Magnetic settlement gauge for monitoring settlement of tunnel retaining structures; protective drainage structure.
By designing a protective drainage structure for the magnetic settlement gauge, the problems of the guide pipe being easily crushed by machinery and blocked by water accumulation were solved, realizing reliable protection and drainage for settlement monitoring of the tunnel retaining structure, and improving the accuracy and stability of settlement data.
Patent Information
- Application Number
- CN202611325782.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-28
- Publication Date
- 2026-11-17
AI Technical Summary
In the existing technology, magnetic settlement gauges are difficult to reliably protect and drain in the settlement monitoring of tunnel retaining structures. The guide tube is easily deformed by mechanical crushing and impact, and water accumulation in the well can cause blockage, making the reading probe unable to work properly.
A protective drainage structure for a magnetic settlement gauge was designed, including a guide pipe, a well cavity, a drainage structure, and anchors. The upper end of the guide pipe is sealed by a cap, and the water in the well cavity is discharged through the drainage structure. The guide pipe deforms synchronously with the soil layer, and the anchors are fixed to the rock layer to provide a stable settlement benchmark.
It effectively avoids the impact of mechanical crushing and water accumulation on the guide pipe, ensures the normal operation of the reading probe, improves the accuracy and stability of settlement data, and provides reliable protection and drainage functions.
Smart Images

Figure CN123109221A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the technical field of tunnel retaining structures, and more specifically, to a magnetic settlement gauge protective drainage structure for monitoring settlement of tunnel retaining structures. Background Technology
[0002] Settlement monitoring of tunnel retaining structures typically employs magnetic settlement gauges, which consist of a guide tube vertically buried in the stratum, magnetic markers spaced along the depth direction of the guide tube, and reading probes repeatedly lowered into the guide tube. The amount of stratified settlement is calculated by identifying changes in the position of the magnetic markers using the reading probes.
[0003] After the guide pipe is buried, its upper end is usually led out to the ground for the passage and maintenance of the reading probe. The upper end of the guide pipe and the wellhead must have sealing and protection capabilities to avoid direct impact from construction activities. At the same time, it must have drainage capabilities to prevent water accumulation in the well from causing blockage of the guide pipe.
[0004] In existing technologies, the upper end of the guide tube and the wellhead are often directly exposed to construction activities, and are prone to deformation and misalignment due to mechanical crushing and impact.
[0005] In addition, the mud, spraying dust and surface runoff accumulated in the well cannot be discharged, causing siltation in the well and blockage of the guide pipe. This prevents the reading probe from being lowered or causes reading distortion, making it difficult for the magnetic settlement gauge to be reliably protected and drained under the tunnel retaining structure. Summary of the Invention
[0006] The purpose of this invention is to provide a protective drainage structure for magnetic settlement gauges used in tunnel retaining structure settlement monitoring, aiming to solve the problem that magnetic settlement gauges are difficult to reliably protect and drain in tunnel retaining structure settlement monitoring in the prior art.
[0007] This invention is implemented as follows: a magnetic settlement gauge protective drainage structure for monitoring settlement of tunnel retaining structures includes a guide pipe vertically inserted into the strata for a reading probe to pass through; the tunnel retaining structure is located in the strata; the strata include a soil layer and a rock layer formed below the soil layer; the lower part of the guide pipe is embedded in the rock layer to form a lower section; the bottom of the lower section is provided with an anchor as a stability reference for settlement measurement; the anchor seals the bottom of the guide pipe and anchors the lower section to the rock layer. The upper part of the guide tube is embedded in the soil layer to form an upper section. The upper section is integrated with the soil layer so that the guide tube and the soil layer deform synchronously and in coordination. The soil layer is provided with a well body, which surrounds and forms a well cavity. The top of the well cavity penetrates the surface of the stratum to form a top opening. The upper section passes through the bottom of the well body and extends into the well cavity to form an exposed section built into the well cavity. The exposed section is covered with a removable cap that closes the exposed section. The top opening is covered with a top cover that closes the top opening and is flush with the surface of the formation. The soil layer is provided with a drainage structure, which is arranged around the outer periphery of the well cavity and is connected to the well cavity. The water in the well cavity is discharged outward through the drainage structure. The guide tube is provided with multiple magnetic markers as a reference for layer identification and for magnetic identification by the reading probe. The multiple magnetic markers are arranged sequentially at intervals along the height direction of the guide tube.
[0008] Furthermore, the drainage structure in the soil layer includes multiple inverted drainage channels that pass through the well body. The multiple inverted drainage channels are arranged circumferentially around the well cavity. The inner end of the inverted drainage channel is connected to the well cavity, and the outer end of the inverted drainage channel extends to the outside of the well body. Along the direction from the inside to the outside of the inverted drainage channel, the inverted drainage channel is arranged inclined from top to bottom.
[0009] Furthermore, the soil layer is filled with a hydrophobic filter layer, which wraps around the outer periphery of the well body. The outer end of the backflow channel extends to the hydrophobic filter layer. The water accumulated in the well cavity flows through the backflow channel to the hydrophobic filter layer, and after being filtered by the hydrophobic filter layer, it is discharged into the soil layer.
