A self-propelled, fully enclosed protective operating platform for cantilevered steel bridge construction and its construction method
The design of the self-driven, fully enclosed protective operating platform solves the problems of unstable movement and safety hazards during cantilever assembly construction, enabling the main load-bearing truss to move smoothly and be fully protected, thus ensuring construction safety.
Patent Information
- Application Number
- CN202611285488.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-24
- Publication Date
- 2026-11-17
AI Technical Summary
Existing protective operation platforms have problems such as unstable movement, easy deviation, significant safety hazards, complex installation and dismantling, and inability to provide full protection during cantilever assembly construction. In particular, they are difficult to effectively prevent falling objects from leaking when working at heights.
Design a self-propelled, fully enclosed protective operating platform. It adopts a main load-bearing truss, upper and lower walking mechanisms, rail clamping device, tensioning device and fall protection device. The main load-bearing truss can be moved smoothly and positioned accurately through frequency conversion drive. Combined with bottom and side enclosure structures, it ensures full protection.
It achieves stable and controllable movement of the main load-bearing truss, meets the requirements of precise positioning and cyclic use, completely eliminates falling objects from heights, ensures construction safety, and is suitable for high-altitude operations in sensitive areas.
Smart Images

Figure CN123109059A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of bridge engineering construction equipment, specifically to a self-driven, fully enclosed protective operating platform for the cantilever assembly of steel structure bridges and its construction method. Background Technology
[0002] In the construction of long-span cable-stayed bridges, the cantilever assembly construction process is commonly used for the installation of steel beam segments. This process has become the core technology for the construction of steel beams for long-span, water-span, and channel-span cable-stayed bridges due to its advantages such as high construction efficiency, strong adaptability to the main structure of the bridge, and no need for large-area temporary support.
[0003] However, the cantilever assembly construction process has technical problems such as high construction height and difficulty in safety management. In addition, during the cantilever assembly construction, the areas below the steel beam segments are mostly sensitive areas such as navigation channels, highways, port roads, chemical industrial parks, and dock storage yards. The risks of falling objects, falling personnel, and slipping components are extremely high, so reliable protection and operation platforms under the beams must be set up.
[0004] In existing technologies, protective operating platforms typically include fixed platforms and mobile platforms. Fixed platforms, being immovable, require segmented erection and dismantling, resulting in significant material waste and long construction periods. Mobile platforms, on the other hand, are usually traction-assisted by winches, which pose risks of asynchronous movement, deviation, and derailment during use. Furthermore, existing protective operating platforms typically provide only partial protection without a fully enclosed bottom structure, making it easy for falling objects to leak out and posing certain safety hazards.
[0005] Chinese patent CN205711774U discloses a suspended construction platform device for bridges with crash barriers, including a construction platform, a main frame, a counterweight platform, and a first traveling roller support structure. The main frame includes a first vertical frame, a horizontal frame, and a second vertical frame. The first vertical frame and the second vertical frame are parallel to each other and perpendicularly connected to both ends of the horizontal frame. The construction platform is connected to the first vertical frame, the counterweight platform is connected to the second vertical frame, and the first traveling roller support structure is perpendicularly connected to the horizontal frame.
[0006] The aforementioned construction platform guides its movement solely through the first and second traveling rollers connected to the top of the crash barrier. The bottom of the platform remains unrestrained and suspended. When strong winds occur, the platform sways under their influence, causing it to shift and affect the construction results, posing a safety hazard. Furthermore, the installation and dismantling of this type of platform is complex and time-consuming. Summary of the Invention
[0007] The present invention aims to overcome the defects in the prior art and provide a safe, reliable, fully enclosed, reusable self-driven, fully enclosed protective operating platform for the cantilever assembly of steel structure bridges and its construction method.
[0008] To achieve the above-mentioned objectives, the present invention adopts the following technical solution: a self-driven, fully enclosed protective operating platform structure for the cantilever assembly of steel structure bridges, comprising a main load-bearing truss suspended under the steel structure bridge in a fully enclosed, bottom-mounted manner. The main load-bearing truss includes a truss body and several vertical trusses connected to the truss body. An upper traveling mechanism corresponding to the top of the steel structure bridge is provided on the vertical trusses. A temporary track cooperating with the upper traveling mechanism is provided on the steel structure bridge. A lower traveling mechanism corresponding to the bottom of the steel structure bridge is provided on the truss body. An inspection vehicle track cooperating with the lower traveling mechanism is provided on the steel structure bridge. Both the upper and lower traveling mechanisms are equipped with rail clamping devices for locking the movement position of the main load-bearing truss. A tensioning device for tightening and fixing the steel structure bridge to the main load-bearing truss is provided on the main load-bearing truss. A frequency conversion drive device for independently controlling the upper and lower traveling mechanisms is provided on the main load-bearing truss. The rail clamping device is provided on the main load-bearing truss.
[0009] As a preferred embodiment of the present invention, the truss body is composed of several transverse main trusses and several longitudinal secondary trusses connected together, and several vertical trusses are connected to the corners of the truss body. The top of the truss body is provided with several lifting devices for hoisting the truss body, and U-bolts for locking the lifting devices are sleeved on the truss body.
[0010] As a preferred embodiment of the present invention, an upper traveling mechanism is installed on each of the aforementioned vertical trusses. The upper traveling mechanisms are symmetrically arranged along the center of the steel structure bridge. Each upper traveling mechanism includes an upper traveling support, an upper directional wheel set, and an upper drive motor. The upper directional wheel set is abutted on a temporary track, and a rail clamping device is installed on the upper traveling support, with the rail clamping device located at the front and rear ends of the upper directional wheel set in the direction of travel.
[0011] As a preferred embodiment of the present invention, the truss body is equipped with several lower traveling mechanisms symmetrically arranged along the center of the steel structure bridge. The lower traveling mechanism includes a lower traveling support, a lower directional wheel set and a lower drive motor. The lower directional wheel set is abutted on the inspection vehicle track, and the rail clamping device is arranged on the lower traveling support, and the rail clamping device is located at the front and rear ends of the lower directional wheel set in the direction of travel.
[0012] As a preferred embodiment of the present invention, the rail clamping device includes two upright plates disposed on both sides of the temporary track or the inspection vehicle track. Each upright plate is provided with a clamping rod threadedly connected to the upright plate. The end of the clamping rod is provided with a clamping head that abuts against the temporary track or the inspection vehicle track. The tail of the clamping rod is provided with an electric controller for rotating the clamping rod.
