A method, device, and medium for adaptive decoupling and heterogeneous unit collaborative control of hybrid energy storage power.

By adaptively adjusting the cutoff frequency and state constraints of the hybrid energy storage system, the problems of insufficient power separation accuracy and energy storage unit response mismatch under the fixed parameter filtering method are solved, thereby improving frequency stability and voltage support capability and extending system life.

CN123121867APending Publication Date: 2026-11-17INNER MONGOLIA UNIV OF TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611517265.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-28
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

In existing flywheel-supercapacitor hybrid energy storage systems, fixed-parameter filtering methods cannot adapt to the power fluctuations of new energy sources, resulting in insufficient power separation accuracy, mismatched responses of heterogeneous energy storage units, and failure to consider the state changes of supercapacitors and flywheels, leading to problems such as overcharging, over-discharging, and overspeeding. Furthermore, it is difficult to balance frequency and voltage deviations during dynamic operation.

Method used

By calculating the operating state vector of the hybrid energy storage system, dynamically adjusting the adaptive cutoff frequency, performing state constraint limiting and residual margin allocation, the target power command matching of the flywheel and supercapacitor is achieved, and coordinated control is executed, including supercapacitor control, flywheel control and grid-connected converter control.

Benefits of technology

It improves power separation accuracy, reduces the risk of overcharging, over-discharging and overspeeding of energy storage units, enhances frequency stability and voltage support capability, and extends system life.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123121867A_ABST
    Figure CN123121867A_ABST
Patent Text Reader

Abstract

This application discloses a method, device, and medium for adaptive decoupling and heterogeneous unit collaborative control of hybrid energy storage power, relating to the fields of new energy microgrids and hybrid energy storage control technology. The method includes: calculating the dynamic drift index based on the operating state vector of the hybrid energy storage system in the current cycle and determining the adaptive cutoff frequency; determining the initial power components of the flywheel and supercapacitor through adaptive decoupling; applying state constraint limiting and margin allocation to the initial power components of the flywheel and supercapacitor to obtain the target power commands for the flywheel and supercapacitor; then executing supercapacitor control, flywheel control, and grid-connected converter control to obtain the actual energy storage power and update the actual energy storage state, thereby updating the operating state vector for the next cycle and entering the collaborative control phase for the next cycle. This application can improve frequency stability and voltage support capability under new energy disturbance and grid disturbance conditions.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of new energy microgrids and hybrid energy storage control technology, and in particular to a method, device and medium for hybrid energy storage power adaptive decoupling and heterogeneous unit collaborative control. Background Technology

[0002] With the increasing proportion of renewable energy generation, the output of renewable energy in microgrids exhibits randomness, volatility, and intermittency, leading to significant dynamic changes in system power fluctuations. Hybrid energy storage systems, by combining different types of energy storage units, can leverage the differences in response speed, power density, energy retention capacity, and cycle life among these units to improve renewable energy absorption capacity and microgrid operational stability. Existing flywheel-supercapacitor hybrid energy storage systems typically employ fixed-parameter low-pass filters for power frequency division, allocating the low-frequency power component output from the low-pass branch to the flywheel energy storage and the high-frequency power component formed by the difference between the demanded power and the low-frequency power component to the supercapacitor energy storage. However, the following problems still exist: (1) The power fluctuation spectrum of new energy sources drifts dynamically with changes in operating conditions. Fixed parameter filtering methods cannot adjust the high and low frequency boundaries according to real-time fluctuation characteristics, resulting in insufficient power separation accuracy.

[0003] (2) Flywheel energy storage and supercapacitor energy storage have different response bandwidths, energy states and power boundaries, and fixed power allocation strategies cannot match power commands with the real-time availability of heterogeneous energy storage.

[0004] (3) When the state of charge of a supercapacitor is close to its upper or lower limit, its subsequent charging or discharging capacity will be reduced; when the speed of the flywheel is close to the allowable boundary, its usable kinetic energy regulation range will be compressed. Ignoring the above state changes (the power distribution process lacks constraints on the state of charge of the supercapacitor and the speed of the flywheel) can easily cause problems such as overcharging, over-discharging, overspeeding, underspeeding, or long-term high-load operation of the energy storage unit, and cause additional losses and lifespan degradation.

[0005] (4) During dynamic operation, the active power command, grid connection point frequency deviation and voltage deviation are coupled with each other, and traditional control methods are difficult to take into account the problems of fast power tracking, active voltage support and safe operation of energy storage. Summary of the Invention

[0006] The purpose of this application is to provide a method, device and medium for adaptive decoupling of hybrid energy storage power and coordinated control of heterogeneous units, which can improve frequency stability and voltage support capability under the conditions of new energy disturbance and grid disturbance.

