A steep-slope waterstop ring device and its installation method for large shield tunneling construction

By employing an inclined steel ring mechanism and a dynamic sealing system consisting of multiple sealing brushes and rubber curtain plates during steep slope shield tunneling, the problems of uneven gaps and water leakage during shield launch were solved, enabling smooth passage and efficient sealing of the shield, thus adapting to the complex environment of steep slope construction.

CN123109729APending Publication Date: 2026-11-17CHINA TIESIJU CIVIL ENGINEERING GROUP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611469413.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-21
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

In the construction of ultra-large diameter, steep slope shield tunnels, there is an angle difference between the straight steel ring axis and the starting axis, which leads to uneven gaps between the upper and lower parts of the shield after it enters the tunnel portal. This can easily cause shield jamming, excessive axis deviation, and water leakage paths, resulting in water and sand inrush accidents.

Method used

The steel ring mechanism is set at an angle, combined with a sealing mechanism and a grease injection mechanism, including multiple sealing brushes, rubber curtain plates and grease injection ports, to form a dynamic sealing cavity. This is suitable for shield tunneling at steep inclines, ensuring that the gap between the shield body and the steel ring is uniform and consistent, and significantly improving the dynamic sealing effect.

Benefits of technology

It effectively solves the problems of shield jamming and axis deviation, reduces the risk of water and sand inrush accidents, significantly improves sealing performance, and adapts to the needs of steep slope launching under complex hydrogeological conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109729A_ABST
    Figure CN123109729A_ABST
Patent Text Reader

Abstract

This invention discloses a steep-slope water-stopping ring device and installation method for large shield tunneling construction, belonging to the field of shield tunneling launch technology. It includes: a steel ring mechanism, installed at the shield launch portal, with the steel ring mechanism in an inclined state adapted to the shield launch slope; a sealing mechanism, installed on the inner wall of the steel ring mechanism, used to form a seal with the outer wall of the shield body when it passes through; and a sealing mechanism connected to the steel ring mechanism. In this design, the steel ring mechanism is inclined to adapt to the launch slope, with the three steel ring sections coaxial and sloped, and their axes parallel to the shield launch axis. This ensures uniform gaps around the shield body after it enters the tunnel, fundamentally solving the problems of jamming and axis deviation under steep-slope long shield conditions. Simultaneously, a multi-seal system using multiple sealing brushes and rubber curtain plates, combined with grease injection, forms a dynamic sealing cavity, adaptable to the up-and-down movement of the shield body, stably sealing dynamic gaps, significantly reducing the risk of water and sand inrush, and meeting the requirements of steep-slope launches.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of shield tunneling technology, and more specifically, to a steep-slope waterstop ring device and its installation method for large shield tunneling. Background Technology

[0002] As urban underground space development extends towards larger diameters, steeper slopes, and more complex geological conditions, ultra-large diameter shield tunneling machines (TBMs) are increasingly widely used in projects such as river-crossing tunnels and urban expressways. Conventional TBM launching portals generally employ a structure with straight, pre-embedded steel rings, with the ring axis horizontal. This design is mature in projects with conventional slopes and small to medium diameter TBMs, but it suffers from several compatibility issues under ultra-large diameter and steeper slope launching conditions. The straight steel ring axis has an angle difference with the starting axis of the steep slope. After the shield enters the tunnel portal, the gap between the upper and lower parts is seriously uneven, which can easily lead to problems such as shield jamming and excessive axis deviation. Moreover, the current straight pre-embedded steel ring cannot effectively seal the dynamic gap of the shield, which can easily form a water leakage path and cause water and sand inrush accidents.

[0003] Therefore, it is necessary to provide a steep slope waterstop ring device and installation method for large shield tunneling to solve the above-mentioned technical problems. Summary of the Invention

[0004] The purpose of this invention is to provide a steep slope water-stopping ring device and installation method for large shield tunneling to solve the above-mentioned technical problems.

[0005] To achieve the above objectives, the present invention adopts the following technical solution: A steep-slope water-stopping ring device for large-diameter tunnel boring machine construction includes: A steel ring mechanism is installed at the tunnel entrance of the shield tunnel, and the steel ring mechanism is installed in an inclined state adapted to the starting slope of the shield tunnel. A sealing mechanism is provided on the inner wall of the steel ring mechanism to form a seal with the outer wall of the shield body when the shield body passes through; The sealing mechanism is connected to the steel ring mechanism and is used to inject grease into the gap between the steel ring mechanism and the shield body.

