A method for dynamic allocation of printing orders in collaboration between chain stores and a central factory
By acquiring multi-source order information from exhibitions and events, combined with exclusive independent imposition rules for printed sheets, and by monitoring content changes in real time and generating dynamic allocation schemes, the issues of print quality and delivery caused by independent production scheduling between the central factory and store printing production nodes have been resolved, achieving on-time and high-quality delivery of printed materials and improving resource utilization.
Patent Information
- Application Number
- CN202611613903.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-19
- Publication Date
- 2026-11-17
AI Technical Summary
During exhibitions and events, the independent scheduling of printing production nodes in the central factory and stores lacks a coordinated response mechanism, which leads to problems such as the invalidation of complete sets of printed materials, inconsistent color differences, or failure to deliver complete sets on time when the content changes.
By acquiring multi-source order information from exhibitions and events, and combining it with exclusive sheet imposition rules, we can allocate initial production nodes and calculate time windows, monitor content changes in real time, identify the types of impact of changes, and generate dynamic allocation plans, including voiding and rearrangement, task migration, or incremental reprint processing, to ensure that printed materials are delivered on time and with high quality.
It has improved the resource utilization rate, color consistency and delivery reliability of printed materials in exhibitions and events, and avoided the situation where the entire set of printed materials could not be arranged on time due to delays or color differences in a single sub-order.
Smart Images

Figure CN123117733A_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of printing production management technology, and in particular to a method for dynamic allocation of printing orders in collaboration between chain stores and a central factory. Background Technology
[0002] Exhibitions and trade shows typically require sets of printed materials, including brochures, posters, flyers, badges, and other items. These sets of printed materials are prone to frequent content changes before the event begins, such as adjustments to exhibitor information and updates to the agenda.
[0003] In current printing production management, the central factory and retail outlets often schedule production independently, lacking a collaborative response mechanism for content changes. When content changes occur in some sub-orders, issues such as the entire batch of printed products being discarded, inconsistent color differences in cross-node reprints, or some sub-orders failing to arrive at the event in sets with other sub-orders before the event begins can arise, affecting the delivery quality and timeliness of complete sets of printed materials. Summary of the Invention
[0004] This application provides a method for dynamically allocating printing orders in collaboration between chain stores and a central factory to solve the above-mentioned problems. The method includes: Acquire multi-source order information sets of complete sets of printed materials for exhibitions and events, combine them with exclusive independent imposition rules for printed sheets, perform initial production node allocation and time window calculation to meet the complete set constraints, and generate an initial allocation scheme information set; Obtain the content change event stream of each sub-order, associate and compare the content change event stream with the initial allocation scheme information set, determine the impact of pre-press rasterization processing on the sub-orders with content changes and update the allocable window, and generate an allocation failure judgment information set when the expected arrival time of a sub-order does not meet the kitting constraint. Based on the allocation failure determination information set, identify the change impact type of sub-orders with content changes, perform voiding and rearrangement or task migration processing on overall rearrangement type sub-orders, perform incremental reprinting sub-task processing on incremental supplement type sub-orders, and generate a dynamic allocation scheme instruction set. Based on the aforementioned dynamic allocation scheme instruction set, node allocation and color difference verification are performed on the temporary reprint sub-orders added before the start of the event. The expected arrival time, color configuration, and substrate batch of each reprint sub-order are uniformly verified to generate a complete set of printing cover information.
[0005] Optionally, the process of generating the initial allocation scheme information set includes: Obtain the content freeze time, printing process chain time, and logistics cut-off time of each sub-order involved in the complete set of printed materials for the exhibition event, and calculate the estimated arrival time of each sub-order at the candidate production node; Determine the order type of each sub-order based on the content change attributes of each sub-order; Based on the independent imposition rules for the exclusive printed sheets, and combined with the expected arrival time and order type of each sub-order, the initial allocation scheme information set is generated.
[0006] Optionally, determining the order type of each sub-order includes: Based on the content change attributes of each sub-order, each sub-order is divided into fixed content orders and variable content orders. Fixed content orders are preferentially allocated to the central factory, and variable content orders are preferentially allocated to stores. For the variable content order, based on how the content change affects the printed finished product, the change impact type is marked as overall rearrangement type and incremental supplement type; The term "overall rearrangement" refers to changes that alter the entire page layout or content structure, necessitating a complete reprint. The term "incremental supplement" refers to changes that involve only a few data records, where most of the content in the printed product remains valid, requiring only additional printing of the changed items.
[0007] Optionally, the calculation of the expected arrival time and the screening process for the initial production node include: Based on the printing process chain time, the production completion time of each sub-order is determined, and the shipping time is obtained by adding the drying and curing buffer period to the production completion time. Based on the logistics cut-off time and logistics shift waiting time, the earliest transport shift is determined, and the departure time of the earliest transport shift is added to the transport time to obtain the estimated arrival time. Candidate production nodes whose expected arrival time is no later than the activity start time and whose expected arrival time is within the same allocable window as other sub-orders will be used as the initial allocation objects that satisfy the complete set constraint.
[0008] Optionally, the process of generating the allocation failure determination information set includes: Obtain the content change event stream for each sub-order, and extract the sub-order identifier and change field that have undergone content change; The changed field is compared with the prepress version data of the corresponding sub-order to determine whether the current change affects the prepress rasterization process, and the result of the determination result of whether the impact level of the prepress process is a severe change or a mild change is obtained. For sub-orders determined to have undergone the severe changes, the content freeze time and the allocable window are re-determined based on the changed content. If the estimated arrival time of a sub-order is later than the start time of the activity, or if the estimated arrival times of each reprint sub-order are not within the same allocable window, resulting in the inability to meet the complete set constraint, then obtain the failed sub-order identifier, failure reason, change impact type, and updated allocable window, and generate the allocation failure determination information set.
[0009] Optionally, determining whether the current change affects the pre-press rasterization process includes: If the changed field only involves updating the content of the data record and does not change the layout, it is determined to be a minor change; If the change in the field causes adjustments to the layout, changes in the position or size of variable content elements, changes in font embedding, or changes in color control parameters, it is determined to be a severe change. For sub-orders identified as having undergone severe changes, the differences in rasterization processing mechanisms between the original production node and the candidate production node are compared. When differences exist, a color tracking data package containing a color configuration description file, gray balance compensation parameters, color level mapping relationship, and target device calibration parameters is generated, and the color tracking data package is associated with the sub-order having undergone severe changes.
[0010] Optionally, the content freeze time and the reassignable window redeter process include: Update the content freeze time of the sub-orders that have undergone the aforementioned severe changes to the latest version confirmation time; If the current sub-order has been assigned to the central factory, determine whether the imposition, printing, drying and loading of the exclusive printed sheets can still be completed before the logistics cut-off time under the updated content freeze time. If it cannot be completed, mark it as node failure. If the current sub-order has been assigned to the store, determine whether the current sub-order can be inserted into the store's equipment schedule for production. If it cannot be inserted, mark it as a node failure. Include the identifier of the sub-order marked as a node failure, the reason for failure, the type of change impact, and the updated assignable window of the sub-order in the assignment failure determination information set.
[0011] Optionally, the process of generating the dynamic allocation scheme instruction set includes: Extract failed sub-orders and their change impact types from the allocation failure determination information set; When the change impact type is the overall reordering type, voiding reordering or task migration processing is performed according to the current task status of the failed sub-order, canceling the original task and generating a new version production task; When the change impact type is the incremental supplement type, the completed production results of the unchanged part are retained, and incremental supplement sub-tasks are generated only for the individuals that have been changed. The new version production task or the incremental reprint sub-task is assigned to the candidate production node, and a migration instruction package containing production parameters, the color tracking data package, batch matching information and time requirements is generated as the instruction set of the dynamic allocation scheme.
[0012] Optionally, the invalidation rearrangement or task migration process includes: Read the task state machine of the failed sub-order, which includes states such as not started, already assembled, printing in progress, post-processing completed, and already shipped. If the failed sub-order is of the overall rearrangement type and is in a state of not started or already assembled, then cancel the original task and generate a new version production task; If the failed sub-order is the overall rearrangement type and is in the printing or post-processing completion state, the feasibility of task migration is evaluated. If there is a candidate production node with compatible capacity, the task migration is executed; otherwise, the entire batch is scrapped and the order is regenerated. If the failed sub-order is the overall rearrangement type and is already shipped, then an on-site reprint instruction is generated; If the failed sub-order is an incremental replenishment type and is in a state of not started, already assembled, or in printing, then the current batch is allowed to continue production until completion, and a replenishment object list is attached to the incremental replenishment sub-task. The replenishment object list only lists the data records that need to be added or corrected, so that the target production node only produces the individuals in the list. If the failed sub-order is of the incremental supplement type and is in the post-processing completed or shipped state, then an incremental reprint sub-task is generated.
[0013] Optionally, the process of generating the printing kit cover information set includes: Based on the color tracking data package, the temporary reprint sub-orders added before the start of the event are assigned nodes, and stores or on-site printing equipment near the event location that have loaded the same color tracking data package and have idle capacity are selected as reprint nodes. The reprint node is controlled to perform a trial print after completing the rasterization process to obtain the color difference value between the reprinted part and the original batch. If the color difference value exceeds a preset threshold, formal printing is prohibited and the color is recalibrated. The reprinted sub-orders are compared with the expected arrival time, color configuration, and substrate batch of each reprinted sub-order. When all sub-orders are complete before the start time of the event and the color configuration and substrate batch are consistent, the complete printing cover plate information set is generated.
