A tunnel lining formwork support system and its construction method
By using a closed-loop truss and a mechanical bracing adjustment system, the problem of space occupation in the middle of the tunnel lining skeleton was solved, enabling efficient and continuous flow-line operation of tunnel construction, with strong adaptability, and reducing material consumption and construction period.
Patent Information
- Application Number
- CN202611401721.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-10
- Publication Date
- 2026-11-17
AI Technical Summary
In existing tunnel lining formwork support technology, the central load-bearing frame occupies the tunnel cross-sectional space, making it difficult for construction personnel to pass and for concrete placement operations. In addition, traditional solutions have long construction periods, high material consumption, and poor adaptability and economy.
The system employs a closed-loop truss and a purely mechanical bracing adjustment system to form a self-supporting system along the inner wall of the tunnel. It achieves synchronous demolding of the entire structure through mechanical drive, with no supporting components in the middle, forming a completely transparent construction passage. The system is prefabricated in the factory, assembled on site, hoisted as a whole, and cyclically reusable.
It enables tunnels with small diameters and irregular cross-sections to operate without the need for central supports, providing ample operating space, ensuring the uniformity and density of concrete, shortening the construction period, improving site transfer efficiency, adapting to different construction conditions, and realizing continuous assembly line operation.
Smart Images

Figure CN123109718A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of nuclear power civil engineering construction technology, and more specifically, to a tunnel lining formwork support system and its construction method. Background Technology
[0002] The quality and efficiency of concrete lining construction for nuclear power plant intake and drainage tunnels directly affect the overall construction cycle and operational safety of nuclear power projects. Currently, tunnel lining construction mainly adopts traditional methods such as full-span scaffolding combined with bulk steel molds, needle beam formwork trolleys, or through-type formwork trolleys.
[0003] While the full-span scaffolding combined with loose steel formwork is widely used, its erection and dismantling processes are cumbersome, time-consuming, and result in high material waste and labor costs. The dense scaffolding components make transportation difficult in the confined space of tunnels, posing significant construction safety risks. Furthermore, the numerous formwork joints make it difficult to control the quality of concrete forming, easily leading to defects such as misalignment and pitting. Although improved solutions using split-type portal scaffolding have emerged in recent years, these only alleviate the problem of passageway obstruction and fail to fundamentally change the inefficient and high-consumption operating mode.
[0004] While needle-beam and through-type formwork trolleys can achieve full-section mechanized lining, improving construction speed and forming accuracy compared to full-span scaffolding schemes, their structural mode involves setting a through needle beam or gantry frame in the middle of the tunnel cross-section as the main load-bearing skeleton, with the formwork system attached to this central skeleton. However, this central skeleton inevitably occupies a significant portion of the tunnel cross-section, especially in small-diameter tunnels, where the skeleton can occupy one-third to one-half of the cross-section. This severely restricts the space for construction personnel to pass through and for concrete placement operations. Vibration operations can only be carried out in the narrow gap between the formwork and the skeleton, making it difficult to ensure the uniformity and density of concrete pouring. In addition, these trolleys are bulky, structurally complex, and expensive. In small-diameter and irregularly shaped tunnels, the arrangement of the central skeleton itself constitutes a construction bottleneck, or even renders it completely unusable, resulting in unsatisfactory economic efficiency and adaptability.
[0005] It is evident that existing tunnel lining formwork support technology has consistently failed to break through the conventional structural approach of "setting a load-bearing skeleton in the middle of the tunnel cross-section." This approach is both a mechanical requirement for load transfer and a fundamental reason for space occupation. There is an urgent need to develop a formwork support structure that eliminates the need for a central support skeleton and forms a self-supporting system along the tunnel's inner wall contour, thereby fundamentally solving the aforementioned technical challenges. Summary of the Invention
[0006] In view of this, the purpose of the present invention is to provide a tunnel lining formwork support system and its construction method. The tunnel lining formwork support system is composed of a closed ring truss arranged along the contour of the inner wall of the tunnel and a purely mechanical bracing adjustment system. The system achieves overall synchronous demolding and deployment through mechanical drive. There are no supporting components in the middle, forming a completely transparent construction channel. It can realize factory prefabrication, on-site assembly, overall hoisting and cyclic turnover.
