A method for generating and regulating ecological water level corridors in shallow lakes
By constructing candidate lake surface water levels and calculating the suitability for aquatic life, recursively estimating the stress state across time periods, and combining gate and pump regulation constraints to screen the set of achievable water levels, the problem of water level regulation not being able to be adjusted effectively in existing technologies has been solved, thus achieving the stability and operability of the ecological water level corridor.
Patent Information
- Application Number
- CN202611367568.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-04
- Publication Date
- 2026-11-17
AI Technical Summary
Existing technologies have not verified whether water level regulation meets the constraints of gate pump regulation, and cannot be adjusted to the required level under actual working conditions, resulting in limited engineering guidance effectiveness.
By acquiring target water body parameters, constructing candidate lake surface water levels and calculating suitability, recursively estimating cross-time stress states, and combining gate and pump regulation constraints to screen the set of achievable water levels, an ecological water level corridor that meets the conditions for continuous connection is determined, thus achieving a closed-loop process for ecological needs and feasible engineering solutions.
Ensure that water level regulation meets the constraints of gate and pump regulation, and adjusts in place under actual working conditions to reduce water level oscillations and frequent start-stop of gates and pumps, so as to achieve the time-series operability and stability of the ecological water level corridor and avoid mis-scheduling of abiotic conditions at a single moment.
Smart Images

Figure CN123114075A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to a method for generating an ecological water level corridor in a lake, belonging to the field of lake ecological restoration, and particularly to a method for generating and regulating an ecological water level corridor in a shallow lake. Background Technology
[0002] Water level and its dynamic changes directly regulate the entire life cycle of aquatic plants in shallow lakes, including germination, seedling establishment, vegetative growth, community expansion, propagation, and overwintering. Through reasonable water level regulation, the lakebed light environment can be effectively improved, the degree of plant submersion can be adjusted, the shoreline submersion-exposure rhythm can be controlled, water connectivity can be optimized, and the disturbance of wind and waves on bottom sediment stability and seedling survival can be mitigated. Therefore, water level regulation is a key engineering method for the ecological restoration of aquatic vegetation in shallow lakes.
[0003] Chinese patent application number 202511031007.4, filed on July 25, 2025, discloses a method for assessing the optimal water level for vegetation based on remote sensing inversion and a food web model. The steps are as follows: Analyzing and processing multispectral remote sensing images of a target shallow lake to extract submerged vegetation area data; acquiring multi-source data of the target shallow lake over the years; constructing an adaptive food web model to assess the optimal water level for submerged vegetation; and systematically validating the adaptive food web model after model construction. Although this design can obtain the optimal water level for vegetation, it still has the following shortcomings:
[0004] The design only outputs the optimal water level from the perspective of ecological model simulation, without verifying whether the water level regulation meets the gate pump regulation constraints. Therefore, the obtained optimal water level may not be able to be adjusted to the correct level under actual working conditions, resulting in limited engineering guidance effect of the assessment results.
[0005] The information disclosed in this background section is intended only to enhance understanding of the overall background of this application and should not be construed as an admission or in any way implying that the information constitutes prior art known to those skilled in the art. Summary of the Invention
[0006] The purpose of this invention is to overcome the defects and problems in the existing technology, such as the lack of verification on whether the water level regulation meets the gate pump regulation constraints and the inability to adjust to the required level under actual working conditions. The invention provides a method for generating and regulating the ecological water level corridor of shallow lakes that can meet the gate pump regulation constraints and ensure that the regulation is in place under actual working conditions.
[0007] To achieve the above objectives, the technical solution of the present invention is:
[0008] A method for generating an ecological water level corridor in a shallow lake, the method comprising the following steps:
[0009] Step 1: First, obtain the current water level and ecological feedback data of the target water body, as well as the lake bottom spatial unit data, the target aquatic plant set, the hydrological and meteorological data for multiple control periods in the future, the parameters of the controllable gate pump facility, and the habitat response parameters of the target aquatic plants at the corresponding growth stages;
[0010] The second step is to first construct multiple candidate lake surface water levels for multiple control periods in the future, then convert the multiple candidate lake surface water levels into the effective water depth of multiple lake bottom spatial units based on the lake bottom spatial unit data, and then calculate the area-weighted fitness of each target aquatic plant and the community's weakest fitness based on the effective water depth and habitat response parameters.
[0011] The third step is to first calculate the stressed area and stress level of each target aquatic plant under each candidate lake surface water level based on the effective water depth, lake bottom spatial unit data, and habitat response parameters corresponding to each candidate lake surface water level. Then, calculate the recovery status of each target aquatic plant based on the ecological feedback data. Finally, based on the stressed area, stress level, and recovery status of each target aquatic plant in adjacent control periods, the cross-time stress status variables of each target aquatic plant are recursively updated.
[0012] Step 4: First, establish time-series constraints based on hydrological and meteorological data, lake bottom spatial unit data, controllable gate pump facility parameters, habitat response parameters, and ecological feedback data. Then, determine the feasibility of water level transfer between adjacent control periods based on the time-series constraints. Next, continuously screen candidate lake surface water levels for multiple future control periods based on the time-series constraints and the feasibility of water level transfer between adjacent control periods to obtain the set of achievable water levels for each control period.
[0013] Step 5: First, within the set of reachable water levels for each control period, calculate the target value of the community corresponding to each candidate lake surface water level based on area-weighted fitness, the community's weakest fitness, and cross-time stress state variables. Then, filter the target values of the community based on the target threshold to obtain scattered lake surface water levels. Next, filter the scattered lake surface water levels to obtain candidate lake surface water level intervals that meet the condition of continuous connection with the scattered lake surface water levels of the next control period. The candidate lake surface water level intervals include the lower limit of the corridor, the preferred water level, and the upper limit of the corridor. Finally, determine the candidate lake surface water level intervals as the ecological water level corridor for the current control period.
[0014] In the fifth step, when filtering the community target value according to the target threshold to obtain the scattered lake surface water level, if the scattered lake surface water level is empty, then a backup solution is performed.
[0015] When screening scattered lake surface water levels, if a candidate lake surface water level interval that meets the condition of continuous connection with the scattered lake surface water level in the next control period cannot be obtained, then an alternative solution is performed.
[0016] The backup solution refers to: first outputting the conflict identifier, affected target aquatic plants, expected stressed area, expected stress duration and unmet target threshold, continuous connection conditions or temporal constraints, and then performing a downgraded solution according to the preset priority of flood control safety, personnel and equipment safety, water supply safety and ecological objectives.
[0017] In the second step, converting multiple candidate lake surface water levels into the effective water depth of multiple lake bottom spatial units based on lake bottom spatial unit data means: firstly, selecting lake bottom spatial units located within the effective habitat from the lake bottom spatial unit data, wherein the effective habitat is hydraulically connected to the main water area and meets the minimum inundation duration or colonization conditions.
[0018] Located within the effective living area of the first The lakebed space unit in the first Effective water depth during each control period The calculation formula is:
[0019] ;
[0020] In the formula, For the first Candidate lake surface water levels for each control period For the first The representative bottom elevation of each lakebed spatial unit, This is a correction for sediment deposition, micro-topography, or measurement deviations.
[0021] In the second step, calculating the area-weighted fitness of each target aquatic plant based on effective water depth and habitat response parameters means: first, determining the target aquatic plants... During the reproductive stage water depth adaptation function :
[0022] when or hour, ;
[0023] when hour, It monotonically increases from 0 to 1;
[0024] when hour, ;
[0025] when hour, It decreases monotonically from 1 to 0;
[0026] In the formula, For effective water depth, This serves as a shallow water-side suppression boundary. To ensure a suitable lower limit for water depth, To ensure an appropriate upper limit of water depth, The deep-water side is used as a suppression boundary; the monotonically increasing or monotonically decreasing response is a linear function, a sigmoid function, or a response function fitted from local observation data.
[0027] Then calculate the target aquatic plants During the reproductive stage and candidate lake surface water level Area-weighted fitness :
[0028] ;
[0029] In the formula, For the first The area of each lakebed space unit Target aquatic plants During the reproductive stage Effective water depth The water depth is suitable for life. Spatial correction coefficients are used to characterize one or a combination of factors such as hydraulic connectivity, substrate colonization, bottom light, wind and wave exposure, or the value of existing vegetation preservation.
[0030] In the third step, the recursive update of the cross-time stress state variables of each target aquatic plant refers to:
[0031] ;
[0032] In the formula, For cross-time stress state variables, The stress memory coefficient, According to the first The cumulative amount of stress is determined by the proportion of stressed area, the degree of stress, and the duration of stress during each control period. The recovery status is determined based on the recovery water depth, the proportion of the recovery area, and the recovery time.
[0033] when When the stress level exceeds the upper limit for the corresponding reproductive stage, this will occur. The candidate lake level was deemed infeasible, or coercive penalties were imposed on it.
[0034] In the fifth step, calculating the target community value corresponding to each candidate lake surface level based on area-weighted fitness, the weakest fitness of the community, and cross-time stress state variables refers to:
[0035] First, the target aquatic plants that are actually involved in the calculation at the current growth stage are grouped as follows: Then, the target aquatic plants Effective weights Normalize:
[0036] ;
[0037] In the formula, Based on weights, The activation coefficient is determined based on whether the target is in its current reproductive stage, monitoring effectiveness, repair priority, or local scarcity. A collection of target aquatic plants The sum of the base weights and activation coefficients of all aquatic plants;
[0038] The community target value The formula for calculation is:
[0039] ;
[0040] In the formula, The weakest protection coefficient for the community is between 0 and 1. Target aquatic plants During the reproductive stage and candidate lake surface water level Area-weighted fitness For effective weights, Punishment for cross-time period coercion. Penalty for water level changes Penalties are imposed for the number of operations or energy consumption of controllable gate pump facilities. , and It is a non-negative coefficient.
[0041] In the fifth step, the process of screening scattered lake surface water levels to obtain candidate lake surface water level intervals that can be continuously connected with the scattered lake surface water levels in the next control period refers to: the candidate lake surface water level intervals satisfy:
[0042] ;
[0043] In the formula, For the first The maximum community target value that can be achieved within the water level set during a given control period. The corridor interception coefficient is between 0 and 1. When the candidate lake water level that meets the conditions forms two or more discontinuous intervals, the selection is based on the number of candidate lake water levels that can reach the set of water levels that can be reached in the subsequent control period, the community's weakest suitability, and the number of times the controllable gate pump facilities are operated. One interval is selected as the ecological water level corridor for the current control period, and the remaining intervals are selected as alternative lake water level intervals.
