A method and structure for reinforcing the collapse zone after the pilot hole of a vertical shaft collapses during the construction of a reverse drilling rig.

By reinforcing the collapse zone of the pilot hole in the vertical shaft of the reverse drilling rig using fine aggregate backfill and a combination of steel cage and I-beam, the problem of controlling the collapse zone was solved, and the safety and stability of the vertical shaft construction were improved. This method is suitable for vertical shaft construction under complex geological conditions.

CN123109671APending Publication Date: 2026-11-17JINCHUAN GROUP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611524893.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-29
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

The voids formed by the collapse of the rock mass around the pilot hole of the vertical shaft during the construction of the raise boring machine are difficult to control effectively. The conventional support structure is not strong enough, resulting in high risks for subsequent construction and making it difficult to safely expand the shaft.

Method used

The steel-concrete composite reinforcement structure is formed by using fine aggregate backfill, systematic anchor bolt support, a combination of steel cage and I-beam structure and suspension system, combined with short excavation and short masonry cycle construction method. The fine aggregate buffer, steel cage support and suspension system provide additional support to inhibit collapse expansion and improve structural stability.

Benefits of technology

It can quickly suppress collapse expansion, improve the integrity and stability of the support structure, reduce the risk of secondary collapse, adapt to shaft construction under complex geological conditions, use materials and equipment that are conventional in mines, have strong construction feasibility, and are economical.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109671A_ABST
    Figure CN123109671A_ABST
Patent Text Reader

Abstract

This invention discloses a method and structure for reinforcing the collapse zone after the pilot hole of a vertical shaft collapses during the construction of a raise boring machine, relating to the field of mine shaft construction technology. The method employs a step-by-step process of "emergency control of the collapse—reinforced support of the locking section—construction of a combined support system—short-cut and short-layout cyclic construction—reinforcement of the lower shaft entrance," constructing a steel-concrete composite reinforcement structure composed of a rectangular steel cage, I-beams, a wire rope suspension system, and wall-supporting anchors. This invention can effectively control the expansion of the collapse zone, improve the stability and overall support of the shaft structure, reduce construction safety risks, and is suitable for handling shaft collapses under complex geological conditions such as fault fracture zones.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of mine shaft construction technology, specifically to a combined reinforcement treatment method and structure for when the rock mass around the shaft collapses and forms a void after the shaft pilot hole is constructed using a raise boring machine. Background Technology

[0002] When constructing a vertical shaft using the reverse drilling method, a pilot hole is first drilled from top to bottom, then the hole is enlarged in the opposite direction from bottom to top to form the pilot shaft. Finally, the shaft is enlarged from top to bottom at the shafthead to the designed cross-section and support is completed. When the shaft passes through a fault fracture zone or extremely fractured rock strata, the surrounding rock has poor self-stabilization capacity after the pilot shaft is constructed, making it prone to spalling and collapse around the pilot shaft, forming an irregular void much larger than the designed excavation cross-section. The rock in this void is fractured and has extremely poor stability, posing a continuous risk of collapse and seriously threatening the personnel involved in subsequent enlargement operations. Conventional drill-and-blast enlargement and support techniques are difficult to implement. Existing methods for handling collapsed holes mostly involve single anchor bolt support or reinforced concrete backfilling, which suffers from problems such as insufficient support strength, poor structural integrity, and ineffective control of the collapse zone: simple anchor bolt support is difficult to effectively transfer loads to large areas of loose rock, and concrete backfilling is prone to forming voids and cracks in the void, leading to the risk of structural instability during subsequent shaft use. Therefore, there is an urgent need to develop a treatment method and combined reinforcement structure specifically for the collapse of the pilot hole of a reverse drilling rig, which can effectively control the expansion of the collapse zone and improve the integrity and stability of the support structure. Summary of the Invention

[0003] The purpose of this invention is to provide a combined reinforcement treatment method and combined reinforcement structure for the collapse zone after the pilot hole of the vertical shaft collapses during the construction of a reverse drilling rig, so as to solve the technical problems in the prior art where it is difficult to control the collapse zone and the support structure is not reliable enough, which makes it impossible to carry out subsequent wellbore sizing operations safely.

