Intelligent Energy Consumption Scheduling Method and System for Sand and Gravel Production Lines

By installing a flow rate monitoring module and frequency modulator on the sand and gravel production line, combined with the frequency adjustment of the ventilation and dust collector, the problems of increased energy consumption and insufficient environmental purification when the flow rate changes in the existing equipment are solved. This achieves intelligent energy consumption and environmental scheduling, ensuring production efficiency and environmental protection.

CN123113783APending Publication Date: 2026-11-17QIYANG WANXIN NEW ENVIRONMENTALLY FRIENDLY BUILDING MATERIALS CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202611582923.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-13
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing intelligent energy consumption scheduling devices for sand and gravel production lines tend to increase energy consumption when the flow rate does not change significantly, exhibiting poor adaptability. Furthermore, they fail to effectively schedule air purification devices, leading to increased energy consumption and insufficient material processing.

Method used

By combining a flow rate monitoring module, a frequency modulator, and a control module, and by setting flow rate thresholds and frequency adjustments, the system ensures that the frequency is adjusted only within the threshold range when the flow rate changes. Combined with the synchronous frequency adjustment of the ventilation and dust collector, intelligent scheduling of energy consumption and environmental purification is achieved.

Benefits of technology

It effectively avoids increased energy consumption due to small changes in circulation volume, ensures material processing quality and environmental purification effect, and achieves energy saving while avoiding insufficient material processing and environmental pollution, thus improving the intelligence and practicality of energy consumption scheduling.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123113783A_ABST
    Figure CN123113783A_ABST
Patent Text Reader

Abstract

This invention relates to the field of sand and gravel production and processing technology, and in particular to an intelligent energy consumption scheduling method and system for sand and gravel production lines. The system includes a flow rate monitoring module, a frequency modulator, and a control module. Let the rated material flow rate processed by the production device at its rated output frequency f0 be Q0, and its output energy consumption be E0. Let the material flow rate processed by the production device at its actual output frequency f be Q, and its output energy consumption be E. In processing devices, E ≤ E0, and the material processing quality at f should meet the execution standard. Let f be the lowest frequency under the execution standard. min Then f≥f min In the case of material handling equipment, E≤E0; This intelligent energy consumption scheduling system can adaptively adjust the frequency of each piece of equipment in sand and gravel production according to the flow of logistics production, thus enabling intelligent energy consumption scheduling of each production device in the sand and gravel production line.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of sand and gravel production and processing technology, and in particular to an intelligent energy consumption scheduling method and system for sand and gravel production lines. Background Technology

[0002] A sand and gravel production line is a complete production system that processes raw materials such as large rocks, pebbles, or mine tailings into construction sand and gravel aggregates of different particle sizes through processes such as feeding, crushing, screening, sand making, and conveying. It is widely used in concrete mixing plants, highway and railway construction, water conservancy projects, and other fields. A typical sand and gravel production line usually consists of a vibrating feeder, crusher, sand making machine, vibrating screen, belt conveyor, and auxiliary equipment such as ventilation and dust removal. The various pieces of equipment are connected by belt conveyors to form a continuous material processing and transfer process. Because sand and gravel production lines require a large number of equipment, they generate a lot of energy consumption in actual production. Therefore, under the premise of ensuring production, effective scheduling of equipment energy consumption is an essential technical means. For example, existing published documents CN113617508B - An Adaptive Online Control Device and Method for a Classifying Crusher and CN107413511B - An Intelligent Control System and Control Method for Crushing and Screening Equipment both disclose an intelligent energy consumption scheduling device for sand and gravel production. Although existing scheduling devices can effectively schedule the energy consumption of sand and gravel production equipment, they still have the following shortcomings in actual use: 1. Existing scheduling devices mainly adjust the frequency of the working motors based on the material flow rate to achieve energy consumption scheduling and thus save energy. However, the existing scheduling method is too simple. If the motor frequency is adjusted when the flow rate does not change much, it will increase energy consumption. In addition, the existing scheduling method has poor adaptability. For processing devices, simply adjusting the frequency may lead to insufficient material processing. For handling devices, reducing the frequency will lead to a decrease in conveying speed, and a decrease in conveying speed will lead to an increase in the weight of material piled up per unit, thus not reducing the overall energy consumption of the conveying. 2. The existing scheduling device only targets the production equipment itself and does not target the air purification device. However, a large amount of dust is generated in sand and gravel production, so the air purification device is an essential piece of equipment. If it is not scheduled accordingly, it will inevitably cause a large amount of energy consumption in sand and gravel production. Therefore, it is necessary to improve the existing technology to solve the above-mentioned technical problems. Summary of the Invention

