A method and system for managing the production of packaging cartons

By establishing a process selectable domain ledger and unidirectional reduction of equipment combinations, combined with historical snapshots and dual verification, the problems of equipment misassignment and chaotic capacity resources in carton production were solved, and stable production management under the constraints of the physical state of work-in-process was achieved.

CN123117740APending Publication Date: 2026-11-17SHIJIAZHUANG TIEDAO UNIV +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611627725.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-21
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

The existing carton production scheduling scheme fails to effectively use the fixed physical dimensions and flute type of the cardboard as a mandatory constraint for equipment allocation, resulting in misallocation of equipment and chaotic production capacity resources. Furthermore, it lacks unified management of quantity accounting and resource occupancy in abnormal replenishment scenarios.

Method used

Establish a process selectable domain ledger with order sub-batches as the key, unidirectionally reduce equipment combinations based on the latest curing status of the cardboard, divide into continueable and pending sub-batches, determine the replenishment start point and capacity occupancy transfer through historical snapshots, and perform double closure checks to ensure the executability of dispatching.

Benefits of technology

Reduce equipment misallocation and ineffective capacity occupation, improve the executability of production plans and delivery stability, and avoid mismatch in replenishment quantities and resource conflicts.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123117740A_ABST
    Figure CN123117740A_ABST
Patent Text Reader

Abstract

This invention relates to the field of production management technology, and proposes a method and system for managing the production of packaging cartons. The method includes: establishing an order sub-batch process selectable domain ledger; unidirectionally reducing the physical compatibility domain based on the actual width, thickness, and flute type, and releasing or freezing capacity slots to be transferred; dividing existing sub-batches according to irreversible boundaries when there is an abnormal gap, performing rework inspection on the sub-batches to be handled, determining the recoverable quantity and replenishment quantity to be included in this delivery based on the remaining delivery gap of the order, and creating a replenishment sub-batch when the replenishment quantity is greater than zero; determining the replenishment process entry boundary with equipment compatibility, availability of starting materials, and reusable tooling from historical snapshots, and atomically transferring or reapplying for capacity slots; verifying the completion, continuation, recoverability, and replenishment quantity closure before dispatching, and verifying the capacity, timing, and tooling status of the sub-batches to be dispatched. This invention can improve the stability of production plan delivery.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of production management technology. More specifically, this invention relates to a method and system for managing the production of packaging cartons. Background Technology

[0002] In a continuous production line for cardboard boxes, after corrugation lamination, slitting, and creasing, the flute shape and transverse width of the cardboard are fixed and cannot be changed in subsequent processing. An order is usually broken down into multiple sub-batch flows, and the current physical state of each sub-batch gradually becomes clear as the process moves forward, and the range of downstream equipment combinations that can be accepted also shrinks accordingly. When the final quality inspection rejects defective products, equipment stops, or there is a shortage of materials in the upstream process, resulting in the total number of sub-batch in production not being able to meet the order delivery quantity, the on-site scheduling generally adopts two approaches: First, global rescheduling, which centrally recalculates all orders and all equipment. This consumes a lot of computing power, has a slow response time, and is difficult to deal with high-frequency disturbances. Moreover, the rescheduling often ignores the fixed dimensions of the cardboard, and the arranged plan may be physically unfeasible. Second, forcibly inserting orders to make up for production based on experience thresholds such as overlap and gain ratio. These thresholds do not have a deterministic conversion relationship with the fixed physical parameters, leaving a lot of room for manual adjustment. Furthermore, directly skipping the compatibility verification of sub-batch can easily lead to equipment misassignment and chaotic capacity data.

[0003] The aforementioned global rescheduling schemes often overlook process boundaries that work-in-process has already crossed when updating production plans. While the calculated rescheduling results may be logically valid, physically assigning already formed sub-batches to downstream equipment with incompatible paper feed width limits or thickness tolerance ranges often leads to paper jams or batch scrapping of products. Similarly, the experience-based threshold-based order-stuffing method does not perform rigorous compatibility checks on already solidified sub-batches, cannot reliably exclude dispatches that violate physical feasibility boundaries, and lacks a logical closed loop for quantity tracking and capacity allocation. This easily leads to idle capacity resources or dispatch conflicts, resulting in disordered shop floor management and uncontrolled equipment changeover losses.

[0004] In summary, existing production scheduling schemes have at least two shortcomings: First, they do not use the fixed physical dimensions and flute type of the cardboard as mandatory constraints for work assignment, which can easily lead to physically unexecutable equipment allocations. Second, during abnormal replenishment production, there is a lack of unified accounting for the completed quantity, remaining quantity, reworkable quantity, and replenishment quantity, as well as a lack of consistency verification between capacity occupancy and tooling usage status. Therefore, a production management method is needed that can select equipment based on the irreversible physical boundary constraints of work-in-process without global reordering, and achieve closed-loop management of quantity, equipment capacity, and tooling resources in replenishment scenarios. Summary of the Invention

[0005] Existing technologies require a production management solution that can constrain selectable equipment based on the actual physical state of work-in-process, and achieve consistency in quantity accounting, tooling locking, and capacity occupancy in abnormal replenishment scenarios. To solve the above technical problems, this invention provides the following technical solution.

[0006] In a first aspect, the present invention provides a method for managing the production of packaging cartons, comprising: establishing a process optional domain ledger with order sub-batches as keys, wherein the process optional domain ledger records the physical state, optional equipment combinations, capacity placeholder references and irreversible boundaries of each order sub-batch; Upon receiving a process completion event, the latest cured width, latest cured thickness, and latest cured flute status of the cardboard are obtained. Based on this, a one-way reduction is performed on the optional equipment combinations of the corresponding order sub-batch, retaining only compatible optional equipment combinations. The capacity placeholder references corresponding to the rejected optional equipment combinations are released or frozen for transfer. The reduced optional equipment combinations and historical snapshots are written to the process optional domain ledger. When the reduced optional equipment combinations are empty, the corresponding order sub-batch is intercepted and an abnormal gap event is generated. Upon receiving the abnormal gap event, the affected orders corresponding to the abnormal gap event are identified, the process optional domain ledger corresponding to the affected orders is locked, the existing sub-batches of the affected orders are divided into continueable sub-batches and pending sub-batches according to the irreversible boundary of each order sub-batch, the recoverable quantity included in this delivery in the pending sub-batches is determined, and the replenishment quantity is determined according to the remaining delivery gap of the order. When the replenishment quantity is greater than zero, a replenishment sub-batch is created. For the replenishment sub-batch, the process entry boundary that is most recent in time and simultaneously meets the conditions of equipment compatibility, availability of replenishment start material, and reusability of printing plate or mold is determined from the historical snapshot formed by the process completion event. The process entry boundary is taken as the replenishment start point, and the capacity placeholder reference atoms in the sub-batch to be processed that correspond to the replenishment execution route and are in a frozen and pending transfer state are transferred to the replenishment sub-batch. If the transferable capacity is insufficient, capacity placeholders are re-requested. Before dispatching work, a dual closure check is performed, including a first-level quantity closure check and a second-level dispatching resource closure check. The first-level quantity closure check verifies whether the sum of the completed and qualified quantity in the warehouse, the unfinished planned quantity of the sub-batch that can continue, the recoverable quantity included in this delivery, and the replenishment quantity equals the order target quantity. The second-level dispatching resource closure check verifies the capacity placeholder reference, process sequence, and printing plate or mold locking status of each sub-batch involved in this dispatch. When both the first-level quantity closure check and the second-level dispatching resource closure check pass, a dispatching instruction is issued.

