Multi-aggregator distribution network source-load-storage multi-timescale collaborative optimization method, device and medium considering load characteristics
By using a collaborative optimization method that combines differentiated electricity pricing guidance signals and response uncertainty boundaries, the problems of varying response capabilities and real-time security status in multi-aggregator distribution networks are solved. This enables optimized control across multiple time scales, thereby improving the operational stability and efficiency of the distribution network.
Patent Information
- Application Number
- CN202611265938.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-20
- Publication Date
- 2026-11-17
AI Technical Summary
The existing day-to-day rolling optimization method is unable to reflect the differences in the response capabilities of multiple aggregators, the actual response deviation, and the real-time safety status of the distribution network, resulting in problems such as power balance deviation, node voltage exceeding limits, and increased line load rate in the distribution network.
By generating differentiated electricity price guidance signals for different aggregators, determining the response uncertainty boundary based on historical response behavior, and performing optimization solutions and compensation control at the day-ahead, intraday, and real-time stages, combined with the coordinated optimization of source, load, and storage resources, the executability of the response plan and the economy and security of distribution network operation are improved.
It has improved the economic operation capability, renewable energy absorption capability and safety constraint satisfaction capability of the distribution network, reduced the overall operating cost, reduced the impact of source-load prediction deviation and load response deviation on the distribution network, and improved node voltage and line operating status.
Smart Images

Figure CN123121690A_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of multi-aggregator collaborative control technology, and in particular to a method, device and medium for multi-aggregator distribution network source-load-storage multi-timescale collaborative optimization considering load characteristics. Background Technology
[0002] With the large-scale integration of distributed photovoltaic, wind power, energy storage systems, electric vehicle charging loads, flexible loads, and interruptible loads into the distribution network, the operation mode of the distribution network is gradually shifting from the traditional unidirectional power supply to a multi-source collaborative interaction model involving power sources, loads, and storage. Distributed renewable energy output is significantly affected by weather conditions, exhibiting randomness and volatility. Load-side resources are influenced by user energy consumption habits, production plans, comfort constraints, and response sensitivity, resulting in discrepancies between actual and planned responses. The superposition of power source-side fluctuations and load-side response uncertainties can easily lead to problems such as power balance deviations in the distribution network, node voltage exceeding limits, increased line load rates, and insufficient renewable energy absorption.
[0003] Multi-aggregators, as key players connecting distribution network operators with end-user resources, can aggregate resources such as residential flexible loads, commercial air conditioning loads, industrial interruptible loads, electric vehicle charging loads, and user-side energy storage to participate in the optimized operation of the distribution network. By guiding multi-aggregators to adjust their electricity consumption behavior through electricity price incentives, the peak-to-valley load difference can be reduced, and the initiative of load-side resources in participating in distribution network regulation can be improved.
[0004] However, different aggregators differ in their resource composition, access location, user response willingness, adjustment costs, response speed, and contract fulfillment reliability. Even under the same electricity price incentive conditions, there may be significant differences between the expected and actual response capacities of different aggregators. If each aggregator is treated as a load resource with the same response capability, a fixed response capacity, and complete obedience to scheduling during the optimization process, it will be difficult to reflect problems such as insufficient response, response delay, and response deviation in actual operation.
[0005] Existing day-ahead to intraday rolling optimization methods can revise day-ahead plans based on renewable energy forecasting errors and load changes. However, their demand-side adjustability is typically updated around a single type of flexible load or a pre-defined scalable capacity, making it difficult to fully reflect the differences among aggregators in terms of resource type, access nodes, response speed, historical performance, and actual response deviations. Furthermore, some optimization methods primarily focus on operating costs and day-ahead plan tracking, lacking continuous characterization of how aggregator actual response deviations affect subsequent callable capacity, reserve capacity, and resource allocation priorities.
[0006] Furthermore, the time resolution optimized day-ahead and intraday is insufficient to directly address operational conditions such as short-term net load surges, node voltage overruns, and line overloads. When the actual output of renewable energy, the actual load value, or the actual response capacity of aggregators deviates from the intraday rolling plan, relying on the complete rolling model for correction makes it difficult to simultaneously meet the requirements of calculation speed and real-time safety control of the distribution network. Summary of the Invention
[0007] This application provides a method, device, and medium for multi-aggregator distribution network source-load-storage multi-timescale collaborative optimization considering load characteristics. It addresses the problem that existing day-ahead-intraday rolling optimization methods cannot simultaneously reflect the differences in response capabilities of multiple aggregators, actual response deviations, and the real-time safety status of the distribution network. Based on the distribution network operating status, it generates differentiated electricity price guidance signals for different aggregators, determines the response uncertainty boundary based on the historical response behavior of aggregators, and integrates the response uncertainty boundary into the day-ahead reserve reservation, intraday reliability update, and real-time deviation compensation processes. This improves the executability of the multi-aggregator response plan and the economic and safe operation capabilities of the distribution network.
[0008] Firstly, this application provides a multi-timescale collaborative optimization method for multi-aggregator distribution network sources, loads, and storage that considers load characteristics, the method comprising: Acquire basic data of the distribution network, relevant data of multiple aggregators, and real-time measurement data; divide the operating resources of the distribution network into four categories: source-side resources, load-side resources, energy storage resources, and network constraints; and perform layered processing on the acquired data according to three time scales: day-ahead, intraday, and real-time to obtain the source-load-storage operation data of the distribution network of multiple aggregators. The operating status of the distribution network is determined based on the multi-aggregator distribution network source-load-storage operation data, and differentiated electricity price guidance signals for different aggregators are generated based on the operating status of the distribution network. Based on the differentiated electricity price guidance signal and the historical response data of aggregators, the expected response capacity and response uncertainty boundary of each aggregator are determined, and the actual response capacity is obtained based on the expected response capacity and the response uncertainty boundary; the response uncertainty boundary serves as a response reliability parameter connecting the three time scales of day-ahead, intraday, and real-time. In the day-ahead phase, a collaborative optimization model for source-load-storage is established and optimized based on the multi-aggregator distribution network source-load-storage operation data, differentiated electricity price guidance signals, and response uncertainty boundaries to obtain the day-ahead scheduling plan. In the optimization solution, the expected response capacity of the aggregator is reliably corrected based on the response uncertainty boundaries to obtain the reliable response capacity, and the multi-aggregator response plan and reserve capacity configuration are arranged based on the reliable response capacity. During the intraday phase, the day-ahead scheduling plan is rolled over based on the latest values of new energy forecasts, the latest values of load forecasts, aggregator response feedback, and the current state of charge of energy storage, resulting in an intraday revised plan. In the rolling revision, the response uncertainty boundary and reliable response capacity of each aggregator in subsequent periods are updated based on the actual response results of aggregators in the executed periods. In the real-time phase, the real-time net load deviation between the actual net load and the planned net load is calculated based on the real-time measurement data, and node voltage and line load rate are acquired simultaneously. When the real-time net load deviation exceeds the power deviation threshold, any node voltage exceeds the allowable range, or any line load rate exceeds the set threshold, real-time deviation fast compensation control is initiated. Based on the resource availability adjustment capacity, response speed, aggregator response reliability, and resource access location, hierarchical invocation is performed to obtain real-time compensation control instructions.
[0009] In one possible design, the basic data of the distribution network includes the distribution network topology, line impedance, line capacity limits, node voltage upper and lower limits, basic load forecast data, and distributed renewable energy forecast output; the multi-aggregator related data includes the rated capacity of energy storage, the maximum charge and discharge power of energy storage, the initial state of charge of energy storage, the load capacity that the multi-aggregator can respond to, the historical response data of the aggregator, and the basic time-of-use pricing benchmark; the real-time measurement data includes real-time voltage, real-time power flow, and real-time load. The distribution network basic data, multi-aggregator related data, and real-time measurement data are processed in layers according to three time scales: day-ahead, intraday, and real-time. This includes: layering the acquired data into day-ahead data according to a first preset time interval to obtain day-ahead load forecast data and renewable energy forecast data; layering the acquired data into intraday data according to a second preset time interval to obtain intraday load forecast update data and renewable energy forecast update data; and layering the acquired data into real-time data according to a third preset time interval to obtain real-time measurement data. The first preset time interval is greater than the second preset time interval, and the second preset time interval is greater than the third preset time interval. Based on the data after hierarchical processing, construct the first... Operating status of power distribution network source, load and storage during different time periods: (1) in, For the first Base load power for the time period; For the first Available power output from renewable energy sources during certain periods; For the first Time-limited energy storage capacity; For the first State of charge of energy storage during a given time period; For the first The aggregator in the first The available responsive capacity for a given time period; For the first The node at the th Voltage amplitude over a given period; For the first The line is in the Trends of different time periods; Based on the operating status of the power distribution network's power generation, load, and storage in each time period, the operating data of the multi-aggregator power distribution network's power generation, load, and storage are summarized.
[0010] In one possible design, the distribution network operating status is determined based on the multi-aggregator distribution network source-load-storage operation data, and differentiated electricity price guidance signals for different aggregators are generated based on the distribution network operating status, including: Based on base load power and new energy available output Calculate the current net load. The deviation from the daily average net load yields the load peak-valley regulation demand index; the deviation between the node voltage and the rated voltage yields the node voltage deviation index; the ratio of line power flow to the upper limit of line capacity yields the line overload index; and the difference between the available output of new energy and the actual output of new energy consumption yields the new energy consumption demand index. Based on the historical response data of the aggregators, the differences in response speed, response reliability, and response cost of each aggregator are calculated to obtain the correction term for the difference in response capability of each aggregator. By superimposing the weighted values of the load peak-valley regulation demand index, the node voltage deviation index, the line overload index, the renewable energy consumption demand index, and the aggregator response capability difference correction term onto the basic time-of-use electricity price guidance benchmark, the results are obtained. The aggregator in the first Electricity price guidance volume for different time periods: (2) in, For the first The aggregator in the first Electricity price guidance volume during specific time periods; It serves as a benchmark for guiding time-of-use electricity pricing. This is an indicator of load peak-valley regulation demand. This refers to the node voltage deviation index. This is an indicator of the line's heavy load level; For the demand indicators of new energy consumption; For the first Individual aggregator response capability difference correction item; , , , , These are the corresponding weighting coefficients; Will As a differentiated electricity pricing guidance signal corresponding to the first The aggregator in the first The signal values for each time period are aggregated to obtain differentiated electricity price guidance signals for different aggregators.
