An elevator energy-saving feedback device and a pre-charging method based on the device.
By adopting capacitive coupling and micro-power rectification control in the elevator energy-saving feedback device, the traditional hardware pre-charging branch is eliminated, solving the problems of high energy consumption, poor versatility and low reliability in the elevator energy-saving feedback device, and realizing the simplification of the equipment and the improvement of reliability.
Patent Information
- Application Number
- CN202611236374.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-14
- Publication Date
- 2026-11-17
AI Technical Summary
In existing elevator energy-saving feedback devices, the traditional resistive pre-charging scheme has problems such as high energy consumption, poor versatility, and low reliability. In addition, the hardware is complex and prone to equipment failure.
A flexible pre-charge current control strategy is adopted. An LC impedance network is formed by capacitive coupling of the three-phase grid-connected contactor and the LCL three-phase filter circuit. Combined with micro-power rectification control, the traditional DC-side hardware pre-charge branch is eliminated, realizing passive soft current limiting and boost pre-charge.
It simplifies the hardware structure, reduces energy consumption, improves the reliability and adaptability of the equipment, shortens the startup time, and avoids the risk of hardware failure.
Smart Images

Figure CN123121791A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of elevator energy-saving technology, and particularly relates to an elevator energy-saving feedback device and a pre-charging method based on the device. Background Technology
[0002] Elevator energy-saving feedback devices are used to recover the electrical energy generated by the elevator traction mechanism during braking and invert the electrical energy back to the three-phase mains power grid to achieve energy-saving operation. Existing elevator energy-saving feedback devices are generally equipped with a three-phase grid-connected contactor, an LCL three-phase filter circuit, a T-type three-level power conversion unit, and a DC bus support capacitor. Among them, the LCL three-phase filter circuit and the T-type three-level power conversion unit only work when the three-phase grid-connected contactor is closed and the device is operating normally in grid-connected mode. Their main function is to filter out SPWM high-frequency harmonics and realize bidirectional energy conversion.
[0003] To avoid the DC bus support capacitor voltage being zero during the initial power-up phase, which could cause a surge current due to the huge potential difference at the moment of grid connection and burn out the grid-connected contactor contacts and power switching devices, existing technologies generally adopt a DC-side hardware pre-charge branch consisting of a pre-charge resistor and a pre-charge relay. Its working principle is as follows: after power-up, the pre-charge relay is turned on, and the DC bus support capacitor is slowly charged by the current limiting of the pre-charge resistor; after the bus voltage rises to the preset safety threshold, the main circuit switch is closed to short-circuit the pre-charge resistor, completing the pre-charge and entering the normal operation mode.
[0004] In practical use, this traditional resistive precharge solution has some inherent defects: First, during the pre-charging process, the current continuously flows through the pre-charging resistor, and a large amount of electrical energy is dissipated in the form of Joule heat, resulting in low energy utilization. At the same time, the pre-charging resistor is in a heating condition for a long time, which makes it prone to aging and failure, posing a potential equipment failure hazard. Secondly, additional pre-charging resistors, pre-charging relays and their drive circuits are required. For high-power models, a special heat dissipation structure is also required, which leads to structural complexity, high pre-charging costs, increased number of components, wiring complexity and material costs, and larger equipment size. Third, the pre-charge current limiting capability is limited by the resistance value, making it difficult to adapt to DC bus support capacitors of different capacities.
[0005] Therefore, there is an urgent need to develop an elevator energy-saving feedback scheme that eliminates DC-side resistive pre-charging hardware and reuses existing power topologies to achieve power-on pre-charging. Summary of the Invention
[0006] The purpose of this invention is to provide an elevator energy-saving feedback device and a pre-charging method based on the device. This solution re-plans the power-on working sequence and adopts a flexible control strategy for the pre-charging current. It eliminates the need to lay out a DC-side hardware pre-charging branch composed of a pre-charging resistor and a pre-charging relay, which simplifies the overall hardware structure, eliminates Joule heat loss during the pre-charging stage, and can adapt to DC bus support capacitors of different capacities.
[0007] This application provides an energy-saving feedback device for elevators: The system includes a main control unit, an LCL three-phase filter circuit, a T-type three-level power bridge, a three-phase grid-connected contactor, and a DC bus support capacitor. The three-phase grid-connected contactor is connected in series between the mains power input and the LCL three-phase filter circuit. During the power-on pre-charging phase, the main control unit controls the three-phase grid-connected contactor to be in the open state. Simultaneously, the three-phase mains power is capacitively coupled to the LCL three-phase filter circuit through the open contacts of the three-phase grid-connected contactor. The main control unit controls the T-type three-level power bridge to operate in a low-power rectification mode, converting the coupled AC power into DC power to boost the DC bus support capacitor for pre-charging. When the pre-charging reaches the preset grid-connection conditions, the main control unit controls the three-phase grid-connected contactor to close, entering the grid-connected operation mode.