[0013] As a preferred embodiment of the present invention, the tensioning device includes a chain hoist and a wire rope sleeve connected together. The steel structure bridge is provided with a reverse hook lifting device for hoisting the chain hoist, and the main load-bearing truss is provided with a suspension point for threading the wire rope sleeve. The suspension point is located at the connection between the truss body and the vertical truss.
[0014] As a preferred embodiment of the present invention, the frequency conversion drive device is electrically connected to the upper traveling mechanism and the lower traveling mechanism. The temporary track is provided with a limit stop for limiting the movement position of the upper traveling mechanism, and the inspection vehicle track is also provided with a limit stop for limiting the movement position of the lower traveling mechanism.
[0015] As a preferred embodiment of the present invention, the fall arrestor includes a double-layer bottom net disposed on the lower surface of the truss body, a bottom load-bearing layer laid on the upper surface of the truss body, and a side anti-throw net connecting adjacent vertical trusses.
[0016] A construction method for a self-driven, fully enclosed protective operating platform structure for cantilevered steel bridge assembly, based on the self-driven, fully enclosed protective operating platform structure for cantilevered steel bridge assembly, includes the following steps:
[0017] Step S1: Factory prefabrication. The width of the steel structure bridge, the length of the bridge segments, the elevation and spacing of the inspection vehicle tracks are measured, and the transverse main truss, longitudinal secondary truss, vertical truss, upper traveling mechanism, lower traveling mechanism and fall protection device are prepared in the factory based on the measured data.
[0018] Step S2: On-site assembly. The horizontal main truss, longitudinal secondary truss, vertical truss, upper traveling mechanism, lower traveling mechanism, fall protection device and lifting equipment prepared in the factory are transported to the site and assembled to obtain the main truss body.
[0019] Step S3: Truss main body hoisting. Hoisting operation is carried out on the steel structure bridge to lift the truss main body to the bottom of the steel structure bridge;
[0020] Step S4: Temporary fixation. Install a chain hoist on the anti-hook lifting device of the steel structure bridge, and hang a wire rope loop that passes through the suspension point on the main load-bearing truss on the chain hoist. Tighten the wire rope loop by slowly pulling the chain hoist.
[0021] Step S5: Install the vertical truss. Perform hoisting operations on the steel structure bridge. After hoisting the vertical truss to the corner node position of the truss main body, bolt the vertical truss to the truss main body and fix it. After the vertical truss is installed, hoist the upper traveling mechanism and install the upper traveling mechanism on the vertical truss.
[0022] Step S6: Electrical commissioning. Remove the chain hoist and wire rope sleeve, install the corresponding limit stops and travel limiters, and test the synchronization of multiple upper traveling mechanisms, the synchronization of multiple lower traveling mechanisms, the braking performance of the rail clamping device, and the travel limiters.
[0023] Step S7: Move and lock, start the upper and lower moving mechanisms, move the main load-bearing truss to the protective position of the steel structure bridge, start the rail clamping device, and reinstall the chain hoist and wire rope to tighten the steel structure bridge and the main load-bearing truss.
[0024] Step S8: Segmental walking, repeat steps S6 and S7 to complete the construction protection of multi-segment steel structure bridges.
[0025] As a preferred embodiment of the present invention, after protective construction is carried out on all segments of the steel structure bridge, the main load-bearing truss is dismantled. The dismantling steps of the main load-bearing truss are the reverse steps of steps S1-S6.
[0026] Compared with the prior art, the beneficial effects of the present invention are as follows: by setting the upper traveling mechanism and the temporary track in coordination, and the lower traveling mechanism and the inspection vehicle track in coordination, the main load-bearing truss is always in a state of dual-track synchronization during the travel process, which can realize the smooth and controllable travel of the main load-bearing truss during the travel process, meet the requirements of precise positioning of the main load-bearing truss during the travel process and can be cyclically advanced with each segment. At the same time, the main load-bearing truss is designed as a truss body and vertical truss prefabricated in the factory, which can realize the rapid assembly of the main load-bearing truss on site, and also facilitate the recycling of the truss body and vertical truss after subsequent dismantling.
[0027] By installing anti-fall devices, a combination of bottom protection, side sealing, and end sealing is achieved to completely prevent objects from falling from heights, thus meeting the requirements for high-altitude operations in sensitive areas such as navigation channels, highway channels, port roads, chemical industrial parks, and dock storage yards.
[0028] By setting up tensioning devices and rail clamping devices, the main load-bearing truss can be temporarily fixed during installation. At the same time, it can also be used to reinforce the connection between the main load-bearing truss and the steel structure bridge in harsh environments, ensuring the safety of the main load-bearing truss in use. Attached Figure Description
[0029] Figure 1 This is a structural schematic diagram of the main load-bearing truss;
[0030] Figure 2 This is a schematic diagram showing the usage status of the main load-bearing truss;
[0031] Figure 3 This is a top view of the main load-bearing truss;
[0032] Figure 4 This is a side view of the main load-bearing truss;
[0033] Figure 5 This is a schematic diagram of the installation of lifting equipment;
[0034] Figure 6 This is a schematic diagram of the tensioning device layout;
[0035] Figure 7 This is a schematic diagram of the layout of the tensioning device in Embodiment 1;
[0036] Figure 8 This is a schematic diagram of the layout of the tensioning device in Embodiment 2;
[0037] Figure 9 yes Figure 2 A magnified view of a section at point A in the middle;
[0038] Figure 10 This is a schematic diagram of the lower traveling mechanism;
[0039] Figure 11 This is a schematic diagram showing the cooperation between the lower traveling mechanism and the rail clamping device;
[0040] Figure 12 This is a schematic diagram showing the interaction between the lower traveling mechanism and the limit stop;
[0041] Figure 13 yes Figure 2 A magnified view of a section at point B in the middle;
[0042] Figure 14 This is a schematic diagram of the upper traveling mechanism;
[0043] Figure 15 This is a schematic diagram showing the interaction between the upper traveling mechanism and the limit stop;
[0044] Figure 16 This is a schematic diagram of the main load-bearing truss in disassembly state;
[0045] Reference numerals: 1. Steel structure bridge; 11. Lifting device; 12. Inspection vehicle track; 13. Temporary track; 14. Anti-hook lifting device; 2. Main load-bearing truss; 3. Truss body; 31. Transverse main truss; 32. Longitudinal secondary truss; 33. Suspension point; 34. U-bolt; 4. Vertical truss; 5. Lower traveling mechanism; 51. Lower traveling support; 52. Lower directional wheel assembly; 53. Lower drive motor; 6. Upper traveling mechanism; 61. Upper traveling support; 62. Upper directional wheel assembly; 63. Upper drive motor; 7. Variable frequency drive device; 71. Limit stop; 8. Tensioning device; 81. Chain hoist; 82. Wire rope sleeve; 9. Fall protection device; 91. Double-layer bottom net; 92. Bottom load-bearing layer; 93. Side anti-throw net; 10. Rail clamping device; 101. Vertical plate; 102. Clamping rod; 103. Clamping head; 104. Electric controller. Detailed Implementation
[0046] The embodiments of the present invention will now be described in detail with reference to the accompanying drawings.