[0007] To achieve the above objectives, the present invention provides a tunnel lining formwork support system for use in tunnels. The support system consists of at least one support unit, which includes a base, a vertical truss, a polygonal truss, a steel panel, and a bracing adjustment system. There are two vertical trusses symmetrically arranged on the left and right sides of the base, and the lower end of each vertical truss is slidably connected to the upper flange of the base; the bottom of the polygonal truss has two connecting surfaces, which are symmetrically arranged at an incline, with the side closer to the center of the polygonal truss being at a higher position, and the polygonal truss is slidably connected to the upper ends of the two vertical trusses through the two connecting surfaces respectively; the polygonal truss is suitable for combining the two vertical trusses on both sides and the base to form a closed annular spatial truss; The steel panel includes vertical panels and horizontal panels, wherein two of the vertical panels are respectively installed on opposite sides of two of the vertical trusses, and the horizontal panels are installed on the top of the polygonal truss; the bracing adjustment system is disposed between the two of the vertical trusses and located below the polygonal truss; The bracing adjustment system includes bracing members, vertical suspension rods, steel sleeves, and lifting adjustment components. The vertical suspension rods are installed at the bottom of the broken-line truss, and the steel sleeves are fitted onto the vertical suspension rods. Two bracing members are symmetrically arranged on the steel sleeves. One end of each bracing member is hinged to the steel sleeve and the other end is hinged to the vertical truss. The lifting adjustment components are used to drive the steel sleeves to move on the vertical suspension rods. By operating the lifting and adjusting components in the support adjustment system, the vertical trusses and the polygonal trusses on both sides can be moved to achieve overall diameter reduction for demolding or diameter expansion to fit the inner wall of the concrete.
[0008] Furthermore, the base is a variable cross-section H-shaped steel base, the lower flange arc of the base matches the forming surface of the horseshoe-shaped tunnel inner wall, and the bottom of the base is reserved with an adjustment gap, which is used to realize the elevation fine adjustment and the leveling of the shim steel plate.
[0009] Furthermore, the lower flange of the base is provided with a fuma wheel support, which is used to detachably install the fuma wheel.
[0010] Furthermore, constraint grooves are provided at both the upper and lower ends of the vertical trusses on both sides. The constraint grooves are used to constrain the vertical trusses on both sides to slide along a preset direction when they are retracted or extended. Polytetrafluoroethylene plates are embedded in the constraint grooves.
[0011] Furthermore, the constraint groove at the upper end of the vertical truss is inclined and parallel to the connecting surface on the same side of the bottom of the polygonal truss, and the inclination angles of the constraint groove at the upper end of the vertical truss and the connecting surface at the bottom of the polygonal truss are both greater than the friction angle of the steel.
[0012] Furthermore, the end of the bracing member that connects to the vertical suspension rod is positioned higher than the end of the bracing member that connects to the vertical truss.
[0013] Furthermore, both ends of the vertical truss and the polygonal truss are equipped with end plates, and the end plates are provided with multiple splicing holes at intervals to allow connecting bolts to be installed in the splicing holes to connect adjacent support units, so that multiple support units form a long continuous support force system.
[0014] Furthermore, the lifting adjustment component includes an external thread provided on the outer wall of the vertical suspension rod and two adjusting nuts adapted to the external thread, with the two adjusting nuts located on the upper and lower sides of the steel sleeve, respectively.
[0015] A construction method for a tunnel lining formwork support system includes the following steps: Step S1: Prefabricate the base, the vertical trusses on both sides, the polygonal truss, the steel panel and the bracing adjustment system according to the tunnel cross-section dimensions, and perform pre-assembly and debugging; Step S2: Transport the prefabricated components to the construction site, and assemble and fix the base, the vertical trusses on both sides, the zigzag truss, the steel panel and the bracing adjustment system in sequence on the assembly platform to form a standard support unit; Step S3: The assembled standard support unit is hoisted to the section to be constructed inside the tunnel. For open-cut tunnels, the entire unit is hoisted into place. For cut-and-cover tunnels, the support unit is first folded up, then slid into place, and then unfolded and reset. Step S4: Pour concrete between the steel panel and the inner wall of the tunnel, and monitor the deformation of the support system during the pouring process; Step S5: After the concrete strength reaches the demolding strength, first loosen the connecting bolts between adjacent support units to make each support unit independent. Then operate the lifting adjustment component to drive the two sides of the support rods to retract inward synchronously, so as to drive the vertical trusses on both sides and the corresponding vertical panels to shrink in diameter as a whole, so that the steel panels are separated from the inner wall of the concrete. Step S6: Install the caster wheels at the bottom of the base and transfer each of the support units to the next construction section. Then, operate the lifting and adjusting components again to drive the two sides of the support rods to expand outward synchronously, so that the steel panel is expanded and restored to the design outline. Then, repeat the above steps S4 and S5 to carry out the next cycle of construction.
[0016] Furthermore, in step S3, after the support unit is hoisted into place, the elevation is finely adjusted using a leveling steel plate through the adjustment gap reserved at the bottom of the base to ensure that the center line of the support unit coincides with the design center line of the tunnel.
[0017] Compared with the prior art, the present invention has the following advantages and effects: 1. The tunnel lining formwork support system and its construction method in this invention employ a variable cross-section H-shaped steel base, two vertical trusses on both sides, and a polygonal truss enclosing the tunnel's inner wall contour to form a closed-loop spatial truss. The concrete lateral pressure and top load are directly borne by this ring truss and transferred to the base, eliminating the need for any vertical support components in the middle of the cross-section, making the entire central area of the cross-section completely open. Simultaneously, the bracing adjustment system located between the two vertical trusses forms a lateral connection only with bracing members in the middle of the closed-loop truss, without constituting a central vertical support. This achieves both contraction and expansion functions while maintaining a completely open central space, further consolidating the structural advantage of central openness. This design not only provides ample operating space for construction personnel passage, concrete placement, vibration operations, and pumping pipeline layout, effectively ensuring the uniformity and density of concrete pouring, but also eliminates the bottleneck of "unable to arrange the skeleton" in small-diameter and irregularly shaped tunnels, fundamentally expanding the applicability of the formwork support system in various cross-section tunnels.