[0011] In one possible design, based on the differentiated electricity price guidance signal and the aggregator's historical response data, the expected response capacity and response uncertainty boundary of each aggregator are determined, and the actual response capacity is obtained based on the expected response capacity and the response uncertainty boundary, including: Based on the differentiated electricity price guidance signal, the preset electricity price guidance sensitivity coefficient, the preset response willingness coefficient, and the preset responsive resource availability coefficient, calculate the first... The aggregator in the first Expected response capacity for the time period: (3) in, For the first The aggregator in the first Expected response capacity for the time period; The sensitivity coefficient for electricity price guidance; The response willingness coefficient; The responsiveness coefficient; For reference guidance level; Based on the historical response data of the aggregators, the response completion rate, response latency rate, and response deviation range of each aggregator are calculated at different time periods. For aggregators with a response completion rate greater than or equal to a set threshold, a response latency less than or equal to a set value, and a stable response deviation, a first uncertainty boundary is set. For aggregators with a response completion rate less than a set threshold, a response latency greater than a set value, or an unstable response deviation, a second uncertainty boundary is set. Both the first and second uncertainty boundaries include a negative response deviation boundary and a positive response deviation boundary. The second uncertainty boundary is greater than the first uncertainty boundary. The actual response capacity is calculated from the expected response capacity using the following formula: (4) in, This represents the actual response capacity. For the response error term; The response error term satisfies the constraints of the response uncertainty boundary: (5) in, This represents the negative response deviation boundary. This represents the positive response deviation boundary.
[0012] In one possible design, during the day-ahead phase, a source-load-storage collaborative optimization model is established and optimized based on the multi-aggregator distribution network source-load-storage operation data, differentiated electricity price guidance signals, and response uncertainty boundaries to obtain the day-ahead dispatch plan, including: With the goal of minimizing the overall operating cost of the distribution network, the following objective function is constructed: (6) Where min is the minimum value operator; F The overall operating cost of the power distribution network; The cost of purchasing and selling electricity from the upper-level power grid; The cost of punitive measures for curtailing renewable energy; To compensate for the cost of responding to the demand of multiple aggregators; Costs associated with energy storage operation losses; For network loss costs; Penalties for voltage and line over-limit violations; Establish source-load-storage power balance constraints: (7) in, For the first Power exchanged with the upstream power grid during the time period; For the first Actual power consumption of renewable energy during the period; For the first Time-limited energy storage discharge power; For the first Time-of-use energy storage charging power; For the first Network power loss during specific time periods; The number of aggregators; Establish energy storage state of charge constraints: (8) in, For the first State of charge of energy storage during a given time period; To improve energy storage charging efficiency; For energy storage discharge efficiency; To optimize the time interval; This refers to the rated capacity of the energy storage. Establish boundary constraints for energy storage operation: (9) (10) (11) in, This is the limit of the energy storage state of charge; This represents the upper limit of the energy storage state of charge. This represents the maximum charging power for energy storage. This represents the maximum discharge power of the energy storage. Establish aggregator response capacity constraints: (12) in, For the first The aggregator in the first Minimum response capacity for the time period; For the first The aggregator in the first Maximum response capacity for the time period; Establish constraints for the safe operation of the power distribution network: (13) (14) in, For the first Lower limit of node voltage; For the first Upper limit of voltage at each node; For the first Maximum capacity of each line; According to the negative response deviation boundary in the response uncertainty boundary The expected response capacity is then reliably modified. (15) Where max is the maximum value operator; For reliable response capacity; Substituting the reliable response capacity as the upper limit of the aggregator response capacity in the day-ahead optimization into the aggregator response capacity constraint, the objective function is solved to obtain the results for each time period. , and The day-ahead planned values, the actual power absorbed by new energy sources, and the day-ahead planned values of energy storage charging and discharging power are summarized as the day-ahead scheduling plan; when the credible response capacity is lower than the expected response capacity, the energy storage regulation capacity, the alternative response capacity of other aggregators, and the upper-level grid interaction margin are reserved in the day-ahead scheduling plan obtained by solving.
[0013] In one possible design, during the intraday phase, the day-ahead scheduling plan is rolled over based on the latest values of new energy forecasts, the latest values of load forecasts, aggregator response feedback, and the current state of charge of energy storage, resulting in an intraday revised plan, including: At the beginning of each daily rolling cycle, obtain the latest values of the new energy predicted power, the latest values of the base load predicted power, and the current state of charge of energy storage, and update the new energy predicted power, base load predicted power, and energy storage state of charge within the rolling window; Based on the aggregator response completion rate, response latency, and actual response deviation for the executed period, update the response uncertainty boundary and the reliable response capacity for each aggregator in subsequent periods; Based on the updated renewable energy forecast power, base load forecast power, energy storage state of charge, response uncertainty boundary, and reliable response capacity, an intraday rolling optimization objective function is constructed with the goal of minimizing the sum of operating costs within the rolling window and the penalty term for the planned deviation of the day-ahead scheduling plan: (16) in, The objective function is optimized for intraday rolling. The operating cost within the scrolling window; superscript Indicates intraday correction amount; superscript Indicates the planned quantity for the current day; , , This is the penalty coefficient for planned deviations; For the first The day-ahead planned value of the power exchanged with the upstream power grid during the specified time period; For the first The planned day-ahead value of the state of charge of energy storage during the time period; For the first The aggregator in the first The planned daily value of the available responsive capacity for the specified time period; For the first Intraday correction of power exchanged with the upstream power grid during the time period; For the first Intraday correction of the state of charge of energy storage during a given period; For the first The aggregator in the first Intraday adjustment of available capacity for a given period; Solve the intraday rolling optimization objective function, and incorporate the daily scheduling plan into the daily schedule. , and The planned values for the day were revised to intraday revised values. , and Only the optimization results of the most recent control cycle are executed, and then the next rolling optimization is performed; the results of each time period are corrected. , and The summaries will form the intraday revision plan.
[0014] In one possible design, during the real-time phase, the real-time net load deviation between the actual net load and the planned net load is calculated based on the real-time measurement data, and node voltage and line load rate are acquired simultaneously. When the real-time net load deviation exceeds a power deviation threshold, any node voltage exceeds the allowable range, or any line load rate exceeds a set threshold, real-time deviation fast compensation control is initiated. This is achieved through hierarchical invocation based on resource availability adjustment capacity, response speed, aggregator response reliability, and resource access location, resulting in real-time compensation control instructions, including: The actual net load is obtained based on the real-time measurement data, and the real-time net load deviation is calculated using the following formula: (17) in, For the first Real-time net load deviation for the time period; This represents the actual net load. For planned net load; Determine the real-time net load deviation Whether the power deviation threshold is exceeded, whether the voltage of any node is outside the allowable range, or whether the load rate of any line exceeds the set threshold; if none of the above conditions are met, the intraday correction plan will continue to be executed. If any of the above conditions are met, resources will be allocated for compensation in the following hierarchical order: When When the time comes, priority is given to activating energy storage for discharge, followed by activating loads with a response speed greater than the set value, a reliable response capacity higher than the set value, and the ability to alleviate constraints on relevant nodes or lines that can be reduced or interrupted; when When energy storage charging and transferable loads are in short supply, priority is given to increasing electricity consumption and absorbing surplus new energy sources; when energy storage and aggregator resources are insufficient, compensation is made through power exchange with the upper-level power grid or adjustable distributed power sources. When compensation is triggered by node voltage over-limit or line overload, priority is given to aggregator resources that are connected to the relevant node or located downstream of the relevant line and can alleviate local network constraints. Based on the above-mentioned hierarchical invocation results, real-time compensation control instructions are generated on the basis of the intraday correction plan. These real-time compensation control instructions include energy storage charging and discharging power adjustment instructions, aggregator response capacity adjustment instructions, and upper-level grid interaction power adjustment instructions. The energy storage charging and discharging power adjustment instructions are used to correct the issues in the intraday correction plan. The aggregator's response capacity adjustment command value is used to correct the intraday correction plan. The power adjustment command value from the upper-level power grid is used to correct the intraday correction plan. .
[0015] In one possible design, the method further includes: Based on the typical operating data in the multi-aggregator distribution network source-load-storage operation data, the simulation parameters are determined, and the price guidance amount, aggregator expected response capacity, aggregator reliable response capacity, actual response capacity, energy storage charging and discharging power, upper-level grid interaction power, node voltage and line power flow are calculated for each time period. The multi-aggregator distribution network source-load-storage multi-timescale collaborative optimization results considering load characteristics are obtained. The evaluation results of the multi-aggregator distribution network source-load-storage multi-timescale collaborative optimization considering load characteristics are evaluated using evaluation indicators, including new energy absorption rate, response completion rate, cost reduction rate, and node voltage deviation index.
[0016] Secondly, this application provides a multi-aggregator distribution network source-load-storage multi-timescale collaborative optimization device that considers load characteristics, the device comprising: The data segmentation module is configured to acquire basic data of the distribution network, relevant data of multiple aggregators, and real-time measurement data; divide the operating resources of the distribution network into four categories: source-side resources, load-side resources, energy storage resources, and network constraints; and perform layered processing on the acquired data according to three time scales: day-ahead, intraday, and real-time to obtain the source-load-storage operation data of the distribution network of multiple aggregators. The guidance signal generation module is configured to determine the operating status of the distribution network based on the multi-aggregator distribution network source-load-storage operation data, and generate differentiated electricity price guidance signals for different aggregators based on the operating status of the distribution network. The uncertainty characterization module is configured to determine the expected response capacity and response uncertainty boundary of each aggregator based on the differentiated electricity price guidance signal and the historical response data of the aggregators, and to obtain the actual response capacity based on the expected response capacity and the response uncertainty boundary; the response uncertainty boundary serves as a response reliability parameter connecting the three time scales of day-ahead, intraday, and real-time. The day-ahead optimization module is configured to establish a source-load-storage collaborative optimization model and perform optimization solution based on the multi-aggregator distribution network source-load-storage operation data, differentiated electricity price guidance signals, and response uncertainty boundaries during the day-ahead phase, thereby obtaining the day-ahead scheduling plan. In the optimization solution, the expected response capacity of the aggregator is reliably corrected according to the response uncertainty boundaries to obtain the reliable response capacity, and the multi-aggregator response plan and reserve capacity configuration are arranged according to the reliable response capacity. The intraday correction module is configured to perform rolling corrections on the day-ahead scheduling plan during the intraday phase based on the latest values of new energy forecasts, the latest values of load forecasts, aggregator response feedback, and the current state of charge of energy storage, to obtain an intraday correction plan; in the rolling correction, the response uncertainty boundary and reliable response capacity of each aggregator in subsequent periods are updated based on the actual response results of aggregators in the executed periods. The real-time deviation compensation module is configured to calculate the real-time net load deviation between the actual net load and the planned net load based on the real-time measurement data during the real-time phase, and simultaneously acquire node voltage and line load rate; when the real-time net load deviation exceeds the power deviation threshold, any node voltage exceeds the allowable range, or any line load rate exceeds the set threshold, the real-time deviation fast compensation control is activated, and the real-time compensation control command is obtained by hierarchical invocation based on resource availability adjustment capacity, response speed, aggregator response reliability, and resource access location.
[0017] Thirdly, embodiments of this application provide a computer-readable storage medium storing computer-executable instructions. When a processor executes the computer-executable instructions, it implements the multi-aggregator distribution network source-load-storage multi-timescale collaborative optimization method considering load characteristics as described in the first aspect and various possible designs of the first aspect.
