Production scheduling method and system for dry-type transformer cores

By using RGV freight cars in the production process of dry-type transformer cores, the scheduling method of synchronous transfer and mapping relationship was adopted, which solved the problem of low efficiency in full-load material supply and empty-load material recovery, and achieved efficient and accurate sheet material supply and improved equipment utilization.

CN123120499APending Publication Date: 2026-11-17HKUST ZHILIAN (SHANGHAI) TECH CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202611614571.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-19
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

In existing technologies, the logistics cycle of dry-type transformer core laminations is long, the efficiency of full tray feeding and empty tray recycling is low, misalignment and mixing of materials are prone to occur, leading to errors in the lamination process and low equipment utilization.

Method used

By scheduling RGV trucks between the shearing machine, sheet material warehouse, and stacking machine, and by adopting synchronous transfer and mapping relationships, multiple full pallets are synchronously transferred to the warehouse location, and empty pallets are synchronously recovered during material supply, ensuring that the sheet material is accurately supplied according to the assembly sequence.

Benefits of technology

It improved the efficiency of full pallet warehousing, ensured the accuracy of material supply and equipment utilization, reduced empty running rate, and optimized logistics cycle.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123120499A_ABST
    Figure CN123120499A_ABST
Patent Text Reader

Abstract

This invention discloses a production scheduling method and system for dry-type transformer cores, belonging to the field of transformer manufacturing technology. The method is implemented using an RGV freight car that travels along an RGV track between a shearing machine, a sheet material warehouse, and a laminating machine. The process includes: transferring full pallets from the shearing machine's discharge rack to designated storage locations; establishing a mapping relationship between storage locations and pallets, and simultaneously transferring multiple full pallets from storage locations to their corresponding storage locations; transferring full pallets corresponding to the same work order from storage locations to their corresponding storage locations; transferring full pallets from storage locations to the laminating machine for feeding, and transferring empty pallets from the laminating machine to storage locations after each feeding; and finally transferring empty pallets from storage locations to storage locations. This invention allows for the synchronous handling of multiple full pallets in groups, resulting in high warehousing efficiency and reduced risk of misalignment; it balances feeding efficiency with accurate assembly sequence; and it completes feeding and empty pallet recovery within the same travel distance, reducing RGV idle time and shortening logistics cycle time.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of transformer manufacturing technology, and in particular to a production scheduling method and system for dry-type transformer cores. Background Technology

[0002] The core of a dry-type transformer is made by stacking five types of core sheets produced by a shearing machine: upper yoke, lower yoke, left column, middle column, and right column.

[0003] In the prior art, such as the method for overall grasping, positioning, stacking and laminating single-stage wafer width of transformer core disclosed in patent application CN117894584A, the following steps are taken: counting the number of wafers of various widths and types required for multiple cores; cutting large coils of silicon steel into silicon steel strips of corresponding widths; cutting silicon steel strips of each width into corresponding wafer types; placing the wafers obtained after cutting into pallets, with each pallet storing only wafers of the same width and type, and each level of wafers separated by partitions; and using a robotic arm to pick up one level of wafers from the pallets at a time and place them into the laminating station for stacking.

[0004] The aforementioned patent states that the full pallet of sheet material can only be supplied to the stacking machine on-site in the stacking table buffer area. It is not possible to first store the sheet material in the warehouse according to the work order, and then take the whole set of materials from the warehouse according to the stacking order to supply the stacking machine. When there are many types and quantities of sheet material, it is easy to mix and misplace the materials. Moreover, it is difficult to coordinate the supply of materials and the recovery of empty pallets, resulting in a long logistics cycle.

[0005] To address the aforementioned shortcomings, existing technologies also employ RGV trucks to transfer full pallets of sheet material between the shearing machine, sheet material warehouse, and stacking machine, storing the sheet material in the warehouse first and then supplying it to the stacking machine as needed. However, these RGV transfer solutions generally adopt a single-position, single-pickup-single-placement task mode, meaning that only one pick-up or place-down action is performed at a time, sequentially completing the pick-up and place-down of sheet material at each position; simultaneously, full pallet feeding and empty pallet recovery are usually completed in two independent RGV cycles, i.e., the feeding cycle is performed first, followed by the empty pallet recovery cycle. This has the following disadvantages: Firstly, when multiple full pallets are transferred from the storage location to the warehouse location, they must be picked up and placed one by one in sequence, requiring multiple round trips. It is impossible to complete the pickup and placement from the storage location to the warehouse location in one set of synchronous actions. This results in low efficiency for full pallet warehousing, and misalignment of workstations is prone to occur during the piece-by-piece pickup and placement process, leading to errors in subsequent piece-stacking processes. Therefore, how to achieve simultaneous pickup and placement from the storage location to the warehouse location to improve the efficiency of warehousing multiple full pallets and avoid misalignment is a technical problem that urgently needs to be solved in this field.