[0004] To achieve the above objectives, the technical solution of the present invention is as follows: A method for reinforcing the collapse zone after the pilot hole of a vertical shaft collapses during the construction of a raise boring machine includes the following steps: Step 1, Emergency control of hole collapse: Backfill fine aggregate into the guide hole to the level of the manual expansion and sizing work surface; Step 2, reinforce the support of the lock section: set a depth section below the wellhead, and install system anchor bolts on the basis of the original anchor bolt support; Step 3, Construction of the Joint Support System: Fine aggregate is used to level and fill the bottom slab of the collapse area to form a horizontal support surface. Then, a steel-concrete composite structure is arranged on the leveled bottom slab. This steel-concrete composite structure includes: A. Pre-embedded lifting ring at the wellhead; B. I-beams are erected laterally along the collapse zone at the bottom of the well casing concrete. C. A rectangular steel cage is laid out in a fan shape along the wellhead in the collapse area, and hanging bars and diagonal bracing bars are added inside and around the steel cage; D. Insert a steel wire rope into the reinforcing cage and fix its upper end to the pre-embedded lifting ring at the wellhead; E. Insert a ring of wall-supporting anchors into the well wall in the collapsed area, and connect the exposed ends of the anchors to the steel mesh before setting up the formwork and pouring the concrete. Step 4, Short Excavation and Short Laying Cycle Construction: A short excavation and short laying cycle operation method will be adopted for the shaft below the collapse area, specifically including: A. Single-cycle tunneling advance, using manual or weak blasting methods for excavation; B. After each cycle of advance is completed, the rock surface is immediately sealed with plain shotcrete, followed by anchor bolt installation, wire mesh installation, and shotcreting for the first stage of support. C. Taking the set section height as a unit, after the first support is completed, carry out the reinforcement binding, formwork and secondary concrete lining pouring of the section, and set the wall support anchor and reinforcing steel during pouring; D. During the downward excavation process, the fine aggregate filling height in the upper guide shaft should always be maintained at a set distance above the working face; Step 5, Strengthening the lower wellhead: When the well is constructed to the level of the lower wellhead, the wall-supporting anchors are densely arranged in the designated section above the lower wellhead, and a steel arch frame is erected as a temporary formwork at the connection between the lower wellhead and the connecting road, and the whole concrete is poured.

[0005] Furthermore, in step three: the rectangular steel cage is formed by binding φ18mm steel bars in a 300×300mm configuration, and φ10mm round steel bars are used as stirrups in a 300mm configuration. The spacing at the ends of the steel cage is 700mm to 1000mm, and the layer spacing when the steel cage is layered is 400-600mm. The transverse spacing of the I-beams is 900-1100mm. The spacing between the wall-supporting anchor rods is 1m×1m. When the anchor rods are inserted, the end of the anchor head is 2000-2200mm from the center line of the well shaft, and the injection angle is not less than 75°.

[0006] The single-cycle tunneling advance is controlled at 1m; the section height is 2m to 3m; the thickness of the plain shotcrete is not less than 50mm when it is sealed; and the fine aggregate filling height in the upper guide shaft is maintained at 300mm above the working face.

[0007] A reinforcement structure for the collapsed area after the pilot hole of a vertical shaft during the construction of a raise boring machine includes: a reinforcing cage assembly, an I-beam assembly, a suspension system, and a wall-supporting anchor assembly. The I-beam assembly comprises several I-beams, which are laterally erected at the bottom of the concrete casing of the shaft and arranged along the slope of the collapsed area. The reinforcing cage assembly is positioned above the I-beam assembly and comprises several rectangular reinforcing cages arranged in a fan shape within the collapsed area. The reinforcing cages are equipped with lifting bars and diagonal bracing bars inside and around them. The suspension system includes a steel wire rope and lifting rings pre-embedded at the shaft opening. The steel wire rope passes through the reinforcing cage, and its upper end is fixed to the lifting ring. The wall-supporting anchor assembly comprises several wall-supporting anchors, which are installed in a ring on the shaft wall of the collapsed area, and the exposed ends of the anchors are connected to a reinforcing mesh.

[0008] Furthermore, the rectangular steel cage is formed by binding φ18mm steel bars in a 300×300mm configuration, and φ10mm round steel bars are used as stirrups in a 300mm configuration; the spacing between the ends of adjacent steel cages is 700mm~1000mm, and the steel cages are arranged in layers with a layer spacing of 400-600mm.

[0009] Furthermore, the spacing between adjacent I-beams is 900-1100mm.

[0010] Furthermore, the wire rope has a diameter of φ20mm, and after being threaded through, it is stretched taut and secured at both ends with no less than 3 wire rope clips with a spacing of 100mm between the clips.