[0047] like Figures 1-16 As shown, a self-driving, fully enclosed protective operating platform structure for the cantilever assembly of steel bridges includes a main load-bearing truss 2 suspended under the steel bridge 1 in a fully enclosed, bottom-supported manner. The main load-bearing truss 2 includes a truss body 3 and several vertical trusses 4 connected to the truss body 3. An upper traveling mechanism 6 corresponding to the top of the steel bridge 1 is provided on the vertical trusses 4. A temporary track 13 cooperating with the upper traveling mechanism 6 is provided on the steel bridge 1. A lower traveling mechanism corresponding to the bottom of the steel bridge 1 is provided on the truss body 3. 5. The steel structure bridge 1 is equipped with an inspection vehicle track 12 that cooperates with the lower traveling mechanism 5. Both the upper traveling mechanism 6 and the lower traveling mechanism 5 are equipped with rail clamping devices 10 for locking the moving position of the main load-bearing truss 2. The main load-bearing truss 2 is equipped with a tensioning device 8 for tightening and fixing the steel structure bridge 1 to the main load-bearing truss 2. The main load-bearing truss 2 is equipped with a frequency conversion drive device 7 for independently controlling the upper traveling mechanism 6 and the lower traveling mechanism 5. The main load-bearing truss 2 is equipped with a fall protection device 9.
[0048] The main load-bearing truss 2 is suspended below the steel structure bridge 1. The truss body 3 is set at the bottom of the steel structure bridge 1, and the vertical truss 4 is set at the side of the steel structure bridge 1. The main load-bearing truss 2 is a fully enclosed bottom-covering structure suspended below the steel structure bridge 1.
[0049] The truss body 3 is composed of several transverse main trusses 31 and several longitudinal secondary trusses 32 connected together. Several vertical trusses 4 are connected to the corners of the truss body 3. The top of the truss body 3 is provided with several lifting devices 11 for hoisting the truss body 3. U-bolts 34 for locking the lifting devices 11 are sleeved on the truss body 3.
[0050] The main load-bearing truss 2 is made of modular Q355B steel. The transverse main truss 31 and the longitudinal secondary truss 32 are both made of H-beams as main chords and web members. The number of transverse main trusses 31 and longitudinal secondary trusses 32 is set according to the actual design needs. Several transverse main trusses 31 are arranged in rows with a spacing of 1.5m, and several longitudinal secondary trusses 32 are arranged in rows with a spacing of 2m. The transverse main trusses 31, longitudinal secondary trusses 32 and vertical truss 4 are bolted together with M30 high-strength bolts of grade 10.9 to ensure the connection strength.
[0051] The truss main body 3 is assembled to form a frame structure, and the vertical trusses 4 are set at the four corners of the truss main body 3. Each vertical truss 4 is equipped with an upper traveling mechanism 6.
[0052] Several vertical trusses 4 are equipped with upper traveling mechanisms 6. Several upper traveling mechanisms 6 are symmetrically arranged along the center of the steel structure bridge 1. The upper traveling mechanism 6 includes an upper traveling support 61, an upper directional wheel set 62 and an upper drive motor 63. The upper directional wheel set 62 is abutted on the temporary track 13. The rail clamping device 10 is set on the upper traveling support 61 and is located at the front and rear ends of the upper directional wheel set 62 in the direction of travel.
[0053] The upper traveling support 61 is welded from Q355B steel. The dimensions of the upper traveling support 61 are 1200mm×800mm×600mm. The top of the upper traveling support 61 is bolted to the vertical truss 4 through a flange. The flange is made of 20mm thick steel plate. The bolts are 10.9 grade M24 high-strength bolts, with a total of 8 bolts / set to ensure a firm connection.
[0054] The upper directional wheel assembly 62 is made of cast steel with a wheel diameter of φ300mm and a wheel width of 100mm. The upper traveling mechanism 6 includes two upper directional wheel assemblies 62. The upper directional wheel assembly 62 is connected to the upper traveling bracket 61 through a rotating shaft. The rotating shaft is made of No. 45 steel with a diameter of φ50mm. Bearings are installed at both ends of the rotating shaft to ensure that the upper directional wheel assembly 62 rotates flexibly without jamming.
[0055] The upper directional wheel assembly 62 travels along the pre-set temporary tracks 13 on both sides of the steel structure bridge 1. The temporary tracks 13 are made of 16a I-beams. The length of the temporary tracks 13 matches the length of the segment of the steel structure bridge 1. The temporary tracks 13 are fixed to the flange plates of the steel structure bridge 1 by pressure plates with a spacing of 50cm to ensure that the temporary tracks 13 are laid flat and firmly, and the elevation error of the top surface of the track is no more than 3mm.
[0056] The upper drive motor 63 is a three-phase asynchronous variable frequency motor with a power of 7.5kW and a rated speed of 1480r / min. Each upper traveling mechanism 6 is equipped with one upper drive motor 63. All upper drive motors 63 of the upper traveling mechanisms 6 are synchronously controlled through a variable frequency drive device 7. The variable frequency drive device 7 includes a frequency converter for synchronously controlling multiple upper drive motors 63. The frequency converter is a vector frequency converter, which can achieve stepless speed regulation from 0 to 5m / min with a speed regulation accuracy of ±0.1m / min, to meet the needs of different construction rhythms.
[0057] Example 1: The rail clamping device 10 includes two upright plates 101 disposed on both sides of the temporary rail 13. The two upright plates 101 are provided with clamping rods 102 that are threadedly connected to the upright plates 101. The clamping rods 102 pass through the two upright plates 101 at the same time, and the clamping rods 102 are formed with external thread sections respectively corresponding to the two upright plates 101. The two external thread sections face opposite directions. The tail of the clamping rods 102 is provided with an electric controller 104 for rotating the clamping rods 102.