[0006] Secondly, when feeding the full pallet, the efficiency of feeding the sheets one by one is low, and when multiple sheets are fed to the stacking machine at the same time, the feeding sequence is easily misaligned, which leads to errors in the subsequent stacking process.

[0007] Third, full pallet feeding and empty pallet retrieval are completed in two separate strokes. Empty pallets unloaded from the stacking machine cannot be retrieved at the same time during feeding, resulting in a high RGV empty running rate, low equipment utilization, long overall logistics cycle time, and chaotic stacking of empty pallets. Summary of the Invention

[0008] Based on this, the purpose of the present invention is to provide a production scheduling method and system for dry-type transformer cores to solve the problems mentioned in the background art.

[0009] To achieve the above objectives, in a first aspect, the present invention proposes a production scheduling method for dry-type transformer cores. This method utilizes RGV freight cars that travel along RGV tracks between a shearing machine, a sheet material warehouse, and a stacking machine to schedule the production of dry-type transformer cores. The RGV freight cars are equipped with cargo positions and corresponding forks. The production scheduling method includes the following steps: S1, transfer multiple full pallets containing different types of iron core sheets from the same work order from the shearing machine's discharge rack to different storage locations, and add pallet labels including the work order number and sheet type to the full pallets; S2 establishes a mapping relationship between storage locations and pallets, and synchronously transfers multiple full pallets in storage locations to the corresponding storage locations; S3 establishes a mapping relationship between storage locations and material types, and transfers full pallets corresponding to the same work order from storage locations to the corresponding storage locations; S4, based on the assembly sequence of core laminations during the manufacturing of dry-type transformer cores, transfers the corresponding full pallets on the storage location to the lamination stacking machine for feeding in stages, and transfers the empty pallets in the lamination stacking machine to the storage location after each feeding. S5 moves empty pallets from the storage location to the warehouse for storage.

[0010] As a further aspect of the present invention, step S1 includes: The cross-cutting machine cuts out iron core sheets based on work orders, and stacks iron core sheets of the same type in the same pallet to form a full pallet before conveying them to the discharge rack; Add pallet labels with work order number and sheet type to full pallets based on the current work order and shearing process type; Obtain the discharge signal of the shearing machine. When the discharge rack reaches a full set of pallets corresponding to a work order, generate a set of shearing machine-cargo location pick-and-place tasks. The corresponding forks transfer the full pallet to the corresponding storage location based on the cross-cutting machine-position pick-and-place task.

[0011] As a further aspect of the present invention, step S2 includes: Get the storage location status; A group of adjacent warehouse locations in the same warehouse area that are currently vacant is designated as a candidate warehouse location group. The number of warehouse locations in the candidate warehouse location group is consistent with the number of different types of iron core sheet materials. The candidate storage location group closest to the RGV truck is used as the storage storage location group, and a mapping relationship between each storage location and pallet is established in the storage storage location group; Based on the mapping relationship between storage locations and pallets, a storage location-to-pallet retrieval and placement task is generated, and the full pallet on the storage location is synchronously transferred to the corresponding storage location using forks; Set the storage location that is full to occupied.

[0012] As a further aspect of the present invention, the step of synchronously transferring full pallets from the storage location to the corresponding storage location via forks includes: The operating forks are determined based on the location-warehouse retrieval and placement tasks; All forks have reached their corresponding positions; Each forklift picks up a full pallet from its position; Each forklift reaches its corresponding storage location; Each forklift will place a full pallet into the storage location.

[0013] As a further aspect of the present invention, the sheet material types include upper yoke sheet material, lower yoke sheet material, left column sheet material, middle column sheet material, and right column sheet material. There are six storage locations, and each storage location is sequentially located along the direction from the sheet material warehouse to the stacking machine as a temporary storage and exchange location, upper yoke location, lower yoke location, left column location, middle column location, and right column location. The mapping relationship between the storage locations and the sheet material types is as follows: upper yoke sheet material, lower yoke sheet material, left column sheet material, middle column sheet material, and right column sheet material are located at the upper yoke location, lower yoke location, left column location, middle column location, and right column location, respectively.