[0007] To achieve the above objectives, this application provides the following solution: Firstly, this application provides a method for adaptive decoupling of hybrid energy storage power and cooperative control of heterogeneous units, including: Obtain the operating state vector of the hybrid energy storage system in the current cycle; the hybrid energy storage system includes a flywheel energy storage unit, a supercapacitor energy storage unit, and a grid-connected converter; The dynamic drift index is calculated based on the operating state vector, and the adaptive cutoff frequency is determined using the dynamic drift index. Based on the operating state vector and the adaptive cutoff frequency, the initial power components of the flywheel and the supercapacitor are determined through adaptive decoupling. Based on the operating state vector, state constraint limiting and residual margin allocation are performed on the initial power component of the flywheel and the initial power component of the supercapacitor to obtain the target power command of the flywheel and the target power command of the supercapacitor. Based on the operating state vector, the flywheel target power command, and the supercapacitor target power command, supercapacitor control, flywheel control, and grid-connected converter control are executed to obtain the actual energy storage power and update the actual energy storage state. Based on the actual energy storage power and the actual energy storage state, the operating state vector for the next cycle is updated, and the coordinated control for the next cycle begins.

[0008] Secondly, this application provides a computer device, including: a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the computer program to implement a hybrid energy storage power adaptive decoupling and heterogeneous unit cooperative control method.

[0009] Thirdly, this application provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements a method for adaptive decoupling of hybrid energy storage power and coordinated control of heterogeneous units.

[0010] According to the specific embodiments provided in this application, the following technical effects are disclosed: This application calculates the dynamic drift index based on the operating state vector of the hybrid energy storage system in the current cycle, and continuously adjusts the adaptive cutoff frequency using the dynamic drift index, enabling the power frequency division boundary to follow the fluctuation spectrum changes of new energy sources, thereby improving the decoupling accuracy of the initial power components of the flywheel and the supercapacitor. Based on this, state constraint limiting and residual margin allocation are performed. Through these two allocation processes, the target power command for the flywheel and the target power command for the supercapacitor are obtained, ensuring that the target power command matches the real-time availability of heterogeneous energy storage. The state constraint limiting and residual margin allocation processes can reduce the risks of supercapacitor overcharging and over-discharging, as well as flywheel overspeeding, underspeeding, or long-term high-load operation, improving the safety and service life of the hybrid energy storage system. Finally, based on the operating state vector, the flywheel target power command, and the supercapacitor target power command, supercapacitor control, flywheel control, and grid-connected converter control are executed to obtain the actual energy storage power and update the actual energy storage state. Thus, this application has achieved coordinated control of heterogeneous units, improving frequency stability and voltage support capability under conditions of new energy disturbance and power grid disturbance. Attached Figure Description

[0011] To more clearly illustrate the technical solutions in the embodiments of this application or the prior art, the drawings used in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0012] Figure 1 This is a flowchart illustrating the method for adaptive decoupling of hybrid energy storage power and collaborative control of heterogeneous units in one embodiment of this application.

[0013] Figure 2 This is a schematic diagram of the structure of a computer device provided in an embodiment of this application. Detailed Implementation

[0014] The technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this application, and not all embodiments. Based on the embodiments of this application, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this application.

[0015] This application applies to the adaptive power decoupling and heterogeneous unit collaborative control of flywheel energy storage and supercapacitor energy storage combined systems under dynamic drift conditions, forming a complete control chain that is sequentially connected by state acquisition, dynamic drift calculation, adaptive power decoupling, state-constrained power correction, converter collaborative execution, and operation feedback update.

[0016] To make the above-mentioned objectives, features and advantages of this application more apparent and understandable, the application will be further described in detail below with reference to the accompanying drawings and specific embodiments.

[0017] In one exemplary embodiment, such as Figure 1 As shown, a hybrid energy storage power adaptive decoupling and heterogeneous unit cooperative control method is provided. This method is executed by a computer device, specifically by a computer device such as a terminal or server alone, or by a terminal and a server together. In the embodiments of this application, it includes the following steps 201 to 206.

[0018] The hybrid energy storage system includes a flywheel energy storage unit, a supercapacitor energy storage unit, a flywheel energy storage converter connected to the flywheel energy storage unit, a bidirectional DC / DC converter connected to the supercapacitor energy storage unit, and a grid-connected converter for connecting to the grid connection point.

[0019] Among them, the new energy power generation unit and the load are connected to the microgrid common bus, the flywheel energy storage unit is connected to the hybrid energy storage DC bus through the flywheel energy storage converter, the supercapacitor energy storage unit is connected to the hybrid energy storage DC bus through the bidirectional DC / DC converter, and the hybrid energy storage DC bus is connected to the grid connection point through the grid-connected converter.

[0020] Step 201: Obtain the operating state vector of the hybrid energy storage system in the current cycle.

[0021] In a specific application, according to a fixed sampling period T s Obtain the running state vector. Step 201 includes the following steps (11)-(15).

[0022] (11) Collect the output power of new energy sources, load power, grid connection point frequency, grid connection point voltage, supercapacitor state of charge, and flywheel speed; in addition, it can also collect the actual output power of each energy storage unit and the output voltage and output current of each converter. Specifically, the output power of new energy sources and load power are collected through power sensors.