[0008] As the preferred embodiment of this application: During the power-on pre-charging phase, the main control unit collects the DC bus voltage and the three-phase mains electrical parameters in real time, and performs phase-locked loop (PLL) calculation based on the three-phase mains electrical parameters, so as to use the PLL calculation result as the synchronous PLL reference.
[0009] As the preferred embodiment of this application: The main control unit adopts a dq synchronous rotating coordinate system current closed-loop control method. It generates an amplitude-controllable SPWM drive signal based on the phase-locked loop operation result, and limits the active power output of the power bridge by adjusting the duty cycle of the SPWM drive signal. This controls the T-type three-level power bridge to operate in a low-power rectification mode, thereby achieving flexible control of the pre-charge current and the bus voltage boost rate.
[0010] As the preferred embodiment of this application: The preset grid connection conditions include: the collected DC bus voltage reaches a stable state and has been synchronized with the mains power.
[0011] As the preferred embodiment of this application: It includes a DC voltage detection circuit, which uses a resistor voltage divider to acquire the DC bus side voltage and sends the sampled signal to the main control unit in a differential sampling form; the main control unit has built-in voltage stability determination logic, which determines whether the DC bus side voltage has reached a stable state based on the real-time acquired DC bus side voltage and the voltage stability determination logic.
[0012] As the preferred embodiment of this application: The LCL three-phase filter circuit includes a bridge-side inductor LA, a grid-side inductor LB, and a star-connected filter capacitor C. The star-connected filter capacitor C is connected to the three-phase bus between the bridge-side inductor LA and the grid-side inductor LB. During the power-on pre-charge stage, the LCL three-phase filter circuit forms an LC impedance network to constrain the AC current formed by coupling, thereby achieving passive soft current limiting during the pre-charge process.
[0013] This solution also provides a pre-charging method, based on the elevator energy-saving feedback device described in any of the above embodiments, the pre-charging method comprising: S1. Power-on initialization: control the three-phase grid-connected contactor to remain open. At the same time, the three-phase mains power is connected to the LCL three-phase filter circuit in a capacitive coupling manner through the open contact of the three-phase grid-connected contactor. The LCL three-phase filter circuit forms an LC impedance network to suppress current surges. S2. Control the T-type three-level power bridge to operate in low-power rectification mode, convert the coupled AC power into DC power, and perform boost pre-charge on the DC bus support capacitor; S3. After pre-charging to meet the preset grid connection conditions, control the three-phase grid connection contactor to engage and enter the grid connection operation mode.
[0014] 8. The control method according to claim 7, characterized in that: Step S1 also includes real-time acquisition of DC bus voltage and three-phase mains electrical parameters, and mains synchronization phase-locking is completed based on the three-phase mains electrical parameters to establish a grid voltage synchronization reference.
[0015] As the preferred embodiment of this application: In step S3, the preset grid connection conditions include: The acquired DC bus voltage has reached a stable state and has been synchronized with the mains power supply. The specific method for determining whether the acquired DC bus voltage has reached a stable state is as follows: The main control unit has built-in voltage stability determination logic. Based on the real-time collected DC bus side voltage and combined with the voltage stability determination logic, it determines whether the DC bus side voltage has reached a stable state.
[0016] As the preferred embodiment of this application: In step S2, the specific method for controlling the T-type three-level power bridge to operate in low-power rectification mode includes: The main control unit adopts a dq synchronous rotating coordinate system current closed-loop control method. It generates an amplitude-controllable SPWM drive signal based on the phase-locked loop operation result, and dynamically limits the rectified current by adjusting the duty cycle of the SPWM drive signal, thereby maintaining the T-type three-level power bridge in a low-power rectification operation state.
[0017] Compared with existing technologies, it has the following advantages: (1) This solution reuses the original LCL three-phase filter circuit and T-type three-level power bridge in the traditional device, and completely removes the traditional whole set of hardware pre-charging branch through capacitive coupling energy extraction and micro-power rectification flexible pre-charging combination architecture. Without increasing hardware costs, it completely solves the industry pain points of high energy consumption, poor versatility and low reliability of traditional pre-charging solutions.
[0018] (2) In the pre-charging stage of the three-phase grid-connected contactor disconnection, this scheme uses the LCL filter circuit to construct the LC passive current limiting network and cooperates with the micro-power rectification control to achieve soft current limiting, smoothly raise the DC bus voltage, reduce the potential difference at the time of grid-connected contactor closing, suppress power-on surge, and protect the contactor, power switching devices and filter inductor; and, while the power-on voltage boost pre-charging is performed, the mains phase lock synchronization is completed simultaneously, effectively shortening the start-up ready time of the whole machine.
[0019] (3) Under the pre-charge condition, the LCL three-phase filter circuit does not participate in the conventional harmonic filtering function. Instead, it uses its own LC topology to form a passive current limiting network and cooperates with the software-controlled T-type three-level power bridge micro-power rectification to achieve dual software and hardware current limiting, replacing the traditional hardware pre-charge resistor current limiting scheme. Attached Figure Description
[0020] Figure 1 The schematic diagram of the control circuit for the elevator energy-saving feedback device provided by the present invention.