[0010] Furthermore, rock strata have formed pores, the lower section is embedded in the pores, and the pores are filled with grout to form a reinforcing section. The reinforcing section wraps around the outer periphery of the lower section, thus integrating the lower section with the rock strata. The bottom of the guide tube is spaced apart from the bottom of the rock stratum hole to form a bottom gap. The reinforcing section fills the bottom gap, and the anchor is wrapped in the reinforcing section and integrated with the reinforcing section.
[0011] Furthermore, the bottom of the rock stratum hole is recessed downward to form an anchoring hole. The upper part of the anchor is sleeved on the bottom of the guide tube to seal the bottom of the guide tube. The lower part of the anchor is embedded in the anchoring hole to form an anchoring section. Grout is injected into the anchoring hole to form an embedded section. The embedded section fills the anchoring section, anchoring the anchoring section and the rock stratum into one. The bottom of the anchoring section extends outward to form a bottom ring, which abuts against the bottom of the anchoring hole, and the outer periphery of the bottom ring abuts against the inner wall of the anchoring hole; the outer periphery of the anchoring section is provided with multiple vertical walls, which are arranged at intervals around the circumference of the anchoring section. The inner end of the vertical wall is connected to the outer periphery of the anchoring section, and the outer end of the vertical wall is covered with an elastic strip. The elastic strip abuts against the inner sidewall of the anchoring hole and is under elastic compression deformation. The bottom of the vertical wall is connected to the bottom ring, and the top of the vertical wall extends upward to the anchoring hole and is arranged open upward. Multiple vertical strips are wrapped in the embedded section, and the embedded section abuts against the bottom ring.
[0012] Furthermore, soil pores are formed in the soil layer, the bottom of which communicates with the rock pores, and the top of which is connected to the bottom of the well body; the upper section is inserted into the soil pores, which are filled with a slurry section that is compatible with the soil layer and deforms synchronously with it; the inner side of the slurry section wraps around the outer periphery of the upper section and is integrated with it, and the outer side of the slurry section is embedded in the soil layer in a split shape and is integrated with it.
[0013] Furthermore, the upper section is provided with a plurality of circumferential positioning structures on its outer periphery, and the plurality of circumferential positioning structures are arranged sequentially at intervals along the height direction of the upper section; the circumferential positioning structures are arranged around the upper section in a circumferential manner and are fixedly sleeved on the outer periphery of the upper section. The circumferential positioning structure has multiple elastically deformable sheets on its outer periphery. These elastic sheets are arranged at intervals around the outer periphery of the circumferential positioning structure. The multiple elastic sheets elastically abut against the inner wall of the soil hole and are in an elastically deformed state. The circumferential positioning structure is wrapped in the slurry section and is integrated with the slurry section.
[0014] Furthermore, the circumferential positioning structure includes a fixed cylinder, which is sleeved on the outer periphery of the upper section and fixedly connected to the upper section; the top of the fixed cylinder has a top outer circumferential ring, and the bottom of the fixed cylinder has a bottom outer circumferential ring, which are arranged around the circumference of the fixed cylinder respectively. The plurality of elastic plates include a plurality of top curved plates and a plurality of bottom curved plates. The inner end of the top curved plate is abutted on the top outer circumferential ring, and the outer end of the top curved plate is bent toward the inner sidewall of the soil hole and abuts against the inner sidewall of the soil hole. The plurality of top curved plates are arranged circumferentially around the top outer circumferential ring at intervals. The inner end of the bottom curved piece is connected to the bottom outer circumferential ring, and the outer end of the bottom curved piece is bent toward the inner wall of the soil hole and abuts against the inner wall of the soil hole. A plurality of the bottom curved pieces are arranged circumferentially around the bottom outer circumferential ring. Along the circumference of the upper section, a plurality of top curved pieces and a plurality of bottom curved pieces are arranged in a staggered manner, and the top curved pieces and the bottom curved pieces are arranged to bend towards each other.
[0015] Furthermore, the fixed cylinder has a cavity through which the upper section passes, and the fixed cylinder is provided with a plurality of curved grooves, which are arranged at intervals around the circumference of the fixed cylinder; the inner end of the curved groove penetrates the inner wall of the cavity to form an inner opening, and the outer end of the curved groove penetrates the outer periphery of the cylinder to form an outer opening. The bending grooves are bent and spiraled along the circumference of the cylinder and are also bent and arranged along the axial direction of the cylinder. Adjacent bending grooves are staggered vertically along the axial direction of the cylinder. The slurry section fills multiple bending grooves through its outer opening to form multiple bending strips. The bending strips are integrated with the slurry section. The bending strips abut against the outer periphery of the upper section through their inner openings and are integrated with the upper section. Along the circumference of the upper section, multiple bending strips are bent and spiraled to clamp the upper section, restricting the circumferential rotation of the guide tube.