[0014] This application provides a method for dynamic allocation of printing orders in collaboration between chain stores and a central factory. This method acquires multi-source order information sets for complete sets of printed materials for exhibitions and combines them with exclusive sheet imposition rules to achieve initial production node allocation and time window calculation that meet complete set constraints. This generates an initial allocation scheme information set, establishing a production benchmark with complete set constraints as the goal. Based on this, by acquiring the content change event stream of each sub-order in real time and comparing it with the initial scheme, the system performs pre-press rasterization processing impact assessment and allocateable window updates for sub-orders with content changes. This allows the system to accurately identify the actual impact of changes on the production process and address situations where complete set constraints are not met by the expected arrival time. When applying constraints, a failure determination information set is generated promptly. Subsequently, based on this failure determination information set, the impact type of content-changed sub-orders is identified. Targeted processing is performed on overall rearrangement-type sub-orders (cancellation or task migration) and incremental supplementary sub-orders (incremental reprinting sub-tasks), thereby generating a dynamic allocation scheme instruction set. This enables differentiated handling of production tasks based on the nature of the change, avoiding unnecessary full reprints. Finally, based on the dynamic allocation scheme instruction set, node allocation and color difference verification are performed on temporary reprint sub-orders added before the event starts. The expected arrival time, color configuration, and substrate batch of each reprint sub-order are uniformly verified, generating a complete set of printing cover information. Therefore, this method avoids situations where the entire set of printed materials cannot be arranged on time due to delays or color differences in a single sub-order, improving resource utilization, color consistency, and delivery reliability in the production of printed materials for exhibitions and events. Attached Figure Description
[0015] To more clearly illustrate the technical solutions in the embodiments of this application or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0016] Figure 1 This is a schematic diagram illustrating an application scenario provided in one embodiment of this application; Figure 2 A flowchart illustrating a method for dynamically allocating printing orders in collaboration between chain stores and a central factory, as provided in an embodiment of this application. Detailed Implementation
[0017] To make the objectives, technical solutions, and advantages of the embodiments of this application clearer, the technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some, not all, of the embodiments of this application. All other embodiments obtained by those skilled in the art based on the embodiments of this application without creative effort are within the scope of protection of this application.
[0018] Furthermore, the term "and / or" in this article is merely a description of the relationship between related objects, indicating that three relationships can exist. For example, A and / or B can represent: A existing alone, A and B existing simultaneously, or B existing alone. Additionally, the character " / " in this article, unless otherwise specified, generally indicates that the preceding and following related objects have an "or" relationship.
[0019] The embodiments of this application will now be described in further detail with reference to the accompanying drawings.
[0020] Figure 1 This application provides an illustration of an application scenario. In the process of printing complete sets of printed materials for exhibitions and events, the method provided in this application can help improve the attendance rate of complete sets of printed materials before the event and reduce color differences caused by reprinting across different stages.
[0021] Specifically, the method provided in this application can be applied to any server, which interacts with the exhibition registration system and the customer ordering system to obtain the multi-source order information set provided by the exhibition registration system and the content change event stream provided by the customer ordering system, and finally outputs the complete set of printing cover plate information to the printing merchant.
[0022] The specific implementation method can be referred to in the following embodiments, wherein the data mentioned in the embodiments are only for reference and examples, so that relevant personnel can better understand them.
[0023] Figure 2 This is a flowchart illustrating a method for dynamically allocating printing orders in collaboration between chain stores and a central factory, as provided in one embodiment of this application. The method of this embodiment can be applied to the server in the above scenario. (See also...) Figure 2 The process, specifically the implementation steps, are as follows: Example 1: In some embodiments, this application provides a method for dynamically allocating printing orders in collaboration between chain stores and a central factory, the method comprising: Step S101: Obtain multi-source order information set of complete sets of printed materials for exhibition activities, combine it with the exclusive independent imposition rules of printed sheets, perform initial production node allocation and time window calculation to meet the complete set constraint, and generate initial allocation scheme information set.
[0024] The multi-source order information is aggregated from channels such as the exhibition registration system and on-site registration terminals, covering detailed production requirements for sub-orders such as exhibitor manuals, exhibitor badges, and invitation letters. The dedicated sheet imposition rule stipulates that each sub-order occupies an independent layout unit or dedicated sheet, with its structured data including page size, trim lines, and content area definitions. This rule ensures that when a sub-order version changes, only the corresponding sheet needs to be replaced without disrupting the production process of other sub-orders.
[0025] The requirement for complete sets necessitates that the estimated arrival time of all sub-orders within a complete set of printed materials is no later than the activity start time, and they must be within the same allocable delivery window to achieve one-time complete delivery. When generating the initial allocation scheme information set, the system extrapolates based on the content freeze time of each sub-order, the printing process chain time, and the logistics cut-off time. The printing process chain time encompasses the time spent on imposition, plate making, printing, drying, and post-processing, with benchmark values derived from historical production data or process quotas.
[0026] For sub-orders with changeable content attributes, they are divided into fixed content items and variable content items. Fixed content items are prioritized for allocation to the central factory, while variable content items are prioritized for allocation to stores; alternatively, load balancing is performed based on the real-time capacity load of each production node, provided that the kitting constraint is met. The calculation model for the estimated arrival time is as follows: Let the content of the sub-order be frozen for a period of time. The time required for pre-press imposition and plate making is The printing time is The drying and curing time is The time required for subsequent processing is Then the production completion time for: ; Introducing a drying and curing buffer time To prevent damage from undried ink layers and achieve a ready-to-ship time : ; The logistics carrier provides several services. Each has its own order cut-off time. and departure time .like If so, the sub-order can take that bus. The system selects the earliest available bus departure time. ; Combined with transportation time Expected arrival time for: ; The system uses candidate production nodes whose expected arrival time meets the kitting constraint as initial allocation objects, and generates an initial allocation scheme information set containing target production nodes, expected arrival time, allocable windows, color configuration, and substrate batch information.
[0027] Step S102: Obtain the content change event stream of each sub-order, compare and correlate the content change event stream with the initial allocation scheme information set, determine the impact of pre-press rasterization processing on the sub-orders with content changes and update the allocable window, and generate an allocation failure judgment information set when the expected arrival time of a sub-order does not meet the kitting constraint.
[0028] Through the customer ordering system, the content change event stream collects the modification operation sequence of each sub-order in real time, including the change time, fields, and differences in content before and after. Pre-press rasterization processing refers to converting page data into dot matrix data that can be executed by printing equipment. The system extracts the sub-order identifier and fields of the change and compares them with the pre-press version data to determine the degree of impact: if only data records are updated and the layout is not changed, it is determined to be a minor change; if it causes layout adjustments, changes in element position and size, font embedding, or changes in color parameters, it is determined to be a major change.
[0029] For sub-orders with weight changes, the system compares the rasterization mechanisms of the original production node and the candidate production node. If differences exist, a color tracking data package containing a color configuration description file, gray balance compensation parameters, color level mapping relationships, and equipment calibration parameters is generated and associated with the sub-order.
[0030] The allocable window is updated based on the judgment result. The content freeze time of the weight change sub-order is updated to the latest version confirmation time. If the original allocation node is the central factory, the system checks whether the entire process of production and loading of the dedicated printing sheets can be completed within the updated time window; otherwise, the node is marked as invalid. If the original allocation node is a store, it checks whether it can be inserted into the current equipment schedule; otherwise, the node is marked as invalid.
[0031] When a sub-order's expected arrival time is later than the event start time, or when a misalignment of the time window causes the completeness constraint to be unmet, the system generates an allocation failure judgment information set. This information set includes the failed sub-order identifier, the reason for failure, the type of change impact, and the updated allocable window, thereby instantly identifying the failure when the completeness constraint is violated.
[0032] Step S103: Based on the allocation failure judgment information set, identify the change impact type of the sub-order with content changes, perform voiding and rearrangement or task migration processing on the overall rearrangement type sub-order, perform incremental supplementation sub-task processing on the incremental supplementation type sub-order, and generate a dynamic allocation scheme instruction set.
[0033] Content changes refer to a situation where changes to the content of a sub-order result in a discrepancy between the production version and the original allocated version. The types of impact from these changes are categorized as either total reflow or incremental supplementation. Total reflow refers to a fundamental change in the layout or content structure requiring a complete reprint, such as a change in name length leading to line breaks. Incremental supplementation refers to changes in only a few data records, with most printed products remaining valid, such as a change in booth number but with the layout unchanged.
[0034] For sub-orders requiring overall reordering, the system reads the task state machine: if the order is in the printing process or completed in the later stages, the entire batch is scrapped and a new order is generated; if the order is not yet started or has already been assembled, the original task is canceled and a new production task is generated. For incremental supplementary sub-orders, the production results of the unchanged parts are retained, and incremental reprint sub-tasks are generated only for the changed individuals. For example, the current batch is allowed to continue production, and the data records that need to be added or corrected are listed as reprint targets, with the target production node only producing the individuals on the list.
[0035] The system assigns new version production tasks or incremental reprint sub-tasks to candidate production nodes, generating migration instruction packages containing production parameters, color tracking data packages, batch matching information, and time requirements, forming a dynamic allocation scheme instruction set. By distinguishing change types, this method maximizes the utilization of available finished products and reduces scrap rates and reprint costs in exhibition scenarios.
[0036] Step S104: Based on the dynamic allocation scheme instruction set, perform node allocation and color difference verification on the temporary reprint sub-orders added before the start of the event, and uniformly verify the expected arrival time, color configuration and substrate batch of each reprint sub-order to generate a complete set of printing cover information.
[0037] Temporary reprint orders stem from unexpected needs during the event preparation phase. The system selects stores or on-site equipment near the event location that have loaded the same color reprint data package and have available capacity as reprint nodes, prioritizing geographical location, equipment compatibility, and time response capability.