[0018] 2. This invention breaks down the support system into standardized modules such as a base, vertical truss, polygonal truss, and bracing adjustment system. All components can be prefabricated, pre-assembled, and debugged in the factory. On-site, only bolts are needed for rapid assembly to form standard units. Adjacent units can be arbitrarily spliced and extended by end caps and bolts to adapt to construction sections of different lengths. In open-cut tunnels, the entire structure can be hoisted into place. In cut-and-cover tunnels, it can be first folded, then slid into place, and then unfolded, flexibly adapting to different construction conditions. After the concrete is poured and reaches the demolding strength, only the connecting bolts between units need to be loosened and the adjusting nuts rotated synchronously to achieve rapid folding and demolding of the closed-loop truss. With the detachable ferrule at the bottom of the base, the support unit can be transferred to the next construction section. After resetting, it can enter the next cycle. The entire operation process does not require disassembling components or removing steel pipes one by one. The total construction period for disassembly, assembly, and transportation is significantly shortened compared to the traditional full-span scaffolding process, and the efficiency of site transfer is also significantly improved compared to hydraulic trolleys, realizing continuous and streamlined operation of tunnel lining construction. Attached Figure Description
[0019] Figure 1 This is a schematic diagram of the support unit structure of the tunnel lining formwork support system in an embodiment of the present invention; Figure 2 for Figure 1 Schematic diagram of the connection between the central base and the vertical truss; Figure 3 for Figure 1 Schematic diagram of the connection between the vertical truss and the polygonal truss; Figure 4 This is a schematic diagram showing the component disassembly of the support unit in an embodiment of the present invention; Figure 5 This is a schematic diagram of the folded state of the support unit in an embodiment of the present invention.
[0020] Explanation of reference numerals in the attached figures: 1. Steel panel; 2. Back rib steel plate; 3. Inner chord; 4. Outer chord; 5. Web member; 6. Diagonal brace; 7. Reinforcing diagonal brace; 8. Sealing plate; 9. Splicing hole; 10. H-beam base; 11. Fouma wheel support; 12. PTFE plate; 13. Constraint groove; 14. Vertical suspension rod; 15. Steel sleeve; 16. Support rod; 17. Crossed steel wire rope; 18. Adjusting nut; 19. Hinge seat; 20. Hinge shaft; 21. Template joint; 22. Fouma wheel connecting bolt hole; 23. Positioning hole; 24. Node stiffening plate; 25. Guide steel plate. Detailed Implementation
[0021] The technical solution of the present invention will now be clearly and completely described with reference to the accompanying drawings. Obviously, the described embodiments are only some, not all, of the embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0022] In the description of this invention, it should be noted that, unless otherwise explicitly specified and limited, the terms "installation," "connection," and "linking" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; they can also refer to the internal connection of two components; and they can refer to a wireless connection or a wired connection. Those skilled in the art can understand the specific meaning of the above terms in this invention based on the specific circumstances.
[0023] Please see Figure 1-5 As shown, this embodiment of the invention provides a tunnel lining formwork support system. Specifically, the support system in this embodiment consists of at least one support unit, and the support unit includes a base 10, a vertical truss, a zigzag truss, a steel panel 1, and a bracing adjustment system.
[0024] There are two vertical trusses symmetrically arranged on the left and right sides of the base 10, and the lower end of each vertical truss is slidably connected to the upper flange of the base 10. The bottom of the polygonal truss has two connecting surfaces, which are symmetrically arranged at an incline, with the side closer to the center of the polygonal truss being at a higher position. The polygonal truss is slidably connected to the upper ends of the two vertical trusses through the two connecting surfaces. The polygonal truss is suitable for combining the two vertical trusses and the base 10 to form a closed annular space truss.
[0025] The steel panel 1 includes vertical panels and horizontal panels, wherein the two vertical panels are respectively installed on opposite sides of the two vertical trusses, and the horizontal panels are installed on the top of the broken truss; the bracing adjustment system is set between the two vertical trusses and located below the broken truss.
[0026] Preferably, in this embodiment, template seams 21 are provided on the opposite sides of both the vertical and horizontal panels to ensure that each panel of the steel panel 1 can be smoothly spliced together.
