Edge computing-based smart classroom equipment collaborative management system

By using the STSGCN spatiotemporal synchronization graph based on edge computing, the problem of control incoordination caused by the difference in the effective time of device actions in smart classroom equipment management is solved, realizing local collaborative management of device actions and improving control stability and energy consumption management.

CN123123389APending Publication Date: 2026-11-17GUANGZHOU SIJIN ELECTRONIC TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611279174.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-21
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

In existing smart classroom equipment management systems, the timing of equipment actions varies significantly, leading to a lack of coordinated control, redundant commands, and ineffective handling of equipment action failures. This affects the stability and energy consumption of collaborative equipment management.

Method used

By adopting the STSGCN spatiotemporal synchronization graph based on edge computing, and through modules such as action espionage, trail freezing, mirroring rebuttal, resource shifting, settlement and deduction, and chain break write prohibition, local collaborative management of device actions is achieved, reducing action conflicts and redundancy, and improving control stability.

Benefits of technology

It effectively avoids conflicts caused by delayed equipment actions, eliminates redundant control, improves the stability and fault isolation capabilities of equipment collaborative management, and reduces energy consumption.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123123389A_ABST
    Figure CN123123389A_ABST
Patent Text Reader

Abstract

This invention discloses a smart classroom equipment collaborative management system based on edge computing, comprising: an action tracking module for embedding the actions of devices to be coordinated into the STSGCN spatiotemporal synchronization graph; a trail freezing module for generating effective trails and freezing reverse device actions; a mirroring and reversal module for constructing non-execution propagation paths and filtering valid device actions; a resource shifting module for forming a staggered shifting sequence; a settlement and deduction module for reverse deduction to generate settlement results; a return tracking and continuation module for enabling alternative device actions; and a chain-breaking and write-blocking module for blocking continuous abnormal writes. This invention relates to the field of smart classroom equipment collaborative management technology, realizing orderly collaboration of smart classroom equipment and improving control stability and anomaly handling efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of collaborative management technology for smart classroom equipment, and more particularly to a collaborative management system for smart classroom equipment based on edge computing. Background Technology

[0002] As the construction of smart campuses progresses, the types of devices connected to smart classrooms are constantly increasing. Common devices include lighting equipment, air conditioning equipment, fresh air equipment, curtain equipment, projection equipment, electronic whiteboards, audio equipment, access control equipment, environmental sensors, and personnel sensing devices. Existing smart classroom management methods mostly adopt centralized platform control, edge gateway forwarding control, and preset scene linkage control, which can complete device access, remote switching, timed start and stop, environmental parameter collection, and basic linkage.

[0003] The existing solutions still have shortcomings in practical use. The activation times of different devices vary significantly. Lighting provides quick feedback, while projectors require a stabilization time to start up. The impact of air conditioning and fresh air systems on the indoor environment is delayed. Existing control methods often process device command issuance and feedback retrieval within the same control cycle, easily misjudging actions that have not yet taken effect as failures. When multiple devices compete for the same classroom resources, existing solutions rely heavily on fixed priorities, making it difficult to stagger the activation order of air conditioning, fresh air systems, curtains, lighting, and projectors.

[0004] Existing solutions lack local verification of the necessity of device actions. In some scenarios, classroom control objectives can still be achieved even without executing a particular device action, and fixed linkage rules will still issue redundant instructions, increasing energy consumption and the number of device actions. After a device action fails, existing solutions often resort to re-issuing instructions or reporting a fault, lacking a process to account for failure feedback back to the time slice from which the action originated, and also lacking write protection for continuously failing device nodes. This can easily lead to abnormal devices repeatedly entering the control sequence, affecting the stability of collaborative management of smart classroom devices.

[0005] Therefore, how to provide a collaborative management system for smart classroom equipment based on edge computing is a problem that urgently needs to be solved by those skilled in the art. Summary of the Invention

[0006] One objective of this invention is to propose a smart classroom equipment collaborative management system based on edge computing. This invention utilizes the STSGCN spatiotemporal synchronization graph to perform action tracking, trail freezing, mirroring and reversal, resource shifting, and settlement processing on equipment actions, thereby realizing local collaborative management of multiple devices in the smart classroom. It has the advantages of fewer action conflicts, accurate feedback judgment, strong anomaly protection, and high control stability.