[0006] Furthermore, the steel ring mechanism includes a pre-embedded steel ring, an extended steel ring, and a portal steel ring that are sequentially connected along the shield launching direction. The three are inclined as a whole and their central axis is parallel to the shield launching axis. The pre-embedded steel ring is pre-embedded in the launching portal.

[0007] Furthermore, the sealing mechanism includes: Multiple sealing brushes are arranged circumferentially on the inner wall of the extended steel ring, with at least one brush. Multiple water-stopping components are arranged circumferentially on the inner wall of the portal steel ring, with at least one component provided; A rubber curtain plate is arranged in a ring on the inner wall of the portal steel ring and is connected to the water-stopping component.

[0008] Furthermore, the water-stopping assembly includes an outer ring plate and an inner ring plate disposed on the inner wall of the portal steel ring, and the rubber curtain plate is disposed between the outer ring plate and the inner ring plate.

[0009] Furthermore, a flap is hinged to the end of the outer ring plate away from the inner wall of the portal steel ring via a pin.

[0010] Furthermore, the inner wall of the extended steel ring is provided with at least two sealing brush mounting grooves spaced apart along the axial direction, and a sealing brush is installed in each of the sealing brush mounting grooves, with the brush bristles of the sealing brush facing the shield tunneling direction.

[0011] Furthermore, the inner wall of the portal steel ring is provided with at least two curtain installation grooves spaced apart along the axial direction, and a rubber curtain plate is installed in each of the curtain installation grooves.

[0012] Furthermore, the sealing mechanism includes multiple grease injection ports evenly arranged circumferentially on the steel ring mechanism. Both the extension steel ring and the portal steel ring are provided with grease injection ports, and each grease injection port is equipped with a control valve and a quick connector.

[0013] Furthermore, the outer wall of the portal steel ring is provided with a first reinforcing plate, the inner wall of the portal steel ring is provided with a second reinforcing plate and a third reinforcing plate, and the second reinforcing plate and the third reinforcing plate are respectively connected to the corresponding outer ring plate, and the outer wall of the extension steel ring is provided with a fourth reinforcing plate.

[0014] A method for installing a steep-slope water-stop ring device for large-diameter tunnel boring machine (TBM) construction, comprising the following steps: S1. Construction Preparation Calibrate the measuring instruments, set up a support system with fine-tuning function, measure and mark the central axis of the steel ring mechanism, establish an installation reference surface with the corresponding design slope, and determine the positioning basis for the installation of the steel ring mechanism. S2, Installation of embedded steel ring While excavating the starting tunnel portal, pre-embedded steel rings are laid out. The pre-embedded steel rings are hoisted to the design position and initially positioned. Their elevation, slope and end face verticality are finely adjusted. After all indicators meet the standards, the pre-embedded steel rings are welded and fixed to the main structure steel bars. Then, concrete is poured to complete the pre-embedded curing of the steel rings. S3, Extended steel ring butt joint The hoisting extension steel ring and the pre-embedded steel ring end face are initially connected by bolts. The coaxiality and slope consistency of the two are checked. After passing the check, the butt joint bevel welding is completed. S4. Welding of the steel ring for the tunnel portal; The portal steel ring is hoisted and connected to the outer end face of the extended steel ring. The axis, slope and verticality of the overall water-stop ring device are checked. After confirming that each section of the steel ring is coaxial and has the same slope, welding and fixing are completed. S5. Sealing mechanism installation Secure each sealing brush in sequence and fill the gaps between the brush bristles with sealing grease; then assemble the water-stop components and rubber curtain plates one by one to ensure tight overlap of the sections. S6, Grease Injection Install control valves and quick connectors at each grease injection port, connect the grease pipeline to the centralized grease pump station, and complete the pipeline sealing test. S7. Overall Acceptance All accuracy indicators of the water-stop ring device were retested, and the quality of the sealing mechanism and the smoothness of the pipeline were checked. After passing the inspection, the device was accepted.

[0015] Compared with the prior art, the beneficial effects of the present invention are as follows: 1. The steel ring mechanism in this scheme adopts an inclined setting that is compatible with the starting slope of the shield tunnel. The three steel rings are coaxial and sloped, and the central axis is parallel to the starting axis of the shield tunnel. This ensures that the gaps around the shield are uniform after it enters the tunnel portal, which greatly reduces the amount and difficulty of adjusting the shield's attitude. It solves the problem of shield jamming and excessive axis deviation caused by uneven gaps of straight steel rings under the conditions of large slope and long shield from the structural root, ensuring that the shield tunnel starting process is smooth and controllable.

