A modular skid-mounted rapid site construction process

By using modular design and rapid installation technology, the problems of low efficiency and high cost in the construction of oil and gas pipeline stations have been solved, enabling rapid station construction and efficient production, reducing equipment interference and space shortages, improving construction efficiency and reducing costs.

CN123116539APending Publication Date: 2026-11-17LIAOHE GASOLINEEUM EXPLORATION BUREAU CO LTD +2
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202510626715.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-05-15
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing technologies for oil and gas pipeline stations are inefficient and costly to construct, failing to meet the production demands for rapid production ramp-up. Furthermore, the lack of systematic spatial optimization and cross-disciplinary collaborative design leads to problems such as equipment interference or insufficient space.

Method used

The system employs a modular design and rapid installation process, utilizes software for spatial collision detection and structural position optimization to generate modular skid-mounted drawings, prefabricates equipment modules, and assembles them via flange connections and H-beam bases. It is equipped with communication and electrical equipment, reducing on-site welding workload.

Benefits of technology

It significantly shortens the construction cycle, improves construction efficiency, reduces costs, enables rapid site construction, reduces equipment collisions and space shortages, and meets the demand for rapid production.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123116539A_ABST
    Figure CN123116539A_ABST
Patent Text Reader

Abstract

This invention relates to a modular skid-mounted rapid construction process for oil and gas pipeline stations, specifically for such stations, and belongs to the field of petroleum equipment technology. The process involves modular design using software, spatial collision detection, and optimization of structural positions to generate modular skid-mounted blueprints. Using these pre-designed blueprints, the equipment is prefabricated in modules. The connection methods and bases of the skid-mounted equipment are designed. The auxiliary equipment is also designed. Finally, the skid-mounted equipment and auxiliary equipment are assembled on-site. The purpose of this invention is to better meet the demands of rapid production ramp-up through modular design and rapid installation, thereby improving the construction efficiency of oil and gas pipeline stations and shortening the construction cycle.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to a modular skid-mounted rapid construction process for oil and gas stations, and belongs to the field of oil equipment technology. Background Technology

[0002] With the increasing demand for national energy security, oil and gas pipeline construction plays a crucial role in energy peak shaving. Currently, domestic pipeline construction still relies heavily on on-site installation, primarily using argon-electric welding, which cannot meet the demands of rapid production ramp-up. This method is not only inefficient and costly during construction but also fails to meet the needs of rapid production ramp-up. Therefore, improving construction efficiency and adapting to the rapidly developing energy market, along with more efficient and economical construction methods, has become an urgent issue to address.

[0003] Existing technology, Chinese utility model patent application number 201520350958.3, discloses a combined LNG skid-mounted gasification station. In this station, the inlet of the unloading pressurization skid connects to an LNG tank truck, and the outlet of the unloading pressurization skid connects to the inlets of the storage tank pressurization skid and the gasification skid. The outlet of the storage tank pressurization skid connects to the inlets of the flash vapor recovery skid and the vent gas heating skid, respectively. The outlet of the vent gas heating skid is used for venting, and the outlets of both the gasification skid and the flash vapor recovery skid are connected to the inlets of the pressure regulating, metering, and odorizing skid. However, while this utility model proposes a combined skid-mounted gasification station, it lacks systematic space optimization and cross-disciplinary collaborative design, and it lacks pipeline layout and space collision detection, leading to potential equipment interference or insufficient space issues during on-site installation. Furthermore, this utility model relies on on-site welding and assembly, failing to achieve modular prefabrication and rapid installation. Summary of the Invention

[0004] This invention proposes a modular skid-mounted rapid construction process for oil and gas pipeline stations. Its purpose is to better meet the needs of rapid production through modular design and rapid installation, improve the construction efficiency of oil and gas pipeline stations, and shorten the construction cycle.