[0027] The bracing adjustment system includes bracing members 16, vertical suspension rods 14, steel sleeves 15, and lifting adjustment components. The vertical suspension rods 14 are installed at the bottom of the broken-line truss, and the steel sleeves 15 are fitted onto the vertical suspension rods 14. Two bracing members 16 are symmetrically arranged on the steel sleeves 15. One end of the bracing member 16 is hinged to the steel sleeve 15, and the other end is hinged to the vertical truss. The lifting adjustment components are used to drive the steel sleeves 15 to move on the vertical suspension rods 14. By operating the lifting adjustment components in the bracing adjustment system, the vertical trusses on both sides and the broken-line truss can be moved to achieve overall diameter reduction for demolding or diameter expansion to fit the inner wall of the concrete.
[0028] As a preferred embodiment of the above scheme, hinge seats 19 are provided at both ends of the strut 16, and ear plates are provided on both sides of the steel sleeve 15 and on the opposite side of the two vertical trusses. A hinge shaft 20 passing through the ear plate is provided in the hinge seat 19, so that the steel sleeve 15 and the vertical truss can be hinged to both ends of the strut 16 respectively through this arrangement.
[0029] As a preferred embodiment of the present invention, the end of the support member 16 connected to the vertical suspension rod 14 is positioned higher than the end of the support member 16 connected to the vertical truss. This height difference limiting design ensures that the support member 16 only moves upward during the retraction of the vertical trusses on both sides, and will not detach from the vertical suspension rod 14, thus helping to further ensure the reliability of the retraction action.
[0030] Please see Figure 1-2 and Figure 4-5 As shown, the base 10 is a variable cross-section H-shaped steel base. The curvature of the lower flange of the base 10 matches the forming surface of the inner wall of the horseshoe-shaped tunnel. The bottom of the base 10 is reserved with an adjustment gap, which is used to realize the fine adjustment of the elevation and the leveling of the shim steel plate.
[0031] The lower flange of the base 10 is provided with a fuma wheel support 11, which is used to detachably install the fuma wheel.
[0032] Specifically, the ferrule support 11 has ferrule connecting bolt holes 22, which are used to insert bolts to detachably fix the ferrule to the ferrule support 11. During the concrete pouring stage, the ferrule is removed, and the base 10 is directly or indirectly supported at the bottom of the tunnel via its lower flange or through a leveling steel plate, ensuring the stability of the support system under the pouring load. During the demolding and transfer stage, the ferrule is installed through the ferrule connecting bolt holes 22, allowing the support unit to roll along the bottom of the tunnel to the next construction section, achieving rapid site transfer. This detachable connection structure allows the same support system to quickly switch between stable pressure bearing and convenient movement, taking into account both pouring accuracy and transfer efficiency.
[0033] Please see Figure 1-5 As shown, in this embodiment, both the vertical truss and the polygonal truss are truss structures. Specifically, the truss structure includes a back rib steel plate 2, inner chords 3, outer chords 4, web members 5, and diagonal braces 6. The back rib steel plate 2 is installed inside the vertical or horizontal panel of the steel panel 1. Multiple outer chords 4 are installed on the side of the back rib steel plate 2 away from the steel panel 1, while multiple inner chords 3 are located on the side of the outer chords 4 away from the back rib steel plate 2, and the inner chords 3 and outer chords 4 are spaced apart by a distance. The diagonal braces 6 are located between the inner chords 3 and outer chords 4, and the web members 5 are located between two adjacent inner chords 3.
[0034] As an example of the vertical truss implementation in this embodiment, the back rib steel plate 2 is arranged circumferentially on the back of the steel panel 1; the steel panel 1 and the back rib steel plate 2 are connected by double-sided fillet welds; the back rib steel plate 2 has a semi-circular hole at the outer chord 4, and after the outer chord 4 is inserted, it is connected by double-sided fillet welds, thereby connecting the panel and the space truss as one unit, ensuring the rigidity and deformation resistance of the panel during the concrete pouring process. The inner chord 3, outer chord 4, web member 5, and diagonal brace 6 are all made of finished steel pipes, which are connected by intersecting welds to form a space truss system; adjacent chord members are connected by welding web members 5 or diagonal braces 6 to form a stable triangular force unit, effectively transmitting axial force, bending moment, and shear force; in addition, after the welding of each plate and steel pipe is completed, the welding deformation needs to be corrected, and sandblasting and anti-rust paint should be applied.
[0035] Please see Figure 1-3 As shown, both ends of the vertical trusses on both sides are provided with constraint grooves 13. The constraint grooves 13 are used to constrain the vertical trusses on both sides to slide along a preset direction when they are retracted or extended. Polytetrafluoroethylene plates 12 are embedded in the constraint grooves 13.
[0036] Specifically, the lower constraint groove 13 is located at the connection node between the vertical truss and the base 10, and the upper constraint groove 13 is located at the connection node between the vertical truss and the polygonal truss; this allows the vertical truss to slide along a preset direction when the two sides of the vertical truss are retracted or extended, preventing component misalignment. The polytetrafluoroethylene plate 12 reduces the sliding friction during retraction, ensuring smooth sliding of the vertical truss during the retraction process.
[0037] For further details, please refer to Figure 1 and Figure 3 In this embodiment, the constraint groove 13 at the upper end of the vertical truss is inclined and parallel to the connecting surface on the same side of the bottom of the broken line truss. The inclination angles of the constraint groove 13 at the upper end of the vertical truss and the connecting surface at the bottom of the broken line truss are both greater than the friction angle of the steel.