[0016] 2. This solution adopts a multi-seal system of "multiple steel wire sealing brushes + multiple rubber curtain plates", and is combined with the injection mechanism to continuously inject grease to form a dynamic sealing cavity. The multiple lines of defense work together to effectively adapt to the vertical floating of the shield under large slopes, stabilize the dynamic gap between the steel ring and the shield, significantly reduce the risk of water and sand inrush accidents, and significantly improve the sealing performance compared with conventional structures. It can adapt to the starting needs of large slopes under complex hydrogeological conditions.

[0017] 3. The components of this device adopt a prefabricated assembly mode in the factory and segmented on-site connection. At the same time, the supporting precision installation method adopts a combination measurement process and multi-dimensional fine adjustment support, which can control the deviation of the steel ring center axis, slope deviation and end face verticality to a high degree, ensuring the high coaxiality of the steel ring and the shield body, and has good engineering versatility and application value. Attached Figure Description

[0018] Figure 1 This is a front structural schematic diagram of the steel ring mechanism of the present invention; Figure 2 for Figure 1 Enlarged view of point A in the middle; Figure 3 for Figure 1 Schematic diagram of the cross-sectional structure at the middle FF section; Figure 4 for Figure 3 Enlarged view of point B in the middle; Figure 5 for Figure 4 Enlarged view of point C in the middle; Figure 6 This is a schematic diagram of the installation method of the shield tunneling steep slope water-stopping ring device of the present invention.

[0019] Explanation of the labels in the diagram: 1. Steel ring mechanism; 101. Embedded steel ring; 102. Extended steel ring; 103. Portal steel ring; 2. Sealing brush; 3. Water-stopping assembly; 301. Outer ring plate; 302. Inner ring plate; 4. Rubber curtain plate; 5. Flip plate; 6. Grease injection port; 7. First reinforcing plate; 8. Second reinforcing plate; 9. Third reinforcing plate; 10. Fourth reinforcing plate; 11. Emergency grouting port. Detailed Implementation

[0020] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0021] Please see Figure 1-6 A steep-slope water-stopping ring device for large-diameter shield tunneling, adapted to the launching conditions of large-diameter shields and steep slopes, wherein the overall slope of the device is parallel to the launching axis of the shield, comprising: The steel ring mechanism 1 is set at the shield tunneling portal, and the steel ring mechanism 1 is set in an inclined state adapted to the shield tunneling inclination. The central axis is parallel to the shield tunneling inclination, providing an installation foundation and passage for the shield to be launched. The sealing mechanism, located on the inner wall of the steel ring mechanism 1, is used to form a seal with the outer wall of the shield body when the shield body passes through, preventing water and soil from overflowing from the tunnel entrance during excavation. The sealing mechanism, connected to the steel ring mechanism 1, is used to inject grease into the gap between the steel ring mechanism 1 and the shield body to form a dynamic grease sealing cavity, further improving the sealing reliability.

[0022] In use, the steel ring mechanism 1 is first pre-installed at an inclined angle in the shield tunnel entrance, so that its inclination angle matches the slope of the shield tunneling, and the central axis of the steel ring mechanism 1 is parallel to the tunneling axis. When the shield tunneling is advanced, the shield body passes through the interior of the steel ring mechanism 1, and forms a basic seal by relying on the sealing mechanism to fit against the outer wall of the shield body. The sealing mechanism is then activated to continuously inject sealing grease into the annular gap between the steel ring mechanism 1 and the shield body, constructing a dynamic grease sealing layer to double-seal the water and soil seepage channels.

[0023] The system employs a three-layer protection logic: a slope-conforming steel ring, a static solid seal, and a dynamic grease seal. The steel ring mechanism 1 adjusts to the slope of the shield to eliminate angle differences, ensuring uniform circumferential gaps during shield movement. This avoids issues such as jamming due to excessively small gaps or sealing failure due to excessively large gaps, preventing problems like significant differences in vertical shield gaps, shield jamming, and axis deviation under steep slopes. The sealing mechanism achieves a solid fit to block water and soil. The grease sealant fills the dynamic gaps generated by the shield's movement, providing double water sealing and greatly reducing water leakage, thus preventing accidents such as water and sand inrush. The three mechanisms have clearly defined functions, adapting to the dynamic working conditions of shield tunneling at steep slopes. It is highly versatile and can be used for water sealing at the entrance of shield tunnels with various slopes.

