A method for modifying the dam body of existing sodium salt ponds in salt fields
By setting up target dam lines in the salt field, cleaning and compacting the base surface, and laying and spraying brine crystallized salt material in layers, a stable dam structure is formed, which solves the problem of reduced effective brine depth caused by sodium salt pool deposition in the salt field, and realizes the effective utilization of the salt field and improves the stability of the dam.
Patent Information
- Application Number
- CN202611556127.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-09
- Publication Date
- 2026-11-17
AI Technical Summary
During long-term operation, sodium salt deposits at the bottom of salt fields gradually reduce the effective brine depth. Existing technologies cannot effectively utilize existing salt fields, and the dam body lacks stability in high-salinity brine and windy/wave environments.
Within the existing salt field area, a target dam line is set, the construction base surface is cleared and compacted, the main body of the dam is constructed in layers using sodium salt material from the salt field, and a wave-proof structure is formed on the water-facing side. Saturated brine is sprayed to crystallize and solidify the gaps between the salt materials, forming a dam body that meets the target dam crest elevation.
Increasing the effective brine depth of the salt ponds extends the service life of the salt fields, improves the density and wave resistance of the dam body, reduces the amount of engineering work, utilizes existing dam construction materials, and enhances the controllability of construction quality.
Smart Images

Figure CN123109099A_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of salt field engineering construction technology, and in particular to a method for modifying the dam body of an existing sodium salt pond in a salt field. Background Technology
[0002] During long-term operation, sodium chloride continuously crystallizes and deposits on the bottom of the salt ponds, gradually thickening the salt layer. With the original dam elevation remaining relatively constant, the rise in the pond bottom elevation reduces the effective space available for storing brine. Once the deposited sodium salt reaches a certain thickness, the salt ponds can no longer maintain the brine depth required for production.
[0003] Generally, the above problems can be solved by constructing new sodium salt ponds at a different site. However, building new salt ponds involves land approval and the reconstruction of salt ponds, roads, and related supporting facilities, which may increase construction costs and time. For existing salt ponds that already have pond systems, roads, and brine extraction and discharge conditions, directly abandoning the original salt ponds and rebuilding new ones would make it difficult to continue using the existing engineering conditions.
[0004] In addition, the salt field dam body has been in an environment of high salinity brine and wind and waves for a long time. Therefore, the stability of the dam body and the scour resistance of the water-facing side also need to be considered during the dam body renovation process.
[0005] Therefore, how to continue utilizing existing sodium salt ponds in salt fields under the condition of continuous sodium salt deposition at the bottom is a problem that needs to be solved in the operation of existing salt fields. Summary of the Invention
[0006] The technical problem this invention aims to solve is the gradual decrease in effective brine depth caused by the continuous deposition of sodium salt at the bottom of sodium salt ponds during long-term operation. To address this problem, this application provides a method for modifying the dam structure of existing sodium salt ponds in salt fields. The technical solution is as follows: On the one hand, a method for modifying the dam body of an existing sodium salt pond in a salt field is provided, including: S101, lay out the target dam line within the existing salt field area, and determine the target dam crest elevation based on the preset brine depth, wave height and safety freeboard. The target dam line is selected from one of the first target dam line and the second target dam line. The first target dam line is located at the top of the original salt field dam body, and the second target dam line is located on the side of the original salt field dam body facing the original sodium salt pond. S102, Clean, level and compact the construction base surface corresponding to the target dam line to obtain the dam body bearing base surface; S103, Obtain sodium salt material from the salt field and sort the sodium salt material according to particle size to obtain backfill salt material for constructing the main body of the dam and block sodium salt for constructing the wave-breaking structure on the water-facing side. S104, the backfill salt material is laid in layers on the bearing base surface of the dam body, each layer of backfill salt material is compacted and the interlayer surface is treated, and saturated brine is sprayed onto the compacted backfill salt material. After the saturated brine evaporates and crystallizes, the next layer of backfill salt material is laid until the target dam body that reaches the target dam crest elevation is formed. S105, the block sodium salt is laid on the lower part of the water-facing side of the target dam body, and sodium salt with a particle size smaller than the block sodium salt is used to fill the gaps between the block sodium salt, and saturated brine is sprayed onto the block sodium salt and the gaps therebetween. After the saturated brine evaporates and crystallizes, a wave-proof structure is formed.
