Fault ride-through collaborative control methods, systems, equipment, and media for flexible DC transmission systems
By coordinating the control of energy-consuming devices on the wind turbine side and thyristor-type energy-consuming units on the converter station side in a flexible DC transmission system, the problem of DC bus voltage rise caused by AC side faults has been solved, achieving rapid response and reliable absorption, and improving the safety and economy of the system.
Patent Information
- Application Number
- CN202611628474.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-21
- Publication Date
- 2026-11-17
AI Technical Summary
In flexible DC transmission systems, the power difference between the reduced power output capacity caused by AC side faults and the continuous injection of input power leads to a sharp increase in DC bus voltage, threatening the safe and stable operation of the system. Existing technical solutions are difficult to achieve a reliable response within a millisecond time window or increase system complexity and cost.
By utilizing existing energy-consuming devices on the wind turbine side for rapid response and setting up energy-consuming units with thyristors and energy-consuming resistors in series on the converter station side, rapid response in the initial stage of a fault and reliable absorption during the duration of a fault are achieved. A time-series coordinated strategy of first consuming energy on the wind turbine side and then on the converter station side is adopted, and control is carried out using DC bus voltage detection and surplus power calculation.
It enables rapid response and reliable absorption of surplus power without large-scale modification of the system's main circuit topology, avoids DC bus overvoltage, improves system reliability and robustness, adapts to different types of AC side faults, and reduces engineering complexity and cost.
Smart Images

Figure CN123121676A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of fault ride-through control technology for flexible DC transmission systems, specifically relating to the collaborative control method, system, equipment, and medium for fault ride-through of flexible DC transmission systems. Background Technology
[0002] With the continuous increase in the transmission capacity and distance of offshore wind power, flexible DC transmission technology based on modular multilevel converters (MMCs) has become the mainstream solution in deep-sea wind power grid connection and transmission projects due to its advantages such as flexible control, high reliability, and low loss. In a flexible DC transmission system, when a fault occurs on the AC side of the receiving-end converter station, the instantaneous drop in AC voltage will significantly reduce the power transmission capacity of the converter station. However, during this fault transient process, the sending-end wind turbine side continues to transmit power to the DC side at the power level before the fault. Due to the power difference between the decrease in transmission capacity and the continuous injection of input power, the surplus power will continuously charge the DC-side capacitor, causing a sharp increase in the DC bus voltage, which seriously threatens the safe and stable operation of the system.
[0003] Therefore, how to achieve fault ride-through under various AC-side fault disturbances—that is, maintaining uninterrupted system operation and safely surviving transient crises during faults—has become one of the key technical issues in the deep-sea development of large-capacity offshore wind power. Currently, existing technical solutions for the fault ride-through problem of flexible DC transmission systems mainly fall into the following two categories: The first type of approach rapidly reduces the wind farm's output power to match the system's limited output capacity during faults. Common techniques include fast communication power reduction, frequency upscaling, and voltage reduction. However, this approach faces inherent limitations in practical applications: fast communication suffers from communication delays, making it difficult to achieve a reliable response within the millisecond-level time window of a transient process; frequency upscaling and voltage reduction can impose additional stress on the wind turbine and even trigger overcurrent risks. Therefore, the reliability of the first type of approach is difficult to meet requirements in engineering practice.
[0004] The second type of solution involves adding energy-consuming devices to the system to absorb surplus power generated during faults. Based on the connection location of these devices, they can be divided into AC and DC energy-consuming devices. While AC energy-consuming devices have the advantages of simple structure and low cost, they occupy a large area, making them difficult to adapt to the design requirements of lightweight and compact equipment layouts for offshore converter platforms. DC energy-consuming devices include various technical approaches, such as centralized and distributed systems. Centralized switch-type direct-series solutions suffer from large DC ripple; MMC-type solutions require voltage or current reversal, resulting in complex control strategies; hybrid solutions have high equipment costs; and distributed solutions typically require additional water-cooling systems, significantly increasing system engineering complexity and construction and maintenance costs. Summary of the Invention
[0005] Based on the aforementioned shortcomings and deficiencies in the existing technology, one of the objectives of this invention is to at least solve one or more of the aforementioned problems in the existing technology. In other words, one of the objectives of this invention is to provide a fault ride-through coordinated control method, system, device, and medium for flexible DC transmission systems that meets one or more of the aforementioned requirements. This aims to achieve low-cost fault ride-through by coordinating the timing of the wind turbine side's energy consumption response and the converter station side's energy consumption follow-up, without requiring large-scale modifications to the system's main circuit topology. This is done by ensuring rapid response in the initial stage of fault ride-through and reliable absorption during the fault duration.