[0044] In the fourth step, the feasibility of water level transfer refers to the determination based on water balance and the water level-reservoir capacity relationship.
[0045] ;
[0046] ;
[0047] In the formula, For the first Lake water storage capacity during a controlled period For the first Lake water storage capacity during a controlled period For the first The amount of water entering the target water body within a control period For the first The amount of water flowing out of the target water body during a controlled period. for The amount of precipitation replenishing the lake surface during the controlled period for Evaporation, leakage, or other water losses within a controlled period. The water level-storage capacity function of the target water body. For the first Candidate lake surface water levels for each control period; and The controllable water volume is constrained by the flow capacity and operating time of the controllable gate pump facilities;
[0048] In the fourth step, the continuous screening refers to: based on the feasibility of water level transfer, the candidate lake surface water levels that can be reached from the previous control period and can continue to enter the next control period are set into a reachable water level set.
[0049] In the first step, the calculation of the ecological feedback data includes at least one or a combination of light correction, wind and wave disturbance correction, and dynamic updates of reproductive stages:
[0050] The light correction refers to: calculating the first... for submerged plants Effective light ratio at the bottom of each lake bottom space unit :
[0051] ;
[0052] In the formula, The light attenuation coefficient is determined based on transparency, turbidity, or light intensity at different underwater depths. No. The lakebed space unit in the first The effective water depth for each control period; when When the light ratio is lower than the minimum light ratio for the corresponding reproductive stage, reduce the spatial correction coefficient of the corresponding lake bottom spatial unit or mark the lake bottom spatial unit as temporarily unsuitable for life;
[0053] The wave disturbance correction refers to: estimating the bottom shear stress caused by waves based on wind speed, wind direction, effective wind zone length and water depth; when the bottom shear stress exceeds the bottom sediment initiation threshold or seedling disturbance resistance threshold, increasing the water level change penalty of the corresponding lake bottom spatial unit in the community target value, and adjusting the candidate lake surface water level range corresponding to the ecological water level corridor.
[0054] The dynamic update of the growth stage refers to updating the growth stage of the target aquatic plant based on accumulated temperature, continuous daily average water temperature, day length, remote sensing images, field images, or artificial phenological surveys.
[0055] In the first step, the process of confirming the habitat response parameters is as follows: First, multiple evidence records are obtained from the aquatic plant habitat demand evidence database. Each evidence record includes one or a combination of the following: species or functional group identifier, life form, reproductive stage, shallow water side inhibition boundary, lower limit of suitable water depth, upper limit of suitable water depth, deep water side inhibition boundary or tolerance boundary, data source, and evidence quality information. Then, the weight of the evidence is determined based on at least two of the following: regional similarity, test type, sample size, reproductive stage matching degree, and local validation degree. Finally, the habitat response parameters are determined comprehensively based on the evidence weights and multiple evidence records.
[0056] A method for regulating the generation of ecological water level corridors in shallow lakes, the method comprising the following steps:
[0057] Step 1: First, generate an ecological water level corridor using the method described in claim 1; then, generate a control data packet for the control period based on the current water level, the ecological water level corridor, and the parameters of the controllable gate pump facility; then, perform a security verification on the control data packet; and finally, send the control data packet to the controller or manual control terminal of the controllable gate pump facility.
[0058] Step 2: First, the controllable gate pump facility regulates the water inflow and outflow process according to the control data package, so that the lake surface water level tends to or remains within the ecological water level corridor.
[0059] Step 3: If at least one of the following is updated: current water level, ecological feedback data, hydrological and meteorological data for multiple future control periods, and parameters of controllable gate pump facilities, then obtain the updated data and return to execute steps 2 to 5 of claim 1 to continuously update the ecological water level corridor for subsequent control periods.
[0060] Compared with the prior art, the beneficial effects of the present invention are as follows:
[0061] 1. The present invention discloses a method for generating and regulating an ecological water level corridor in a shallow lake. The method includes the following steps: First, obtain relevant parameters of the target water body; Second, construct multiple candidate lake surface water levels for multiple control periods in the future, and then combine relevant parameters to obtain the area-weighted fitness and the weakest fitness of the community for each target aquatic plant; Third, obtain the stressed area, stress level, and recovery status of each target aquatic plant based on relevant parameters, and then recursively update the cross-period stress state variables of each target aquatic plant; Fourth, establish temporal constraints based on relevant parameters, and then determine the time-series constraints. The feasibility of water level transfer between adjacent control periods is determined, and then continuous screening is performed based on time constraints and water level transfer feasibility to obtain the set of achievable water levels for each control period; the fifth step: firstly, the target value of the community is calculated based on the aforementioned set of achievable water levels according to the weighted fitness, the community's weakest fitness, and cross-time stress state variables, and then the target value of the community is screened to obtain scattered lake surface water levels, and then the scattered lake surface water levels are screened to obtain candidate lake surface water level intervals that meet the condition of continuous connection with the scattered lake surface water levels of the next control period, and then the candidate lake surface water level intervals are determined as the ecological water level corridor of the current control period. The advantages of this invention also include:
[0062] Firstly, this invention obtains target water body parameters, constructs candidate lake surface water levels and calculates suitability, recursively calculates cross-time stress states, combines gate and pump regulation constraints to screen the set of achievable water levels, and finally determines the ecological water level corridor that meets the continuous connection conditions, thus realizing a closed-loop process from ecological demand assessment to engineering feasible water level schemes.
[0063] Secondly, this invention determines the feasibility of water level transfer between adjacent control periods based on time constraints and continuously filters to obtain the set of achievable water levels for each control period, ensuring that the obtained water level meets the constraints of water balance and gate pump facility regulation, thus overcoming the defect that the water level may not be achievable in the prior art.
[0064] Thirdly, by continuously screening the scattered lake surface water levels, the operability and stability of the ecological water level corridor in the time series are ensured, reducing water level oscillations and frequent start-stop of gate pumps; the ecological water level corridor has a lower limit, a preferred water level, and an upper limit rather than a single point value, which preserves buffer space for on-site scheduling.
[0065] Fourthly, by recursively updating the stress state variables across time periods, a dynamic and continuous assessment of ecological impacts is achieved, thereby distinguishing between short-term disturbances and continuous stresses and reducing the risk of making erroneous scheduling decisions based solely on fitness at a single moment. At the same time, the community's weakest fitness is also included in the calculation of community target values to avoid dominant species masking damage to sensitive targets.
[0066] Therefore, the water level regulation of the present invention can meet the control constraints of gate pumps and ensure that the regulation is in place under actual working conditions.
[0067] 2. In the fifth step of the present invention, a method for generating and regulating ecological water level corridors in shallow lakes, if the scattered lake surface water levels are empty or a candidate lake surface water level interval that meets the condition of continuous connection with the scattered lake surface water levels in the next control period cannot be obtained, a backup solution is performed: first, conflict identifiers and related information are output, and then a degraded solution is executed according to the preset priorities of flood control safety, personnel and equipment safety, water supply safety, and ecological objectives. In application, this mechanism can effectively deal with constraint conflict problems under complex working conditions. When the conventional solution output cannot obtain a candidate lake surface water level interval that meets all constraints, this method will not fall into a state of no output or paralysis, but will provide clear conflict diagnosis information to the dispatchers by outputting conflict identifiers and related information, which facilitates rapid manual risk assessment and intervention decisions. At the same time, the degraded solution is executed according to the preset priority to ensure that when multiple objectives conflict, the key safety objective (flood control) is given absolute priority, avoiding flood control or equipment safety risks caused by excessive pursuit of ecological benefits. Therefore, the present invention has strong stability.
[0068] 3. In the second step of the present invention, a method for generating and regulating ecological water level corridors in shallow lakes, the lake bottom spatial units located within effective habitats are first selected from the lake bottom spatial unit data. Then, the effective water depth is calculated, followed by the determination of the water depth suitability function, and then the area-weighted suitability is calculated. In application, the lake bottom of shallow lakes has spatial differences such as shoals, bank slopes, deep channels, bays, and siltation areas. The local water depth corresponding to the same lake surface water level may vary greatly. Therefore, the average water depth cannot represent the actual area of various water depth zones and potential colonization habitats, nor can it reflect spatial constraints such as hydraulic connectivity and substrate colonization. The present invention converts a unified lake surface water level into the effective water depth of multiple lake bottom spatial units and filters out invalid habitat units such as those separated by dikes, those with only short-term water accumulation, substrates unsuitable for colonization, or those located in engineering restricted areas. This allows the area-weighted suitability to truly reflect the effective habitat area and quality obtained by the target plants under the candidate lake surface water level, significantly improving the accuracy of habitat evaluation and adaptability to lake bottom topographic heterogeneity. Therefore, the habitat assessment accuracy of this invention is relatively high.
[0069] 4. In the method for generating and regulating the ecological water level corridor in a shallow lake according to the present invention, in the third step, the stress accumulation determined by the stress memory coefficient, the proportion of stressed area during the control period, the degree of stress and the duration of stress, and the recovery status determined by the recovery depth, the proportion of recovered area and the recovery time are used to recursively update the cross-period stress state variables of each target aquatic plant. When applied, the third step overcomes the defect that the water level scheme is evaluated based on the suitability at a single moment and cannot reflect the long-term cumulative effect of stress on plants. For example, if a water level with a high current suitability causes sensitive plants to be continuously in the inhibited water depth for multiple periods, its cumulative stress will exceed the allowable level, but a single moment evaluation cannot detect this risk. The present invention retains the historical stress memory through the stress memory coefficient, calculates the stress accumulation and recovery amount, and recursively updates the cross-period stress state variables, thereby distinguishing between short-term disturbances and continuous multi-period stress. When screening water levels, those water levels that are currently suitable but will cause subsequent continuous stress exceeding the limit are excluded, reducing the risk of making incorrect scheduling based solely on the suitability at a single moment. Therefore, the present invention has a good effect on protecting vegetation.