[0007] Furthermore, the process optional domain ledger includes: determining feasible process routes and optional equipment combinations that meet static process capacity constraints based on order product specifications and factory process capacity model, forming an initial optional domain set; determining execution routes from the initial optional domain set according to order delivery dates, capacity calendars, and dispatch rules; establishing capacity placeholder references for the equipment corresponding to the execution routes and locking the required printing plates or molds; and establishing capacity application reference templates for candidate routes other than the execution routes in the initial optional domain set without actually occupying capacity.

[0008] Further, the unidirectional reduction includes: comparing the latest cured width, thickness, and flute type with the paper feed width limit range, thickness tolerance range, and supporting flute type set of each device in the optional equipment combination; when the paper feed width limit range, thickness tolerance range, or supporting flute type set of any device is incompatible with the latest cured width, thickness, or flute type, the equipment combination to which that device belongs is removed; for the allocated capacity placeholder reference corresponding to the removed equipment combination, if the allocated capacity placeholder reference corresponds to the execution route before this unidirectional reduction and its locked time period has not yet ended, it is marked as frozen and awaiting transfer; otherwise, it is released to the workshop common capacity pool; and the unallocated capacity application reference template corresponding to the removed equipment combination is deleted.

[0009] Furthermore, the historical snapshot is a version snapshot formed each time the unidirectional reduction is executed. The version snapshot records the process identifier, process boundary identifier, material status corresponding to the process boundary identifier, cardboard curing width, thickness and flute status before and after the operation, optional equipment combinations before and after the operation, rejected equipment combinations and their corresponding capacity placeholder reference processing results, and has a timestamp and transaction version number.

[0010] Furthermore, the interception of the corresponding order sub-batch includes: generating an interception signal, transferring the physical items of the corresponding order sub-batch from the main line to the isolation buffer area, and pushing an alarm indicating that the optional device combination is empty.

[0011] Furthermore, the recoverable quantity included in this delivery is the smaller of the actual recoverable quantity obtained from the rework inspection of the sub-batch to be disposed of and the remaining delivery gap of the order. The quantity of the actual recoverable quantity that exceeds the remaining delivery gap of the order is not included in this delivery, and the corresponding cardboard remains in the state of pending disposal.

[0012] Furthermore, the process entry boundary includes: parsing the historical snapshots formed by process completion events in order of recent to distant timestamps; sequentially determining whether the optional equipment combination corresponding to each historical snapshot is compatible with the design width, design thickness, and design flute type of the replenishment sub-batch; whether the raw materials or semi-finished products corresponding to the process boundary identifier are available; and whether the printing plates or molds associated with each historical snapshot are sized and can be locked within the planned usage period; determining the boundary corresponding to the process boundary identifier recorded in the historical snapshot that first simultaneously meets the above conditions as the process entry boundary; when there are no historical snapshots that meet the conditions, if the raw materials and required printing plates or molds are available, replenishment is started from the raw material starting process; if the raw materials or required printing plates or molds are not available, a boundary missing alarm is generated.

[0013] Furthermore, each sub-batch involved in this dispatch is a pending dispatch sub-batch. The second layer of dispatch resource closure verification includes: checking whether the capacity placeholder reference corresponding to the execution route of the pending dispatch sub-batch is in an allocated state, whether it has not expired, and whether it conflicts with other valid capacity placeholder references; checking whether the locking time period of the adjacent processes of the pending dispatch sub-batch meets the process sequence relationship and reserves transportation time and plate change or mold change time; checking whether the printing plate or mold required by the pending dispatch sub-batch has been locked within the corresponding time period; when all the above checks pass, it is determined that the second layer of dispatch resource closure verification passes.

[0014] Furthermore, the dispatch instruction is a dispatch change message, which includes the order sub-batch number, target equipment number, lock time period, specified process route, printing plate or mold identifier, and capacity placeholder reference.

[0015] Secondly, the present invention provides a packaging carton production management system, which adopts the following technical solution: a packaging carton production management system includes a processor and a memory, wherein the memory stores computer program instructions, and when the computer program instructions are executed by the processor, the above-mentioned packaging carton production management method is implemented.

[0016] The present invention has the following beneficial effects: 1. By unidirectionally reducing the optional equipment combination based on the latest cured width, thickness and flute state of the cardboard after the process is completed, and simultaneously releasing or freezing the capacity occupancy references of the rejected routes, the dispatch range is always constrained by the irreversible physical state of the work-in-process, thereby reducing the mis-dispatch of incompatible equipment and the occupation of ineffective capacity.

[0017] 2. By dividing the existing sub-batch of an order based on the irreversible boundary when an abnormal gap occurs, the recoverable quantity and replenishment quantity to be included in this delivery are first determined based on the rework inspection results and the remaining delivery gap of the order. Then, the nearest process entry boundary that simultaneously meets the conditions of equipment compatibility, availability of replenishment start-up materials, and tooling reusability is selected from historical snapshots. With the atomic transfer or re-application of capacity placeholder references, the replenishment adjustment can be limited to the affected orders and executable processes, reducing the losses caused by global reordering and repeated version or mold changes.

[0018] 3. By performing quantity closure and dispatch resource closure checks before dispatching, dispatch instructions are only issued when the order quantity is maintained, the capacity occupancy is valid, the process sequence is free of conflict, and the tooling is locked. This avoids production quantity mismatch, capacity conflict, and tooling occupation conflict, thereby improving the executability of the production plan and the stability of delivery. Attached Figure Description

[0019] Figure 1 The diagram illustrates the steps of a packaging carton production management method according to the present invention. Detailed Implementation

[0020] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some, not all, of the embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0021] The specific embodiments of the present invention will now be described in detail with reference to the accompanying drawings.

[0022] S1: Establish a process option domain ledger with order sub-batches as keys, storing the physical status, optional equipment combinations, and capacity placeholder references for each sub-batch.

[0023] In the continuous production line of packaging cartons involved in this embodiment, after the cardboard undergoes corrugated composite forming, slitting and creasing processes, its flute shape, thickness and transverse width will gradually solidify, forming irreversible physical constraints that must be followed in subsequent processing.

[0024] A single order is usually divided into multiple independent work units according to production batch and circulation needs, which are referred to as order sub-batches.