[0006] To achieve the above-mentioned objectives, the present invention adopts the following technical solution: In a first aspect, the present invention provides a fault ride-through coordinated control method for a flexible DC transmission system, wherein the flexible DC transmission system includes an energy dissipation unit disposed at the DC port of a modular multilevel converter submodule, the energy dissipation unit being composed of a thyristor and an energy dissipation resistor connected in series, and the method includes the following steps: Obtain the DC bus voltage of the flexible DC transmission system; When the DC bus voltage reaches the preset triggering condition for wind turbine energy consumption, the number of energy consumption devices installed in the wind power converter is determined according to the surplus power, and the energy consumption devices are put into operation to absorb the surplus power. After the energy-consuming device has been running for a preset time, the energy-consuming device is controlled to shut down and the energy-consuming unit is simultaneously controlled to start running, so as to suppress the DC bus overvoltage caused by the power change at the moment the energy-consuming device shuts down. After the energy-consuming unit is put into operation, when the DC bus voltage reaches the preset trigger condition for the energy-consuming unit to turn on, the thyristor is controlled to turn on to connect the energy-consuming resistor in order to absorb the excess power, until the DC bus voltage drops to the preset trigger condition for the energy-consuming unit to turn off, the thyristor is controlled to turn off to disconnect the energy-consuming resistor.
[0007] In a second aspect, the present invention provides a fault ride-through cooperative control system for a flexible DC transmission system, for implementing the method described in the first aspect.
[0008] Thirdly, the present invention provides an electronic device, the electronic device including a memory, a processor and a computer program, wherein the computer program, when executed by the processor, implements the method described in the first aspect.
[0009] Fourthly, the present invention provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the method described in the first aspect.
[0010] Compared with the prior art, the present invention has the following beneficial effects: 1. This invention fully utilizes the existing energy dissipation devices within the wind turbine-side converter as a rapid response measure during the initial fault ride-through phase, eliminating the need for additional, space-consuming AC energy dissipation devices or complex water-cooled distributed DC energy dissipation devices on offshore platforms. Simultaneously, this invention employs a thyristor and energy-dissipating resistor connected in series to form an energy dissipation unit at the receiving-end converter station, located at the DC port of the modular multilevel converter submodule. The thyristor, as a semi-controlled device, offers a significant cost advantage compared to the fully controlled devices (such as IGBTs) widely used in existing DC energy dissipation devices. Furthermore, the energy dissipation unit can reuse the existing structure of the submodule for configuration, without requiring large-scale modifications to the system's main circuit topology, demonstrating good engineering feasibility and compatibility.
[0011] 2. In the initial stage of fault ride-through, this invention uses a DC bus voltage reaching 1.1 times the rated voltage as a trigger condition to activate existing energy-consuming devices on the wind turbine side. Compared to existing technologies that reduce wind farm output power through rapid communication (which suffers from communication delays), the wind turbine-side energy-consuming devices provide a local response, eliminating the need for long-distance communication links. This allows for activation within a millisecond-level time window, enabling rapid suppression of power surges in the initial stage of a fault and effectively preventing a sudden rise in DC bus voltage to dangerous levels.
[0012] 3. This invention creatively employs a timing-coordinated strategy of first consuming energy on the wind turbine side and then on the converter station side. The core technical advantage of this timing arrangement lies in the fact that after the wind turbine-side energy consumption device responds rapidly in the initial stage of a fault, its withdrawal moment will cause a significant DC bus overvoltage surge due to the sudden power change. This invention, by actively activating the thyristor-type energy consumption unit on the converter station side at this moment, precisely suppresses this withdrawal overvoltage. The two energy consumption methods are staggered in time and functionally connected, respectively solving different technical problems at different stages of fault ride-through. The former solves the power surge problem in the initial stage of a fault, while the latter solves the overvoltage surge problem when the wind turbine energy consumption withdraws, thus taking into account the dual requirements of speed and safety during fault ride-through.