[0038] As a further description of the above solution, in this embodiment, the inclination angle of the top zigzag truss and the constraint groove 13 is set to be greater than the friction angle of the steel. This is so that after the fasteners are removed, the trusses on both sides can slide smoothly along the constraint groove 13 by gravity or a very small external force. This avoids the trusses getting stuck or requiring a large additional traction force when retracting due to excessive friction, thereby effectively improving the smoothness of the sliding of the vertical truss during the retraction process.
[0039] As a preferred embodiment of the present invention, the projections of the two constraint grooves 13 on the vertical truss are staggered. Specifically, the upper constraint groove 13 is located in the middle of the vertical truss, and the bottom surfaces of the constraint groove 13 are connected to the inner chord 3 and the outer chord 4 respectively. The bottom end of the inner chord 3 in the vertical truss is connected to the middle of the lower constraint groove 13, and the outer chord 4 is connected to one end of the lower constraint groove 13. In addition, a reinforcing brace 7 is provided on the side of the lower constraint groove 13 away from the outer chord 4. The reinforcing brace 7 is obliquely arranged and is connected to the inner chord 3 and the outer chord 4 on the vertical truss respectively.
[0040] Specifically, in this embodiment, the upper constraint groove 13 is centrally connected to the inner and outer chords, forming an in-plane lateral constraint at the top of the truss to ensure accurate and reliable top sliding guidance. The lower constraint groove 13 is connected to the outer chord 4 at one end and the inner chord 3 in the middle, which helps to form a triangular stable area at the bottom in conjunction with the reinforcing diagonal brace 7. This allows the bottom loads of the inner and outer chords to be collected through the constraint groove 13 and uniformly transferred to the base 10, avoiding stress concentration caused by independent force transmission. The staggered projections of the upper and lower ends, combined with the diagonal reinforcement at the bottom, significantly improve the overall torsional stiffness of the closed-loop annular truss, making the internal force distribution of the truss members under external loads more uniform, which is beneficial to fully utilizing the overall spatial force performance of the closed-loop spatial truss.
[0041] For a preferred embodiment of the above solution, please refer to [link / reference]. Figure 1 and Figure 3 As shown, the inner chord 3 on the polygonal truss is set as a semi-circle, and a guide steel plate 25 is installed at the bottom of the semi-circular chord. The side of the guide steel plate 25 away from the inner chord 3 is the connection surface of the polygonal truss. A node stiffening plate 24 is provided at the top of the guide steel plate 25. The node stiffening plate 24 is connected to the guide steel plate 25 and the inner chord 3 by welding. This allows the polygonal truss to achieve a sliding connection with the constraint groove 13 through the installed guide steel plate 25.
[0042] In this embodiment, the inner chord 3 on the broken truss is preferably V-shaped, so that the middle of the connecting surface is high and the two sides are low. This arrangement can be used to slide the top of the vertical truss from the lowest point of the bottom of the broken truss to the center point at the top when the vertical trusses on both sides are closed, so as to achieve the effect of moving the broken truss position downward, so as to realize the demolding of the broken truss and the top concrete when the vertical trusses on both sides are closed and demolded from the concrete on both sides.
[0043] Furthermore, positioning holes 23 are provided at both ends of the upper flange of the constraint groove 13 and the base 10, as well as at both ends of the bottom of the polygonal truss, for setting fastening bolts in the positioning holes 23 to connect the constraint groove 13 with the base 10 and / or the polygonal truss.
[0044] As a further description of the above solution, in this embodiment, the positioning holes 23 at the bottom of the polygonal truss are set on the guide steel plate 25. When the two vertical trusses are unfolded and moved to the bottom ends of the polygonal truss, the positioning holes 23 on the guide steel plate 25 correspond to the positioning holes 23 on the constraint groove 13. At this time, fastening bolts can be arranged in the two sets of positioning holes 23, so that the fastening bolts pass through the guide steel plate 25 and the constraint groove 13, thereby realizing the connection between the polygonal truss and the vertical truss. While ensuring that the outer contour of the steel panel 1 matches the inner wall of the tunnel, it also restricts the relative movement of the vertical and horizontal panels in the steel panel 1, effectively ensuring the stability of the support unit.
[0045] Please see Figure 1-3 As shown, both ends of the vertical truss and the polygonal truss are equipped with end plates 8. Multiple splicing holes 9 are provided at intervals on the end plates 8 to allow connecting bolts to be installed in the splicing holes 9 to connect adjacent support units, so that multiple support units form a long continuous support force system.
[0046] Please see Figure 1 and Figure 4-5 As shown, the lifting adjustment component includes an external thread on the outer wall of the vertical suspension rod 14 and two adjusting nuts 18 that are adapted to the external thread. The two adjusting nuts 18 are located on the upper and lower sides of the steel sleeve 15, respectively.