[0070] 5. In the fifth step of the present invention, a method for generating and regulating ecological water level corridors in shallow lakes, the target aquatic plants currently participating in the calculation are first identified, and then their effective weights are normalized. Then, the target community value is calculated based on area-weighted suitability, normalized effective weights, water level change penalties, and the number of times controllable gate pump facilities are operated or energy consumption penalties. The target community values are then screened to obtain scattered lake surface water levels. In application, the target set participating in the calculation is dynamically determined based on the actual growth stage of the plants to avoid interference from species outside the current stage. Through effective weight normalization, combined with activation coefficients such as restoration priority and local scarcity, the weight allocation is made more aligned with actual management needs. Simultaneously, water level change penalties and facility operation cost penalties are deducted from the target community value, comprehensively considering ecological benefits and engineering operation costs. This approach protects the weakest link in the community while reducing frequent gate pump starts and stops, balancing ecological effects and facility operation economics. Therefore, the present invention comprehensively considers ecological and engineering operation costs.
[0071] 5. In the method for generating and regulating the ecological water level corridor of a shallow lake according to the present invention, the feasibility of water level transfer in the fourth step refers to: determined by water balance and water level-storage capacity relationship, the lake's water storage capacity is related to the amount of water entering and leaving the target water body during the control period, the amount of precipitation replenishing the lake surface, evaporation, seepage, or other water losses. Based on the feasibility of water level transfer, a set of candidate lake surface water levels that can be reached from the previous control period and continue to enter the next control period is formed as a set of achievable water levels. In application, the fourth step binds water level changes with the actual water volume inflow and outflow process of the lake through the water balance equation, so that the judgment of water level transfer feasibility is based on real physical water volume changes, rather than hypothetical curves detached from engineering reality. By screening candidate water levels that simultaneously satisfy forward and backward accessibility to form a set of achievable water levels, it is ensured that the obtained water level is engineering-adjustable under the joint constraints of gate pump facility capacity, water balance, and future time period constraints, avoiding the output of ecologically suitable but physically unattainable water level schemes. Therefore, the water level of the present invention has engineering accessibility.
[0072] 6. In the method for generating and regulating the ecological water level corridor of a shallow lake according to the present invention, the calculation of the ecological feedback data in the first step includes at least one or a combination of light correction, wave disturbance correction, and dynamic updating of growth stage. The process of confirming the habitat response parameters is as follows: multiple evidence records are obtained from the aquatic plant habitat demand evidence database, and then the habitat response parameters are determined comprehensively based on the evidence weights and multiple evidence records. In application, through light correction, wave disturbance correction, and dynamic updating of growth stage, the habitat assessment can be adjusted in real time according to the actual environmental changes such as transparency, wind speed, and phenology, avoiding evaluation bias caused by fixed parameters failing to reflect dynamic conditions. At the same time, by extracting multiple records from the evidence database and comprehensively determining the habitat response parameters based on the evidence weights, the limitations of single literature or experimental data are avoided, allowing the parameters to integrate information from multiple sources and retain uncertainty, providing reliable and traceable input for subsequent calculations. Therefore, the data of the present invention is reliable and dynamically adaptable.
[0073] 7. In the present invention, a method for generating and regulating an ecological water level corridor in a shallow lake, the regulation method includes the following steps: First, a regulation data packet for a control period is generated based on the current water level, the ecological water level corridor, and parameters of the controllable gate pump facility. This packet is then verified for safety and sent to the controller or manual control terminal of the controllable gate pump facility. Second, the controllable gate pump facility adjusts the inflow and outflow process according to the regulation data packet, causing the lake surface water level to tend towards or remain within the ecological water level corridor. Third, if the current water level, ecological feedback data, hydrological and meteorological data for multiple future control periods, and parameters of the controllable gate pump facility are all considered, the data packet is generated and then used to regulate the water level. If at least one of the data is updated, the updated data is obtained, and steps two through five of the generation method are returned to continuously update the ecological water level corridor for subsequent control periods. In application, this control method converts the ecological water level corridor into a control data package containing instructions such as facility identification, control direction, flow rate or opening degree, and time limit. This package is then sent out after security verification to ensure the safety and reliability of engineering operations. Simultaneously, by obtaining the updated data and returning it to the generation method, the ecological water level corridor is continuously updated, forming a dynamic closed loop of "monitoring-calculation-execution-feedback," avoiding control failure due to data lag or forecast deviations. Therefore, this invention achieves a dynamic closed loop for water level control. Attached Figure Description
[0074] Figure 1 This is a flowchart of the present invention.
[0075] Figure 2 yes Figure 1 A schematic diagram of the formation of the ecological water level corridor. Detailed Implementation
[0076] The present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments.
[0077] Please see Figure 1 — Figure 2 A method for generating an ecological water level corridor in a shallow lake, the method comprising the following steps:
[0078] Step 1: First, obtain the current water level and ecological feedback data of the target water body, as well as the lake bottom spatial unit data, the target aquatic plant set, the hydrological and meteorological data for multiple control periods in the future, the parameters of the controllable gate pump facility, and the habitat response parameters of the target aquatic plants at the corresponding growth stages;
[0079] The second step is to first construct multiple candidate lake surface water levels for multiple control periods in the future, then convert the multiple candidate lake surface water levels into the effective water depth of multiple lake bottom spatial units based on the lake bottom spatial unit data, and then calculate the area-weighted fitness of each target aquatic plant and the community's weakest fitness based on the effective water depth and habitat response parameters.
[0080] The third step is to first calculate the stressed area and stress level of each target aquatic plant under each candidate lake surface water level based on the effective water depth, lake bottom spatial unit data, and habitat response parameters corresponding to each candidate lake surface water level. Then, calculate the recovery status of each target aquatic plant based on the ecological feedback data. Finally, based on the stressed area, stress level, and recovery status of each target aquatic plant in adjacent control periods, the cross-time stress status variables of each target aquatic plant are recursively updated.
[0081] Step 4: First, establish time-series constraints based on hydrological and meteorological data, lake bottom spatial unit data, controllable gate pump facility parameters, habitat response parameters, and ecological feedback data. Then, determine the feasibility of water level transfer between adjacent control periods based on the time-series constraints. Next, continuously screen candidate lake surface water levels for multiple future control periods based on the time-series constraints and the feasibility of water level transfer between adjacent control periods to obtain the set of achievable water levels for each control period.
[0082] Step 5: First, within the set of reachable water levels for each control period, calculate the target value of the community corresponding to each candidate lake surface water level based on area-weighted fitness, the community's weakest fitness, and cross-time stress state variables. Then, filter the target values of the community based on the target threshold to obtain scattered lake surface water levels. Next, filter the scattered lake surface water levels to obtain candidate lake surface water level intervals that meet the condition of continuous connection with the scattered lake surface water levels of the next control period. The candidate lake surface water level intervals include the lower limit of the corridor, the preferred water level, and the upper limit of the corridor. Finally, determine the candidate lake surface water level intervals as the ecological water level corridor for the current control period.
[0083] In the fifth step, when filtering the community target value according to the target threshold to obtain the scattered lake surface water level, if the scattered lake surface water level is empty, then a backup solution is performed.
[0084] When screening scattered lake surface water levels, if a candidate lake surface water level interval that meets the condition of continuous connection with the scattered lake surface water level in the next control period cannot be obtained, then an alternative solution is performed.
[0085] The backup solution refers to: first outputting the conflict identifier, affected target aquatic plants, expected stressed area, expected stress duration and unmet target threshold, continuous connection conditions or temporal constraints, and then performing a downgraded solution according to the preset priority of flood control safety, personnel and equipment safety, water supply safety and ecological objectives.
[0086] In the second step, converting multiple candidate lake surface water levels into the effective water depth of multiple lake bottom spatial units based on lake bottom spatial unit data means: firstly, selecting lake bottom spatial units located within the effective habitat from the lake bottom spatial unit data, wherein the effective habitat is hydraulically connected to the main water area and meets the minimum inundation duration or colonization conditions.
[0087] Located within the effective living area of the first The lakebed space unit in the first Effective water depth during each control period The calculation formula is:
[0088] ;
[0089] In the formula, For the first Candidate lake surface water levels for each control period For the first The representative bottom elevation of each lakebed spatial unit, This is a correction for sediment deposition, micro-topography, or measurement deviations.
[0090] In the second step, calculating the area-weighted fitness of each target aquatic plant based on effective water depth and habitat response parameters means: first, determining the target aquatic plants... During the reproductive stage water depth adaptation function :
[0091] when or hour, ;
[0092] when hour, It monotonically increases from 0 to 1;
[0093] when hour, ;
[0094] when hour, It decreases monotonically from 1 to 0;
[0095] In the formula, For effective water depth, This serves as a shallow water-side suppression boundary. To ensure a suitable lower limit for water depth, To ensure an appropriate upper limit of water depth, The deep-water side is used as a suppression boundary; the monotonically increasing or monotonically decreasing response is a linear function, a sigmoid function, or a response function fitted from local observation data.
[0096] Then calculate the target aquatic plants During the reproductive stage and candidate lake surface water level Area-weighted fitness :
[0097] ;
[0098] In the formula, For the first The area of each lakebed space unit Target aquatic plants During the reproductive stage Effective water depth The water depth is suitable for life. Spatial correction coefficients are used to characterize one or a combination of factors such as hydraulic connectivity, substrate colonization, bottom light, wind and wave exposure, or the value of existing vegetation preservation.
[0099] In the third step, the recursive update of the cross-time stress state variables of each target aquatic plant refers to:
[0100] ;
[0101] In the formula, For cross-time stress state variables, The stress memory coefficient, According to the first The cumulative amount of stress is determined by the proportion of stressed area, the degree of stress, and the duration of stress during each control period. The recovery status is determined based on the recovery water depth, the proportion of the recovery area, and the recovery time.
[0102] when When the stress level exceeds the upper limit for the corresponding reproductive stage, this will occur. The candidate lake level was deemed infeasible, or coercive penalties were imposed on it.