[0007] Optionally, the target dam line is the first target dam line; S102 involves cleaning, leveling, and compacting the construction base surface corresponding to the target dam line to obtain the dam body bearing base surface, including: The weathered salt cover layer, loose salt cover layer and impurity layer on the top of the original salt field dam were stripped off until the core layer of the dense clay dam was exposed. The exposed core layer of the clay dam was compacted; A graded salt granule cushion layer is laid on the compacted clay dam core layer to obtain a transitional bearing base surface for supporting the target dam body.
[0008] Optionally, the target dam line is the second target dam line; S102 involves cleaning, leveling, and compacting the construction base surface corresponding to the target dam line to obtain the dam body bearing base surface, including: Remove the surface material from the new dam construction area corresponding to the second target dam line until the stable salt layer base is exposed; The stable salt layer base is leveled and compacted to obtain a salt layer bearing base surface for supporting the target dam body; The sodium salt material in S103 includes at least the deposited sodium salt excavated from the original sodium salt pond.
[0009] Optionally, in step S103, sodium salt material is obtained from the salt field and sorted according to particle size to obtain backfill salt material for constructing the main body of the dam and blocky sodium salt for constructing the wave-breaking structure on the water-facing side, including: The deposited sodium salt in the original sodium salt pond was excavated in layers, and the excavated sodium salt was transferred to the stockpiling area and screened. The sodium salt with relatively uniform particle size obtained by sieving is used as the backfill salt material, and the sieving block sodium salt is stored separately and used as the building material of the wave-proof structure.
[0010] Optionally, the layered paving in S104 includes: paving the backfill salt material with a single layer thickness of 20cm to 30cm; The interlayer surface treatment in S104 includes: roughening or roughening the current construction layer after it has been compacted or consolidated to obtain the current construction layer with interlayer surface treatment.
[0011] Optionally, the compaction in S104 includes: static compaction and vibratory compaction of the current construction layer after paving, with an overlapping area set between adjacent compaction trajectories; The spraying of saturated brine in S104 includes: spraying the saturated brine onto the compacted current construction layer using a high-pressure spraying method; The evaporation crystallization in S104 includes: allowing the current construction layer to stand after spraying the saturated brine until the saturated brine evaporates and crystallizes to form a salt crystal solidification structure that fills the gaps in the backfill salt material.
[0012] Optionally, in a low-temperature or rainy construction environment, the evaporation crystallization in S104 includes at least one of the following methods: extending the static time of the current construction layer and covering and insulating the current construction layer, until the saturated brine sprayed onto the current construction layer continues to evaporate and crystallize.
[0013] Optionally, in S105, the blocky sodium salt includes large sodium salt with a particle size of 30cm to 50cm. The large sodium salt is interlocked or staggered on the lower part of the water-facing side of the target dam body, and medium salt blocks with a particle size of 15cm to 30cm are filled between adjacent large sodium salt blocks. A graded slope protection extending towards the dam crest is formed above the blocky sodium salt using medium- and fine-grained sodium salts.
[0014] Optionally, laying the blocky sodium salt in step S105 includes: For the target dam body corresponding to the first target dam line, the blocky sodium salt is laid up to a position higher than the normal brine liquid level; For the target dam body corresponding to the second target dam line, the blocky sodium salt is laid from the toe of the dam upwards, and a graded slope protection extending towards the top of the dam is laid on top of the blocky sodium salt.
[0015] Optionally, the method further includes: During the construction of the target dam, at least one of the following should be monitored: dam elevation, salt layer compaction, brine infiltration, and dam settlement. Based on the monitoring results, adjustments were made to at least one of the construction processes, namely, the laying and compaction of backfill salt material, and the spraying and consolidation of saturated brine.
[0016] Compared with the prior art, the present invention has the following beneficial effects.