[0003] The purpose of this section is to outline some aspects of embodiments of the present invention and to briefly describe some preferred embodiments. Simplifications or omissions may be made in this section, as well as in the abstract and title of this application, to avoid obscuring the purpose of these documents; however, such simplifications or omissions should not be construed as limiting the scope of the invention.

[0004] In view of the problems of poor scheduling effect and insufficient practicality of the existing intelligent energy consumption scheduling system, an intelligent energy consumption scheduling system for sand and gravel production lines is proposed.

[0005] To solve the above-mentioned technical problems, the present invention provides the following technical solution: an intelligent energy consumption scheduling system for sand and gravel production lines, comprising: a flow rate monitoring module, wherein each production device is equipped with a flow rate monitoring module at its input or output end; a frequency modulator, wherein each production device's motor is equipped with a frequency modulator; and a control module, wherein the flow rate monitoring module and frequency modulator used in conjunction with each production device form a group of scheduling modules, and multiple groups of scheduling modules are electrically connected to the same control module, wherein the production devices include processing devices and handling devices; Let Q0 be the rated material flow rate processed by the production device at the rated output frequency f0, and E0 be the output energy consumption. Let Q be the material flow rate processed by the production device at the actual output frequency f, and E be the output energy consumption. In processing equipment, E≤E0, and the material processing quality under f should meet the execution standard. Let f be the lowest frequency under the execution standard. tmin Then f≥f tmin ; In the case of transport devices, E≤E0; Let the graded adjustment value be δ n And 0≤δ n ≤1; When Q≥Q0×(1-δ1), f=f0; When Q0×(1-δ2)≤Q<Q0×(1-δ1), then f=f1; When Q0×(1-δ3)≤Q<Q0×(1-δ2), then f=f2; ... When Q0×(1-δ) n+1 )≤Q<Q0×(1-δ n When f = f n ; When Q < Q0 × (1-δ) n+1 When f = f n+1 ; And n≥1, 0≤f n+1 ≤f n ...≤f2≤f1≤f0,f nmin ≤fn ≤f nmax .

[0006] As a preferred embodiment of the intelligent energy consumption scheduling system for sand and gravel production lines of the present invention, the processing devices include crushers and screening machines, and the handling devices include conveyors and lifting machines.

[0007] As a preferred embodiment of the intelligent energy consumption scheduling system for sand and gravel production lines of the present invention, the flow rate monitoring module includes at least one of an electronic weighing scale, a distance sensor, and an impact flow meter.

[0008] As a preferred embodiment of the intelligent energy consumption scheduling system for sand and gravel production lines of this invention, wherein: f nmin Q0×(1-δ) n+1 )~Q0×(1-δ n The minimum frequency below the flux threshold, f nmax Q0×(1-δ) n+1 )~Q0×(1-δ n The maximum frequency below the flow threshold.

[0009] As a preferred embodiment of the intelligent energy consumption scheduling system for sand and gravel production lines of the present invention, wherein: when Q < (Q0 × (1-δ) n+1 )+Q0×(1-δ n When f = 2, nmin ≤f n <(f) nmin +f nmax ) / 2; when Q≥(Q0×(1-δ n+1 )+Q0×(1-δ n When )) / 2, (f nmin +f nmax ) / 2≤f n ≤f nmax .