[0024] Preferably, the steel ring mechanism 1 includes a pre-embedded steel ring 101, an extended steel ring 102, and a portal steel ring 103 that are sequentially connected along the shield launching direction. The three are inclined as a whole and their central axis is parallel to the shield launching axis. The pre-embedded steel ring 101 is pre-embedded in the launching portal. Several stiffening plates are arranged circumferentially on the outer wall of the pre-embedded steel ring 101. The stiffening plates are used to weld and fix to the main structural steel bars of the launching portal, which can effectively disperse the stress during concrete pouring and shield launching process and prevent the pre-embedded steel ring 101 from deforming or shifting.

[0025] Specifically, when excavating the initial tunnel portal, the pre-embedded steel ring 101 is hoisted into place, the outer wall stiffening plate is welded and fixed to the main body steel reinforcement of the tunnel portal, and concrete is poured to complete the pre-embedding. Then, the extension steel ring 102 is hoisted and fixed to the end face of the pre-embedded steel ring 101. Finally, the tunnel portal steel ring 103 is hoisted and welded to the outside of the extension steel ring 102. The three sections are kept coaxial and have the same slope.

[0026] In the initial stage of tunnel boring machine (TBM) operation: The shield passes through the portal steel ring 103, the extension steel ring 102, and the pre-embedded steel ring 101. The three steel rings form a continuous and regular annular channel, maintaining uniform gaps around the shield throughout the entire process. The three steel rings are coaxial and have the same slope, forming a continuous and smooth annular channel. The shield passes through without steps or local compression, reducing wear.

[0027] The three-section split steel ring is prefabricated in sections and assembled on site. The difficulty of hoisting, transportation and underground assembly is much lower than that of the whole large steel ring. Damaged sections can be replaced individually, and the later operation and maintenance repair costs are lower.

[0028] The embedded steel ring 101 is responsible for anchoring and fixing, the extended steel ring 102 provides a double-layer sealed installation space, and the portal steel ring 103 is equipped with a water-stop structure; the stiffening plate enhances the connection rigidity between the embedded steel ring 101 and the main structure to prevent deformation during casting.

[0029] In addition, the embedded steel ring 101 can be made of Q235B steel plate. The embedded steel ring 101 is embedded in the main structure of the starting tunnel portal and is cast in the same way as the main structure of the station. The mating end face of the embedded steel ring 101 has multiple sets of bolt holes along the circumferential direction. In this embodiment, M24 bolt holes are used to realize bolt connection with the extension steel ring 102. At the same time, bevel welding is used to strengthen the connection strength. The extension steel ring 102 and the portal steel ring 103 are both made of the same steel plate as the pre-embedded steel ring 101. The whole is set at an inclination along with the pre-embedded steel ring 101, and both end faces are strictly perpendicular to the shield tunneling starting axis. Preferably, the sealing mechanism includes: Multiple sealing brushes 2 are arranged circumferentially on the inner wall of the extended steel ring 102, with at least one brush. They can be made of φ0.5mm galvanized steel wire. After installation, the interference between the brush bristles and the shield surface is ≥30mm to ensure that the brush bristles are tightly attached to the outer wall of the shield and form an effective seal. Multiple water-stopping components 3 are arranged circumferentially on the inner wall of the portal steel ring 103, and at least one is provided; The rubber curtain plate 4 is arranged in a ring on the inner wall of the portal steel ring 103 and connected to the water-stop component 3. It can be made of 16mm thick wear-resistant rubber in sections. The joints are evenly coated with sealant to ensure the sealing of the joints. The inner diameter of the rubber curtain plate 4 is 150mm smaller than the inner diameter of the steel ring to ensure that the inner edge fits tightly against the outer wall of the shield after installation, forming an interference seal.

[0030] Specifically, first, multiple sealing brushes 2 are installed on the inner wall of the extended steel ring 102. The gaps between the brush bristles need to be manually filled with sealing grease, which can further improve the sealing effect, lubricate the brush bristles, and reduce wear when the shield passes through. Then, water-stop components 3 are arranged circumferentially on the inner wall of the portal steel ring 103, and the rubber curtain plate 4 is assembled and fixed on the water-stop components 3.

