A method for assembling steel reinforcement in cable tower components

By using the steel reinforcement assembly construction method for cable tower components, the problems of low construction efficiency and high safety risks in variable cross-section cable tower reinforcement construction have been solved, achieving high-precision alignment control and improved construction efficiency.

CN123109058APending Publication Date: 2026-11-17CHINA RAILWAY 12TH BUREAU GRP CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611254593.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-18
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

In existing technologies, the construction of steel reinforcement for variable cross-section cable towers suffers from problems such as long construction time, high labor demand, high safety risks, low precision in steel reinforcement placement, and difficulty in accurately matching the spatial posture of steel reinforcement blocks, and lacks a full-process linear control system.

Method used

The cable tower components are assembled using a steel reinforcement construction method. By disassembling the steel reinforcement blocks, a finite element model is established. Angle adjustment devices and guide mechanisms are used for precise assembly and installation. Combined with top coordinate measurement and internal tie devices, closed-loop control is implemented to ensure alignment accuracy.

Benefits of technology

It improved construction efficiency and safety, reduced the risks of working at heights, and ensured that the alignment accuracy of the steel bars after installation met the design requirements.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109058A_ABST
    Figure CN123109058A_ABST
Patent Text Reader

Abstract

This invention relates to the field of structural reinforcement construction technology, and more specifically, to a method for assembling structural reinforcement for cable tower components. This method improves construction efficiency and safety. The steps are as follows: S1. Divide the cable tower segment reinforcement into multiple steel block pieces; S2. Divide each layer of stirrups into multiple stirrup units, which are then processed into stirrup mesh sheets using a flexible steel sheet manufacturing production line; S3. Stack the multiple layers of stirrup mesh sheets in parallel and axially insert the main reinforcement bars; S4. Assemble the multiple steel block pieces into structural reinforcement components on an assembly jig; S5. Hoist the structural reinforcement components to the installation position on the tower, guide the main reinforcement joints for initial connection using a guiding mechanism, and finely adjust the alignment using top coordinate measurement feedback and internal tie rods. After adjusting to the target coordinates, the main reinforcement joint connection is completed. This method transfers the binding and welding operations of the cable tower reinforcement to a ground factory, reducing the number of personnel and working time on the tower, and lowering the safety risks of high-altitude operations. This invention is mainly applied to the assembly construction of structural reinforcement for cable tower components.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of steel reinforcement construction technology for cable tower components, and more specifically, to a method for assembling and constructing steel reinforcement for cable tower components. Background Technology

[0002] Reinforced concrete bridge towers are widely used in cable-stayed bridge systems. Currently, the construction of reinforced concrete bridge towers mostly adopts the in-situ casting method. The steel bars are processed into semi-finished products in the ground factory and then transported to the height by tower crane. The binding, welding, connection, and testing are then carried out manually. This method has problems such as long process time, large labor demand, low precision of steel bar placement, and high safety risks.

[0003] In recent years, the concept of prefabricated construction has been gradually promoted in bridge engineering. Some cable tower reinforcement construction has begun to adopt modular technology, assembling the reinforcement on the ground and then hoisting it onto the tower as a whole. However, in the existing technology, for variable cross-section cable towers, the cross-sectional dimensions and inclination angles of each segment are different, making it difficult to accurately match the spatial posture of the reinforcement blocks to the design alignment. The positioning of the component reinforcement during assembly mainly relies on manual measurement, which is inefficient and prone to errors. At the same time, the lack of a complete alignment control system from pre-arch calculation and block forming to installation on the tower makes it difficult to guarantee the alignment accuracy of the component reinforcement after installation. Summary of the Invention

[0004] To overcome the shortcomings of the prior art, the present invention provides a method for assembling and constructing steel reinforcement for cable tower components.