[0103] In the fifth step, calculating the target community value corresponding to each candidate lake surface level based on area-weighted fitness, the weakest fitness of the community, and cross-time stress state variables refers to:
[0104] First, the target aquatic plants that are actually involved in the calculation at the current growth stage are grouped as follows: Then, the target aquatic plants Effective weights Normalize:
[0105] ;
[0106] In the formula, Based on weights, The activation coefficient is determined based on whether the target is in its current reproductive stage, monitoring effectiveness, repair priority, or local scarcity. A collection of target aquatic plants The sum of the base weights and activation coefficients of all aquatic plants;
[0107] The community target value The formula for calculation is:
[0108] ;
[0109] In the formula, The weakest protection coefficient for the community is between 0 and 1. Target aquatic plants During the reproductive stage and candidate lake surface water level Area-weighted fitness For effective weights, Punishment for cross-time period coercion. Penalty for water level changes Penalties are imposed for the number of operations or energy consumption of controllable gate pump facilities. , and It is a non-negative coefficient.
[0110] In the fifth step, the process of screening scattered lake surface water levels to obtain candidate lake surface water level intervals that can be continuously connected with the scattered lake surface water levels in the next control period refers to: the candidate lake surface water level intervals satisfy:
[0111] ;
[0112] In the formula, For the first The maximum community target value that can be achieved within the water level set during a given control period. The corridor interception coefficient is between 0 and 1. When the candidate lake water level that meets the conditions forms two or more discontinuous intervals, the selection is based on the number of candidate lake water levels that can reach the set of water levels that can be reached in the subsequent control period, the community's weakest suitability, and the number of times the controllable gate pump facilities are operated. One interval is selected as the ecological water level corridor for the current control period, and the remaining intervals are selected as alternative lake water level intervals.
[0113] In the fourth step, the feasibility of water level transfer refers to the determination based on water balance and the water level-reservoir capacity relationship.
[0114] ;
[0115] ;
[0116] In the formula, For the first Lake water storage capacity during a controlled period For the first Lake water storage capacity during a controlled period For the first The amount of water entering the target water body within a control period For the first The amount of water flowing out of the target water body during a controlled period. for The amount of precipitation replenishing the lake surface during the controlled period for Evaporation, leakage, or other water losses within a controlled period. The water level-storage capacity function of the target water body. For the first Candidate lake surface water levels for each control period; and The controllable water volume is constrained by the flow capacity and operating time of the controllable gate pump facilities;
[0117] In the fourth step, the continuous screening refers to: based on the feasibility of water level transfer, the candidate lake surface water levels that can be reached from the previous control period and can continue to enter the next control period are set into a reachable water level set.
[0118] In the first step, the calculation of the ecological feedback data includes at least one or a combination of light correction, wind and wave disturbance correction, and dynamic updates of reproductive stages:
[0119] The light correction refers to: calculating the first... for submerged plants Effective light ratio at the bottom of each lake bottom space unit :
[0120] ;
[0121] In the formula, The light attenuation coefficient is determined based on transparency, turbidity, or light intensity at different underwater depths. No. The lakebed space unit in the first The effective water depth for each control period; when When the light ratio is lower than the minimum light ratio for the corresponding reproductive stage, reduce the spatial correction coefficient of the corresponding lake bottom spatial unit or mark the lake bottom spatial unit as temporarily unsuitable for life;
[0122] The wave disturbance correction refers to: estimating the bottom shear stress caused by waves based on wind speed, wind direction, effective wind zone length and water depth; when the bottom shear stress exceeds the bottom sediment initiation threshold or seedling disturbance resistance threshold, increasing the water level change penalty of the corresponding lake bottom spatial unit in the community target value, and adjusting the candidate lake surface water level range corresponding to the ecological water level corridor.
[0123] The dynamic update of the growth stage refers to updating the growth stage of the target aquatic plant based on accumulated temperature, continuous daily average water temperature, day length, remote sensing images, field images, or artificial phenological surveys.
[0124] In the first step, the process of confirming the habitat response parameters is as follows: First, multiple evidence records are obtained from the aquatic plant habitat demand evidence database. Each evidence record includes one or a combination of the following: species or functional group identifier, life form, reproductive stage, shallow water side inhibition boundary, lower limit of suitable water depth, upper limit of suitable water depth, deep water side inhibition boundary or tolerance boundary, data source, and evidence quality information. Then, the weight of the evidence is determined based on at least two of the following: regional similarity, test type, sample size, reproductive stage matching degree, and local validation degree. Finally, the habitat response parameters are determined comprehensively based on the evidence weights and multiple evidence records.
[0125] A method for regulating the generation of ecological water level corridors in shallow lakes, the method comprising the following steps:
[0126] Step 1: First, generate an ecological water level corridor using the method described in claim 1; then, generate a control data packet for the control period based on the current water level, the ecological water level corridor, and the parameters of the controllable gate pump facility; then, perform a security verification on the control data packet; and finally, send the control data packet to the controller or manual control terminal of the controllable gate pump facility.
[0127] Step 2: First, the controllable gate pump facility regulates the water inflow and outflow process according to the control data package, so that the lake surface water level tends to or remains within the ecological water level corridor.
[0128] Step 3: If at least one of the following is updated: current water level, ecological feedback data, hydrological and meteorological data for multiple future control periods, and parameters of controllable gate pump facilities, then obtain the updated data and return to execute steps 2 to 5 of claim 1 to continuously update the ecological water level corridor for subsequent control periods.
[0129] The following are supplementary descriptions of the present invention:
[0130] The lake bottom spatial unit described in this invention refers to a regular grid, irregular grid, contour zone, or management zone that divides a target water body based on at least one of the following: lake bottom elevation, area, bottom sediment, hydraulic connectivity, wind and wave exposure, or existing vegetation.
[0131] The controllable gate pump facility described in this invention refers to: a gate, pumping station and its controller, controllable inlet and outlet, or water engineering facility with equivalent water volume regulation function that can regulate the inflow or outflow of a target water body.
[0132] Example 1:
[0133] Please see Figure 1 — Figure 2 A method for generating an ecological water level corridor in a shallow lake, the method comprising the following steps:
[0134] Step 1: First, obtain the current water level and ecological feedback data of the target water body, as well as the lake bottom spatial unit data, the target aquatic plant set, the hydrological and meteorological data for multiple control periods in the future, the parameters of the controllable gate pump facility, and the habitat response parameters of the target aquatic plants at the corresponding growth stages;
[0135] The second step is to first construct multiple candidate lake surface water levels for multiple control periods in the future, then convert the multiple candidate lake surface water levels into the effective water depth of multiple lake bottom spatial units based on the lake bottom spatial unit data, and then calculate the area-weighted fitness of each target aquatic plant and the community's weakest fitness based on the effective water depth and habitat response parameters.
[0136] The third step is to first calculate the stressed area and stress level of each target aquatic plant under each candidate lake surface water level based on the effective water depth, lake bottom spatial unit data, and habitat response parameters corresponding to each candidate lake surface water level. Then, calculate the recovery status of each target aquatic plant based on the ecological feedback data. Finally, based on the stressed area, stress level, and recovery status of each target aquatic plant in adjacent control periods, the cross-time stress status variables of each target aquatic plant are recursively updated.
[0137] Step 4: First, establish time-series constraints based on hydrological and meteorological data, lake bottom spatial unit data, controllable gate pump facility parameters, habitat response parameters, and ecological feedback data. Then, determine the feasibility of water level transfer between adjacent control periods based on the time-series constraints. Next, continuously screen candidate lake surface water levels for multiple future control periods based on the time-series constraints and the feasibility of water level transfer between adjacent control periods to obtain the set of achievable water levels for each control period.
[0138] Step 5: First, within the set of reachable water levels for each control period, calculate the target value of the community corresponding to each candidate lake surface water level based on area-weighted fitness, the community's weakest fitness, and cross-time stress state variables. Then, filter the target values of the community based on the target threshold to obtain scattered lake surface water levels. Next, filter the scattered lake surface water levels to obtain candidate lake surface water level intervals that meet the condition of continuous connection with the scattered lake surface water levels of the next control period. The candidate lake surface water level intervals include the lower limit of the corridor, the preferred water level, and the upper limit of the corridor. Finally, determine the candidate lake surface water level intervals as the ecological water level corridor for the current control period.
[0139] Example 2:
[0140] The basic content is the same as in Example 1, except that:
[0141] Please see Figure 1 — Figure 2In the fifth step, when filtering community target values based on target thresholds to obtain scattered lake surface water levels, if the scattered lake surface water levels are empty, a backup solution is performed; when filtering scattered lake surface water levels, if a candidate lake surface water level interval that meets the condition of continuous connection with the scattered lake surface water level in the next control period cannot be obtained, a backup solution is performed; the backup solution refers to: first outputting the conflict identifier, affected target aquatic plants, expected stressed area, expected stressed duration, and unmet target thresholds, continuous connection conditions or temporal constraints, and then performing a downgraded solution based on the preset priority of flood control safety, personnel and equipment safety, water supply safety and ecological objectives.
[0142] When applied, the system obtains the community target value for the current control period and the connection conditions for the next control period, and filters the scattered lake surface water levels based on the target threshold. If the filtering result is empty, or if none of the candidate lake surface water level intervals can meet the continuous connection conditions with the next control period, a backup solution is automatically triggered: First, a conflict identifier is generated and output, and details of the affected plant species, the expected stressed area, the expected stress duration, and the specific unmet target threshold, continuous connection conditions, or temporal constraints are recorded. Then, the system performs a downgraded solution in the order of preset priorities—flood control safety, personnel and equipment safety, water supply safety, and ecological objectives. That is, under the premise of ensuring the absolute priority of high-priority objectives, the constraints of low-priority objectives are appropriately relaxed, and feasible lake surface water level intervals are searched again. If the downgraded solution is successful, the recommended water level after downgrading is output. If all priorities cannot be met, an extreme condition alarm is output and it is recommended to activate the emergency dispatch plan.