[0038] Color difference verification aims to ensure consistent printing quality across different nodes. After rasterization processing is completed at each node, a test print is performed to obtain the color difference value between the reprinted part and the original batch. The color difference formula under the CIE Lab color space is used for any color patch. The original batch measurement value was The measured value of the reprinted test sample is Color difference for: ; right The average color difference is calculated by averaging the standard color patches. : ; In the formula, For brightness, , These are the chromaticity coordinates. If the average color difference exceeds the preset threshold, formal printing is prohibited, and color calibration must be performed until the calibration parameters or ICC color profile are adjusted to make the color difference acceptable.
[0039] Finally, the system uniformly verifies the expected arrival time, color configuration, and substrate batch of each reprinted sub-order. Only when all sub-orders are complete and their colors match the batch before the event begins is a complete set of printing information generated. This information set signifies final confirmation of the production task, and all sub-orders enter the final set status, where no further content changes are accepted, ensuring that the complete set of printed materials is completed on time, with the required quality, and in the required quantity.
[0040] Example 2: In one embodiment, this application provides a method for calculating the expected arrival time and determining the order type during the generation of the initial allocation scheme information set, including: Step S201: Obtain the content freeze time, printing process chain time, and logistics cut-off time of each sub-order involved in the complete set of printed materials for the exhibition event, and calculate the expected arrival time of each sub-order at the candidate production node.
[0041] Content freeze time refers to the starting point when the production content of a sub-order is finally confirmed and allowed to enter the production process. This time is determined by the final confirmation record of the exhibition registration system or the customer ordering system. Printing process chain time refers to the total production time required for a sub-order from entering the production line to reaching a shippable state. This includes the total time for each stage: pre-press imposition, plate making or imaging, formal printing, ink curing and drying, and post-processing (such as cutting, binding, lamination, etc.). Logistics cut-off time refers to the latest time set by the logistics carrier for receiving goods on a specific transport schedule. Only goods produced and delivered before this time can be transported on that schedule.
[0042] Based on the above time parameters, the production completion time is first calculated. If the content freeze time for a certain sub-order is... Its pre-press imposition and plate making time is The printing time is The drying and curing time is The time required for subsequent processing is Then the production completion time Through formula The calculations show that, considering the need for sufficient stabilization time for the ink layer after printing to avoid scratches during transportation, a drying and curing buffer time is added to the production completion time. Thus, the available shipping time is obtained. Its calculation formula is .
[0043] After obtaining available departure times, the estimated arrival time is calculated based on logistics schedule information. Logistics carriers typically offer multiple departures, each with its own schedule. Corresponding to a cut-off time and a departure time The shipping time will be available. Compare with the cut-off times of each shift, if If the condition is met, the sub-order is deemed eligible for that particular bus. To ensure early arrival, the bus with the earliest departure time is selected from all eligible buses. Combined with transportation time The final estimated arrival time was determined. The calculation formula is: If the available shipping time for a sub-order is later than the cut-off time for all shifts on that day, it will be automatically postponed to the earliest shift on the next working day, and the above time parameters will be recalculated. By accurately quantifying each time node, the timeliness differences under different production paths can be objectively reflected, providing data support for subsequent node optimization.
[0044] Step S202: Determine the order type of each sub-order by changing the content attributes of each sub-order.
[0045] Order type is used to characterize the stability of sub-order content during the event, serving as a basis for allocating production tasks to appropriate production nodes. Content change attributes refer to the likelihood and frequency of changes to the printing information (such as text, images, layout, data fields, etc.) contained in the sub-order during the period from order placement to the start of the event.
[0046] Based on content change attributes, sub-orders are divided into fixed-content orders and variable-content orders. Fixed-content orders refer to those where the core printing content, such as layout design, main graphic, and color scheme, remains largely unchanged during event preparation, such as exhibitor manuals, backdrops, and fixed posters. These orders typically feature stable layouts, large print runs, and highly versatile content, requiring minimal modifications once the design is finalized. Variable-content orders, on the other hand, include personalized data that needs to be adjusted based on dynamic factors such as exhibitor information, booth allocation, and schedules, such as exhibitor badges, table cards, and personalized invitations printed with personal names, photos, job titles, and QR codes. The content change attribute of these orders is characterized by high-frequency, individualized data updates.
[0047] When determining order types, the characteristics of the data sources and business rules upon which sub-orders rely are analyzed. If the printing content of a sub-order is directly linked to easily changeable fields in the exhibition management database (such as personnel lists or booth numbers), and changes to these fields directly affect the validity of the printed materials, it is classified as a variable content order. Conversely, if the sub-order content only involves general promotional information, brand logos, or fixed visual images, and has no direct binding relationship with dynamic data fields, it is classified as a fixed content order. Through this classification, the system can identify which orders are suitable for utilizing the large-volume, low-cost capacity of the central factory, and which orders are suitable for utilizing the rapid response capabilities of stores or on-site equipment, thereby achieving differentiated allocation of production resources.
[0048] Step S203: Based on the independent imposition rules of the exclusive printing sheets, and combined with the expected arrival time and order type of each sub-order, generate an initial allocation scheme information set.
[0049] The dedicated sheet independent imposition rule refers to assigning an independent imposition unit or dedicated sheet to each sub-order during the prepress stage, completely isolating its content from other sub-orders. This rule requires that each sub-order occupy an independent physical or logical area during typesetting, and that film output, plate making, or digital printing equipment driving can be performed separately for this dedicated sheet during printing. This ensures that if the content of a sub-order changes and needs to be reprinted, only its corresponding dedicated sheet needs to be replaced, without interfering with or causing the scrapping of sheets from other sub-orders within the same printing batch.
[0050] The process of generating the initial allocation scheme information set is a comprehensive decision-making process that matches time calculation results, order type judgment, and production resources. First, preliminary resource screening is carried out based on order type: for orders with fixed contents, they are prioritized for allocation to candidate production nodes in central factories with economies of scale to utilize their efficient offset printing or large-format digital printing capabilities; for orders with variable contents, they are prioritized for allocation to candidate production nodes in chain stores closer to the event venue or on-site equipment with on-demand printing capabilities to shorten logistics paths and improve response speed.
[0051] Apply dedicated sheet imposition rules to each candidate production node and verify whether the estimated arrival time meets the set completion constraint. The set completion constraint requires that the estimated arrival time of each reprint sub-order in a set of printed materials, regardless of which node it is produced from, must fall within the same allocable delivery window and be no later than the start time of the exhibition. The allocable delivery window can refer to the time interval provided by the logistics provider that ensures that the goods are delivered to the venue uniformly within a specified period. Iterate through the estimated arrival times of each candidate node to find the node combination that can align all sub-orders to the same window. For example, if some sub-orders produced at the central factory will cause their arrival time to fall into the first window, while other sub-orders produced at the store will cause their arrival time to fall into the second window, then adjust the node selection or adjust the production scheduling priority to try to force the estimated arrival time of all sub-orders to converge to the same window (such as uniformly coordinating to the second window).
[0052] Once all sub-orders meet the set completion time constraints and node allocations are determined, an initial allocation scheme information set is generated. This information set includes the identifier of each sub-order, the target production node (such as a specific central factory production line or store equipment), the calculated estimated arrival time, the confirmed allocable window, the order type, and the corresponding dedicated sheet imposition parameters. This initial allocation scheme information set establishes a baseline state for subsequent change monitoring and dynamic adjustments, ensuring that the production plan is synchronized in time and rational in resources from the initial stage.
[0053] The above method calculates the estimated arrival time by obtaining precise time parameters, categorizes orders based on content change attributes, and then uses dedicated sheet-based independent layout rules for resource matching. This ensures that the production plan considers both the production timeliness of individual orders and the overall completeness of set delivery. This initial allocation based on multi-dimensional constraints provides the infrastructure to cope with frequent subsequent content changes, effectively reducing the risk of later rescheduling due to unreasonable initial scheduling.
[0054] Example 3: In one implementation, this application provides a method for determining each sub-order type, including: Step S301: Based on the content change attributes of each sub-order, divide each sub-order into fixed content order and variable content order, prioritize the allocation of fixed content orders to the central factory, and prioritize the allocation of variable content orders to stores.
[0055] During the initial allocation scheme generation phase, the production node allocation logic is executed based on the content change attributes of each sub-order. Content change attributes characterize the expected stability and frequency of change of order content during the event preparation period. Fixed-content orders refer to sub-orders whose layout, text and graphics, and main visual elements remain largely unchanged after the design is finalized, and do not involve real-time updates to personalized information for attendees. Examples include event backdrops, general promotional posters, and the main layout of exhibitor manuals. These orders are characterized by large batch sizes and standardized processes, making them suitable for leveraging the large-scale centralized production advantages of a central factory to reduce unit costs. Therefore, when performing allocation calculations, candidate production nodes for fixed-content orders are prioritized for the central factory, and the central factory's capacity windows and logistics shifts are selected first.
[0056] Correspondingly, variable content orders refer to sub-orders whose content has highly uncertain or personalized characteristics and needs to be frequently and dynamically modified in real time according to dynamic information such as the list of exhibitors, booth arrangements, and agenda adjustments. Examples include exhibitor badges, table cards, and personalized invitations printed with personal names, photos, and QR codes. These orders typically have a small quantity of each item but extremely high timeliness requirements, and changes often occur within a time window close to the start of the event. To shorten physical transportation distances and improve response speed, variable content orders are prioritized for allocation to stores near the event venue or the event site. Utilizing the stores' small-batch rapid production and instant delivery capabilities, it is ensured that changes can be quickly reflected on physical printed materials. Through this binary division based on content change attributes, a preliminary rational layout of printing tasks in the spatial dimension is achieved, balancing production costs and delivery timeliness.
[0057] Step S302: For orders with variable content, mark the change impact type as either overall rearrangement type or incremental supplement type based on how the content change affects the printed finished product.