[0014] As a further aspect of the present invention, step S3 includes: Find the full pallet based on the work order number, and determine the corresponding storage location of the full pallet based on the mapping relationship between storage location and pallet; The type of sheet material corresponding to a full pallet in the storage location is determined based on the pallet label; Based on the material types of the full pallet and the mapping relationship between the storage location and the material types, a storage location-storage location retrieval and placement task is generated; Based on the location-based pickup and drop-off task, the full pallet is transferred to the corresponding location.

[0015] As a further embodiment of the present invention, in step S4, the assembly sequence of the core sheet materials during the manufacturing of the dry-type transformer core is: first the two yokes, then the three columns.

[0016] As a further aspect of the present invention, step S4 includes: Based on the assembly sequence of core laminations during the manufacturing of dry-type transformer cores, the following material feeding and recycling task is generated: Transfer the full loads of the upper and lower yoke positions to the stacker; Take three empty trays from the stacker and transfer them to the temporary exchange bit, upper yoke bit, and lower yoke bit; Transfer the full trays on the left, middle, and right columns to the stacker; Take two empty trays from the stacking machine and transfer them to the left column and the middle column.

[0017] As a further aspect of the present invention, step S5 includes: Set the pallet labels of empty pallets in the storage location to empty; Store the empty pallet in a storage location that is currently free; Set the storage location status with empty pallets to temporary.

[0018] A production scheduling system for dry-type transformer cores, used to implement the production scheduling method described above, includes: The shearing machine - pallet picking and placing module is used to transfer multiple full pallets containing different types of iron core sheets from the same work order from the shearing machine's discharge rack to different pallets, and add pallet labels including work order number and sheet type to the full pallets; The pallet-warehouse location retrieval module establishes a mapping relationship between warehouse locations and pallets, and synchronously transfers multiple full pallets from a warehouse location to the corresponding warehouse location. The warehouse location-cargo location retrieval module is used to establish the mapping relationship between warehouse locations and material types, and to transfer full pallets corresponding to the same work order from warehouse locations to the corresponding cargo locations; The feeding and recycling module is used to transfer the corresponding full pallets on the storage location to the lamination machine for feeding in steps based on the assembly sequence of the core laminations during the manufacturing of dry-type transformer cores, and to transfer the empty pallets in the lamination machine to the storage location after each feeding. The empty pallet temporary storage module is used to transfer empty pallets from the storage location to the warehouse storage location.

[0019] Compared with the prior art, the present invention has the following beneficial effects: 1. When multiple full pallets are transferred to the storage location, they carry pallet tags containing work order numbers and material types. Multiple full pallets at the storage location are synchronously transferred to their corresponding locations through the location-pallet mapping relationship. The process of picking and placing multiple full pallets has changed from one-by-one to group synchronous picking and placing, completing the transfer from storage location to storage location in one go, resulting in high efficiency for full pallet warehousing.

[0020] 2. A mapping relationship is established between storage locations and sheet material types. A full pallet corresponding to the same work order is transferred from the storage location to its corresponding storage location, and materials are supplied step-by-step according to the assembly sequence of the iron core sheets. Five types of sheets from the same work order can be retrieved as a complete set at once and placed in their respective locations, resulting in high supply efficiency. Supply is strictly carried out step-by-step according to the assembly sequence, with the order of each sheet material guaranteed by the mapping relationship between storage locations and sheet material types. This prevents misalignment due to simultaneous supply, balancing supply efficiency and the accuracy of the supply sequence.

[0021] 3. While feeding materials, the empty pallets at the stacker are transferred to the storage location. The empty pallets are then recovered and transferred to the storage location during the same stroke. Full pallet feeding and empty pallet recovery are completed alternately within the same stroke, eliminating the need for additional strokes to recover empty pallets. This reduces the number of RGV round trips, lowers the empty run rate, and improves equipment utilization and logistics cycle time. Attached Figure Description

[0022] Figure 1 This is a schematic diagram of the layout of the RGV truck of the present invention; Figure 2 This is a flowchart of a production scheduling method for dry-type transformer cores.