[0021] Figure 2 The three-phase grid-connected contactor control circuit diagram provided by the present invention.
[0022] Figure 3 A DC voltage divider circuit diagram provided for this invention.
[0023] Figure 4 The pre-charging flowchart provided for this invention. Figure Labels
[0024] Figure 1 middle: C1, C2: DC bus support capacitors; SA1-SA4, SB1-SB4, SC1-SC4: T-type three-level power bridge; LA1, LA2, LA3: bridge-side inductors; C3-C5: star-connected filter capacitors; LB1, LB2, LB3: grid-side inductors; KM1: three-phase grid-connected contactor; Figure 2 middle: RC864 is the base current limiting resistor of the transistor; RC866 is the base pull-down resistor; RC865 is the collector pull-up resistor; Figure 3 middle: VBUS+: Positive DC bus terminal; VBUS-: Negative DC bus terminal; VBUS01, VBUS02: Midpoint stratified potentials of the bus; BUS+, BUSN, BUS-: Output after voltage division; R90~R109: High voltage dividing resistors; R110, R111, R112: Balanced bleeder resistors; R113, R114, R115: Midpoint matching resistors; C76-C81: Filter capacitors. Detailed Implementation
[0025] The present invention will be further described in detail below with reference to specific embodiments and accompanying drawings. It should be emphasized that the following description is merely exemplary and is not intended to limit the scope and application of the present invention. Example 1
[0026] This embodiment provides an elevator energy-saving feedback device, which includes a main control unit, an LCL three-phase filter circuit, a T-type three-level power bridge, a three-phase grid-connected contactor, and a DC bus support capacitor. Figure 1 As shown, in this embodiment, the LCL three-phase filter circuit includes bridge-side inductors LA1, LA2, LA3, grid-side inductors LB1, LB2, LB3, and star-connected filter capacitors C3-C5. The star-connected filter capacitors C3-C5 are respectively connected to the three-phase bus between the bridge-side inductors LA1, LA2, LA3 and the grid-side inductors LB1, LB2, LB3. The T-type three-level power bridge is an IGBT power bridge. The three-phase grid-connected contactor KM preferably adopts an AC solid-state relay KM with better energy efficiency. The AC solid-state relay KM is connected in series between the three-phase mains power input and the LCL three-phase filter circuit, serving as a switch for switching the power grid and the power circuit. The preferred main control unit model is TMS320F28335.
[0027] During the pre-charging phase, the main control unit continuously controls the three-phase grid-connected contactor to be in the open state. The moving and stationary contacts of the three-phase grid-connected contactor form a natural parasitic capacitance. The power frequency alternating voltage of the three-phase mains power generates a capacitive coupling displacement current through this parasitic capacitance. The weak AC power is transmitted across the gap to the downstream LCL three-phase filter circuit. That is, the three-phase mains power is connected to the LCL three-phase filter circuit in a capacitive coupling manner through the open contacts of the three-phase grid-connected contactor. The LCL three-phase filter circuit forms an LC impedance network during the pre-charging phase, which constrains the amplitude of the coupled AC current to avoid sudden current surges and achieves passive soft current limiting during the pre-charging process. The main control unit controls the T-type three-level power bridge to operate in a low-power rectification mode, smoothly converting the coupled AC power into DC power to perform a gradual voltage boost pre-charging of the DC bus support capacitor. When the pre-charging reaches the preset grid-connection conditions, the main control unit controls the three-phase grid-connected contactor to close, entering the grid-connected operation mode and implementing a bidirectional energy feedback operation mechanism.
[0028] In this embodiment, under pre-charge conditions, the LCL three-phase filter circuit does not participate in the conventional harmonic filtering function. Instead, it uses its own LC topology to form a passive current limiting network, which, together with the micro-power rectification control of the T-type three-level power bridge, achieves dual hardware and software soft current limiting, replacing the traditional pre-charge resistor current limiting scheme.
[0029] like Figure 2 The diagram shown is a control circuit diagram of a three-phase grid-connected contactor provided in this embodiment. The I / O interface output of the TMS320F28335 main control chip (hereinafter referred to as 28335) is 3.3V, which has limited driving capability and cannot directly drive the 12V AC solid-state three-phase grid-connected contactor KM to engage. Therefore, this embodiment adds a transistor level conversion drive circuit, connecting the control pin RELAY of 28335 to the base of the transistor, and using the switching characteristics of the transistor to control the on / off state of the grounding terminal of the three-phase grid-connected contactor coil.
[0030] As shown in the figure, the positive terminal of the three-phase grid-connected contactor coil is continuously connected to a +12V voltage, and the negative terminal of the coil is connected to the static ground STATIC_GND through an NPN transistor Q60. In the circuit: RC864 is the base current limiting resistor of the transistor, RC866 is the base pull-down resistor, used to prevent the transistor from being falsely triggered when the signal is floating, and RC865 is the collector pull-up resistor, which, together with the NPN switching transistor, forms a level conversion switching circuit to realize the controllable output level of the STATIC_GND node.