[0018] The method, apparatus, and medium for multi-aggregator commercial distribution network source-load-storage multi-timescale collaborative optimization considering load characteristics provided in this application have at least the following beneficial effects: This application not only considers the coordination relationship between power generation, load, and storage resources in the distribution network, but also takes into account the differences among multiple aggregators in terms of response speed, response completion rate, response delay, and response deviation. It generates differentiated electricity price guidance signals based on the distribution network's operating status, determines the response uncertainty boundary based on historical performance results, and corrects the reliable response capacity and reserved reserve capacity in the day-ahead phase. In the intraday phase, it dynamically updates the response reliability based on actual response feedback. In the real-time phase, it performs hierarchical rapid compensation based on net load deviation, node voltage, and line load status. This improves the economic operation capability, renewable energy absorption capacity, and safety constraint compliance capability of the distribution network. This application can reduce the overall operating cost of the distribution network, improve renewable energy absorption capacity, reduce the impact of power generation and load prediction deviations and load response deviations on distribution network operation, and improve node voltage levels and line operating status, demonstrating strong applicability and practicality. Attached Figure Description
[0019] The accompanying drawings, which are incorporated in and form part of this specification, illustrate embodiments consistent with this application and, together with the description, serve to explain the principles of this application.
[0020] Figure 1A schematic diagram of a multi-aggregator distribution network source-load-storage collaborative optimization scenario provided in this application embodiment; Figure 2 A flowchart of a multi-timescale collaborative optimization method for power distribution networks with multiple aggregaters considering load characteristics, provided in this application embodiment; Figure 3 A comparison chart of the load response of multiple aggregators before and after electricity price guidance is provided for embodiments of this application; Figure 4 A comparison chart of planned response capacity and actual response capacity provided for embodiments of this application; Figure 5 A comparison chart of source-load-storage power balance optimization results provided in the embodiments of this application; wherein, (a) single day-ahead optimization; (b) day-ahead-intraday rolling optimization; (c) day-ahead-real-time correction optimization; (d) the method described in this paper; Figure 6 A comparison diagram of energy storage charge and discharge power and state of charge provided for embodiments of this application; Figure 7 A comparison chart of distribution network node voltage optimization results provided in the embodiments of this application; Figure 8 A comparative chart of the overall operating results of different optimization methods provided in the embodiments of this application; wherein, (a) overall operating cost; (b) renewable energy absorption rate; (c) load peak-valley difference; (d) response completion rate and voltage limit exceedance; Figure 9 is a structural diagram of a multi-aggregator distribution network source-load-storage multi-timescale collaborative optimization device that considers load characteristics, provided in an embodiment of this application.
[0021] The accompanying drawings illustrate specific embodiments of this application, which will be described in more detail below. These drawings and descriptions are not intended to limit the scope of the concept in any way, but rather to illustrate the concepts of this application to those skilled in the art through reference to specific embodiments. Detailed Implementation
[0022] Exemplary embodiments will now be described in detail, examples of which are illustrated in the accompanying drawings. When the following description relates to the drawings, unless otherwise indicated, the same numbers in different drawings denote the same or similar elements. The embodiments described in the following exemplary embodiments do not represent all embodiments consistent with this application. Rather, they are merely examples of apparatuses and methods consistent with some aspects of this application as detailed in the appended claims.
[0023] The collection, storage, use, processing, transmission, provision, and disclosure of relevant data and information in the technical solution of this application all comply with the provisions of relevant laws and regulations and do not violate public order and good morals.
[0024] It should be noted that in the embodiments of this application, certain software, components, models and other existing solutions in the industry may be mentioned. These should be regarded as exemplary and are only intended to illustrate the feasibility of implementing the technical solution of this application. However, it does not mean that the applicant has used or necessarily used the solution.
[0025] The technical solution of this application and how it solves the above-mentioned technical problems will be described in detail below with specific embodiments. These specific embodiments can be combined with each other, and the same or similar concepts or processes may not be described again in some embodiments. The embodiments of this application will be described below with reference to the accompanying drawings.
[0026] Example 1: This application provides a multi-aggregator distribution network source-load-storage multi-timescale collaborative optimization method that considers load characteristics, such as... Figure 1 The diagram shown illustrates a scenario where this method can be applied to the coordinated optimization of power generation, load, and storage in a multi-aggregator distribution network. Figure 1In the scenario shown, the method proceeds sequentially through four steps: source-load-storage and multi-aggregator data input, electricity price guidance and response uncertainty modeling, day-ahead-intraday-real-time multi-timescale collaborative optimization, and optimization result output and evaluation. The first step is source-load-storage and multi-aggregator data input. Input parameters include new energy predicted output, base load prediction, energy storage operating status, aggregator response resources, historical response deviation, and distribution network operating constraints. New energy predicted output and base load prediction are both represented by power change curves over time. Energy storage operating status includes state of charge, charging power, discharging power, and overall operating status. Aggregator response resources include adjustable load resources corresponding to multiple aggregators. Historical response deviation is presented as the distribution of deviation over time. Distribution network operating constraints include the upper and lower limits of node voltage and the maximum current carrying capacity limit of lines. The second step is modeling uncertainty in electricity price guidance and response, which includes two branches: electricity price guidance modeling and response uncertainty modeling. Electricity price guidance modeling is based on the basic time-of-use electricity price benchmark and combines peak-valley regulation demand, renewable energy consumption, voltage deviation, and line load level to carry out dynamic guidance corrections and generate differentiated guidance signals for different targets. Response uncertainty modeling is based on three elements: response intention, planned response capacity, and response deviation range, and outputs uncertainty characterization results including planned response curves, actual response curves, and positive and negative deviation boundaries. The third step is multi-timescale collaborative optimization of day-ahead, intraday, and real-time, which adopts a progressive architecture of multi-timescale collaborative optimization. Day-ahead optimization, intraday rolling correction, and real-time deviation compensation are executed sequentially from top to bottom. All three stages output scheduling curves of power changing over time. The real-time deviation compensation stage simultaneously displays the correspondence between the planned curve, the actual curve, and the compensation amount, refining the time resolution and correcting operational deviations step by step. The fourth step is to optimize the output and evaluation of the results. The output content and evaluation indicators include response results, energy storage plan, renewable energy consumption results, grid interaction power, comprehensive operating cost, response completion rate, and voltage compliance. Among them, the response results, energy storage plan, and grid interaction power are all displayed as power curves over time. Renewable energy consumption results are divided into three categories of statistical values: consumed electricity, abandoned electricity, and available electricity. The comprehensive operating cost is compared and statistically analyzed according to different categories. The response completion rate is represented by a range of 0 to 100% to characterize the overall performance level. Voltage compliance is reflected by the distribution of voltage relative values at each node and time period to show operational safety. A complete optimized operation result is formed and the corresponding result analysis is completed.
[0027] like Figure 2 As shown, the multi-aggregator distribution network source-load-storage multi-timescale collaborative optimization method considering load characteristics is executed according to the following steps S10-S60.
[0028] S10: Acquire basic data of the distribution network, relevant data of multiple aggregators, and real-time measurement data; divide the operating resources of the distribution network into four categories: source-side resources, load-side resources, energy storage resources, and network constraints; and perform layered processing on the acquired data according to three time scales: day-ahead, intraday, and real-time to obtain the source-load-storage operation data of the distribution network of multiple aggregators.
[0029] This embodiment uses step S10 to divide the power generation, load, and storage operation data of the multi-aggregator distribution network. In some embodiments, the following data are obtained: distribution network topology, line impedance, line capacity limits, node voltage upper and lower limits, basic load forecast data, distributed renewable energy forecast output, energy storage rated capacity, energy storage maximum charge and discharge power, energy storage initial state of charge, multi-aggregator responsive load capacity, aggregator historical response data, basic time-of-use pricing benchmark, and real-time measurement data.
[0030] Distribution network operating resources are classified into four categories: source-side resources, load-side resources, energy storage resources, and network constraints. Source-side resources include distributed photovoltaic, wind power, and adjustable distributed power sources; load-side resources include rigid loads, loads that can be reduced, loads that can be transferred, and interruptible loads; energy storage resources include centralized energy storage and user-side energy storage; and network constraints include node voltage constraints, line power flow constraints, and power interaction constraints with the upstream grid.
[0031] The data is processed in layers according to three time scales: day-ahead, intraday, and real-time. The day-ahead optimization interval is 1 hour, used to form the next day's operation plan using day-ahead load forecast and new energy forecast data; the intraday rolling optimization interval is 15 minutes, used to revise the subsequent plan based on the latest forecast values, energy storage status, and aggregator response feedback; and the real-time control interval is 5 minutes, used to correct net load deviation, node voltage deviation, and line load status based on real-time measurement data.
[0032] Let the first The operating status of the power distribution network's source, load, and storage during the specified time period is as follows: (1) in, For the first Base load power for the time period; For the first Available power output from renewable energy sources during certain periods; For the first Time-limited energy storage capacity; For the first State of charge of energy storage during a given time period; For the first The aggregator in the first The available responsive capacity for a given time period; For the first The node at the th Voltage amplitude over a given period; For the first The line is in the Trends of different time periods.
[0033] S20: Determine the operating status of the distribution network based on the multi-aggregator distribution network source-load-storage operation data, and generate differentiated electricity price guidance signals for different aggregators based on the distribution network operating status.
[0034] This embodiment achieves the generation of electricity price guidance signals based on the operating status of the distribution network through step S20.
[0035] In some embodiments, a multi-aggregator electricity price guidance signal is generated based on the distribution network operating status. This price guidance signal is not directly equivalent to a mandatory dispatch command, but rather serves as an economic incentive signal for the distribution network operator to guide aggregators in adjusting their load response behavior. The price guidance signal consists of a basic time-of-use electricity price guidance benchmark, a load peak-valley adjustment correction item, a renewable energy consumption correction item, a node voltage correction item, a line load rate correction item, and an aggregator difference correction item.
[0036] During peak load periods, if the net load of the distribution network is high or the line load rate is close to the upper limit, the economic incentive for load reduction or transfer will be increased to guide aggregators to reduce peak power consumption. During periods of high renewable energy output, if there is a risk of renewable energy curtailment, the incentive for transferable loads will be adjusted or the incentive for renewable energy consumption will be increased to guide aggregators to increase electricity demand during off-peak periods and periods of high renewable energy output. In areas with large voltage deviations at local nodes, the electricity price guidance signal will be differentiated based on the node location and the node accessed by the aggregator.
[0037] No. The aggregator in the first The electricity price guidance amount for a given period is expressed as follows: (1) in, For the first The aggregator in the first Electricity price guidance volume during specific time periods; It serves as a benchmark for guiding time-of-use electricity pricing. This is an indicator of load peak-valley regulation demand. This refers to the node voltage deviation index. This is an indicator of the line's heavy load level; For the demand indicators of new energy consumption; For the first Individual aggregator response capability difference correction item; , , , , These are the corresponding weighting coefficients.
[0038] Among them, the load peak-valley regulation demand index is determined based on the deviation between the current net load and the daily average net load; the node voltage deviation index is determined based on the deviation between the node voltage and the rated voltage; the line overload index is determined based on the ratio of line power flow to the upper limit of line capacity; and the renewable energy consumption demand index is determined based on the difference between the available renewable energy output and the actual consumed output. The aggregator response capability difference correction item is used to reflect the differences in response speed, response reliability, and response cost among different aggregators.
