A reverse-sequence construction method for elevator shaft foundations under water-rich soft soil conditions
By employing a steel sheet pile support system and a lightweight wellpoint method for drainage combined with a composite waterproofing structure in water-rich soft soil foundations, the problems of soil settlement and slippery conditions in the pit that are common in traditional construction methods have been solved, thereby improving the stability and waterproofing of elevator shaft foundations.
Patent Information
- Application Number
- CN202611261027.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-19
- Publication Date
- 2026-11-17
AI Technical Summary
In water-rich soft soil foundations, traditional elevator shaft construction methods are prone to causing settlement of the surrounding soil and slippery working space inside the pit, making it difficult to guarantee the quality of the foundation and affecting the safety of old buildings.
A steel sheet pile support system is used for water protection and waterproofing, combined with a lightweight well point method to drain groundwater, forming a composite waterproof structure. High-grade impermeable concrete and meticulous construction techniques are used to ensure the stability and waterproofing of the elevator shaft foundation.
This effectively reduced the risk of excavation, ensured the dryness and waterproofing of the elevator shaft foundation, improved the compactness and durability of the foundation, and guaranteed the construction quality.
Smart Images

Figure CN123109176A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of elevator shaft construction technology, specifically to a reverse-sequence construction method for elevator shaft foundations under water-rich soft soil conditions. Background Technology
[0002] In urban renewal and renovation, especially in the important project of installing elevators in old residential communities, while fulfilling the practical need to improve residents' quality of life, the actual implementation often faces severe geological and site challenges. These old communities were mostly built in the past, and the existing buildings have limited foundation bearing capacity, and some even experience varying degrees of settlement. The added elevator shafts and foundation loads may threaten the safety of the original structure. Furthermore, significant differences in geological conditions between buildings, such as variations in groundwater levels and uneven distribution of soft soil layers, place extremely high demands on foundation selection and construction techniques.
[0003] Traditional elevator shaft construction in water-rich soft soil foundations often involves large-scale deep well dewatering before excavation. However, dewatering may cause settlement of the surrounding soil, threatening the safety of nearby old buildings. If steel sheet pile support is used for conventional construction, the slippery working space inside the pit and leakage on the side walls often make it difficult to guarantee the quality of the subbase and waterproofing construction. The harsh concrete pouring environment also affects the final quality of the foundation.
[0004] Therefore, we propose a reverse construction method for elevator shaft foundations under water-rich soft soil conditions to solve the above problems. Summary of the Invention
[0005] The purpose of this invention is to solve the technical problems mentioned above.
[0006] To achieve the above objectives, the present invention adopts the following technical solution: A reverse-sequence construction method for elevator shaft foundations under water-rich soft soil conditions includes the following steps: S1: Construction of steel sheet pile support system; Several interlocking steel sheet piles are driven into the outer edge of the elevator shaft foundation pit; the steel sheet piles form a retaining and water-stopping structure. S2: Drain the groundwater within the area of the retaining waterproof structure; The groundwater in the area of the retaining water-stop structure is extracted using the lightweight wellpoint method or the small-diameter well method in order to drain the groundwater in the area of the retaining water-stop structure. S3: Excavation of the foundation pit; Using excavation equipment, the ground layer within the retaining water-stop structure area is excavated. After excavation to the set depth, the foundation pit of the elevator shaft is formed. S4: Construct a foundation layer within the foundation pit; A filter layer is laid in the initially formed foundation pit, and an impermeable concrete structural layer is laid on top of the filter layer. Furthermore, an integrally formed concrete flange is set at the edge of the concrete structural layer. S5: Formwork for laying waterproof bricks; Formwork bricks are laid on the top surface of the impermeable concrete structural layer and the inner wall of the concrete flange. When the formwork bricks on the side are built to the set height, a brick formwork is formed and used as the outer formwork for pouring. S6: Tie steel bars inside the mold brick; A steel mesh arranged horizontally and vertically is tied to the inner bottom surface of the brick formwork. A steel cage is tied to the inner side of the brick formwork, and a water-stop baffle is installed inside the steel cage. The height of the water-stop baffle is flush with the height of the pre-laid concrete pad. S7: Template System Installation: An inner casting template is installed inside the brick formwork, and a certain gap is left between the bottom of the inner casting template and the inner bottom surface of the brick formwork so that the concrete bedding layer and the side wall are integrally formed; a casting chamber is formed between the brick formwork and the inner casting template. S8: Pouring concrete; Concrete is poured in advance below the brick mold. After the height of the poured concrete is level with the bottom of the inner formwork, concrete is poured into the interior of the pouring chamber. After the poured concrete has completely solidified, the foundation structure of the elevator shaft is formed. S9: Sheet pile extraction; After the concrete has been cured and reached the set strength, the tension piles are removed at intervals. After all the tension piles have been removed, grout is filled into the gaps created by the tension piles.