[0058] Under the rotation of the clamping rod 102 driven by the electric controller 104, the clamping rod 102 simultaneously drives the movement of the two upright plates 101, so that the two upright plates 101 can clamp or release the temporary track 13.
[0059] The truss body 3 is equipped with several lower traveling mechanisms 5 symmetrically arranged along the center of the steel structure bridge 1. The lower traveling mechanism 5 includes a lower traveling support 51, a lower directional wheel set 52 and a lower drive motor 53. The lower directional wheel set 52 is abutted on the inspection vehicle track 12. The rail clamping device 10 is set on the lower traveling support 51 and is located at the front and rear ends of the lower directional wheel set 52 in the direction of travel.
[0060] There are two sets of lower traveling mechanisms 5, which are evenly installed in the lower part of the truss body 3. The structure of the lower traveling mechanism 5 is similar to that of the upper traveling mechanism 6. The directional wheel diameter is φ250mm, which is compatible with the bridge inspection vehicle track 12 (standard inspection vehicle track specification). The lower traveling mechanism 5 is fixed to the truss body 3 by welding. The weld is inspected for flaws to ensure load-bearing safety.
[0061] The lower traveling support 51 is welded from Q355B steel. The dimensions of the lower traveling support 51 are 1200mm×800mm×600mm. The bottom of the lower traveling support 51 is bolted to the truss body 3 through a flange. The flange is made of 20mm thick steel plate. The bolts are 10.9 grade M24 high-strength bolts, a total of 8 bolts / set, to ensure a firm connection.
[0062] The lower directional wheel assembly 52 is made of cast steel with a wheel diameter of φ300mm and a wheel width of 100mm. The lower traveling mechanism 5 includes two lower directional wheel assemblies 52. The lower directional wheel assembly 52 is connected to the lower traveling bracket 51 through a rotating shaft. The rotating shaft is made of No. 45 steel with a diameter of φ50mm. Bearings are installed at both ends of the rotating shaft to ensure that the lower directional wheel assembly 52 rotates flexibly without jamming.
[0063] The lower drive motor 53 is a three-phase asynchronous variable frequency motor with a power of 7.5kW and a rated speed of 1480r / min. Each upper traveling mechanism 6 is equipped with one lower drive motor 53. All lower drive motors 53 of the lower traveling mechanisms 5 are synchronously controlled through a variable frequency drive device 7. The variable frequency drive device 7 includes a frequency converter for synchronously controlling multiple lower drive motors 53. The frequency converter is a vector frequency converter, which can achieve stepless speed regulation from 0 to 5m / min with a speed regulation accuracy of ±0.1m / min, to meet the needs of different construction rhythms.
[0064] The lower traveling mechanism 5 and the upper traveling mechanism 6 work together under the action of the frequency conversion drive device 7, so that the steel structure bridge 1 and the main load-bearing truss 2 form a double-track constraint, which effectively prevents the main load-bearing truss 2 from shifting laterally and overturning, and ensures the stability of the main load-bearing truss 2 during the travel process.
[0065] Example 2: The rail clamping device 10 includes two upright plates 101 disposed on both sides of the inspection vehicle rail 12. Each upright plate 101 is provided with a clamping rod 102 threadedly connected to the upright plate 101. The end of the clamping rod 102 is provided with a clamping head 103 that abuts against the inspection vehicle rail 12. The tail of the clamping rod 102 is provided with an electric controller 104 for rotating the clamping rod 102.
[0066] Two clamping rods 102 are threadedly connected to the two upright plates 101. When the upright plates 101 are always in a relatively stationary state, the rotation of the clamping rods 102 drives the clamping heads 103 to move along the axial direction of the clamping rods 102, so that the inspection vehicle track 12 can be clamped by the two clamping heads 103.
[0067] The tensioning device 8 includes a chain hoist 81 and a wire rope sleeve 82 connected to each other. The steel structure bridge 1 is equipped with a reverse hook lifting device 14 for hoisting the chain hoist 81. The main load-bearing truss 2 is equipped with a suspension point 33 for threading the wire rope sleeve 82. The suspension point 33 is located at the connection between the truss body 3 and the vertical truss 4.
[0068] The steel structure bridge 1 and the main load-bearing truss 2 are tightened and fixed by the suspension points 33 and the 3t or 30t chain hoist 81. The suspension points 33 are set at the connection between the truss body 3 and the vertical truss 4 of the main load-bearing truss 2, with a total of 8 suspension points. The suspension points are made of 16mm thick steel plates welded to the main load-bearing truss 2, with a welding height of not less than 12mm and a bearing capacity of not less than 50kN.
[0069] The chain hoist 81 is a manual chain hoist. The 3t chain hoist 81 is used for daily construction fixing, and the 30t chain hoist 81 is used for typhoon crossing reinforcement. The chain hoist 81 is selected and used according to the actual situation. The chain hoist 81 is connected to the suspension point 33 by a wire rope sleeve 82. The wire rope sleeve 82 adopts a through connection to ensure reliable connection and further improve the stability of the main load-bearing truss 2.
[0070] The variable frequency drive device 7 is electrically connected to the upper traveling mechanism 6 and the lower traveling mechanism 5. The temporary track 13 is provided with a limit stop 71 for limiting the movement position of the upper traveling mechanism 6, and the inspection vehicle track 12 is also provided with a limit stop 71 for limiting the movement position of the lower traveling mechanism 5.
[0071] The variable frequency drive device 7 is equipped with a travel limit device, which adopts photoelectric limit switches and is installed at the front and rear ends of the main load-bearing truss 2 respectively. When the main load-bearing truss 2 travels to the end of a segment or the limit position of the steel structure bridge 1, the limit switch is triggered and the motor automatically stops to prevent the main load-bearing truss 2 from traveling beyond its travel range.
[0072] The variable frequency drive unit 7 is also equipped with an emergency braking device. The emergency braking buttons are located on the operating surface of the main load-bearing truss 2, the control box of the steel structure bridge 1, and the motor control cabinet. After pressing the emergency braking button, the motor is immediately de-energized, and at the same time, the rail clamping anti-fall device 10 automatically clamps the corresponding rail to achieve double braking and prevent accidents from occurring.
[0073] The cable of the frequency converter drive device 7 is a waterproof and flame-retardant cable. The cable is laid inside the main load-bearing truss 2 and fixed with cable clips to avoid cable wear and pulling, and to ensure the safe operation of the electrical system.