[0031] During tunnel boring machine (TBM) advancement: The shield body first passes through the portal steel ring 103, and the annular rubber curtain plate 4 elastically fits the outer wall of the shield body, forming the first flexible sealing barrier in conjunction with the water-stopping component 3. The shield body continues to advance into the extension steel ring 102, and the multiple sealing brushes 2 brush filaments closely adhere to the shield shell to form the second steel wire sealing barrier, thus preventing groundwater and sand from seeping inward.

[0032] By adopting a double-layer sealing protection system of flexible rubber seal and rigid steel wire seal, the water-stopping and sand-proofing capabilities are significantly improved compared to a single seal. The shield body is less prone to leakage when floating up and down on a large slope, and it can adapt to slight deviations in the shield body's attitude, adapting to dynamic gap changes at the start of a large slope.

[0033] Preferably, the water-stopping component 3 includes an outer ring plate 301 and an inner ring plate 302 disposed on the inner wall of the portal steel ring 103, and a rubber curtain plate 4 disposed between the outer ring plate 301 and the inner ring plate 302. The rubber curtain plate 4 is connected to the outer ring plate 301 and the inner ring plate 302 by bolts.

[0034] Specifically, when assembling the water-stopping component 3, first, the inner ring plate 302 is attached and fixed to the inner wall of the portal steel ring 103, then the annular rubber curtain plate 4 is laid flat and attached to the outside of the inner ring plate 302, and finally the outer ring plate 301 is covered, and bolts are inserted to fasten the outer ring plate 301, the rubber curtain plate 4, and the inner ring plate 302 into one unit.

[0035] During tunnel boring machine (TBM) operation: The rubber curtain plate 4 is clamped and limited by the double ring plates, bending and deforming under pressure to fit inward against the shield shell, stably performing a flexible sealing function. Damaged rubber curtain plate 4 can be replaced by loosening the bolts, without the need to completely remove the portal steel ring 103, making disassembly and assembly convenient, and maintenance and replacement easy.

[0036] Preferably, the end of the outer ring plate 301 away from the inner wall of the portal steel ring 103 is hinged to a flap 5 by a pin, and the flap 5 can rotate freely around the pin.

[0037] With this design, when the tunnel boring machine (TBM) starts to launch, the flap 5 naturally hangs down and fits against the outside of the rubber curtain plate 4. When the shield body advances and contacts the flap 5, the shield shell pushes the flap 5 to rotate slightly inward around the pin axis. After the shield body has completely passed through, the flap 5 relies on continuous pressure to hold the rubber curtain plate 4 and the outside of the shield shell.

[0038] The hinged rotatable flap 5 forms an external limiting and pressing structure. The flap 5 continuously presses down on the rubber curtain plate 4, preventing the curtain from flipping outward, the seal from failing, and sand and water leakage.

[0039] Preferably, the inner wall of the extended steel ring 102 is provided with at least two sealing brush mounting grooves spaced apart along the axial direction, and a sealing brush 2 is installed in each sealing brush mounting groove, with the brush bristles of the sealing brush 2 facing the shield tunneling direction.

[0040] This design allows the sealing brush 2 to be fixedly embedded in the sealing brush mounting groove, and the direction of the brush bristles to the tunnel boring machine to be uniformly adjusted. The gaps between the brush bristles are filled with sealing grease to further seal the tiny gaps between the steel wires.

[0041] Tunnel Boring: The shield moves from the portal steel ring 103 toward the pre-embedded steel ring 101. The shield shell passes through the sealing brush 2 along the inclined direction of the brush filaments. The brush filaments are squeezed tightly against the outer wall by the shield shell, forming a gradient ring barrier. Multiple sealing brushes 2 intercept ground water and silt in sequence, providing multiple layers of protection. Even after one brush wears out, another brush can still maintain water stoppage.

[0042] Preferably, the inner wall of the portal steel ring 103 is provided with at least two curtain installation grooves spaced apart along the axial direction, and a rubber curtain plate 4 is installed in each curtain installation groove.

[0043] With this design, the shield body passes through multiple rubber curtain plates 4 in sequence, and multiple layers of rubber rings are attached to the shield shell in sequence to seal the leakage gaps step by step, forming a multi-level flexible sealing ring, dispersing water and soil pressure, gradually reducing the leakage channel, and the front and rear layers form a buffer, so that the two layers will not fail at the same time when the shield body floats up and down on a large slope.