[0031] When the RELAY pin outputs a low level, transistor Q60 is cut off, and the negative potential of the three-phase grid-connected contactor coil is pulled up to 12V. At this time, there is no voltage difference across the coil, and the three-phase grid-connected contactor remains in the open state. When the RELAY pin outputs a high level, transistor Q60 is turned on, and the negative terminal of the three-phase grid-connected contactor coil is reliably connected to static ground. A 12V working voltage difference is formed across the coil, and the relay is stably energized. This achieves the purpose of indirectly and accurately controlling the on / off state of the three-phase grid-connected contactor through the I / O port of the main control chip.
[0032] As a preferred embodiment, during the power-on pre-charging stage, the main control unit collects the DC bus voltage and the three-phase electrical parameters of the mains power in real time, and performs phase-locked loop (PLL) calculation based on the three-phase electrical parameters of the mains power. The accurately calculated real-time phase angle result of the power grid is used as the synchronous PLL reference to establish a high-precision power grid synchronization reference. At the same time, the real-time frequency of the power grid is acquired synchronously to complete the power grid state verification, providing a synchronization basis for the subsequent dq synchronous rotating coordinate system current closed-loop control, ensuring that the T-type three-level power bridge can operate accurately in the low-power rectification condition, and realizing that the internal control timing of the device is synchronized with the mains power. In this embodiment, the DC bus voltage parameter is used to monitor the pre-charging boost process and determine the steady-state condition of the bus voltage, and does not participate in the PLL calculation.
[0033] This embodiment includes a DC voltage detection circuit. This circuit is used to acquire the DC bus side operating voltage of the device in real time and perform signal preprocessing, providing accurate sampling data for the main control unit's voltage steady-state determination, grid connection condition judgment, and overall voltage protection logic. The DC voltage detection circuit acquires the DC bus side voltage using a resistor divider method and sends the sampled signal to the main control unit in a differential sampling manner. Specifically, the DC voltage detection circuit performs multi-stage resistor divider voltage reduction processing on the DC bus high-voltage signal, such as... Figure 3 As shown, the positive terminal VBUS+ of the DC bus, the midpoint potentials VBUS01 and VBUS02 of the bus, and the negative terminal VBUS- of the DC bus are respectively connected to a high-voltage divider branch composed of multiple resistors connected in series, which converts the signals into four low-voltage sampling signals VBUS+, VBUS-, VBUS01, and VBUS02. Among them, VBUS+ and VBUS- form one low-voltage differential signal pair, and VBUS01 and VBUS02 form another low-voltage differential signal pair. The two sets of low-voltage differential signals after voltage division are respectively connected to operational amplifiers to complete differential amplification and filtering preprocessing.
[0034] Among them, R90 to R109 are high-voltage divider resistors. Multiple resistors are connected in series to the positive, midpoint, and negative terminals of the DC bus, respectively, to attenuate the high voltage of the bus and convert it into a low-voltage sampling signal. This also disperses the withstand voltage stress on the resistors and reduces the static power consumption of the sampling branch. R110, R111, and R112 are balancing discharge resistors, connected between the sampling output terminals BUS+ and BUS-, used for discharging residual charge from the sampling capacitor and matching the impedance of the sampling circuit. R113, R114, and R115 are midpoint matching resistors, connecting the midpoint sampling terminal BUSN to BUS+ and BUS-, achieving impedance balance across the three sampling channels. It also works with C76-C81 filter capacitors to form an RC low-pass filter network to suppress high-frequency interference generated by power switching. The processed signal is sent to the main control unit (TMS320F28335 chip). The main control unit performs differential operations based on the three sampling signals of BUS+, BUSN, and BUS- to obtain the upper bus capacitor voltage, lower bus capacitor voltage, and total DC bus voltage, providing voltage basis for the main control unit to determine pre-charge boost and grid connection closing conditions.
[0035] Specifically, the main control unit continuously monitors the total DC bus voltage and judges the bus voltage ramp-up rate in real time to prevent voltage surges caused by sudden changes in precharge current. At the same time, it synchronously collects the voltage of the upper bus capacitor and the lower bus capacitor, monitors the voltage difference between the upper and lower bus capacitors, ensures the neutral point potential balance of the T-type three-level topology, and avoids the risk of overvoltage of power devices caused by neutral point offset during precharge.
[0036] Meanwhile, the main control unit incorporates voltage stability determination logic. Based on the real-time collected DC bus voltage and in conjunction with this logic, it determines whether the DC bus voltage has reached a stable state. Specifically, this includes: The target voltage U1 and voltage fluctuation threshold φ on the DC bus side are preset. The target voltage U1 after the DC bus voltage stabilizes is usually set to 450V-480V to match the rated voltage of the DC bus of the elevator inverter. The voltage fluctuation threshold φ is usually set to 3V-5V. When the DC bus side voltage is detected to meet the following conditions: the average voltage value of 20ms is greater than U1 and the absolute value of the difference between the 10-point sampling sliding average value and the 1s average voltage value is less than φ, and at the same time, the difference between the upper bus capacitor voltage and the lower bus capacitor voltage is less than the allowable imbalance threshold, it is determined that the DC bus voltage has reached a safe and stable state.