[0007] S10: Remove the inner formwork; The internal pouring formwork is then removed, ultimately forming a complete elevator shaft foundation pit.
[0008] Furthermore: In step S1, an inner support structure is erected above the retaining water-stop structure to reinforce the retaining water-stop structure.
[0009] Furthermore: the internal support structure is composed of several walers, with adjacent walers fixed together by bolts; and support rods are installed between opposite or adjacent walers.
[0010] Furthermore: In step S5, when the brick formwork is being constructed, concrete structural columns are set at the corners and the midpoints of the side walls of the brick formwork, and capping beams are installed on the tops of two adjacent structural columns. The capping beams and structural columns are used to improve the stability of the brick formwork.
[0011] Furthermore: In step S5, waterproof membrane is adhered to the inner bottom wall and side wall of the formwork brick, with the self-adhesive side of the waterproof membrane facing inward; after the concrete is completely solidified after pouring, the waterproof membrane adheres to the solidified concrete to form an elevator shaft foundation structure with waterproof function.
[0012] Furthermore, the sides of two adjacent rows of waterproof membrane overlap, and the overlapping parts are fixed with adhesive.
[0013] Furthermore: In step S6: the water-stop baffle is assembled from several steel plates, and the connection between two adjacent steel plates is made by double-sided full welding.
[0014] Furthermore: In step S7, after the inner pouring formwork is installed, the inner pouring formwork is embedded in the concrete structural column by fixing rods so that there is a certain gap between the inner pouring formwork and the inner bottom wall of the brick formwork; tie rods are provided at the diagonal or opposite sides of the inner pouring formwork to reinforce the inner pouring formwork.
[0015] Furthermore: In step S8, the concrete to be poured is micro-expansion impermeable concrete with an impermeability grade of not less than P8; during the pouring process, the concrete is poured in layers, and after each pour, it is compacted by a vibrator. After pouring, it is kept moist and heated for curing.
[0016] The beneficial effects of this invention are: This invention employs a retaining and water-stopping structure for support before excavation, providing a favorable environment for subsequent excavation and significantly reducing the risk of collapse and water inrush during excavation in water-rich soft soil. Thickened brick formwork and structural measures enhance the stability of the pit walls, further reducing the risk of collapse and water inrush.
[0017] This invention employs a composite layer and concrete flanges to effectively isolate groundwater and ensure the dryness of the foundation's base. Furthermore, the pre-laid reverse-adhesive waterproofing process fundamentally eliminates water seepage channels, ensuring reliable waterproofing. High-grade impermeable concrete and meticulous construction guarantee the foundation's density and durability. Attached Figure Description
[0018] Figure 1 This is a schematic diagram of the construction state structure of the present invention; Figure 2 This is a cross-sectional structural diagram of the present invention; Figure 3 This is a partial three-dimensional structural schematic diagram of the present invention.
[0019] The names corresponding to each mark in the diagram: 1. Sheet piles; 2. Filter layer; 3. Impermeable concrete structural layer; 4. Concrete flange; 5. Formwork bricks; 6. Reinforcing mesh; 7. Reinforcing cage; 8. Waterstop baffle; 9. Inner casting formwork; 10. Concrete; 11. Internal support structure; 1101. Waler; 1102. Support rod; 12. Concrete structural column; 13. Coping lintel; 14. Waterproof membrane; 15. Tie rod. Detailed Implementation
[0020] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. All other embodiments obtained by those skilled in the art based on the embodiments of the present invention are within the scope of protection of the present invention.