[0047] As a further description of the above solution, the two adjusting nuts 18 in this embodiment can respectively clamp the upper and lower end faces of the steel sleeve 15. In use, the two adjusting nuts 18 are rotated synchronously in the same direction of rotation, for example clockwise. Since the two nuts move in the same direction along the vertical suspension rod 14 at the same time, the steel sleeve 15, together with the hinge point of the support rod 16 fixed to it, can be driven to move axially along the vertical suspension rod 14, thereby driving the two support rods 16 on both sides to expand or retract synchronously; when the two adjusting nuts 18 are rotated in the opposite direction, the two support rods 16 on both sides are driven to move in the opposite direction.
[0048] Furthermore, the two adjusting nuts 18 simultaneously bear the axial force transmitted by the steel sleeve 15, forming a bidirectional lock. This ensures the stability of the force on the support rod 16 in the extended state, preventing the support rod from retracting due to vibration or lateral pressure during concrete pouring. It also ensures reliable positioning in the retracted state, preventing the support rod from accidentally loosening. In addition, the two adjusting nuts 18 make the adjustment operation more flexible. If one nut wears or becomes stuck due to long-term use, the other nut can still serve as a backup force-applying component and locking device, ensuring the continued effectiveness of the adjustment and locking functions.
[0049] It should be noted that using a nut and threaded rod to adjust the movement of the steel sleeve 15 is only one preferred driving method for the lifting and adjusting component. Those skilled in the art should understand that any driving structure capable of driving the steel sleeve 15 to produce controllable displacement along its axial direction and locking it at the target position can replace the adjusting nut 18 to achieve the same function. For example, installing a hydraulic rod, electric push rod, cylinder, or other actuator between the zigzag truss and the steel sleeve 15 can also achieve the synchronous receiving and dividing function of this invention.
[0050] The aforementioned structural modifications that use hydraulic, electric, or pneumatic drive methods to replace manual rotation of the nut all achieve essentially the same function and effect through essentially the same means, and can be conceived by those skilled in the art without creative effort. Therefore, they should all fall within the protection scope of this invention. Any technical solution that uses the same or equivalent function as the lifting and adjusting component in this invention also falls within the protection scope of this invention.
[0051] As a preferred embodiment of the present invention, in order to improve the out-of-plane stability of the bracing adjustment system, a cross steel wire rope 17 is provided between two adjacent vertical suspension rods 14. The four ends of the cross steel wire rope 17 are respectively connected to the broken truss and the steel sleeves 15 on the two vertical suspension rods 14, and the two steel sleeves 15 are connected by a horizontal bar. This arrangement allows the cross steel wire rope 17 to improve the installation stability of the two adjacent vertical suspension rods 14 in combination with the horizontal bar, and avoids the lateral instability of the vertical suspension rods 14 due to accidental load.
[0052] Please see Figure 1-5As shown, the present invention also provides a construction method for a tunnel lining formwork support system, comprising the following steps: Step S1: Prefabricate the base 10, the vertical trusses on both sides, the zigzag truss, the steel panel 1 and the bracing adjustment system according to the tunnel cross-section dimensions, and perform pre-assembly and debugging; Step S2: Transport the prefabricated components to the construction site, and assemble and fix the base 10, the vertical trusses on both sides, the zigzag truss, the steel panel 1 and the bracing adjustment system in sequence on the assembly platform to form a standard support unit; Step S3: The assembled standard support unit is hoisted to the section to be constructed inside the tunnel. For open-cut tunnels, the entire unit is hoisted into place. For cut-and-cover tunnels, the support unit is first folded up, then slid into place, and then unfolded and reset. Specifically, after the support unit is hoisted into place, the elevation is finely adjusted using a leveling steel plate through the adjustment gap reserved at the bottom of the base 10 to ensure that the center line of the support unit coincides with the design center line of the tunnel.
[0053] Step S4: Pour concrete between the steel panel 1 and the inner wall of the tunnel, and monitor the deformation of the support system during the pouring process; Preferably, in step S4, before pouring, a comprehensive inspection of the working conditions of each connection node of the support system, the steel panel 1, and the bracing adjustment system is required. Concrete pouring can only proceed after confirming that everything is in order. Secondly, during the pouring process, a symmetrical pouring method is preferably adopted, and the pouring rate is controlled to reduce the impact of asymmetrical lateral pressure on the support system. In addition, during the pouring process, a dedicated person can be assigned to monitor the deformation and stress state of the support system throughout the process, focusing on observing the deformation of the truss members, panels, and connection nodes. If any abnormality is found, work should be stopped immediately. Finally, after the pouring is completed, the laitance at the joint 21 of the support unit template needs to be cleaned in a timely manner, and concrete curing work should be carried out simultaneously.
[0054] Step S5: After the concrete reaches the demolding strength, first loosen the connecting bolts between adjacent support units to make each support unit independent. Then operate the lifting and adjusting components to drive the two sides of the support rods 16 to retract inward simultaneously, so as to drive the vertical trusses on both sides and the corresponding vertical panels to shrink in diameter as a whole, so that the steel panel 1 separates from the inner wall of the concrete.