[0023] (12) Based on the output power of the new energy source and the load power The formula for calculating the required power for energy storage is: Among them, the energy storage demand power This indicates that the hybrid energy storage system discharges into the microgrid, and the energy storage demand P is...b (k)<0 indicates that the hybrid energy storage system absorbs power from the microgrid; k is the index of the period.

[0024] (13) Calculate the power change rate v based on the energy storage demand power of adjacent cycles. P (k), the formula is: (14) Based on the rated frequency f N The frequency deviation Δf(k) is calculated based on the grid connection point frequency f(k) using the following formula: ; (15) Based on the rated voltage U N According to the grid connection point voltage U pcc (k) Calculate the voltage deviation ΔU(k) ​​using the following formula: .

[0025] The energy storage demand power, the power change rate, the frequency deviation, the voltage deviation, the grid connection point frequency, the grid connection point voltage, and the supercapacitor state of charge. and the flywheel speed ω m (k) This constitutes the operating state vector, which may also include the actual output power of each energy storage unit and the output voltage and current of each converter, such as the output voltage of the bidirectional DC / DC converter and the actual power P of the supercapacitor. sc (k) Flywheel actual power P fw (k). The running state vector can be represented as: This data is used in multiple subsequent steps, including dynamic drift identification, state constraint power correction, and feedback update.

[0026] Step 202: Calculate the dynamic drift index based on the running state vector, and use the dynamic drift index to determine the adaptive cutoff frequency.

[0027] In a specific application, step 202 includes the following steps (21)-(24).

[0028] (21) Regarding the power change rate v P The power change normalization quantity ρ is obtained by normalizing the frequency deviation Δf(k) and the frequency deviation Δf(k). P (k) and frequency deviation normalization ρ f (k), the calculation formula is: .

[0029] .

[0030] in, Δ is the preset power change rate benchmark value. fN This is the preset frequency deviation reference value.

[0031] (22) The normalized power change and the normalized frequency deviation are weighted and calculated to obtain the dynamic drift index, which is given by the following formula: ; where λ P and λ f These are the power change rate weight and the frequency deviation weight, respectively. The value of D(k) ranges from 0 to 1.

[0032] An increase in the dynamic drift index indicates an increase in the power change rate or frequency deviation. The cutoff frequency decreases as the dynamic drift index increases, thereby expanding the frequency range covered by the high-pass branch and enabling the supercapacitor to handle more rapidly fluctuating power. A decrease in the dynamic drift index indicates that the system power change is slowing down, and the cutoff frequency increases accordingly, enabling the flywheel to handle more low-frequency and stable power components.

[0033] (23) Based on the dynamic drift index, determine the original value of the cutoff frequency between the preset minimum cutoff frequency and the preset maximum cutoff frequency, using the following formula: .

[0034] (24) Perform first-order smoothing on the original value of the cutoff frequency to determine the adaptive cutoff frequency, using the following formula: .

[0035] Among them, f c,min and f c,max These are the preset minimum cutoff frequency and the preset maximum cutoff frequency, respectively, where α is the cutoff frequency smoothing coefficient and 0 ≤ α < 1. Increasing D(k) makes f c,raw As D(k) decreases, the coverage area of ​​the high-pass branch expands, and the initial power component of the supercapacitor increases; as D(k) decreases, f c,raw As (k) increases, the coverage of the low-pass branch expands, and the initial power component of the flywheel increases.

[0036] Step 203: Based on the operating state vector and the adaptive cutoff frequency, determine the initial power components of the flywheel and the supercapacitor through adaptive decoupling; In a specific application, step 203 includes the following steps (31)-(33).

[0037] (31) The adaptive cutoff frequency f c (k) is converted to discrete low-pass filter coefficients. The formula is: .

[0038] (32) Using the discrete low-pass filter coefficients to determine the energy storage demand power P b(k) Perform low-pass filtering to obtain the initial power component P of the flywheel. fw,0 (k), the formula is: Among them, P fw,0 (k-1) represents the initial power component of the flywheel in the previous sampling period.

[0039] (33) The difference between the energy storage demand power and the initial power component of the flywheel is used to obtain the initial power component P of the supercapacitor. sc,0 (k), the formula is: That is, the sum of the initial power components of the flywheel and the initial power components of the supercapacitor equals the energy storage demand power.

[0040] Step 204: Based on the operating state vector, perform state constraint limiting and residual margin allocation on the initial power component of the flywheel and the initial power component of the supercapacitor to obtain the target power command of the flywheel and the target power command of the supercapacitor.

[0041] In a specific application, step 204 includes the following steps (41)-(47).

[0042] (41) Based on the state of charge (SOC) of the supercapacitor sc (k), calculate the supercapacitor charging availability factor κ sc,ch (k) and the discharge availability factor κ of the supercapacitor sc,dis (k), the formula is: .

[0043] .

[0044] Among them, SOC sc,min SOC sc,max and SOC sc,ref These are the upper limit, upper limit, and reference value for the state of charge of a supercapacitor. .