[0005] To solve the above-mentioned technical problems, the technical solution adopted by the present invention is as follows: A method for assembling steel reinforcement in cable tower components includes the following steps: S1. The steel reinforcement of the tower segment is divided into multiple steel reinforcement blocks, which are composed of stirrup mesh and main reinforcement. The rotational constraint stiffness of the intersection of the main reinforcement and stirrup is obtained, a finite element model of the component steel reinforcement is established, and the deformation value of the component steel reinforcement under the connection condition is simulated and calculated to provide a basis for the pre-arched shape of the component steel reinforcement. S2. The stirrups in each layer are divided into multiple stirrup units, which are then processed into stirrup meshes using a flexible steel sheet manufacturing production line. S3. Stack the multiple layers of stirrup mesh in parallel and insert the main reinforcement bars axially. Use a lifting mechanism to unfold the multiple layers of stirrup mesh at equal intervals along the axial direction of the main reinforcement bars. Then adjust the spatial tilt angle of the steel bar block through an angle adjustment device, and then fix the intersection point to obtain the steel bar block. S4. Assemble multiple steel bar blocks into component steel bars on an assembly jig, wherein the assembly jig integrates self-propelled, alignment adjustment and work platform functions; S5. Hoist the steel reinforcement components to the installation position on the tower. Guide the main reinforcement joints for initial connection through the guide mechanism. Use the top coordinate measurement feedback and internal tie device for fine-tuning the alignment. After adjusting to the target coordinates, complete the connection of the main reinforcement joints.

[0006] In step S1, the rotational constraint stiffness is obtained through a test on the constraint stiffness of the weld joint between the main reinforcement and the stirrup. In the finite element model, the main reinforcement and the stirrup are connected by a spring, and the spring constraint stiffness is the result of the test.

[0007] In step S1, the stirrups at the three adjacent variable cross-section locations along the height of the bridge tower are set to the same structural size; a non-installation area with a height of 0.42m is reserved at the top and bottom of the component reinforcement. The stirrups in this area are not installed during ground processing, but are installed after being hoisted to the tower.

[0008] In step S2, the processing of the stirrup mesh includes: unit component preparation, where the same type of steel bar unit components are stacked on the material rack in order of length; automatic unit component placement, where the servo clamp is automatically adjusted and opened according to the mesh size, and the truss robot and the robot work together to place the stirrup units and tie bar units on the work platform; automatic sheet welding, where the welding robot performs point welding, and some intersections are tied with an automatic binding gun; and sheet unloading and stacking, where the unloading robot stacks the formed mesh to the storage rack.

[0009] In step S3, the stirrup mesh is hoisted to the center of the block forming area and placed. The main reinforcement is axially limited by a positioning plate with an inclined limiting baffle. The inclined limiting baffle is set at a 10° inclination angle along the direction of the main reinforcement. The main reinforcement is driven to pass through the stacked layers of stirrup mesh and then the limiting is released. Multiple sets of chain hooks are used to hook each layer of stirrup mesh and lift it upwards to be evenly spaced. An angle adjustment device is used to clamp the four corners of each layer of mesh. After inputting the inclination angle value, the inclination angle of the block space is adjusted synchronously, and then the intersection point welding is performed.

[0010] In step S4, the assembly jig is a walking assembly jig, which consists of an outer ring platform, an inner ring platform, a walking jacking device, a sliding trolley, and a sliding track. The outer ring platform opens outward through the walking jacking device to provide hoisting space. The adjusting screw fixes the steel bar blocks and adjusts their spatial posture. Then, the walking jacking device drives the outer ring platform to move the steel bar blocks to the designated position to assemble them into component steel bars. The remaining main steel bars are inserted and welded on the inner and outer ring working platforms.

[0011] Between steps S4 and S5, the process includes transporting the steel bar blocks vertically fixed on a special frame on a flatbed truck; after assembling the component steel bars, suspending them at multiple points using a polygonal lifting device. The lifting points on the lifting device are movable to adapt to the cross-sectional taper. By setting main lifting ropes of different lengths, the center of the hook coincides with the center of the component steel bars. The lifting device and the component are connected by turnbuckles.