[0058] For the sub-orders identified as variable content orders, a more refined management mechanism for the impact types of changes will be established. Specifically, the actual impact of content changes on printed products or existing production tasks will be determined and marked. This determination process occurs after the content change event stream is triggered and compared with the initial allocation scheme information set. A complete reflow type can refer to a situation where the changed content disrupts the original layout structure, resulting in substantial changes to the entire layout, page arrangement, main text and image positioning, or background image, rendering the original pre-press imposition data completely invalid. This makes it impossible to maintain the original production through partial repairs, necessitating a complete reprint. For example, a significant increase in exhibitor names leads to insufficient space in the original name field, triggering the typesetting software to rearrange and scale all page elements; or a change in booth number necessitates a redesign of the background pattern to match the new numerical structure. Such changes are marked as complete reflow types.
[0059] Incremental reprints refer to changes that only involve updating data records for specific individuals, without affecting the established layout structure. The majority of the printed content remains valid and meets usage requirements, requiring only reprinting for the affected individuals. For example, an attendee's job title changes from manager to director, but there is sufficient space in the layout area for that text field, resulting only in character replacement without triggering a recalculation. Similarly, a booth number change only involves updating the corresponding QR code information, while the position and size of the QR code area remain unchanged. These types of changes are marked as incremental reprints. By marking the impact type of changes in real time, the system can accurately select differentiated processing strategies such as voiding and re-layouting, task migration, or incremental reprinting in subsequent dynamic reallocation stages. This avoids material waste caused by full reprinting and prevents mismatches in the final product due to improper partial reprinting.
[0060] Step S303: Among them, the overall rearrangement type refers to the change that causes the entire page layout or content structure to change and requires the entire page to be reprinted, while the incremental supplement type refers to the change that only involves individual data records and most of the content in the printed product is still valid, so only the individual changes need to be reprinted.
[0061] As the first category of change impact types, the core characteristic of overall reflow is that the change disrupts the entire layout or content structure of the printed sheet. This includes, but is not limited to, changes in automatic pagination or text wrapping paths due to drastic increases or decreases in text length, repositioning of adjacent elements caused by adjustments to image size or cropping methods, overall layout reconstruction due to the addition or deletion of content sections, and complete rewriting of color data due to changes in color modes or spot color replacements. In this case, the original production tasks (including imposition files, plate-making data, or digital printing job queues) are no longer usable. The tasks corresponding to the original printed sheets must be scrapped, and the entire production process, starting from imposition, must be re-executed based on the latest changes.
[0062] Incremental reprints, as the second category of change impact types, are characterized by the locality of the change and the substitutability of data records. These changes are typically limited to numerical modifications of specific records in database fields, and on the physical page, they manifest as content replacement of text and images in fixed locations rather than relocation. Since the layout remains unchanged, the vast majority of printed products without changed records meet delivery standards in terms of content accuracy and appearance integrity, and therefore do not need to be scrapped. When handling this type of change, it is only necessary to extract a list of individuals containing the changed data, generate an incremental reprint subtask containing only these specific individuals, and merge it with the valid finished products retained from the original batch after production to form a complete delivery set. These precise definitions of the two change impact types provide a standardized logical basis for subsequent differentiated resource scheduling, cost accounting, and production decisions.
[0063] Example 4: In one embodiment, this application provides a method for determining the expected arrival time and the initial production node screening process based on logistics cut-off time and complete set constraints. The method includes: Step S401: Determine the production completion time of each sub-order based on the printing process chain time, and obtain the shipment time based on the production completion time plus the drying and curing buffer period.
[0064] Starting from the freeze time of the obtained sub-order content, the printing process chain time is accumulated to determine the production completion time. This printing process chain time encompasses the cumulative time spent on imposition, plate making, printing, drying, and post-processing. Given that the adhesion of printing ink to the substrate surface and solvent evaporation require a certain physical time, immediate packaging and shipping after production can easily lead to damage such as smudging or rubbing during transport. Therefore, a drying and curing buffer period is added to the production completion time to generate a ready-to-ship time. This drying and curing buffer period is not a fixed constant but a dynamically determined physical duration based on the substrate material (such as coated paper, offset paper, or specialty paper), ink type, and ambient temperature and humidity. For example, for high-volume coated paper printing using high-speed rotary offset printing, the drying and curing buffer period can be set to 30 minutes to 2 hours; while for digital printing using ultraviolet (UV) curing inks, this buffer period can be shortened to 5 minutes to 10 minutes. By introducing the aforementioned physical time buffer mechanism, the finished product is ensured to reach a level of physical stability that allows it to be touched and stacked before entering the logistics process, effectively avoiding quality risks caused by insufficient curing of the ink layer.
[0065] Step S402: Based on the logistics cut-off time and logistics shift waiting time, determine the earliest transport shift, and add the transport time to the departure time of the earliest transport shift to obtain the estimated arrival time.
[0066] The calculated available departure times are matched with the logistics schedule to address the calculation errors caused by existing technologies that only estimate arrival times based on fixed transportation cycles and do not consider the cut-off time constraints of logistics schedules. The logistics schedule includes the cut-off time (i.e., the latest time the transporter can receive the goods) and departure time for each schedule. The matching logic is as follows: all candidate schedules with cut-off times later than or equal to the available departure times are selected, and the schedule with the earliest departure time is chosen as the earliest transport schedule. If the available departure time is later than the cut-off time of all schedules on that day, it is automatically postponed to the first schedule of the next day. During this process, the time difference between the available departure time and the departure time of the earliest transport schedule is the logistics schedule waiting time. After determining the earliest transport schedule, the transport time of that schedule (including transit time and loading / unloading time) is added to the departure time to calculate the estimated arrival time. This time-series calculation method, which combines the production completion status with the discrete logistics timetable, can accurately reflect the actual flow time from when the product comes off the production line to when it arrives at the venue.
[0067] Step S403: Select candidate production nodes whose expected arrival time is no later than the activity start time and whose expected arrival time is within the same allocable window as other sub-orders, as the initial allocation objects that satisfy the complete set constraint.
[0068] The estimated arrival time calculated for each candidate production node is projected into a time window to identify the initial allocation object that satisfies the set-fit constraint. The allocable window can refer to a time interval allowed by logistics and distribution that ensures the concentrated arrival of sets of products, such as a morning delivery window, an afternoon delivery window, or a nighttime warehousing window. Satisfying the set-fit constraint requires not only that the estimated arrival time of a single sub-order is no later than the activity start time, but also mandates that the estimated arrival times of all sub-orders included in the set of printed materials must fall within the same allocable window. If the estimated arrival time of a sub-order falls into one window, while the estimated arrival times of other sub-orders in the same set fall into another window, then the candidate production node is determined not to satisfy the set-fit constraint. Only when a candidate production node can ensure that the estimated arrival times of the current sub-order and all other sub-orders in the same group converge to the same allocable window, and are all earlier than the activity start time, is that node selected as the initial allocation object. This selection logic based on time window completeness avoids the engineering risks of delays in overall exhibition setup caused by some sub-orders arriving too early and occupying warehousing resources or some sub-orders arriving late.
[0069] The precise calculation logic for the estimated arrival time and the screening judgment based on the same allocable window provide a quantitative benchmark for determining allocation failure after subsequent content changes. When content changes occur, the system can quickly identify which sub-orders no longer meet the set requirements due to time offsets based on the allocable window, thereby triggering a dynamic reallocation process. By coupling the physical time constraints of production nodes with the discrete time constraints of logistics, this method constructs a precise time transmission chain from the end of production to the exhibition site, ensuring the coordinated delivery of complete sets of printed materials within a strict time window.
[0070] Example 5: In one embodiment, this application provides a process for generating a set of allocation failure determination information, the generation process including: Step S501: Obtain the content change event stream for each sub-order and extract the sub-order identifier and change field that have undergone content change.
[0071] The content change event stream is a sequence of modification operations on the production content of each sub-order, collected in real-time or near real-time by the exhibition registration system, customer ordering system, or on-site registration terminal. By continuously listening to and capturing this event stream, specific change events are parsed. For each change event, its corresponding sub-order identifier is extracted, such as exhibitor badge 002 or table nameplate 015, along with specific change fields, such as name, booth number, or QR code data. These sub-order identifiers and change fields serve as the basic index data for subsequent content change identification and impact assessment, ensuring the system can accurately locate the specific affected sub-order and its specific changes.
[0072] Step S502: Compare the changed fields with the prepress version data of the corresponding sub-order to determine whether the current change affects the prepress rasterization process, and obtain the judgment result that the impact level of the prepress processing is a severe change or a minor change.
[0073] Prepress version data can refer to a snapshot of the original data in the initial allocation scheme information set that has been confirmed and used for production typesetting. The extracted changed fields are then compared in depth with the corresponding original fields in the prepress version data. If the changed fields only involve updates to database record content (such as text string replacement) and do not change the layout structure, object size, or rendering parameters of the typesetting file, it is considered a minor change. A minor change indicates that the current change does not require rebuilding the layout structure or adjusting rasterization parameters, but it regenerates the rasterized data corresponding to the variable data layer for the changed data records, and the original production schedule can continue to be executed.
[0074] If a change to a field causes adjustments to the layout, changes in the position or size of variable content elements, changes in font embedding methods, or modifications to color control parameters, it is considered a weight change. A weight change means that the current change will alter the bitmap data generated by prepress rasterization, rendering the original production output inapplicable. By distinguishing between minor and weight changes, we can effectively avoid accidentally triggering a reflow process for minor changes, while preventing oversights of weight changes, ensuring the accuracy and economy of production response.
[0075] Step S503: For sub-orders determined to have weight changes, redetermine the content freeze time and allocable window based on the changed content.