[0023] Attached diagram labels: 1-RGV track, 2-cross shearing machine, 3-sheet material warehouse, 31-warehouse area, 311-warehouse location, 4-stacker, 5-RGV truck, 51-cargo location. Detailed Implementation

[0024] To facilitate understanding of the present invention, a more comprehensive description will be given below with reference to specific embodiments. However, the present invention can be implemented in many different forms and is not limited to the embodiments described herein. Rather, these embodiments are provided to provide a more thorough and complete understanding of the disclosure of the present invention.

[0025] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention pertains. The terminology used herein in the description of the invention is for the purpose of describing particular embodiments only and is not intended to be limiting of the invention.

[0026] Example 1 like Figure 1 As shown, in the production process of dry-type transformer cores, core sheets are produced by shearing machine 2. The core sheets are stacked in pallets according to their type. Then, a full pallet of one type of core sheet is transported to the discharge rack of shearing machine 2. RGV truck 5 uses its forks to transfer the full pallet to storage location 51. The sheet warehouse 3 generally includes multiple storage areas 31, and each storage area 31 contains multiple storage locations 311. RGV truck 5 travels along RGV track 1 to the sheet warehouse 3, and then uses its forks to transfer the full pallet to storage location 311.

[0027] When assembling dry-type transformer cores, the full pallet corresponding to storage location 311 is transferred to storage location 51 according to the work order. Then, the RGV truck 5 drives to the laminating machine 4 and transfers the full pallet on storage location 51 to the laminating machine 4 for feeding. Various core laminations are assembled by the laminating machine 4 to produce dry-type transformer cores.

[0028] like Figure 2As shown in the figure, this embodiment proposes a production scheduling method for dry-type transformer cores, including the following steps: Step S1 involves transferring multiple full pallets containing different types of iron core sheets from the same work order from the discharge rack of the shearing machine 2 to different storage locations 51, and adding pallet labels including the work order number and sheet type to the full pallets. Step S1 includes the following process: The shearing machine 2 cuts out different types of core sheets according to the work order requirements, such as upper yoke sheets, lower yoke sheets, left column sheets, middle column sheets, and right column sheets. Core sheets of the same type are stacked on the same pallet. When a pallet contains all the core sheets of a certain type corresponding to a work order, it is considered a full pallet. The full pallet is then conveyed to the discharge rack to await pickup by the RGV truck 5.

[0029] The pallet label is used to identify the work order to which the full pallet belongs and the type of core sheet material carried by the full pallet.

[0030] Upon receiving the discharge signal from the shearing machine, when a full pallet corresponding to a work order arrives on the discharge rack, a shearing machine-position pick-and-place task is generated and assigned to the corresponding idle position 51. The forks corresponding to the idle position 51 transfer the full pallet to the idle position 51 until all five types of iron core sheet materials corresponding to a work order are transferred to position 51. The RGV truck 5 then travels to the sheet material warehouse 3 for full pallet storage.

[0031] Step S2 establishes a mapping relationship between storage location 311 and pallets, synchronously transferring multiple full pallets from storage location 51 to their corresponding storage location 311. Step S2 includes the following process: The status of storage location 311 is obtained. The sheet material warehouse 3 is divided into multiple storage areas 31, and each storage area 31 has multiple storage locations 311. The status of each storage location 311 includes three types: idle, occupied, and temporary. Idle means that the storage location 311 does not store any pallets, occupied means that the storage location 311 is full of pallets, and temporary means that the storage location 311 is empty. Only when the status of storage location 311 is idle can the storage location 311 be fully loaded with pallets.

[0032] In this embodiment, the five types of iron core sheet materials of the same work order are stored in five adjacent empty storage locations 311. That is, the storage location 311 numbers of these five empty storage locations 311 are required to differ by four, and each empty storage location 311 is located in the same storage area 31.

[0033] First, we iterate through the entire sheet material warehouse 3 and select five adjacent storage locations 311 that are in the same storage area 31 and whose storage location 311 is in an empty state as candidate storage location groups. Then, we calculate the distance between each candidate storage location group and the RGV truck 5. Here, we generally calculate the distance between the middle storage location 311 in the candidate storage location group and the RGV truck 5 at the position of the shearing machine 2 as the distance between the candidate storage location group and the RGV truck 5. The candidate storage location group that is closest to the RGV truck 5 is selected as the storage storage location group.