[0016] Furthermore, the well body is provided with a reinforcing ring, which surrounds the outer periphery of the well cavity; along the direction from top to bottom of the reinforcing ring, the reinforcing ring sequentially includes a support section, a diameter reduction section and an elastic section; the diameter of the support section is larger than the diameter of the diameter reduction section, the diameter of the elastic section is larger than the diameter of the diameter reduction section, and the outer periphery of the diameter reduction section is combined to form an inwardly concave ring. The bottom of the support section is flat, the top of the elastic section is exposed at the top of the well body, the top of the elastic section is concave to form a downward concave stepped ring, the stepped ring is arranged around the outer periphery of the top opening, and the outer periphery of the top cover abuts against the stepped ring. The elastic section is provided with an annular groove, which is arranged around the circumference of the elastic section. The top of the annular groove penetrates the top of the elastic section to form an annular elastic opening. The pressing of the annular groove extends to the narrowing section. Along the direction from top to bottom of the annular groove, the width of the annular groove decreases. The annular groove is filled with an annular elastic layer, the top of which extends into an elastic opening and is laid flat towards the top of the elastic segment to form a flat ring, which is integrally formed with the elastic segment. During the process of the top cover being subjected to downward compressive force, the elastic layer reciprocates elastically deforms, causing the elastic segment to elastically contract inward or elastically expand outward, in order to buffer the compressive force applied to the top cover, and the flat layer elastically limits the elastic deformation range of the elastic segment.
[0017] Compared with the prior art, the magnetic settlement gauge protection and drainage structure for tunnel retaining structure settlement monitoring provided by this invention provides reliable protection and drainage for the magnetic settlement gauge in tunnel retaining structure settlement monitoring, specifically in the following aspects: 1) The exposed section is sealed by the cap, and the top opening is sealed by the top cover, which avoids mechanical crushing and impact directly acting on the upper end of the guide pipe; the cap also prevents mud, spray dust and surface runoff from entering the guide pipe, so that the guide pipe can remain intact and unobstructed under high disturbance conditions during construction.
[0018] 2) The water in the well cavity is discharged outward from the inside out through the drainage structure to prevent water from overflowing into the guide pipe and causing blockage, so that the reading probe can be lowered smoothly to read data.
[0019] 3) By integrating the upper section with the soil layer, the guide tube and the soil layer deform synchronously and in coordination, avoiding the formation of relative slippage or void zones between the guide tube and the soil layer. This ensures that the measured settlement data is consistent with the actual soil settlement, thereby improving the accuracy of monitoring.
[0020] 4) The bottom of the guide pipe is sealed and anchored to the rock layer using anchors, so that the rock layer forms a stable displacement reference point. In this way, the lower part of the guide pipe will no longer drift as a whole with the disturbance of the soil layer, thus providing a stable benchmark for monitoring the settlement of the strata. Attached Figure Description
[0021] Figure 1 This is a schematic diagram of the protective drainage structure of the magnetic settlement gauge for monitoring settlement of tunnel retaining structures provided by the present invention. Figure 2 This is a cross-sectional schematic diagram of the reinforcing section and the slurry section provided by the present invention; Figure 3 This is a cross-sectional schematic diagram of the anchor provided by the present invention; Figure 4 This is a plan view of the fixed cylinder provided by the present invention; Figure 5 This is a cross-sectional schematic diagram of the fixed cylinder provided by the present invention; Figure 6 This is a schematic diagram of the unfolded fixed tube provided by the present invention; Figure 7 This is a schematic diagram of the reinforcing ring provided by the present invention; In the diagram: stratum 100, soil layer 101, rock layer 102, soil layer hole 103, rock layer hole 104, bottom gap 105, reinforcement section 106, slurry section 107; Guide tube 200, lower section 201, upper section 202, exposed section 203, cap 204, magnetic marker 205; Anchor 300, bottom ring 301, vertical wall 302, elastic strip 303, anchoring section 304; Well body 400, well cavity 401, top cover 402, back drain 403, hydrophobic filter layer 404; Fixed cylinder 500, cylinder cavity 501, top outer circumferential ring 502, bottom outer circumferential ring 503, top bending plate 504, bottom bending plate 505, bending groove 506; Reinforcing ring 600, support section 601, diameter reduction section 602, elastic section 603, recessed ring 604, stepped ring 605, elastic layer 606, flat ring 607. Detailed Implementation
[0022] To make the objectives, technical solutions, and advantages of this invention clearer, the invention will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative and not intended to limit the invention.
[0023] The implementation of the present invention will be described in detail below with reference to specific embodiments.
[0024] In the accompanying drawings of this embodiment, the same or similar reference numerals correspond to the same or similar components. In the description of this invention, it should be understood that if terms such as "upper," "lower," "left," and "right" indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, they are only for the convenience of describing this invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, the terms used to describe positional relationships in the drawings are only for illustrative purposes and should not be construed as limiting this invention. For those skilled in the art, the specific meaning of the above terms can be understood according to the specific circumstances.
[0025] Reference Figures 1-7 The image shown is a preferred embodiment of the present invention.