[0076] For sub-orders identified as having undergone weight changes, the current production status of the sub-order is frozen, and the time parameters are recalculated based on the latest confirmed changes. First, the content freeze time is updated to the moment the change confirmation arrives, meaning the content is considered finally stable at that moment. Then, based on this new content freeze time, combined with the printing process chain time, drying and curing buffer period, and logistics cut-off time, the production completion time, shippable time, and estimated arrival time are recalculated. Finally, based on the recalculated estimated arrival time, it is determined whether the sub-order still falls within the original allocable window or needs to be adjusted to a new allocable window. This process ensures that the time plan can be dynamically synchronized after substantial changes to the content, providing an accurate time benchmark for subsequent kitting checks.
[0077] Step S504: If the expected arrival time of a sub-order is later than the start time of the activity, or if the expected arrival times of each reprint sub-order are not within the same allocable window, resulting in the inability to meet the complete set constraint, then obtain the invalid sub-order identifier, invalidation reason, change impact type, and updated allocable window, and generate an allocation invalidation judgment information set.
[0078] After recalculating the time parameters, a strict determination is made as to whether the complete set constraint is met. The complete set constraint requires that the estimated arrival time of all sub-orders is no later than the activity start time and must be within the same allocable delivery window. If the estimated arrival time of any sub-order is later than the activity start time, or if the latest estimated arrival times of the sub-orders are scattered across different allocable windows, making it impossible to achieve a complete set arrival at once, then the current allocation plan is deemed invalid.
[0079] In this scenario, detailed information about the failure is collected and recorded, including the identifier of the failed sub-order, the specific reason for the failure (e.g., exceeding the expected meeting time limit or inconsistent window), the prepress processing impact level that triggered the failure (i.e., the aforementioned weight change or light change), and the updated allocable window. This structured information is aggregated to generate an allocation failure determination information set. This information set objectively records the status and causes of allocation failures, providing accurate decision-making basis and data support for subsequent dynamic reallocation, task migration, or incremental reprinting, achieving an automated closed loop from change awareness to failure handling.
[0080] Example 6: In one embodiment, this application provides a method for determining whether a current change affects pre-press rasterization processing. The method includes: Step S601: If the change only involves updating the content of the data record and does not change the layout, it is determined to be a minor change.
[0081] In the printing production process, not all content modifications trigger cumbersome prepress processing. When a change only involves updating the content of data records without altering the layout, it means the modification is limited to pure numerical or text replacement at the underlying data layer, without affecting the upper-level layout instructions that determine the page's geometry and visual presentation. Such lightweight changes typically involve modifications to fields such as job titles, phone numbers, or notes, and the updated data's length, format, and line break logic within the original layout area do not exceed design limits. Therefore, there's no need to recalculate the page's geometry or refresh the layout engine's rendering tree. Since the core output of Rasterization Processing (RIP) heavily relies on the spatial coordinates, size descriptions, and rendering instructions of page elements, when these core elements remain unchanged, the original layout structure and rasterization parameters remain valid. Only the rasterized data for the corresponding variable data layer needs to be regenerated for the changed data records; the system classifies this as a lightweight change. This process avoids wasting resources on unnecessary reprints, allowing production resources to focus on changes that truly impact the physical printing results.
[0082] Step S602: If changing a field causes adjustments to the layout, changes in the position of variable content elements, changes in the size of variable content elements, changes in font embedding, or changes in color control parameters, it is determined to be a weight change.
[0083] When a change in a field triggers a change in any depth element of the page layout, the system recognizes it as a weight change. This includes: layout adjustments (such as rearranging columns, scaling the page, or moving headers and footers); positional changes of variable content elements (such as shifting the coordinates of specific data units like QR codes, avatars, or name tags); size changes of variable content elements (such as modifying their aspect ratio or absolute area, causing expansion or contraction of their physical space); font embedding changes (such as calling a new font file, changing the font weight or size, thus altering the outline curves of the rendered text); and changes in color control parameters (such as modifying spot color values, color mode conversion rules, or ink coverage settings). All of these changes directly cause the prepress rasterization equipment to generate drastically different halftone, mask, or color channel data when interpreting page description languages (such as PostScript or PDF), rendering the original rasterization results inapplicable. Unlike the traditional, crude approach of reprinting any modification, this embodiment precisely quantifies the severity of changes by accurately defining the various specific physical and parameter dimensions affecting the rasterization result. By incorporating five core features—adjustments to layout, changes in the position of variable content elements, changes in the size of variable content elements, changes in font embedding, and changes in color control parameters—into the judgment criteria, the system can accurately identify weight changes that require re-entry into the plate-making or imaging process, ensuring that production instructions remain strictly consistent with the latest design intent.
[0084] Step S603: For sub-orders determined to have weight changes, compare the differences in rasterization processing mechanisms between the original production node and the candidate production node. When differences exist, generate a color tracking data package containing a color configuration description file, gray balance compensation parameters, color level mapping relationship, and target device calibration parameters, and associate the color tracking data package with the sub-orders that have weight changes.
[0085] For sub-orders involving weight changes, if a production task needs to be migrated from the original production node to a candidate production node (e.g., from a central factory offset printing press to a store digital printing press), the rasterization processing mechanisms of the two nodes must first be compared. Differences in rasterization processing mechanisms include, but are not limited to, differences in screening algorithms (AM vs. FM screening), resolution settings, bitmap generation logic, and color rendering pipelines. Once a mechanism difference is detected, it means that even with identical input page files, the finished products output by the two devices will have objectively different color representations. Therefore, a color tracking data package must be generated to align with color standards. The color tracking data package encapsulates the complete technical parameters required to achieve cross-device color consistency. Its generation process is typically based on fitting calculations between the standard output sample data of the original production node and the device characteristic curves of the candidate production node.
[0086] Specifically, the color tracking data package includes the following core components: a color configuration description file (ICCProfile), used to define the conversion relationship between the source color space and the target device color space, ensuring semantic consistency of color values across different devices; gray balance compensation parameters, used to correct gray axis shifts caused by different dot gain rates or paper background colors, ensuring accurate reproduction of neutral gray areas; color gamut mapping relationships, defining mapping algorithms from the source color gamut to the target color gamut (such as perceptual mapping, relative chromaticity mapping), used to handle compression and reproduction strategies for colors outside the color gamut; and target device calibration parameters, including hardware-level adjustment instructions such as linearization correction curves and ink volume limitation curves for the target printing press. After associating the color tracking data package with the sub-order that has undergone a weight change, the data package is sent along with the production task to the candidate production node, guiding its RIP driver module to make targeted parameter adjustments. This parameterized data transmission method transforms abstract color management requirements into executable machine instructions, ensuring that the color visual effect of the entire set of printed materials remains highly consistent even when switching between production nodes with different processes and characteristics.
[0087] Example 7: In one embodiment, this application provides a method for determining the failure of a central factory or store node during the content freeze time and allocable window re-determination process, the method comprising: Step S701: Update the content freeze time of the sub-orders that have undergone weight changes to the latest version confirmation time.
[0088] A weight change signifies a substantial alteration to the production content of a sub-order, rendering the original production timeline inapplicable. The latest version confirmation time can refer to the system's receipt of the final changes by the event organizer or client; this time serves as the logical starting point for recalculating the production cycle. By updating the content freeze time to the latest version confirmation time, the time delays caused by changes can be eliminated, ensuring that subsequent production scheduling calculations are based on the latest time constraints, thus providing a reliable timeline for accurately assessing node availability.
[0089] Step S702: If the current sub-order has been assigned to the central factory, determine whether the imposition, printing, drying and loading of the exclusive printed sheets can still be completed before the logistics cut-off time under the updated content freeze time. If it cannot be completed, mark it as node failure.
[0090] When a sub-order is assigned to the central factory, the core constraint on production scheduling lies in the logistics cut-off time, which is the latest time the carrier is allowed to receive the goods that day. Starting from the updated content freeze time, the imposition time required for the dedicated printing sheet, the printing operation time, the ink drying and curing waiting time, and the loading operation time are added sequentially. If the total time of the above process chain results in a shipping time later than the logistics cut-off time, it indicates that the production task cannot meet the logistics schedule for the day or the originally planned logistics shift in terms of time. At this time, although the central factory's capacity resources may be physically idle, the complete set constraint cannot be met in terms of time window, so the sub-order is marked as a node failure. This judgment mechanism avoids invalid scheduling attempts and prevents the risk of venue shortages due to failure to ship on time.
[0091] Step S703: If the current sub-order has been assigned to a store, determine whether the current sub-order can be inserted into the store's equipment schedule for production. If it cannot be inserted, mark it as a node failure.
[0092] For store nodes, which typically handle small batches of personalized orders, their equipment scheduling is fragmented. Resource constraints are primarily reflected in equipment availability within specific time slots rather than simple logistics deadlines. The system scans the store's current equipment scheduling queue to find a continuous time segment long enough to accommodate the complete production process chain of the current sub-order (including imaging, printing, drying, and cutting), and the segment's end time must meet subsequent delivery time requirements. The decision-making logic involves not only time matching but also verifying whether the equipment is occupied by other high-priority tasks within that time period and whether consumables (such as specific paper sizes) are in place. If a suitable insertion point cannot be found in the existing schedule, or if insertion would cause severe chain reactions of delays for other orders, the current store node is deemed unable to handle the task and marked as node failure. This process ensures that dynamic order insertion at the store is performed without disrupting the overall production order.
[0093] Step S704: Incorporate the identifier, failure reason, change impact type, and updated allocable window of the sub-order marked as node failure into the allocation failure determination information set.