[0044] Preferably, the sealing mechanism includes multiple grease injection ports 6 evenly arranged circumferentially on the steel ring mechanism 1. Grease injection ports 6 are provided on the extension steel ring 102 and the portal steel ring 103. Each grease injection port 6 is equipped with a control valve and a quick connector. The grease injection ports 6 are connected to a centralized grease pump station through pipelines.

[0045] Specifically, the grease pump station is turned on, and the control valve of the corresponding area grease injection port 6 is opened. Grease is continuously pressed into the annular gap between the inner wall of the steel ring and the shield body through the quick connector and grease injection port 6. Depending on the leakage situation, the local grease injection port 6 can be opened separately to replenish the grease. The grease fills the cavity between the sealing brush 2 and the rubber curtain plate 4 to form a continuous grease sealing layer.

[0046] By using circumferential multi-point distributed grease injection, combined with independent control valves for zoned grease control, local leakage is only addressed at the corresponding points, saving grease and reducing waste; a dynamic grease-waterproof layer is constructed inside the sealing structure, where the grease serves both sealing and lubrication functions.

[0047] Preferably, the outer wall of the extended steel ring 102 is also provided with an emergency grouting port 11, which is located between the pre-embedded steel ring 101 and the adjacent sealing brush 2.

[0048] With this design, the pipeline connects the emergency grouting port 11 to the grouting equipment. In the event of water or sand inrush, polyurethane can be injected to seal the leak. Furthermore, one port is installed every 30° along the outer wall of the extended steel ring 102 to further enhance the sealing reliability and increase the number of emergency response options.

[0049] Preferably, the outer wall of the portal steel ring 103 is provided with a first reinforcing plate 7, the inner wall of the portal steel ring 103 is provided with a second reinforcing plate 8 and a third reinforcing plate 9, and the second reinforcing plate 8 and the third reinforcing plate 9 are respectively connected to the corresponding outer ring plate 301, and the outer wall of the extension steel ring 102 is provided with a fourth reinforcing plate 10.

[0050] The first reinforcing plate 7 and the fourth reinforcing plate 10 enhance the overall circumferential stiffness of the portal steel ring 103 and the extension steel ring 102, preventing elliptical deformation under uneven loads with large slopes and ensuring uniform annular sealing gaps. The second reinforcing plate 8 and the third reinforcing plate 9 directly support the outer circular ring plate 301. The water-stop component 3 and the rubber curtain plate 4 have sufficient rigidity on the mounting base, preventing pressure-induced indentation and ensuring stable sealing fit.

[0051] The present invention also provides an installation method for a steep slope water-stop ring device for large shield tunneling construction, which is used to install the above-mentioned steep slope water-stop ring device for large shield tunneling construction, specifically including the following steps: S1. Construction Preparation First, technical briefings were conducted, providing all construction personnel with detailed instructions on the slope requirements, accuracy indicators, operational points, and quality acceptance standards for the steel ring installation. Next, measuring instruments were calibrated: total stations, levels, laser line projectors, and other measuring instruments underwent mandatory verification and calibration to ensure measurement accuracy met construction requirements. A support system with fine-tuning capabilities was erected: a full-span scaffolding support system was constructed at the steel ring installation location, equipped with adjustable support screws and hydraulic jacks, providing fine-tuning functions for elevation, slope, and horizontal position. The center axis of steel ring mechanism 1 was measured and laid out using a total station, marking the center crosshairs and controlling the deviation between the steel ring center and the design axis to be ≤3mm. Finally, an installation reference surface corresponding to the design slope was established: the height difference between the top and bottom of the steel ring was calculated based on the design slope, and a laser line projector was used to project the reference surface along the design slope, serving as the slope reference for steel ring installation and determining the positioning basis for the installation of steel ring mechanism 1.

[0052] S2, Installation of embedded steel ring While excavating the starting tunnel portal, the pre-embedded steel ring 101 is laid out. The pre-embedded steel ring 101 is hoisted to the design position and initially positioned. Its elevation, slope and end face verticality are finely adjusted. After all indicators meet the standards, the pre-embedded steel ring 101 is welded and fixed to the main structure steel bars. Then concrete is poured to complete the pre-embedded curing of the pre-embedded steel ring 101. During the adjustment process, the elevations of four characteristic points (top, bottom, left, and right) of the steel ring were measured using a level, and the actual slope was calculated. The actual slope was then fine-tuned to ensure that the deviation between the actual slope and the design slope was ≤1‰. A total station was used to check the verticality of the steel ring end face, and the verticality of the end face was controlled to be ≤1‰ (i.e., the deviation within 1m height was ≤1mm). At the same time, the plane position of the steel ring was adjusted to ensure that the deviation of the central axis was ≤3mm.