[0012] In step S5, after the component steel bar is hoisted onto the tower and suspended 5cm above the installation position, the outer hand chain hoist is used to align and adjust each side. The hook is slowly lowered so that the main steel bar enters the lower flared guide to complete the initial positioning. The coordinates of the eight corner points of the component's top opening are measured with a biaxial prism and compared with the monitoring command to obtain the adjustment direction and displacement. An inclined hand chain hoist is installed inside the component steel bar, with one end connected to the top opening and the other end connected to the bottom opening. The component's posture is adjusted by the hand chain hoist until the requirements are met.

[0013] After the attitude adjustment in step S5, the cone sleeve is installed with hydraulic clamps. When the number of cone sleeves connected reaches 25% of the total, the tower crane hook is released. The coordinate deviation of the top opening of the component reinforcement is re-measured and further adjusted by hand chain hoist. The remaining cone sleeves are installed with hydraulic clamps, and the internal tie device is removed. The stirrups within 0.5m of the bottom opening of the component reinforcement and the top opening of the previous section are installed, and the control coordinates and displacement error of the top opening are re-measured.

[0014] Compared with the prior art, the beneficial effects of the present invention are as follows: This improved construction efficiency and safety. By transferring the binding and welding of the tower's reinforcing steel bars to a ground factory, the number of workers and working time on the tower were reduced, thus lowering the safety risks associated with working at heights.

[0015] By conducting rotational constraint stiffness tests at the intersection of main reinforcement and stirrups and establishing a finite element model, the deformation values ​​of the component reinforcement under connection conditions were simulated and calculated, providing a basis for the pre-arched shape. By using an angle adjustment device to apply three-dimensional spatial tilt angle adjustment to the reinforcement blocks, the main reinforcement and stirrup mesh form a diagonal intersection angle that matches the variable cross-section shape of the bridge tower, solving the forming problem caused by the different tilt angles and different main reinforcement lengths of the reinforcement blocks in the variable cross-section cable tower.

[0016] A local three-dimensional coordinate system is established with the bottom center of the component as the origin. The bottom center ruler is used to quickly locate the bottom of the steel block. The top corner point is 3D coordinate layout and correction of the top spatial position is improved, thus improving the assembly accuracy. The flared guide is used to complete the initial centering. The three-dimensional coordinates of the top corner point are collected in real time by a dual-axis prism and compared with the target coordinates. Combined with the internal tensioning device, the attitude is finely adjusted, realizing closed-loop control of the component steel reinforcement from initial positioning to fine adjustment, ensuring that the installation line meets the design requirements. Attached Figure Description

[0017] Fig. 1This is a schematic diagram of the construction process of the present invention; Fig. 2 This is a schematic diagram of the steel reinforcement disassembly of the components in this invention; Fig. 3 This is a schematic diagram of the hoisting of the reinforcing steel bars in the present invention. Detailed Implementation

[0018] To better understand the above-mentioned objectives, features, and advantages of the present invention, the present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments. It should be noted that, unless otherwise specified, the embodiments and features described in these embodiments can be combined with each other.

[0019] Many specific details are set forth in the following description in order to provide a full understanding of the invention. However, the invention may also be implemented in other ways different from those described herein. Therefore, the scope of protection of the invention is not limited to the specific embodiments disclosed below.

[0020] like Figs. 1 to 3 As shown, a method for assembling steel reinforcement for cable tower components includes the following steps: S1. The steel reinforcement of the tower segment is divided into multiple steel reinforcement blocks, which are composed of stirrup mesh and main reinforcement. The rotational constraint stiffness of the intersection of the main reinforcement and stirrup is obtained, a finite element model of the component steel reinforcement is established, and the deformation value of the component steel reinforcement under the connection condition is simulated and calculated to provide a basis for the pre-arched shape of the component steel reinforcement.

[0021] The tower's stirrups employ an interlocking section reinforcement method, consisting of multiple closed, overlapping interlocking stirrups. To ensure the structural integrity of each interlocking stirrup, a block-based component reinforcement forming method is used, dividing the component reinforcement into eight reinforcement blocks. The main reinforcement in the overlapping areas within each block is installed during the assembly of the component reinforcement. The spatial four-tower cable-stayed structure has transverse and longitudinal bridge inclination angles; each reinforcement block has a different inclination angle, while the main reinforcement within the same block has the same cutting length.