[0074] The fall arrestor 9 includes a double-layer bottom net 91 installed on the lower surface of the truss body 3, a bottom load-bearing layer 92 laid on the upper surface of the truss body 3, and a side anti-throw net 93 connected between adjacent vertical trusses 4.
[0075] The upper surface of the truss body 3 is covered with a bottom support layer 92. The bottom support layer 92 can be made of 8mm thick patterned steel plate, and the patterned steel plate is fixed to the upper chord of the truss body 3 by welding.
[0076] The double-layer safety net 91 has a double-layer structure. The upper layer is a close-mesh safety net (mesh count ≥ 2000 mesh / 100cm²), and the lower layer is a high-strength nylon fall arrest net (breaking strength ≥ 50kN / m). The double-layer safety net 91 has a spacing of 50cm between the two layers and is fixed to the truss web members by steel wire rope clips. The clip spacing is no more than 50cm to ensure the reliability of the bottom protection.
[0077] Under the action of four vertical trusses 4, the side anti-throw net 93 forms a frame structure, creating a fully enclosed protective net surrounding the steel structure bridge 1. The side anti-throw net 93 is a close-mesh safety net with a net size of 1.8m × 6m. The edge of the net is fixed to the vertical truss 4 with bolts. The bottom of the side anti-throw net 93 is flush with the bottom support layer 92, and the top of the side anti-throw net 93 is 1.2m higher than the operating surface of the truss main body 3. A 2.0m high closed baffle is set at the end of the side anti-throw net 93. The baffle is made of 3mm thick steel plate and is bolted to the vertical truss 4 to achieve a closed-off environment without dead angles and prevent leakage of falling objects from high altitudes.
[0078] A construction method for a self-driven, fully enclosed protective operating platform structure for cantilevered steel bridge assembly, based on the self-driven, fully enclosed protective operating platform structure for cantilevered steel bridge assembly as described in any one of claims 1-9, characterized by comprising the following steps:
[0079] Step S1: Factory prefabrication. The width of the steel structure bridge 1, the length of the bridge segments, the elevation and spacing of the inspection vehicle track 12 are measured, and the transverse main truss 31, longitudinal secondary truss 32, vertical truss 4, upper traveling mechanism 6, lower traveling mechanism 5 and rail clamping device 10 are prepared in the factory based on the measured data.
[0080] First, a total station was used to accurately measure the width of the steel structure bridge 1, the length of the bridge segments, and the elevation and spacing of the inspection vehicle track 12. The measurement error was controlled within ±2mm. Based on the measurement data, component processing drawings were drawn. After the drawings were reviewed and found to be correct, the prefabrication of the upper traveling mechanism 6, the lower traveling mechanism 5, and the rail clamping device 10 was completed in the factory.
[0081] The steel profiles of the main truss 3 and the vertical truss 4 are cut using a CNC cutting machine with a cutting accuracy of ±1mm. The beveling is done using a mechanical beveling machine with a beveling angle of 45°. After processing, sandblasting is performed to remove rust, achieving a rust removal grade of Sa2.5. After rust removal, two coats of primer (epoxy zinc-rich primer, 80μm thick) and two coats of topcoat (fluorocarbon topcoat, 60μm thick) are applied promptly, ensuring uniform coating without any missed areas or runs.
[0082] Step S2: On-site assembly. The transverse main truss 31, longitudinal secondary truss 32, vertical truss 4, upper traveling mechanism 6, lower traveling mechanism 5, fall arrest device 9 and lifting equipment 11 prepared in the factory are transported to the site. The transverse main truss 31, longitudinal secondary truss 32, lower traveling mechanism 5, fall arrest device 9 and lifting equipment 11 are assembled to obtain the truss body 3.
[0083] The assembly site was leveled near the main pier of steel structure bridge 1. The site was hardened with C20 concrete with a hardening thickness of 10cm and a flatness error of no more than 5mm. Then, 16a I-beams were laid at the design points in the assembly site as assembly support frames with a spacing of 2.0m between the support frames, consistent elevation, and an error of no more than 3mm.
[0084] The truss is assembled in the following order: "lateral main truss 31 → longitudinal secondary truss 32 → lower traveling mechanism 5 → double-layer bottom support net 91 → bottom support load-bearing layer 92". During the assembly process, a level and theodolite are used to monitor the horizontality and verticality of the truss in real time. The horizontality error is no greater than 3mm / m, and the verticality error is no greater than 5mm / m. After the assembly is completed, all bolts are tightened to ensure that the connection is firm. At the same time, the installation quality of the double-layer bottom support net 91 and the bottom support load-bearing layer 92 is checked to ensure that there is no loosening or damage. After the overall ground assembly is completed, the main body of the truss 3 is weighed to ensure that the overall weight meets the design requirements.
[0085] Step S3: The main truss 3 is hoisted. The hoisting operation is carried out on the steel structure bridge 1, and the main truss 3 is hoisted to the bottom of the steel structure bridge 1.
[0086] The main truss 3 is hoisted using a mast-mounted bridge crane. Before hoisting, the performance of the crane and the integrity of the lifting equipment 11 are checked. The lifting equipment uses a special lifting beam, and the lifting equipment 11 is made of H-beams with a load-bearing capacity of not less than 50t. The lifting equipment 11 is set at the four corners of the main truss 3 and connected to the node parts of the main truss 3 to ensure uniform force during hoisting.
[0087] During hoisting, lift slowly. When the main truss 3 is 10cm off the ground, stop lifting and conduct a static load test for 30 minutes. Observe the deformation of the main truss 3. The deformation should not exceed 3mm. After confirming that there are no abnormalities, slowly lift the crane while adjusting the crane's rotation angle to smoothly lift the main truss 3 to below the steel structure bridge 1. During the lifting process, arrange a dedicated person to direct the operation to ensure that the main truss 3 does not collide with the steel structure bridge 1, cable stays, or other components.
[0088] Step S4: Temporary fixation. Install a chain hoist 81 on the anti-hook lifting device 14 of the steel structure bridge 1, and hang a wire rope sleeve 82 that passes through the suspension point 33 on the main load-bearing truss 2 on the chain hoist 81. Tighten the wire rope sleeve 82 by slowly pulling the chain hoist 81.