[0094] After completing the feasibility assessment of the central factory or store nodes, a structured information summary is performed on all sub-orders marked as node failures. The failure sub-order identifier uniquely identifies the problematic production task; the specific cause of failure is recorded as either insufficient time to meet logistics deadlines or equipment scheduling conflicts preventing insertion into production; the change impact type retains the overall rearrangement or incremental supplementation attribute determined in previous steps for subsequent decision-making; the updated allocable window records the theoretically available production time period recalculated based on the latest freeze time. This information is incorporated into the allocation failure determination information set, forming a complete snapshot of the failure status, providing accurate data input for subsequent dynamic reallocation. This allows the reallocation logic to take corresponding remedial measures for different failure causes, such as finding other stores with available time slots or initiating an emergency reprint process.
[0095] Through the above steps, the system can perform precise failure determination based on the differences in the types of production nodes (the rigid time constraints of the central factory and the flexible spatial constraints of the stores) after a weight change, thereby transforming the originally ambiguous scheduling problem into definite structured data and ensuring the real-time performance and accuracy of dynamic allocation decisions.
[0096] Example 8: In one embodiment, this application provides a method for performing invalidation rearrangement or task migration processing based on overall rearrangement or incremental supplementation during the generation of a dynamic allocation scheme instruction set, including: Step S801: Extract failed sub-orders and their change impact types from the allocation failure determination information set.
[0097] The allocation failure determination information set records detailed information about sub-orders whose original production arrangements are no longer valid due to content changes. This includes the unique identifier of the failed sub-order, the reason for failure, the corresponding change impact type, and the updated allocable window. By parsing this information set, records marked as failed are filtered out, and their associated change type tags are read to extract the failed sub-orders and their change impact types. The change impact type is used to distinguish whether a failed sub-order is a complete rearrangement requiring full re-rowing or an incremental supplement requiring only partial reprinting. This extraction process accurately identifies order objects that require dynamic adjustment, providing a basis for subsequent decision-making on differentiated reallocation strategies and ensuring that all pending orders are included in the subsequent process.
[0098] Step S802: When the change impact type is overall reordering, perform voiding reordering or task migration processing according to the current task status of the failed sub-order, cancel the original task and generate a new version production task.
[0099] In cases where the change impact is a complete reordering, it typically means that the layout, content structure, or core elements of a sub-order have undergone significant changes, rendering the original semi-finished or finished products unusable. In this situation, a task status mechanism is introduced as the basis for decision-making regarding actions. The task status represents the real-time progress of the sub-order on the production line, such as being categorized into discrete states like not started, already assembled, printing in progress, post-production completed, or already shipped. For failed sub-orders in the not started or assembled stage, the system determines they are easily reset and directly performs a void reordering operation. This involves releasing the previously occupied production resource slots, resubmitting the production data containing the latest changes to the scheduling queue, and generating a new version production task that overwrites the original version. For failed sub-orders in the printing in progress, post-production completed, or already shipped stage, considering the material and time costs already invested, the system prioritizes assessing the feasibility of task migration. For example, it might attempt to transfer remaining production demand to candidate production nodes closer to the venue or stores with emergency order insertion capabilities. If migration is not possible, a void reordering is also performed. The action of canceling the original task includes sending a stop instruction to the production execution system, locking the corresponding physical batch and recording the reason for cancellation. The newly generated production task carries the updated process parameters and content data to ensure that subsequent processes are executed according to the latest version.
[0100] Step S803: When the change impact type is incremental supplement, retain the completed production results of the unchanged part, and only generate incremental supplement sub-tasks for the individuals that have been changed.
[0101] In cases where the change impact type is incremental replenishment, it means that the content change only involves individual data records in the set of printed materials, such as correcting attendee names or adjusting booth numbers, while the majority of the content remains unchanged. In this case, a refined incremental processing strategy is implemented to maximize the utilization of already produced or in-production assets. By comparing the data differences before and after the change, a list of specific individuals affected by the change is extracted, such as specific ID numbers or table numbering, and this list serves as the core input for the incremental reprint sub-task. For finished or semi-finished products that have already been produced and whose content is unaffected, their original state is maintained, without any withdrawal or reprinting, thus avoiding large-scale waste due to small-scale changes. The generated incremental reprint sub-task only includes the production needs of the individuals on the list, with a production volume far less than the original order total. This task is configured in a fast-flow mode to ensure that the changed individuals can be quickly replenished and merged with the original batch, ultimately forming a complete set of deliverables.
[0102] Step S804: Assign the new version production task or incremental reprint sub-task to the candidate production node, and generate a migration instruction package containing production parameters, color tracking data package, batch matching information and time requirements as the instruction set for the dynamic allocation scheme.
[0103] After identifying new or reprint tasks, matching and allocation are performed based on the real-time capacity load, equipment type, and geographical location of each candidate production node, prioritizing nodes that meet the time window requirements and have compatible production capabilities. Once allocation is complete, a migration instruction package is generated. This package is a structured data set that guides the target node in executing production actions, integrating all necessary information for production execution. Production parameters specifically include physical and technological limitations such as printing medium specifications (e.g., paper weight, material type), finished product size requirements, printing resolution, and number of printing colors. The color tracking data package contains ICC (International Color Consortium) color profiles, gray balance compensation parameters, and color mapping curves to correct cross-device color differences, ensuring visual color consistency between the reprinted product and the original batch. Batch matching information records the batch number of raw materials used in the original production batch to prevent texture color differences caused by variations in the physical properties of different batches of paper or ink. Time requirements specify the latest start and delivery times for the task. After the aforementioned migration instruction package is generated, it is issued to the target production node as a dynamic allocation scheme instruction set, driving its automated equipment to complete production according to a unified standard, thereby realizing closed-loop control from failure judgment to reassignment execution.
[0104] By extracting the change impact types of failed sub-orders, it is possible to accurately distinguish between overall rearrangement requiring a full reset and incremental supplementation requiring only partial increments. Then, based on the task status, corresponding cancellation, migration, or reprint operations can be executed, avoiding resource waste or production delays caused by improper change handling. Simultaneously, by generating migration instruction packages containing production parameters, color tracking data packages, batch matching information, and time requirements, a standardized execution basis is provided for cross-node collaborative production, ensuring that the reassigned production tasks meet the completeness requirements of the exhibition in terms of both process quality and delivery time.
[0105] Example 9: In one embodiment, this application provides a method for invalidation rearrangement or task migration processing, the steps of which specifically include: Step S901: Read the task state machine of the failed sub-order. The task state machine includes not started, already assembled, printing in progress, post-processing completed, and already shipped.
[0106] When processing failed sub-orders, the corresponding task state machine is first read to obtain the current production stage of the order, which then serves as the basis for formulating subsequent handling strategies. The task state machine is an abstract description of the discrete states of a sub-order in its production lifecycle, representing the complete flow process from order entry into scheduling to finished product delivery. The task state machine includes five states: Not Started, Set up, Printing in Progress, Post-processing Completed, and Shipped. Among them, Not Started means that the order has entered the scheduling but has not yet undergone physical processing, and the production resource slots have been reserved but not actually occupied; Set up means that the pre-press layout file has been generated and the printing conditions are met, but the printing process has not yet officially begun; Printing in Progress means that the printing equipment is performing imaging or printing operations, and the work-in-process is flowing on the production line; Post-processing Completed means that the printing process has been completed, and post-processing steps such as cutting, binding, lamination, and quality inspection have been completed or are being completed, and the finished product is ready for shipment; Shipped means that the finished product has been loaded onto a truck and delivered to the logistics carrier, and the goods have left the production node and entered the transportation stage.
[0107] Step S902: If the failed sub-order is a complete rearrangement type and is in a state of not starting or already assembled, then cancel the original task and generate a new version production task.
[0108] When the change impact type of a failed sub-order is a complete rescheduling, and it is currently in an unstarted state, it indicates that the order has entered the production schedule but has not yet been put into physical processing. The original task has not generated any work-in-process or finished products, and the cost of scrapping and resetting is the lowest. At this time, the system directly cancels the original production task, releases the scheduling resource slots and equipment reserved time slots it occupies, re-executes prepress imposition based on the latest changed content, and generates a new version of the production task. Subsequently, the new version of the production task is reassigned to candidate production nodes that meet the set completion constraints. Since no physical production has occurred, there is no need to perform material scrapping operations; only the task status needs to be reset and the associated production parameters and color tracking data packages need to be updated synchronously.
[0109] When a failed sub-order is in the "already imposition" state, it indicates that the order has completed the generation of prepress layout files and is ready for printing, but has not yet officially entered the printing process. At this point, prepress processing costs have been incurred, but no actual finished product has been produced. Since the change affects a complete re-layout, the change causes changes to the entire page layout or content structure, and the original imposition file cannot be reused through partial updates. The system invalidates the original imposition file, releases the printing time slots reserved in the original node, re-executes imposition, plate making, or imaging processing based on the changed content, and generates a new version production task. This new version production task is then assigned to candidate production nodes that meet the set completion constraints. When the new version production task is generated, the system simultaneously regenerates the associated color tracking data package to ensure consistent color performance across production nodes.
[0110] Step S903: If the failed sub-order is a complete rearrangement type and is in the printing or post-processing completion state, assess the feasibility of task migration. If there is a candidate production node with compatible capacity, execute the task migration; otherwise, scrap the entire batch and trigger the regeneration of the order.
[0111] When the change impact type of a failed sub-order is a complete rearrangement, and it is currently in the printing or post-processing completion stage, it indicates that the content structure of the original order has undergone a fundamental change, and the physical production has already invested a considerable amount of resources. The currently producing or completed semi-finished or finished products cannot continue to meet the new content requirements. At this time, the system first assesses the feasibility of task migration: scanning candidate production nodes that meet the set completion constraints, verifying one by one whether they have a compatible rasterization processing mechanism, whether they have loaded a matching color tracking data package, and whether there is an idle capacity period that can accommodate the new version production task. If there is a candidate production node with compatible capacity, and migrating the task to that node can complete production within the updated allocable window and meet the set completion constraints, then the task migration is executed: a stop command is sent to the original production node to terminate the current printing or post-processing operation, and all sheets in production, semi-finished products, and corresponding materials in the current process are scrapped. At the same time, the new version production task, along with the color tracking data package, batch matching information, and time requirements, is sent to the candidate production node, which then executes the complete production process based on the changed content.