[0013] 4. In this invention, the shutdown of the wind turbine's energy consumption is controlled by a preset time, rather than by voltage. This time-condition active switching mechanism is fundamentally different from the passive switching method in existing technologies that relies on external fault signals. Time-condition switching makes the switching time precisely controllable, accurately matching the thermal capacity characteristics of the energy-consuming resistor, avoiding switching failures caused by fault signal delays or misjudgments, and significantly improving the reliability and robustness of the control system.
[0014] 5. This invention makes control decisions based on DC bus voltage detection and surplus power calculation. It does not rely on the prior judgment of fault type, fault location or fault degree. It has the adaptive ability to deal with different types of AC side faults (such as single-phase ground fault, two-phase short circuit fault, three-phase short circuit fault, etc.) and does not require switching control strategies for different fault conditions. It has strong engineering practicality and versatility.
[0015] Further or more detailed beneficial effects will be described in conjunction with specific embodiments in the detailed implementation. Attached Figure Description
[0016] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0017] Figure 1 This is a schematic diagram of an application scenario of the fault-crossing collaborative control method described in Embodiment 1 of the present invention.
[0018] Figure 2 This is a flowchart illustrating the fault-crossing collaborative control method described in Embodiment 1 of the present invention.
[0019] Figure 3 This is a schematic diagram illustrating the principle of the fault-crossing cooperative control method described in Embodiment 1 of the present invention.
[0020] Figure 4 This is a schematic diagram of the structure of the electronic device described in Embodiment 3 of the present invention.
[0021] Figure 5 This is a schematic diagram of the working conditions for the simulation experiment described in Embodiment 5 of the present invention.
[0022] Icon labels: 400. Electronic devices; 401. Processor; 402. Communication bus; 403. User interface; 404. Network interface; 405. Memory. Detailed Implementation
[0023] The technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
[0024] In the following description, several embodiments of the present invention are provided. Different embodiments can be substituted or combined. Therefore, the present invention can also be considered to include all possible combinations of the same and / or different embodiments described. Thus, if one embodiment includes features A, B, and C, and another embodiment includes features B and D, then the present invention should also be considered to include embodiments containing one or more other possible combinations of A, B, C, and D, even if such embodiments are not explicitly described in the following text.
[0025] The following description provides examples and does not limit the scope, applicability, or examples set forth in the claims. Changes may be made to the function and arrangement of the described elements without departing from the scope of the invention. Various processes or components may be appropriately omitted, substituted, or added to the various examples. For example, the described methods may be performed in a different order than described, and various steps may be added, omitted, or combined. Furthermore, features described with respect to some examples may be combined into other examples.
[0026] To facilitate a better understanding of the embodiments of the present invention, its application scenarios will be explained before providing a detailed explanation of the specific implementation methods.
[0027] Please see Figure 1 , Figure 1 A schematic diagram illustrating an application scenario of the fault-crossing cooperative control method is shown. For example... Figure 1 As shown, the flexible DC transmission system includes an offshore wind farm, a sending-end converter station, DC transmission lines, a receiving-end converter station, and an onshore AC power grid. The offshore wind farm comprises multiple wind turbines, each employing a permanent magnet synchronous generator (PMSG), connected to a wind power converter. Each wind power converter contains an energy dissipation device, an existing unit used to absorb surplus power during initial fault conditions. The combined power from all wind turbines is connected to a sending-end modular multilevel converter (MMC), and then transmitted to the receiving-end converter station via cable lines. The receiving-end converter station is an energy dissipation MMC with integrated thyristor-resistor units (ITU-MMC). Each arm contains multiple sub-modules, and each sub-module's DC port is equipped with an energy dissipation unit. This unit consists of a thyristor and a dissipating resistor connected in series, and is connected in parallel to the sub-module's DC port. The thyristor's on / off state controls the connection and disconnection of the dissipating resistor. The receiving-end converter station outputs power to the onshore AC power grid.
[0028] The fault ride-through collaborative control method described in this specification is applied to offshore wind power transmission systems via flexible DC transmission lines, specifically involving scenarios where offshore wind farms are connected to the onshore AC grid via a sending-end converter station, a DC transmission line, and a receiving-end converter station. In these scenarios, when a fault occurs on the AC side of the receiving-end converter station, causing a decrease in power transmission capacity, the system generates a power surplus and triggers an increase in the DC bus voltage. The application of the fault ride-through collaborative control method aims to achieve low-cost fault ride-through by coordinating the existing energy-consuming resources on the wind turbine side with the thyristor-type energy-consuming units on the converter station side, without requiring large-scale modifications to the system's main circuit topology, thus balancing rapid response in the initial stage of fault ride-through with reliable absorption during the fault duration.