[0010] As a preferred embodiment of the intelligent energy consumption scheduling system for sand and gravel production lines of the present invention, wherein: when Q < (Q0 × (1-δ) n+1 )+Q0×(1-δ n When f = 2, n =f nmin When Q≥(Q0×(1-δ n+1 )+Q0×(1-δ n When f = 2, n =f nmax .

[0011] As a preferred embodiment of the intelligent energy consumption scheduling system for sand and gravel production lines of this invention, a ventilation and dust collector is installed above the production unit, and the operating frequency of the ventilation and dust collector is f. x Then f x =kf, where k is an adjustment constant; the ventilation dust collector is electrically connected to the control module via a transmission line.

[0012] As a preferred embodiment of the intelligent energy consumption scheduling system for sand and gravel production lines of this invention, an air monitoring sensor is also installed on the production equipment to determine the adjustment coefficients m and f. x =k(1+m)f, and 0≤m≤1; the air monitoring sensor is electrically connected to the control module through a conductive line.

[0013] The beneficial effects of this invention are: when the intelligent energy consumption scheduling system is in use, it adjusts the value δ... n This configuration divides the material flow rate into various flow rate thresholds. When a change in flow rate occurs, frequency adjustment only occurs if the change reaches the corresponding threshold range. If the change in flow rate does not exceed the threshold, the operating frequency will not change. This avoids increased energy consumption due to automatic frequency conversion when the flow rate change is small. Furthermore, this device further limits the specific threshold range within which the flow rate change falls when a change in flow rate occurs, allowing for predictive determination of subsequent flow rate change trends (e.g., Q < (Q0 × (1-δ)). n+1 )+Q0×(1-δ n ()) / 2 indicates that the flow rate changes in the upper half of the threshold, which can predict that the frequency adjustment will change in the upper half, thus avoiding the problem of excessive frequency adjustment and increased energy consumption. For processing equipment, by setting the material processing quality under f to meet the requirements of the execution standard, energy saving can be achieved while avoiding insufficient material processing. For handling equipment, by setting E≤E0, the problem of energy consumption not being reduced when adjusting the frequency can be avoided.

[0014] Another beneficial effect of this invention is that, when the intelligent energy consumption scheduling system is in use, because there is a positive correlation between the unit processing volume of materials and air pollution, thus through f x When the frequency of the production unit is adjusted due to changes in the material flow, the ventilation and dust collector will also adjust its frequency accordingly. This allows for energy saving while ensuring that the working environment meets the working standards, thereby improving the intelligent scheduling of energy consumption.

[0015] In addition, the present invention also provides the following technical solution: an intelligent energy consumption scheduling method for sand and gravel production lines, wherein the above-mentioned intelligent energy consumption scheduling system for sand and gravel production lines is operated according to the following steps; S1: The staff inputs the adjustment value δ through the control module. n To set the material flow rate Q to each flow rate threshold, and to set the value of the frequency f under each flow rate threshold; S2: The flow rate monitoring module collects flow rate data from the production unit, and the control module analyzes the collected data to determine which specific flow rate threshold the data falls within. S3: Then the control module adjusts the motor operating frequency through the frequency converter according to the corresponding flow threshold value f, thereby realizing energy consumption adjustment; S4: At the same time, the control module will also adjust the frequency of the ventilation and dust collector based on the detected flow rate data. x ; S5: The air monitoring sensor monitors the working air environment to enable the control module to control f x Make adjustments in real time. Attached Figure Description

[0016] To more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort. Wherein: Figure 1 This is a schematic diagram of the energy consumption intelligent scheduling system for sand and gravel production lines.

[0017] Figure 2 This is a block diagram illustrating the working principle of the scheduling module, production device, and control module in this invention.