[0025] As each sub-batch of an order completes its respective process, its physical state becomes increasingly clear, and the compatible downstream processing paths also narrow accordingly.

[0026] Based on the above characteristics, in order to avoid fixed order sub-batches being misassigned to downstream equipment with incompatible physical parameters, the system establishes a process optional domain ledger for each order sub-batch with the sub-batch identifier as the key.

[0027] After receiving an order and completing the initial scheduling, the system assigns a unique sub-batch identifier to each order sub-batch and uses this identifier as an index to create a corresponding process optional field ledger record.

[0028] The process optional domain ledger uses transaction version control to centrally record the physical status, optional equipment combinations, and capacity placeholder references of the order sub-batch, ensuring that subsequent scheduling is consistent with the physical status.

[0029] For ease of explanation, the information in the process optional domain ledger is divided into three categories: physical status, optional equipment combinations, and capacity placeholder references.

[0030] The physical state data items include the latest cured physical dimensions and flute state parameters of the cardboard corresponding to this sub-batch, which were extracted and written in the most recent process completion event.

[0031] Specifically, the physical state data item includes the measured width of the cardboard, which has been measured, collected, and verified. The unit is millimeters; the actual thickness is measured. The unit is millimeters; and the type symbol that identifies the corrugated structure, such as A-flute, B-flute, C-flute or E-flute, each flute type corresponding to different standard thicknesses and compressive strength ranges.

[0032] The aforementioned width, thickness, and flute type together constitute the process compatibility threshold: the measured width and thickness should fall within the processing range of the downstream equipment, and the flute type should belong to the flute type set supported by the equipment; otherwise, the equipment combination that includes the equipment is no longer feasible.

[0033] At the beginning of the sub-batch flow, these physical status fields are filled with initial values ​​given by the production standards.

[0034] When an order sub-batch completes a process and triggers a process completion event, the measured value overwrites the corresponding physical status field in the ledger; the replaced old value, along with the timestamp, is written to the historical snapshot, only for subsequent traceability, and is no longer used as the basis for current work assignment.

[0035] Corresponding to the physical state, the second type of information in the ledger is the combination of downstream process equipment that can still be executed under the current physical state, namely, the optional equipment combination.

[0036] An optional equipment combination is a set of several process route branches. Each element of the set represents a complete downstream path from the current process to the completion of the order product. Each process on this path is bound to at least one available physical device.

[0037] The initial optional domain set is constructed as follows: First, based on the order product specifications, including flute type, size, and printing requirements, the required processing sequence is analyzed; then, each process is traversed, and equipment capable of performing the corresponding process and whose processing parameters cover the order design width, design thickness, and design flute type are selected from the process capability model; then, based on the equipment processing parameter range, the connection conditions between adjacent processes, and the mold matching relationship, a directed process route diagram is constructed according to the process sequence, and branches that do not meet the constraints are deleted during the layer-by-layer expansion process, thereby obtaining the equipment combination path that meets the static process capability constraints.

[0038] The capacity calendar is only used to determine the current execution route and its holding time, and is not used as a basis for permanently removing candidate routes.

[0039] If the initial set of selectable domains formed based on static process capability constraints is empty, the system triggers an exception alarm, prevents the creation of sub-batch, and prompts the scheduler to intervene.

[0040] The method for determining whether a candidate route is currently schedulable is as follows: for each piece of equipment on the route, search the capacity calendar for continuous idle time periods within the order delivery period that meet the estimated processing time of the sub-batch; only when all equipment has idle time periods that meet the process sequence and changeover time requirements is the route determined as the currently executable route. Routes that are currently not schedulable are retained in the physically compatible candidate set and re-evaluated after the capacity status changes.

[0041] The estimated processing time for a sub-batch can be obtained from the initial schedule.

[0042] The process capacity model includes static data such as equipment ledger, equipment processing parameter range, and mold matching relationship; the capacity calendar is used to record the dynamic occupancy status of equipment and related tooling.

[0043] Therefore, the initial set of selectable domains is written when the ledger is established, and is subsequently reduced only in one direction based on the fixed physical state; the current execution route and capacity placeholders are dynamically determined or adjusted according to the capacity calendar.

[0044] According to preset dispatching rules such as the earliest available time, the initial execution route is selected from the candidate routes with available time slots; if no available route is available at the moment, the physically compatible candidate route is retained and a scheduling alarm is generated.

[0045] After the above initialization is completed, the event-driven phase begins, and the physical state and optional equipment combination are updated according to S2 when the order sub-batch completes the subsequent process.

[0046] Once the execution route is determined, the third type of information in the ledger is used to record capacity placeholder references.

[0047] Capacity placeholder references refer to the logical credentials that the system pre-applies for and locks in the capacity period on a specific downstream device for that sub-batch.

[0048] During the ledger initialization phase, actual capacity placeholder references are established only for devices involved in the confirmed execution routes.

[0049] The data structure referenced by the capacity placeholder includes at least: the target device identifier, indicating the specific device to be occupied; the planned start and end times of the capacity placeholder locked on the device; and a token identifier, representing the validity of the capacity placeholder transaction and used for subsequent verification.

[0050] When creating a reference, the system iterates through each device according to the selected initial execution route, takes the estimated processing time of the sub-batch calculated in the initial scheduling stage, combines the available continuous time window of the corresponding device in the capacity calendar with the dispatch rules, determines the start and end times of the planned occupation, creates a token identifier, and fills in the reference.

[0051] For those device combinations that are candidates but have not yet been confirmed as execution routes in the optional device combinations, the corresponding ledger fields store capacity request reference templates, rather than actual placeholders.

[0052] The template does not contain the specific time period for locking or the token identifier; it is only a placeholder to reserve space for possible path switching later.

[0053] The template is a data structure containing a target device identifier and a placeholder status flag, with the placeholder status initially set to candidate.

[0054] If actual capacity needs to be occupied due to path switching, the system will initiate a capacity application using this template, allocate a specific time period and token identifier according to the current equipment capacity calendar, establish an actual capacity placeholder reference, and replace the template.

[0055] During the subsequent flow of order sub-batch, if a certain equipment combination is removed due to unidirectional reduction, the system will synchronously process the capacity placeholder reference corresponding to that combination to avoid the capacity being locked ineffectively. See S2 for details.

[0056] Therefore, the process selectability domain ledger unifies the physical status, process feasible domain, and capacity occupancy, providing a consistent data foundation for subsequent unidirectional reduction, abnormal replenishment, and dispatch verification.

[0057] S2: Receive process completion event, perform unidirectional reduction of the optional equipment combination of the corresponding sub-batch based on the latest solidified physical state, and handle capacity occupancy.

[0058] After a certain process on the production line is completed, the accompanying online measuring device samples the cardboard output from that process to obtain measured values ​​for width, thickness, and flute type.