[0039] S30: Based on the differentiated electricity price guidance signal and the historical response data of aggregators, determine the expected response capacity and response uncertainty boundary of each aggregator, and obtain the actual response capacity based on the expected response capacity and response uncertainty boundary; the response uncertainty boundary serves as a response reliability parameter connecting the three time scales of day-ahead, intraday, and real-time.
[0040] In this embodiment, the purpose of step S30 is to characterize the load response uncertainty considering response intention and response deviation.
[0041] In some embodiments, under the guidance of electricity prices, aggregators determine their expected response capacity based on the status of their aggregated resources, user willingness to respond, response costs, and sensitivity to guidance. Since end users are not entirely controllable, their actual response capacity is affected by the randomness of user behavior, comfort constraints, changes in production plans, and execution delays. Therefore, the actual response capacity usually deviates from the expected response capacity.
[0042] No. The aggregator in the first The expected response capacity for a given time period is expressed as: (2) in, For the first The aggregator in the first Expected response capacity for the time period; The sensitivity coefficient for electricity price guidance; The response willingness coefficient; The responsiveness coefficient; For reference and guidance level.
[0043] The actual response capacity is expressed as: (4) in, This represents the actual response capacity. This is the response error term.
[0044] The response error term satisfies: (5) in, This represents the negative response deviation boundary, indicating the maximum deviation between the actual response capacity and the expected response capacity. This represents the positive response deviation boundary, indicating the maximum deviation between the actual response capacity and the expected response capacity.
[0045] Based on historical response data, the response completion rate, response latency rate, and response deviation range of different aggregators at different time periods are calculated. For aggregators with high response completion rates, low response latency, and stable response deviations, a smaller uncertainty boundary is set; for aggregators with complex user compositions, unstable response intentions, significant execution delays, or large response deviations, a larger uncertainty boundary is set.
[0046] The response uncertainty boundary serves as a response reliability parameter connecting the three time scales: day-ahead, intraday, and real-time. During the day-ahead phase, the response uncertainty boundary is used to adjust the aggregator's reliable response capacity and determine backup capacity requirements. During the intraday phase, the response uncertainty boundary is updated based on the response completion rate, response latency, and actual response deviation of the executed period. During the real-time phase, the aggregator's callable capacity and call priority are determined based on the updated response uncertainty boundary.
[0047] S40: In the day-ahead phase, a collaborative optimization model of source, load and storage is established and optimized based on the multi-aggregator distribution network source-load-storage operation data, differentiated electricity price guidance signals and response uncertainty boundaries to obtain the day-ahead dispatch plan; in the optimization solution, the expected response capacity of the aggregator is reliably corrected according to the response uncertainty boundary to obtain the reliable response capacity, and the multi-aggregator response plan and reserve capacity configuration are arranged according to the reliable response capacity.
[0048] Step S40 is the day-ahead source-load-storage collaborative optimization step. In some embodiments, the day-ahead stage establishes a source-load-storage collaborative optimization model based on the next day's base load forecast, the new energy forecast output, the initial state of charge of energy storage, the responsive capacity of multiple aggregators, and the electricity price guidance signal.
[0049] The following day, the power interaction plan with the upper-level power grid, the new energy consumption plan, the energy storage charging and discharging plan, and the multi-aggregator response plan for each time period were optimized and formed.
[0050] The recent optimization aims to minimize the overall operating cost of the distribution network, taking into account the electricity purchase and sale costs of the upper-level power grid, the cost of renewable energy curtailment penalties, the demand response compensation costs of multiple aggregators, the operating loss costs of energy storage, the network loss costs, and the cost of safety constraint penalties.
[0051] The objective function is: (6) Where min is the minimum value operator; FThe overall operating cost of the power distribution network; The cost of purchasing and selling electricity from the upper-level power grid; The cost of punitive measures for curtailing renewable energy; To compensate for the cost of responding to the demand of multiple aggregators; Costs associated with energy storage operation losses; For network loss costs; Penalty costs for voltage and line over-limit violations.
[0052] The source-load-storage power balance constraint is: (7) in, For the first Power exchanged with the upstream power grid during the time period; For the first Actual power consumption of renewable energy during the period; For the first Time-limited energy storage discharge power; For the first Time-of-use energy storage charging power; For the first Network power loss during specific time periods; This represents the number of aggregators.
[0053] The energy storage state of charge constraints are: (8) in, For the first State of charge of energy storage during a given time period; To improve energy storage charging efficiency; For energy storage discharge efficiency; To optimize the time interval; This refers to the rated capacity of the energy storage.
[0054] The energy storage operating boundary is: (9) (10) (11) in, This is the limit of the energy storage state of charge; This represents the upper limit of the energy storage state of charge. This represents the maximum charging power for energy storage. This represents the maximum discharge power of the energy storage.
[0055] The aggregator's response capacity constraint is: (12) The constraints for safe operation of the power distribution network are: (13) (14) in, and The first The aggregator in the first Minimum and maximum response capacity for the time period; and The first Lower and upper limits of node voltage; For the first Maximum capacity of each line.
[0056] In the recent optimization, the expected response capacity of aggregators is not directly used as the determined available capacity. Instead, it is reliably corrected based on the negative response deviation boundary, and the multi-aggregator response plan is arranged according to the corrected reliable response capacity.
[0057] (15) Where max is the maximum value operator; For reliable response capacity.
[0058] When the credible response capacity is lower than the expected response capacity, the day-ahead phase reserves energy storage regulation capacity, alternative response capacity of other aggregators, and interaction margin of the upper-level grid for the corresponding period, so that the load response uncertainty is transformed into executable reserve demand in the day-ahead plan, and regulation space is reserved for intraday rolling correction and real-time deviation compensation.
[0059] Specifically, the reliable response capacity is substituted into the aggregator response capacity constraint as the upper limit of the aggregator response capacity in the day-ahead optimization, and the objective function is solved to obtain the results for each time period. , and The day-ahead planned values, as well as the day-ahead planned values of the actual power consumption of new energy sources and the charging and discharging power of energy storage, are summarized as the day-ahead dispatch plan. When the credible response capacity is lower than the expected response capacity, the energy storage regulation capacity, the alternative response capacity of other aggregators, and the interaction margin of the upper-level power grid are reserved in the day-ahead dispatch plan obtained by solving.
[0060] S50: During the intraday phase, the day-ahead dispatch plan is rolled over based on the latest values of new energy forecasts, the latest values of load forecasts, aggregator response feedback, and the current state of charge of energy storage, resulting in an intraday revised plan; during the rolling revision, the response uncertainty boundary and reliable response capacity of each aggregator in subsequent periods are updated based on the actual response results of aggregators in the executed periods.
[0061] Step S50 is the intraday rolling correction step. During the intraday phase, the day-ahead plan is rolled over based on the latest new energy forecast, the latest load forecast, aggregator response feedback, and the current state of charge of energy storage. The intraday rolling correction does not completely replace the day-ahead plan, but rather corrects for source-load forecast errors and aggregator response deviations based on the day-ahead plan, so that subsequent plans are consistent with the actual adjustable capacity.
[0062] In some embodiments, within each intraday rolling cycle, the predicted power of new energy sources, the predicted power of base load, and the state of charge of energy storage within the rolling window are first updated; then, based on the response completion rate, response delay, and actual response deviation of the executed period, the response uncertainty boundary and reliable response capacity of each aggregator for subsequent periods are updated; then, the differentiated electricity price guidance amount is recalculated based on the latest distribution network operating status, and the source-load-storage scheduling plan and reserve capacity configuration are corrected; finally, only the optimization results of the most recent control cycle are executed, and the next rolling optimization is initiated.
[0063] The intraday rolling optimization goal is: (16) in, The objective function is optimized for intraday rolling. The operating cost within the scrolling window; superscript Indicates intraday correction amount; superscript Indicates the planned quantity for the current day; , , This is the penalty coefficient for planned deviations; For the first The day-ahead planned value of the power exchanged with the upstream power grid during the specified time period; For the first The planned day-ahead value of the state of charge of energy storage during the time period; For the first The aggregator in the first The planned daily value of the available responsive capacity for the specified time period; For the first Intraday correction of power exchanged with the upstream power grid during the time period; For the first Intraday correction of the state of charge of energy storage during a given period; For the first The aggregator in the first Intraday adjustment of the available capacity for a given period.
[0064] When the latest new energy forecast is lower than the day-ahead forecast, intraday optimization increases the intensity of energy storage discharge reserves and load shedding guidance. When the latest new energy forecast is higher than the day-ahead forecast, intraday optimization increases energy storage charging plans and transferable load absorption plans. When a certain aggregator's response completion rate is lower than a set threshold, response delay increases, or actual response deviation exceeds the original uncertainty boundary, the uncertainty boundary of that aggregator in subsequent periods is expanded, its reliable response capacity is reduced, and the reserve weight of other high-reliability aggregators, energy storage, or upstream grid interaction power is increased. When the aggregator's subsequent response completion rate improves, response delay decreases, and response deviation recovers to within the allowable range, its response uncertainty boundary is narrowed, and its callable capacity in subsequent periods is restored accordingly. Through the above methods, the intraday rolling phase not only updates source and load forecast data but also continuously adjusts subsequent adjustable capacity based on the actual performance of aggregators.
[0065] S60: In the real-time phase, the real-time net load deviation between the actual net load and the planned net load is calculated based on the real-time measurement data, and the node voltage and line load rate are acquired simultaneously. When the real-time net load deviation exceeds the power deviation threshold, the voltage of any node exceeds the allowable range, or the load rate of any line exceeds the set threshold, the real-time deviation fast compensation control is initiated. The real-time compensation control command is obtained by hierarchical invocation based on the resource availability adjustment capacity, response speed, aggregator response reliability, and resource access location.
[0066] Step S60 is the real-time deviation rapid compensation step. In the real-time stage, the deviation between the planned net load and the actual net load is calculated based on the real-time measurement data of the distribution network, and node voltage and line load rate are acquired simultaneously. When the net load deviation does not exceed the set threshold, the node voltage is within the allowable range, and the line load rate does not exceed the set threshold, the intraday rolling plan continues to be executed. When the net load deviation exceeds the power deviation threshold, any node voltage exceeds the allowable range, or any line load rate exceeds the set threshold, real-time deviation rapid compensation control is initiated.
[0067] In some embodiments, the real-time net load deviation is expressed as: (17) in, For the first Real-time net load deviation for the time period; This represents the actual net load. This is the planned net load.
[0068] Real-time deviation compensation does not resolve the complete day-ahead or intraday optimization model, but instead performs layered calls based on resource availability adjustment capacity, response speed, aggregator response reliability, and resource access location.
[0069] like This indicates that the actual net load is higher than the planned value. Priority should be given to activating energy storage for discharge, followed by loads with faster response times, higher reliable response capacity, and the ability to alleviate constraints on relevant nodes or lines that can be reduced or interrupted. This indicates that the actual net load is lower than the planned value. Priority will be given to using energy storage charging and transferable loads to increase electricity consumption in order to absorb surplus new energy.
[0070] If energy storage and aggregator resources are insufficient, compensation can be made through power exchange with the upper-level grid or adjustable distributed power sources.