[0037] As a preferred embodiment, the main control unit adopts a dq synchronous rotating coordinate system current closed-loop control method. It completes the dq coordinate transformation based on the real-time phase angle of the power grid calculated by phase-locked loop operation to ensure that it is in phase with the mains power. It also generates an SPWM drive signal with controllable amplitude. By dynamically adjusting the duty cycle of the SPWM drive signal, it limits the active power output of the power bridge, thereby controlling the T-type three-level power bridge to operate in a low-power rectification mode. This achieves flexible control of the pre-charge current and the bus voltage boost rate, so as to smoothly convert the small amount of AC power obtained by coupling into DC power and continuously perform a smooth voltage boost pre-charge on the DC bus support capacitor.
[0038] It should be noted that the real-time phase angle only determines the modulation output at a single moment. In order to avoid the control instability caused by continuous phase drift, this embodiment preferably sets two-level phase-locked synchronization judgment conditions to synchronously verify the phase error and frequency deviation. Only when the real-time grid frequency deviation is less than the first preset frequency threshold, the phase error is less than the first preset phase threshold, and the state is stably maintained for a preset time, the preliminary phase-locked synchronization is determined to be completed, and the current closed-loop control in the dq coordinate system can be entered.
[0039] It should also be noted that this embodiment uses dq current closed-loop control, which can control the direction of energy transmission through the polarity of the current command, and avoid the reverse backflow of power from the DC bus side to the grid.
[0040] As a preferred embodiment, when the precharge reaches the preset grid connection condition, the main control unit controls the three-phase grid connection contactor to close. The preset grid connection condition is a software dual-judgment logic that does not rely on hardware circuitry. Specifically, it includes two judgment conditions that must be met simultaneously: the collected DC bus voltage reaches a stable state and has completed synchronous phase locking with the mains power. That is, it includes two conditions, and only when both conditions are met simultaneously can it be determined that the grid connection is satisfied.
[0041] Specifically, during the pre-charging process, the DC bus voltage is continuously monitored. When the DC bus voltage reaches the preset voltage target and the voltage fluctuation meets the stability index, the main control unit re-verifies the phase-locked state. If the real-time grid frequency deviation is less than the second preset frequency threshold and the phase error is less than the second preset phase threshold, and is maintained for a preset duration, it is determined that the synchronization conditions required for grid connection are met. After the bus voltage stability condition and the high-precision phase-locked synchronization condition are both met, the main control unit controls the three-phase grid-connected contactor to close, and the device switches to the elevator braking energy feedback grid-connected operation mode.
[0042] It should be noted that the method for determining whether the DC bus voltage has reached a stable state has been explained above and will not be repeated here; the condition for determining whether synchronization with the mains power lock is completed is the same as the method for determining whether to enter the dq coordinate system current closed-loop control, and will not be repeated here either.
[0043] In summary, this embodiment reuses the original LCL three-phase filter circuit and T-type three-level power bridge in the traditional device, and adjusts the power-on sequence of the whole machine through a combination architecture of capacitive coupling energy harvesting and micro-power rectification flexible pre-charging: power-on initialization → three-phase grid-connected contactor disconnects capacitive coupling energy harvesting → micro-power rectification boost pre-charging → synchronous phase-locking and voltage steady-state judgment → condition meets grid connection and closing → bidirectional energy feedback operation. This eliminates the need to lay out the traditional DC hardware pre-charging branch composed of pre-charging resistors and pre-charging relays in the whole device. This not only reduces the number of components, simplifies the device wiring and mechanical structure, reduces material costs and shrinks the equipment size, but also eliminates the resistance energy consumption in the entire pre-charging process, thereby eliminating energy loss and reducing heat dissipation requirements. In addition, it avoids the fault hazards caused by the long-term heat generation of traditional pre-charging resistors, and improves the reliability of operation. Preferably, when a fault occurs and the machine stops, the three-phase grid-connected contactor is disconnected first, and then the main switch on the DC bus side is disconnected to achieve safe power-off.
[0044] This embodiment is preferably adapted to standard 380V three-phase mains power and elevator inverter DC bus rated voltage of 540V~580V; the mains frequency is 50Hz, the LCL three-phase filter circuit adopts the standard parameter configuration of conventional feedback device, the T-type three-level power bridge is a 1200V level IGBT power device, and the DC bus support capacitor capacity ranges from 400μF to 2000μF.
[0045] Specific control parameters during the pre-charge phase: main control unit phase-locked loop update frequency 10kHz, dq current closed-loop control period 100μs.