[0011] Furthermore, the spacing between the wall-supporting anchor bolts is 1m×1m; after the anchor bolts are injected, the end of the anchor head is 2000-2200mm away from the center line of the wellbore, and the injection angle is not less than 75°.

[0012] Furthermore, it also includes a reinforced support structure for the lock section, which is a system of anchor bolts arranged on the basis of the original anchor bolt support in the 0-4m section below the wellhead.

[0013] Furthermore, the system anchor bolts include reinforcing anchor bolts installed between two adjacent original anchor bolts and extended anchor bolts installed above the original anchor bolts.

[0014] Compared with the prior art, the beneficial effects of the present invention are: (1) Rapid and effective emergency control: Through active support by filling with sand, the expansion of the collapse zone is quickly suppressed, and the sand buffer avoids secondary disturbance to the fractured rock mass; (2) Reliable treatment of voids: The steel-concrete composite structure of "steel cage + I-beam + wire rope suspension + wall anchor" is adopted, which integrates load-bearing, tensile and shear resistance, and adapts to the deformation characteristics of fractured rock mass; (3) The wire rope suspension system provides additional suspension force for the steel-concrete structure, effectively preventing the poured concrete from falling off; (4) The exposed ends of the wall-supporting anchors are tied to the steel mesh to effectively connect the newly poured concrete layer with the original rock wall as a whole, thereby improving the synergistic bearing capacity; (5) Short excavation and short masonry cycles reduce the exposure time of the surrounding rock, reduce the risk of secondary collapse, and allow for dynamic adjustment of support parameters according to rock mass conditions; (6) The construction is highly feasible and economical. The materials and equipment used are all conventional mine configurations, and no special equipment is required. A standardized and replicable processing flow is formed, which is suitable for shaft collapse treatment under complex geological conditions such as fault fracture zones. Attached Figure Description

[0015] Figure 1 This is a top view of the steel reinforcement cage arrangement in this invention; Figure 2 This is a side view of the steel reinforcement cage arrangement in this invention; Figure 3 This is a schematic diagram of the installation of the wall-supporting anchor rod in this invention; Figure 4 This is a side view of the anchor bolt of the locking section system in this invention after installation; Figure 5 This is a top view of the anchor bolts of the locking section system in this invention after installation.

[0016] In the picture: 1. Wellhead; 2. Reinforcing cage; 3. Wire rope; 4. Lifting ring; 5. Wall-supporting anchor; 6. Reinforcing mesh; 7. System anchor; 701. Existing anchor; 702. Extended anchor; 703. Reinforced anchor. Detailed Implementation

[0017] To make the objectives, technical solutions, and advantages of this invention clearer, the invention will be further described in detail below with reference to specific embodiments and the accompanying drawings. It should be understood that these descriptions are merely exemplary and not intended to limit the scope of the invention. Furthermore, descriptions of well-known structures and techniques are omitted in the following description to avoid unnecessarily obscuring the concept of the invention.

[0018] A return air shaft in a mine, designed to be 52m deep with a net diameter of 4.0m and a cut diameter of 5.2m, experienced a borehole collapse 7m below the shaft opening after a 1.2m pilot shaft was constructed using a raise boring machine. This resulted in an irregular collapse zone, with an actual measured area of ​​approximately 61m². 2 The average depth is 6.5m, the average width is 6.1m, the first floor collapse height is 2m, the collapse area is located in the fault fracture zone, the rock is extremely broken and the stability is poor, and there is still a tendency to continue to collapse.

[0019] Implementation process: (1) Emergency control of hole collapse: After discovering the hole collapse, immediately stop the excavation and evacuate the personnel. Backfill the guide hole with dry medium sand to the position of the artificial expansion and brushing operation face. Use the looseness and fluidity of the sand to fill the collapsed void and provide lateral active pressure to the broken rock wall to suppress the expansion of the collapse range. In the section 2-4m below the upper wellhead 1, reinforced anchors 703 with φ18mm and L=3000mm are arranged in the middle position on the basis of the original anchors 701. The length of the reinforced anchors 703 is longer than the length of the original anchors 701. An extended anchor 702 is installed above the original anchors 701, with a row spacing of 1m, for a total of 2 rows, as the system anchors 7, forming a lock structure.