[0021] A reverse-sequence construction method for elevator shaft foundations under water-rich soft soil conditions includes the following steps: S1: Construction of steel sheet pile support system; Based on the dimensions of the elevator shaft's designed edge line (assumed to be 2.5m x 2.5m; pit depth 6m), an extension of 1m is added outwards as construction space to determine the excavation line of the foundation pit. Following the established excavation line, several sheet piles 1 are driven into the ground. Type IV Larssen sheet piles 1 are selected for this purpose. It should be noted that when the sheet piles 1 are driven into the ground, adjacent sheet piles 1 interlock. Ultimately, the several sheet piles 1 form a sealed retaining and waterproofing structure.
[0022] After the retaining water-stop structure is driven into the ground, an inner support structure 11 is erected above the retaining water-stop structure. The inner support structure 11 reinforces the retaining water-stop structure 1, preventing it from loosening or shaking during use, and thus providing strong stability.
[0023] In detail: The inner support structure 11 is composed of several walers 1101. The connection between two adjacent walers 1101 is made by fixing bolts, which can strengthen the walers. Diagonal support rods 1102 are set between two adjacent walers, or support rods 1102 are set between two opposite walers. The setting of support rods 1102 can further strengthen the walers 1101.
[0024] S2: Drain the groundwater within the area of the retaining waterproof structure; The groundwater in the retaining water-stop structure area is extracted using the lightweight wellpoint method or small-diameter well method, and the water level is lowered to at least 0.5m below the bottom of the pre-excavated foundation pit, thereby draining the groundwater in the retaining water-stop structure area and facilitating subsequent construction.
[0025] S3: Excavation of the foundation pit; Using excavation equipment (usually referring to small excavators), the ground layer within the retaining water-stop structure area is excavated. After excavating to a certain depth, usually 6m is sufficient to meet the requirements. Ultimately, the foundation pit of the elevator shaft is formed, which facilitates subsequent construction operations.
[0026] S4: Construct a foundation layer within the foundation pit; After the initial foundation pit is formed, the inner bottom wall of the pit is cleaned to ensure its flatness. After acceptance, a 150mm filter layer 2, composed of crushed stone, is laid on the inner bottom wall of the pit. After watering and compaction, an impermeable concrete structural layer 3 is laid on top of the filter layer 2. It should be noted that during the construction of the impermeable concrete structural layer 3, a 400mm high concrete flange 4 is poured on all four sides using building formwork to ensure that the concrete flange 4 and the impermeable concrete structural layer 3 are integrally formed. The concrete flange 4 provides initial waterproofing. It should be noted that the impermeable concrete layer 3 and the concrete flanges are made of C35 early-strength impermeable concrete, which contains high-efficiency water-reducing agents and early-strength agents, thereby accelerating the chemical reaction of the concrete, increasing its early hardness, shortening the curing period, and thus improving the performance of the cured concrete.
[0027] S5: Formwork for laying waterproof bricks; Formwork bricks 5 are laid on the top surface of the impermeable concrete structural layer 3 and on the inner wall of the concrete flange 4. After the formwork bricks 5 are laid to the specified height, a brick formwork is formed, which is used as the outer formwork for casting. It should be noted that during the laying of the brick formwork, concrete structural columns 12 need to be installed at the corners and midpoints of the brick formwork, and capping beams 13 are installed on the top of the adjacent concrete structural columns. The stability of the brick formwork is improved by setting the capping beams 13 and the concrete structural columns, and the brick formwork is prevented from tilting or collapsing in the later stage.