[0053] S3, Extended steel ring butt joint The end faces of the hoisting extension steel ring 102 and the pre-embedded steel ring 101 are initially connected by bolts. The coaxiality and slope consistency of the two are checked. After passing the check, the butt joint bevel welding is completed. After welding is completed, ultrasonic testing is performed to ensure that there are no defects inside the weld and that the pass rate of the testing reaches 100%. S4. Welding of the steel ring for the tunnel portal; The portal steel ring 103 is hoisted and connected to the outer end face of the extension steel ring 102. The axis, slope and verticality of the overall water-stop ring device are checked. After confirming that each section of the steel ring is coaxial and has the same slope, welding and fixing are completed. S5. Sealing mechanism installation Secure each sealing brush 2 in sequence and fill the gaps between the brush bristles with sealing grease; then assemble the water-stopping components 3 and rubber curtain plates 4 one by one to ensure tight overlap of the sections. Among them, the two sealing brushes are fastened to the sealing brush installation groove by steel plate pressure strips and bolts to ensure that the brush bristles are evenly distributed in the circumferential direction and have the same orientation, without any lying down or skewing; the rubber curtain plate 4 is evenly coated with sealant at the joint of the sections to ensure that the sections overlap tightly without warping or gaps. During the installation process, it is confirmed that the inner edge of the rubber curtain plate 4 faces the shield tunneling direction to ensure that the mating surface is flat. S6, Grease Injection Install control valves and quick connectors at each of the six grease injection ports, connect the grease pipeline to the centralized grease pump station, and complete the pipeline sealing test; the test pressure is 1.0 MPa, and it is considered qualified if there is no leakage after holding the pressure for 30 minutes. After the test is qualified, check the unobstructedness of each grease injection port and emergency grouting port to ensure that there is no blockage.

[0054] S7. Overall Acceptance All accuracy indicators of the water-stop ring device were retested, and the quality of the sealing mechanism and the smoothness of the pipeline were checked. After passing the inspection, the device was accepted.

[0055] It should be understood that the examples and embodiments described herein are for illustrative purposes only and are not intended to limit the invention. Those skilled in the art can make various modifications or changes based on them. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the invention should be included within the protection scope of the invention.

[0056] It should be noted that if the embodiments of the present invention involve directional indicators such as up, down, left, right, front, back, etc., the directional indicators are only used to explain the relative positional relationship and movement of the components in a specific posture as shown in the attached figure. If the specific posture changes, the directional indicators will also change accordingly.

[0057] Furthermore, if the embodiments of this invention involve descriptions such as "first" or "second," these descriptions are for descriptive purposes only and should not be construed as indicating or implying their relative importance or implicitly specifying the number of technical features indicated. Therefore, a feature defined with "first" or "second" may explicitly or implicitly include at least one of those features. Additionally, the meaning of "and / or" throughout the text includes three parallel solutions; for example, "A and / or B" includes solution A, solution B, or a solution where both A and B are satisfied simultaneously. Furthermore, "multiple" refers to two or more. Moreover, the technical solutions of the various embodiments can be combined with each other, but this must be based on the ability of those skilled in the art to implement them. When the combination of technical solutions is contradictory or impossible to implement, it should be considered that such a combination of technical solutions does not exist and is not within the scope of protection claimed by this invention.

Claims

1. A large slope water stop ring device for large shield construction, characterized in that, include: A steel ring mechanism (1) is installed at the shield tunneling starting portal, and the steel ring mechanism (1) is installed in an inclined state that is adapted to the starting slope of the shield tunneling. A sealing mechanism is provided on the inner wall of the steel ring mechanism (1) to form a seal with the outer wall of the shield body when the shield body passes through; The sealing mechanism is connected to the steel ring mechanism (1) and is used to inject grease into the gap between the steel ring mechanism (1) and the shield body.

2. A large slope water stop ring device for large shield construction according to claim 1, characterized in that, The steel ring mechanism (1) includes a pre-embedded steel ring (101), an extended steel ring (102) and a portal steel ring (103) that are connected sequentially along the shield launching direction. The three are inclined as a whole and their central axis is parallel to the shield launching axis. The pre-embedded steel ring (101) is pre-embedded in the launching portal.