[0018] Figure 3 This is a flowchart of an intelligent energy consumption scheduling method for sand and gravel production lines. Detailed Implementation

[0019] To make the above-mentioned objects, features and advantages of the present invention more apparent and understandable, the specific embodiments of the present invention will be described in detail below with reference to the accompanying drawings.

[0020] Many specific details are set forth in the following description in order to provide a full understanding of the invention. However, the invention may also be practiced in other ways different from those described herein, and those skilled in the art can make similar extensions without departing from the spirit of the invention. Therefore, the invention is not limited to the specific embodiments disclosed below.

[0021] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The phrase "in one embodiment" appearing in different places in this specification does not necessarily refer to the same embodiment, nor is it a single or selective embodiment that is mutually exclusive with other embodiments.

[0022] Secondly, the present invention is described in detail with reference to the schematic diagrams. When detailing the embodiments of the present invention, for ease of explanation, the cross-sectional views illustrating the device structure may be partially enlarged, not according to the usual scale. Furthermore, the schematic diagrams are merely examples and should not limit the scope of protection of the present invention. In addition, actual fabrication should include three-dimensional spatial dimensions of length, width, and depth. Example

[0023] Reference Figure 1 and Figure 2 This is the first embodiment of the present invention. This embodiment provides an intelligent energy consumption scheduling system for a sand and gravel production line. When the intelligent energy consumption scheduling system is in use, the flow rate monitoring module is used to monitor the input or output flow rate of the production device in real time, the frequency modulator is used to adjust the frequency of the motor of the production device, and the control module is used to monitor and regulate each group of scheduling modules in real time.

[0024] Specifically, it includes a flow monitoring module, with each production unit equipped with a flow monitoring module at its input or output end; a frequency modulator, with each production unit's motor equipped with a frequency modulator; and a control module, with each production unit's flow monitoring module and frequency modulator forming a set of scheduling modules, and multiple sets of scheduling modules electrically connected to the same control module. The production units include processing units and handling units. Preferably, the processing equipment includes a crusher and a screening machine, and the handling equipment includes a conveyor and a lifting machine. The crusher is used to crush materials, while the screening machine can screen and classify the crushed materials as needed. The conveyor is used to transfer materials, and the lifting machine is used to feed materials into the processing equipment. The flow rate monitoring module includes at least one of an electronic weighing scale, a distance sensor, and an impact flow meter. All of the above devices are used to monitor the flow rate of materials.

[0025] Let Q0 be the rated material flow rate processed by the production device at the rated output frequency f0, and E0 be the output energy consumption. Let Q be the material flow rate processed by the production device at the actual output frequency f, and E be the output energy consumption. In processing equipment, E≤E0, and the material processing quality under f should meet the execution standard. Let f be the lowest frequency under the execution standard. tmin Then f≥f tminThis allows for energy conservation while ensuring the quality of material processing. The quality of material processing should comply with the existing publicly available standards, which will not be elaborated here. The appropriate standard can be selected based on the actual industrial application, such as GB / T 14685-2022 "Construction Pebbles and Crushed Stones". In material handling equipment, E≤E0, in order to avoid the increase in material accumulation thickness per unit distance after frequency conversion, which would lead to an increase in overall energy consumption; Let the graded adjustment value be δ n And 0≤δ n ≤1; When Q≥Q0×(1-δ1), f=f0; When Q0×(1-δ2)≤Q<Q0×(1-δ1), then f=f1; When Q0×(1-δ3)≤Q<Q0×(1-δ2), then f=f2; ... When Q0×(1-δ) n+1 )≤Q<Q0×(1-δ n When f = f n ; When Q < Q0 × (1-δ) n+1 When f = f n+1 ; And n≥1, 0≤f n+1 ≤f n ...≤f2≤f1≤f0,f nmin ≤f n ≤f nmax .