[0028] It should be noted that: several rows of waterproof membrane 14 (HDPE type) are adhered to the inner bottom wall and inner side wall of the brick formwork; the adjacent rows of waterproof membrane 14 are partially overlapped, and the overlapping part is joined by self-adhesive. If necessary, special sealant can also be used for reinforcement, which serves as a temporary reinforcement for the brick formwork. The adhesive side of the waterproof membrane is set inward. After the poured concrete 7 has solidified, the waterproof membrane can be directly bonded to the outer side of the brick formwork, thereby forming a waterproof elevator shaft foundation structure.
[0029] S6: Tie steel bars inside the mold brick 5; A steel mesh 6 arranged horizontally and vertically is tied to the inner bottom surface of the brick formwork. This steel mesh 6 is used to reinforce the foundation layer of the elevator shaft. A steel cage 7 is tied to the inner side of the brick formwork. This steel cage 7 is used to reinforce the side walls of the elevator shaft foundation. It should be noted that a water-stop baffle 8 is installed inside the steel cage 7, and the height of the water-stop baffle 8 corresponds to the height of the concrete foundation layer. The water-stop baffle 8 further serves to waterproof the structure. In detail: the waterstop baffle 8 is assembled from several Q235B steel plates, and the connection between two adjacent steel plates is made by double-sided full welding; thus, it can strengthen the waterstop baffle 8.
[0030] S7: Template System Installation: An inner casting template 9 is installed inside the brick formwork. It should be noted that the inner bottom wall of the inner casting template 9 and the inner bottom surface of the brick formwork have a certain gap. A casting chamber is formed between the brick formwork and the inner casting template 9 so that the concrete bedding layer and the side wall are integrally formed.
[0031] After the inner pouring formwork 9 is installed, it is embedded in the concrete structural column 12 by fixing rods so that the inner pouring formwork 9 can be suspended in the air. After the inner pouring formwork 9 is installed, tie rods 15 are set at the diagonal or opposite sides of the inner pouring formwork 9. The tie rods 15 are used to reinforce the inner pouring formwork 9 and prevent it from loosening or shaking during use, thus providing strong stability.
[0032] S8: Pour 10 cubic meters of concrete; Concrete 10 is poured in advance below the formwork. After the height of the poured concrete 10 is level with the bottom of the inner formwork, concrete 10 is poured into the interior of the pouring chamber, so that the first poured concrete 10 and the second poured concrete 10 can be formed as one piece. The water-stop baffle 8 is set at the connection between the first poured concrete 10 and the second poured concrete 10, and the water-stop baffle 8 plays the role of stopping water. After the poured concrete is completely solidified, the foundation structure of the elevator shaft is formed.
[0033] It should be noted that the concrete 10 being poured is micro-expansion impermeable concrete with an impermeability grade of not less than P8, so that the elevator shaft foundation itself has waterproof performance after being formed. During the pouring process, concrete 10 is poured in layers. After each pour, a vibrator is used to compact it to ensure that the concrete is filled densely. Then, it is kept warm and cured for no less than 14 days.
[0034] S9: Sheet pile 1 is pulled out; After a period of curing, the foundation structure of the elevator shaft reaches the set strength. Several anti-tension piles 1 are then removed at intervals. After the anti-tension piles 1 are removed, gaps are formed for filling with grout (i.e., cement and mortar).
[0035] S10: Remove the internal casting formwork 9; The inner formwork 9 is removed, and after the inner formwork is removed, the complete elevator shaft foundation structure is formed.