[0045] (42) Based on the flywheel speed ω m (k) Calculate the flywheel equivalent energy state (SOE) fw (k), the formula is: ; where ω min and ω max These are the minimum and maximum permissible speeds of the flywheel, respectively; SOE fw (k) is used to characterize the proportion of currently available kinetic energy of the flywheel after being limited to 0 to 1.

[0046] (43) Calculate the flywheel charging availability factor κ based on the flywheel equivalent energy state. fw,ch (k) and flywheel discharge availability factor κ fw,dis (k), the formula is: .

[0047] .

[0048] Among them, SOE fw,min SOE fw,max and SOE fw,ref These are the lower limit, upper limit, and reference value of the flywheel's equivalent energy state, respectively.

[0049] (44) Based on the supercapacitor charging availability coefficient or the supercapacitor discharging availability coefficient, and in combination with the supercapacitor rated power, determine the current allowable supercapacitor power range; use the current allowable supercapacitor power range to limit the initial power component of the supercapacitor to obtain the first corrected supercapacitor power.

[0050] (45) Based on the flywheel charging availability coefficient or the flywheel discharging availability coefficient, and in combination with the flywheel rated power, determine the current allowable flywheel power range; use the current allowable flywheel power range to limit the initial power component of the flywheel to obtain the first corrected flywheel power.

[0051] When the power is positive, the discharge availability factor is used to determine the positive upper limit; when the power is negative, the charging availability factor is used to determine the negative lower limit. Specifically, a positive power value indicates that the energy storage is discharging into the microgrid, and a negative power value indicates that the energy storage is charging from the microgrid. When the state of charge of the supercapacitor and the equivalent energy state of the flywheel are close to their lower limits, the allowable discharge power of the corresponding energy storage is reduced; when the state of charge of the supercapacitor and the equivalent energy state of the flywheel are close to their upper limits, the allowable charging power of the corresponding energy storage is reduced.

[0052] (46) Based on the energy storage demand power P b (k) The first corrected supercapacitor power P sc,1 (k) and the first corrected flywheel power P fw,1 (k), calculate the unallocated power after clipping, the formula is: .

[0053] (47) The unallocated power after the limit is allocated to the first corrected supercapacitor power and the first corrected flywheel power according to the margin. At the same time, the limit is performed according to the current allowed supercapacitor power range and the current allowed flywheel power range to obtain the supercapacitor target power command and the flywheel target power command.

[0054] Specifically, the remaining power margin M of the supercapacitor is calculated based on the direction of the unallocated power. sc (k) and flywheel residual power margin M fw(k); Calculate the secondary allocation supercapacitor weight and secondary allocation flywheel weight based on the remaining power margin of the supercapacitor and the remaining power margin of the flywheel; Based on the unallocated power after the limiting, correct the first corrected supercapacitor power according to the secondary allocation supercapacitor weight, and limit the supercapacitor power according to the current allowed supercapacitor power range to obtain the supercapacitor target power command; Based on the unallocated power after the limiting, correct the first corrected flywheel power according to the secondary allocation flywheel weight, and limit the flywheel power according to the current allowed flywheel power range to obtain the flywheel target power command.

[0055] Secondary allocation of supercapacitor weights μ sc (k) and secondary allocation flywheel weight μ fw The formula for calculating (k) is: .

[0056] .

[0057] Specifically, when the sum of the remaining power margin of the supercapacitor and the remaining power margin of the flywheel is greater than zero, the sum of the secondary allocation weight of the supercapacitor and the secondary allocation weight of the flywheel is 1; when the sum of the two is equal to zero, both secondary allocation weights are set to zero, and an unallocated power flag is output.

[0058] Supercapacitor Target Power Command and flywheel target power command The calculation formula is: .

[0059] .

[0060] Provided that the absolute value of the unallocated power after limiting is not greater than the sum of the remaining power margin of the supercapacitor and the remaining power margin of the flywheel, Otherwise, output the unallocated power flag and the remaining power value for the upper-level power management unit to perform new energy power limiting, external grid power compensation, or load management.

[0061] After obtaining the allowable power range of the two types of energy storage in the current sampling period, this application limits the initial power components of the flywheel and the initial power components of the supercapacitor; calculates the unallocated power after limiting, and performs secondary allocation based on the remaining power margin of the two types of energy storage in the unallocated power direction to obtain the target power command of the flywheel and the target power command of the supercapacitor that satisfy the state constraints and power boundaries.

[0062] Step 205: Based on the operating state vector, the flywheel target power command, and the supercapacitor target power command, execute supercapacitor control, flywheel control, and grid-connected converter control to obtain the actual energy storage power and update the actual energy storage state.

[0063] In a specific application, step 205 includes supercapacitor execution control, flywheel execution control, and grid-connected converter control. In the grid-connected converter control, the grid-connected converter adopts an active-reactive power outer loop and current inner loop control structure. The reactive power setpoint is obtained by proportional-integral regulation and limiting processing of the grid connection point voltage deviation. The above three controls correspond to steps (51) to (53) below.