[0029] The following is a brief explanation of the flexible DC transmission system, fault ride-through, DC bus voltage, rated voltage, modular multilevel converter submodule, energy consumption unit, energy consumption device, surplus power, wind turbine energy consumption conditions, preset time, energy consumption unit turn-on conditions, and energy consumption unit turn-off conditions involved in the various embodiments of this specification: Flexible DC transmission system: A high-voltage DC transmission system based on voltage source converter (VSC), which uses modular multilevel converter (MMC) as the core converter equipment. It has the characteristics of flexible control, independent adjustment of active and reactive power, and no need for AC side to provide commutation voltage. It is particularly suitable for applications such as offshore wind power grid connection and passive network power supply.
[0030] Fault ride-through refers to the ability of a power system to maintain uninterrupted operation and safely weather transient events when faults or disturbances occur. In flexible DC transmission systems, fault ride-through specifically manifests as the ability of the system to maintain normal operation without triggering protection actions and causing outages when a fault occurs on the AC side of the receiving-end converter station, until the system returns to a steady state after the fault is cleared.
[0031] DC bus voltage: The voltage between the positive and negative poles of a DC line in a flexible DC transmission system, it is a core physical quantity for determining whether the system's power is balanced. When the system's input power and output power are unbalanced, the DC bus voltage will change accordingly; the voltage rises when there is a power surplus and falls when there is a power deficit. In this invention, the DC bus voltage serves as the detection object and judgment basis for control triggering.
[0032] Rated voltage: The target value of the DC bus voltage used in the design of a flexible DC transmission system under normal and continuous operation conditions, i.e., the base value of the per-unit (pu). In the per-unit system, the rated voltage is denoted as 1.0 pu, and all voltage thresholds are set based on this value.
[0033] Modular Multilevel Converter Submodule: The basic building block of a modular multilevel converter (MMC) is the smallest functional unit that constitutes the converter valve. A typical half-bridge submodule consists of two insulated-gate bipolar transistors (IGBTs) and a DC capacitor. By controlling the on and off states of the IGBTs, the submodule can be in an on, off, or bypass state. Multiple submodules are cascaded and superimposed to form the AC output voltage of the converter.
[0034] Energy dissipation unit: A power dissipation structure located at the DC port of the modular multilevel converter submodule. It consists of a thyristor and an energy-dissipating resistor connected in series and in parallel to the DC port of the submodule. The energy dissipation unit controls the connection and disconnection of the energy-dissipating resistor by turning the thyristor on and off, thereby absorbing excess power. The energy dissipation unit is a newly added structure in this invention, different from the existing energy dissipation devices in wind power converters.
[0035] Energy dissipation device: An existing power dissipation structure installed inside the wind turbine converter, which is an original component of the equipment on the wind turbine side. In this invention, the energy dissipation device is activated at the initial stage of a fault, serving as the first line of defense for rapid response, and utilizing its existing fast-acting characteristics to suppress sudden rises in DC voltage.
[0036] Surplus power: The difference between input power and output power in a flexible DC transmission system represents the power that cannot be transmitted and accumulates in the system. When the input power exceeds the output power, a positive surplus power is generated. This power charges the DC-side capacitors, causing the DC bus voltage to rise. This surplus power needs to be absorbed through energy dissipation methods to maintain power balance.
[0037] Wind turbine energy consumption condition: The voltage condition that triggers the operation of the energy consumption device installed in the wind power converter. In this invention, this condition is that the DC bus voltage rises to 1.1 times the rated voltage. When the DC bus voltage reaches this threshold, the system determines that the wind turbine-side energy consumption needs to be activated to achieve a rapid response.
[0038] Preset Time: The duration from the start-up to the shutdown of the energy-consuming device within the wind turbine converter, i.e., the operating time of the wind turbine's energy consumption. This preset time is a millisecond-level time window, the length of which is determined by the time coordination relationship of the system's fault ride-through process, specifically allocated based on the total fault ride-through duration and the duration for which the energy-consuming unit subsequently undertakes the task of absorbing surplus power. The operating time of the energy-consuming unit is primarily limited by the allowable energy absorption and temperature rise constraints of its energy-consuming resistor; that is, its safe operating time is determined based on the thermal capacity characteristics of the energy-consuming resistor. Therefore, the continuous operating time of the energy-consuming device on the wind turbine side is set as the remaining time after deducting the allowable operating time of the energy-consuming unit from the total fault ride-through time. This ensures that the wind turbine's energy-consuming device completes the suppression of surplus power during the rapid response phase in the initial stage of a fault, while preventing the energy-consuming unit from affecting the system's continuous fault ride-through capability due to excessive thermal stress. In this invention, the shutdown of wind turbine energy consumption is controlled by time, not voltage.