[0046] It should be noted that the parameter values mentioned above are not intended to limit the implementation of this embodiment. This embodiment can be adapted to all 380V-class elevator feedback devices, and its protection scope covers all equivalent replacement schemes with the same principle but different parameters. Example 2
[0047] This embodiment provides a pre-charging method, such as Figure 4 As shown, this method is based on the elevator energy-saving feedback device described in Embodiment 1 above, and the pre-charging method includes: S1. Power-on initialization: control the three-phase grid-connected contactor to remain open. At the same time, the three-phase mains power is connected to the LCL three-phase filter circuit via the open contact of the three-phase grid-connected contactor in a capacitive coupling manner. The LCL three-phase filter circuit forms an LC impedance network to suppress current surges and achieve passive constraint of pre-charge current.
[0048] In this step, the disconnecting contacts of the three-phase grid-connected contactor form a natural parasitic capacitance. The power frequency alternating voltage of the three-phase mains power generates a capacitive coupling displacement current through this parasitic capacitance. The weak AC power can be transmitted across the gap to the downstream LCL three-phase filter circuit. That is, the three-phase mains power is connected to the LCL three-phase filter circuit in a capacitive coupling manner through the disconnecting contacts of the three-phase grid-connected contactor. The LCL three-phase filter circuit uses its own LC impedance network to constrain the amplitude of the coupled AC current and avoid current surge. In other words, in this embodiment, under the pre-charge condition, the LCL three-phase filter circuit does not participate in the conventional harmonic filtering function, but uses its own LC topology to form a passive current limiting network to limit the magnitude of the coupled current and realize passive soft current limiting in the pre-charge process.
[0049] This step also includes real-time acquisition of DC bus voltage and three-phase mains electrical parameters, and performing phase-locked loop (PLL) calculations based on these parameters. The accurately calculated real-time grid phase angle θ is used as the synchronous PLL reference to establish a high-precision grid synchronization reference. Simultaneously, the real-time grid frequency is acquired to complete grid status verification, providing a synchronization basis for subsequent dq synchronous rotating coordinate system current closed-loop control. This ensures that the T-type three-level power bridge can operate accurately in low-power rectification mode, achieving synchronization between the device's internal control timing and the mains power. The DC bus voltage parameters are used to monitor the pre-charge boost process and determine the steady-state condition of the bus voltage, but do not participate in the PLL calculations.
[0050] In this embodiment, the specific steps of phase-locked loop operation include: Step 1: Perform digital filtering on the acquired three-phase raw voltage sampling signals to remove switching harmonics and high-frequency interference signals, and obtain smooth three-phase AC voltage sampling values Ua, Ub and Uc; Step 2: Transform the three-phase voltages Ua, Ub, and Uc into voltage components Uα and Uβ in the two-phase stationary αβ coordinate system, completing the transformation from the three-phase stationary coordinate system to the two-phase stationary coordinate system (Clark transformation). Step 3: Based on the voltage components of the two-phase stationary coordinate system, the three-phase software phase-locked loop (SPLL) algorithm based on the quadrature signal generator is used to obtain the grid voltage phase error and construct a synchronous rotating coordinate system phase-locked loop model; Step 4: Input the phase deviation into the PI regulator, output the grid angular frequency correction, superimpose the rated power frequency angular frequency to obtain the real-time grid angular frequency, and perform integral calculation on the angular frequency to obtain the real-time phase angle θ of the current mains voltage; use the real-time phase angle θ as the synchronization reference signal for dq coordinate transformation and SPWM modulation calculation, and send it to the current closed-loop control module.
[0051] In this embodiment, a resistor voltage divider method is preferably used to acquire the DC bus voltage, and the sampled signal is sent to the main control unit in a differential sampling manner. Specifically, the DC bus high voltage signal is subjected to multi-stage resistor voltage divider reduction processing, and the processed signal is directly sent to the main control unit (TMS320F28335 chip). The main control unit has built-in voltage stability determination logic, which determines whether the DC bus voltage has reached a stable state based on the real-time acquired DC bus voltage and this voltage stability determination logic. Specifically, this includes: The main control unit continuously monitors the total DC bus voltage and judges the bus voltage ramp-up rate in real time to prevent voltage surges caused by sudden changes in precharge current. At the same time, it synchronously collects the voltage of the upper bus capacitor and the lower bus capacitor, monitors the voltage difference between the upper and lower bus capacitors, ensures the neutral point potential balance of the T-type three-level topology, and avoids the risk of overvoltage of power devices caused by neutral point offset during precharge.
[0052] Meanwhile, the main control unit incorporates voltage stability determination logic, specifically including: The target voltage U1 and voltage fluctuation threshold φ on the DC bus side are preset. The target voltage U1 after the DC bus voltage stabilizes is usually set to 450V-480V to match the rated voltage of the DC bus of the elevator inverter. The voltage fluctuation threshold φ is usually set to 3V-5V. When the DC bus side voltage is detected to meet the following conditions: the average voltage value of 20ms is greater than U1 and the absolute value of the difference between the 10-point sampling sliding average value and the 1s average voltage value is less than φ, and at the same time, the difference between the upper bus capacitor voltage and the lower bus capacitor voltage is less than the allowable imbalance threshold, then it is determined that the DC bus voltage has reached a safe and stable state.