[0059] The measuring device encapsulates the measured value, sub-batch identifier, and process identifier into a process completion event message, and sends it to the scheduling system event bus via the workshop control network.

[0060] The one-way reduction module receives the process completion event message and reads the corresponding process optional field ledger using the sub-batch identifier in the message.

[0061] While reading the ledger, the one-way reduction module extracts the latest solidified width, latest solidified thickness, and flute type identifier from the message, and uses these three as the physical constraint input for this one-way reduction.

[0062] Before updating the current physical state, the one-way reduction module first saves the original physical state field and its timestamp in the ledger, forming a physical state snapshot and appending it to the historical snapshot list.

[0063] Subsequently, the one-way reduction module uses the measured value carried in the message to update the physical status field in the ledger, so that the ledger record is consistent with the current physical status.

[0064] Since the updated physical parameters have been fixed in the corresponding process, subsequent sub-batch orders can only be processed using equipment combinations compatible with the physical parameters.

[0065] Based on this restriction, the one-way reduction module traverses the currently available combinations of devices and performs a compatibility check for each combination of devices.

[0066] For any combination of devices, the unidirectional reduction module checks each device in the combination one by one.

[0067] During the inspection, the paper feed width limit range, thickness tolerance range, and support flute set of each device are read from the process capability model; where the width and thickness are both in millimeters.

[0068] The aforementioned equipment capability parameters are derived from the equipment technical specifications and are written into the process capability model during system initialization, serving as static constraints that remain unchanged during the unidirectional reduction process.

[0069] Subsequently, the unidirectional reduction module determines whether the curing width of the paperboard is within the limit range of the feed width of the equipment, whether the curing thickness is within the thickness tolerance range, and whether the actual flute type belongs to the set of flute types supported by the equipment.

[0070] A device combination will only be retained in the current available device combinations if all devices in the combination meet the above compatibility conditions.

[0071] If any device in the equipment combination does not meet any compatibility condition, the equipment combination is determined to be incompatible with the current curing physical state and is marked as to be removed.

[0072] Therefore, unidirectional reduction, constrained by the current fixed physical parameters, performs irreversible filtering on the current combination of available devices, and the result will only maintain or reduce the original available domain.

[0073] After completing the compatibility assessment, the one-way reduction module removes all device combinations to be eliminated from the current available device combinations, resulting in a reduced set of available device combinations.

[0074] While deleting device combinations, the one-way reduction module checks the capacity placeholder references associated with each removed device combination and processes them according to the reference status.

[0075] For capacity placeholder references corresponding to the removed equipment combination, the module first determines their status. If the capacity placeholder reference is only a capacity application reference template that has not yet been actually allocated, then the template is deleted; if the capacity placeholder reference has been allocated, belongs to the current execution route that triggered the abnormal gap event, and its locked time period has not yet ended, then its status is set to frozen pending transfer, and it will not be released to the workshop common capacity pool within the preset transaction window; the remaining allocated capacity placeholder references are released from time period locking and marked as released.

[0076] Frozen references that have not been transferred by the end of the preset transaction window are automatically released to avoid long-term occupation of capacity.

[0077] After completing the removal of device combinations and capacity placeholder processing, the one-way reduction module updates the current optional device combination field in the ledger with the reduced optional device combinations; when the reduction result is empty, an empty set is written to the field.

[0078] Regardless of whether the reduced optional device combination is empty, the one-way reduction module will create a version snapshot for this one-way reduction.

[0079] The version snapshot records the process identifier, process boundary identifier, material status corresponding to the boundary, solidified physical status before and after the operation, optional equipment combinations, eliminated equipment combinations, release of capacity placeholder references, frozen pending transfer or template deletion results corresponding to the completion event of this process, and associates them with the timestamp of this one-way reduction and the current ledger transaction version number.

[0080] After a version snapshot is written to the historical snapshot list, it is committed in the same transaction as the updated ledger content so that it can be traced and verified according to the transaction boundaries later.

[0081] When the transaction is successfully committed, the ledger update takes effect, and the one-way reduction module determines whether the reduced combination of optional devices is empty.

[0082] If the reduced set of optional equipment is empty, an interception signal is triggered, and the process switches to S3 to prevent the corresponding order sub-batch from continuing into the subsequent normal processing stage.

[0083] If the reduced optional equipment combination is not empty, the one-way reduction process ends, and the corresponding order sub-batch continues to enter normal processing according to the updated optional equipment combination.

[0084] S3: When the reduced combination of optional devices is empty, intercept the corresponding sub-batch and generate an abnormal gap event.

[0085] After the interception signal is triggered, the system encapsulates it into an interception instruction message and sends it to the PLC of the corresponding order sub-batch on the production line via the workshop control network.

[0086] The PLC queries material tracking data based on the sub-batch identifier to determine the real-time position of the corresponding cardboard in the conveying system; the real-time position is determined based on the conveyor belt encoder pulse and the status of the lane photoelectric sensor.

[0087] When the corresponding cardboard arrives at the intersection of the main line and the isolation branch line, the PLC drive lever moves it to the isolation buffer area, causing the order sub-batch to stop entering the subsequent normal processing stage, and retaining the physical material for rework inspection or re-production judgment.

[0088] While the physical transfer is being carried out, the system generates an empty set alarm, pushes it to the alarm interface of the production scheduling system, and triggers the on-site audio and visual prompts for the corresponding production line segment.

[0089] Empty set alarm logs must include at least the following fields: the order sub-batch identifier of the intercepted sub-batch, the process node name at which the interception occurred, and the current fixed width. Measured values, cured thickness Measured values, timestamps of when the interception occurred, and descriptions of alarm types.

[0090] Among them, the curing width is the transverse width of the paperboard after being measured and cured in the current process, and the curing thickness is the bonding thickness of the corresponding flute type of the paperboard; the alarm type description is that the optional equipment combination has been reduced to empty and there is no compatible downstream processing route.

[0091] After the interception and alarm are completed, the one-way reduction module updates the ledger status of the order sub-batch to empty set interception and writes the interception event record containing timestamp and reason to the historical snapshot chain.

[0092] Subsequently, the one-way reduction module sends an abnormal gap event to the event bus; after receiving the abnormal gap event, S4 divides the existing sub-batches of the affected orders, determines the recoverable quantity and the replenishment quantity, and creates a replenishment sub-batch when the replenishment quantity is greater than zero.

[0093] S4: Receive abnormal gap events, lock the ledger of affected orders, divide existing sub-batches according to irreversible boundaries, and determine the recoverable quantity and replenishment quantity.

[0094] After receiving the abnormal gap event message from the event bus, the splitting and reconstructing module extracts the identifier and interception reason code of the intercepted sub-batch from the message payload.

[0095] The splitting and reconstructing module queries the mapping relationship between orders and sub-batches based on the sub-batch identifier to determine the order identifier to which the sub-batch belongs.