[0071] When real-time compensation is triggered by node voltage exceeding limits or line overload, priority is given to aggregator resources that are connected to the relevant nodes or located downstream of the relevant lines and can effectively alleviate local network constraints, rather than uniformly calling resources based solely on the aggregator's response capacity.
[0072] Based on the above-mentioned tiered call results, real-time compensation control instructions are generated on the basis of the intraday correction plan. These instructions include energy storage charging and discharging power adjustment instructions, aggregator response capacity adjustment instructions, and upper-level grid interaction power adjustment instructions. The energy storage charging and discharging power adjustment instructions are used to correct the issues in the intraday correction plan. The aggregator's response capacity adjustment command value is used to correct the intraday correction plan. The power adjustment command value from the upper-level power grid is used to correct the intraday correction plan. .
[0073] The specific implementation methods of the above instruction values are as follows: When real-time net load deviation When the energy storage charging / discharging power adjustment command value is positive, it indicates an increase in energy storage discharge power or a decrease in energy storage charging power. After this energy storage charging / discharging power adjustment command value is sent to the energy storage converter controller, the energy storage converter adjusts its power output to adjust the energy storage discharge power. Increase or reduce energy storage charging power Decrease. According to the recursive formula for the state of charge of energy storage (8), the adjustment of the energy storage charging and discharging power will directly change the change in the state of charge of energy storage during that period, thereby realizing the adjustment of the state of charge of energy storage in the intraday correction plan. Corrections.
[0074] when When the energy storage charging and discharging power adjustment command value is negative, it indicates an increase in energy storage charging power or a decrease in energy storage discharging power. The energy storage system absorbs excess power, and the adjustment is achieved through the recursive relationship of formula (8). Corrections.
[0075] It should be noted that although the physical quantity directly controlled by the energy storage charging and discharging power adjustment command value is and However, the direct decision variable for energy storage state in intraday rolling optimization is ,and and and There exists a unidirectional causal relationship determined by formula (8). Given this time period and the previous period The charging and discharging power is determined by a recursive formula. Therefore, with As the object of correction for the energy storage charging and discharging power adjustment command value.
[0076] The aggregator response capacity adjustment instruction value corresponds to the multi-aggregator response capacity in the intraday correction plan. After the aggregator's response capacity adjustment instruction value is issued to each aggregator's management system, the aggregator adjusts the capacity of its aggregated loads that can be reduced, transferred, or interrupted according to the instruction value. A positive value indicates that the aggregator is required to increase its response capacity based on the current response plan; a negative value indicates that the aggregator is allowed to reduce its response capacity. Each aggregator's management system decomposes the adjusted response target to its aggregated end users, executing specific load adjustment actions through user-side smart terminals. The adjustment of the aggregator's response capacity does not involve changes in the energy storage state of charge; therefore, it directly corrects the intraday correction plan. That's it; no additional recursive transformation is needed.
[0077] The upper-level power grid interaction power adjustment command value directly corresponds to the upper-level power grid interaction power in the intraday correction plan. The power adjustment command value from the upper-level power grid is sent to the power control system of the tie line between the distribution network and the upper-level power grid. This system adjusts the tap position of the tie line transformer or the power setting value of the tie line circuit breaker to increase or decrease the power received from the upper-level power grid. If... Furthermore, when energy storage and aggregator resources are insufficient, the upper-level grid interaction power adjustment command value is positive, indicating an increase in power purchased from the upper-level grid; if When the energy storage can no longer be charged, the power adjustment command value of the upstream grid is negative, indicating a reduction in purchased power or a reverse power supply to the upstream grid. This adjustment directly affects the power balance constraint formula (7). This indirectly maintains the system's power balance.
[0078] Furthermore, it should be noted that during real-time compensation control, the priority of the three correction targets—energy storage, aggregators, and upstream grid interaction power—is not fixed but dynamically coordinated based on real-time conditions. Specifically, energy storage has the highest priority, followed by aggregators, and upstream grid interaction power has the lowest priority. When the correction capacity of a single resource is insufficient, the next level of resources is sequentially activated to participate in the correction. This hierarchical coordination mechanism can confirm the matching between the response speed differences of various resources and the real-time compensation requirements, effectively reducing the frequency of high-cost resource calls, while also ensuring the safety of the distribution network's real-time operation.
[0079] In real-time control, energy storage plays a role in rapid power compensation, high-reliability aggregators play a role in short-term load correction, and power exchange with the upper-level grid plays a role in bottom-line balancing. This hierarchical compensation sequence reduces the frequency of large-scale adjustment signals to aggregators, lowers user-side response disturbances, and improves the real-time operational security of the distribution network.
[0080] In some embodiments, after step S60, the multi-aggregator distribution network source-load-storage multi-timescale collaborative optimization method considering load characteristics further includes step S70, which involves determining simulation parameters based on typical operating data in the multi-aggregator distribution network source-load-storage operation data, calculating the price guidance amount, aggregator expected response capacity, aggregator reliable response capacity, actual response capacity, energy storage charging and discharging power, upstream grid interaction power, node voltage, and line power flow for each time period, and obtaining the multi-aggregator distribution network source-load-storage multi-timescale collaborative optimization results considering load characteristics; and using evaluation indicators to evaluate the multi-aggregator distribution network source-load-storage multi-timescale collaborative optimization results considering load characteristics, including new energy absorption rate, response completion rate, cost reduction rate, and node voltage deviation index.
[0081] Specifically, this embodiment determines the number of distribution network nodes, line parameters, distributed new energy installed capacity, rated energy storage capacity, energy storage charging and discharging efficiency, multi-aggregator responsive load capacity, basic load curve, basic time-of-use pricing benchmark, dynamic pricing correction coefficient, and load response uncertainty boundary based on typical operating data of multi-aggregator distribution networks.
[0082] Data sampling intervals include 1 hour before the day, 15 minutes within the day, and 5 minutes in real time.
[0083] Based on steps S10 to S60, the electricity price guidance amount, aggregator expected response capacity, aggregator reliable response capacity, actual response capacity, energy storage charging and discharging power, upstream grid interaction power, node voltage and line power flow are calculated for each time period, and the multi-aggregator distribution network source-load-storage multi-timescale collaborative optimization results considering load characteristics are obtained.
[0084] To verify the effectiveness of each technical step in the method of this application, the following comparison method is set up: Method 1 is a traditional source-load-storage optimization method that does not consider electricity price guidance and load response uncertainty; Method 2 is an optimization method that considers uniform electricity pricing guidance but does not differentiate between aggregator response differences; Method 3 is an optimization method that considers differentiated electricity pricing guidance but treats the aggregator's response capacity as a fixed value; Method four is a method that considers load response uncertainty but only performs day-ahead-to-day optimization; Method 5 is the differentiated electricity pricing guidance, dynamic update in response to uncertainty, and multi-timescale collaborative optimization method proposed in this application, which includes day-ahead, intraday, and real-time approaches.
[0085] It should be noted that the comparison results between the above comparison method and the method of this application will be explained in detail in the subsequent Embodiment 2 with specific experimental data. This embodiment only describes the working principle and theoretical effect of the method of this application. The subsequent Embodiment 2 will verify the relevant theoretical effect and the feasibility of the method of this application with specific experimental data.
[0086] In this embodiment, let For the actual electricity consumed by new energy sources, If the available electricity from renewable energy sources is used, then the renewable energy absorption rate is defined as: (18) set up For the first The aggregator in the first Planned response capacity for the time period For the first The aggregator in the first The actual response capacity for a given time period is used to define the response completion rate as follows: (19) set up To compare the overall operating costs of different methods, Given the overall operating cost of the method presented in this paper, the cost reduction rate is defined as: (20) set up For the first The node at the th Voltage amplitude during the period For reference voltage, For the number of nodes, Given the number of time periods, the node voltage deviation index is defined as follows: (twenty one) The operating results obtained by different optimization methods are calculated according to the above evaluation indicators to obtain the new energy consumption rate, response completion rate, comprehensive operating cost reduction rate and node voltage deviation index.
[0087] Example 2: This application provides a multi-aggregator distribution network source-load-storage multi-timescale collaborative optimization method considering load characteristics, including the following steps: 1) Constructing a multi-aggregator distribution network source-load-storage collaborative optimization scenario, obtaining distribution network topology, line capacity, node voltage constraints, basic load forecast, new energy predicted output, energy storage operation status, multi-aggregator responsive capacity, and historical response data; 2) Generating differentiated electricity price guidance signals based on distribution network load peak-valley regulation demand, new energy consumption demand, node voltage deviation, line load rate, and aggregator historical response characteristics; 3) Based on the multi-aggregator historical response completion rate, response... 4) Establish a load response uncertainty model based on the delay rate and response deviation range; 5) Establish a day-ahead source-load-storage collaborative optimization model considering reliable response capacity and reserve reserves to form a day-ahead operation plan; 6) Roll out the response uncertainty boundary and source-load-storage operation plan based on the intraday new energy forecast deviation, load forecast deviation, and actual response feedback from aggregators; 7) Perform rapid deviation compensation based on real-time net load deviation, node voltage, and line load status; 8) Compare and analyze the source-load-storage power balance, new energy absorption rate, response completion rate, node voltage deviation, and comprehensive operating cost under different optimization methods.
[0088] To verify the effectiveness of the proposed method, an experimental analysis was conducted using a 10kV multi-aggregator distribution network. This network includes distributed photovoltaic (PV), distributed wind power, centralized energy storage, and five load aggregators. The five aggregators aggregate residential flexible loads, commercial air conditioning loads, industrial interruptible loads, electric vehicle charging loads, and user-side energy storage resources, respectively. The day-ahead optimization time resolution is 1 hour, the intraday rolling optimization time resolution is 15 minutes, and the real-time control time resolution is 5 minutes.
[0089] The method is implemented in the following steps 1-7, each of which corresponds to steps S10-S70 in Embodiment 1. The specific principles are not elaborated here. This embodiment aims to verify the effectiveness and progress of the method by combining experimental data.
[0090] Step 1: Constructing a scenario for collaborative optimization of power generation, load and storage in a multi-aggregator distribution network.
[0091] like Figure 1As shown, the distribution network operator resides at the coordination layer, while distributed renewable energy, energy storage systems, and multiple aggregators reside at the resource layer. The distribution network operator collects information on net load, renewable energy output, energy storage status, node voltage, line power flow, and historical aggregator responses. Based on the distribution network's operating status, it issues differentiated electricity price guidance signals and coordinates the load response resources of energy storage systems and multiple aggregators to participate in the optimized operation of the distribution network. Source-side resources include distributed photovoltaic, distributed wind power, and adjustable distributed power sources; load-side resources include rigid loads, loads that can be reduced, loads that can be transferred, and interruptible loads; energy storage-side resources include centralized energy storage and user-side energy storage. Through this scenario construction, the impact of renewable energy output fluctuations, the uncertainty of multiple aggregator responses, the flexible adjustment capabilities of energy storage, and distribution network constraints on the operation plan is described.
[0092] Step 2: Generate electricity price guidance signals based on the operating status of the distribution network.