[0005] The technical solution adopted in this invention is a modular skid-mounted rapid site construction process, including:

[0006] Step 1: Modular design, spatial collision detection, and structural position optimization are performed using software to generate modular skid-mounted drawings;

[0007] Step 2: Using pre-designed modular skid-mounted drawings, the equipment is prefabricated in modules.

[0008] Step 3: Design the connection method and base of the skid-mounted equipment;

[0009] Step four: Design the auxiliary equipment for the skid-mounted equipment;

[0010] Step 5: Assemble the skid-mounted equipment and auxiliary equipment after they are put into operation at the site.

[0011] Furthermore, the modular design using software in step one specifically involves using PDMS design software to perform modular design by functional blocks or production areas.

[0012] Furthermore, in step one, spatial collision detection and structural position optimization specifically involves using SolidWorks software to perform three-dimensional modeling of the pipeline layout and spatial position, integrating civil engineering, steel structure engineering, and communication engineering for spatial position analysis, and optimizing the collision location.

[0013] Furthermore, the step one of forming modular skid-mounted drawings specifically involves taking into full consideration the on-site installation and equipment transportation aspects, and optimizing the design in conjunction with the principles of the process flow to form modular skid-mounted drawings.

[0014] Furthermore, in step three, the connection method of the skid-mounted equipment is specifically designed to use flanges on both sides of the connection end with the skid-mounted equipment and welding at the end of the process pipeline network.

[0015] Furthermore, in step three, the base is made of H-beams and steel gratings. The steel gratings are laid on the edge of the H-beams, and the inner side of the steel gratings is hollowed out for stacking skid-mounted equipment.

[0016] Furthermore, step four specifically involves designing the communication electrical system and lightning protection grounding of the skid-mounted equipment in advance, and equipping the base of the skid-mounted equipment with communication electrical equipment.

[0017] Furthermore, the provision of communication electrical equipment on the base of the skid-mounted equipment specifically involves positioning the skid-mounted equipment, equipping it with a junction box, installing a grounding terminal at the base, and equipping it with pre-embedded anchor bolts. After the skid-mounted equipment is in place and leveled, secondary grouting is used for fixation.

[0018] Furthermore, step five specifically involves connecting the skid-mounted equipment and auxiliary equipment to the flanges using a dedicated torque wrench and an electric wrench after assembly, followed by purging and pressure testing.

[0019] Furthermore, the skid-mounted equipment includes a valve group metering skid, a process pipeline skid, an oil collecting valve group skid, a pipeline pressure testing skid, and a launch / receiver skid.

[0020] This invention discloses a modular skid-mounted rapid construction process for railway stations. Its advantages include significantly shortening the construction cycle, improving construction efficiency, and saving costs through modular design and rapid on-site assembly. Space collision detection is performed before fabricating the skid-mounted equipment to optimize structural positioning, ensuring collision-free equipment and improving space utilization efficiency. Attached Figure Description

[0021] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0022] Figure 1 The figure shown is a schematic diagram of the three-dimensional modular design of the present invention.

[0023] As shown in the figure:

[0024] 1. Pressure vessel; 2. Pressure pipeline; 3. Operating platform; 4. Base; 5. Safety valve; 6. Automatic instrument; 7. Lightning protection grounding terminal. Detailed Implementation

[0025] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. The following description of at least one exemplary embodiment is merely illustrative and is in no way intended to limit the present invention or its application or use. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0026] To address the aforementioned technical problems and to further understand the content of this invention, the technical solution is further elaborated below in conjunction with specific embodiments.

[0027] Example 1: As Figure 1 As shown, this embodiment provides a modular skid-mounted rapid construction process, including step one: modular design, spatial collision detection, and structural position optimization using software to generate modular skid-mounted drawings. As a specific implementation method, there are two options for modular selection: one is based on production area division, and the other is based on functional unit division. Given the impact of process pipeline connection issues, functional unit division is preferred for modular design. Specifically, this embodiment utilizes PDMS design software for modular design by functional blocks, and uses SolidWorks software for spatial position analysis through 3D modeling, integrating civil engineering, steel structure engineering, and communication engineering. Collision locations are optimized, and on-site installation and equipment transportation are fully considered, combined with process flow principles for optimized design, thereby generating modular skid-mounted drawings.