[0096] Subsequently, the splitting and refactoring module applies an exclusive transaction lock to the process selectable domain ledger of all sub-batches under the order.

[0097] During the period when the exclusive transaction lock is valid, the scheduling system suspends the execution of capacity placeholder changes, dispatch updates, and status writes for the order, thereby avoiding interference from concurrent operations during the splitting process.

[0098] Under the protection of exclusive transaction locks, the splitting and reconstructing module reads the current ledger snapshot of each sub-batch under the order one by one.

[0099] The latest curing width, curing thickness, flute type, and optional equipment combinations retained after unidirectional reduction recorded in the ledger of each order sub-batch together constitute the current irreversible boundary of that order sub-batch.

[0100] Irreversible boundaries limit the scope of downstream processing that can still be performed on a sub-batch of an order in its current physical state, and this scope can only be maintained or narrowed as the process progresses.

[0101] If the optional equipment combination of an order sub-batch is empty, or if there is an empty set interception mark or a quality inspection abnormality mark in the ledger, the order sub-batch is determined to be unable to continue to flow along the normal route and is included in the sub-batch set to be processed.

[0102] If the optional equipment combination of an order sub-batch is not empty and there are no abnormal markers, it will be included in the set of sub-batch that can continue, and the unexecuted processes will continue to proceed according to the effective work assignment plan.

[0103] The splitting and reconstructing module adds up the remaining unfinished planned output of each sub-batch in the set of continueable sub-batches to obtain the continueable quantity, in units of pieces.

[0104] For a set of sub-batches to be disposed of, the splitting and reconstructing module adds up the portion of the original planned output of each sub-batch that has not yet been completed and put into storage, to obtain the total amount to be disposed of, in units of pieces.

[0105] The initial target delivery quantity for this order Read from the warehouse management system: Quantity of completed and qualified items received into the warehouse. Both data are read from the manufacturing execution system and are in units of pieces.

[0106] The splitting and restructuring module first calculates the remaining delivery gap for orders before including recoverable quantities by subtracting the completed and qualified quantities and the unfinished planned quantities for subsequent sub-batches from the target order quantity. The unit is pieces:

[0107] In the formula, This represents the remaining delivery shortfall for orders before including the recoverable quantity of pending sub-batches; when the calculation result is less than zero, Process as zero.

[0108] For the target quantity of the order, This refers to the quantity of completed and qualified products that have been put into storage. This represents the number of unfinished projects that can be continued in subsequent sub-batches.

[0109] Subsequently, the splitting and reconstructing module initiates physical status and recoverability inspections of the cardboard physical objects of the sub-batch to be disposed of through automatic detection equipment or manual inspection task interfaces; after receiving the inspection completion feedback, it obtains the actual recoverable quantity confirmed by rework verification, and writes the value into the ledger record of the corresponding sub-batch to be disposed of and a historical snapshot containing the inspection results and timestamps.

[0110] The splitting and reconstructing modules will determine the actual recoverable quantity and The smaller value among them is determined as the recoverable quantity confirmed after repair and included in this delivery; exceeding The quantity of items that passed inspection will not be included in this delivery, and the corresponding cardboard will remain in a pending disposal state.

[0111] by The final replenishment quantity is determined by subtracting the recoverable quantity confirmed after repair and included in this delivery from the non-negative difference. When the final replenishment quantity is greater than zero, a new replenishment sub-batch identifier is created for the order, and a replenishment sub-batch record is written in the process optional domain ledger storage. Its initial state is set to pending start, the planned output field is written with the final replenishment quantity, and the physical status and optional equipment combination fields are left to be determined by S5 based on historical snapshots.

[0112] The splitting and reconstructing module writes the division results of the continueable sub-batches and pending sub-batches, the rework inspection results, the recoverable quantity included in this delivery, the final replenishment quantity, the replenishment sub-batches data created when the replenishment quantity is greater than zero, and the summary of abnormal gap events into a new historical snapshot and associates it with the ledger of the relevant sub-batches; then, it marks the status of the order in the process optional domain ledger as split.

[0113] When a database transaction is committed, the system releases the exclusive lock on the ledger of the sub-batch that can continue and the sub-batch awaiting processing that has completed rework confirmation, allowing them to resume corresponding event processing. When creating a replacement sub-batch, the ledger of the replacement sub-batch remains write-protected until S5 completes the determination of the replacement process entry boundary and capacity placeholder processing. After completing the above processing, the process transitions to S5.

[0114] S5: Determine the process entry boundary for the supplementary production batch from historical snapshots, and atomically transfer capacity placeholders or re-apply for capacity placeholders.

[0115] When the final replenishment quantity approved by S4 is greater than zero and a replenishment sub-batch is created, the splitting and reconstructing modules sequentially complete the replenishment process entry boundary positioning, tooling locking, and the transfer or reapplication of capacity placeholder references.

[0116] The splitting and reconstructing module reads the one-way reduced historical snapshots of each sub-batch contained in the affected order, formed by the process completion events, and arranges them in order of recent to distant timestamps.

[0117] Each one-way reduction historical snapshot record contains the process identifier, process boundary identifier, material status corresponding to the boundary, solidified physical status before and after the operation, optional equipment combinations, a list of removed equipment combinations, the processing result of the corresponding capacity placeholder reference, timestamp, transaction version number, and the printing plate or mold identifier associated with this operation.

[0118] To determine the most recent and executable replenishment process cut-in boundary, the split and refactoring module performs the following four checks sequentially for each unidirectional reduction historical snapshot.

[0119] First, the valid combination of selectable devices recorded in the historical snapshot should not be empty.

[0120] Second, the expected initial physical state of the supplementary production sub-batch is based on the order design width, design thickness, and design flute type. It is also checked whether the processing capacity of each equipment in the candidate equipment combination covers the design width and design thickness, and whether the design flute type belongs to the flute type set supported by each equipment.

[0121] Third, check whether the input materials required for the process entry boundary are available; if there is sufficient inventory of the same specification of semi-finished products for the corresponding process state, supplementary production can be started from that semi-finished product state; otherwise, continue to search for earlier historical snapshots until the boundary that can be started from existing raw materials or semi-finished products is determined.

[0122] Fourth, check whether the printing plates or molds associated with the historical snapshots are consistent with the order specifications, are currently available, and can be locked within the planned usage period of the replenishment execution route; when the tooling wear or remaining life does not meet the preset requirements, it is determined that it is not reusable.

[0123] When a historical snapshot meets all four of the above conditions, the backtracking process stops, and the process boundary corresponding to that historical snapshot is determined as the process entry boundary for the supplementary production batch.

[0124] The module writes the initial physical state, optional equipment combinations, starting material identifier, locked printing plate or mold identifier, and usage period of the replenishment sub-batch into the replenishment sub-batch ledger.