[0053] S2 controls the T-type three-level power bridge to operate in low-power rectification mode, converting the coupled AC power into DC power to boost and pre-charge the DC bus support capacitor.
[0054] In this embodiment, the T-type three-level power bridge is controlled by software to operate under low-power rectification conditions. Specifically, a dq synchronous rotating coordinate system current closed-loop control method is adopted. Based on the real-time phase angle θ of the power grid calculated by phase-locked loop operation (based on this real-time phase angle θ, the control timing is kept synchronized with the mains power, laying the foundation for subsequent stable grid connection), an amplitude-controllable SPWM drive signal is generated. Preferably, the frequency of the SPWM drive signal is 10kHz. By dynamically adjusting the duty cycle of the SPWM drive signal, the active power output of the power bridge is limited, thereby controlling the T-type three-level power bridge to operate under low-power rectification conditions. This achieves flexible regulation of the pre-charge current and the bus voltage boost rate, so as to smoothly convert the small amount of AC power obtained by coupling into DC power and continuously perform a smooth voltage boost pre-charge on the DC bus support capacitor.
[0055] It should be noted that the real-time phase angle θ only determines the modulation output at a single moment. To avoid continuous phase drift leading to control instability, this embodiment preferably sets two-level phase-locked synchronization judgment conditions to synchronously verify the phase error and frequency deviation. Only when the real-time grid frequency deviation is less than the first preset frequency threshold (preferably 0.1 Hz), the phase error is less than the first preset phase threshold (preferably 0.5°), and this state is stably maintained for a preset duration (e.g., 2-5 seconds), is the preliminary phase-locked synchronization determined to be complete, and the current closed-loop control in the dq coordinate system can be entered.
[0056] S3. After pre-charging to meet the preset grid connection conditions, control the three-phase grid connection contactor to engage and enter the grid connection operation mode.
[0057] In this embodiment, the preset grid connection condition is a software dual-judgment logic, which does not rely on hardware circuits for implementation. Specifically, it includes two judgment conditions that must be met simultaneously: the collected DC bus voltage reaches a stable state and has completed synchronous phase-locking with the mains power. That is, it includes two conditions, and only when both conditions are met simultaneously can it be determined that the grid connection is satisfied.
[0058] Specifically, during the pre-charging process, the DC bus voltage is continuously monitored. When the DC bus voltage reaches the preset voltage target and the voltage fluctuation meets the stability index, the main control unit re-verifies the phase-locked state. If the real-time grid frequency deviation is less than the second preset frequency threshold and the phase error is less than the second preset phase threshold, and is maintained for a preset duration, it is determined that the synchronization conditions required for grid connection are met. After the bus voltage stability condition and the high-precision phase-locked synchronization condition are both met, the main control unit controls the three-phase grid-connected contactor to close, and the device switches to the elevator braking energy feedback grid-connected operation mode.
[0059] It should be noted that the method for determining whether the DC bus voltage has reached a stable state has been explained above and will not be repeated here; at the same time, the condition for determining whether synchronization with the mains power lock is completed is the same as the method for determining whether to enter the dq coordinate system current closed-loop control, and will not be repeated here either.
[0060] As a preferred embodiment, during the pre-charge stage, the SPWM drive signal is immediately blocked upon the occurrence of a fault, and preferably the three-phase grid-connected contactor is disconnected after a 10ms delay, and the DC main switch is disconnected after a 50ms delay, so as to achieve graded safety pressure relief and avoid high-voltage breakdown of the device.
[0061] In summary, while existing elevator energy-saving feedback devices also incorporate LCL three-phase filter circuits, T-type three-level power bridges, and DC bus support capacitors, these devices only operate after the three-phase grid-connected contactor is closed and connected to the grid, serving to achieve bidirectional energy conversion and harmonic suppression. During the power-on pre-charging phase, a separate DC-side resistive pre-charging branch is used to boost the bus capacitor voltage; the LCL three-phase filter circuit and T-type three-level power bridge do not participate in this phase. This embodiment, however, eliminates the DC-side pre-charging resistor and pre-charging relay hardware branches, changing the overall power-on sequence: with the three-phase grid-connected contactor open, the LCL three-phase filter circuit is reused to construct a cross-break capacitive coupling AC path, simultaneously driving the T-type three-level power bridge in low-power rectification mode. Simultaneously, soft current limiting is achieved through the LC impedance network, completing the DC bus capacitor pre-charging boost. In other words… This embodiment changes the original timing of the components, the energy transmission path, and the division of labor among the components. It enables the LCL three-phase filter circuit, which originally only had grid-connected filtering function, to take on the additional function of pre-charge current limiting, eliminating the resistive pre-charge hardware. This solves the technical problems of pre-charge heat generation and hardware redundancy in traditional solutions, forming a complete technical solution that is different from the existing technology.