[0022] S2. The stirrups of each layer are divided into multiple stirrup units, which are then processed into stirrup mesh sheets by a flexible steel sheet manufacturing production line.

[0023] The stirrup mesh is a closed stirrup structure. Based on the design of the stirrup connection position, the stirrup mesh is divided into multiple stirrup units.

[0024] S3. Stack the multi-layer stirrup mesh in parallel and insert the main reinforcement bars axially. Use a lifting mechanism to unfold the multi-layer stirrup mesh at equal intervals along the axial direction of the main reinforcement bars. Then, adjust the spatial tilt angle of the steel reinforcement block through an angle adjustment device, and then fix the intersection point to obtain the steel reinforcement block.

[0025] S4. Assemble multiple steel bars into component steel bars on the assembly jig. The assembly jig integrates self-propelled, alignment adjustment and work platform functions.

[0026] S5. Hoist the steel reinforcement components to the installation position on the tower. Guided by the guiding mechanism, the main reinforcement joints are initially connected. The top coordinate measurement feedback and the internal tie device are used for fine-tuning the alignment. After adjusting to the target coordinates, the main reinforcement joint connection is completed.

[0027] Preferably, in step S1, the rotational constraint stiffness is obtained through a test of the constraint stiffness of the weld joints between the main reinforcement and the stirrups. In the finite element model, the main reinforcement and the stirrups are connected by springs, and the spring constraint stiffness is the result of the test. The component reinforcement fabrication profile includes the tower limb profile, the installation error of the previous segment, the concrete pouring deformation, the pre-camber value of the current segment, and the deformation under the self-weight of the component reinforcement connection. When assembling the reinforcement blocks into component reinforcement, the component reinforcement profile is controlled by adjusting the extension and retraction lengths of the side of the reinforcement blocks and the assembly support rods.

[0028] Preferably, in step S1, the stirrups at the three adjacent variable cross-section locations along the height direction of the bridge tower are set to the same structural size; a non-installation area with a height of 0.42m is reserved at the top and bottom of the component reinforcement. The stirrups in this area are not installed during ground processing, but are installed after being hoisted to the tower.

[0029] Preferably, in step S2, the processing of the stirrup mesh includes: unit component preparation, where similar steel bar unit components are stacked in length order on a material rack; automatic unit component placement, where a servo clamp automatically adjusts and opens according to the mesh size, and a truss robot and a robot work together to place the stirrup units and tie bar units on the work platform; automatic sheet welding, where a welding robot performs point welding, and some intersections are tied with an automatic binding gun; and sheet unloading and stacking, where an unloading robot stacks the formed mesh sheets onto a storage rack. When the in-plane stiffness of the stirrup mesh is low, reinforcing ribs can be added to increase the in-plane stiffness.

[0030] Preferably, in step S3, the stirrup mesh is hoisted to the center of the block forming area and placed. The main reinforcement is axially limited by a positioning plate with an inclined limiting baffle. The inclined limiting baffle is set at a 10° inclination angle along the direction of the main reinforcement. The main reinforcement is driven to pass through the stacked multi-layer stirrup mesh and then the limiting is released. Each layer of stirrup mesh is hooked with multiple sets of chain hooks and lifted upwards to be evenly spaced. The four corners of each layer of mesh are clamped by an angle adjustment device. After inputting the inclination angle value, the inclination angle of the block space is adjusted synchronously, and then the intersection point welding is performed.

[0031] Preferably, in step S4, the assembly jig is a walking assembly jig, consisting of an outer ring platform, an inner ring platform, a walking jacking device, a sliding trolley, and a sliding track. The outer ring platform opens outward through the walking jacking device to provide hoisting space. Adjusting screws fix the reinforcing bar blocks and adjust their spatial posture. Then, the walking jacking device drives the outer ring platform to slide the reinforcing bar blocks to the designated position for assembly into the component reinforcing bars. The remaining main reinforcing bars are inserted and welded on the inner and outer ring working platforms. Before assembly, eight sliding trolley rulers are established with the centroid of the component bottom opening to achieve rapid positioning of the bottom opening of the reinforcing bar blocks; a local coordinate system is established to lay out the top opening of the reinforcing bar blocks.