[0143] Example 3:
[0144] The basic content is the same as in Example 1, except that:
[0145] Please see Figure 1 — Figure 2 In the second step, converting multiple candidate lake surface water levels into effective water depths of multiple lake bottom spatial units based on lake bottom spatial unit data refers to: firstly, selecting lake bottom spatial units located within the effective habitat from the lake bottom spatial unit data; these effective habitats are hydraulically connected to the main water area and meet the minimum inundation duration or colonization conditions; the first lake bottom spatial unit located within the effective habitat... The lakebed space unit in the first Effective water depth during each control period The calculation formula is:
[0146] ;
[0147] In the formula, For the first Candidate lake surface water levels for each control period For the first The representative bottom elevation of each lakebed spatial unit, This is a correction for sediment deposition, micro-topography, or measurement bias. In the second step, calculating the area-weighted fitness of each target aquatic plant based on effective water depth and habitat response parameters means: first, determining the target aquatic plants... During the reproductive stage water depth adaptation function :
[0148] when or hour, ;
[0149] when hour, It monotonically increases from 0 to 1;
[0150] when hour, ;
[0151] when hour, It decreases monotonically from 1 to 0;
[0152] In the formula, For effective water depth, This serves as a shallow water-side suppression boundary. To ensure a suitable lower limit for water depth, To ensure an appropriate upper limit of water depth, The deep-water side is used as a suppression boundary; the monotonically increasing or monotonically decreasing response is a linear function, a sigmoid function, or a response function fitted from local observation data.
[0153] Then calculate the target aquatic plants During the reproductive stage and candidate lake surface water level Area-weighted fitness :
[0154] ;
[0155] In the formula, For the first The area of each lakebed space unit Target aquatic plants During the reproductive stage Effective water depth The water depth is suitable for life. Spatial correction coefficients are used to characterize one or a combination of factors such as hydraulic connectivity, substrate colonization, bottom light, wind and wave exposure, or the value of existing vegetation preservation.
[0156] Preferably, the community's weakest fitness factor is: , A collection of aquatic plants for the target population.
[0157] In application, candidate lake surface water levels and topographic and attribute data of lake bottom spatial units for the current control period are acquired. First, units located within effective habitats are selected from all lake bottom spatial units. These effective habitats must maintain hydraulic connectivity with the main water area and meet minimum inundation duration or plant establishment conditions. Next, for each effective habitat unit, its effective water depth at the current water level is calculated: the candidate lake surface water level is subtracted from the representative bottom elevation of the unit and the correction amount for bottom sedimentation, micro-topography, or measurement deviation. If the difference is less than zero, zero is taken as the effective water depth. Subsequently, the water depth suitability of each unit is determined according to the water depth suitability function of the target aquatic plants at the corresponding growth stage. This function defines the suitability of plants with water depth changes through shallow water side inhibition boundary, lower limit of suitable water depth, upper limit of suitable water depth, and deep water side inhibition boundary. The suitability is highest when the effective water depth is within the suitable range and lowest when it is outside the boundary range. The intermediate transition section uses a linear function, an S-shaped function, or a response function fitted by local observation data for monotonic mapping. Then, by combining the area of all effective habitat units, the spatial correction coefficients used to characterize hydraulic connectivity, substrate colonization, bottom light, wind and wave exposure, or the value of existing vegetation preservation, and the corresponding water depth suitability, the area-weighted suitability of the target aquatic plant at the current growth stage and candidate lake level is calculated using an area-weighted average method. This suitability is then used as the corresponding community target value and input into the subsequent screening steps.
[0158] Example 4:
[0159] The basic content is the same as in Example 1, except that:
[0160] Please see Figure 1 — Figure 2 In the third step, the recursive update of the cross-time stress state variables of each target aquatic plant refers to:
[0161] ;
[0162] In the formula, For cross-time stress state variables, The stress memory coefficient, According to the first The cumulative amount of stress is determined by the proportion of stressed area, the degree of stress, and the duration of stress during each control period. The recovery status is determined based on the recovery water depth, the proportion of the recovery area, and the recovery time.
[0163] when When the stress level exceeds the upper limit for the corresponding reproductive stage, this will occur. The candidate lake level was deemed infeasible, or coercive penalties were imposed on it.
[0164] Preferably, the cumulative amount of stress The formula for calculation is:
[0165] ;
[0166] In the formula, This is the cumulative coefficient corresponding to the reproductive stage. The proportion of effective habitat area under stress. To determine fitness under duress, Target aquatic plants During the reproductive stage and candidate lake surface water level Area-weighted fitness The length of the kth control period;
[0167] The recovery state The formula for calculation is:
[0168] ;
[0169] In the formula, This represents the recovery coefficient corresponding to the reproductive stage. To restore the effective habitat area to a suitable level, To restore the assessment of fitness, Target aquatic plants During the reproductive stage and candidate lake surface water level Area-weighted fitness The length of the kth control period.
[0170] In application, firstly, the area-weighted suitability of the target aquatic plant at the corresponding growth stage is calculated based on the current candidate lake level. This, combined with the proportion of effective habitat area under stress, the stress-based suitability, and the length of the control period, yields the current cumulative stress. Simultaneously, the current recovery status is calculated by combining the proportion of effective habitat area restored to suitable conditions, the recovery-based suitability, and the length of the control period. Next, using a recursive update formula, the stress state variable from the previous control period is multiplied by the stress memory coefficient, added to the current cumulative stress, and subtracted from the current recovery status to obtain the updated cross-period stress state variable. Then, it is determined whether the updated stress state variable exceeds the upper limit of the stress state for the corresponding growth stage of the plant. If it does, the current candidate lake level is deemed infeasible, or a stress penalty is imposed, and it is included in subsequent evaluations. If it does not exceed the upper limit, the candidate lake level is retained.
[0171] Example 5:
[0172] The basic content is the same as in Example 1, except that:
[0173] Please see Figure 1 — Figure 2 In the fifth step, calculating the target community value corresponding to each candidate lake surface level based on area-weighted fitness, the community's weakest fitness, and cross-time stress state variables means:
[0174] First, the target aquatic plants that are actually involved in the calculation at the current growth stage are grouped as follows: Then, the target aquatic plants Effective weights Normalize:
[0175] ;
[0176] In the formula, Based on weights, The activation coefficient is determined based on whether the target is in its current reproductive stage, monitoring effectiveness, repair priority, or local scarcity. A collection of target aquatic plants The sum of the base weights and activation coefficients of all aquatic plants;
[0177] The community target value The formula for calculation is:
[0178] ;
[0179] In the formula, The weakest protection coefficient for the community is between 0 and 1. Target aquatic plants During the reproductive stage and candidate lake surface water level Area-weighted fitness For normalized effective weights, Punishment for cross-time period coercion. Penalty for water level changes Penalties are imposed for the number of operations or energy consumption of controllable gate pump facilities. , and It is a non-negative coefficient.
[0180] In the fifth step, the process of screening scattered lake surface water levels to obtain candidate lake surface water level intervals that can be continuously connected with the scattered lake surface water levels in the next control period refers to: the candidate lake surface water level intervals satisfy:
[0181] ;
[0182] In the formula, For the first The maximum community target value that can be achieved within the water level set during a given control period. The corridor interception coefficient is between 0 and 1. When the candidate lake water level that meets the conditions forms two or more discontinuous intervals, the selection is based on the number of candidate lake water levels that can reach the set of water levels that can be reached in the subsequent control period, the community's weakest suitability, and the number of times the controllable gate pump facilities are operated. One interval is selected as the ecological water level corridor for the current control period, and the remaining intervals are selected as alternative lake water level intervals.
[0183] Preferably, the cross-time-period stress state penalty It is obtained based on the cross-time stress state variables.
[0184] Preferably, the community target simultaneously protects the weakest target while considering overall benefits, deducting the costs of cumulative stress, water level changes, and frequent operation of controllable gate pump facilities. Preferably, the community's weakest protection coefficient... Corridor interception coefficient and stress memory coefficient Determined based on the remediation stage and the tolerance of the target plant. In the early stages of remediation or when prioritizing sensitive targets, [efforts can be made to] improve [the effectiveness of remediation]. and This improves the protection level of the weakest target and brings the corridor closer to the optimal range. When the community is stable and a large operational buffer is required on-site, the level can be reduced. or Initial repair phase A value of 0.60 to 0.70 is acceptable. A value of 0.90 to 0.95 is acceptable; vegetation stabilization period. A value of 0.35 to 0.50 is acceptable. A value of 0.85 to 0.90 is acceptable. For targets sensitive to continuous stress or with slow recovery, A value of 0.70 to 0.90 is acceptable; for targets with strong tolerance and rapid recovery, A value of 0.40 to 0.60 is acceptable.
[0185] In application, firstly, based on the basic weights of each target aquatic plant and the activation coefficients determined according to whether the target is in its current growth stage, monitoring effectiveness, restoration priority, or local scarcity, the effective weights are calculated and normalized. Next, based on the community target value calculation formula, combined with the community's weakest protection coefficient, the normalized effective weights, the area-weighted fitness of each target aquatic plant, and penalties for cross-time stress states, water level changes, and the number of controlled gate pump operations or energy consumption, the community target value corresponding to each candidate lake surface water level is calculated. Subsequently, the target values for the community are screened based on the corridor interception coefficient, retaining candidate lake levels that meet the threshold conditions to form candidate lake level intervals. When two or more discontinuous intervals of candidate lake levels meet the conditions, the selection is based on the number of candidate lake levels that can reach the set of achievable water levels in subsequent control periods, the community's weakest suitability factor, and the number of times controllable gate pump facilities are operated. One interval is selected as the ecological water level corridor for the current control period, and the remaining intervals are selected as alternative lake level intervals. On this basis, the feasibility of water level transfer is calculated from the current water level to each future time period, and candidate water levels that cannot be reached under the conditions of controllable gate pump facility capacity and water volume are deleted. Then, the process is backtracked from the predicted end time period to the current time period, and candidate water levels that can be reached but cannot enter the subsequent safe and feasible set are deleted. If no feasible water level is found after screening, or if none of the candidate lake level intervals can meet the continuous connection conditions with the next control period, a backup solution is used.
[0186] Example 6:
[0187] The basic content is the same as in Example 1, except that:
[0188] Please see Figure 1 — Figure 2 According to claim 1 or 2, a method for generating an ecological water level corridor in a shallow lake is characterized in that: in the fourth step, the feasibility of water level transfer refers to being determined by water balance and the water level-reservoir capacity relationship.