[0017] This invention establishes a target dam line within an existing salt field, treats the corresponding construction base surface, and uses sodium salt material from the salt field to construct the main dam body in layers. After compaction and interlayer treatment of each construction layer, saturated brine is sprayed. The salt crystals precipitated from the evaporation of the saturated brine solidify the gaps between the salt materials and adjacent construction layers. Simultaneously, a wave-resistant structure is formed on the water-facing side of the dam body using blocky sodium salt and smaller particle size sodium salt. This allows for the reconstruction of a dam body that meets the target dam crest elevation on the basis of an existing salt field, increasing the effective brine depth of the salt pond and extending the service life of the existing sodium salt pond. The combination of layered compaction and saturated brine evaporation and crystallization improves the density of the dam body and the interlayer bonding, while the blocky sodium salt wave-resistant structure on the water-facing side reduces the direct erosion of the dam body by brine waves.
[0018] In other embodiments, when the target dam line is set on the top of the original salt field dam body, by removing the weathered and loose salt cover layer and impurity layer on the top of the original dam, compacting the exposed dense clay dam core layer, and laying a graded salt granule cushion layer on it, the existing foundation and seepage prevention structure of the original salt field dam body can be used to form a new dam body, reducing the amount of work required to redo the dam foundation and bottom seepage prevention construction.
[0019] In other embodiments, when the target dam line is set on the side of the original salt field dam facing the original sodium salt pond, a new dam body is formed inside the original sodium salt pond, and the sodium salt that has been deposited in the original pond for a long time is excavated, screened and used for the main body of the dam body and the wave-breaking structure on the water-facing side, respectively. This can reduce the local bottom elevation of the pond while obtaining dam construction materials, so that the sodium salt deposited in the original pond can be used on-site, and the transportation of salt materials and the use of external dam construction materials can be reduced.
[0020] In other embodiments, by controlling the thickness of a single layer of backfill salt material and roughening or roughening the surface between adjacent construction layers, the influence of the continuously hardened surface on the bonding between the upper and lower construction layers can be reduced, allowing the subsequently sprayed saturated brine to form salt crystal connections between adjacent construction layers, which is beneficial to improving the interlayer integrity of the dam body.
[0021] In other embodiments, by sequentially performing static and vibratory compaction, and then using saturated brine spraying and evaporation crystallization to solidify the salt material, the porosity between the salt materials can be further reduced, and the density of the dam body can be improved. When natural evaporation conditions are insufficient, the evaporation crystallization process of the salt layer can be maintained by extending the settling time or covering and insulating it.
[0022] In other embodiments, by using large blocks of sodium salt to form an interlocking or staggered skeleton on the lower part of the water-facing side of the dam body, and filling the gaps with smaller salt blocks, and at the same time setting up a graded slope protection formed by sodium salt of different particle sizes on it, the stability of the water-facing structure can be improved and the loosening and loss of salt material caused by direct erosion by wind and waves can be reduced.
[0023] In other embodiments, by monitoring the dam elevation, salt layer compaction, brine permeability, and dam settlement, and adjusting the construction process accordingly based on the monitoring results, local insufficient compaction, abnormal permeability, or abnormal settlement that occur during dam construction can be detected in a timely manner, thereby improving the controllability of dam construction quality. Attached Figure Description
[0024] Figure 1 A schematic diagram of the existing salt field system; Figure 2 This is a schematic diagram of the cross-sectional structure of an existing salt field dam. Detailed Implementation
[0025] To make the objectives, technical solutions, and advantages of this application clearer, the embodiments of this application will be described in further detail below with reference to the accompanying drawings.
[0026] In this article, "multiple" refers to two or more. "And / or" describes the relationship between related objects, indicating that three relationships can exist. For example, A and / or B can represent: A alone, A and B simultaneously, or B alone. The character " / " generally indicates that the preceding and following related objects have an "or" relationship.
[0027] The dimensions, particle size, equipment specifications, number of construction passes, and monitoring indicators in the following embodiments are all derived from the briefing plan and are used to illustrate the feasible construction methods. Without changing the dam modification concept of this application, adjustments can be made according to the salt field geology, pond layout, brine depth, wind and wave conditions, equipment conditions, and dam purpose.
[0028] The term "sodium salt material" as used in this application includes salt grains, crystalline salt blocks, and salt material with sodium chloride as the main component that can be obtained on-site in salt fields, as well as salt material that has been deposited in the original sodium salt ponds for a long time; the term "saturated brine" refers to high-concentration brine that can be used on-site in salt fields to dissolve the surface of salt material and re-precipitate salt crystals during the evaporation process.