[0032] Preferably, between steps S4 and S5, the process further includes transporting the reinforcing bar blocks vertically fixed to a special jig on a flatbed truck; after assembling them into the component reinforcing bars, they are suspended at multiple points using a polygonal lifting device. The lifting points on the lifting device are movable to adapt to the cross-sectional taper. By setting main lifting ropes of different lengths, the center of the hook is made to coincide with the center of the component reinforcing bars. The lifting device and the component are connected by turnbuckles. After lifting 10% of the component reinforcing bars, each turnbuckle is tightened to ensure that the force is evenly distributed at each lifting point.

[0033] Preferably, in step S5, after the component reinforcement is hoisted onto the tower and suspended 5cm above the installation position, the outer hand-operated hoist is used to align and adjust each side, and the hook is slowly lowered to allow the main reinforcement to enter the lower flared guide to complete the initial positioning; the coordinates of the eight corner points of the component top opening are measured with a biaxial prism and compared with the monitoring command to obtain the adjustment direction and displacement; an inclined hand-operated hoist is installed inside the component reinforcement, with one end connected to the top opening and the other end connected to the bottom opening, and the component posture is adjusted by the hand-operated hoist until the requirements are met.

[0034] Preferably, after the attitude adjustment in step S5, the conical sleeve is installed using hydraulic clamps. When the number of conical sleeve connections reaches 25% of the total, the tower crane hook is released, the coordinate deviation of the top opening of the component reinforcement is re-measured, and further adjusted using a hand-operated hoist. The remaining conical sleeves are then installed using hydraulic clamps, and the internal tie rods are removed. The stirrups within 0.5m of the bottom opening of the component reinforcement and the top opening of the previous segment are installed, and the control coordinates and displacement errors of the top opening are re-measured. When installing the first segment of component reinforcement on the tower, if the top openings of the loosely bound segment reinforcements are not in the same plane, a cutting machine should be used to level them.

[0035] The above description only illustrates the preferred embodiments of the present invention. However, the present invention is not limited to the above embodiments. Within the scope of knowledge possessed by those skilled in the art, various changes can be made without departing from the spirit of the present invention, and all such changes should be included within the protection scope of the present invention.

Claims

1. A method for assembling steel reinforcement in cable tower components, characterized in that, Includes the following steps: S1. The steel reinforcement of the tower segment is divided into multiple steel reinforcement blocks, which are composed of stirrup mesh and main reinforcement. The rotational constraint stiffness of the intersection of the main reinforcement and stirrup is obtained, a finite element model of the component steel reinforcement is established, and the deformation value of the component steel reinforcement under the connection condition is simulated and calculated to provide a basis for the pre-arched shape of the component steel reinforcement. S2. The stirrups in each layer are divided into multiple stirrup units, which are then processed into stirrup meshes using a flexible steel sheet manufacturing production line. S3. Stack the multiple layers of stirrup mesh in parallel and insert the main reinforcement bars axially. Use a lifting mechanism to unfold the multiple layers of stirrup mesh at equal intervals along the axial direction of the main reinforcement bars. Then adjust the spatial tilt angle of the steel bar block through an angle adjustment device, and then fix the intersection point to obtain the steel bar block. S4. Assemble multiple steel bar blocks into component steel bars on an assembly jig, wherein the assembly jig integrates self-propelled, alignment adjustment and work platform functions; S5. Hoist the steel reinforcement components to the installation position on the tower. Guide the main reinforcement joints for initial connection through the guide mechanism. Use the top coordinate measurement feedback and internal tie device for fine-tuning the alignment. After adjusting to the target coordinates, complete the connection of the main reinforcement joints.

2. The method for assembling steel reinforcement for cable tower components according to claim 1, characterized in that: In step S1, the rotational constraint stiffness is obtained through a test on the constraint stiffness of the weld joint between the main reinforcement and the stirrup. In the finite element model, the main reinforcement and the stirrup are connected by a spring, and the spring constraint stiffness is the result of the test.