[0039] Energy dissipation unit conduction condition: The voltage condition that triggers the thyristor in the energy dissipation unit to conduct. In this invention, this condition is that the DC bus voltage is higher than 1.05 times the rated voltage. When the DC bus voltage exceeds this threshold, the thyristor conducts, the energy dissipation resistor is connected, and the excess power begins to be absorbed.
[0040] Energy dissipation unit turn-off condition: The voltage condition that triggers the thyristor turn-off in the energy dissipation unit. In this invention, this condition is that the DC bus voltage is lower than 0.95 times the rated voltage. When the DC bus voltage drops below this threshold, the thyristor turns off, the energy dissipation resistor is disconnected, and the absorption of surplus power stops. The aforementioned 1.05 times and 0.95 times thresholds together constitute the hysteresis control range for switching the energy dissipation unit.
[0041] Example 1: like Figure 2 As shown, this embodiment provides a fault ride-through cooperative control method for a flexible DC transmission system, including the following steps: Step S1: Obtain the DC bus voltage of the flexible DC transmission system.
[0042] The DC bus voltage of the flexible DC transmission system is acquired in real time by a voltage measuring device installed at the DC bus. U dc The DC bus voltage is the voltage between the positive and negative poles of the DC line, and its value reflects the current power balance state of the system.
[0043] Step S2: When the DC bus voltage reaches the preset triggering condition for wind turbine energy consumption, determine the number of energy consumption devices installed in the wind power converter based on the surplus power, and control the energy consumption devices to be put into operation to absorb the surplus power.
[0044] When the DC bus voltage rises to a preset trigger fan energy consumption condition, the energy consumption device on the trigger fan side is activated. In this embodiment, the preset trigger fan energy consumption condition is when the DC bus voltage rises to 1.1 times the rated voltage. Figure 3 As shown, t Before time 0, the system is in normal operation, the energy-consuming unit is not working, and the MMC operates according to normal control logic.
[0045] t At time 0, a fault occurs, the AC side voltage of the receiving-end converter station drops, the system's output power capacity decreases, while the input power of the wind turbine remains unchanged. The surplus power charges the capacitors in the system. At time 0, the DC bus voltage reaches 1.1 times the rated voltage, triggering the wind turbine to consume energy.
[0046] The number of energy-consuming devices to be put into operation is determined based on the surplus power, specifically as follows: Based on surplus power P surplus Rated capacity of a single energy-consuming device P equipment The ratio determines the number of units to be invested. a, that is, calculated according to formula (1): (1), Among them, surplus power P surplus Input power to the system P in With output power P out The difference is: (2), After calculating the number of units 'a' to be put into operation according to formula (1), the corresponding number of energy-consuming devices are controlled to be put into operation to absorb the surplus power. For example Figure 3 middle T wind The signal indicates that the fan was in an energy-consuming state during this period, and the rise in DC bus voltage was suppressed.
[0047] Step S3: After the energy-consuming device has been running for a preset time, control the energy-consuming device to shut down and control the energy-consuming unit to start running, switching the surplus power consumption task from the wind turbine side to the converter station side.
[0048] like Figure 3 As shown, the energy-consuming device is tAfter being put into operation at moment 1, the system will continue to operate for a preset time. This preset time is a millisecond-level time window, the length of which is determined by the time coordination relationship of the system's fault ride-through process. Specifically, it is allocated based on the total fault ride-through duration and the duration for which the energy-consuming unit subsequently undertakes the task of absorbing surplus power. The operating time of the energy-consuming unit is mainly limited by the allowable energy absorption and temperature rise constraints of its energy-consuming resistor; that is, its safe operating time is determined based on the thermal capacity characteristics of the energy-consuming resistor. Therefore, the continuous operating time of the wind turbine-side energy-consuming device is set as the remaining time after deducting the allowable operating time of the energy-consuming unit from the total fault ride-through time. This ensures that the wind turbine energy-consuming device can suppress surplus power during the initial rapid response phase of a fault, while preventing the energy-consuming unit from affecting the system's continuous fault ride-through capability due to excessive thermal stress.