[0026] Furthermore, f nmin Q0×(1-δ) n+1 )~Q0×(1-δ n The minimum frequency below the flux threshold, f nmax Q0×(1-δ) n+1 )~Q0×(1-δ n The maximum frequency below the flux threshold, when Q < (Q0 × (1 - δ) n+1 )+Q0×(1-δ n When f = 2, nmin ≤f n <(f) nmin +f nmax ) / 2; when Q≥(Q0×(1-δ n+1 )+Q0×(1-δ n When )) / 2, (f nmin +f nmax ) / 2≤f n ≤f nmaxThis allows for a prediction of the next flux threshold change, thus avoiding excessive frequency modulation amplitude that could lead to increased energy consumption. If the flux in this stage is Q ≥ (Q0 × (1 - δ)... n+1 )+Q0×(1-δ n If the value is 1 / 2, then it can be predicted that the next flow threshold will most likely be Q0×(1-δ). n )~Q0×(1-δ n-1 Therefore, it is preferable to adjust the frequency to (f nmin +f nmax ) / 2≤f n ≤f nmax ; Additionally, it should be noted that f n+1 You can follow f n It can be determined in a certain way, or it can be set as a constant.

[0027] Preferably, when Q < (Q0 × (1 - δ) n+1 )+Q0×(1-δ n When f = 2, n =f nmin When Q≥(Q0×(1-δ n+1 )+Q0×(1-δ n When f = 2, n =f nmax .

[0028] Furthermore, in order to better illustrate the present invention, the following specific numerical examples are provided for supplementary explanation; Let the adjustment value be 0.15, and 0 ≤ δ ≤ 1; When Q ≥ 0.85Q0, f = 50 Hz; When 0.7Q0 ≤ Q < 0.85Q0, then f = f1, and f is the value of f. nmin =45Hz, f nmax =50Hz; When 0.55Q0 ≤ Q < 0.7Q0, then f = f2, and f nmin =40Hz, f nmax =45Hz; When 0.4Q0 ≤ Q < 0.55Q0, then f = f3, and f is the value of f. nmin =35Hz, f nmax =40Hz; When 0.25Q0 ≤ Q < 0.4Q0, then f = f4, and f is the value of f. nmin =30Hz, f nmax =35Hz; When 0.1Q0 ≤ Q < 0.25Q0, then f = f5, and f nmin =25Hz, fnmax =30Hz; When Q < 0.1Q0, then f = f6 = 30Hz, and f6 is a constant at this time; According to the flux threshold set above, when the detected flux Q = 0.81Q0, the flux falls within the threshold range of 0.7Q0 ≤ Q < 0.85Q0, and 0.81Q0 > (0.7Q0 + 0.85Q0) / 2 = 0.775Q0. Therefore, f should be taken between 47.5Hz and 50Hz, preferably 50Hz. When the detected flux Q = 0.41Q0, at this time... The flux falls within the threshold of 0.4Q0≤Q<0.55Q0, and 0.41Q0<(0.4Q0+0.55Q0) / 2=0.475Q0. Therefore, f should be taken between 35Hz and 37.5Hz, preferably 35Hz. When the detected flux Q=0.87Q0, f=50Hz; when the detected flux Q=0.08Q0, f=30Hz. Example

[0029] Reference Figure 2 This is the second embodiment of the present invention. This embodiment is based on the previous embodiment, but differs in that, in order to improve the sufficiency of intelligent energy consumption scheduling and avoid the insufficiency of artificially high energy consumption caused by environmental factors, this embodiment is proposed.

[0030] Specifically, a ventilation and dust collector is installed above the production unit, and the operating frequency of the ventilation and dust collector is f. x Then f x =kf, where k is an adjustment constant; the ventilation and dust collector is electrically connected to the control module via a conductive line, so that the operating frequency f of the ventilation and dust collector can be adjusted as needed when the control module adjusts f. x Synchronous adjustments are made so that when the flow rate decreases (and the dust generated by the production equipment also decreases), the frequency of the ventilation and dust collector also decreases accordingly, thus achieving energy consumption scheduling.