[0020] (2) Construction of the joint support system: Medium sand was used to level and fill the bottom slab of the collapsed area to form a horizontal support surface. 20a I-beams were erected laterally along the slope of the collapsed area at the bottom of the well casing concrete, with a spacing of 1000mm, to form an I-beam assembly. Subsequently, a rectangular steel cage 2 was arranged in a fan shape along the well opening 1 on top of it. The steel cage 2 was made of φ18mm steel bars 300×300 tied together and φ10mm round steel bars 300 used as stirrups, with a spacing of 1000mm, layered and with a layer spacing of 500mm. Hanging bars and diagonal bracing were added inside and around the cage, and φ18mm steel bars were used as stirrups. mm connecting bars connect each steel cage 2 into a whole; φ20mm steel wire rope 3 is inserted into the steel cage 2, the upper end is fixed to the pre-embedded lifting ring 4 at the wellhead 1 and pulled straight and taut, and no less than 3 steel wire rope 3 are fixed at both ends with a spacing of 100mm between the clamps; a ring of wall-supporting anchor rods 5 is installed in the well wall of the collapse area, using φ18mm, L=3000mm threaded anchor rods, with a row spacing of 1m×1m, the anchor head end is 2100mm away from the center line of the well cylinder, the injection angle is 80°, the exposed end is tied to the double-layer steel mesh 6, and φ20mm reinforcing steel bars are added.

[0021] (3) Short excavation and short masonry cycle construction: The shaft below the collapse area is manually excavated along the outline of the shaft, and the single cycle advance is strictly controlled at 1m; in 2m sections, after each advance, the rock surface is sealed with plain shotcrete with a thickness of not less than 50mm, and then anchor bolts, wire mesh and shotcrete are used for the first support, followed by steel reinforcement binding, formwork and C30 concrete secondary lining pouring for the section; during the downward excavation, the sand filling height in the upper guide shaft is always kept 300mm above the working face, and the sand column is used to buffer and support the workers below.

[0022] (4) Reinforcement of the lower wellhead 1: When the well is constructed to the level of the lower wellhead 1, the wall support anchors 5 are densely arranged in the 3m section above the lower wellhead 1, and a steel arch frame is erected at the connection between the lower wellhead 1 and the connecting road as a temporary template for overall concrete pouring.

[0023] The process is repeated in the above cycle to complete the expansion and pouring of the entire well shaft. The steel cage 2, I-beams, steel wire ropes 3 and wall-supporting anchors 5 together form a long-term stable steel-concrete composite reinforcement structure.

[0024] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.

Claims

1. A method for reinforcing the collapse zone after the pilot hole of a vertical shaft collapses during the construction of a raise boring machine, characterized in that, Includes the following steps: Step 1, Emergency control of hole collapse: Backfill fine aggregate into the guide hole to the level of the manual expansion and sizing work surface; Step 2, Strengthening support of the lock section: Set a depth section below the wellhead (1), and arrange system anchors (7) on the basis of the original anchor (701) support. Step 3, Construction of the Joint Support System: Fine aggregate is used to level and fill the bottom slab of the collapse area to form a horizontal support surface. Then, a steel-concrete composite structure is arranged on the leveled bottom slab. This steel-concrete composite structure includes: A. Wellhead (1) pre-embedded lifting ring (4); B. I-beams are erected laterally along the collapse zone at the bottom of the well casing concrete. C. A rectangular steel cage (2) is arranged in a fan shape along the wellhead (1) in the collapse area. Hanging bars and diagonal bracing bars are added inside and around the steel cage (2). D. Insert a steel wire rope (3) into the steel cage (2) and fix its upper end to the pre-embedded lifting ring (4) at the wellhead (1); E. Insert a ring of wall-supporting anchors (5) into the well wall of the collapsed area, and connect the exposed end of the anchors to the steel mesh (6) before setting up the formwork and pouring the concrete. Step 4, Short Excavation and Short Laying Cycle Construction: A short excavation and short laying cycle operation method will be adopted for the shaft below the collapse area, specifically including: A. Single-cycle tunneling advance, using manual or weak blasting methods for excavation; B. After each cycle of advance is completed, the rock surface is immediately sealed with plain shotcrete, followed by anchor bolt installation, wire mesh installation, and shotcreting for the first stage of support. C. Taking the set section height as a unit, after the first support is completed, the steel reinforcement binding, formwork and secondary concrete lining of the section are carried out. During the pouring, the wall support anchor rod (5) and reinforcing steel are set. D. During the downward excavation process, the fine aggregate filling height in the upper guide shaft should always be maintained at a set distance above the working face; Step 5, Strengthening the lower wellhead (1): When the well is constructed to the level of the lower wellhead (1), the wall anchor rods (5) are densely arranged in the section above the lower wellhead (1), and a steel arch frame is erected as a temporary template at the connection between the lower wellhead (1) and the connecting road, and the whole concrete is poured.