[0125] If no suitable process entry boundary is found when tracing back to the earliest one-way reduction history snapshot, then if both raw materials and required tooling are available, the supplementary production will be restarted from the raw material starting process; if neither raw materials nor required tooling are available, the supplementary production sub-batch will be marked as having a missing boundary and an alarm will be triggered.

[0126] Once the process entry boundary is determined, the splitting and refactoring module continues to handle the capacity placeholder references required for the supplementary production execution route.

[0127] The module queries the process selectable domain ledger of the sub-batch to be processed in this order, and extracts the capacity placeholder references that are in a frozen pending transfer state, have not expired, and correspond to the replenishment execution route.

[0128] The frozen state is only retained within the preset transaction window, and the corresponding time period cannot be occupied by other orders.

[0129] For each downstream device involved in the supplementary production sub-batch execution route, references bound to the corresponding device, whose planned occupation time period has not expired, and which meet the requirements of process sequence and conversion time are selected from the frozen references. The production quantity corresponding to each reference is calculated based on the device's production cycle time.

[0130] When the producible quantity corresponding to a single reference is not less than the planned output of the supplementary production sub-batch, that reference is selected. When a single reference is insufficient, multiple references are combined without causing time conflicts, until the cumulative producible quantity is greater than or equal to the planned output of the supplementary production sub-batch. The aforementioned producible quantity is used to determine whether the capacity during the locked time period meets the supplementary production demand, and is not necessarily the quantity that must be actually put into production. The supplementary production sub-batch is assigned according to the approved planned output; for each downstream device involved in the supplementary production execution route, the portion of the cumulative producible quantity of the selected reference that exceeds the planned output of the supplementary production sub-batch will not generate a new assignment task.

[0131] Within the same transaction, the validity and conflict status of the selected reference are re-verified, and the sub-batch to which the reference belongs is updated from the original pending sub-batch to the supplementary sub-batch. After a successful transfer, the reference serves as a placeholder for valid capacity in the supplementary sub-batch ledger, but no longer serves as a placeholder for valid capacity in the original pending sub-batch ledger; if any update fails, the entire process is rolled back.

[0132] If there are insufficient frozen references, a new capacity placeholder will be requested based on the current capacity calendar. After the transaction is committed, the workshop public capacity pool and related ledgers will be updated synchronously.

[0133] After the capacity transfer or re-application transaction is completed, release the write protection lock on the supplementary batch ledger.

[0134] For frozen capacity placeholders not selected in the supplementary production sub-batch, the system will unfreeze and release them to the workshop common capacity pool after the above transactions are committed to avoid continued occupation of excess capacity. For each downstream device involved in the supplementary production execution route, when the cumulative producible quantity of the selected reference is greater than the planned output of the supplementary production sub-batch, the excess portion is the capacity surplus not used for arranging supplementary production tasks in this instance, and no additional production tasks will be generated based on this; the selected references will remain in place according to the original locked time period.

[0135] When the final replenishment quantity approved by S4 is zero, the system does not create a replenishment sub-batch and skips the process entry boundary positioning, tooling locking and capacity occupancy processing in this step.

[0136] The recoverable quantities of the sub-batch awaiting disposal that have been confirmed after repair and included in this delivery, as well as the remaining physical status of items not included in this delivery, have all been written into the corresponding ledger and historical snapshots in S4.

[0137] Therefore, the production replenishment plan output processed in this step is the final replenishment quantity approved by S4, and does not apply for capacity or lock tooling based on the initial gap without obtaining the rework inspection results.

[0138] S6: Perform double closure check before dispatching.

[0139] When the rework verification of the sub-batch to be processed, the positioning of the process entry boundary for replenishment, the tooling locking, the transfer or reapplication of capacity occupancy, and the verification of replenishment quantity have all been completed, the sub-batch to be dispatched this time has complete data required to perform double closure verification.

[0140] At this point, the system does not directly issue dispatch instructions, but first performs a closed-loop check on the order quantity and dispatch resources.

[0141] The double closure check includes a first-level quantity closure and a second-level dispatch resource closure; if either closure fails, the system will refuse to enter the dispatch stage and maintain the dispatch lock status of the relevant orders and sub-batches.

[0142] The dual closure verification module loads the latest snapshot of the relevant sub-batch from the process optional domain ledger of the order, extracts the quantity values ​​of each sub-batch required for quantity closure, and reads the completed and qualified quantity from the manufacturing execution system.

[0143] For sub-batches that can continue, the remaining unfinished planned quantities recorded in the ledger of each sub-batchment are read one by one. That is, the quantities after deducting the quantities that have been completed and put into storage and the quantities that have been reported as completed from the current planned output are added together to obtain the continuing quantity, in units of pieces. For sub-batches that are pending disposal, the module reads the recoverable quantity that has been written into its ledger by the rework inspection feedback interface and marked as confirmed by rework and included in this delivery, in units of pieces.

[0144] For the replenishment sub-batch, the planned output that has been finalized by S4 and kept consistent after boundary positioning is read to obtain the replenishment quantity, in units of pieces; in addition, the initial target delivery quantity of the order is retrieved from the order basic information, in units of pieces.

[0145] Subsequently, the quantity of completed and qualified goods that have been put into storage is added to the above three types of quantities and then strictly compared with the initial target delivery quantity of the order.

[0146] The formula for determining closure based on quantity conservation is:

[0147] in, The quantity that has been confirmed to be recoverable after repair and included in this delivery. To make up for the number of offspring produced, , and The meaning is the same as before.

[0148] If the equation is not true, that is, the sum of the quantity of completed and qualified goods put into storage, the quantity of sub-batches that can continue, the quantity of recoverable sub-batches that have been confirmed for repair and included in this delivery, and the quantity of re-production sub-batches is inconsistent with the target quantity of the order, then the first layer of closure verification fails.

[0149] The system records a quantity non-closure flag in the work assignment change transaction, forms an alarm record containing the difference value and the above four types of quantity details, and sends it to the scheduling interaction interface; at the same time, it maintains the work assignment lock of the current work assignment sub-batch and does not execute subsequent work assignment operations.

[0150] If the equation is true, the first closure is successful, and the double closure verification module continues to execute the second closure verification of the dispatch resource.

[0151] The second layer of work assignment resource closure verification targets the sub-batches that can continue to be assigned, the sub-batches that have been confirmed to be repaired and need to continue processing, and the re-production sub-batches.

[0152] Each capacity placeholder reference record represents the capacity reservation for a specific device within a specific time period, and includes elements such as the token, the occupied time period, and the sub-batch to which it belongs.

[0153] Extract each downstream device and its corresponding capacity placeholder reference from the confirmed execution route of this batch of pending work, and read the conversion time of adjacent processes and the locking record of the required printing plates or molds.

[0154] For each capacity placeholder reference, check whether it has completed the actual reservation and holds a valid token, whether the planned end time of the occupancy is later than the current system clock and within the available production time period, and whether the lock time period on the same device overlaps with other valid capacity placeholder references; for the same sub-batch, also check whether the lock time periods of adjacent processes meet the process sequence relationship and reserve time for transportation, plate changing or mold changing; at the same time, check whether the required printing plate or mold has been locked within the corresponding usage time period and whether there is any tooling occupation conflict.