[0055] In this embodiment, the specific operation steps for driving the two sides of the support rod 16 to retract inward synchronously by operating the lifting and adjusting component are as follows: the two adjusting nuts 18 on the upper and lower sides of the steel sleeve 15 are rotated synchronously. The threaded connection between the adjusting nuts 18 and the external thread on the vertical suspension rod 14 is used to make the adjusting nuts 18 drive the steel sleeve 15 to move along the axis of the vertical suspension rod 14. Specifically, when it is necessary to retract the two sides of the support rod 16, the steel sleeve 15 needs to move upward; conversely, when it is necessary to unfold the two sides of the support rod 16, the steel sleeve 15 needs to move downward.
[0056] Step S6: Install the caster wheel at the bottom of the base 10 and transfer each support unit to the next construction section. Run the lifting and adjusting components again to drive the two sides of the support rods 16 to expand outward synchronously, so that the steel panel 1 is expanded and reset to the design outline. Then, repeat the above steps S4 and S5 to carry out the next cycle of construction.
[0057] Furthermore, in step S6, after the support unit is transported to the next construction section, the surface of the steel panel 1 and each component need to be cleaned and maintained according to the actual situation. The specific contents include removing concrete residue, comprehensively checking the condition of truss members / welds / connectors / bracing adjustment system, correcting deformed components, repairing damaged welds, repairing damaged anti-corrosion layer, and replacing worn parts. Only after the maintenance is accepted can the next construction cycle be entered, and the above concrete pouring, demolding and transportation steps are repeated.
[0058] As a preferred embodiment of the tunnel lining formwork support system in this invention: The standard width of a single support unit is 2.4m. Adjacent support units are connected by end sealing plates 8. Splicing holes 9 are reserved every 300mm along the circumference of the sealing plates 8 to allow for extension as needed and to adapt to tunnel construction sections of different lengths.
[0059] The preferred adjustment gap at the bottom of the base 10 is 30mm. This value range takes into account both the common elevation error range on site and the processing accuracy of the H-shaped steel base. It ensures sufficient adjustment margin while avoiding excessive gap that could cause the base 10 to settle and deform during concrete pouring.
[0060] The vertical height difference between the two ends of the strut 16 is preferably 200mm. Under this height difference, the trajectory of the upward displacement of the strut 16 during the retraction process can avoid the threaded section of the vertical suspension rod 14, ensuring that the strut will not detach from the screw. At the same time, it can provide sufficient horizontal thrust to overcome the lateral pressure of the concrete in the unfolded state.
[0061] The preferred inclination angle of the constraint groove 13 is 25°, which is greater than the friction angle between the steel (about 8°~12°). This ensures that after the fastening bolts are removed, the vertical truss can slide along the groove by gravity or a very small external force to achieve smooth folding. At the same time, the inclination angle is not too large to avoid excessive lateral force in the unfolded state, which would cause the truss to expand outward and become unstable.
[0062] The preferred spacing of the back rib steel plates 2 is 150mm. This spacing ensures that the deflection of the steel plate 1 under the action of concrete lateral pressure meets the requirements of concrete forming flatness (usually required to be ≤1 / 400 span), while avoiding excessive back rib density which would lead to excessive self-weight of the support system and reduced economy.
[0063] The preferred angle of the polygonal truss is 25°, which matches the angle of the constraint groove 13. This ensures optimal geometric coordination between the polygonal truss and the vertical trusses on both sides during the closing process, avoiding interference between members at the closing limit position.
[0064] It should be noted that the above parameters are preferred examples of the present invention. The specific values can be adaptively adjusted according to the actual cross-sectional dimensions of the tunnel, concrete load conditions and construction equipment capabilities. For example, the adjustment gap can be selected in the range of 20mm to 50mm, and the back rib spacing can be adjusted in the range of 120mm to 200mm. None of these constitute a limitation on the scope of protection of the present invention.
[0065] While the present invention has been disclosed above, its scope of protection is not limited thereto. Those skilled in the art can make various changes and modifications without departing from the spirit and scope of this disclosure, and all such changes and modifications will fall within the scope of protection of this invention.