[0064] (51) According to the supercapacitor target power command and the output voltage U of the bidirectional DC / DC converter dc (k) Calculate the supercapacitor current setpoint; based on the supercapacitor current setpoint, determine the duty cycle signal through the current closed-loop controller; perform amplitude limiting and pulse width modulation on the duty cycle signal to obtain the switching pulse of the bidirectional DC / DC converter, and collect the actual power of the supercapacitor.

[0065] Among them, the supercapacitor current setpoint The calculation formula is: .

[0066] Among them, U ε To prevent division by zero. Minimum voltage.

[0067] Will Compared with the actual output current i of the supercapacitor sc (k) The difference is input to the proportional-integral controller (PIC) to obtain the duty cycle setpoint, i.e., the duty cycle signal. ;right Limiting and pulse width modulation are performed to generate pulse signals for the switching devices of the bidirectional DC / DC converter, enabling the supercapacitor's actual output power to track the signal. .

[0068] (52) According to the flywheel target power command and the flywheel speed ω m (k) Calculate the quadrature-axis current setpoint and determine the direct-axis current setpoint; based on the direct-axis current setpoint and the quadrature-axis current setpoint, determine the direct-axis voltage setpoint and the quadrature-axis voltage setpoint through the direct-axis and quadrature-axis current closed-loop controller; perform inverse coordinate transformation and space vector pulse width modulation on the direct-axis voltage setpoint and the quadrature-axis voltage setpoint to generate the pulse signal of the flywheel energy storage converter, and collect the actual power of the flywheel.

[0069] Specifically, the electromagnetic torque setpoint The calculation formula is: .

[0070] ω ε To prevent division by zero, the minimum speed is required. For flywheel energy storage units using permanent magnet synchronous motors, the minimum speed is determined based on the number of motor pole pairs p and the permanent magnet flux linkage ψ. f ,Will Converted to quadrature axis current setpoint And set the direct-axis current setpoint to =0, the formula is expressed as: .

[0071] The three-phase stator current of the flywheel motor is collected, and the direct-axis current i is obtained through coordinate transformation. d (k) and quadrature axis current i q (k); respectively -i d (k) and -i q (k) Input the direct-axis and quadrature-axis current proportional-integral controllers, and obtain the direct-axis voltage setpoint by combining the motor cross-coupling compensation term. and quadrature axis voltage setpoint The voltage setpoint is subjected to inverse coordinate transformation and space vector pulse width modulation to generate pulse signals for the switching devices of the flywheel energy storage converter, enabling the actual output power of the flywheel to track the voltage. .

[0072] (53) Generate reactive power support command based on voltage deviation, and have the grid-connected converter simultaneously track the active power command and reactive power support command of hybrid energy storage: take the sum of the target power command of the supercapacitor and the target power command of the flywheel as the active power setpoint of the grid-connected converter; generate reactive power support command based on the active power setpoint of the grid-connected converter and the voltage deviation; through the grid-connected converter, based on the active power setpoint of the grid-connected converter and the reactive power support command, perform active-reactive power outer loop and current inner loop control, and collect the actual active power and actual reactive power of the grid connection point.

[0073] Specifically, As the active power setpoint of the grid-connected converter Reactive power support commands are generated based on the voltage deviation ΔU(k). The formula is: .

[0074] Among them, K PU and K IU These are the voltage support proportional coefficient and integral coefficient, respectively, Q maxThis specifies the allowable reactive power for the grid-connected converter. The grid-connected converter employs an active-reactive power outer loop and a current inner loop control, respectively tracking... and This enables the hybrid energy storage system to provide active voltage support at the grid connection point while simultaneously compensating for active power.

[0075] The actual power of the supercapacitor, the actual power of the flywheel, the actual active power at the grid connection point, and the actual reactive power at the grid connection point constitute the actual energy storage power. This application achieves heterogeneous energy storage power tracking and active grid connection point voltage support through the above processing, obtaining the switching pulses of each converter and the actual energy storage power.

[0076] Step 206: Based on the actual energy storage power and the actual energy storage state, update the operating state vector for the next cycle and enter the collaborative control for the next cycle.

[0077] In a specific application, based on the actual energy storage power, the flywheel target power command, and the supercapacitor target power command, the power tracking deviation is calculated; that is, the tracking deviation between the target power and the actual output power is calculated. According to the actual energy storage power, the power tracking deviation, and the actual energy storage state (including supercapacitor state of charge, flywheel speed, grid connection point frequency, and grid connection point voltage, etc.), the operating state vector for the next cycle is updated, and then the cooperative control for the next cycle is executed, updating the dynamic drift index, adaptive cutoff frequency, allowable power range, and secondary allocation weight.

[0078] The formula for calculating the power tracking error is as follows: e sc (k) represents the supercapacitor power tracking error, e fw (k) represents the flywheel power tracking error, P sc (k) represents the actual power of the supercapacitor, P fw (k) represents the actual power of the flywheel.