[0093] The price guidance adjustment is calculated based on load peak-valley regulation demand, renewable energy consumption demand, node voltage deviation, and line load rate. During peak load periods, the price guidance signal is primarily used to guide aggregators to reduce or transfer load. During periods of high renewable energy output, the price guidance signal is primarily used to guide transferable loads to adjust their electricity consumption periods, and coordinates with energy storage charging plans to absorb renewable energy. During periods of tight local network constraints, differentiated adjustments are made based on the aggregator's access node and the status of relevant lines. Under the same system regulation demand, aggregators with high historical response completion rates, low response delays, and access locations that can alleviate local network constraints receive increased guidance intensity; aggregators with large response deviations or insufficient subsequent adjustability have their planned response dependence reduced. After the price guidance signal is generated, each aggregator provides feedback on its expected response capacity based on its aggregator resource status, response willingness, and response cost. Table 1 Evaluation of the Effectiveness of Electricity Price Guidance
[0094] like Figure 3 As shown in Table 1, during peak load periods, differentiated electricity pricing can guide aggregators to increase load reduction capacity; during periods of high renewable energy output, it can guide transferable loads to increase electricity consumption and, in conjunction with energy storage charging plans, improve the local consumption capacity of renewable energy. Compared to the no-price-guided approach, under differentiated electricity pricing guidance for aggregators, the peak-to-valley difference decreased from 2765kW to 1972kW, and the overall operating cost decreased from 128,360 yuan to 114,736 yuan, demonstrating that the price guidance mechanism can improve the effectiveness of multiple aggregators participating in distribution network regulation.
[0095] Step 3: Model the load response uncertainty considering response intention and response deviation.
[0096] Based on historical response data from different aggregators, the response completion rate, response latency rate, and response deviation range for each aggregator in different time periods are calculated, and positive and negative response uncertainty boundaries are determined accordingly. For aggregators with high historical response completion rates, low response latency, and strong response stability, a smaller response uncertainty range is set; for aggregators with complex user compositions, significant execution latency, or large response fluctuations, a larger response uncertainty range is set. In the day-ahead phase, the expected response capacity is reduced based on the negative response deviation boundary to obtain the reliable response capacity used for planning. In the intraday phase, the uncertainty boundaries for subsequent time periods are updated based on the actual response results of the executed time periods. In the real-time phase, the aggregator's callable capacity and call priority are determined based on the updated reliable response capacity.
[0097] Table 2 Evaluation Table of Load Response Uncertainty Handling Results
[0098] like Figure 4 As shown, under the same electricity price guidance signal, there are differences between the actual response capacity and the planned response capacity of different aggregators. Without considering response uncertainty, the actual response capacity may be lower than the planned response capacity during some peak periods, leading to a larger deviation in the source-load-storage power balance. Considering response uncertainty, day-ahead optimization can reserve necessary energy storage reserves and alternative response capacity based on the reliable response capacity, and during the intraday phase, it can adjust subsequent response plans based on actual performance results, improving the reliability of multi-aggregator response results.
[0099] As shown in Table 2, the response completion rate of the method presented in this paper reached 97.36%, the maximum response deviation was reduced to 121.4kW, and the number of voltage over-limits was reduced to 1, indicating that the method can improve the reliability of the response results of multiple polymerizers.
[0100] Step 4: Day-ahead source-load-storage collaborative optimization.
[0101] In the day-ahead phase, a source-load-storage collaborative optimization model is established based on the next day's predicted new energy output, base load forecast, initial state of charge of energy storage, differentiated electricity price guidance signals, and reliable response capacity of multiple aggregators.
[0102] By solving the day-ahead source-load-storage collaborative optimization model, the power exchange with the upstream grid, the power absorption of new energy sources, the charging and discharging power of energy storage, and the planned response capacity of multi-aggregator are determined for each time period on the following day.
[0103] To avoid over-reliance on uncertain load response resources, the current-day optimization adjusts the available response capacity based on the negative response deviation boundary of aggregators. It also reserves energy storage capacity, alternative aggregator response capacity, and upstream grid interaction capacity to account for the difference between the reliable and expected response capacity. This ensures that the current-day plan has backup capacity to cope with insufficient aggregator response. Step 5: Intraday rolling correction.
[0104] During the intraday phase, rolling optimization is performed based on the latest renewable energy forecasts, the latest load forecasts, the current state of charge of energy storage, and aggregator response feedback. Each rolling cycle utilizes the response completion rate, response delay, and actual response deviation of the executed period to update the response uncertainty boundary and reliable response capacity of each aggregator for subsequent periods, and recalculates the differentiated electricity price guidance amount based on the latest node voltage, line load rate, and renewable energy consumption demand.
[0105] If the predicted output of new energy sources is lower than the day-ahead plan, the intensity of energy storage discharge reserves and load shedding guidance will be increased; if the predicted output of new energy sources is higher than the day-ahead plan, the energy storage charging power will be increased, and transferable loads will be guided to absorb new energy sources. If the actual response completion rate of a certain aggregator is lower than the threshold or the response deviation exceeds the original uncertainty boundary, the reliable response capacity of that aggregator in subsequent periods will be reduced, and other high-reliability aggregators, energy storage, or upstream grid interaction power will be used for substitution.
[0106] During the intraday phase, only the optimization results of the most recent control cycle are executed; for the remaining periods, the calculations are planned to be recalculated based on the forecast data and response feedback of the next rolling cycle.
[0107] Step 6: Real-time deviation rapid compensation.
[0108] In the real-time phase, the deviation between the actual net load and the planned net load for the day is calculated based on real-time measurement data, and node voltage and line load rate are monitored. Real-time deviation rapid compensation is initiated when the net load deviation exceeds a set threshold, any node voltage exceeds the allowable range, or any line load rate exceeds a set threshold. Real-time deviation compensation does not re-solve the complete intraday rolling optimization model; instead, it implements hierarchical allocation based on adjustment speed, available capacity, aggregator response reliability, and resource access location. When the actual net load is higher than the planned value, energy storage discharge is prioritized, followed by high-reliability and fast-responding loads that can be reduced or interrupted. When the actual net load is lower than the planned value, energy storage charging and transferable loads are prioritized to increase power consumption. When node voltage or line load status triggers compensation, aggregator resources that are connected to the corresponding node or line area and can effectively alleviate local network constraints are prioritized. When energy storage and aggregator resources are insufficient, power exchange with the upper-level grid or adjustable distributed power sources are used for fallback balancing.
[0109] By hierarchically calling upon power exchange between energy storage, high-reliability aggregators, and the upper-level grid, real-time operational deviations can be rapidly reduced without resolving the complete optimization model.
[0110] Table 3 Evaluation Table of Multi-Time-Scale Collaborative Optimization Results
[0111] like Figure 5 As shown, single-day day-ahead optimization struggles to maintain source-load-storage power balance when there are deviations between renewable energy output and load forecasting. The method presented in this paper, however, effectively reduces net load deviation through intraday rolling correction and real-time rapid control. Figure 7 As shown, the energy storage charging and discharging behavior under the method presented in this paper can match the fluctuations in new energy output and load response demands, avoiding excessive discharge of energy storage before peak hours. Figure 7 As shown in Table 3, the proposed method reduces node voltage fluctuations and improves end-node voltage levels. The overall operating cost of the proposed method is 109,372 yuan, the renewable energy absorption rate is 98.21%, the maximum net load deviation is 136.8 kW, and the node voltage deviation is 0.0186 pu, all of which are superior to other comparative methods.
[0112] Step 7: Overall method comparison and verification.
[0113] This paper compares the proposed method with existing methods. Method 1 is a traditional source-load-storage optimization method, which does not consider electricity price guidance and load response uncertainty; Method 2 is a fixed time-of-use electricity price guidance optimization method, which considers guidance for fixed time periods but not response uncertainty; Method 3 is an electricity price guidance optimization method, which considers dynamic electricity price guidance but does not perform load response uncertainty correction; Method 4 is an uncertainty optimization method, which considers load response uncertainty but does not perform multi-timescale rolling correction; Method 5 is a multi-timescale optimization method, which considers day-ahead, intraday, and real-time optimization but does not distinguish between the response differences of multiple aggregators; The proposed method simultaneously considers electricity price guidance, load response uncertainty, multi-aggregator response differences, and day-ahead-intraday-real-time multi-timescale collaborative optimization.
[0114] Table 4 Evaluation Table of Comprehensive Operation Results of Each Optimization Method
[0115] like Figure 8As shown, the proposed method outperforms the comparative methods in terms of overall operating cost, renewable energy absorption rate, peak-valley difference, response completion rate, and voltage overrun frequency. This result indicates that relying solely on deterministic load response is insufficient to adapt to response deviations in the actual operation of multiple aggregators; optimization using only a single time scale is insufficient to promptly correct source-load prediction errors; while the proposed method, through the combination of electricity price guidance signals, response uncertainty correction, and multi-time scale collaborative optimization, can improve the coordinated operation of power distribution network sources, loads, and energy storage.
[0116] In summary, the proposed method can generate an economic operation plan in the day-ahead phase, make rolling corrections based on forecast deviations and response feedback in the intraday phase, and provide rapid compensation based on operational deviations in the real-time phase. This method retains the regulatory role of electricity price guidance in the load response of multiple aggregators while also considering the uncertainty between the actual and planned response capacities of aggregators, thereby improving the economic efficiency of distribution network operation, the capacity for renewable energy absorption, and the ability to meet security constraints.
[0117] Example 3: This application also provides a multi-aggregator distribution network source-load-storage multi-timescale collaborative optimization device that considers load characteristics, used to implement the methods described in any of the above embodiments, such as... Figure 9 As shown, the device includes: The data segmentation module 901 is configured to acquire basic data of the distribution network, relevant data of multiple aggregators, and real-time measurement data; divide the operating resources of the distribution network into four categories: source-side resources, load-side resources, energy storage resources, and network constraints; and perform layered processing on the acquired data according to three time scales: day-ahead, intraday, and real-time to obtain the source-load-storage operation data of the distribution network of multiple aggregators. The guidance signal generation module 902 is configured to determine the operating status of the distribution network based on the multi-aggregator distribution network source-load-storage operation data, and generate differentiated electricity price guidance signals for different aggregators based on the operating status of the distribution network. The uncertainty characterization module 903 is configured to determine the expected response capacity and response uncertainty boundary of each aggregator based on the differentiated electricity price guidance signal and the historical response data of the aggregators, and to obtain the actual response capacity based on the expected response capacity and the response uncertainty boundary; the response uncertainty boundary serves as a response reliability parameter connecting the three time scales of day-ahead, intraday, and real-time. The day-ahead optimization module 904 is configured to establish a source-load-storage collaborative optimization model and perform optimization solution based on the multi-aggregator distribution network source-load-storage operation data, differentiated electricity price guidance signals, and response uncertainty boundaries during the day-ahead phase, thereby obtaining the day-ahead scheduling plan; in the optimization solution, the expected response capacity of the aggregator is reliably corrected according to the response uncertainty boundaries to obtain the reliable response capacity, and the multi-aggregator response plan and reserve capacity configuration are arranged according to the reliable response capacity; The intraday correction module 905 is configured to perform rolling corrections on the day-ahead scheduling plan during the intraday phase based on the latest values of new energy forecasts, the latest values of load forecasts, aggregator response feedback, and the current state of charge of energy storage, to obtain an intraday correction plan; in the rolling correction, the response uncertainty boundary and reliable response capacity of each aggregator in subsequent periods are updated based on the actual response results of aggregators in the executed period. The real-time deviation compensation module 906 is configured to calculate the real-time net load deviation between the actual net load and the planned net load based on the real-time measurement data during the real-time phase, and simultaneously acquire node voltage and line load rate; when the real-time net load deviation exceeds the power deviation threshold, any node voltage exceeds the allowable range, or any line load rate exceeds the set threshold, the real-time deviation fast compensation control is activated, and the real-time compensation control command is obtained by hierarchical invocation based on resource availability adjustment capacity, response speed, aggregator response reliability, and resource access location.