[0029] Example 1
[0030] See Figure 1 and Figure 2 After long-term operation, sodium chloride accumulates at the bottom of salt ponds in salt fields, increasing the bottom elevation. If the original salt field system, roads, and brine extraction and drainage conditions can still be utilized, the location for dam modification can be determined based on the original dam's load-bearing capacity, the thickness of the deposited sodium chloride in the pond, and the required brine depth after modification. If the original dam still has the capacity to bear load and the salt pond's horizontal area does not require significant adjustment, the top of the original dam can be raised; if it is necessary to reduce the pond's surface area to restore the effective brine depth, a new dam can be built on the side of the original dam facing the salt pond.
[0031] S101, within the existing salt field area, the target dam line is laid out, and the target dam crest elevation is determined based on the preset brine depth, wave height, and safety freeboard. The target dam line is selected from one of the first target dam line and the second target dam line. The first target dam line is located at the top of the original salt field dam body, and the second target dam line is located on the side of the original salt field dam body facing the original sodium salt pond.
[0032] The determination of the target dam line is based on the existing salt pan system layout. See [link / reference needed] Figure 1 The layout of the salt ponds mainly considers the direction of brine source and old brine discharge, ore transportation direction, the length of the windward slope dam, and the direction of wave impact. The long axis of the pond system can form an angle with the prevailing wind direction of the lake area to reduce the continuous impact of waves on the water-facing dam body under the prevailing wind. The dam crest elevation is determined according to actual operational needs, and its height is determined by the brine depth, the height of wind and wave uplift, and the safety freeboard.
[0033] Under certain salt field engineering conditions, the site, at a depth of approximately 4 meters, comprises, from top to bottom, layers D1 (hard salt crust), D2 (silty light clay), D3 (halite), and D4 (interlayers of clay and light clay). Layer D1, except for some water-eroded zones, has a relatively hard salt crust; layer D2 contains organic matter and salt particles, exhibiting a soft plastic to fluid plastic state; layer D3 is relatively hard at the top and loose at the bottom, containing silt and clay; the clay layer in layer D4 gradually thickens downwards, exhibiting good water-impermeable properties. When determining the target dam line, the dam construction location can be determined by combining the above geological distribution and the existing dam foundation conditions.
[0034] S102, clean, level and compact the construction base surface corresponding to the target dam line to obtain the dam body bearing base surface.
[0035] When using the first target dam line, the construction base surface is the original dam crest. (See also...) Figure 2 The existing dam body can adopt a clay sandwich structure for seepage prevention, and salt-covered soil can be used as the dam body material on both sides. Figure 2 The dam shown has a crest width of 4500mm, a total dam width of approximately 13300mm, a slope of 1:2, and a clay core in the middle of the dam with an upper width of approximately 700mm. The original dam construction created a trench with a width of 1.2m and an average depth of 1.85m, penetrating the salt layer and extending approximately 0.2m into the clay layer below the salt layer's base. When raising this type of existing dam, the existing clay core and trench seepage prevention structure are retained. The weathered, loose salt cap and impurity layers on the dam crest are stripped until the dense clay dam core layer is exposed. Then, a heavy roller is used to compact the surface 2-3 times. A 15-30cm thick layer of graded salt particles can be laid on the compacted clay dam top surface as a transitional bearing layer between the new dam and the original dam.
[0036] When using the second target dam line, the inner boundary can be demarcated by advancing 50-100m from the inner side of the original dam into the pool. A total station is used to locate and lay out the line along this boundary, with markers placed approximately every 20m. In the new dam construction area, approximately 15-20cm of surface debris and unstable materials are removed until a stable salt layer is exposed. Then, a vibratory roller is used to compact the surface approximately twice and level it. The flatness error of the base can be controlled within ±5cm.
[0037] S103, Obtain sodium salt material from the salt field and sort it according to particle size to obtain backfill salt material for constructing the main body of the dam and block sodium salt for constructing the wave-breaking structure on the water-facing side.