[0089] When the truss main body 3 is lifted to the designed position below the steel structure bridge 1, construction workers are arranged to wear safety belts and descend from the steel structure bridge 1 to the truss main body 3 using a temporary ladder. Five chain hoists 81 are set at the four corners and the middle of the truss main body 3. One end of the chain hoist 81 is connected to the suspension point 33 through a wire rope loop 82, and the other end of the chain hoist 81 is bolted and fixed to the flange plate or crossbeam node of the steel structure bridge 1. The chain hoists 81 are slowly tightened to keep the truss main body 3 and the steel structure bridge 1 relatively fixed. During the temporary fixing process, the horizontality and verticality of the platform are monitored in real time to ensure that the position of the truss main body 3 is accurate and there is no deviation.
[0090] Step S5: Install the vertical truss 4. Perform hoisting operations on the steel structure bridge 1. After hoisting the vertical truss 4 to the corner node position of the truss body 3, bolt the vertical truss 4 to the truss body 3 and fix it. After the vertical truss 4 is installed, hoist the upper traveling mechanism 6 and install the upper traveling mechanism 6 on the vertical truss 4.
[0091] The four corner vertical trusses 4 were hoisted separately using a bridge deck crane. Before hoisting the vertical trusses 4, their verticality and the integrity of the connection nodes were checked. During hoisting, the vertical trusses 4 were slowly hoisted to the corner node position of the truss body 3. The verticality of the vertical trusses 4 was adjusted, and the verticality error was not greater than 5mm / m. Then, the vertical trusses 4 were bolted and fixed to the truss body 3 with high-strength bolts. The bolt tightening torque met the design requirements.
[0092] After the vertical truss 4 is installed, the upper traveling mechanism 6 is hoisted and the upper traveling support 61 of the upper traveling mechanism 6 is aligned with the flange at the top of the vertical truss 4. High-strength bolts are used to fix it. After installation, the fit between the upper directional wheel set 62 of the upper traveling mechanism 6 and the temporary track 13 is checked to ensure that the upper directional wheel set 62 and the temporary track 13 have good contact, without gaps or deviations.
[0093] Step S6: Electrical debugging. Remove the chain hoist 81 and wire rope sleeve 82, install the corresponding limit stop 71 and travel limiter, and debug the synchronization of multiple upper traveling mechanisms 6, the synchronization of multiple lower traveling mechanisms 5, the braking performance of the rail clamping device 10 and the travel limiter.
[0094] The variable frequency drive unit 7 includes electrical equipment such as the variable frequency control cabinet, emergency brake button, and limit switches. Cables are laid according to specifications, wiring is secure, and insulation is properly applied. Before commissioning, the insulation performance of the electrical system is checked; the insulation resistance is not less than 1MΩ. After confirming there is no leakage, no-load travel testing is performed.
[0095] First, debug the synchronization of the lower drive motor 53 and the upper drive motor 63. Start the frequency converter and adjust the walking speed to ensure that the lower walking mechanism 5 and the upper walking mechanism 6 walk synchronously without deviation. Then, debug the braking device. Press the emergency brake button, and the motor will be powered off immediately. The rail clamping device 10 will automatically clamp the corresponding rail, and the braking will be reliable. Finally, debug the limit stop 71. Simulate the overtravel of the truss body 3. The limit switch will be triggered, and the motor will stop automatically. After the debugging is qualified, record the debugging data to ensure that the electrical system is operating normally.
[0096] Step S7: Move and lock, start the upper walking mechanism 6 and the lower walking mechanism 5, move the main load-bearing truss 2 to the protective position of the steel structure bridge 1, start the rail clamping device 10, and reinstall the guide chain hoist 81 and the wire rope sleeve 82 to tighten the steel structure bridge 1 and the main load-bearing truss 2.
[0097] After electrical commissioning is completed, the upper traveling mechanism 6 and the lower traveling mechanism 5 are started by the frequency converter drive device 7 to slowly move the truss body 3 to the protective position. During the movement, a dedicated person monitors the platform's movement status, the fit between the traveling mechanism and the track, and the operation of the electrical system to ensure smooth, unimpeded, and undevised movement. When the platform reaches the designed protective position, it stops moving and the rail clamping device 10 is activated to firmly clamp the corresponding track. Then, the 6 suspension points 33 of the main load-bearing truss 2 are tightened and fixed to the steel structure bridge 1 using a 3t or 30t chain hoist 81. After anchoring, the stability of the main load-bearing truss 2 is checked. If there is no shaking or deviation, and the work is confirmed to be qualified, the main load-bearing truss 2 is put into use for the operation and protection of welding, bolting, and cable anchoring of the steel structure bridge 1 segments.
[0098] Step S8: Segmental walking, repeat steps S6 and S7 to complete the construction protection of the multi-segment steel structure bridge 1.
[0099] After the cantilever construction of a steel structure bridge segment 1 is completed (welding, bolting, cable anchoring, etc.), the segment movement operation of the main load-bearing truss 2 is carried out. The specific process is as follows: First, release the temporary anchoring of all chain hoists 81 to ensure that the chain hoists 81 are completely relaxed and do not affect the movement of the main load-bearing truss 2.
[0100] Then, start the variable frequency drive system 7, start the upper walking mechanism 6 and the lower walking mechanism, adjust the walking speed to 2-3 m / min, control the lower drive motor 53 and the upper drive motor 63 on both sides to run synchronously, drive the main load-bearing truss 2 to move forward along the temporary track 13 and the inspection vehicle track 12. The walking distance of the main load-bearing truss 2 is consistent with the length of the steel beam segment. During the walking process, arrange a dedicated person to monitor the whole process and adjust the walking speed and direction in real time to ensure that the platform walks smoothly and without deviation.
[0101] When the main load-bearing truss 2 moves to the next protection position, it stops moving and immediately starts the rail clamping device 10 to clamp the corresponding rail. Then, the 6 suspension points 33 of the main load-bearing truss 2 are tightened and fixed to the steel structure bridge 1 by the 3t or 30t chain hoist 81, completing the segment movement operation and entering the construction protection cycle of the next steel beam segment.
[0102] When a typhoon warning is received (wind force ≥ level 8), the main load-bearing truss 2 is immediately reinforced by crossing the platform to ensure the safety and stability of the main load-bearing truss 2 during typhoon weather.