[0028] Step two: Using the modular skid-mounted drawings determined in step one, manufacture the equipment in modules.

[0029] Step 3: Design the connection method for the skid-mounted equipment and the base 4. For the connection method, flanges are used on both sides of the connection end to the skid-mounted equipment, while welding is used for the "dead joint" connection to the process piping end. For the base 4 design, H-beams and steel grating are used. The steel grating is laid along the edge of the H-beams, and the inner side of the grating is hollowed out for stacking the skid-mounted equipment. This base 4 design meets rigidity requirements while reducing the overall weight of the skid-mounted equipment by more than 10%.

[0030] Step four involves designing the auxiliary equipment for the skid-mounted equipment. Specifically, this includes pre-designing the communication electrical systems and lightning protection grounding for the skid-mounted equipment, and equipping the base 4 of the skid-mounted equipment with the communication electrical equipment. The equipment is then positioned on the skid-mounted equipment, equipped with junction boxes, and grounding terminals are installed at base 4. Pre-embedded anchor bolts are also provided. After the skid-mounted equipment is in place and leveled, secondary grouting is used for fixation.

[0031] Step five involves assembling the skid-mounted equipment and auxiliary equipment after they are installed at the operational site. This means using specialized torque wrenches and electric wrenches to connect the flanges after the skid-mounted equipment and auxiliary equipment are installed at the operational site. Figure 1 As shown, the skid-mounted equipment includes a pressure vessel tank 1 mounted on a base 4, pressure pipelines 2, automatic instruments 6, and a safety valve 5 installed on the pressure vessel tank 1. An operating platform 3 is mounted above the pressure vessel tank 1, and a lightning protection grounding terminal 7 is located below the base 4. This design reduces installation time by more than 50%, decreases on-site assembly and welding workload, lowers labor costs, achieves rapid plant construction, and shortens the construction cycle by more than 10%. After assembly, a purging and pressure test is performed, and formal operation begins after successful debugging.

[0032] Example 2: As Figure 1 As shown, this embodiment provides a modular skid-mounted rapid site construction process, including step one: using PDMS design software to perform modular design according to production blocks, using BIM software to perform spatial location analysis by integrating civil engineering, steel structure engineering and communication engineering through 3D modeling, optimizing the collision location, fully considering on-site installation and equipment transportation, and combining the process flow principle to optimize the design, thereby forming modular skid-mounted drawings;

[0033] Step two: Using the modular skid-mounted drawings determined in step one, the equipment is manufactured in modules.

[0034] Step 3: Regarding the connection method of the skid-mounted equipment, flanges are used on both sides of the connection end with the skid-mounted equipment, and welding is used for the "dead joint" connection with the end of the process pipeline. For the design of the base 4 of the skid-mounted equipment, the base 4 uses H-beams and steel grating. The steel grating is laid on the edge of the H-beams, and the inner side of the steel grating is hollowed out for stacking the skid-mounted equipment.

[0035] Step four involves pre-designing the communication electrical systems and lightning protection grounding for the skid-mounted equipment, and equipping the base 4 of the skid-mounted equipment with the communication electrical equipment. The equipment is then positioned on the skid-mounted equipment, a junction box is installed, a grounding terminal is installed at base 4, and pre-embedded anchor bolts are provided. After the skid-mounted equipment is in place and leveled, secondary grouting is used for fixation.

[0036] Step 5: After the skid-mounted equipment and auxiliary equipment are put into operation on site, they are assembled. After assembly, a purging and pressure test are carried out.