[0079] If the power tracking deviation exceeds a preset value or the converter experiences a current-limiting state, the remaining power margin of the corresponding energy storage is set to zero, and the untracked power is transferred to another energy storage unit. If the other energy storage unit also reaches its state boundary or power boundary, an unallocated power flag is output. Through the above feedback update, each cycle is executed sequentially, forming a continuous data transmission and closed-loop collaborative control process. That is, this application forms a closed-loop collaborative control chain by sequentially performing state acquisition, drift identification, power decoupling, state correction, collaborative execution, and feedback update.

[0080] In summary, this application collects sampling signals from various sensors in the hybrid energy storage system to obtain an operating state vector containing energy storage demand power, power change rate, frequency deviation, voltage deviation, supercapacitor state of charge, and flywheel speed. Based on the operating state vector, a dynamic drift index is calculated and an adaptive cutoff frequency is determined. Based on the adaptive cutoff frequency, the energy storage demand power is adaptively decoupled. Based on the initial power component obtained after decoupling and the supercapacitor state of charge and flywheel speed in the energy storage state data, state constraint power correction is performed to obtain a target power command. Based on the target power command, heterogeneous energy storage power tracking and active grid connection point voltage support are executed to obtain the execution result. Based on the execution result, the control input for the next cycle is updated, and then the coordinated control for the next cycle begins.

[0081] The period, cutoff frequency upper and lower limits, power change rate reference value, frequency deviation reference value, energy storage state upper and lower limits, rated power, and controller parameters can all be pre-tuned based on the microgrid's rated capacity, energy storage unit rated parameters, and converter control bandwidth. Changes in parameter values ​​do not affect the input-output relationships and control logic between each step.

[0082] Compared with the prior art, this application has the following advantages: (1) The power change rate and frequency deviation are converted into dynamic drift index, and the cutoff frequency is continuously adjusted using the dynamic drift index so that the power frequency division boundary can follow the fluctuation spectrum of new energy and improve the decoupling accuracy of the initial power component of the flywheel and the initial power component of the supercapacitor.

[0083] (2) Convert the state of charge of the supercapacitor and the speed of the flywheel into the available charging and discharging coefficients and the allowable power range, respectively, and perform secondary allocation of the unallocated power based on the remaining margin, so that the target power command matches the real-time availability of heterogeneous energy storage.

[0084] (3) By limiting the state constraint, allocating the remaining margin and marking the unallocated power, the risk of overcharging and over-discharging of supercapacitors and overspeeding, underspeeding or long-term high-load operation of flywheels is reduced, thereby improving the safety and service life of hybrid energy storage systems.

[0085] (4) Through the coordinated control of the supercapacitor bidirectional DC / DC converter, flywheel energy storage converter and grid-connected converter, active power tracking and reactive voltage support at the grid connection point are realized simultaneously, thereby improving frequency stability and voltage support capability under the conditions of new energy disturbance and grid disturbance.

[0086] In one exemplary embodiment, a computer device is provided, which may be a server or a terminal, and its internal structure diagram may be as follows. Figure 2As shown, this computer device includes a processor, memory, input / output (I / O) interfaces, and a communication interface. The processor, memory, and I / O interfaces are connected via a system bus, and the communication interface is also connected to the system bus via the I / O interfaces. The processor provides computational and control capabilities. The memory includes non-volatile storage media and internal memory. The non-volatile storage media stores the operating system, computer programs, and a database. The internal memory provides the environment for the operating system and computer programs stored in the non-volatile storage media to run. The I / O interfaces are used for exchanging information between the processor and external devices. The communication interface is used for communicating with external terminals via a network connection. When the computer program is executed by the processor, it implements a hybrid energy storage power adaptive decoupling and heterogeneous unit cooperative control method.

[0087] Those skilled in the art will understand that Figure 2 The structure shown is merely a block diagram of a portion of the structure related to the present application and does not constitute a limitation on the computer device to which the present application is applied. Specific computer devices may include more or fewer components than those shown in the figure, or combine certain components, or have different component arrangements.

[0088] In one exemplary embodiment, a computer device is also provided, including: a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the computer program to implement the steps in the above-described method embodiments.

[0089] In one exemplary embodiment, a computer-readable storage medium is provided storing a computer program that, when executed by a processor, implements the steps in the above-described method embodiments.

[0090] In one exemplary embodiment, a computer program product is provided, including a computer program that, when executed by a processor, implements the steps in the above-described method embodiments.

[0091] It should be noted that the user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for analysis, data stored, data displayed, etc.) involved in this application are all information and data authorized by the user or fully authorized by all parties, and the collection, use and processing of the relevant data must comply with relevant regulations.

[0092] Those skilled in the art will understand that all or part of the processes in the above embodiments can be implemented by a computer program instructing related hardware. The computer program can be stored in a non-volatile computer-readable storage medium. When executed, the computer program can include the processes of the embodiments described above. Any references to memory, databases, or other media used in the embodiments provided in this application can include at least one of non-volatile and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetic random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. By way of illustration and not limitation, RAM can take many forms, such as Static Random Access Memory (SRAM) or Dynamic Random Access Memory (DRAM).