[0038] Salt materials can be obtained locally within the existing salt fields. When constructing the dam inward using the second target dam line, the sodium salt material should include at least the deposited sodium salt excavated from the original sodium salt ponds. The long-term deposited sodium salt in the original ponds should be excavated in sections and layers, with each layer being 30-40 cm thick, and transported to a temporary storage area by a loader. The storage area can be located outside the new dam construction area and away from the brine operation area. The site should be covered with a coarse salt cushion layer of about 10 cm thickness, and the salt material stacking height should be controlled within 3 m, with a construction passage of not less than 6 m wide reserved.
[0039] After transfer, the sodium salt can be screened using a sieve with an aperture of approximately 5 cm. Salt with a more uniform particle size is used for backfilling the main dam body, primarily using salt with a particle size of 2-5 cm, as used during the inward dam construction. Larger salt blocks, approximately 30-50 cm in diameter, with dense structure and no obvious cracks, are stored separately for the wave-breaking structure on the water-facing side. Approximately 3-4 large salt blocks per square meter are prepared for the water-facing side of the dam base. When raising the original dam, the sodium salt can also be graded according to different parts of the dam body, with 10-30 cm salt blocks forming the framework at the bottom, and 5-10 mm and 2-5 mm salt blocks filling the gaps in the middle and upper layers.
[0040] S104. Backfill salt material is laid in layers on the bearing base of the dam body. Each layer of backfill salt material is compacted and the surface between layers is treated. Saturated brine is sprayed onto the compacted backfill salt material. After the saturated brine evaporates and crystallizes, the next layer of backfill salt material is laid until the target dam body reaches the target dam crest elevation.
[0041] When raising the original dam, the thickness of a single layer of salt material can be controlled at 20-30cm. The first layer can use sodium salt crystals with a particle size of 2-5mm, and be laid out in a grid pattern. When a framework needs to be formed at the bottom of the dam, larger-diameter salt blocks can be laid first, and then medium- and fine-diameter salt materials can be used to fill the gaps. When building the dam inward, the thickness of a single layer can be controlled at about 30cm, and it should be laid out evenly in a quincunx pattern. After laying, leveling should be done, and the thickness error of a single layer can be controlled within ±3cm.
[0042] For recessed dam construction, layered compaction can begin with one pass of static compaction, followed by two to three passes of vibratory compaction. The compaction speed can be controlled at 2 to 3 km / h, with an overlap width of no less than 20 cm between adjacent compaction tracks. After compaction of the previous layer, the surface should be roughened or lightly planed. During recessed dam construction, excavator bucket teeth can be used for light planing of approximately 3 to 5 cm; when raising the original dam, the surface of the consolidated salt layer can be lightly planed to break up the continuously hardened surface layer. This treatment creates an undulating interface on the surface of the previous construction layer, facilitating the entry of salt material into the uneven areas of the next construction layer.
[0043] After compaction and interlayer treatment, a high-pressure spraying system is used to evenly spray saturated brine from the sodium salt tank onto the salt layer, allowing the brine to penetrate the gaps between the salt particles. After spraying, the mixture is allowed to stand and natural evaporation allows the salt to recrystallize, gradually filling the gaps. Under low temperature or rainy conditions, the standing time can be extended, and a membrane covering for insulation may be necessary. When permeability testing is available, the permeability coefficient can be reduced to 1×10⁻⁶. -4 A value below cm / s can be used as a construction control indicator; it can also be combined with the density and load-bearing capacity of the salt layer to determine whether to continue construction on the next layer.
[0044] The quality of the paving can be inspected during construction. When raising the original dam, the compaction of the salt dam can be tested using the ring cutter method after every 3 layers are completed, and the brine seepage can be monitored. If local seepage abnormalities are found, construction of the next layer should be suspended, and the corresponding area should be sprayed with saturated brine and re-consolidated. When building the dam inward, the dam elevation can be tested using a level instrument after every 5 layers are completed. The cumulative elevation deviation can be controlled within ±5cm, and settlement observation points should be set at approximately 50m intervals on the dam crest.