[0034] Establish a mapping relationship between each storage location 311 in the storage location group and the pallet, and generate a location-to-location retrieval task based on the mapping relationship between storage location 311 and pallet. The location-to-location retrieval task determines which storage location 311 in the storage location group a full pallet in each storage location 51 should be transferred to. By establishing a mapping relationship between each storage location 311 in the storage location group and the pallet, the work order number and material type of the full pallet stored in storage location 311 can be determined based on the pallet label.

[0035] The forks are used to synchronously transfer the full pallet from pallet location 51 to the corresponding storage location 311. The pallet-to-storage location retrieval and placement task adopts a simultaneous retrieval and placement mode, with all forks working collaboratively, specifically as follows: The operating forks are determined based on the location-warehouse retrieval and placement tasks; All forks have reached their corresponding storage positions 51; Each forklift operator retrieves a full pallet from pallet position 51; Each forklift reaches its corresponding storage location 311; Each forklift will place a full pallet into storage location 311.

[0036] Each fork must be aligned during each stage of descent, ascent, travel, and unloading. If any fork is not in position, the entire group must wait. Through a synchronization barrier mechanism, multiple forks are guaranteed to maintain consistent movement during the picking and placing process, preventing pallet misalignment due to a single fork not being in position.

[0037] After a full pallet is placed into storage location 311, the status of storage location 311 is updated from idle to occupied, and the type of iron core sheet material in the full pallet stored in storage location 311 and the corresponding work order are determined.

[0038] Step S3: Establish the mapping relationship between storage location 51 and material type, and transfer the full pallet corresponding to the same work order from storage location 311 to the corresponding storage location 51.

[0039] In this embodiment, the production of dry-type transformer cores requires five types of laminations: upper yoke laminations, lower yoke laminations, left column laminations, middle column laminations, and right column laminations. The RGV truck 5 has six storage locations 51, which, along the direction from the lamination warehouse 3 to the lamination stacker 4, are sequentially designated as temporary storage / exchange location, upper yoke location, lower yoke location, left column location, middle column location, and right column location. The mapping relationship between storage locations 51 and lamination types is as follows: the upper yoke laminations, lower yoke laminations, left column laminations, middle column laminations, and right column laminations corresponding to the same work order in storage location 311 are transferred to the upper yoke location, lower yoke location, left column location, middle column location, and right column location in storage location 51, respectively.

[0040] Step S3 includes the following process: The system locates full pallets based on work order numbers and determines the corresponding storage location 311 based on the mapping relationship between storage location 311 and pallets. When a full pallet is transferred to storage location 311, the work order number and material type corresponding to the full pallet stored in storage location 311 have already been determined based on the pallet label.

[0041] During the stacking process, the corresponding work order number is first issued. Based on the work order number, the storage location 311 corresponding to the five types of iron core sheet materials for that work order is found. Then, based on the mapping relationship between storage location 51 and sheet material type, it is determined which storage location 51 in the RGV truck 5 the full pallet in storage location 311 corresponding to the work order needs to be transferred to, and a storage location-storage location retrieval and placement task is generated.

[0042] The warehouse location-cargo location retrieval and placement task refers to which forklift will pick up a full pallet from warehouse location 311 and place it onto the corresponding cargo location 51.

[0043] After the full pallet in storage location 311 is removed, the status of storage location 311 is updated to idle.

[0044] Step S4: Based on the assembly sequence of core laminations during the manufacturing of dry-type transformer cores, the corresponding full pallets on storage location 51 are transferred to the lamination stacking machine 4 for feeding in stages, and after each feeding, the empty pallets in the lamination stacking machine 4 are transferred to storage location 51.

[0045] In the lamination process, the upper and lower yoke laminations need to be positioned first to form a positioning reference, and then the left, middle, and right column laminations are inserted. Therefore, the assembly sequence of core laminations during the manufacturing of dry-type transformer cores is: first the two yokes, then the three columns.

[0046] Based on the assembly sequence of core laminations during the manufacturing of dry-type transformer cores, the following material feeding and recycling task is generated: Transfer the full loads of the upper and lower yoke positions to the stacker 4; Take three empty trays from stacker 4 and transfer them to the temporary exchange position, upper yoke position and lower yoke position; Transfer the full trays on the left column, middle column and right column to the stacker 4; Take two empty trays from stacker 4 and transfer them to the left column and the middle column.