[0037] This invention is applied to the construction of unconventional oil and gas stations in a certain region, forming skid-mounted equipment such as valve group metering skids, process pipeline skids, oil gathering valve group skids, pipeline pressure testing skids, and launch / receiver skids. Taking traditional oil and gas station construction as an example, the construction process involves overlapping construction, with on-site installation standards at 20,000 inch diameters. Through the design of this embodiment, parallel construction using factory prefabrication can be adopted, completing the prefabrication of more than 10,000 inch diameters, shortening the installation time by more than 50%, reducing on-site assembly workload, lowering labor costs, achieving the goal of rapid station construction, and shortening the station construction cycle by more than 10%. After assembly, purging and pressure testing are carried out, and formal operation is carried out after debugging. The construction process of this invention provides important support for efficient production, quality improvement and efficiency enhancement, and low-carbon transformation.

[0038] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, and not to limit them; although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some or all of the technical features; and these modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.

Claims

1. A modular skid-mounted rapid construction process for railway stations, characterized in that, include: Step 1: Modular design, spatial collision detection, and structural position optimization are performed using software to generate modular skid-mounted drawings; Step 2: Using pre-designed modular skid-mounted drawings, the equipment is prefabricated in modules. Step 3: Design the connection method and base of the skid-mounted equipment (4); Step four: Design the auxiliary equipment for the skid-mounted equipment; Step 5: Assemble the skid-mounted equipment and auxiliary equipment after they are put into operation at the site.

2. The modular skid-mounted rapid construction process according to claim 1, characterized in that, In step one, modular design using software specifically involves using PDMS design software to perform modular design by functional blocks or production areas.

3. The modular skid-mounted rapid construction process for a railway station according to claim 1, characterized in that, In step one, spatial collision detection and structural position optimization specifically involves using software to perform 3D modeling of the pipeline layout and spatial position, integrating civil engineering, steel structure engineering, and communication engineering to conduct spatial position analysis, and optimizing the collision locations.

4. The modular skid-mounted rapid construction process for a railway station according to claim 1, characterized in that, Step one, forming modular skid-mounted drawings, involves fully considering on-site installation and equipment transportation, and optimizing the design in conjunction with process flow principles to form modular skid-mounted drawings.

5. The modular skid-mounted rapid construction process for a railway station according to claim 1, characterized in that, In step three, the connection method for the skid-mounted equipment is designed as follows: flanges are used on both sides of the connection end with the skid-mounted equipment, and welding is used at the end of the process pipeline.

6. The modular skid-mounted rapid construction process for a railway station according to claim 1, characterized in that, In step three, the base (4) uses H-beams and steel gratings. The steel gratings are laid on the edge of the H-beams, and the inner side of the steel gratings is hollowed out for stacking skid-mounted equipment.

7. The modular skid-mounted rapid construction process for a railway station according to claim 1, characterized in that, Step four specifically involves designing the communication electrical system and lightning protection grounding of the skid-mounted equipment in advance, and equipping the base (4) of the skid-mounted equipment with communication electrical equipment.

8. The modular skid-mounted rapid construction process for a railway station according to claim 7, characterized in that, The communication electrical equipment is matched on the base (4) of the skid-mounted equipment. Specifically, the position is arranged on the skid-mounted equipment, a junction box is equipped, a grounding terminal is installed at the base (4), and pre-embedded anchor bolts are provided. After the skid-mounted equipment is in place and leveled, secondary grouting is performed for fixation.

9. The modular skid-mounted rapid construction process for a railway station according to claim 1, characterized in that, Step five involves connecting the skid-mounted equipment and auxiliary equipment at the operational site using a dedicated torque wrench and an electric wrench, and then performing a purging and pressure test after assembly.

10. The modular skid-mounted rapid construction process for a railway station according to claim 1, characterized in that, Skid-mounted equipment includes valve assembly metering skids, process piping skids, oil collecting valve assembly skids, pipeline pressure testing skids, and launch / receiver skids.