[0103] The specific reinforcement process is as follows: First, add a set of lower traveling mechanisms 5 at the front end of the main load-bearing truss 2, and evenly arrange them with the original lower traveling mechanisms 5 to enhance the platform's traveling constraint capability. Then, activate all the rail clamping devices 10 of the upper traveling mechanisms 6 and the lower traveling mechanisms 5 to ensure that all upper directional wheel sets 62 and lower directional wheel sets 52 are firmly clamped to prevent the main load-bearing truss 2 from sliding.
[0104] A 30t chain hoist 81 is used to tighten and anchor all six suspension points 33 of the main load-bearing truss 2 to the steel structure bridge 1. The tension of the chain hoist 81 at each suspension point 33 is controlled at 15-20kN. At the same time, a steel wire rope sleeve 82 is added between the main load-bearing truss 2 and the steel structure bridge 1 for diagonal reinforcement to ensure that the main load-bearing truss 2 does not sway, shift or fall under the typhoon load, and meets the wind resistance requirements of a once-in-a-century wind load (basic wind speed 40.44m / s).
[0105] After the typhoon, a comprehensive inspection was conducted on the tensioning device 8, the lower traveling mechanism 5, the upper traveling mechanism 6, and the fall arrestor 9 of the main load-bearing truss 2. After confirming that there was no damage or loosening, the tensioning device 8 was released, and the main load-bearing truss 2 was restored to normal use.
[0106] After protective construction is carried out on all segments of the steel structure bridge 1, the main load-bearing truss 2 is dismantled. The dismantling steps of the main load-bearing truss 2 are the reverse steps of steps S1-S6.
[0107] First, a set of lower traveling mechanism 5 is added to the front end of the main load-bearing truss 2 to ensure that the main load-bearing truss 2 is completely suspended by the inspection vehicle track 12, thereby improving the stability during the dismantling process.
[0108] Then, the four corner vertical trusses 4 and the upper traveling mechanism 6 are dismantled. During dismantling, a bridge deck crane is used to lift the vertical trusses 4 and the upper traveling mechanism 6 to the ground one by one. During the dismantling process, collisions between components and the steel structure bridge 1, cable stays, and other structures are avoided to ensure construction safety.
[0109] After the vertical truss 4 and the upper traveling mechanism 6 are dismantled, the lower traveling mechanism 5 is started through the frequency conversion drive system 7 to slowly move the truss body 3 back to a safe area near the main pier. During the retraction process, a dedicated person monitors the entire process to ensure smooth movement. After the truss body 3 has moved to the safe area, the vertical truss 4 is lowered simultaneously by a bridge deck winch (rated lifting capacity 50t) through multiple lifting devices 11. The lowering speed is controlled at 0.5 to 1 m / min. During the lowering process, the speed and position of the winch are adjusted to ensure that the vertical truss 4 is lowered smoothly and does not collide with the steel structure bridge 1.
[0110] After the vertical truss 4 is lowered to the ground, it is disassembled at the assembly site in the following order: "double-layer bottom net 91 → bottom load-bearing layer 92 → lower traveling mechanism 5 → longitudinal secondary truss 32 → transverse main truss 31". The disassembled components are cleaned, derusted, painted and maintained, and then transported to the warehouse for storage. They are then used for subsequent construction of similar bridges, achieving recycling and reducing construction costs.
[0111] This implementation method has been applied to the cantilever construction of the steel beams of the P58 and P59 main piers of the Yongjiang Grand Bridge, part of the third phase of the G9221 Hangzhou-Ningbo Expressway in Ningbo. This bridge is a three-tower, double-cable-stayed, steel-concrete composite beam cable-stayed bridge with a main span of 540m / 570m, a standard steel beam segment length of 12m, a local segment length of 10.5m, and a bridge deck width of 40.5m. Below the bridge are the port operation area, chemical industrial park, and navigation channel. The safety, stability, and adaptability of the protective platform are extremely important. This invention can fully meet the construction requirements of this scenario and is also adaptable to the cantilever construction of similar large-span steel-concrete composite beam cable-stayed bridges.
[0112] The above description of the disclosed embodiments enables those skilled in the art to make or use the invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the invention; therefore, the invention is not to be limited to the embodiments shown herein, but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.
[0113] Although this article uses many reference numerals from the figures: steel bridge 1, lifting equipment 11, inspection vehicle track 12, temporary track 13, anti-hook lifting equipment 14, main load-bearing truss 2, truss body 3, transverse main truss 31, longitudinal secondary truss 32, suspension point 33, U-bolt 34, vertical truss 4, lower traveling mechanism 5, lower traveling support 51, lower directional wheel set 52, lower drive motor 53, upper traveling mechanism 6, upper traveling support 61, upper directional wheel set 62, upper drive motor 63, frequency conversion drive device 7, limit stop 71, tensioning device 8, chain hoist 81, wire rope sleeve 82, fall protection device 9, double-layer bottom net 91, bottom load-bearing layer 92, side anti-throw net 93, rail clamping device 10, upright plate 101, clamping rod 102, clamping head 103, electric controller 104, etc., the possibility of using other terms cannot be excluded. The use of these terms is merely for the convenience of describing and explaining the nature of the invention; interpreting them as any kind of additional limitation would be contrary to the spirit of the invention.
Claims
1. A self-driven fully-enclosed protective operation platform structure for steel structure bridge cantilever assembly, comprising a main load-bearing truss (2) which is fully-enclosed and bottomed suspended under a steel structure bridge (1), characterized in that, The main load-bearing truss (2) includes a truss body (3) and several vertical trusses (4) connected to the truss body (3). The vertical trusses (4) are equipped with an upper traveling mechanism (6) corresponding to the top of the steel structure bridge (1). The steel structure bridge (1) is equipped with a temporary track (13) that cooperates with the upper traveling mechanism (6). The truss body (3) is equipped with a lower traveling mechanism (5) corresponding to the bottom of the steel structure bridge (1). The steel structure bridge (1) is equipped with an inspection track that cooperates with the lower traveling mechanism (5). The upper traveling mechanism (6) and the lower traveling mechanism (5) are equipped with rail clamping devices (10) for locking the moving position of the main load-bearing truss (2); the main load-bearing truss (2) is equipped with a tensioning device (8) for tightening and fixing the steel structure bridge (1) to the main load-bearing truss (2); the main load-bearing truss (2) is equipped with a frequency conversion drive device (7) for independently controlling the upper traveling mechanism (6) and the lower traveling mechanism (5); the main load-bearing truss (2) is equipped with a fall protection device (9).