[0047] Specifically, after the RGV truck 5 arrives at the docking station of the stacking machine 4, it first transfers the full loads of the upper and lower yoke positions to the stacking machine 4 for feeding.

[0048] In the initial state, the stacker 4 has five empty trays. After the upper and lower yoke materials are fed, the temporary exchange position, upper yoke position, and lower yoke position on the RGV truck 5 are empty. Therefore, three empty trays can be taken out and placed in the temporary exchange position, upper yoke position, and lower yoke position.

[0049] After stacking the upper and lower yoke sheets, the stacking machine 4 transfers the full pallets from the left, middle, and right column positions to the stacking machine 4. Then, two empty pallets are taken from the stacking machine 4 and placed in the left and middle column positions. After stacking the sheets from the left, middle, and right columns, the stacking machine 4 has five empty pallets.

[0050] Step S5: Transfer the empty pallet on storage location 51 to storage location 311.

[0051] After the material feeding and recycling task is completed, there are five empty pallets on the RGV truck 5. The labels on these five empty pallets need to be set to empty, that is, the pallet labels do not contain the work order number and the type of sheet material, so that the information can be rewritten when the sheet material is stacked later.

[0052] After the RGV truck 5 completes the feeding and empty pallet retrieval, it returns to the sheet material warehouse 3 and stores the empty pallets in the warehouse 311 where the status is idle. After the empty pallets are stored, the status of the warehouse 311 is updated to temporary storage, indicating that the warehouse 311 currently stores empty pallets.

[0053] Example 2 This embodiment proposes a production scheduling system for dry-type transformer cores to implement the production scheduling method of Embodiment 1. The production scheduling system includes a shearing machine-warehouse retrieval module, a warehouse-storage location retrieval module, a storage location-warehouse retrieval module, a material supply and recycling module, and an empty pallet temporary storage module.

[0054] The cross-cutting machine-position picking and placing module is used to transfer multiple full pallets containing different types of iron core sheets from the same work order from the discharge rack of the cross-cutting machine 2 to different positions 51, and to add pallet labels including work order number and sheet type to the full pallets.

[0055] The cross-cutting machine-position picking and placing module is configured as follows: receiving the iron core sheet material produced by the cross-cutting machine 2 based on the work order; stacking iron core sheet materials of the same type in the same pallet to form a full pallet and then conveying it to the discharge rack; adding pallet labels with work order number and sheet type to the full pallet based on the current work order and cutting process type; obtaining the discharge signal of the cross-cutting machine 2; generating a cross-cutting machine-position picking and placing task when a full pallet is reached on the discharge rack; controlling the corresponding forks to transfer the full pallet to the corresponding position 51 based on the cross-cutting machine-position picking and placing task.

[0056] The location-warehouse pickup and drop module establishes a mapping relationship between warehouse location 311 and pallets, and synchronously transfers multiple full pallets on warehouse location 51 to the corresponding warehouse location 311.

[0057] The location-warehouse retrieval module is configured as follows: obtain the status of warehouse location 311; select several adjacent warehouse locations 311 in the same warehouse area 31 whose status is idle as candidate warehouse location groups, with the number of warehouse locations 311 in the candidate warehouse location groups being consistent with the number of types of iron core sheet materials; select the candidate warehouse location group closest to the RGV truck 5 as the storage warehouse location group, and establish a mapping relationship between each warehouse location 311 in the storage warehouse location group and the pallet; generate a location-warehouse retrieval task based on the mapping relationship between warehouse location 311 and pallet, and synchronously transfer the full pallet on warehouse location 51 to the corresponding warehouse location 311 through the forks; set the status of the warehouse location 311 with the full pallet to occupied. During synchronous transfer, the location-to-warehouse location retrieval module is also configured to: determine the operating forks based on the location-to-warehouse location retrieval task; all operating forks arrive at the corresponding location 51; each operating fork picks up a full pallet from location 51; each operating fork arrives at the corresponding warehouse location 311; each operating fork places the full pallet into warehouse location 311.

[0058] The storage location-cargo location retrieval module is used to establish the mapping relationship between storage location 51 and material type, and to transfer the full pallet corresponding to the same work order from storage location 311 to the corresponding storage location 51.