[0031] Furthermore, air monitoring sensors are installed on the production unit to determine the adjustment coefficients m and f. x =k(1+m)f, and 0≤m≤1; The air monitoring sensor is electrically connected to the control module through a conductive line, so that it can make adaptive adjustments when special cases occur, such as when the material dryness is high and the dust exceeds the normal value, thereby avoiding harsh working environment. Example

[0032] Reference Figure 3 This is the third embodiment of the present invention, which provides an intelligent energy consumption scheduling method for sand and gravel production lines. Specifically, it is operated according to the following steps. Staff input the adjustment value δ through the control module n To set the material flow rate Q to each flow rate threshold, and to set the value of the frequency f under each flow rate threshold; The flow rate monitoring module collects flow rate data from the production unit, and the control module analyzes the collected data to determine which specific flow rate threshold the data falls within. Then, the control module adjusts the motor's operating frequency via a frequency converter based on the corresponding flux threshold value f, thereby adjusting energy consumption. At the same time, the control module will also adjust the frequency of the ventilation and dust collector based on the detected flow rate data. x ; Air monitoring sensors monitor the working air environment to enable control modules to manage f. x Make adjustments in real time.

[0033] Additionally, it should be noted that components not described in detail in this article are existing technologies.

[0034] It is important to note that the constructions and arrangements of this application shown in several different exemplary embodiments are merely illustrative. Although only a few embodiments are described in detail in this disclosure, those who consult this disclosure will readily understand that many modifications are possible (e.g., variations in the size, dimensions, structure, shape, and proportions of various elements, as well as parameter values ​​(e.g., temperature, pressure, etc.), mounting arrangements, use of materials, color, orientation, etc.) without substantially departing from the novel teachings and advantages of the subject matter described in this application. For example, an element shown as integrally formed may be composed of multiple parts or elements, the position of elements may be inverted or otherwise altered, and the nature or number or position of discrete elements may be changed or altered. Other substitutions, modifications, alterations, and omissions may be made in the design, operation, and arrangement of the exemplary embodiments without departing from the scope of the invention. Therefore, the invention is not limited to the particular embodiments but extends to a variety of modifications that still fall within the scope of the appended claims.

[0035] Furthermore, in order to provide a concise description of exemplary embodiments, not all features of actual embodiments (i.e., those features that are not relevant to the currently considered best mode for carrying out the invention, or those features that are not relevant to implementing the invention) may be omitted.

[0036] It should be understood that numerous specific implementation decisions can be made during the development of any practical implementation, such as in any engineering or design project. Such development efforts may be complex and time-consuming, but for those skilled in the art who benefit from this disclosure, the development effort will be a routine work of design, manufacturing, and production without requiring much experimentation.

[0037] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and are not intended to limit it. Although the present invention has been described in detail with reference to preferred embodiments, those skilled in the art should understand that modifications or equivalent substitutions can be made to the technical solutions of the present invention without departing from the spirit and scope of the technical solutions of the present invention, and all such modifications or substitutions should be covered within the scope of the claims of the present invention.