2. The method for reinforcing the collapsed area after the pilot hole of the vertical shaft during the construction of a reverse drilling rig, as described in claim 1, is characterized in that... In step three: the rectangular steel cage (2) is formed by binding φ18mm steel bars in 300×300mm increments, and φ10mm round steel bars are used as stirrups in 300mm increments. The spacing between the ends of the steel cage (2) is 700mm~1000mm. When the steel cage (2) is set in layers, the layer spacing is 400-600mm. The transverse spacing of the I-beams is 900-1100mm. The spacing between the wall-supporting anchor rods (5) is 1m×1m. When the anchor rods are inserted, the end of the anchor head is 2000-2200mm away from the center line of the well shaft, and the injection angle is not less than 75°.

3. The method for reinforcing the collapsed area after the pilot hole of the vertical shaft during the construction of a reverse drilling rig, as described in claim 1, is characterized in that... In step four: the single-cycle tunneling advance is controlled at 1m; the section height is 2m to 3m; the thickness of the plain shotcrete is not less than 50mm when it is sealed; and the fine aggregate filling height in the upper guide shaft is maintained at 300mm above the working face.

4. A reinforcement structure for the collapse zone after the pilot hole of a vertical shaft collapses during the construction of a raise boring machine, characterized in that, include: The assembly includes a steel cage (2), an I-beam assembly, a suspension system, and a wall-supporting anchor (5); the I-beam assembly includes several I-beams, which are horizontally erected at the bottom of the well casing concrete and arranged along the collapse zone; the steel cage (2) assembly is located above the I-beam assembly; the steel cage (2) assembly includes several rectangular steel cages (2), which are arranged in a fan shape along the well opening (1) in the collapse zone, and the steel cage (2) is provided with lifting bars and diagonal bracing bars inside and around it; the suspension system includes a wire rope (3) and a lifting ring (4) pre-embedded in the well opening (1); the wire rope (3) is threaded through the steel cage (2), and its upper end is fixed to the lifting ring (4); the wall-supporting anchor (5) assembly includes several wall-supporting anchors (5), which are installed in a ring on the well wall of the collapse zone, and the exposed end of the anchor is connected to a steel mesh (6).

5. The reinforcement structure for the collapse zone after the pilot hole of the vertical shaft during the construction of a raise boring machine, as described in claim 4, is characterized in that: The rectangular steel cage (2) is formed by binding φ18mm steel bars in 300×300mm increments and φ10mm round steel bars in 300mm increments as stirrups; the spacing between the ends of adjacent steel cages (2) is 700mm~1000mm, and the steel cages (2) are set in layers with a layer spacing of 400-600mm.

6. The reinforcement structure for the collapse zone after the collapse of the pilot hole in the vertical shaft during the construction of a raise boring machine, as described in claim 4, is characterized in that: The spacing between adjacent I-beams is 900-1100mm.

7. The reinforcement structure for the collapse zone after the pilot hole of the vertical shaft during the construction of a raise boring machine, as described in claim 4, is characterized in that: The steel wire rope (3) has a diameter of φ20mm. After the steel wire rope (3) is threaded through, it is straightened and tightened. Both ends are fixed with no less than 3 steel wire rope clips with a spacing of 100mm.

8. The reinforcement structure for the collapse zone after the pilot hole of the vertical shaft during the construction of a raise boring machine, as described in claim 4, is characterized in that: The spacing between the wall-supporting anchors (5) is 1m×1m; after the anchor is injected, the end of the anchor head is 2000-2200mm away from the center line of the well, and the injection angle is not less than 75°.

9. The reinforcement structure for the collapse zone after the pilot hole of the vertical shaft during the construction of a raise boring machine, as described in claim 4, is characterized in that: It also includes a reinforced support structure for the lock section, which is a system anchor (7) arranged on the basis of the original anchor (701) in the 0-4m section below the wellhead (1).

10. The reinforcement structure for the collapse zone after the collapse of the pilot hole in the vertical shaft during the construction of a raise boring machine, as described in claim 9, is characterized in that: The system anchor (7) includes a reinforcing anchor (703) installed between two adjacent original anchors (701) and an extended anchor (702) installed above the original anchors (701).