2. The self-driven fully-enclosed protective operating platform structure for the cantilevered assembly of a steel structure bridge according to claim 1, characterized in that, The truss body (3) is composed of several transverse main trusses (31) and several longitudinal secondary trusses (32) connected together. Several vertical trusses (4) are connected to the corners of the truss body (3). The top of the truss body (3) is provided with several lifting devices (11) for hoisting the truss body (3). U-bolts (34) for locking the lifting devices (11) are sleeved on the truss body (3).
3. The self-driving, fully enclosed protective operating platform structure for cantilevered steel bridge assembly according to claim 1, characterized in that, Several of the vertical trusses (4) are equipped with upper traveling mechanisms (6). Several upper traveling mechanisms (6) are symmetrically arranged along the center of the steel structure bridge (1). The upper traveling mechanism (6) includes an upper traveling support (61), an upper directional wheel set (62) and an upper drive motor (63). The upper directional wheel set (62) is abutted on the temporary track (13). The rail clamping device (10) is set on the upper traveling support (61) and is located at the front and rear ends of the upper directional wheel set (62) in the direction of travel.
4. The self-driving, fully enclosed protective operating platform structure for cantilevered steel bridges according to claim 1, characterized in that, The truss body (3) is equipped with several lower traveling mechanisms (5) symmetrically arranged along the center of the steel structure bridge (1). The lower traveling mechanism (5) includes a lower traveling support (51), a lower directional wheel set (52) and a lower drive motor (53). The lower directional wheel set (52) is abutted on the inspection vehicle track (12). The rail clamping device (10) is set on the lower traveling support (51) and is located at the front and rear ends of the lower directional wheel set (52) in the direction of travel.
5. A self-driving, fully enclosed protective operating platform structure for cantilevered steel bridge assembly according to claim 3 or 4, characterized in that, The rail clamping device (10) includes two upright plates (101) set on both sides of the temporary rail (13) or the inspection vehicle rail (12). Each upright plate (101) is provided with a clamping rod (102) threadedly connected to the upright plate (101). The end of the clamping rod (102) is provided with a clamping head (103) that abuts against the temporary rail (13) or the inspection vehicle rail (12). The tail of the clamping rod (102) is provided with an electric controller (104) for rotating the clamping rod (102).
6. The self-driving, fully enclosed protective operating platform structure for cantilevered steel bridges according to claim 1, characterized in that, The tensioning device (8) includes a chain hoist (81) and a wire rope sleeve (82) connected to each other. The steel structure bridge (1) is equipped with a reverse hook lifting device (14) for hoisting the chain hoist (81). The main load-bearing truss (2) is equipped with a suspension point (33) for threading the wire rope sleeve (82). The suspension point (33) is located at the connection between the truss body (3) and the vertical truss (4).
7. The self-driving, fully enclosed protective operating platform structure for cantilevered steel bridges according to claim 1, characterized in that, The variable frequency drive device (7) is electrically connected to the upper walking mechanism (6) and the lower walking mechanism (5). The temporary track (13) is provided with a limit stop (71) for limiting the movement position of the upper walking mechanism (6), and the inspection vehicle track (12) is also provided with a limit stop (71) for limiting the movement position of the lower walking mechanism (5).
8. The self-driving, fully enclosed protective operating platform structure for cantilevered steel bridges according to claim 1, characterized in that, The fall arrestor (9) includes a double-layer bottom net (91) set on the lower surface of the truss body (3), a bottom load-bearing layer (92) laid on the upper surface of the truss body (3), and a side anti-throw net (93) connected between adjacent vertical trusses (4).
9. A construction method for a self-driven, fully enclosed protective operating platform structure for cantilevered steel bridge assembly, based on the self-driven, fully enclosed protective operating platform structure for cantilevered steel bridge assembly as described in any one of claims 1-8, characterized in that, Includes the following steps: Step S1: Factory prefabrication. The width of the steel structure bridge (1), the length of the bridge segment, the elevation and spacing of the inspection vehicle track (12) are measured, and the transverse main truss (31), longitudinal secondary truss (32), vertical truss (4), upper traveling mechanism (6), lower traveling mechanism (5) and rail clamping device (10) are prepared in the factory based on the measured data. Step S2: On-site assembly. The transverse main truss (31), longitudinal secondary truss (32), vertical truss (4), upper traveling mechanism (6), lower traveling mechanism (5), fall protection device (9) and lifting equipment (11) prepared in the factory are transported to the site. The transverse main truss (31), longitudinal secondary truss (32), lower traveling mechanism (5), fall protection device (9) and lifting equipment (11) are assembled to obtain the truss body (3). Step S3: The main body of the truss (3) is hoisted. The hoisting operation is carried out on the steel structure bridge (1) to lift the main body of the truss (3) to the bottom of the steel structure bridge (1); Step S4: Temporary fixation, install a chain hoist (81) on the anti-hook lifting device (14) of the steel structure bridge (1), and hang a wire rope sleeve (82) that passes through the suspension point (33) on the main load-bearing truss (2) on the chain hoist (81). Tighten the wire rope sleeve (82) by slowly pulling the chain hoist (81); Step S5: Install the vertical truss (4). Perform hoisting operation on the steel structure bridge (1). After hoisting the vertical truss (4) to the corner node position of the truss body (3), bolt the vertical truss (4) to the truss body (3) and fix it. After the vertical truss (4) is installed, hoist the upper traveling mechanism (6) and install the upper traveling mechanism (6) on the vertical truss (4). Step S6: Electrical debugging, remove the chain hoist (81) and wire rope sleeve (82), install the corresponding limit stop (71) and travel limiter, and debug the synchronization of multiple upper traveling mechanisms (6), the synchronization of multiple lower traveling mechanisms (5), the braking performance of the rail clamping device (10) and the travel limiter. Step S7: Walk and lock, start the upper walking mechanism (6) and the lower walking mechanism (5), walk the main load-bearing truss (2) to the protective position of the steel structure bridge (1), start the rail clamping device (10), and install the guide chain hoist (81) and wire rope sleeve (82) again to tighten the steel structure bridge (1) and the main load-bearing truss (2); Step S8: Segmental walking, repeat steps S6 and S7 to complete the construction protection of multi-segment steel structure bridge (1).
10. A construction method for a self-driving, fully enclosed protective operating platform structure for cantilevered steel bridges according to claim 9, characterized in that, After protective construction is carried out on all the segments of the steel structure bridge (1), the main load-bearing truss (2) is dismantled. The dismantling steps of the main load-bearing truss (2) are the reverse steps of steps S1-S6.