[0112] If there are no candidate production nodes with compatible capacity, or if all candidate nodes are unable to complete production within the updated allocable window, then the entire batch will be scrapped: the system sends a stop command to the production control terminal to terminate the current printing or post-processing operation, scrapping all sheets in production, semi-finished products, and finished products in the current process, and triggering a new order generation process to regenerate a new version of the production task based on the changed content, and re-execute the production node allocation and scheduling to ensure that the failed sub-orders can re-enter the production process under the condition of meeting the complete set constraint.
[0113] Step S904: If the failed sub-order is a complete rearrangement type and is in the shipped state, then generate an on-site reprint instruction.
[0114] When the change to an invalid sub-order is a complete rearrangement and it is currently in the shipped state, it indicates that the goods corresponding to the original production task have been loaded and delivered to the logistics carrier. The goods have left the production node and entered the transportation stage. The original finished product content is invalid due to the complete rearrangement, and it is usually difficult to retrieve during transportation or the cost of retrieval is too high. At this time, the system generates an on-site reprint instruction, scheduling stores or on-site printing equipment near the event location that have loaded the same color tracking data package and have idle capacity as reprint nodes, and performing reprint production based on the changed complete content. The on-site reprint instruction includes the complete content data of the reprint sub-order, the color tracking data package, the substrate specifications, the production quantity requirements, and the delivery deadline. After receiving the on-site reprint instruction, the reprint node performs pre-press rasterization processing, test printing, and color difference verification to ensure that the reprinted parts are consistent with the color configuration and substrate batch of the original batch. Then, it officially starts printing and completes production within the delivery deadline, delivering the reprinted finished products to the event site to ensure that the changed printed materials can arrive in a timely manner and avoid the loss of complete sets of printed materials due to the original goods having already been shipped.
[0115] Step S905: If the failed sub-order is an incremental replenishment type and is in a state of not started, already assembled, or in printing, then the current batch is allowed to continue production until completion, and the replenishment object list is attached to the incremental replenishment sub-task. The replenishment object list only lists the data records that need to be added or corrected, so that the target production node only produces the individuals in the list.
[0116] When the change impact type of a failed sub-order is incremental supplementary and it is currently in an inactive state, it indicates that the change only involves updating individual data records, the layout structure remains unchanged, and the original task has not yet started physical processing. The system allows the original task to continue execution according to its original schedule, while compiling the data records that need to be added or corrected into a reprint object list and attaching it to the incremental reprint sub-task. The incremental reprint sub-task is scheduled in parallel with the original task. The target production node only produces the individuals listed in the reprint object list; individuals not affected by the change are produced normally by the original task, without needing to scrap the original task or regenerate a complete production task.
[0117] When a failed sub-order is already in the imposition state, the layout structure of the original imposition file remains valid; only the content of the variable data layer needs to be updated. The system replaces the changed data records on the original imposition file, regenerates the rasterized data for the corresponding variable data layer, and maintains the original imposition structure, printing parameters, color configuration, and substrate batch unchanged, allowing the current batch to continue production until completion. Simultaneously, the data records requiring addition or correction are compiled into a reprint object list and attached to the incremental reprint sub-task. The target production node then produces only the individuals on the list, merging the reprinted individuals with the normally produced individuals from the original batch to form a complete delivery set.
[0118] When a failed sub-order is in the printing process, items in the currently running printing batch that have not been changed remain valid. The system allows the current batch to continue production until completion without interrupting the production flow, maximizing the utilization of invested equipment capacity and material resources. For the changed parts, the data records that need to be added or corrected are compiled into a reprint object list and attached to the incremental reprint sub-task. The reprint object list is a streamlined data set that only lists specific data records that need to be added or corrected due to content changes (such as the name, position, booth number, or QR code information of a specific exhibitor), and does not contain duplicate data for unchanged items. After receiving the incremental reprint sub-task, the target production node only produces the items listed in the reprint object list, avoiding duplicate printing of unchanged content, thus completing the supplementary delivery of changed content without interrupting the original production flow.
[0119] Step S906: If the failed sub-order is an incremental replenishment type and is in the post-processing completed or shipped state, then generate an incremental reprint sub-task.
[0120] When the change impact type of a failed sub-order is incremental supplementary, and it is currently in the post-processing completion stage, it indicates that the printing process of the original order has been completed, and the post-processing stage is in progress or has already been completed. Most of the finished products in the original batch that were not affected by the change remain valid, and only a few individual data records require supplementary printing. The system does not need to invalidate the original batch or interrupt the post-processing flow. Instead, it generates an incremental reprint sub-task, compiling the data records that need to be added or corrected into a reprint object list, and sends it along with the color tracking data package to the candidate production nodes that meet the set completion constraints. The candidate production nodes perform small-batch reprint production based on the reprint object list. After rasterization processing, they conduct trial printing and color difference verification to ensure that the reprinted parts are consistent with the color configuration and substrate batch of the original batch. After the reprint is completed, the reprinted individuals are merged with the valid finished products retained in the original batch to form a complete set of printed materials for delivery.
[0121] When a failed sub-order is in the shipped state, the original goods have already left the production node and entered the logistics transportation stage. Most of the unchanged content in the original goods remains valid, with only a few individual data records requiring reprinting. Instead of retrieving the shipped original goods, the system generates an incremental reprint sub-task, sending a list of reprint objects (only listing data records that need to be added or corrected) along with a color tracking data package to reprint nodes near the event location. The reprint nodes perform small-batch reprint production based on the color tracking data package, and after rasterization processing, conduct trial printing and color difference verification to ensure that the reprinted parts are consistent with the color configuration and substrate batch of the original batch. After reprinting is completed, the reprinted individuals are merged with the valid finished products retained in the original batch at the event site to form a complete set of printed materials for delivery, thus completing the supplementary delivery of changed content without interrupting the original logistics process.
[0122] Example 10: In one embodiment, this application provides a method for generating a set of printed kit cover information, the method comprising: Step S1001: Based on the color tracking data package, assign nodes to the temporary reprint sub-orders added before the start of the event, and select stores or on-site printing equipment near the event location that have loaded the same color tracking data package and have idle capacity as reprint nodes.
[0123] For new temporary reprint orders arising from unforeseen demand before the event begins, the optimal reprint node is determined through a dual-dimensional screening logic based on geographic location and production capacity. This process, based on the color tracking data package generated in the preceding steps, first scans all production resources within a preset radius of the event location, including surrounding chain stores and mobile printing vehicles or backup printing equipment deployed on-site. For each candidate production node, it is verified whether it has loaded and supports the color tracking data package associated with the current temporary reprint order. This verification ensures that the reprint equipment has the technical foundation to reproduce the color performance of the original batch, avoiding production failures or severe color differences due to incompatibility with the color management system. After confirming color tracking capability, the real-time equipment scheduling table of each candidate node is further queried to analyze whether there is a continuous idle time window sufficient to cover the estimated production time of the temporary reprint order between the current moment and the latest delivery time of the temporary reprint order. Only candidate nodes that simultaneously meet the three conditions of geographical proximity, matching color tracking data package, and available capacity are selected as reprint nodes. The selection process prioritizes nodes with the shortest transportation distance to reduce logistics time. If no stores have available capacity, on-site printing equipment will be given priority to ensure the timeliness of reprint tasks to the greatest extent possible.
[0124] Step S1002: Control the reprint node to perform a trial print after completing the rasterization process, obtain the color difference value between the reprinted part and the original batch. If the color difference value exceeds the preset threshold, the formal printing is prohibited and the color is recalibrated.
[0125] Once the reprint node is determined, a color consistency verification mechanism is enforced before formal production to ensure visual consistency between the reprinted product and the original batch. The reprint node first performs pre-press rasterization processing based on the content data of the temporary reprint sub-order and the associated color tracking data package, generating print control data recognizable by the equipment. Subsequently, the reprint node outputs a test print sample of standard color blocks, which includes representative key color areas from the original order. After obtaining the test print sample, color measurement equipment is used to collect colorimetric data from the corresponding color blocks of the test print sample and the original batch, and the color difference between the two is calculated. This calculation process can, for example, use the Euclidean distance formula in the CIE Lab color space to calculate the comprehensive color difference between the reprint sample and the original product in the brightness, red-green, and yellow-blue channels. If the calculated color difference value does not exceed a preset threshold, the color reproduction accuracy is deemed to meet the requirements, and the reprint node is allowed to begin printing. Conversely, if the color difference value exceeds the preset threshold, it indicates a deviation in the current equipment configuration, immediately triggering a command to prohibit formal printing and initiating a recalibration process. The recalibration process may include, for example, adjusting the device's base ink output based on the gray balance compensation parameters in the color tracking data package, correcting the device's linearization curve according to the target device calibration parameters, or reloading a color configuration description file with a higher matching degree. After calibration, the reprint node needs to perform trial printing and color difference value calculation again until the new color difference value falls within the preset threshold range before the prohibition state can be lifted and the formal printing stage can begin.
[0126] Step S1003: Compare the reprinted sub-orders with the expected arrival time, color configuration, and substrate batch of each reprinted sub-order. When all sub-orders are complete before the start time of the event and the color configuration and substrate batch are consistent, generate a complete set of printing cover information.