3. A large slope water stop ring device for large shield construction according to claim 2, characterized in that, The sealing mechanism includes: Multiple sealing brushes (2) are provided circumferentially covering the inner wall of the extended steel ring (102), with at least one brush. Multiple water-stopping components (3) are arranged circumferentially on the inner wall of the portal steel ring (103), and at least one is provided; The rubber curtain plate (4) is arranged in a ring on the inner wall of the portal steel ring (103) and connected to the water-stopping component (3).

4. A large slope water stop ring device for large shield construction according to claim 3, characterized in that, The water-stopping component (3) includes an outer ring plate (301) and an inner ring plate (302) disposed on the inner wall of the portal steel ring (103), and the rubber curtain plate (4) is disposed between the outer ring plate (301) and the inner ring plate (302).

5. A large slope water stop ring device for large shield construction according to claim 4, characterized in that, The outer ring plate (301) is hinged to a flap (5) at one end away from the inner wall of the portal steel ring (103) by a pin.

6. A large shield construction large slope water stop ring device according to claim 3, characterized in that, The inner wall of the extended steel ring (102) is provided with at least two sealing brush mounting grooves spaced apart along the axial direction. Each sealing brush (2) is installed in each sealing brush mounting groove, and the bristles of the sealing brush (2) are arranged in the direction of shield tunneling.

7. A large slope water stop ring device for large shield construction according to claim 3, characterized in that, The inner wall of the portal steel ring (103) is provided with at least two curtain installation grooves spaced apart along the axial direction, and a rubber curtain plate (4) is installed in each of the curtain installation grooves.

8. A large slope waterstop ring device for large shield construction according to claim 2, characterized in that, The sealing mechanism includes multiple grease inlets (6) evenly arranged circumferentially on the steel ring mechanism (1). The extension steel ring (102) and the portal steel ring (103) are both provided with grease inlets (6). Each grease inlet (6) is equipped with a control valve and a quick connector.

9. A steep slope water-stopping ring device for large shield tunneling construction according to claim 4, characterized in that, The outer wall of the portal steel ring (103) is provided with a first reinforcing plate (7), the inner wall of the portal steel ring (103) is provided with a second reinforcing plate (8) and a third reinforcing plate (9), and the second reinforcing plate (8) and the third reinforcing plate (9) are respectively connected to the corresponding outer ring plate (301), and the outer wall of the extension steel ring (102) is provided with a fourth reinforcing plate (10).

10. A method for installing a steep-slope water-stop ring device for large shield tunneling construction, characterized in that, The method for installing the steep slope waterstop ring device for large shield tunneling construction as described in any one of claims 1-9 specifically includes the following steps: S1. Construction Preparation Calibrate the measuring instruments, set up a support system with fine-tuning function, measure and set the central axis of the steel ring mechanism (1), establish the installation reference surface corresponding to the design slope, and determine the positioning basis for the installation of the steel ring mechanism (1). S2, Installation of embedded steel ring While excavating the starting tunnel portal, a pre-embedded steel ring (101) is laid out. The pre-embedded steel ring (101) is hoisted to the design position and initially positioned. Its elevation, slope and end face verticality are finely adjusted. After all indicators meet the standards, the pre-embedded steel ring (101) is welded and fixed to the main structure steel bars. Then, concrete is poured to complete the pre-embedded curing of the pre-embedded steel ring (101). S3, Extended steel ring butt joint The end faces of the hoisting extension steel ring (102) and the pre-embedded steel ring (101) are initially connected by bolts. The coaxiality and slope of the two are checked and the butt joint bevel welding is completed after the qualification is qualified. S4. Welding of the steel ring for the tunnel portal; The portal steel ring (103) is hoisted and connected to the outer end face of the extension steel ring (102). The axis, slope and verticality of the overall water-stop ring device are checked. After confirming that each section of the steel ring is coaxial and has the same slope, welding and fixing are completed. S5, Sealing mechanism installation Fix each sealing brush (2) in sequence and fill the gaps between the brush bristles with sealing grease; then assemble the water-stopping components (3) and rubber curtain plates (4) one by one to ensure tight overlap of the sections; S6, Grease Injection Install control valves and quick connectors at each grease injection port (6), connect the grease pipeline to the centralized grease pump station, and complete the pipeline sealing test; S7. Overall Acceptance All accuracy indicators of the water-stop ring device were retested, and the quality of the sealing mechanism and the smoothness of the pipeline were checked. After passing the inspection, the device was accepted.