[0189] ;
[0190] ;
[0191] In the formula, For the first Lake water storage capacity during a controlled period For the first Lake water storage capacity during a controlled period For the first The amount of water entering the target water body within a control period For the first The amount of water flowing out of the target water body during a controlled period. for The amount of precipitation replenishing the lake surface during the controlled period for Evaporation, leakage, or other water losses within a controlled period. The water level-storage capacity function of the target water body. For the first Candidate lake surface water levels for each control period; and The controllable water volume is constrained by the flow capacity and operating time of the controllable gate pump facilities;
[0192] In the fourth step, the continuous screening refers to: based on the feasibility of water level transfer, the candidate lake surface water levels that can be reached from the previous control period and can continue to enter the next control period are set into a reachable water level set.
[0193] In application, firstly, based on the water balance and water level-storage capacity relationship, combined with the lake's water storage in the previous control period, the amount of water entering the target water body in the current control period, the amount of water flowing out of the target water body, the amount of precipitation replenishing the lake surface, and the amount of water lost due to evaporation, seepage, or other losses, the first [unclear text] is calculated. The lake's water storage capacity during the first control period is then calculated; subsequently, based on the target water body's water level-storage capacity function, the calculated water storage capacity is converted into the first... Candidate lake surface water levels are selected for each control period, where the controllable water volume is constrained by the flow capacity and operating duration of the controllable gate pump facilities. Subsequently, based on the feasibility of water level transfer, the set of candidate lake surface water levels that can be reached from the previous control period and continue into the next control period is determined as the achievable water level set. If no feasible water level is found after screening, or if none of the candidate lake surface water level intervals can meet the continuous connection condition with the next control period, an alternate solution is used.
[0194] Example 7:
[0195] The basic content is the same as in Example 1, except that:
[0196] Please see Figure 1 — Figure 2 In the first step, the calculation of the ecological feedback data includes at least one or a combination of light correction, wind and wave disturbance correction, and dynamic updates of reproductive stages:
[0197] The light correction refers to: calculating the first... for submerged plants Effective light ratio at the bottom of each lake bottom space unit :
[0198] ;
[0199] In the formula, The light attenuation coefficient is determined based on transparency, turbidity, or light intensity at different underwater depths. No. The lakebed space unit in the first The effective water depth for each control period; when When the light ratio is lower than the minimum light ratio for the corresponding reproductive stage, reduce the spatial correction coefficient of the corresponding lake bottom spatial unit or mark the lake bottom spatial unit as temporarily unsuitable for life;
[0200] The wave disturbance correction refers to: estimating the bottom shear stress caused by waves based on wind speed, wind direction, effective wind zone length and water depth; when the bottom shear stress exceeds the bottom sediment initiation threshold or seedling disturbance resistance threshold, increasing the water level change penalty of the corresponding lake bottom spatial unit in the community target value, and adjusting the candidate lake surface water level range corresponding to the ecological water level corridor.
[0201] The dynamic update of the growth stage refers to updating the growth stage of the target aquatic plant based on accumulated temperature, continuous daily average water temperature, day length, remote sensing images, field images, or artificial phenological surveys.
[0202] In the first step, the confirmation process of the habitat response parameters is as follows: First, multiple evidence records are obtained from the aquatic plant habitat demand evidence database. Each evidence record includes one or a combination of: species or functional group identifier, life form, reproductive stage, shallow-water inhibition boundary, lower limit of suitable water depth, upper limit of suitable water depth, deep-water inhibition boundary or tolerance boundary, data source, and evidence quality information. Then, the weight of the evidence is determined based on at least two of the following: regional similarity, test type, sample size, reproductive stage matching degree, and local validation degree. Finally, the habitat response parameters are determined comprehensively based on the evidence weights and multiple evidence records. Preferably, the evidence weights form multiple response scenarios, which may include a conservative scenario, a baseline scenario, and a lenient scenario. The conservative scenario is used in the early stages of the project or in the stage of lack of data; the baseline scenario is used for routine scheduling; the lenient scenario is used for sensitivity analysis; and as local monitoring accumulates, the relative weight of local records is increased and new parameter versions are released.
[0203] In application, firstly, the effective light ratio at the bottom of each lake bottom spatial unit is calculated for submerged plants. When this ratio is lower than the minimum light ratio for the corresponding growth stage, the spatial correction coefficient of the corresponding lake bottom spatial unit is reduced or it is marked as temporarily unsuitable for aquaculture. Simultaneously, the bottom shear stress caused by waves is estimated based on wind speed, wind direction, effective wind zone length, and water depth. When this shear stress exceeds the bottom sediment initiation threshold or seedling disturbance resistance threshold, the water level change penalty for the corresponding lake bottom spatial unit in the community target value is increased, and the candidate lake surface water level interval corresponding to the ecological water level corridor is adjusted. The growth stage of the target aquatic plants is dynamically updated based on accumulated temperature, continuous daily average water temperature, day length, remote sensing images, field images, or artificial phenological surveys. Next, multiple evidence records are obtained from the aquatic plant habitat demand evidence database. The weight of the evidence is determined based on at least two of the following: regional similarity, experiment type, sample size, growth stage matching degree, and local validation degree. The habitat response parameters are determined comprehensively based on the evidence weights and multiple evidence records, and the corresponding parameter versions are applied according to the conservative scenario, baseline scenario, or lenient scenario.
[0204] Example 8:
[0205] The basic content is the same as in Example 1, except that:
[0206] Please see Figure 1 — Figure 2 First, organize the water depth requirements of aquatic plants one by one. Each record corresponds to a research conclusion with source and conditions. It is forbidden to directly merge the values of the same species in different regions, at different stages and at different experimental scales into a single interval without source.
[0207] The target plants are submerged plant A, emergent plant B, and floating-leaved plant C. For ease of recalculation, the baseline scenario parameters are as follows:
[0208]
[0209] In actual applications and projects, plants A, B, and C can be replaced with target plants such as those from the genera *Vallisneria*, *Hydrilla*, *Potamogeton*, *Phragmites*, *Typha*, *Zizania*, *Nymphoides*, *Euryale*, or *Trapa*, and the number of targets is not fixed.
[0210] The target water body is then divided into 6 spatial units:
[0211]
[0212] Take the spatial correction factor =0, when the candidate lake surface water level H is 23.70m, the water depth of each unit is 20cm, 35cm, 50cm, 65cm, 80cm and 30cm respectively;
[0213] Taking plant A as an example: Unit 1 has a water depth of 20cm, which is at the shallow water inhibition boundary, and its suitability is 0; Unit 2 has a water depth of 35cm, and its suitability is 0.75 calculated according to the linear ascending segment; Units 3 to 5 have water depths of 50cm, 65cm and 80cm, respectively, which are all in the suitable range, and their suitability is 1; Unit 6 has a water depth of 30cm, and its suitability is 0.50.
[0214] The area-weighted fitness of plant A is:
[0215] ;
[0216] The area-weighted fitness of plant B and plant C were calculated using the same method. This proves that the water level on the same lake surface is not equivalent to the uniform water depth of the entire lake, and that the area and bottom elevation of spatial units directly change the effective habitat of each plant.
[0217] The current lake level is set at 23.60m, and the length of each of the next five control periods is 7 days. The candidate water level step size is 0.05m. The simulation constraints are as follows:
[0218]
[0219] "Natural net water level change" refers to the water level change caused by inflow, rainfall, evaporation, and uncontrollable outflow when no controlled regulation is implemented. "Maximum net regulation of the facility" refers to the maximum increase or decrease in water level that the gate pump can cause within a controlled period.
[0220] For any candidate lake surface water level achievable candidate lake water level The water level range is determined by both natural net change and facility capacity. For example, if H3 = 23.85m, even if the maximum capacity is reduced by 0.08m in the fourth period, under the influence of natural net change +0.18m, the minimum H4 will still be 23.95m, exceeding the flood control limit of 23.80m for the fourth period. Therefore, although H3 = 23.85m may have a high ecological suitability in the third period, it cannot enter the safe water level range in the fourth period according to the existing facility capacity. It should be removed from the multi-period water level continuous accessibility screening. Therefore, the ecological water level corridor of this invention is not a simple threshold cutoff of the current objective function, but includes accessibility conditions to the set of safe and feasible sets for subsequent periods.
[0221] Take the stress memory coefficient of plant A initial state .Will The product of missing values below 0.60 and the proportion of stressed area is used as the cumulative stress level. ,Will The excess amount above 0.80 is multiplied by the recovery factor to obtain the recovery amount. .
[0222] Candidate trajectory T1 (i.e., a water level change sequence formed by sequentially stringing together candidate lake surface water levels from multiple consecutive control periods) in plant A at five time periods The values were 0.82, 0.78, 0.70, 0.66, and 0.84 respectively; the candidate trajectory T2 for plant A in the five time periods The values are 0.82, 0.74, 0.52, 0.45, and 0.82, respectively.
[0223] No occurrences were observed in any of the time slots in T1. When the value is below 0.60, the stress level gradually decreases with recovery. T2 occurs in periods 3 and 4. Continuously below 0.60, Continuous is positive. Cumulative increase. If the 4th period... If the seedling stage limit is exceeded, T2 is deemed infeasible, even if T2 is in time slots 1 and 5. The water level is too high, and it cannot enter the set of feasible trajectories corresponding to the ecological water level corridor.
[0224] To make the calculation directly reproducible, the proportion of the stressed area can be set. = The proportion of spatial units with a suitability of less than 0.60 to the total effective habitat area, and the restoration area proportion. The percentage of space units with a suitability score higher than 0.80 is taken as... =1、 =0.5, and normalize the control period length to 1. Then substitute each period into the value... , The stress states of the two trajectories can be obtained by combining the state recursion formula.
[0225] In time period 1, the HSI of the three plants is calculated for candidate water levels in the reachable water level set. =0.50, =0.20, =0.05, =0.02, no operation penalty has been incurred in the current time period. Some calculation results are as follows:
[0226]
[0227] J1 in this table is a simplified result showing the weakest effect of the community. The full calculation also deducts stress, water level changes and operational costs.
[0228] The maximum J1 among the reachable candidates is 0.683, so we take... =0.90, threshold is 0.615. The continuous water level that meets the threshold and is subsequently achievable is 23.60m to 23.70m. Therefore: the lower limit of the corridor is 23.60m; the preferred water level is 23.65m; the upper limit of the corridor is 23.70m.