[0093] The databases involved in the embodiments provided in this application may include at least one type of relational database and non-relational database. Non-relational databases may include, but are not limited to, blockchain-based distributed databases. The processors involved in the embodiments provided in this application may be general-purpose processors, central processing units, graphics processing units, digital signal processors, programmable logic devices, quantum computing-based data processing logic devices, etc., and are not limited to these.

[0094] The technical features of the above embodiments can be combined in any way. For the sake of brevity, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0095] This document uses specific examples to illustrate the principles and implementation methods of this application. The descriptions of the above embodiments are only for the purpose of helping to understand the methods and core ideas of this application. Furthermore, those skilled in the art will recognize that, based on the ideas of this application, there will be changes in the specific implementation methods and application scope. Therefore, the content of this specification should not be construed as a limitation of this application.

Claims

1. A method for adaptive decoupling of hybrid energy storage power and cooperative control of heterogeneous units, characterized in that, The method includes: Obtain the operating state vector of the hybrid energy storage system in the current cycle; the hybrid energy storage system includes a flywheel energy storage unit, a supercapacitor energy storage unit, and a grid-connected converter; The dynamic drift index is calculated based on the operating state vector, and the adaptive cutoff frequency is determined using the dynamic drift index. Based on the operating state vector and the adaptive cutoff frequency, the initial power components of the flywheel and the supercapacitor are determined through adaptive decoupling. Based on the operating state vector, state constraint limiting and residual margin allocation are performed on the initial power component of the flywheel and the initial power component of the supercapacitor to obtain the target power command of the flywheel and the target power command of the supercapacitor. Based on the operating state vector, the flywheel target power command, and the supercapacitor target power command, supercapacitor control, flywheel control, and grid-connected converter control are executed to obtain the actual energy storage power and update the actual energy storage state. Based on the actual energy storage power and the actual energy storage state, the operating state vector for the next cycle is updated, and the coordinated control for the next cycle begins.

2. The method for adaptive decoupling of hybrid energy storage power and coordinated control of heterogeneous units according to claim 1, characterized in that, Obtain the operating state vector of the hybrid energy storage system in the current cycle, including: Collect data on the output power of new energy sources, load power, grid connection point frequency, grid connection point voltage, supercapacitor state of charge, and flywheel speed; Calculate the energy storage power requirement based on the output power of the new energy source and the load power. Calculate the power change rate based on the energy storage demand power in adjacent cycles; Based on the rated frequency, calculate the frequency deviation according to the grid connection point frequency; Based on the rated voltage, the voltage deviation is calculated according to the grid connection point voltage; the energy storage demand power, the power change rate, the frequency deviation, the voltage deviation, the supercapacitor state of charge, and the flywheel speed constitute the operating state vector.

3. The method for adaptive decoupling of hybrid energy storage power and coordinated control of heterogeneous units according to claim 1, characterized in that, The operating state vector includes the power change rate and frequency deviation; The dynamic drift index is calculated based on the operating state vector, and the adaptive cutoff frequency is determined using the dynamic drift index, including: The power change rate and the frequency deviation are normalized to obtain the normalized power change and the normalized frequency deviation. The dynamic drift index is obtained by weighting the normalized power change and the normalized frequency deviation. Based on the dynamic drift index, the original value of the cutoff frequency is determined between the preset minimum cutoff frequency and the preset maximum cutoff frequency; The original cutoff frequency value is smoothed using a first-order method to determine the adaptive cutoff frequency.

4. The method for adaptive decoupling of hybrid energy storage power and coordinated control of heterogeneous units according to claim 1, characterized in that, The operating state vector includes the energy storage demand power; Based on the operating state vector and the adaptive cutoff frequency, the initial power components of the flywheel and the supercapacitor are determined through adaptive decoupling, including: The adaptive cutoff frequency is converted into discrete low-pass filter coefficients; The energy storage demand power is low-pass filtered using the discrete low-pass filter coefficients to obtain the initial power component of the flywheel. The initial power component of the supercapacitor is obtained by subtracting the energy storage demand power from the initial power component of the flywheel.