[0026] A magnetic settlement gauge protective drainage structure for monitoring settlement of tunnel retaining structures includes a guide pipe 200 vertically inserted into the stratum 100 for a reading probe to pass through. The tunnel retaining structure is located in the stratum 100. The stratum 100 includes a soil layer 101 and a rock layer 102 formed below the soil layer 101. The lower part of the guide pipe 200 is embedded in the rock layer 102 to form a lower section 201. The bottom of the lower section 201 is provided with an anchor 300 as a stability reference for settlement measurement. The anchor 300 closes the bottom of the guide pipe 200 and anchors the lower section 201 to the rock layer 102. The upper part of the guide tube 200 is embedded in the soil layer 101 to form the upper section 202. The upper section 202 is integrated with the soil layer 101 so that the guide tube 200 and the soil layer 101 deform synchronously and in coordination. The soil layer 101 is provided with a well body 400, which surrounds and forms a well cavity 401. The top of the well cavity 401 penetrates the surface of the stratum 100 to form a top opening. The upper section 202 passes through the bottom of the well body 400 and extends into the well cavity 401, forming an exposed section 203 built into the well cavity 401. The exposed section 203 is covered by a removable cap 204 that closes the exposed section 203. The top opening is covered by a top cover 402, which closes the top opening and is flush with the surface of the formation 100. A drainage structure is provided in the soil layer 101. The drainage structure is arranged around the outer periphery of the well cavity 401 and is connected to the well cavity 401. The water in the well cavity 401 is discharged outward through the drainage structure. The guide pipe 200 is provided with multiple magnetic markers 205, which serve as a reference for layer identification and are magnetically identified by the reading probe. The multiple magnetic markers 205 are arranged sequentially and at intervals along the height direction of the guide pipe 200.
[0027] The aforementioned magnetic settlement gauge protection and drainage structure for monitoring settlement of tunnel retaining structures provides reliable protection and drainage for the magnetic settlement gauge in tunnel retaining structure settlement monitoring, specifically in the following aspects: 1) The exposed section 203 is sealed by the cap 204 and the top opening is sealed by the top cover 402, which prevents mechanical crushing and impact from directly acting on the upper end of the guide pipe 200. The cap 204 also prevents mud, spraying dust and surface runoff from entering the guide pipe 200, so that the guide pipe 200 can remain intact and unobstructed under high construction disturbance conditions.
[0028] 2) The water in the well cavity 401 is discharged outward through the drainage structure in the direction from the inside to the outside, so as to prevent the water from overflowing into the guide pipe 200 and causing blockage, so that the reading probe can be lowered smoothly to read the data.
[0029] 3) By integrating the upper section 202 with the soil layer 101, the guide pipe 200 and the soil layer 101 can deform synchronously and in coordination, avoiding the formation of relative slippage or voids between the guide pipe 200 and the soil layer 101. This ensures that the measured settlement data is consistent with the actual soil settlement, thereby improving the accuracy of monitoring.
[0030] 4) The bottom of the guide pipe 200 is sealed and anchored to the rock layer 102 by the anchor 300, so that the rock layer 102 forms a stable displacement reference point. In this way, the lower part of the guide pipe 200 no longer drifts as a whole with the soil disturbance, thus providing a stable benchmark for the monitoring of stratum settlement.
[0031] As an extended embodiment, the drainage structure in the soil layer 101 includes a plurality of back drain channels 403 passing through the well body 400. The plurality of back drain channels 403 are arranged around the well cavity 401 at intervals in the circumference. The inner end of the back drain channel 403 is connected to the well cavity 401, and the outer end of the back drain channel 403 extends to the outside of the well body 400. Along the direction from the inside to the outside of the back drain channel 403, the back drain channel 403 is arranged inclined from top to bottom.
[0032] By circumferentially arranging multiple inverted drainage channels 403, the water in the well cavity 401 can be discharged outward from multiple directions simultaneously, improving the efficiency of outward discharge. At the same time, the inverted drainage channels 403 are arranged at an angle from top to bottom, and the water flows out along the inverted drainage channels 403 by gravity under the action of gravity, without the need for additional power support.
[0033] As an extended embodiment, the soil layer 101 is filled with a hydrophobic filter layer 404, which wraps around the outer periphery of the well body 400. The outer end of the back drain channel 403 extends to the hydrophobic filter layer 404. The water accumulated in the well cavity 401 flows through the back drain channel 403 to the hydrophobic filter layer 404, and after being filtered by the hydrophobic filter layer 404, it is discharged into the soil layer 101.
[0034] The hydrophobic filter layer 404 can be made of gravel or other permeable granular materials. The gaps between the particles form permeable channels, and when water passes through, mud and sand are trapped in the gaps between the particles.
[0035] For example, when surface runoff from heavy rain or construction watering carries mud and sand into the well cavity 401, the accumulated water is discharged through the back drain 403 to the drainage filter layer 404. The drainage filter layer 404 intercepts the mud and sand and discharges the clean water into the soil layer 101, thereby preventing the mud and sand from flowing back into the well cavity 401 with the accumulated water and causing blockage. This ensures that the magnetic settlement gauge receives reliable protection and drainage in the settlement monitoring of the tunnel retaining structure.
[0036] As an extended embodiment, a rock stratum hole 104 is formed in the rock stratum 102, and the lower section 201 is embedded in the rock stratum hole 104. The rock stratum hole 104 is filled with grout to form a reinforcing section 106. The reinforcing section 106 wraps around the outer periphery of the lower section 201, thus combining the lower section 201 with the rock stratum 102 as one unit. The bottom of the guide tube 200 is spaced apart from the bottom of the rock stratum hole 104 to form a bottom gap 105. The reinforcing section 106 fills the bottom gap 105, and the anchor 300 is wrapped in the reinforcing section 106 and integrated with the reinforcing section 106.