[0049] Before the wind turbine energy consumption unit is put into operation, the energy consumption unit at the MMC submodule port will not be put into operation. For example... Figure 3 middle T SCR The signal is t 1 to t A low level for two consecutive periods indicates that the thyristor is in the off state. t At time 2, the energy dissipation devices within the wind turbine converter are deactivated, while the energy dissipation units at the MMC submodule ports are activated, thus shifting the surplus power consumption task from the wind turbine side to the converter station side. At this point, the wind turbine resumes normal power generation, and the system input power... P in Restored to the power level before the fault.
[0050] Step S4: After the energy-consuming unit is put into operation, when the DC bus voltage reaches the preset trigger condition for the energy-consuming unit to turn on, the thyristor is controlled to turn on so that the energy-consuming resistor is connected to absorb the excess power until the DC bus voltage drops to the preset trigger condition for the energy-consuming unit to turn off, and the thyristor is controlled to turn off so that the energy-consuming resistor is disconnected.
[0051] After the energy-consuming unit is put into operation, hysteresis control logic is used to control the conduction and turn-off of the thyristors. In this embodiment, the preset trigger condition for the energy-consuming unit to turn on is that the DC bus voltage is higher than 1.05 times the rated voltage; the preset trigger condition for the energy-consuming unit to turn off is that the DC bus voltage is lower than 0.95 times the rated voltage.
[0052] Specifically, such as Figure 3 As shown, in t After time 2, when the DC bus voltage U dc When the voltage exceeds 1.05 times the rated voltage, the thyristor turns on, the energy-consuming resistor is connected, and the excess power begins to be absorbed; when the DC bus voltage... U dcWhen the voltage drops below 0.95 times the rated voltage, the thyristor turns off, and the power-consuming resistor is disconnected. This process repeats throughout the fault period, causing the DC bus voltage to fluctuate between 0.95 and 1.05 times the rated voltage, thus achieving continuous and reliable absorption of surplus power. Figure 3 middle T SCR The signal indicates that the thyristor is in t After time 2, the circuit is repeatedly switched on and off based on the fluctuations in the DC bus voltage.
[0053] When the AC side voltage of the receiving-end converter station begins to recover, the system's surplus power gradually decreases, the DC bus voltage continues to drop, the thyristors remain in the off state, the energy-consuming units naturally shut down, and the system gradually returns to normal operation.
[0054] In summary, this embodiment achieves low-cost fault ride-through control by coordinating the timing of the energy-consuming devices on the wind turbine side and the thyristor-type energy-consuming units on the converter station side. First, it utilizes the existing energy resources on the wind turbine side to achieve rapid response in the early stage of a fault, and then utilizes the thyristor-type energy-consuming units to achieve reliable absorption during the duration of the fault.
[0055] Example 2: This embodiment provides a fault ride-through cooperative control system for a flexible DC transmission system, used to implement the method described in Embodiment 1.
[0056] Example 3: like Figure 4 As shown, this embodiment provides an electronic device, which may include: at least one processor, at least one network interface, a user interface, a memory, and at least one communication bus.
[0057] The communication bus can be used to enable communication between the various components mentioned above.
[0058] The user interface may include buttons, and optional user interfaces may also include standard wired interfaces and wireless interfaces.
[0059] The network interface may include, but is not limited to, Bluetooth modules, NFC modules, Wi-Fi modules, etc.
[0060] The processor may include one or more processing cores. It connects various parts of the electronic device via various interfaces and lines, executing instructions, programs, code sets, or instruction sets stored in memory, and accessing data stored in memory to perform various functions and process data. Optionally, the processor can be implemented using at least one hardware form of DSP, FPGA, or PLA. The processor may integrate one or more of the following: CPU, GPU, and modem. The CPU primarily handles the operating system, user interface, and applications; the GPU is responsible for rendering and drawing the content required for display; and the modem handles wireless communication. It is understood that the modem may also be implemented as a separate chip without being integrated into the processor.