[0007] The edge computing-based smart classroom device collaborative management system according to an embodiment of the present invention includes: The action escort module is used to embed the actions of the devices to be coordinated into the STSGCN spatiotemporal synchronization graph, and bind the action source time slice, expected effective time slice, device node, classroom resource node, classroom control target, and alternative device action; The trail freezing module is used to generate an effective trail based on the actions of the devices to be coordinated, and freeze the reverse device actions under the same classroom resource node within the effective trail. The mirror proof module is used to construct non-execution propagation paths for the actions of the devices to be coordinated, and to synchronously deduce the actions of the devices to be coordinated within the STSGCN spatiotemporal synchronization diagram. The actions of the devices to be coordinated that change the classroom control objective from not being achieved to being achieved are retained as valid device actions. The resource shifting module is used to rearrange the valid device actions that compete for the same classroom resource node according to the effective trail, forming a staggered shifting sequence. The accounting and deduction module is used to issue staggered shift sequence, read action feedback, deduct the action feedback in reverse along the effective trail to the time slice of the action source, and generate completed accounting, incomplete accounting, and reverse accounting. The re-push continuation module is used to re-push valid equipment actions that have not been completed or have been reversed back to the time slice of the action source, and to enable alternative equipment actions to continue the classroom control target. The Disconnect Write Blocking module is used to cut off the propagation path between the same device node and the classroom resource node when incomplete or reverse reconciliation is continuously generated on the same device node, while opening the secure shutdown path, the anomaly reporting path, and the manual takeover path.

[0008] Optionally, the action escort module embeds the actions of the device to be coordinated into the STSGCN spatiotemporal synchronization graph, specifically including: Read the device node corresponding to the action of the device to be coordinated, and mark the time slice where the device node is located as the time slice from which the action originates; Based on the lag of the action taking effect on the device node, the time slice following the time slice from which the action originates is marked as the expected time slice. Push the actions of the devices to be coordinated into the time slice between the time slice of the action source and the expected effective time slice; Link the actions of the devices to be coordinated to the classroom resource nodes; Link classroom resource nodes to classroom control targets; Mark the actions of devices that are to be coordinated but have the same classroom control objective but different device nodes as alternative device actions.

[0009] Optionally, the generation of an effective trail in the trail freezing module specifically includes: Mark consecutive time slices between the source time slice of the action and the expected effective time slice as effective trails; Read the actions of the devices to be coordinated that are connected to the same classroom resource node within the effective trail; Mark the actions of devices that require coordination but have opposite classroom control objectives as reverse device actions; Stop reverse device actions from writing to the same classroom resource node within the effective trail; Upon reaching the expected effective time, the reverse device action is restored to write to the same classroom resource node.

[0010] Optionally, the mirroring counter-evidence module constructs a non-execution propagation path for the actions of the device to be coordinated, specifically including: Extract the time slice interval between the time slice from the time slice of the action source to the expected effective time slice of the device to be coordinated; Mark time slice intervals as propagation segments; Remove the writes to the device node and classroom resource node by the actions of the device to be coordinated within the propagation segment; Mark the propagation segment after the action of the device to be coordinated is deleted as not to execute the propagation path; The non-execution propagation path and the actions of the devices to be coordinated will be synchronously simulated within the STSGCN spatiotemporal synchronization diagram. Read the classroom control target achievement status within the expected effective time slice for actions of devices that do not execute propagation paths and those that need to be coordinated; Mark the actions of devices that do not perform the propagation path, fail to achieve the classroom control objective, and are awaiting collaborative device actions as valid device actions.

[0011] Optionally, the step of not performing synchronous simulation of the propagation path and the actions of the device to be coordinated within the STSGCN spatiotemporal synchronization diagram specifically includes: The time frame from which the action originates is used as the starting point for deduction; Maintain the write state after the action of the cooperating device is deleted without executing the propagation path; The write operations of the device node and classroom resource node corresponding to the action of the device to be coordinated are retained in the propagation segment. The non-execution propagation path and the actions of the devices awaiting coordination will be extrapolated along the effective trail to the expected effective time slice; During the expected effective time slice, read the classroom control target achievement status for those who do not execute the propagation path and the classroom control target achievement status for those who need to coordinate the action of the equipment. If the propagation path is not achieved and the collaborative device action achieves the classroom control objective, the collaborative device action will be marked as a valid device action.

[0012] Optionally, the resource shifting module forms a staggered shifting sequence, specifically including: Read the valid device actions that are competing for the same classroom resource node; Arrange the time slices according to the expected effective time of effective equipment operation; For valid device actions whose effective trails overlap, the action source time slice of the latter valid device action is moved to the adjacent time slice after the expected effective time slice of the former valid device action. The effective trail of the next valid device action is determined by re-determining the time slice from the source of the action after the movement. Preserve the sequence of valid device actions where the trailing traces do not overlap; The results of arranging the effective device actions and the retained order after the effective tail is redefined are marked as a staggered shift sequence.