5. The method for adaptive decoupling of hybrid energy storage power and coordinated control of heterogeneous units according to claim 1, characterized in that, The operating state vector includes energy storage power demand, supercapacitor state of charge, and flywheel speed. Based on the operating state vector, state constraint limiting and residual margin allocation are performed on the initial power component of the flywheel and the initial power component of the supercapacitor to obtain the target power command for the flywheel and the target power command for the supercapacitor, including: Based on the state of charge of the supercapacitor, calculate the supercapacitor charging availability factor and the supercapacitor discharging availability factor; Calculate the equivalent energy state of the flywheel based on the flywheel rotation speed; Based on the equivalent energy state of the flywheel, calculate the flywheel charging availability factor and the flywheel discharging availability factor; Based on the supercapacitor charging availability coefficient or the supercapacitor discharging availability coefficient, and in conjunction with the supercapacitor's rated power, the current allowable supercapacitor power range is determined; the initial power component of the supercapacitor is limited using the current allowable supercapacitor power range to obtain the first corrected supercapacitor power; Based on the flywheel charging availability coefficient or the flywheel discharging availability coefficient, and in conjunction with the flywheel rated power, the current allowable flywheel power range is determined; the initial power component of the flywheel is limited using the current allowable flywheel power range to obtain the first corrected flywheel power; The unallocated power after limiting is calculated based on the energy storage demand power, the first corrected supercapacitor power, and the first corrected flywheel power. The unallocated power after the limit is allocated to the first corrected supercapacitor power and the first corrected flywheel power according to the margin. At the same time, the limit is performed according to the current allowed supercapacitor power range and the current allowed flywheel power range to obtain the supercapacitor target power command and the flywheel target power command.

6. The method for adaptive decoupling of hybrid energy storage power and coordinated control of heterogeneous units according to claim 1, characterized in that, The hybrid energy storage system includes a flywheel energy storage converter connected to the flywheel energy storage unit and a bidirectional DC / DC converter connected to the supercapacitor energy storage unit; the operating state vector includes voltage deviation, output voltage of the bidirectional DC / DC converter, and flywheel speed. Based on the operating state vector, the flywheel target power command, and the supercapacitor target power command, supercapacitor control, flywheel control, and grid-connected converter control are executed to obtain the actual energy storage power, including: Based on the target power command of the supercapacitor and the output voltage of the bidirectional DC / DC converter, the supercapacitor current setpoint is calculated; based on the supercapacitor current setpoint, the duty cycle signal is determined by the current closed-loop controller; the duty cycle signal is limited and pulse width modulated to obtain the switching pulse of the bidirectional DC / DC converter, and the actual power of the supercapacitor is collected. Based on the flywheel target power command and the flywheel speed, the quadrature-axis current setpoint is calculated, and the direct-axis current setpoint is determined. Based on the direct-axis current setpoint and the quadrature-axis current setpoint, the direct-axis voltage setpoint and the quadrature-axis voltage setpoint are determined through a direct-axis and quadrature-axis current closed-loop controller. The direct-axis voltage setpoint and the quadrature-axis voltage setpoint are subjected to inverse coordinate transformation and space vector pulse width modulation to generate the pulse signal of the flywheel energy storage converter, and the actual flywheel power is collected. The sum of the target power command of the supercapacitor and the target power command of the flywheel is used as the active power setpoint of the grid-connected converter; based on the active power setpoint of the grid-connected converter and the voltage deviation, a reactive power support command is generated; through the grid-connected converter, based on the active power setpoint of the grid-connected converter and the reactive power support command, active-reactive power outer loop and current inner loop control are performed, and the actual active power and actual reactive power at the grid connection point are collected; the actual power of the supercapacitor, the actual power of the flywheel, the actual active power at the grid connection point, and the actual reactive power at the grid connection point constitute the actual energy storage power.

7. The method for adaptive decoupling of hybrid energy storage power and coordinated control of heterogeneous units according to claim 1, characterized in that, Based on the actual energy storage power and the actual energy storage state, update the operating state vector for the next cycle and enter the cooperative control for the next cycle, including: Based on the actual energy storage power, the flywheel target power command, and the supercapacitor target power command, calculate the power tracking deviation; Based on the actual energy storage power, the power tracking deviation, and the actual energy storage state, the operating state vector for the next cycle is updated, and then the coordinated control for the next cycle is executed.

8. The method for adaptive decoupling of hybrid energy storage power and coordinated control of heterogeneous units according to claim 5, characterized in that, The unallocated power after the limiting is allocated to the first-corrected supercapacitor power and the first-corrected flywheel power with a margin. Simultaneously, limiting is performed based on the current allowed supercapacitor power range and the current allowed flywheel power range to obtain the supercapacitor target power command and the flywheel target power command, including: Calculate the remaining power margin of the supercapacitor and the remaining power margin of the flywheel based on the direction of the unallocated power. Based on the remaining power margin of the supercapacitor and the remaining power margin of the flywheel, calculate the secondary allocation weight of the supercapacitor and the secondary allocation weight of the flywheel. Based on the unallocated power after the limiting, the first corrected supercapacitor power is adjusted according to the second allocation of supercapacitor weight, and the limiting is performed according to the current allowed supercapacitor power range to obtain the supercapacitor target power command; Based on the unallocated power after the limiting, the first corrected flywheel power is adjusted according to the secondary allocation flywheel weight, and the limiting is performed according to the current allowed flywheel power range to obtain the flywheel target power command.

9. A computer device, comprising: A memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that the processor executes the computer program to implement the hybrid energy storage power adaptive decoupling and heterogeneous unit cooperative control method according to any one of claims 1-8.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that, When the computer program is executed by the processor, it implements the hybrid energy storage power adaptive decoupling and heterogeneous unit cooperative control method as described in any one of claims 1-8.