[0155] The second closure is established only when all capacity placeholder references are in an allocated, unexpired, and conflict-free state, the process timing meets the requirements, and the required printing plate or mold is effectively locked.

[0156] The second closure check fails when any capacity occupancy, process timing, or tooling locking condition is not met.

[0157] The system sends the corresponding capacity, timing or tooling conflict alarm to the event bus, marks the abnormal status in the corresponding record, and maintains the dispatch lock of the current sub-batch to be dispatched, preventing the dispatch command from being issued.

[0158] When both the first and second closures are valid, the double closure verification module generates a verification pass record, updates the ledger status of the affected orders and the current batch of orders to be dispatched to be dispatched, and sends the verification pass record and the latest ledger snapshot of the relevant batch to the dispatch module, and the process proceeds to S7.

[0159] S7: When both closures are successful, issue a dispatch instruction containing the device identifier, lockout time period, and capacity placeholder reference.

[0160] Receive the verification pass record from the double closure check output and the latest snapshot of the relevant sub-batch process optional field ledger, and use both as inputs for this step.

[0161] Only after both quantity closure and dispatch resource closure have been completed will subsequent dispatch instruction generation and issuance operations be executed.

[0162] Specifically, the total number of completed and qualified products that have been verified to be in the warehouse, the number of unfinished planned products that can continue to the sub-batch, the number of recoverable products in the sub-batch that have been confirmed to have been repaired and included in this delivery, and the number of supplementary production sub-batch equals the initial target delivery quantity of the order; in addition, the downstream equipment capacity placeholder references bound to the sub-batch to be dispatched this time are all in an allocated, not expired and conflict-free state, the time periods of adjacent processes meet the process sequence and conversion time requirements, and the required printing plates or molds have been locked in the corresponding time period.

[0163] Once the above prerequisites are met, the work assignment process begins.

[0164] First, apply a dispatch transaction lock to the ledger of the affected orders to keep the ledger write-protected during dispatching, so as to avoid concurrent scheduling operations from disrupting dispatching consistency.

[0165] Process the current batches of work to be dispatched in sequence, including batches that can continue, batches that have been confirmed for repair and included in this delivery and need to continue processing, and batches that need to be reproduced. Read the confirmed downstream equipment sequence, capacity placeholder references and tooling lock records from the ledger of each batch.

[0166] The data structure referenced by the capacity placeholder includes the target device identifier, the lock period defined by the planned start time and the planned end time of the placeholder, and a token identifier used to identify the validity of this placeholder transaction.

[0167] For each order sub-batch and its corresponding target equipment, a structured dispatch change message is generated. For replenishment sub-batches, the dispatch module generates corresponding dispatch change messages based on the approved planned output in the replenishment sub-batch ledger, as well as the confirmed execution route and capacity placeholder references. The producible quantity corresponding to the capacity placeholder reference is used to verify whether the capacity is sufficient and is not used as the basis for adding production tasks. Unused capacity reserves do not form dispatch tasks that exceed the planned output of the replenishment sub-batch.

[0168] The order sub-batch number is the unique identifier of the sub-batch; the target equipment number is consistent with the equipment identifier in the capacity placeholder reference; the lock time period is taken from the planned start and end time of the capacity placeholder reference; the specified process route includes the process nodes and equipment combination path identifiers from the current process to the finished product; the printing plate or mold identifier is used to indicate the locked tooling; the capacity placeholder token is used for the target equipment control system to verify the validity of the capacity reservation.

[0169] Using the above fields, the dispatch change message can uniquely identify the processing object, target equipment, occupied time period, execution route, tooling, and capacity reservation credentials.

[0170] After all dispatch change messages are generated, the dispatch module sends each message to the corresponding equipment control unit or manufacturing execution system interface via the workshop control network according to the target equipment number.

[0171] The communication process uses a reliable protocol with acknowledgments and timeout retransmission to ensure reliable message delivery.

[0172] After receiving the dispatch change message, the equipment control unit extracts the capacity placeholder token and calls the local capacity management process to verify the capacity reservation on which this dispatch depends.

[0173] The verification includes: whether the capacity placeholder token is consistent with the local reservation token, and whether the token is still valid and does not conflict with other reservations.

[0174] After the verification is successful, the equipment control unit marks the locked time period in the message as occupied and records the correspondence between the time period and the order sub-batch in the local capacity calendar.

[0175] Subsequently, the equipment control unit adds the jobs of the order sub-batch to the local queue to be executed according to the locked time period.

[0176] After completing these actions, the equipment control unit sends a confirmation message back to the dispatching system. The message includes the sub-batch number, equipment number, and dispatch confirmation code, which serves as the successful credential issued by the equipment for this dispatch.

[0177] Collect confirmation responses from each target device within the preset timeout window. If all devices return positive confirmation, the dispatch instruction is considered to have been successfully issued.

[0178] The dispatch module completes the status write-back within the same transaction: it updates the status of the order's process optional field ledger from pending dispatch to dispatched, appends dispatch event records to the historical snapshot chain of each sub-batch ledger, and releases the dispatch transaction lock after successful submission; the dispatch event record includes dispatch timestamp, double-closed verification evidence summary, and dispatch change message list.

[0179] If any device returns a negative response or a communication timeout occurs, the dispatch module performs a transaction rollback, sends a cancellation command to the device that has successfully received the dispatch instruction, removes the occupied mark on the device for the corresponding locked time period, and restores the corresponding capacity placeholder to the allocated state before dispatch; only capacity placeholders that have been re-verified as invalid or need to be re-scheduled are released.

[0180] Subsequently, the order ledger is restored to its pre-dispatch state and a dispatch failure alarm is generated to maintain consistency between capacity resources and ledger status.

[0181] Once the work assignment is completed, the order officially enters the execution phase, and each sub-batch of physical goods flows on the production line according to the locked time period and the designated process route.

[0182] After the work assignment is completed in this step, the system continues to monitor for new process completion events, abnormal gap events, and other production disturbances. When a new event arrives, the system restarts from S2 to perform ledger updates, exception handling, closure verification, and work assignment, thus forming a continuously operating production management closed loop.

[0183] This invention also discloses a packaging carton production management system. The system can be implemented using a processor, a memory, and a communication interface, or it can be functionally divided into a ledger construction module, a one-way reduction module, an anomaly interception module, a splitting and reconstruction module, a double closure verification module, and a dispatching module. The memory stores computer program instructions, which, when executed by the processor, implement the aforementioned packaging carton production management method. Other components, such as the communication bus and communication interface, can adopt commonly used structures in the art, and will not be described in detail here.