[0229] When the upper limit of the corridor is 23.75m, although plant A and plant C have high adaptability, plant B becomes a significant weakness and the water level cannot be used to reach the subsequent period of strong flood control constraints, so it does not enter the ecological water level corridor.
[0230] If only the current weighted average fitness of the three targets is used for ranking, the weighted average of 23.65m and 23.70m is 0.706, and 23.75m still reaches 0.686, making it difficult to directly identify its subsequent unreachability risk. This invention further considers the weakest link, cross-period stress, and subsequent reachability, causing 23.75m and 23.80m to be removed from the executable set. This simulation comparison is used to illustrate the substantial impact of multi-period continuous reachability screening on the control results.
[0231] After the initial control period ended, the measured water level was 23.64m, within the original ecological water level corridor. Simultaneously, monitoring revealed a decrease in transparency and an increase in the inverted light attenuation coefficient, leading to a reduction in effective light intensity at the bottom of the deep-water unit. The system reduces the impact of the deep-water space unit on plant A. The new water level, light attenuation, and future rainfall forecasts will be used as inputs for the next round of data collection.
[0232] After recalculation, the high water level end of the reachable water level set in the second period is restricted by both the low light risk and the flood control accessibility in the fourth period. The ecological water level corridor has been adjusted from the original prediction of 23.65m to 23.80m to 23.60m to 23.72m, with the preferred water level being 23.66m.
[0233] When adjusting water levels, the original plan's actions are not executed directly. Instead, a new initial action is generated based on the updated second-period corridor, thus avoiding the accumulation of forecast errors.
[0234] When the monitored water level is 23.58m and the current corridor level is between 23.60m and 23.70m, the following control data package can be generated:
[0235] Task identifier: WL-YYYYMMDD-001;
[0236] Target facility: Intake gate A;
[0237] Direction control: Increase water intake;
[0238] Target flow rate: Calculated based on the water level-area curve, target increment, and execution time;
[0239] Maximum execution time: 6 hours;
[0240] Target corridor: 23.60m to 23.70m;
[0241] Preferred water level for the first period: 23.65m;
[0242] Permissible deviation: ±0.02m;
[0243] Recalculation trigger conditions: The measured water level reaches 23.63m, the change in the rainfall forecast exceeds the set value, the transparency is lower than the set value, or the equipment status is abnormal;
[0244] Safety rollback conditions: flood control calibration failure, communication interruption, water level gauge malfunction, or manual cancellation;
[0245] Manual confirmation status: Pending confirmation.
[0246] In actual projects, the target flow rate and execution duration are calculated jointly based on the facility's flow curve, gate opening, upstream and downstream water levels, and the water level-reservoir capacity relationship. When not connected to an automatic control system, the control data packet is sent to a manual control terminal, where dispatchers confirm and operate the controllable gate pump facility. When connected to an automatic control system, the control data packet is sent to the gate pump controller after passing security verification and manual authorization. Both deployment methods involve the controllable gate pump facility altering the actual inflow and outflow process of the target water body.
[0247] Taking the application of this invention to seasonal shallow lakes in the middle and lower reaches of the Yangtze River (such as Honghu Lake) as an example, the whole year can be divided into stages such as germination or sprouting, seedling establishment, nutrient expansion, high water level coordination during the flood season, propagation, and overwintering. Target aquatic plants can be selected from submerged plants such as *Vallisneria* or *Vallisneria spinosa*, floating-leaved plants such as *Nymphoides peltata* or *Trapa natans*, and emergent plants such as reeds, wild rice, or cattails.
[0248] First, import the lake bottom spatial units and water level-area-reservoir capacity relationship under a unified elevation benchmark. Also, import historical and real-time water level, gate pump capacity, transparency or turbidity, wind speed and plant distribution monitoring data. The evidence library generates conservative, benchmark and relaxed response scenarios for each target plant based on the above data.
[0249] In the initial stages of local control experiments lacking the shallow lake, water depth ranges and water level change rates from existing data can be used as prior candidate parameters, but the source, applicable stage, and validation status must be labeled. This invention eliminates parameter combinations that violate flood control boundaries or controllable gate pump facilities through historical process back-calculation, and then uses fixed quadrats or transects for at least one growing season to monitor and calibrate fitness, stress accumulation, and recovery parameters. The approved local parameters are released in a new version, replacing or reducing the weight of prior parameters from foreign literature.
[0250] The above values are not fixed hard thresholds for all lakes. The lake surface water level should be converted to local lake bottom space units, and the ecological water level corridor for the current period of the project should be generated based on target plants, transparency, wind and waves, phenology, flood control scheduling and facility capacity.
[0251] Example 9:
[0252] The basic content is the same as in Example 1, except that:
[0253] Please see Figure 1 — Figure 2 A method for regulating the generation of ecological water level corridors in shallow lakes, the method comprising the following steps:
[0254] Step 1: First, generate an ecological water level corridor using the method described in claim 1; then, generate a control data packet for the control period based on the current water level, the ecological water level corridor, and the parameters of the controllable gate pump facility; then, perform a security verification on the control data packet; and finally, send the control data packet to the controller or manual control terminal of the controllable gate pump facility.
[0255] Step 2: First, the controllable gate pump facility regulates the water inflow and outflow process according to the control data package, so that the lake surface water level tends to or remains within the ecological water level corridor.
[0256] Step 3: If at least one of the following is updated: current water level, ecological feedback data, hydrological and meteorological data for multiple future control periods, and parameters of controllable gate pump facilities, then obtain the updated data and return to execute steps 2 to 5 of claim 1 to continuously update the ecological water level corridor for subsequent control periods.
[0257] Preferably, in the first step, the control data package includes at least one or a combination of the following: target facility identifier, control direction, target flow or opening degree, maximum execution duration, ecological water level corridor, allowable deviation, manual confirmation status, recalculation trigger condition, and safety rollback condition; the safety verification pass condition is: passing flood control verification, equipment status verification, and manual authorization verification. Preferably, in the third step, during the rolling update, the calculated lakebed spatial unit version, habitat response parameter version, hydrological and meteorological data version, ecological monitoring data version, objective function parameters, constraint activation status, ecological water level corridor, control data package, and execution feedback are combined to form a recalculated ecological scheduling record.
[0258] Example 10:
[0259] The basic content is the same as in Example 1, except that:
[0260] Please see Figure 1 — Figure 2A system for generating and regulating an ecological water level corridor in a shallow lake includes a water level sensor, ecological monitoring equipment, a server or industrial control computer, and a controller for a controllable gate pump facility; the server or industrial control computer is connected to the controller of the water level sensor, ecological monitoring equipment, and controllable gate pump facility via a communication interface.
[0261] The server or industrial control computer includes:
[0262] The data acquisition unit is used to acquire current water level, ecological feedback data and controllable gate pump facility parameters through the communication interface, as well as lake bottom space unit data, target aquatic plant set, and hydrological and meteorological data for multiple future control periods;
[0263] The spatial habitat calculation unit is used to convert candidate lake surface water levels for multiple future control periods into effective water depths and calculate the area-weighted fitness of target aquatic plants and the fitness of the weakest community component.
[0264] The stress state update unit is used to recursively calculate the cross-period stress state variables of the target aquatic plant;
[0265] The water level transfer feasibility unit is used to obtain the set of achievable water levels for each control period based on water balance, the flow capacity of controllable gate pump facilities, water level boundaries, water level change rate, and upper limit of stress state.
[0266] The corridor generation unit is used to generate an ecological water level corridor in the set of reachable water levels based on the community's weakest fitness, area-weighted fitness, and the continuous connection conditions of subsequent control periods.
[0267] The rolling control unit is used to update the ecological water level corridor based on newly acquired data, generate the regulation data packet for the first control period, and send the regulation data packet to the controller or manual control terminal of the controllable gate pump facility after passing the security verification.
[0268] The traceable storage unit is used to save computational inputs, parameters, results, and execution feedback;
[0269] The various units work together to enable the controllable gate pump facility to regulate the inflow and outflow of the target water body.
[0270] The controller of the controllable gate pump facility is connected to the safety interface signal. When the control data packet is not manually authorized, the equipment malfunctions, communication is interrupted, the water level measurement is abnormal, or the predicted flood exceeds the preset risk level, the safety interface will not send the control data packet or will switch the controllable gate pump facility to the preset safety state.
[0271] This system is deployed on the lake management unit's server, cloud server, industrial control computer, or independent workstation. The server or industrial control computer connects to the controllers of water level sensors, ecological monitoring equipment, and controllable gate pump facilities via communication interfaces; for data that does not have an online interface, the system imports approved files to obtain lake bottom topography, target plant parameters, and historical hydrological data.
[0272] When the automatic control interface for the gate pumps is missing, the system sends control data packets to the manual control terminal, where personnel operate the controllable gate pump facilities and report the execution results. When equipment communication is available, the safety interface connects to the PLC, gate controller, or pump station control system. Regardless of whether manual confirmation or automatic transmission is used, the water level sensor is used to verify the actual water level response; when the measured response deviates from the predicted value, communication is interrupted, or the facility malfunctions, the current data packet is stopped and a safe state is entered.
[0273] The above description is only a preferred embodiment of the present invention. The scope of protection of the present invention is not limited to the above embodiments. Any equivalent modifications or changes made by those skilled in the art based on the content disclosed in the present invention should be included within the scope of protection set forth in the claims.