[0037] The reinforcing section 106 fills the bottom gap 105 and anchors the lower section 201 to the rock layer 102 as a whole. The anchor 300 is wrapped by the reinforcing section 106 and forms an integral anchoring structure with the lower section 201 and the rock layer 102. In this way, the anchoring force is evenly distributed, avoiding the phenomenon of anchoring failure caused by local stress concentration, and making the anchoring of the lower part of the guide tube 200 to the rock layer 102 more secure.
[0038] As an extended embodiment, the bottom of the rock stratum hole 104 is recessed downward to form an anchoring hole. The upper part of the anchor 300 is sleeved on the bottom of the guide tube 200 to close the bottom of the guide tube 200. The lower part of the anchor 300 is embedded in the anchoring hole to form an anchoring section 304. Grouting is injected into the anchoring hole to form an embedded section. The embedded section fills the anchoring section 304, anchoring the anchoring section 304 and the rock stratum 102 together. The bottom of the anchoring section 304 extends outward to form a bottom ring 301, which abuts against the bottom of the anchoring hole. The outer periphery of the bottom ring 301 abuts against the inner wall of the anchoring hole. Multiple vertical walls 302 are provided on the outer periphery of the anchoring section 304, and the multiple vertical walls 302 are arranged around the anchoring section 304 at intervals along the circumference. The inner end of the vertical wall 302 is connected to the outer periphery of the anchoring section 304. The outer end of the vertical wall 302 is covered with an elastic strip 303. The elastic strip 303 abuts against the inner wall of the anchoring hole and is in elastic compression deformation. The bottom of the vertical wall 302 is connected to the bottom ring 301. The top of the vertical wall 302 extends upward out of the anchoring hole and is arranged open upward. Multiple vertical walls 302 are wrapped in the embedded section, and the embedded section abuts against the bottom ring 301.
[0039] When the anchor 300 is lowered into the anchor hole, the bottom ring 301 first abuts against the bottom of the anchor hole to achieve axial positioning, while the vertical wall 302 and the elastic strip 303 abut against the inner wall of the anchor hole to achieve radial positioning. The elastic strip 303 is in an elastic compression deformation state to adapt to the unevenness of the anchor hole wall.
[0040] After the embedded section is grouted, it wraps around the vertical wall 302 and presses against the bottom ring 301, anchoring the anchoring section 304 and the rock stratum 102 into one. In this way, the anchoring of the guide pipe 200 and the rock stratum 102 is reliable, so that the stability benchmark for settlement measurement can be guaranteed.
[0041] As an extended embodiment, a soil hole 103 is formed in the soil layer 101. The bottom of the soil hole 103 is connected to the rock hole 104, and the top of the soil hole 103 is connected to the bottom of the well body 400. The upper section 202 is inserted into the soil hole 103. The soil hole 103 is filled with a slurry section 107 that is compatible with the soil layer 101 and deforms synchronously with the soil layer 101. The inner side of the slurry section 107 wraps around the outer periphery of the upper section 202 and is integrated with the upper section 202. The outer side of the slurry section 107 is embedded in the soil layer 101 in a split shape and is integrated with the soil layer 101.
[0042] During grouting, the grout is split and penetrates into the soil fissures under pressure. After solidification, it forms grout segment 107. In this way, the compressibility of grout segment 107 is similar to that of soil layer 101, and the two deform synchronously, avoiding segregation and voids.
[0043] Based on this, the upper section 202 is integrated with the soil layer 101 via the slurry section 107. When the soil layer 101 settles, the upper section 202 deforms synchronously and in coordination with it, avoiding the formation of relative slippage or voids between the guide pipe 200 and the soil layer 101, thereby improving the consistency between the measured settlement data and the actual soil settlement.
[0044] As an extended embodiment, the outer periphery of the upper section 202 is provided with a plurality of circumferential positioning structures, which are arranged sequentially at intervals along the height direction of the upper section 202; the circumferential positioning structures are arranged around the circumference of the upper section 202 and are fixedly sleeved on the outer periphery of the upper section 202. The outer periphery of the circumferential positioning structure has multiple elastically deformable sheets. These sheets are arranged at intervals around the outer periphery of the circumferential positioning structure. The sheets elastically abut against the inner wall of the soil hole 103 and are in an elastically deformed state. The circumferential positioning structure is encased in the slurry section 107 and is integrated with the slurry section 107.
[0045] If circumferential rotation occurs during the lowering of the guide tube 200, it will affect the accuracy of the reading probe in magnetically identifying the magnetic marker 205. Therefore, the elastic sheet elastically abuts against the inner wall of the soil hole 103 to restrict the circumferential rotation of the guide tube 200, which not only avoids circumferential misalignment during lowering but also improves the accuracy of the reading probe in magnetically identifying the magnetic marker 205.