[0118] This application also provides a computer program product, which includes a computer program stored in a computer-readable storage medium. At least one processor can read the computer program from the computer-readable storage medium. When the at least one processor executes the computer program, it can implement the technical solution of the multi-aggregator distribution network source-load-storage multi-timescale collaborative optimization method considering load characteristics in the above embodiments.
[0119] In the several embodiments provided in this application, it should be understood that the disclosed apparatus and methods can be implemented in other ways. For example, the apparatus embodiments described above are merely illustrative; for instance, the division of modules is only a logical functional division, and in actual implementation, there may be other division methods. For example, multiple modules may be combined or integrated into another system, or some features may be ignored or not executed. Furthermore, the coupling or direct coupling or communication connection shown or discussed may be through some interfaces; the indirect coupling or communication connection between apparatuses or modules may be electrical, mechanical, or other forms.
[0120] The modules described as separate components may or may not be physically separate. The components shown as modules may or may not be physical units; that is, they may be located in one place or distributed across multiple network units. Some or all of the modules can be selected to implement the solution of this embodiment according to actual needs.
[0121] Furthermore, the functional modules in the various embodiments of this application can be integrated into one processing unit, or each module can exist physically separately, or two or more modules can be integrated into one unit. The unit composed of the above modules can be implemented in hardware or in the form of hardware plus software functional units.
[0122] The integrated modules described above, implemented as software functional modules, can be stored in a computer-readable storage medium. These software functional modules, stored in a storage medium, include several instructions to cause a computer device (which may be a personal computer, server, or network device, etc.) or processor to execute some steps of the methods of the various embodiments of this application.
[0123] It should be understood that the aforementioned processor can be a Central Processing Unit (CPU), or other general-purpose processors, digital signal processors (DSPs), application-specific integrated circuits (ASICs), etc. A general-purpose processor can be a microprocessor or any conventional processor. The steps of the method disclosed in this invention can be directly manifested as execution by a hardware processor, or execution by a combination of hardware and software modules within the processor.
[0124] The memory may include high-speed RAM, and may also include non-volatile storage (NVM), such as at least one disk storage device, and may also be a USB flash drive, external hard drive, read-only memory, disk or optical disc, etc.
[0125] Buses can be Industry Standard Architecture (ISA) buses, Peripheral Component Interconnect (PCI) buses, or Extended Industry Standard Architecture (EISA) buses, etc. Buses can be categorized into address buses, data buses, control buses, etc.
[0126] The aforementioned storage medium can be implemented by any type of volatile or non-volatile storage device or a combination thereof, such as static random access memory (SRAM), electrically erasable programmable read-only memory (EEPROM), erasable programmable read-only memory (EPROM), programmable read-only memory (PROM), read-only memory (ROM), magnetic storage, flash memory, magnetic disk, or optical disk. The storage medium can be any available medium that can be accessed by a general-purpose or special-purpose computer.
[0127] An exemplary storage medium is coupled to a processor, enabling the processor to read information from and write information to the storage medium. Alternatively, the storage medium can be an integral part of the processor. The processor and storage medium can reside in an Application Specific Integrated Circuit (ASIC). Alternatively, the processor and storage medium can exist as discrete components in an electronic control unit or main control device.
[0128] Those skilled in the art will understand that all or part of the steps of the above-described method embodiments can be implemented by hardware related to program instructions. The aforementioned program can be stored in a computer-readable storage medium. When executed, the program performs the steps of the above-described method embodiments; and the aforementioned storage medium includes various media capable of storing program code, such as ROM, RAM, magnetic disks, or optical disks.
[0129] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of this application, and are not intended to limit them. Although this application has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some or all of the technical features therein. Such modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of this application.
Claims
1. A multi-timescale collaborative optimization method for power generation, load, and storage in a multi-aggregator distribution network considering load characteristics, characterized in that... The method includes: Acquire basic data of the distribution network, relevant data of multiple aggregators, and real-time measurement data; divide the operating resources of the distribution network into four categories: source-side resources, load-side resources, energy storage resources, and network constraints; and perform layered processing on the acquired data according to three time scales: day-ahead, intraday, and real-time to obtain the source-load-storage operation data of the distribution network of multiple aggregators. The operating status of the distribution network is determined based on the multi-aggregator distribution network source-load-storage operation data, and differentiated electricity price guidance signals for different aggregators are generated based on the operating status of the distribution network. Based on the differentiated electricity price guidance signal and the historical response data of aggregators, the expected response capacity and response uncertainty boundary of each aggregator are determined, and the actual response capacity is obtained based on the expected response capacity and the response uncertainty boundary; the response uncertainty boundary serves as a response reliability parameter connecting the three time scales of day-ahead, intraday, and real-time. In the day-ahead phase, a collaborative optimization model for source-load-storage is established and optimized based on the multi-aggregator distribution network source-load-storage operation data, differentiated electricity price guidance signals, and response uncertainty boundaries to obtain the day-ahead scheduling plan. In the optimization solution, the expected response capacity of the aggregator is reliably corrected based on the response uncertainty boundaries to obtain the reliable response capacity, and the multi-aggregator response plan and reserve capacity configuration are arranged based on the reliable response capacity. During the intraday phase, the day-ahead scheduling plan is rolled over based on the latest values of new energy forecasts, the latest values of load forecasts, aggregator response feedback, and the current state of charge of energy storage, resulting in an intraday revised plan. In the rolling revision, the response uncertainty boundary and reliable response capacity of each aggregator in subsequent periods are updated based on the actual response results of aggregators in the executed periods. In the real-time phase, the real-time net load deviation between the actual net load and the planned net load is calculated based on the real-time measurement data, and node voltage and line load rate are acquired simultaneously. When the real-time net load deviation exceeds the power deviation threshold, any node voltage exceeds the allowable range, or any line load rate exceeds the set threshold, real-time deviation fast compensation control is initiated. Based on the resource availability adjustment capacity, response speed, aggregator response reliability, and resource access location, hierarchical invocation is performed to obtain real-time compensation control instructions.
2. The method for multi-aggregator distribution network source-load-storage multi-timescale collaborative optimization considering load characteristics as described in claim 1, is characterized in that, The basic data of the distribution network includes the distribution network topology, line impedance, line capacity limits, node voltage upper and lower limits, basic load forecast data, and distributed renewable energy forecast output; the data related to multiple aggregators includes the rated capacity of energy storage, the maximum charge and discharge power of energy storage, the initial state of charge of energy storage, the load capacity that multiple aggregators can respond to, the historical response data of aggregators, and the basic time-of-use pricing benchmark; the real-time measurement data includes real-time voltage, real-time power flow, and real-time load. The distribution network basic data, multi-aggregator related data, and real-time measurement data are processed in layers according to three time scales: day-ahead, intraday, and real-time. This includes: layering the acquired data into day-ahead data according to a first preset time interval to obtain day-ahead load forecast data and renewable energy forecast data; layering the acquired data into intraday data according to a second preset time interval to obtain intraday load forecast update data and renewable energy forecast update data; and layering the acquired data into real-time data according to a third preset time interval to obtain real-time measurement data. The first preset time interval is greater than the second preset time interval, and the second preset time interval is greater than the third preset time interval. Based on the data after hierarchical processing, construct the first... Operating status of power distribution network source, load and storage during different time periods: (1) in, For the first Base load power for the time period; For the first Available power output from renewable energy sources during certain periods; For the first Time-of-use energy storage capacity; For the first State of charge of energy storage during a given time period; For the first The aggregator in the first The available responsive capacity for a given time period; For the first The node at the th Voltage amplitude over a given period; For the first The line is in the Trends of different time periods; Based on the operating status of the power distribution network's power generation, load, and storage in each time period, the operating data of the multi-aggregator power distribution network's power generation, load, and storage are summarized.
3. The method for multi-aggregator distribution network source-load-storage multi-timescale collaborative optimization considering load characteristics as described in claim 2, is characterized in that... The distribution network operating status is determined based on the multi-aggregator distribution network source-load-storage operation data, and differentiated electricity price guidance signals for different aggregators are generated based on the distribution network operating status, including: Based on base load power and new energy available output Calculate the current net load. The deviation from the daily average net load yields the load peak-valley regulation demand index; the deviation between the node voltage and the rated voltage yields the node voltage deviation index; the ratio of line power flow to the upper limit of line capacity yields the line overload index; and the difference between the available output of new energy and the actual output of new energy consumption yields the new energy consumption demand index. Based on the historical response data of the aggregators, the differences in response speed, response reliability, and response cost of each aggregator are calculated to obtain the correction term for the difference in response capability of each aggregator. By superimposing the weighted values of the load peak-valley regulation demand index, node voltage deviation index, line overload index, renewable energy consumption demand index, and aggregator response capability difference correction term onto the basic time-of-use electricity price guidance benchmark, the results are obtained. The aggregator in the first Electricity price guidance volume for different time periods: (2) in, For the first The aggregator in the first Electricity price guidance volume during specific time periods; It serves as a guiding benchmark for basic time-of-use electricity pricing. This is an indicator of load peak-valley regulation demand. This refers to the node voltage deviation index. This is an indicator of the line's heavy load level; For the demand indicators of new energy consumption; For the first Individual aggregator response capability difference correction item; , , , , These are the corresponding weighting coefficients; Will As a differentiated electricity pricing guidance signal corresponding to the first The aggregator in the first The signal values for each time period are aggregated to obtain differentiated electricity price guidance signals for different aggregators.
4. The method for multi-aggregator distribution network source-load-storage multi-timescale collaborative optimization considering load characteristics as described in claim 3, is characterized in that... Based on the differentiated electricity pricing guidance signal and the aggregator's historical response data, the expected response capacity and response uncertainty boundary of each aggregator are determined, and the actual response capacity is obtained based on the expected response capacity and the response uncertainty boundary, including: Based on the differentiated electricity price guidance signal, the preset electricity price guidance sensitivity coefficient, the preset response willingness coefficient, and the preset responsive resource availability coefficient, calculate the first... The aggregator in the first Expected response capacity for the time period: (3) in, For the first The aggregator in the first Expected response capacity for the time period; The sensitivity coefficient for electricity price guidance; The response willingness coefficient; The responsiveness coefficient; For reference guidance level; Based on the historical response data of the aggregators, the response completion rate, response latency rate, and response deviation range of each aggregator are calculated at different time periods. For aggregators with a response completion rate greater than or equal to a set threshold, a response latency less than or equal to a set value, and a stable response deviation, a first uncertainty boundary is set. For aggregators with a response completion rate less than a set threshold, a response latency greater than a set value, or an unstable response deviation, a second uncertainty boundary is set. Both the first and second uncertainty boundaries include a negative response deviation boundary and a positive response deviation boundary. The second uncertainty boundary is greater than the first uncertainty boundary. The actual response capacity is calculated from the expected response capacity using the following formula: (4) in, This represents the actual response capacity. For the response error term; The response error term satisfies the constraints of the response uncertainty boundary: (5) in, This represents the negative response deviation boundary. This represents the positive response deviation boundary.