Claims
1. A method for generating ecological water level corridors in shallow lakes, characterized in that: The method includes the following steps: Step 1: First, obtain the current water level and ecological feedback data of the target water body, as well as the lake bottom spatial unit data, the target aquatic plant set, the hydrological and meteorological data for multiple control periods in the future, the parameters of the controllable gate pump facility, and the habitat response parameters of the target aquatic plants at the corresponding growth stages; The second step is to first construct multiple candidate lake surface water levels for multiple control periods in the future, then convert the multiple candidate lake surface water levels into the effective water depth of multiple lake bottom spatial units based on the lake bottom spatial unit data, and then calculate the area-weighted fitness of each target aquatic plant and the community's weakest fitness based on the effective water depth and habitat response parameters. The third step is to first calculate the stressed area and stress level of each target aquatic plant under each candidate lake surface water level based on the effective water depth, lake bottom spatial unit data, and habitat response parameters corresponding to each candidate lake surface water level. Then, calculate the recovery status of each target aquatic plant based on the ecological feedback data. Finally, based on the stressed area, stress level, and recovery status of each target aquatic plant in adjacent control periods, the cross-time stress status variables of each target aquatic plant are recursively updated. Step 4: First, establish time-series constraints based on hydrological and meteorological data, lake bottom spatial unit data, controllable gate pump facility parameters, habitat response parameters, and ecological feedback data. Then, determine the feasibility of water level transfer between adjacent control periods based on the time-series constraints. Next, continuously screen candidate lake surface water levels for multiple future control periods based on the time-series constraints and the feasibility of water level transfer between adjacent control periods to obtain the set of achievable water levels for each control period. Step 5: First, within the set of reachable water levels for each control period, calculate the target value of the community corresponding to each candidate lake surface water level based on area-weighted fitness, the community's weakest fitness, and cross-time stress state variables. Then, filter the target values of the community based on the target threshold to obtain scattered lake surface water levels. Next, filter the scattered lake surface water levels to obtain candidate lake surface water level intervals that meet the condition of continuous connection with the scattered lake surface water levels of the next control period. The candidate lake surface water level intervals include the lower limit of the corridor, the preferred water level, and the upper limit of the corridor. Finally, determine the candidate lake surface water level intervals as the ecological water level corridor for the current control period.
2. The method for generating an ecological water level corridor in a shallow lake according to claim 1, characterized in that: In the fifth step, when filtering the community target value according to the target threshold to obtain the scattered lake surface water level, if the scattered lake surface water level is empty, then a backup solution is performed. When screening scattered lake surface water levels, if a candidate lake surface water level interval that meets the condition of continuous connection with the scattered lake surface water level in the next control period cannot be obtained, then an alternative solution is performed. The alternative solution refers to: first outputting the conflict identifier, affected target aquatic plants, expected stressed area, expected stress duration and unmet target threshold, continuity conditions or temporal constraints, and then performing a downgraded solution based on the preset priorities of flood control safety, personnel and equipment safety, water supply safety and ecological objectives.
3. A method for generating an ecological water level corridor in a shallow lake according to claim 1 or 2, characterized in that: In the second step, converting multiple candidate lake surface water levels into the effective water depth of multiple lake bottom spatial units based on lake bottom spatial unit data means: firstly, selecting lake bottom spatial units located within the effective habitat from the lake bottom spatial unit data, wherein the effective habitat is hydraulically connected to the main water area and meets the minimum inundation duration or colonization conditions. Located within the effective living area of the first The lakebed space unit in the first Effective water depth during each control period The calculation formula is: ; In the formula, For the first Candidate lake surface water levels for each control period For the first The representative bottom elevation of each lakebed spatial unit, This is a correction for sediment deposition, micro-topography, or measurement deviations.
4. The method for generating an ecological water level corridor in a shallow lake according to claim 3, characterized in that: In the second step, calculating the area-weighted fitness of each target aquatic plant based on effective water depth and habitat response parameters means: first, determining the target aquatic plants... During the reproductive stage water depth adaptation function : when or hour, ; when hour, It monotonically increases from 0 to 1; when hour, ; when hour, It decreases monotonically from 1 to 0; In the formula, For effective water depth, This serves as a shallow water-side suppression boundary. To ensure a suitable lower limit for water depth, To ensure an appropriate upper limit of water depth, The deep-water side is used as a suppression boundary; the monotonically increasing or monotonically decreasing response is a linear function, a sigmoid function, or a response function fitted from local observation data. Then calculate the target aquatic plants During the reproductive stage and candidate lake surface water level Area-weighted fitness : ; In the formula, For the first The area of each lakebed space unit Target aquatic plants During the reproductive stage Effective water depth The water depth is suitable for life. Spatial correction coefficients are used to characterize one or a combination of hydraulic connectivity, substrate colonization, bottom light, wind and wave exposure, or the value of existing vegetation preservation.
5. A method for generating an ecological water level corridor in a shallow lake according to claim 1 or 2, characterized in that: In the third step, the recursive update of the cross-time stress state variables of each target aquatic plant refers to: ; In the formula, For cross-time stress state variables, The stress memory coefficient, According to the first The cumulative amount of stress is determined by the proportion of stressed area, the degree of stress, and the duration of stress during each control period. The recovery status is determined based on the recovery water depth, the proportion of the recovery area, and the recovery time. when When the stress level exceeds the upper limit for the corresponding reproductive stage, this will occur. The candidate lake level was deemed infeasible, or coercive penalties were imposed on it.
6. A method for generating an ecological water level corridor in a shallow lake according to claim 1 or 2, characterized in that: In the fifth step, calculating the target community value corresponding to each candidate lake surface level based on area-weighted fitness, the weakest fitness of the community, and cross-time stress state variables refers to: First, the target aquatic plants that are actually involved in the calculation at the current growth stage are grouped as follows: Then, the target aquatic plants Effective weights Normalize: ; In the formula, Based on the weights, The activation coefficient is determined based on whether the target is in its current reproductive stage, monitoring effectiveness, repair priority, or local scarcity. A collection of target aquatic plants The sum of the base weights and activation coefficients of all aquatic plants; The community target value The formula for calculation is: ; In the formula, The weakest protection coefficient for the community is between 0 and 1. Target aquatic plants During the reproductive stage and candidate lake surface water level Area-weighted fitness For normalized effective weights, Punishment for cross-time period coercion. Penalty for water level changes Penalties are imposed for the number of operations or energy consumption of controllable gate pump facilities. , and It is a non-negative coefficient.
7. The method for generating an ecological water level corridor in a shallow lake according to claim 6, characterized in that: In the fifth step, the process of screening scattered lake surface water levels to obtain candidate lake surface water level intervals that can be continuously connected with the scattered lake surface water levels in the next control period refers to: the candidate lake surface water level intervals satisfy: ; In the formula, For the first The maximum community target value within the water level set can be achieved within a control period. The corridor interception coefficient is between 0 and 1. When the candidate lake water level that meets the conditions forms two or more discontinuous intervals, the selection is based on the number of candidate lake water levels that can reach the set of water levels that can be reached in the subsequent control period, the community's weakest suitability, and the number of times the controllable gate pump facilities are operated. One interval is selected as the ecological water level corridor for the current control period, and the remaining intervals are selected as alternative lake water level intervals.
8. A method for generating an ecological water level corridor in a shallow lake according to claim 1 or 2, characterized in that: In the fourth step, the feasibility of water level transfer refers to the determination based on water balance and the water level-reservoir capacity relationship. ; ; In the formula, For the first Lake water storage capacity during a controlled period For the first Lake water storage capacity during a controlled period For the first The amount of water entering the target water body within a control period For the first The amount of water flowing out of the target water body during a controlled period. for The amount of precipitation replenishing the lake surface during the controlled period for Evaporation, leakage, or other water losses within a controlled period. The water level-storage capacity function of the target water body. For the first Candidate lake surface water levels for each control period; and The controllable water volume is constrained by the flow capacity and operating time of the controllable gate pump facilities; In the fourth step, the continuous screening refers to: based on the feasibility of water level transfer, the candidate lake surface water levels that can be reached from the previous control period and can continue to enter the next control period are set into a reachable water level set.
9. A method for generating an ecological water level corridor in a shallow lake according to claim 1 or 2, characterized in that: In the first step, the calculation of the ecological feedback data includes at least one or a combination of light correction, wind and wave disturbance correction, and dynamic updates of reproductive stages: The light correction refers to: calculating the first... for submerged plants Effective light ratio at the bottom of each lake bottom space unit : ; In the formula, The light attenuation coefficient is determined based on transparency, turbidity, or light intensity at different underwater depths. No. The lakebed space unit in the first The effective water depth for each control period; when When the light ratio is lower than the minimum light ratio for the corresponding reproductive stage, reduce the spatial correction coefficient of the corresponding lake bottom spatial unit or mark the lake bottom spatial unit as temporarily unsuitable for life; The wave disturbance correction refers to: estimating the bottom shear stress caused by waves based on wind speed, wind direction, effective wind zone length and water depth; when the bottom shear stress exceeds the bottom sediment initiation threshold or seedling disturbance resistance threshold, increasing the water level change penalty of the corresponding lake bottom spatial unit in the community target value, and adjusting the candidate lake surface water level range corresponding to the ecological water level corridor. The dynamic update of the growth stage refers to updating the growth stage of the target aquatic plant based on accumulated temperature, continuous daily average water temperature, day length, remote sensing images, field images, or artificial phenological surveys. In the first step, the process of confirming the habitat response parameters is as follows: First, multiple evidence records are obtained from the aquatic plant habitat demand evidence database. Each evidence record includes one or a combination of the following: species or functional group identifier, life form, reproductive stage, shallow water side inhibition boundary, lower limit of suitable water depth, upper limit of suitable water depth, deep water side inhibition boundary or tolerance boundary, data source, and evidence quality information. Then, the weight of the evidence is determined based on at least two of the following: regional similarity, test type, sample size, reproductive stage matching degree, and local validation degree. Finally, the habitat response parameters are determined comprehensively based on the evidence weight and multiple evidence records.
10. A method for regulating the generation of ecological water level corridors in shallow lakes using the method described in claim 1, characterized in that: The method includes the following steps: Step 1: First, generate an ecological water level corridor using the method described in claim 1; then, generate a control data packet for the control period based on the current water level, the ecological water level corridor, and the parameters of the controllable gate pump facility; then, perform a security verification on the control data packet; and finally, send the control data packet to the controller or manual control terminal of the controllable gate pump facility. Step 2: First, the controllable gate pump facility regulates the water inflow and outflow process according to the control data package, so that the lake surface water level tends to or remains within the ecological water level corridor. Step 3: If at least one of the following is updated: current water level, ecological feedback data, hydrological and meteorological data for multiple future control periods, and parameters of controllable gate pump facilities, then obtain the updated data and return to execute steps 2 to 5 of claim 1 to continuously update the ecological water level corridor for subsequent control periods.