3. The method for assembling steel reinforcement for cable tower components according to claim 1, characterized in that: In step S1, the stirrups at the three adjacent variable cross-section locations along the height of the bridge tower are set to the same structural size; a non-installation area with a height of 0.42m is reserved at the top and bottom of the component reinforcement. The stirrups in this area are not installed during ground processing, but are installed after being hoisted to the tower.

4. The method for assembling steel reinforcement for cable tower components according to claim 1, characterized in that: In step S2, the processing of the stirrup mesh includes: unit component preparation, where the same type of steel bar unit components are stacked on the material rack in order of length; automatic unit component placement, where the servo clamp is automatically adjusted and opened according to the mesh size, and the truss robot and the robot work together to place the stirrup units and tie bar units on the work platform; automatic sheet welding, where the welding robot performs point welding, and some intersections are tied with an automatic binding gun; and sheet unloading and stacking, where the unloading robot stacks the formed mesh to the storage rack.

5. The method for assembling steel reinforcement for cable tower components according to claim 1, characterized in that: In step S3, the stirrup mesh is hoisted to the center of the block forming area and placed. The main reinforcement is axially limited by a positioning plate with an inclined limiting baffle. The inclined limiting baffle is set at a 10° inclination angle along the direction of the main reinforcement. The main reinforcement is driven to pass through the stacked layers of stirrup mesh and then the limiting is released. Multiple sets of chain hooks are used to hook each layer of stirrup mesh and lift it upwards to be evenly spaced. An angle adjustment device is used to clamp the four corners of each layer of mesh. After inputting the inclination angle value, the inclination angle of the block space is adjusted synchronously, and then the intersection point welding is performed.

6. The method for assembling steel reinforcement for cable tower components according to claim 1, characterized in that: In step S4, the assembly jig is a walking assembly jig, which consists of an outer ring platform, an inner ring platform, a walking jacking device, a sliding trolley, and a sliding track. The outer ring platform opens outward through the walking jacking device to provide hoisting space. The adjusting screw fixes the steel bar blocks and adjusts their spatial posture. Then, the walking jacking device drives the outer ring platform to move the steel bar blocks to the designated position to assemble them into component steel bars. The remaining main steel bars are inserted and welded on the inner and outer ring working platforms.

7. The method for assembling steel reinforcement for cable tower components according to claim 1, characterized in that: Between steps S4 and S5, the process includes transporting the steel bar blocks vertically fixed on a special frame on a flatbed truck; after assembling the component steel bars, suspending them at multiple points using a polygonal lifting device. The lifting points on the lifting device are movable to adapt to the cross-sectional taper. By setting main lifting ropes of different lengths, the center of the hook coincides with the center of the component steel bars. The lifting device and the component are connected by turnbuckles.

8. The method for assembling steel reinforcement for cable tower components according to claim 1, characterized in that: In step S5, after the component steel bar is hoisted onto the tower and suspended 5cm above the installation position, the outer hand chain hoist is used to align and adjust each side. The hook is slowly lowered so that the main steel bar enters the lower flared guide to complete the initial positioning. The coordinates of the eight corner points of the component's top opening are measured with a biaxial prism and compared with the monitoring command to obtain the adjustment direction and displacement. An inclined hand chain hoist is installed inside the component steel bar, with one end connected to the top opening and the other end connected to the bottom opening. The component's posture is adjusted by the hand chain hoist until the requirements are met.

9. A method for assembling steel reinforcement for cable tower components according to claim 8, characterized in that: After the attitude adjustment in step S5, the cone sleeve is installed with hydraulic clamps. When the number of cone sleeves connected reaches 25% of the total, the tower crane hook is released. The coordinate deviation of the top opening of the component reinforcement is re-measured and further adjusted by hand chain hoist. The remaining cone sleeves are installed with hydraulic clamps, and the internal tie device is removed. The stirrups within 0.5m of the bottom opening of the component reinforcement and the top opening of the previous section are installed, and the control coordinates and displacement error of the top opening are re-measured.