Claims

1. An intelligent energy consumption scheduling system for sand and gravel production lines, including: Flow monitoring module: Each production unit is equipped with a flow monitoring module at its input or output end. Frequency modulators are used in every motor of the production unit; and, The control module consists of a flow monitoring module and a frequency modulator that work with each production unit as a set of scheduling modules. Multiple sets of scheduling modules are electrically connected to the same control module. The production units include processing units and handling units. characterized in that Let Q0 be the rated material flow rate processed by the production device at the rated output frequency f0, and E0 be the output energy consumption. Let Q be the material flow rate processed by the production device at the actual output frequency f, and E be the output energy consumption. Then in the processing device, E≤E0, and the material processing quality under f should meet the execution standard, and the minimum frequency under the execution standard is f tmin Then f≥f tmin ; In the case of transport devices, E≤E0; Let the step size be δ n , and 0≤δ n ≤1. When Q≥Q0×(1-δ1), f=f0; When Q0×(1-δ2)≤Q<Q0×(1-δ1), then f=f1; When Q0×(1-δ3)≤Q<Q0×(1-δ2), then f=f2; ... when Q0x (1 - δ n+1 ) ≤ Q < Q0x (1 - δ n ), then f = f n ; When Q < Q0x (1 - δ n+1 ) then f = f n+1 ; And n≥1, 0≤f n+1 ≤f n ...≤f2≤f1≤f0,f nmin ≤f n ≤f nmax .

2. The energy consumption intelligent scheduling system for sandstone production line according to claim 1, characterized in that: The processing equipment includes crushers and screening machines, and the handling equipment includes conveyors and lifting machines.

3. The energy consumption intelligent scheduling system for sandstone production line according to claim 2, characterized in that: The flow monitoring module includes at least one of an electronic weighing scale, a distance sensor, and an impact flow meter.

4. The energy consumption intelligent scheduling system for sandstone production line according to claim 3, characterized in that: The f nmin Q0×(1-δ) n+1 )~Q0×(1-δ n The minimum frequency below the flux threshold, f nmax Q0×(1-δ) n+1 )~Q0×(1-δ n The maximum frequency below the flow threshold.

5. The intelligent energy consumption scheduling system for sand and gravel production lines as described in claim 4, characterized in that: When Q < (Q0 × (1-δ) n+1 )+Q0×(1-δ n When f = 2, nmin ≤f n <(f) nmin +f nmax ) / 2; When Q≥(Q0×(1-δ n+1 )+Q0×(1-δ n When )) / 2, (f nmin +f nmax ) / 2≤f n ≤f nmax .

6. The intelligent energy consumption scheduling system for sand and gravel production lines as described in claim 5, characterized in that: When Q < (Q0 × (1-δ) n+1 )+Q0×(1-δ n When f = 2, n =f nmin ; When Q≥(Q0×(1-δ n+1 )+Q0×(1-δ n When f = 2, n =f nmax .

7. The energy consumption intelligent scheduling system for sandstone production line according to claim 5 or 6, characterized in that: A ventilation and dust collector is installed above the production device, and the operating frequency of the ventilation and dust collector is f. x Then f x =kf, where k is the adjustment constant; The ventilation and dust collector is electrically connected to the control module via a conductor.

8. The intelligent energy consumption scheduling system for sand and gravel production lines as described in claim 7, characterized in that: The production device is also provided with an air monitoring sensor, through which the adjustment coefficient m, f is determined x = k (1 + m) f, and 0 ≤ m ≤ 1. The air monitoring sensor is electrically connected to the control module via a conductive wire.

9. An intelligent energy consumption scheduling method for sand and gravel production lines, characterized by: The intelligent energy consumption scheduling system for sand and gravel production lines as described in claim 8 operates according to the following steps; S1 : the worker inputs an adjustment value δ through the control module n to set the material flow Q to each flow threshold and set the value of the frequency f below each flow threshold; S2: The flow rate monitoring module collects flow rate data from the production unit, and the control module analyzes the collected data to determine which specific flow rate threshold the data falls within. S3: Then the control module adjusts the motor operating frequency through the frequency converter according to the corresponding flow threshold value f, thereby realizing energy consumption adjustment; S4: At the same time, the control module will also adjust the frequency f of the ventilation dust collector according to the detected flow data x ; S5: The air monitoring sensor monitors the working air environment to enable the control module to control f x Make adjustments in real time.

Citation Information

Patent Citations

  • A smart control system and control method for crushing and screening equipment

    CN107413511B

  • An adaptive online control device and method for a grading crusher

    CN113617508B