[0046] As an extended embodiment, the circumferential positioning structure includes a fixed cylinder 500, which is sleeved on the outer periphery of the upper section 202 and fixedly connected to the upper section 202; the top of the fixed cylinder 500 has a top outer peripheral ring 502, and the bottom of the fixed cylinder 500 has a bottom outer peripheral ring 503, with the top outer peripheral ring 502 and the bottom outer peripheral ring 503 respectively arranged around the circumference of the fixed cylinder 500; The multiple elastic plates include multiple top curved plates 504 and multiple bottom curved plates 505. The inner end of the top curved plate 504 is abutted on the top outer peripheral ring 502, and the outer end of the top curved plate 504 is bent toward the inner sidewall of the soil hole 103 and abuts against the inner sidewall of the soil hole 103. The multiple top curved plates 504 are arranged circumferentially around the top outer peripheral ring 502. The inner end of the bottom curved piece 505 is connected to the bottom outer peripheral ring 503, and the outer end of the bottom curved piece 505 is bent towards the inner wall of the soil hole 103 and abuts against the inner wall of the soil hole 103. Multiple bottom curved pieces 505 are arranged around the bottom outer peripheral ring 503 at intervals in the circumferential direction. Along the circumference of the upper section 202, a plurality of top curved pieces 504 and a plurality of bottom curved pieces 505 are arranged in a staggered manner, and the top curved pieces 504 and the bottom curved pieces 505 are arranged to bend towards each other.
[0047] By staggering the top bending plate 504 and the bottom bending plate 505, the circumferential positioning structure forms two elastic contact points in the axial direction of the soil hole 103, thereby increasing the axial span between the circumferential positioning structure and the inner wall of the soil hole 103.
[0048] Moreover, the top curved plate 504 and the bottom curved plate 505 are spaced around each other in the circumferential direction, so that each curved plate can provide radial elastic abutment force. In this way, multiple points can be evenly stressed in the circumferential direction, which makes the guide tube 200 reliably restricted in circumferential rotation.
[0049] As an extended embodiment, the fixed cylinder 500 has a cavity 501 through which the upper section 202 passes. The fixed cylinder 500 is provided with a plurality of curved grooves 506, which are arranged around the fixed cylinder 500 at intervals in the circumference. The inner end of the curved groove 506 penetrates the inner wall of the cavity 501 to form an inner opening, and the outer end of the curved groove 506 penetrates the outer periphery of the fixed cylinder 500 to form an outer opening. The bending groove 506 bends and coils around the circumference of the fixed cylinder 500 and is arranged to bend along the axial direction of the fixed cylinder 500; adjacent bending grooves 506 are arranged vertically and horizontally offset along the axial direction of the fixed cylinder 500; the slurry section 107 fills multiple bending grooves 506 through the outer opening to form multiple bending strips, which are integrated with the slurry section 107; the bending strips abut against the outer periphery of the upper section 202 through the inner opening and are integrated with the upper section 202; along the circumference of the upper section 202, multiple bending strips bend and coil to clamp the upper section 202, restricting the circumferential rotation of the guide tube 200.
[0050] After the slurry section 107 fills the bending groove 506, the formed bending strip bends and coils in the circumferential direction, so that the fixed cylinder 500 and the upper section 202 interlock in the circumferential direction. Furthermore, the bending strip and the slurry section 107 are integrated into one, which enhances the bonding between the upper section 202 and the soil layer 101 and further restricts the circumferential rotation of the guide tube 200.
[0051] As an extended embodiment, a reinforcing ring 600 is provided in the well body 400, and the reinforcing ring 600 surrounds the outer periphery of the well cavity 401; along the top-to-bottom direction of the reinforcing ring 600, the reinforcing ring 600 sequentially includes a support section 601, a reduced diameter section 602, and an elastic section 603; the diameter of the support section 601 is larger than the diameter of the reduced diameter section 602, the diameter of the elastic section 603 is larger than the diameter of the reduced diameter section 602, and the outer periphery of the reduced diameter section 602 is combined to form an inwardly recessed ring 604; The bottom of the support section 601 is flat, the top of the elastic section 603 is exposed on the top of the well body 400, the top of the elastic section 603 is concave, forming a downward concave stepped ring 605, the stepped ring 605 is arranged around the outer periphery of the top opening, and the outer periphery of the top cover 402 abuts against the stepped ring 605. The elastic section 603 is provided with an annular groove, which is arranged around the circumference of the elastic section 603. The top of the annular groove passes through the top of the elastic section 603 to form an annular elastic opening. The bottom of the annular groove extends to the narrowing section 602. Along the direction from top to bottom, the width of the annular groove gradually decreases. The annular groove is filled with an annular elastic layer 606. The top of the elastic layer 606 extends out an elastic opening and is laid flat towards the top of the elastic segment 603 to form a flat ring 607. The flat ring 607 and the elastic segment 603 are integrally formed. During the process of the top cover 402 bearing the downward compressive force, the elastic layer 606 reciprocates elastically deforms so that the elastic segment 603 elastically contracts inward or elastically expands outward to buffer the compressive force applied to the top cover 402, and the flat ring 607 elastically limits the elastic deformation range of the elastic segment 603.