[0045] S105, block sodium salt is laid on the lower part of the water-facing side of the target dam body, and sodium salt with a particle size smaller than that of the block sodium salt is used to fill the gaps between the block sodium salt. Saturated brine is sprayed onto the block sodium salt and its gaps, and after the saturated brine evaporates and crystallizes, a wave-proof structure is formed.
[0046] Large blocks of sodium salt, 30-50 cm in diameter, can be laid on the lower part of the water-facing side. These large blocks should be interlocked or staggered, and larger gaps should be filled with salt blocks of 15-30 cm in diameter. When the original dam is heightened, the protective area of the large salt blocks can be about 50 cm higher than the normal brine level. When the dam is built inwards, large salt blocks can be laid from the dam toe upwards for about 1.5 m, with a thickness of 80-100 cm. After spraying saturated brine into the salt blocks and their gaps, the brine enters the gaps between the blocks and precipitates salt crystals during natural evaporation, causing solidification between adjacent salt blocks.
[0047] Graded salt granules can be further installed above the blocky salt wave protection structure. When raising the original dam, a gentle slope of 1:2.5 can be used; when building the dam inward, a gentle slope of 1:3 can be formed using 5-10cm medium salt granules and 2-5cm fine salt granules, with the slope thickness gradually transitioning from about 50cm at the bottom to about 30cm at the top. After laying, a small amount of saturated brine is sprayed again for surface consolidation. After the dam body reaches the target elevation, the dam top is leveled and compacted, and a fine salt granule cushion layer of about 5cm thickness can be laid. The width of the dam top can be 3m when it is not open to traffic, 4.5m when general vehicles can pass, and 10m for a two-lane road with a large transport volume.
[0048] After adopting the above methods, the first target dam line corresponds to the original dam top being raised, while the existing foundation and seepage prevention structure of the original dam are continued to be used, and a new salt dam is formed on it; the second target dam line corresponds to the inward retreat dam within the pool, where the excavated sodium salt deposited in the pool is used for the main body of the new dam and the wave-breaking structure on the water-facing side, and a new retaining boundary is formed within the original pool. In both construction locations, the salt material is consolidated through layered paving and evaporation and crystallization of saturated brine, and the blocky salt structure on the water-facing side withstands the erosion of wind and waves.
[0049] Example 2
[0050] See Figure 2 If the original dam foundation is stable and the salt pond's horizontal extent does not require adjustment, the existing dam body can be directly used for heightening. For example, if the original dam is a clay-core dam, first remove the loose salt cover layer on the dam crest and compact the clay core layer, then place a 15-30cm thick layer of graded salt particles on top. Subsequently, lay sodium salt material layer by layer at a thickness of 20-30cm. After each layer is completed, spray with saturated brine and allow it to crystallize. After solidification, lightly plan the surface before continuing to lay the material.
[0051] In this construction scenario, the original foundation trench and clay core at the bottom of the dam will not be reconstructed; the new construction will mainly focus on the area above the dam crest. The lower part of the new dam body can be constructed using 10-30cm salt blocks to form a framework, with the middle and upper parts filled with salt of varying particle sizes. On the water-facing side, a 30-50cm large salt block is laid at the bottom, with gaps filled with 15-30cm salt blocks. After the large salt block protection extends a certain distance above the normal brine level, a graded salt granule slope protection is formed towards the dam crest. This allows for an increase in the dam crest elevation while preserving the original salt field's planar pond system.
[0052] For example, when the existing dam crest is used for general vehicle traffic, the construction can continue to raise the dam crest to approximately 4.5m width; for sections of the pool that do not serve vehicle traffic, a dam crest width of approximately 3m can be used. The actual dam crest elevation is still determined based on the brine depth, wave height, and safety freeboard of the pool area, and is not limited to other pool areas by the specific width in this embodiment.
[0053] Example 3
[0054] See Figure 1When it is not advisable to further increase the elevation of the original dam, or when the sodium salt deposits in the pool are too thick and it is necessary to restore the effective brine depth by adjusting the pool surface area, a new target dam line can be formed inside the original dam. For example, the line can be laid out 50-100m into the pool based on the inside of the original dam. The foundation in the new dam construction area should be cleared and compacted, and the long-term deposited sodium salts in this area and adjacent areas should be excavated in layers.