[0059] The sheet types include upper yoke sheet, lower yoke sheet, left column sheet, middle column sheet, and right column sheet. There are six storage locations 51. Along the direction from the sheet storage warehouse 3 to the stacking machine 4, each storage location 51 is sequentially designated as a temporary storage / exchange location, upper yoke location, lower yoke location, left column location, middle column location, and right column location. The mapping relationship between storage locations 51 and sheet types is as follows: upper yoke sheet, lower yoke sheet, left column sheet, middle column sheet, and right column sheet are located at the upper yoke location, lower yoke location, left column location, middle column location, and right column location, respectively. The storage location-pallet retrieval module is configured as follows: It searches for full pallets based on work order numbers and determines the storage location 311 where the full pallet is located based on the mapping relationship between storage location 311 and pallets; it determines the material type corresponding to the full pallet in storage location 311 based on the pallet label; it generates a storage location-pallet retrieval task based on the material type of the full pallet and the mapping relationship between storage location 51 and material type; and it transfers the full pallet to the corresponding storage location 51 based on the storage location-pallet retrieval task.

[0060] The feeding and recycling module is used to transfer the corresponding full pallets on the storage position 51 to the lamination machine 4 in steps according to the assembly sequence of the core laminations during the manufacturing of dry-type transformer cores, and to transfer the empty pallets in the lamination machine 4 to the storage position 51 after each feeding.

[0061] The assembly sequence of the core sheet is: first the two yokes, then the three columns. The feeding and recycling module is configured to generate the following feeding and recycling tasks based on this assembly sequence: transfer the full trays of the upper and lower yoke positions to the stacking machine 4; take three empty trays from the stacking machine 4 and transfer them to the temporary exchange position, upper yoke position, and lower yoke position; transfer the full trays of the left column position, middle column position, and right column position to the stacking machine 4; take two empty trays from the stacking machine 4 and transfer them to the left column position and middle column position.

[0062] The empty pallet temporary storage module is used to transfer empty pallets on storage location 51 to storage location 311.

[0063] The empty pallet temporary storage module is configured as follows: set the pallet label of the empty pallet on storage location 51 to empty; store the empty pallet in storage location 311 where the status is idle; and set the status of storage location 311 containing the empty pallet to temporary storage.

[0064] The technical features of the above embodiments can be combined in any way. For the sake of brevity, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0065] The above embodiments merely illustrate several implementation methods of the present invention, and their descriptions are relatively specific and detailed, but they should not be construed as limiting the scope of the invention. It should be noted that those skilled in the art can make various modifications and improvements without departing from the concept of the present invention, and these all fall within the protection scope of the present invention. Therefore, the protection scope of the present invention should be determined by the appended claims.

Claims

1. A production scheduling method for dry-type transformer cores, wherein the production scheduling of dry-type transformer cores is achieved by using RGV freight cars that travel along RGV tracks between a shearing machine, a sheet material warehouse, and a stacking machine, wherein the RGV freight cars are equipped with cargo positions and corresponding forks, characterized in that, This production scheduling method Includes the following steps: S1, transfer multiple full pallets containing different types of iron core sheets from the same work order from the shearing machine's discharge rack to different storage locations, and add pallet labels including the work order number and sheet type to the full pallets; S2 establishes a mapping relationship between storage locations and pallets, and synchronously transfers multiple full pallets in storage locations to the corresponding storage locations; S3 establishes a mapping relationship between storage locations and material types, and transfers full pallets corresponding to the same work order from storage locations to the corresponding storage locations; S4, based on the assembly sequence of core laminations during the manufacturing of dry-type transformer cores, transfers the corresponding full pallets on the storage location to the lamination stacking machine for feeding in stages, and transfers the empty pallets in the lamination stacking machine to the storage location after each feeding. S5 moves empty pallets from the storage location to the warehouse for storage.

2. The production scheduling method for dry-type transformer cores according to claim 1, characterized in that, Step S1 includes: The cross-cutting machine cuts out iron core sheets based on work orders, and stacks iron core sheets of the same type in the same pallet to form a full pallet before conveying them to the discharge rack; Add pallet labels with work order number and sheet type to full pallets based on the current work order and shearing process type; Obtain the discharge signal of the shearing machine. When the discharge rack reaches a full set of pallets corresponding to a work order, generate a set of shearing machine-cargo location pick-and-place tasks. The corresponding forks transfer the full pallet to the corresponding storage location based on the cross-cutting machine-position pick-and-place task.