[0052] The width of the annular groove gradually decreases from top to bottom, resulting in a large deformation at the top and a small deformation at the bottom of the elastic layer 606, forming a gradual buffer. When construction compaction or surcharge compression is applied to the top cover 402, the elastic layer 606 undergoes reciprocating elastic deformation under pressure. The elastic segment 603 contracts inward to absorb the compression energy and expands outward to recover during rebound.
[0053] The flat ring 607 and the elastic section 603 are integrally formed. The flat ring 607 can limit the deformation range of the elastic layer 606 at the top of the elastic section 603 and prevent the elastic section 603 from being over-deformed, thereby ensuring that the magnetic settlement gauge is reliably protected and drained in the settlement monitoring of the tunnel retaining structure.
[0054] The above description is merely a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of the present invention should be included within the protection scope of the present invention.
Claims
1. A magnetic settlement gauge protective drainage structure for monitoring settlement of tunnel retaining structures, characterized in that, The system includes a guide tube that is vertically inserted into the strata and allows a reading probe to pass through. The tunnel enclosure structure is set in the strata. The strata include a soil layer and a rock layer formed below the soil layer. The lower part of the guide tube is embedded in the rock layer to form a lower section. The bottom of the lower section is provided with an anchor as a stability benchmark for settlement measurement. The anchor seals the bottom of the guide tube and anchors the lower section to the rock layer. The upper part of the guide tube is embedded in the soil layer to form an upper section. The upper section is integrated with the soil layer so that the guide tube and the soil layer deform synchronously and in coordination. The soil layer is provided with a well body, which surrounds and forms a well cavity. The top of the well cavity penetrates the surface of the stratum to form a top opening. The upper section passes through the bottom of the well body and extends into the well cavity to form an exposed section built into the well cavity. The exposed section is covered with a removable cap that closes the exposed section. The top opening is covered with a top cover that closes the top opening and is flush with the surface of the formation. The soil layer is provided with a drainage structure, which is arranged around the outer periphery of the well cavity and is connected to the well cavity. The water in the well cavity is discharged outward through the drainage structure. The guide tube is provided with multiple magnetic markers as a reference for layer identification and for magnetic identification by the reading probe. The multiple magnetic markers are arranged sequentially at intervals along the height direction of the guide tube.
2. The magnetic settlement gauge protective drainage structure for monitoring settlement of tunnel retaining structures as described in claim 1, characterized in that, The drainage structure in the soil layer includes multiple inverted drainage channels that pass through the well body. The multiple inverted drainage channels are arranged circumferentially around the well cavity. The inner end of the inverted drainage channel is connected to the well cavity, and the outer end of the inverted drainage channel extends to the outside of the well body. Along the direction from the inside to the outside of the inverted drainage channel, the inverted drainage channel is arranged inclined from top to bottom.
3. The magnetic settlement gauge protective drainage structure for monitoring settlement of tunnel retaining structures as described in claim 2, characterized in that, The soil layer is filled with a hydrophobic filter layer, which wraps around the outer perimeter of the well body. The outer end of the back drain extends to the hydrophobic filter layer. The water in the well cavity flows through the back drain to the hydrophobic filter layer, and after being filtered by the hydrophobic filter layer, it is discharged into the soil layer.
4. The magnetic settlement gauge protective drainage structure for monitoring settlement of tunnel retaining structures as described in any one of claims 1-3, characterized in that, Rock strata have pores formed in the rock strata, the lower section is embedded in the rock strata pores, and the rock strata pores are filled by grouting to form a reinforcing section. The reinforcing section wraps around the outer periphery of the lower section, thus combining the lower section with the rock strata as one unit. The bottom of the guide tube is spaced apart from the bottom of the rock stratum hole to form a bottom gap. The reinforcing section fills the bottom gap, and the anchor is wrapped in the reinforcing section and integrated with the reinforcing section.
5. The magnetic settlement gauge protective drainage structure for monitoring settlement of tunnel retaining structures as described in claim 4, characterized in that, The bottom of the rock stratum hole is recessed downward to form an anchoring hole. The upper part of the anchor is sleeved on the bottom of the guide tube to seal the bottom of the guide tube. The lower part of the anchor is embedded in the anchoring hole to form an anchoring section. Grout is injected into the anchoring hole to form an embedded section. The embedded section fills the anchoring section, thus anchoring the anchoring section and the rock stratum together. The bottom of the anchoring section extends outward to form a bottom ring, which abuts against the bottom of the anchoring hole, and the outer periphery of the bottom ring abuts against the inner wall of the anchoring hole; the outer periphery of the anchoring section is provided with multiple vertical walls, which are arranged at intervals around the circumference of the anchoring section. The inner end of the vertical wall is connected to the outer periphery of the anchoring section, and the outer end of the vertical wall is covered with an elastic strip. The elastic strip abuts against the inner sidewall of the anchoring hole and is under elastic compression deformation. The bottom of the vertical wall is connected to the bottom ring, and the top of the vertical wall extends upward to the anchoring hole and is arranged open upward. Multiple vertical strips are wrapped in the embedded section, and the embedded section abuts against the bottom ring.