Claims
1. A tunnel lining formwork support system for use in a tunnel, characterised in that, The support system consists of at least one support unit, which includes a base (10), a vertical truss, a polygonal truss, a steel panel (1), and a bracing adjustment system. There are two vertical trusses symmetrically arranged on the left and right sides of the base (10), and the lower end of each vertical truss is slidably connected to the upper flange of the base (10); the bottom of the polygonal truss has two connecting surfaces, which are symmetrically arranged at an incline and the side closer to the center of the polygonal truss is at a higher position. The polygonal truss is slidably connected to the upper ends of the two vertical trusses through the two connecting surfaces respectively; the polygonal truss is suitable for combining the two vertical trusses and the base (10) to form a closed annular space truss. The steel panel (1) includes a vertical panel and a horizontal panel, wherein two of the vertical panels are respectively installed on opposite sides of two of the vertical trusses, and the horizontal panel is installed on the top of the zigzag truss; the bracing adjustment system is arranged between the two of the vertical trusses and located below the zigzag truss; The bracing adjustment system includes bracing members (16), vertical suspension rods (14), steel sleeves (15), and lifting adjustment components. The vertical suspension rods (14) are installed at the bottom of the broken-line truss. The steel sleeves (15) are fitted onto the vertical suspension rods (14). Two bracing members (16) are symmetrically arranged on the steel sleeves (15). One end of each bracing member (16) is hinged to the steel sleeves (15), and the other end is hinged to the vertical truss. The lifting adjustment components are used to drive the steel sleeves (15) to move on the vertical suspension rods (14). By operating the lifting and adjusting components in the support adjustment system, the vertical trusses and the polygonal trusses on both sides can be moved to achieve overall diameter reduction for demolding or diameter expansion to fit the inner wall of the concrete.
2. The tunnel lining formwork support system according to claim 1, wherein, The base (10) is a variable cross-section H-shaped steel base. The lower flange arc of the base (10) matches the forming surface of the inner wall of the horseshoe-shaped tunnel. The bottom of the base (10) is reserved with an adjustment gap, which is used to realize the elevation fine adjustment and the leveling of the pad steel plate.
3. The tunnel lining formwork support system according to claim 1, characterized in that, The lower flange of the base (10) is provided with a fuma wheel support (11), which is used to detachably install the fuma wheel.
4. The tunnel lining formwork support system according to claim 1, characterized in that, Both ends of the vertical trusses on both sides are provided with constraint grooves (13). The constraint grooves (13) are used to constrain the vertical trusses on both sides to slide along a preset direction when they are retracted or expanded. A polytetrafluoroethylene plate (12) is embedded in the constraint grooves (13).
5. The tunnel lining formwork support system according to claim 4, wherein, The constraint groove (13) at the upper end of the vertical truss is inclined and parallel to the connecting surface on the same side of the bottom of the polygonal truss. The inclination angles of the constraint groove (13) at the upper end of the vertical truss and the connecting surface at the bottom of the polygonal truss are both greater than the friction angle of the steel.
6. The tunnel lining formwork support system according to claim 1, wherein, The position of one end of the bracing member (16) connected to the vertical suspension rod (14) is higher than the position of one end of the bracing member (16) connected to the vertical truss.
7. The tunnel lining formwork support system according to claim 1, wherein, Both ends of the vertical truss and the polygonal truss are equipped with sealing plates (8). Multiple splicing holes (9) are provided at intervals on the sealing plates (8) for setting connecting bolts in the splicing holes (9) to connect adjacent support units, so that multiple support units form a long continuous support force system.
8. The tunnel lining formwork support system according to claim 1, wherein, The lifting adjustment component includes an external thread provided on the outer wall of the vertical suspension rod (14) and two adjusting nuts (18) adapted to the external thread. The two adjusting nuts (18) are located on the upper and lower sides of the steel sleeve (15), respectively.
9. A method of construction based on the tunnel lining formwork support system according to any one of claims 1 to 8, characterized in that, Includes the following steps: Step S1: Prefabricate the base (10), the vertical trusses on both sides, the zigzag truss, the steel panel (1) and the bracing adjustment system according to the tunnel cross-section dimensions, and perform pre-assembly and debugging; Step S2: Transport the prefabricated components to the construction site, and assemble and fix the base (10), the vertical trusses on both sides, the zigzag truss, the steel panel (1) and the counter-bracing adjustment system in sequence on the assembly platform to form a standard support unit; Step S3: The assembled standard support unit is hoisted to the section to be constructed inside the tunnel. For open-cut tunnels, the entire unit is hoisted into place. For cut-and-cover tunnels, the support unit is first folded up, then slid into place, and then unfolded and reset. Step S4: Concrete is poured between the steel panel (1) and the inner wall of the tunnel, and the deformation of the support system is monitored during the pouring process; Step S5: After the concrete strength reaches the demolding strength, first loosen the connecting bolts between adjacent support units so that each support unit is independent of the others. Then operate the lifting adjustment component to drive the two sides of the support rods (16) to retract inward synchronously, so as to drive the vertical trusses on both sides and the corresponding vertical panels to shrink in diameter as a whole, so that the steel panel (1) is separated from the inner wall of the concrete. Step S6: Install the ferrule at the bottom of the base (10), and transfer each of the support units to the next construction section. Run the lifting adjustment component again to drive the two sides of the support rod (16) to expand outward synchronously, so that the steel panel (1) is expanded and reset to the design outline. Then, repeat the above steps S4 and S5 to carry out the next cycle of construction.
10. The construction method of a tunnel lining formwork support system according to claim 9, characterized in that, In step S3, after the support unit is hoisted into place, the elevation is finely adjusted by using a leveling steel plate through the adjustment gap reserved at the bottom of the base (10) to ensure that the center line of the support unit coincides with the design center line of the tunnel.