[0184] The above are merely preferred embodiments of the present invention. It should be noted that those skilled in the art can make several improvements and substitutions without departing from the technical principles of the present invention, and these improvements and substitutions should also be considered within the scope of protection of the present invention.

Claims

1. A carton packaging production management method characterized by, include: Establish a process option domain ledger with order sub-batches as keys. The process option domain ledger records the physical state, optional equipment combinations, capacity placeholder references, and irreversible boundaries of each order sub-batch. Upon receiving a process completion event, the latest cured width, latest cured thickness, and latest cured flute status of the cardboard are obtained. Based on this, a one-way reduction is performed on the optional equipment combinations of the corresponding order sub-batch, retaining only compatible optional equipment combinations. The capacity placeholder references corresponding to the rejected optional equipment combinations are released or frozen for transfer. The reduced optional equipment combinations and historical snapshots are written to the process optional domain ledger. When the reduced optional equipment combinations are empty, the corresponding order sub-batch is intercepted and an abnormal gap event is generated. Upon receiving the abnormal gap event, the affected orders corresponding to the abnormal gap event are identified, the process optional domain ledger corresponding to the affected orders is locked, the existing sub-batches of the affected orders are divided into continueable sub-batches and pending sub-batches according to the irreversible boundary of each order sub-batch, the recoverable quantity included in this delivery in the pending sub-batches is determined, and the replenishment quantity is determined according to the remaining delivery gap of the order. When the replenishment quantity is greater than zero, a replenishment sub-batch is created. For the replenishment sub-batch, the process entry boundary that is most recent in time and simultaneously meets the conditions of equipment compatibility, availability of replenishment start material, and reusability of printing plate or mold is determined from the historical snapshot formed by the process completion event. The process entry boundary is taken as the replenishment start point, and the capacity placeholder reference atoms in the sub-batch to be processed that correspond to the replenishment execution route and are in a frozen and pending transfer state are transferred to the replenishment sub-batch. If the transferable capacity is insufficient, capacity placeholders are re-requested. Before dispatching work, a dual closure check is performed, including a first-level quantity closure check and a second-level dispatching resource closure check. The first-level quantity closure check verifies whether the sum of the completed and qualified quantity in the warehouse, the unfinished planned quantity of the sub-batch that can continue, the recoverable quantity included in this delivery, and the replenishment quantity equals the order target quantity. The second-level dispatching resource closure check verifies the capacity placeholder reference, process sequence, and printing plate or mold locking status of each sub-batch involved in this dispatch. When both the first-level quantity closure check and the second-level dispatching resource closure check pass, a dispatching instruction is issued.

2. The carton production management method according to claim 1, wherein The process selectable domain ledger includes: Based on the product specifications of the order and the factory process capability model, determine the feasible process routes and optional equipment combinations that meet the static process capability constraints, and form an initial set of optional domains; Based on the order delivery date, capacity calendar, and dispatch rules, the execution route is determined from the initial set of selectable domains. Capacity placeholder references are established for the equipment corresponding to the execution route, and the required printing plates or molds are locked. A capacity request reference template is created for candidate routes in the initial set of selectable domains other than the execution route, without actually occupying capacity.

3. The method for managing the production of packaging cartons according to claim 1, characterized in that, The unidirectional reduction includes: The latest cured width, thickness, and flute type are compared with the paper feed width limit range, thickness tolerance range, and support flute type set of each device in the optional equipment combination; When the paper feed width limit range, thickness tolerance range, or support flute set of any device is incompatible with the latest cured width, thickness, or flute state, the device combination to which the device belongs shall be removed. For the allocated capacity placeholder references corresponding to the eliminated equipment combination, if the allocated capacity placeholder reference corresponds to the execution route before this unidirectional reduction and its locking time period has not yet ended, it is marked as frozen and awaiting transfer; otherwise, it is released to the workshop common capacity pool. The template references for unallocated capacity applications corresponding to the excluded equipment combinations will be deleted.

4. The method for managing the production of packaging cartons according to claim 1, characterized in that, The historical snapshot is a version snapshot formed each time the unidirectional reduction is executed. The version snapshot records the process identifier, process boundary identifier, material status corresponding to the process boundary identifier, cardboard curing width, thickness and flute status before and after the operation, optional equipment combinations before and after the operation, rejected equipment combinations and their corresponding capacity placeholder reference processing results, and has a timestamp and transaction version number.

5. The method for managing the production of packaging cartons according to claim 1, characterized in that, The interception of the corresponding order sub-batch includes: generating an interception signal, transferring the physical goods of the corresponding order sub-batch from the main line to the isolation buffer area, and pushing an alarm indicating that the optional device combination is empty.

6. The method for managing the production of packaging cartons according to claim 1, characterized in that, The recoverable quantity included in this delivery is the smaller of the actual recoverable quantity obtained from the rework inspection of the sub-batch to be disposed of and the remaining delivery gap of the order. The quantity of the actual recoverable quantity that exceeds the remaining delivery gap of the order is not included in this delivery, and the corresponding cardboard remains in the state of pending disposal.

7. The packaging carton production management method according to claim 4, characterized in that, The process entry boundary includes: The historical snapshots formed by the completion events of the process are analyzed from the most recent to the oldest according to the timestamp. The system then determines whether the optional equipment combination corresponding to each historical snapshot is compatible with the design width, design thickness and design flute type of the supplementary production batch, whether the raw materials or semi-finished products corresponding to the process boundary identifier are available, and whether the printing plates or molds associated with each historical snapshot are sized and can be locked within the planned usage period. The boundary corresponding to the process boundary identifier recorded in the historical snapshot that first simultaneously meets the above conditions is determined as the process entry boundary. If no historical snapshot meets the conditions, and the raw materials and required printing plates or molds are available, supplementary production is started from the raw material starting process. If the raw materials or required printing plates or molds are not available, a boundary missing alarm is generated.

8. The method for managing the production of packaging cartons according to claim 1, characterized in that, The sub-batches involved in this dispatch are the sub-batches to be dispatched. The second dispatch resource closure verification includes: checking whether the capacity placeholder reference corresponding to the execution route of the sub-batches to be dispatched is in an allocated state, whether it has not expired, and whether it does not conflict with other valid capacity placeholder references. Check whether the locking time period of the adjacent processes of the batch to be dispatched meets the process sequence relationship and allows for transportation time and time for changing the form or mold; Check whether the printing plates or molds required for the batch of work to be dispatched have been locked within the corresponding time period; When all the above checks pass, the second level of dispatch resource closure verification is confirmed to be successful.

9. A method for managing the production of packaging cartons according to claim 1, characterized in that, The dispatch instruction is a dispatch change message, which includes the order sub-batch number, target equipment number, lock time period, specified process route, printing plate or mold identifier, and capacity placeholder reference.

10. A packaging carton production management system, characterized in that, include: A processor and a memory, the memory storing computer program instructions that, when executed by the processor, implement a packaging carton production management method according to any one of claims 1-9.