Claims
1. A method for reverse-sequence construction of elevator shaft foundations under water-rich soft soil conditions: characterized by: Includes the following steps: S1: Construction of steel sheet pile support system; Several interlocking steel sheet piles are driven into the outer edge of the elevator shaft foundation pit; the steel sheet piles form a retaining and water-stopping structure. S2: Drain the groundwater within the area of the retaining waterproof structure; The groundwater in the area of the retaining water-stop structure is extracted using the lightweight wellpoint method or the small-diameter well method in order to drain the groundwater in the area of the retaining water-stop structure. S3: Excavation of the foundation pit; Using excavation equipment, the ground layer within the retaining water-stop structure area is excavated. After excavation to the set depth, the foundation pit of the elevator shaft is formed. S4: Construct a compliant subbase layer within the foundation pit; A filter layer is laid in the initially formed foundation pit, and an impermeable concrete structural layer is laid on top of the filter layer. Furthermore, an integrally formed concrete flange is set at the edge of the concrete structural layer. S5: Formwork for laying waterproof bricks; Formwork bricks are laid on the top surface of the impermeable concrete structural layer and on the inner wall of the concrete flange. When the formwork bricks on the side are built to the set height, a brick formwork is formed and used as the outer formwork for pouring. S6: Tie steel bars inside the mold brick; A steel mesh arranged horizontally and vertically is tied to the inner bottom surface of the brick formwork. A steel cage is tied to the inner side of the brick formwork, and a water-stop baffle is installed inside the steel cage. The height of the water-stop baffle is flush with the height of the pre-laid concrete pad. S7: Template System Installation: An inner casting template is installed inside the brick formwork, with a certain gap between the bottom of the inner casting template and the inner bottom surface of the brick formwork, so that the concrete bedding layer and the side wall are integrally formed; a casting chamber is formed between the brick formwork and the inner casting template. S8: Pouring concrete; Concrete is poured in advance below the brick mold. When the height of the poured concrete is level with the bottom of the inner formwork, concrete is poured into the interior of the pouring chamber. After the poured concrete has completely solidified, the foundation structure of the elevator shaft is formed. S9: Sheet pile extraction; After the concrete has been cured and reached the set strength, the anti-extraction piles are removed at intervals. After all the tension piles have been removed, grout is filled into the gaps created by the tension piles. S10: Remove the inner formwork; The internal pouring formwork was removed, and finally, the elevator shaft foundation pit was completed.
2. The method for reverse construction of elevator shaft foundations under water-rich soft soil conditions according to claim 1, characterized in that: In step S1, an inner support structure is erected above the retaining water-stop structure to reinforce the retaining water-stop structure.
3. The method for reverse construction of elevator shaft foundations under water-rich soft soil conditions according to claim 2, characterized in that: The internal support structure is composed of several walers, with adjacent walers fixed together by bolts; and support rods are installed between opposite or adjacent walers.
4. The method for reverse construction of elevator shaft foundations under water-rich soft soil conditions according to claim 1, characterized in that: In step S5, when the brick formwork is being constructed, concrete structural columns are set at the corners and the midpoints of the side walls of the brick formwork, and capping beams are installed on the tops of two adjacent structural columns. The capping beams and structural columns are used to improve the stability of the brick formwork.
5. The method for reverse construction of elevator shaft foundations under water-rich soft soil conditions according to claim 1, characterized in that: In step S5, waterproof membrane is adhered to the inner bottom wall and side wall of the formwork brick, with the self-adhesive side of the waterproof membrane facing inward; after the concrete is completely solidified after pouring, the waterproof membrane adheres to the solidified concrete to form a waterproof elevator shaft foundation structure.
6. The method for reverse construction of elevator shaft foundations under water-rich soft soil conditions according to claim 5, characterized in that: The sides of two adjacent rows of waterproof membrane overlap, and the overlapping parts are fixed with adhesive.
7. The method for reverse construction of elevator shaft foundations under water-rich soft soil conditions according to claim 1, characterized in that: In step S6: the water-stop baffle is assembled from several steel plates, and the connection between two adjacent steel plates is made by double-sided full welding.
8. The method for reverse construction of elevator shaft foundations under water-rich soft soil conditions according to claim 1, characterized in that: In step S7, after the inner pouring formwork is installed, the inner pouring formwork is embedded in the concrete structural column by fixing rods so that there is a certain gap between the inner pouring formwork and the inner bottom wall of the brick formwork; tie rods are provided at the diagonal or opposite sides of the inner pouring formwork to reinforce the inner pouring formwork.
9. The method for reverse construction of elevator shaft foundations under water-rich soft soil conditions according to claim 1, characterized in that: In step S8, the concrete being poured is micro-expansion impermeable concrete with an impermeability grade of not less than P8. During the pouring process, the concrete is poured in layers, and after each pour, it is compacted using a vibrator. After pouring, it is kept moist and heated for curing.