[0061] The memory may include RAM or ROM. Optionally, the memory may include a non-transitory computer-readable medium. The memory can be used to store instructions, programs, code, code sets, or instruction sets. The memory may include a program storage area and a data storage area, wherein the program storage area may store instructions for implementing an operating system, instructions for at least one function (such as touch function, sound playback function, image playback function, etc.), instructions for implementing the above-described method embodiments, etc.; the data storage area may store data involved in the above-described method embodiments, etc. Optionally, the memory may also be at least one storage device located remotely from the aforementioned processor. The memory, as a computer storage medium, may include an operating system, a network communication module, a user interface module, and a control application program. The processor can be used to call the control application program stored in the memory and execute the steps of the fault-crossing cooperative control method mentioned in the foregoing embodiments.
[0062] Example 4: This embodiment provides a computer-readable storage medium storing instructions that, when executed on a computer or processor, cause the computer or processor to perform the above-described instructions. Figure 2 One or more steps in the illustrated embodiment. If the constituent modules of the above-described electronic device are implemented as software functional units and sold or used as independent products, they can be stored in the computer-readable storage medium.
[0063] In the above embodiments, implementation can be achieved, in whole or in part, through software, hardware, firmware, or any combination thereof. When implemented in software, it can be implemented, in whole or in part, as a computer program product. The computer program product includes one or more computer instructions. When the computer program instructions are loaded and executed on a computer, all or part of the processes or functions described in the embodiments of this specification are generated. The computer can be a general-purpose computer, a special-purpose computer, a computer network, or other programmable device. The computer instructions can be stored in or transmitted through a computer-readable storage medium. The computer instructions can be transmitted from one website, computer, server, or data center to another website, computer, server, or data center via wired (e.g., coaxial cable, fiber optic, Digital Subscriber Line (DSL)) or wireless (e.g., infrared, wireless, microwave, etc.) means. The computer-readable storage medium can be any available medium accessible to a computer or a data storage device such as a server or data center that integrates one or more available media. The available media may be magnetic media (e.g., floppy disks, hard disks, magnetic tapes), optical media (e.g., Digital Versatile Discs (DVDs)), or semiconductor media (e.g., Solid State Disks (SSDs)).
[0064] Those skilled in the art will understand that all or part of the processes in the method of Embodiment 1 described above can be implemented by a computer program instructing related hardware. This program can be stored in a computer-readable storage medium, and when executed, it can include the processes of the embodiments of the methods described above. The aforementioned storage medium includes various media capable of storing program code, such as ROM, RAM, magnetic disks, or optical disks. Unless otherwise specified, the technical features of this embodiment and the implementation scheme can be combined arbitrarily.
[0065] Example 5: To verify the effectiveness of the fault ride-through collaborative control method for flexible DC transmission systems described in this specification, this embodiment conducts simulation verification based on a ±500kV / 2000MW system.
[0066] In this embodiment, the total fault ride-through time is set to 2 seconds. Based on the structural and thermal parameters of the energy-consuming unit, its energy-consuming resistor is allowed to continuously absorb surplus power for 150 ms. Therefore, under the premise of meeting the safety operation constraints of the energy-consuming unit, the continuous operating time of the energy-consuming device on the wind turbine side is set to 1850 ms, which will undertake the main energy consumption task in the initial stage of the fault. Subsequently, the energy-consuming unit will be put into operation to complete the subsequent surplus power absorption within the remaining 150 ms.
[0067] During the simulation, the DC bus voltage is the primary focus. U dc capacitor voltage U SM Power consumption of fan energy devices P wind and energy dissipation unit (EDU) current I EDU Equal electrical quantities are used to verify whether the DC overvoltage in the initial stage of the fault is quickly suppressed and whether the subsequent surplus power can be continuously absorbed by the energy-consuming unit.
[0068] like Figure 5 As shown, the simulation conditions are set as follows: a fault occurs on the AC side of the transmitter / receiver at 0.2 s, and the DC bus voltage... U dc Upon reaching 1.1 PU, the wind turbine-side energy dissipation device is activated, absorbing excess power. The wind turbine energy dissipation device operates continuously for 1850 ms before deactivating, simultaneously activating the energy dissipation unit on the receiving end converter station side, and proceeding according to... U dc The hysteresis logic, which turns on when the power consumption is above 1.05 PU and turns off when the power consumption is below 0.95 PU, runs for 150 ms. The fault ends at 2.2 s, the power consumption unit exits, and the system gradually returns to normal.
[0069] During fault ride-through, the DC bus voltage fluctuation is less than 10%, and the submodule capacitor voltage... U SM The maximum value is 1.05 pu and the minimum value is 0.84 pu, with fluctuations not exceeding ±20%, which meets the requirements for fault ride-through.