6. The magnetic settlement gauge protective drainage structure for monitoring settlement of tunnel retaining structures as described in any one of claims 1-3, characterized in that, Soil pores are formed in the soil layer, the bottom of which communicates with the rock pores, and the top of which is connected to the bottom of the well body. The upper section is inserted into the soil pores, which are filled with a slurry section that is compatible with the soil layer and deforms synchronously with it. The inner side of the slurry section wraps around the outer periphery of the upper section and is integrated with it. The outer side of the slurry section is embedded in the soil layer in a split shape and is integrated with it.
7. The magnetic settlement gauge protective drainage structure for monitoring settlement of tunnel retaining structures as described in any one of claims 1-3, characterized in that, The upper section is provided with multiple circumferential positioning structures on its outer periphery. The multiple circumferential positioning structures are arranged sequentially at intervals along the height direction of the upper section. The circumferential positioning structures are arranged around the circumference of the upper section and are fixedly sleeved on the outer periphery of the upper section. The circumferential positioning structure has multiple elastically deformable sheets on its outer periphery. These elastic sheets are arranged at intervals around the outer periphery of the circumferential positioning structure. The multiple elastic sheets elastically abut against the inner wall of the soil hole and are in an elastically deformed state. The circumferential positioning structure is wrapped in the slurry section and is integrated with the slurry section.
8. The magnetic settlement gauge protective drainage structure for monitoring settlement of tunnel retaining structures as described in claim 7, characterized in that, The circumferential positioning structure includes a fixed cylinder, which is sleeved on the outer periphery of the upper section and fixedly connected to the upper section; the top of the fixed cylinder has a top outer circumferential ring, and the bottom of the fixed cylinder has a bottom outer circumferential ring, which are arranged around the circumference of the fixed cylinder respectively. The plurality of elastic plates include a plurality of top curved plates and a plurality of bottom curved plates. The inner end of the top curved plate is abutted on the top outer circumferential ring, and the outer end of the top curved plate is bent toward the inner sidewall of the soil hole and abuts against the inner sidewall of the soil hole. The plurality of top curved plates are arranged circumferentially around the top outer circumferential ring at intervals. The inner end of the bottom curved piece is connected to the bottom outer circumferential ring, and the outer end of the bottom curved piece is bent toward the inner wall of the soil hole and abuts against the inner wall of the soil hole. A plurality of the bottom curved pieces are arranged circumferentially around the bottom outer circumferential ring. Along the circumference of the upper section, a plurality of top curved pieces and a plurality of bottom curved pieces are arranged in a staggered manner, and the top curved pieces and the bottom curved pieces are arranged to bend towards each other.
9. The magnetic settlement gauge protective drainage structure for monitoring settlement of tunnel retaining structures as described in claim 8, characterized in that, The fixed cylinder has a cavity through which the upper section passes. The fixed cylinder is provided with multiple curved grooves, which are arranged at intervals around the circumference of the fixed cylinder. The inner end of the curved groove penetrates the inner wall of the cavity to form an inner opening, and the outer end of the curved groove penetrates the outer circumference of the cylinder to form an outer opening. The bending grooves are bent and spiraled along the circumference of the cylinder and are also bent and arranged along the axial direction of the cylinder. Adjacent bending grooves are staggered vertically along the axial direction of the cylinder. The slurry section fills multiple bending grooves through its outer opening to form multiple bending strips. The bending strips are integrated with the slurry section. The bending strips abut against the outer periphery of the upper section through their inner openings and are integrated with the upper section. Along the circumference of the upper section, multiple bending strips are bent and spiraled to clamp the upper section, restricting the circumferential rotation of the guide tube.
10. The magnetic settlement gauge protective drainage structure for monitoring settlement of tunnel retaining structures as described in any one of claims 1-3, characterized in that, The well body is provided with a reinforcing ring, which surrounds the outer periphery of the well cavity; along the direction from top to bottom of the reinforcing ring, the reinforcing ring sequentially includes a support section, a reduced diameter section and an elastic section; the diameter of the support section is larger than the diameter of the reduced diameter section, the diameter of the elastic section is larger than the diameter of the reduced diameter section, and the outer periphery of the reduced diameter section is combined to form an inwardly concave ring. The bottom of the support section is flat, the top of the elastic section is exposed at the top of the well body, the top of the elastic section is concave to form a downward concave stepped ring, the stepped ring is arranged around the outer periphery of the top opening, and the outer periphery of the top cover abuts against the stepped ring. The elastic section is provided with an annular groove, which is arranged around the circumference of the elastic section. The top of the annular groove penetrates the top of the elastic section to form an annular elastic opening. The pressing of the annular groove extends to the narrowing section. Along the direction from top to bottom of the annular groove, the width of the annular groove decreases. The annular groove is filled with an annular elastic layer, the top of which extends into an elastic opening and is laid flat towards the top of the elastic segment to form a flat ring, which is integrally formed with the elastic segment. During the process of the top cover being subjected to downward compressive force, the elastic layer reciprocates elastically deforms, causing the elastic segment to elastically contract inward or elastically expand outward, in order to buffer the compressive force applied to the top cover, and the flat layer elastically limits the elastic deformation range of the elastic segment.