[0127] When a reprinted sub-order is completed and ready to be integrated into the overall delivery process, a final set-together verification is performed. This step establishes a multi-dimensional quality and timeliness closed loop, comparing the reprinted sub-order with all other sub-orders in the set of printed materials. The comparison process includes three core dimensions: First, the time dimension, verifying the estimated arrival time of each reprinted sub-order to ensure that each is earlier than or equal to the event start time, and that the estimated arrival times of all sub-orders fall within the same pre-defined allocable window to meet the set-together constraints of the unified on-site arrangement; second, the color dimension, extracting the currently effective color configuration identifiers or feature parameters of each reprinted sub-order to confirm that the reprinted parts are consistent with the color configuration description files referenced in the original batch, preventing color differences in the set of products; and finally, the material dimension, comparing the batch information of the substrates used in each reprinted order to ensure that the paper material, texture, and coating characteristics of all printed materials belong to the same production batch, avoiding sensory differences caused by different paper batches. Only when the comparison results of the above three dimensions are consistent, and all sub-orders meet the completeness time requirements, will the final printing completeness sealing information set be generated. This information set marks the end of the production and distribution stage. It contains the final confirmation status of all sub-orders and serves as the sole basis for subsequent logistics release, on-site receipt, and inventory management. Any new change requests will no longer be accepted after sealing.
[0128] By introducing a node filtering mechanism based on color tracking data packages and a mandatory trial print color difference verification process, the challenges of cross-device color inconsistency and response lag faced by temporary reprint tasks in exhibition scenarios were resolved, achieving a high degree of visual and material consistency between reprinted parts and the original batch. Simultaneously, through a triple comparison of the expected arrival time, color configuration, and substrate batch, a rigorous complete set sealing loop was formed, effectively mitigating the overall exhibition setup risk caused by the absence or quality differences of a single sub-order, ensuring that complete sets of printed materials can be delivered to the event site with consistent quality and precise delivery times.
[0129] The above description is merely a preferred embodiment of this application and is not intended to limit this application. Although this application has been described in detail with reference to the foregoing embodiments, those skilled in the art can still modify the technical solutions described in the foregoing embodiments or make equivalent substitutions for some of the technical features. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of this application should be included within the protection scope of this application.
Claims
1. A method for dynamically allocating printing orders in collaboration between chain stores and a central factory, characterized in that, include: Acquire multi-source order information sets of complete sets of printed materials for exhibitions and events, combine them with exclusive independent imposition rules for printed sheets, perform initial production node allocation and time window calculation to meet the complete set constraints, and generate an initial allocation scheme information set; Obtain the content change event stream of each sub-order, associate and compare the content change event stream with the initial allocation scheme information set, determine the impact of pre-press rasterization processing on the sub-orders with content changes and update the allocable window, and generate an allocation failure judgment information set when the expected arrival time of a sub-order does not meet the kitting constraint. Based on the allocation failure determination information set, identify the change impact type of sub-orders with content changes, perform voiding and rearrangement or task migration processing on overall rearrangement type sub-orders, perform incremental reprinting sub-task processing on incremental supplement type sub-orders, and generate a dynamic allocation scheme instruction set. Based on the aforementioned dynamic allocation scheme instruction set, node allocation and color difference verification are performed on the temporary reprint sub-orders added before the start of the event. The expected arrival time, color configuration, and substrate batch of each reprint sub-order are uniformly verified to generate a complete set of printing cover information.
2. The method according to claim 1, characterized in that, The process of generating the initial allocation scheme information set includes: Obtain the content freeze time, printing process chain time, and logistics cut-off time of each sub-order involved in the complete set of printed materials for the exhibition event, and calculate the estimated arrival time of each sub-order at the candidate production node; Determine the order type of each sub-order based on the content change attributes of each sub-order; Based on the independent imposition rules for the exclusive printed sheets, and combined with the expected arrival time and order type of each sub-order, the initial allocation scheme information set is generated.
3. The method according to claim 2, characterized in that, The determination of the order type for each sub-order includes: Based on the content change attributes of each sub-order, each sub-order is divided into fixed content orders and variable content orders. Fixed content orders are preferentially allocated to the central factory, and variable content orders are preferentially allocated to stores. For the variable content order, based on how the content change affects the printed finished product, the change impact type is marked as overall rearrangement type and incremental supplement type; The term "overall rearrangement" refers to changes that alter the entire page layout or content structure, necessitating a complete reprint. The term "incremental supplement" refers to changes that involve only a few data records, where most of the content in the printed product remains valid, requiring only additional printing of the changed items.
4. The method according to claim 2, characterized in that, The calculation of the expected arrival time and the selection process for the initial production nodes include: Based on the printing process chain time, the production completion time of each sub-order is determined, and the shipping time is obtained by adding the drying and curing buffer period to the production completion time. Based on the logistics cut-off time and logistics shift waiting time, the earliest transport shift is determined, and the departure time of the earliest transport shift is added to the transport time to obtain the estimated arrival time. Candidate production nodes whose expected arrival time is no later than the activity start time and whose expected arrival time is within the same allocable window as other sub-orders will be used as the initial allocation objects that satisfy the complete set constraint.
5. The method according to claim 4, characterized in that, The process of generating the allocation failure determination information set includes: Obtain the content change event stream for each sub-order, and extract the sub-order identifier and change field that have undergone content change; The changed field is compared with the prepress version data of the corresponding sub-order to determine whether the current change affects the prepress rasterization process, and the result of the determination result of whether the impact level of the prepress process is a severe change or a mild change is obtained. For sub-orders determined to have undergone the severe changes, the content freeze time and the allocable window are re-determined based on the changed content. If the estimated arrival time of a sub-order is later than the start time of the activity, or if the estimated arrival times of each reprint sub-order are not within the same allocable window, resulting in the inability to meet the complete set constraint, then obtain the failed sub-order identifier, failure reason, change impact type, and updated allocable window, and generate the allocation failure determination information set.
6. The method according to claim 5, characterized in that, The step of determining whether the current change affects the pre-press rasterization process includes: If the changed field only involves updating the content of the data record and does not change the layout, it is determined to be a minor change; If the change in the field causes adjustments to the layout, changes in the position or size of variable content elements, changes in font embedding, or changes in color control parameters, it is determined to be a severe change. For sub-orders identified as having undergone severe changes, the differences in rasterization processing mechanisms between the original production node and the candidate production node are compared. When differences exist, a color tracking data package containing a color configuration description file, gray balance compensation parameters, color level mapping relationship, and target device calibration parameters is generated, and the color tracking data package is associated with the sub-order having undergone severe changes.
7. The method according to claim 6, characterized in that, The content freeze time and the process of re-determining the allocatable window include: Update the content freeze time of the sub-orders that have undergone the aforementioned severe changes to the latest version confirmation time; If the current sub-order has been assigned to the central factory, determine whether the imposition, printing, drying and loading of the exclusive printed sheets can still be completed before the logistics cut-off time under the updated content freeze time. If it cannot be completed, mark it as node failure. If the current sub-order has been assigned to the store, determine whether the current sub-order can be inserted into the store's equipment schedule for production. If it cannot be inserted, mark it as a node failure. Include the identifier of the sub-order marked as a node failure, the reason for failure, the type of change impact, and the updated assignable window of the sub-order in the assignment failure determination information set.
8. The method according to claim 7, characterized in that, The generation process of the dynamic allocation scheme instruction set includes: Extract failed sub-orders and their change impact types from the allocation failure determination information set; When the change impact type is the overall reordering type, voiding reordering or task migration processing is performed according to the current task status of the failed sub-order, canceling the original task and generating a new version production task; When the change impact type is the incremental supplement type, the completed production results of the unchanged part are retained, and incremental supplement sub-tasks are generated only for the individuals that have been changed. The new version production task or the incremental reprint sub-task is assigned to the candidate production node, and a migration instruction package containing production parameters, the color tracking data package, batch matching information and time requirements is generated as the instruction set of the dynamic allocation scheme.
9. The method according to claim 8, characterized in that, The invalidation rearrangement or task migration process includes: Read the task state machine of the failed sub-order, which includes states such as not started, already assembled, printing in progress, post-processing completed, and already shipped. If the failed sub-order is of the overall rearrangement type and is in a state of not started or already assembled, then cancel the original task and generate a new version production task; If the failed sub-order is the overall rearrangement type and is in the printing or post-processing completion state, the feasibility of task migration is evaluated. If there is a candidate production node with compatible capacity, the task migration is executed; otherwise, the entire batch is scrapped and the order is regenerated. If the failed sub-order is the overall rearrangement type and is already shipped, then an on-site reprint instruction is generated; If the failed sub-order is an incremental replenishment type and is in a state of not started, already assembled, or in printing, then the current batch is allowed to continue production until completion, and a replenishment object list is attached to the incremental replenishment sub-task. The replenishment object list only lists the data records that need to be added or corrected, so that the target production node only produces the individuals in the list. If the failed sub-order is of the incremental supplement type and is in the post-processing completed or shipped state, then an incremental reprint sub-task is generated.
10. The method according to claim 8, characterized in that, The process of generating the complete set of printing cover information includes: Based on the color tracking data package, the temporary reprint sub-orders added before the start of the event are assigned nodes, and stores or on-site printing equipment near the event location that have loaded the same color tracking data package and have idle capacity are selected as reprint nodes. The reprint node is controlled to perform a trial print after completing the rasterization process to obtain the color difference value between the reprinted part and the original batch. If the color difference value exceeds a preset threshold, formal printing is prohibited and the color is recalibrated. The reprinted sub-orders are compared with the expected arrival time, color configuration, and substrate batch of each reprinted sub-order. When all sub-orders are complete before the start time of the event and the color configuration and substrate batch are consistent, the complete printing cover plate information set is generated.
