the operator is in a state of reduced capability, the notification device outputs notification data.
Citation Information
Patent Citations
Sewing management system and sewing management method
JP2021117815A