[0055] After the excavated salt material is transported to a temporary storage area, it is screened. Salt material suitable for compaction is used for the main body of the new dam, while larger salt blocks are used on the water-facing side. The main body of the new dam is laid in layers approximately 30cm thick. After static pressure, vibration compaction, and roughening, saturated brine is sprayed. The next layer is constructed only after the salt layer has evaporated, crystallized, and solidified. The lower part of the water-facing side uses large salt blocks laid in a staggered pattern, with smaller salt blocks filling the gaps. The upper part uses medium and fine salt particles to form a gentle slope for slope protection.
[0056] When the new dam also serves as a transportation road for salt fields, the dam crest width can be set at approximately 10 meters for a two-lane configuration. During construction, elevation monitoring and settlement observation will be used to control the dam's construction status. Once the new dam reaches the target elevation, the area between the original dam and the new dam will no longer serve as the original brine-holding area; the salt ponds that will continue to be used will be re-enclosed by the new dam. In this way, the original sodium salt deposits in the ponds are transformed into dam construction material while simultaneously lowering the local pond bottom elevation.
[0057] Example 4
[0058] Different target dam positions can be adopted in different pond areas of the same salt field, depending on the original dam foundation and the sedimentation conditions within the pond. For example, in pond areas where the original dam foundation is stable and the pond surface area is suitable, the top of the original dam is raised; in pond areas where further raising of the original dam is limited or where the salt layer deposited within the pond is thick, the dam is built by retreating inward within the pond. Both construction methods use layered sodium salt materials for dam construction, saturated brine evaporation and crystallization consolidation, and blocky sodium salt protection on the water-facing side. Therefore, construction can be organized separately in different pond areas of the same salt field.
[0059] For pool areas where the inward retreat dam construction has been completed, the newly formed inward retreat dam body will become the existing dam body in the pool area during subsequent operation. When the effective brine depth at the bottom of the pool decreases again due to sodium salt deposition, and the dam body still has the capacity to continue bearing the load, the aforementioned layered salt laying, saturated brine spraying, and wave-breaking construction methods on the water-facing side can be used to raise the dam top.
[0060] Those skilled in the art should understand that the above embodiments are for illustrative purposes only and are not intended to limit the scope of protection of the present invention. Without departing from the spirit and essence of the present invention, those skilled in the art can make various modifications, substitutions, or equivalent improvements to the above embodiments, and all such modifications, substitutions, or equivalent improvements should fall within the scope of protection defined by the present invention.
Claims
1. A method for modifying the dam body of an existing sodium salt pond in a salt field, characterized in that, The method includes: S101, lay out the target dam line within the existing salt field area, and determine the target dam crest elevation based on the preset brine depth, wave height and safety freeboard. The target dam line is selected from one of the first target dam line and the second target dam line. The first target dam line is located at the top of the original salt field dam body, and the second target dam line is located on the side of the original salt field dam body facing the original sodium salt pond. S102, Clean, level and compact the construction base surface corresponding to the target dam line to obtain the dam body bearing base surface; S103, Obtain sodium salt material from the salt field and sort the sodium salt material according to particle size to obtain backfill salt material for constructing the main body of the dam and block sodium salt for constructing the wave-breaking structure on the water-facing side. S104, the backfill salt material is laid in layers on the bearing base surface of the dam body, each layer of backfill salt material is compacted and the interlayer surface is treated, and saturated brine is sprayed onto the compacted backfill salt material. After the saturated brine evaporates and crystallizes, the next layer of backfill salt material is laid until the target dam body that reaches the target dam crest elevation is formed. S105, the block sodium salt is laid on the lower part of the water-facing side of the target dam body, and sodium salt with a particle size smaller than the block sodium salt is used to fill the gaps between the block sodium salt, and saturated brine is sprayed onto the block sodium salt and the gaps therebetween. After the saturated brine evaporates and crystallizes, a wave-proof structure is formed.
2. The method for modifying the dam body of existing sodium salt ponds in salt fields according to claim 1, characterized in that, The target dam line is the first target dam line; S102 involves cleaning, leveling, and compacting the construction base surface corresponding to the target dam line to obtain the dam body bearing base surface, including: The weathered salt cover layer, loose salt cover layer and impurity layer on the top of the original salt field dam were stripped off until the core layer of the dense clay dam was exposed. The exposed core layer of the clay dam was compacted; A graded salt granule cushion layer is laid on the compacted clay dam core layer to obtain a transitional bearing base surface for supporting the target dam body.