5. The method for multi-aggregator distribution network source-load-storage multi-timescale collaborative optimization considering load characteristics as described in claim 4, is characterized in that... In the day-ahead phase, based on the multi-aggregator distribution network source-load-storage operation data, differentiated electricity price guidance signals, and response uncertainty boundaries, a source-load-storage collaborative optimization model is established and optimized to obtain the day-ahead dispatch plan, including: With the goal of minimizing the overall operating cost of the distribution network, the following objective function is constructed: (6) Where min is the minimum value operator; F The overall operating cost of the power distribution network; The cost of purchasing and selling electricity from the upper-level power grid; The cost of punitive measures for curtailing renewable energy; To compensate for the cost of responding to the demand of multiple aggregators; Costs associated with energy storage operation losses; For network loss costs; Penalties for voltage and line over-limit violations; Establish source-load-storage power balance constraints: (7) in, For the first Power exchanged with the upstream power grid during the time period; For the first Actual power consumption of renewable energy during the period; For the first Time-limited energy storage discharge power; For the first Time-of-use energy storage charging power; For the first Network power loss during specific time periods; The number of aggregators; Establish energy storage state of charge constraints: (8) in, For the first State of charge of energy storage during a given time period; To improve energy storage charging efficiency; For energy storage discharge efficiency; To optimize the time interval; This refers to the rated capacity of the energy storage. Establish boundary constraints for energy storage operation: (9) (10) (11) in, This is the limit of the energy storage state of charge; This represents the upper limit of the energy storage state of charge. This represents the maximum charging power for energy storage. This represents the maximum discharge power of the energy storage. Establish aggregator response capacity constraints: (12) in, For the first The aggregator in the first Minimum response capacity for the time period; For the first The aggregator in the first Maximum response capacity for the time period; Establish constraints for the safe operation of the power distribution network: (13) (14) in, For the first Lower limit of node voltage; For the first Upper limit of voltage at each node; For the first Maximum capacity of each line; According to the negative response deviation boundary in the response uncertainty boundary The expected response capacity is then reliably modified. (15) Where max is the maximum value operator; For reliable response capacity; Substituting the reliable response capacity as the upper limit of the aggregator response capacity in the day-ahead optimization into the aggregator response capacity constraint, the objective function is solved to obtain the results for each time period. , and The day-ahead planned values, the actual power absorbed by new energy sources, and the day-ahead planned values of energy storage charging and discharging power are summarized as the day-ahead scheduling plan; when the credible response capacity is lower than the expected response capacity, the energy storage regulation capacity, the alternative response capacity of other aggregators, and the upper-level grid interaction margin are reserved in the day-ahead scheduling plan obtained by solving.
6. The method for multi-aggregator distribution network source-load-storage multi-timescale collaborative optimization considering load characteristics as described in claim 5, is characterized in that... During the intraday phase, the day-ahead dispatch plan is rolled over and revised based on the latest values of new energy forecasts, the latest values of load forecasts, aggregator response feedback, and the current state of charge of energy storage, resulting in an intraday revised plan, including: At the beginning of each daily rolling cycle, obtain the latest values of the new energy predicted power, the latest values of the base load predicted power, and the current state of charge of energy storage, and update the new energy predicted power, base load predicted power, and energy storage state of charge within the rolling window; Based on the aggregator response completion rate, response latency, and actual response deviation for the executed period, update the response uncertainty boundary and the reliable response capacity for each aggregator in subsequent periods; Based on the updated predicted power of new energy sources, predicted power of base load, state of charge of energy storage, response uncertainty boundary, and reliable response capacity, an intraday rolling optimization objective function is constructed with the goal of minimizing the sum of operating costs within the rolling window and the penalty term for the planned deviation of the day-ahead scheduling plan: (16) in, Optimize the objective function for intraday rolling. The operating cost within the scrolling window; superscript Indicates intraday correction amount; superscript Indicates the planned quantity for the current day; , , This is the penalty coefficient for planned deviations; For the first The day-ahead planned value of the power exchanged with the upstream power grid during the specified time period; For the first The planned day-ahead value of the state of charge of energy storage during the time period; For the first The aggregator in the first The planned daily value of the available responsive capacity for the specified time period; For the first Intraday correction of power exchanged with the upstream power grid during the time period; For the first Intraday correction of the state of charge of energy storage during a given period; For the first The aggregator in the first Intraday adjustment of available capacity for a given period; Solve the intraday rolling optimization objective function, and incorporate the daily scheduling plan into the daily schedule. , and The planned values for the day were revised to intraday revised values. , and Only the optimization results of the most recent control cycle are executed, and then the next rolling optimization is performed; the results of each time period are corrected. , and The summaries will form the intraday revision plan.
7. The method for multi-aggregator distribution network source-load-storage multi-timescale collaborative optimization considering load characteristics as described in claim 6, is characterized in that... In the real-time phase, the real-time net load deviation between the actual net load and the planned net load is calculated based on the real-time measurement data, and node voltage and line load rate are acquired simultaneously. When the real-time net load deviation exceeds the power deviation threshold, any node voltage exceeds the allowable range, or any line load rate exceeds the set threshold, real-time deviation fast compensation control is initiated. Based on resource availability adjustment capacity, response speed, aggregator response reliability, and resource access location, hierarchical invocation is performed to obtain real-time compensation control instructions, including: The actual net load is obtained based on the real-time measurement data, and the real-time net load deviation is calculated using the following formula: (17) in, For the first Real-time net load deviation for the time period; This represents the actual net load. For planned net load; Determine the real-time net load deviation Whether the power deviation threshold is exceeded, whether the voltage of any node is outside the allowable range, or whether the load rate of any line exceeds the set threshold; if none of the above conditions are met, the intraday correction plan will continue to be executed. If any of the above conditions are met, resources will be allocated for compensation in the following hierarchical order: When When the time comes, priority is given to activating energy storage for discharge, followed by activating loads with a response speed greater than the set value, a reliable response capacity higher than the set value, and the ability to alleviate constraints on relevant nodes or lines that can be reduced or interrupted; when When energy storage charging and transferable loads are in short supply, priority is given to increasing electricity consumption and absorbing surplus new energy sources; when energy storage and aggregator resources are insufficient, compensation is made through power exchange with the upper-level power grid or adjustable distributed power sources. When compensation is triggered by node voltage over-limit or line overload, priority is given to aggregator resources that are connected to the relevant node or located downstream of the relevant line and can alleviate local network constraints. Based on the above-mentioned hierarchical invocation results, real-time compensation control instructions are generated on the basis of the intraday correction plan. These real-time compensation control instructions include energy storage charging and discharging power adjustment instructions, aggregator response capacity adjustment instructions, and upper-level grid interaction power adjustment instructions. The energy storage charging and discharging power adjustment instructions are used to correct the issues in the intraday correction plan. The aggregator's response capacity adjustment command value is used to correct the intraday correction plan. The power adjustment command value from the upper-level power grid is used to correct the intraday correction plan. .
8. The multi-aggregator distribution network source-load-storage multi-timescale collaborative optimization method considering load characteristics according to any one of claims 1 to 7, characterized in that, The method further includes: Based on the typical operating data in the multi-aggregator distribution network source-load-storage operation data, the simulation parameters are determined, and the price guidance amount, aggregator expected response capacity, aggregator reliable response capacity, actual response capacity, energy storage charging and discharging power, upper-level grid interaction power, node voltage and line power flow are calculated for each time period. The multi-aggregator distribution network source-load-storage multi-timescale collaborative optimization results considering load characteristics are obtained. The evaluation results of the multi-aggregator distribution network source-load-storage multi-timescale collaborative optimization considering load characteristics are evaluated using evaluation indicators, including new energy absorption rate, response completion rate, cost reduction rate, and node voltage deviation index.
9. A multi-timescale collaborative optimization device for a multi-aggregator distribution network source-load-storage system considering load characteristics, characterized in that, The device includes: The data segmentation module is configured to acquire basic data of the distribution network, relevant data of multiple aggregators, and real-time measurement data; divide the operating resources of the distribution network into four categories: source-side resources, load-side resources, energy storage resources, and network constraints; and perform layered processing on the acquired data according to three time scales: day-ahead, intraday, and real-time to obtain the source-load-storage operation data of the distribution network of multiple aggregators. The guidance signal generation module is configured to determine the operating status of the distribution network based on the multi-aggregator distribution network source-load-storage operation data, and generate differentiated electricity price guidance signals for different aggregators based on the operating status of the distribution network. The uncertainty characterization module is configured to determine the expected response capacity and response uncertainty boundary of each aggregator based on the differentiated electricity price guidance signal and the historical response data of the aggregators, and to obtain the actual response capacity based on the expected response capacity and the response uncertainty boundary; the response uncertainty boundary serves as a response reliability parameter connecting the three time scales of day-ahead, intraday, and real-time. The day-ahead optimization module is configured to establish a source-load-storage collaborative optimization model and perform optimization solution based on the multi-aggregator distribution network source-load-storage operation data, differentiated electricity price guidance signals, and response uncertainty boundaries during the day-ahead phase, thereby obtaining the day-ahead scheduling plan. In the optimization solution, the expected response capacity of the aggregator is reliably corrected according to the response uncertainty boundaries to obtain the reliable response capacity, and the multi-aggregator response plan and reserve capacity configuration are arranged according to the reliable response capacity. The intraday correction module is configured to perform rolling corrections on the day-ahead scheduling plan during the intraday phase based on the latest values of new energy forecasts, the latest values of load forecasts, aggregator response feedback, and the current state of charge of energy storage, to obtain an intraday correction plan; in the rolling correction, the response uncertainty boundary and reliable response capacity of each aggregator in subsequent periods are updated based on the actual response results of aggregators in the executed periods. The real-time deviation compensation module is configured to calculate the real-time net load deviation between the actual net load and the planned net load based on the real-time measurement data during the real-time phase, and simultaneously acquire node voltage and line load rate; when the real-time net load deviation exceeds the power deviation threshold, any node voltage exceeds the allowable range, or any line load rate exceeds the set threshold, the real-time deviation fast compensation control is activated, and the real-time compensation control command is obtained by hierarchical invocation based on resource availability adjustment capacity, response speed, aggregator response reliability, and resource access location.
10. A computer-readable storage medium, characterized in that, The computer-readable storage medium stores computer-executable instructions, which, when executed by a processor, are used to implement the multi-aggregator distribution network source-load-storage multi-timescale collaborative optimization method considering load characteristics as described in any one of claims 1-8.