[0070] Based on the above, this embodiment verifies the effectiveness of the fault ride-through collaborative control method for the flexible DC transmission system described in this specification.
[0071] It should be noted that, for the sake of simplicity, the foregoing method embodiments are all described as a series of actions. However, those skilled in the art should understand that the present invention is not limited to the described order of actions, as some steps can be performed in other orders or simultaneously according to the present invention. Furthermore, those skilled in the art should also understand that the embodiments described in the specification are preferred embodiments, and the actions and modules involved are not necessarily essential to the present invention.
[0072] In the above embodiments, the descriptions of each embodiment have different focuses. For parts not described in detail in a certain embodiment, please refer to the relevant descriptions in other embodiments.
[0073] The foregoing description is merely an exemplary embodiment of the present invention and should not be construed as limiting the scope of the invention. Any equivalent changes and modifications made in accordance with the teachings of this invention are still within the scope of this invention. Those skilled in the art will readily conceive of embodiments of the invention upon considering the specification and practicing the disclosure herein. This invention is intended to cover any variations, uses, or adaptations of the invention that follow the general principles of the invention and include knowledge or means in the art not described herein. The specification and embodiments are to be considered exemplary only, and the scope and spirit of the invention are defined by the claims.
Claims
1. A fault ride-through cooperative control method for a flexible DC transmission system, characterized in that, The flexible DC transmission system includes a power dissipation unit located at the DC port of a modular multilevel converter submodule. The power dissipation unit is composed of a thyristor and a power dissipation resistor connected in series. The method includes the following steps: Obtain the DC bus voltage of the flexible DC transmission system; When the DC bus voltage reaches the preset triggering condition for wind turbine energy consumption, the number of energy consumption devices installed in the wind power converter is determined according to the surplus power, and the energy consumption devices are put into operation to absorb the surplus power. After the energy-consuming device has been running for a preset time, the energy-consuming device is controlled to shut down and the energy-consuming unit is simultaneously controlled to start running, so as to suppress the DC bus overvoltage caused by the power change at the moment the energy-consuming device shuts down. After the energy-consuming unit is put into operation, when the DC bus voltage reaches the preset trigger condition for the energy-consuming unit to turn on, the thyristor is controlled to turn on to connect the energy-consuming resistor in order to absorb the excess power, until the DC bus voltage drops to the preset trigger condition for the energy-consuming unit to turn off, the thyristor is controlled to turn off to disconnect the energy-consuming resistor.
2. The method according to claim 1, characterized in that: The preset time is the difference between the total fault ride-through duration of the system and the allowable operating time of the energy-consuming unit; The permissible operating time of the energy-consuming unit is limited by the thermal capacity characteristics of the energy-consuming resistor.
3. The method according to claim 1, characterized in that: The preset trigger energy consumption unit is turned on when the DC bus voltage is 1.05 times higher than the rated voltage; the preset trigger energy consumption unit is turned off when the DC bus voltage is 0.95 times lower than the rated voltage.
4. The method according to claim 1, characterized in that: The preset triggering condition for the fan energy consumption is that the DC bus voltage rises to 1.1 times the rated voltage.
5. The method according to claim 1, characterized in that: The energy-consuming unit is disposed at the DC port of each submodule of each bridge arm of the modular multilevel converter, and the energy-consuming resistor is connected in series with the thyristor and then connected in parallel to the DC port of the submodule.
6. The method according to claim 1, characterized in that, The determination of the number of energy-consuming devices to be installed in the wind power converter based on the surplus power is specifically as follows: The number of units to be put into operation is determined based on the ratio of the surplus power to the rated capacity of a single energy-consuming device.
7. The method according to claim 1, characterized in that: After the energy-consuming device is put into operation, the sub-modules of the modular multilevel converter remain in normal switching state, and the connection and disconnection of the energy-consuming resistor are independent of the switching control of the sub-module.
8. A fault ride-through cooperative control system for a flexible DC transmission system, characterized in that, Used to implement the method as described in any one of claims 1 to 7.
9. An electronic device, the electronic device comprising a memory, a processor, and a computer program, characterized in that, When the computer program is executed by a processor, it implements the method as described in any one of claims 1 to 7.
10. A computer-readable storage medium having a computer program stored thereon, characterized in that, When the computer program is executed by a processor, it implements the method as described in any one of claims 1 to 7.