3. The method for modifying the dam body of existing sodium salt ponds in salt fields according to claim 1, characterized in that, The target dam line is the second target dam line; S102 involves cleaning, leveling, and compacting the construction base surface corresponding to the target dam line to obtain the dam body bearing base surface, including: Remove the surface material from the new dam construction area corresponding to the second target dam line until the stable salt layer base is exposed; The stable salt layer base is leveled and compacted to obtain a salt layer bearing base surface for supporting the target dam body; The sodium salt material in S103 includes at least the deposited sodium salt excavated from the original sodium salt pond.
4. The method for modifying the dam body of existing sodium salt ponds in salt fields according to claim 3, characterized in that, In step S103, sodium salt material is obtained from the salt field and sorted according to particle size to obtain backfill salt material for constructing the main body of the dam and blocky sodium salt for constructing the wave-breaking structure on the water-facing side, including: The deposited sodium salt in the original sodium salt pond was excavated in layers, and the excavated sodium salt was transferred to the stockpiling area and screened. The sodium salt with relatively uniform particle size obtained by sieving is used as the backfill salt material, and the sieving block sodium salt is stored separately and used as the building material of the wave-breaking structure.
5. The method for modifying the dam body of an existing sodium salt pond in a salt field according to any one of claims 1 to 4, characterized in that, The layered paving in S104 includes: paving the backfill salt material in a single layer with a thickness of 20cm to 30cm; The interlayer surface treatment in S104 includes: roughening or roughening the current construction layer after it has been compacted or consolidated to obtain the current construction layer with interlayer surface treatment.
6. The method for modifying the dam body of an existing sodium salt pond in a salt field according to claim 3, characterized in that, The compaction in S104 includes: static compaction and vibratory compaction of the current construction layer after paving, with overlapping areas set between adjacent compaction trajectories; The spraying of saturated brine in S104 includes: spraying the saturated brine onto the compacted current construction layer using a high-pressure spraying method; The evaporation crystallization in S104 includes: allowing the current construction layer to stand after spraying the saturated brine until the saturated brine evaporates and crystallizes to form a salt crystal solidification structure that fills the gaps in the backfill salt material.
7. The method for modifying the dam body of an existing sodium salt pond in a salt field according to claim 6, characterized in that, In low-temperature or rainy construction environments, the evaporation crystallization in S104 includes at least one of the following methods: extending the static time of the current construction layer and covering and insulating the current construction layer, until the saturated brine sprayed onto the current construction layer continues to evaporate and crystallize.
8. The method for modifying the dam body of an existing sodium salt pond in a salt field according to any one of claims 1 to 7, characterized in that, In S105, the blocky sodium salt includes large sodium salt with a particle size of 30cm to 50cm. The large sodium salt is interlocked or staggered on the lower part of the water-facing side of the target dam body, and medium salt blocks with a particle size of 15cm to 30cm are filled between adjacent large sodium salt blocks. A graded slope protection extending towards the dam crest is formed above the blocky sodium salt using medium- and fine-grained sodium salts.
9. The method for modifying the dam body of an existing sodium salt pond in a salt field according to claim 8, characterized in that, The laying of the blocky sodium salt in S105 includes: For the target dam body corresponding to the first target dam line, the blocky sodium salt is laid up to a position higher than the normal brine liquid level; For the target dam body corresponding to the second target dam line, the blocky sodium salt is laid from the toe of the dam upwards, and a graded slope protection extending towards the top of the dam is laid on top of the blocky sodium salt.
10. The method for modifying the dam body of an existing sodium salt pond in a salt field according to any one of claims 1 to 9, characterized in that, The method further includes: During the construction of the target dam, at least one of the following should be monitored: dam elevation, salt layer compaction, brine infiltration, and dam settlement. Based on the monitoring results, adjustments were made to at least one of the construction processes, namely, the laying and compaction of backfill salt material, and the spraying and consolidation of saturated brine.