3. The production scheduling method for dry-type transformer cores according to claim 1, characterized in that, Step S2 includes: Get the storage location status; A group of adjacent warehouse locations in the same warehouse area that are currently vacant is designated as a candidate warehouse location group. The number of warehouse locations in the candidate warehouse location group is consistent with the number of different types of iron core sheet materials. The candidate storage location group closest to the RGV truck is used as the storage storage location group, and a mapping relationship between each storage location and pallet is established in the storage storage location group; Based on the mapping relationship between storage locations and pallets, a storage location-to-pallet retrieval and placement task is generated, and the full pallet on the storage location is synchronously transferred to the corresponding storage location using forks; Set the storage location that is full to occupied.

4. The production scheduling method for dry-type transformer cores according to claim 3, characterized in that, The process of synchronously transferring full pallets from the storage location to the corresponding warehouse location using forks includes: The operating forks are determined based on the location-warehouse location retrieval and placement tasks; All forks have reached their corresponding positions; Each forklift picks up a full pallet from its position; Each forklift reaches its corresponding storage location; Each forklift will place a full pallet into the storage location.

5. The production scheduling method for dry-type transformer cores according to claim 1, characterized in that, In step S3, the sheet material types include upper yoke sheet material, lower yoke sheet material, left column sheet material, middle column sheet material, and right column sheet material. There are six storage locations, and each storage location is sequentially located along the direction from the sheet material warehouse to the stacking machine as a temporary storage and exchange location, upper yoke location, lower yoke location, left column location, middle column location, and right column location. The mapping relationship between the storage locations and the sheet material types is as follows: upper yoke sheet material, lower yoke sheet material, left column sheet material, middle column sheet material, and right column sheet material are located at the upper yoke location, lower yoke location, left column location, middle column location, and right column location, respectively.

6. The production scheduling method for dry-type transformer cores according to claim 5, characterized in that, Step S3 includes: Find the full pallet based on the work order number, and determine the corresponding storage location of the full pallet based on the mapping relationship between storage location and pallet; The type of sheet material corresponding to a full pallet in the storage location is determined based on the pallet label; Based on the material types of the full pallet and the mapping relationship between the storage location and the material types, a storage location-storage location retrieval and placement task is generated; Based on the location-warehouse pickup and drop-off task, the full pallet is transferred to the corresponding warehouse location.

7. The production scheduling method for dry-type transformer cores according to claim 5, characterized in that, In step S4, the assembly sequence of the core sheet materials during the manufacturing of the dry-type transformer core is: first the two yokes, then the three columns.

8. The production scheduling method for dry-type transformer cores according to claim 7, characterized in that, Step S4 includes: Based on the assembly sequence of core laminations during the manufacturing of dry-type transformer cores, the following material feeding and recycling task is generated: Transfer the full loads of the upper and lower yoke positions to the stacker; Take three empty trays from the stacker and transfer them to the temporary exchange bit, upper yoke bit, and lower yoke bit; Transfer the full trays on the left, middle, and right columns to the stacker; Take two empty trays from the stacking machine and transfer them to the left column and the middle column.

9. The production scheduling method for dry-type transformer cores according to claim 7, characterized in that, Step S5 includes: Set the pallet labels of empty pallets in the storage location to empty; Store the empty pallet in a storage location that is currently free; Set the storage location status with empty pallets to temporary.

10. A production scheduling system for dry-type transformer cores, used to implement the production scheduling method as described in any one of claims 1-9, characterized in that, include: The shearing machine - pallet picking and placing module is used to transfer multiple full pallets containing different types of iron core sheets from the same work order from the shearing machine's discharge rack to different pallets, and add pallet labels including work order number and sheet type to the full pallets; The pallet-warehouse location retrieval module establishes a mapping relationship between warehouse locations and pallets, and synchronously transfers multiple full pallets from a warehouse location to the corresponding warehouse location. The warehouse location-cargo location retrieval module is used to establish the mapping relationship between warehouse locations and material types, and to transfer full pallets corresponding to the same work order from warehouse locations to the corresponding cargo locations; The feeding and recycling module is used to transfer the corresponding full pallets on the storage location to the lamination machine for feeding in steps based on the assembly sequence of the core laminations during the manufacturing of dry-type transformer cores, and to transfer the empty pallets in the lamination machine to the storage location after each feeding. The empty pallet temporary storage module is used to transfer empty pallets from the storage location to the warehouse storage location.