[0062] The above descriptions are merely embodiments of the present invention, and common knowledge regarding specific structures and characteristics in the solutions is not described in detail here. It should be noted that those skilled in the art can make several improvements without departing from the present invention, and these should also be considered within the scope of protection of the present invention. These improvements will not affect the effectiveness of the implementation of the present invention or the practicality of the patent. The scope of protection claimed in this application should be determined by the content of the claims, and the specific embodiments described in the specification can be used to interpret the content of the claims.
Claims
1. An elevator energy-saving feedback device, characterized in that: The system includes a main control unit, an LCL three-phase filter circuit, a T-type three-level power bridge, a three-phase grid-connected contactor, and a DC bus support capacitor. The three-phase grid-connected contactor is connected in series between the mains power input and the LCL three-phase filter circuit. During the power-on pre-charging phase, the main control unit controls the three-phase grid-connected contactor to be in the open state. Simultaneously, the three-phase mains power is capacitively coupled to the LCL three-phase filter circuit through the open contacts of the three-phase grid-connected contactor. The main control unit controls the T-type three-level power bridge to operate in a low-power rectification mode, converting the coupled AC power into DC power to boost the DC bus support capacitor for pre-charging. When the pre-charging reaches the preset grid-connection conditions, the main control unit controls the three-phase grid-connected contactor to close, entering the grid-connected operation mode.
2. The elevator energy-saving feedback device according to claim 1, characterized in that: During the power-on pre-charging phase, the main control unit collects the DC bus voltage and the three-phase mains electrical parameters in real time, and performs phase-locked loop (PLL) calculation based on the three-phase mains electrical parameters, so as to use the PLL calculation result as the synchronous PLL reference.
3. The elevator energy-saving feedback device according to claim 2, characterized in that: The main control unit adopts a dq synchronous rotating coordinate system current closed-loop control method. It generates an amplitude-controllable SPWM drive signal based on the phase-locked loop operation result, and limits the active power output of the power bridge by adjusting the duty cycle of the SPWM drive signal. This controls the T-type three-level power bridge to operate in a low-power rectification mode, thereby achieving flexible control of the pre-charge current and the bus voltage boost rate.
4. The elevator energy-saving feedback device according to claim 2, characterized in that: The preset grid connection conditions include: the collected DC bus voltage reaches a stable state and has been synchronized with the mains power.
5. The elevator energy-saving feedback device according to claim 2, characterized in that: It includes a DC voltage detection circuit, which uses a resistor voltage divider to acquire the DC bus side voltage and sends the sampled signal to the main control unit in a differential sampling form; the main control unit has built-in voltage stability determination logic, which determines whether the DC bus side voltage has reached a stable state based on the real-time acquired DC bus side voltage and the voltage stability determination logic.
6. The elevator energy-saving feedback device according to claim 1, characterized in that: The LCL three-phase filter circuit includes a bridge-side inductor LA, a grid-side inductor LB, and a star-connected filter capacitor C. The star-connected filter capacitor C is connected to the three-phase bus between the bridge-side inductor LA and the grid-side inductor LB. During the power-on pre-charge stage, the LCL three-phase filter circuit forms an LC impedance network to constrain the AC current formed by coupling, thereby achieving passive soft current limiting during the pre-charge process.
7. A pre-charging method, characterized in that: Based on the elevator energy-saving feedback device according to any one of claims 1-6, the pre-charging method includes: S1. Power-on initialization: control the three-phase grid-connected contactor to remain open. At the same time, the three-phase mains power is connected to the LCL three-phase filter circuit in a capacitive coupling manner through the open contact of the three-phase grid-connected contactor. The LCL three-phase filter circuit forms an LC impedance network to suppress current surges. S2. Control the T-type three-level power bridge to operate in low-power rectification mode, convert the coupled AC power into DC power, and perform boost pre-charge on the DC bus support capacitor; S3. After pre-charging to meet the preset grid connection conditions, control the three-phase grid connection contactor to engage and enter the grid connection operation mode.
8. The control method according to claim 7, characterized in that: Step S1 also includes real-time acquisition of DC bus voltage and three-phase mains electrical parameters, and mains synchronization phase-locking is completed based on the three-phase mains electrical parameters to establish a grid voltage synchronization reference.
9. The control method according to claim 8, characterized in that: In step S3, the preset grid connection conditions include: The acquired DC bus voltage has reached a stable state and has been synchronized with the mains power supply. The specific method for determining whether the acquired DC bus voltage has reached a stable state is as follows: The main control unit has built-in voltage stability determination logic. Based on the real-time collected DC bus side voltage and combined with the voltage stability determination logic, it determines whether the DC bus side voltage has reached a stable state.
10. The control method according to claim 7, characterized in that: In step S2, the specific method for controlling the T-type three-level power bridge to operate in low-power rectification mode includes: The main control unit adopts a dq synchronous rotating coordinate system current closed-loop control method. It generates an amplitude-controllable SPWM drive signal based on the phase-locked loop operation result, and dynamically limits the rectified current by adjusting the duty cycle of the SPWM drive signal, thereby maintaining the T-type three-level power bridge in a low-power rectification operation state.