[0013] Optionally, the reconciliation module reconciles the action feedback along the effective trail back to the action source time slice, specifically including: Issue the staggered shift sequence; Read the action feedback during the expected effective time slice corresponding to the effective device action; The effective trail is traced back from the expected effective time slice to the time slice where the action originated. The motion feedback is matched to the valid device action within the time slice from which the motion originates; When the action feedback achieves the classroom control target, the effective equipment action is marked as completed and accounted for. When the action feedback is contrary to the classroom control objective, the effective equipment action is marked as reversed. If the action feedback does not meet the classroom control target and does not belong to reverse accounting, the valid equipment action will be marked as incomplete accounting.

[0014] Optionally, the alternative device action for classroom control target activation in the return-to-classroom continuation module specifically includes: Read valid device actions marked as incomplete or reversed reconciliation; The effective equipment action is traced back to the time slice from which the action originated; When the effective equipment action stops in the time slice of the action source, it re-enters the staggered shift sequence under the same classroom resource node; Read the alternative device action bound to the valid device action; Bind alternative device actions to classroom control targets and classroom resource nodes that are valid device actions; Mark the expected effective time segment according to the action lag of the alternative equipment action; The alternative equipment action is pushed into the time slice between the action source time slice and the expected effective time slice to continue the classroom control target.

[0015] Optionally, the disconnection and write-blocking module cuts off the propagation path between the same device node and the classroom resource node, specifically including: Read incomplete and reverse reconciliations generated by the same device node within two consecutive expected effective time slices; If the same device node generates incomplete reconciliation or reverse reconciliation within two consecutive expected effective time slices, the same device node will be marked as a write-prohibited device node; Stop the write-blocking device node from writing the device to be coordinated to the classroom resource node; Block the valid device actions corresponding to the write-prohibited device node from entering the staggered shift sequence; Enable the secure shutdown path, anomaly reporting path, and manual takeover path for write-prohibited device nodes.

[0016] Optionally, the security shutdown path, anomaly reporting path, and manual takeover path corresponding to the open write-prohibited device node specifically include: Read the classroom resource node and the time slice of the action source corresponding to the write-prohibited device node; Bind the secure shutdown path to the classroom resource node corresponding to the write-disabled device node; Bind the anomaly reporting path to the continuously generated incomplete reconciliation and reverse reconciliation of write-prohibited device nodes; Bind the manual takeover path to the time slice of the action source corresponding to the write-protected device node; During the periods when the safe shutdown path, the abnormal reporting path, and the manual takeover path are open, the actions of the devices to be coordinated corresponding to the write-prohibited device nodes are stopped from writing to the classroom resource nodes; The valid device actions corresponding to the write-blocked device node are entered into the staggered shift sequence.

[0017] The beneficial effects of this invention are: (1) This invention transforms device actions from instantaneous control commands into cross-time slice propagation objects by action excitation and effective trail freezing. Before the device action reaches the expected effective time slice, the reverse device action writing under the same classroom resource node is frozen. This process can avoid reverse preemption between air conditioners, fresh air systems, curtains, lights, and projectors due to effective delay, and solve the problem that ordinary scene linkage rules are difficult to identify "the action is overwritten by the reverse action before it takes effect".

[0018] (2) This invention constructs a non-execution propagation path for the actions of the devices to be coordinated through mirror proof processing. The non-execution propagation path and the actions of the devices to be coordinated are synchronously deduced in the STSGCN spatiotemporal synchronization diagram. Only the actions of the devices to be coordinated that can change the classroom control target from not being achieved to being achieved are retained. This processing can eliminate redundant control actions locally at the edge computing node, reduce invalid start-stop, repeated adjustment and non-contributing device linkage, and achieve the action necessity judgment effect that ordinary priority control cannot achieve.

[0019] (3) This invention uses the methods of accounting and deduction, re-push and continuation, and chain break and write prohibition to reverse the action feedback along the effective trail to the time slice of the action source, and re-push the effective equipment actions that have not been accounted for or reversed. The propagation path between the continuously abnormal equipment nodes and the classroom resource nodes is cut off, and only the safe shutdown path, the abnormal reporting path and the manual takeover path are opened. This process can prevent abnormal equipment from repeatedly entering the collaborative control sequence and improve the stability and fault isolation capability of smart classroom equipment collaborative management. Attached Figure Description

[0020] The accompanying drawings are provided to further illustrate the invention and form part of the specification. They are used in conjunction with embodiments of the invention to explain the invention and do not constitute a limitation thereof. In the drawings: Figure 1 This is a block diagram of the smart classroom equipment collaborative management system based on edge computing proposed in this invention. Figure 2 This is a diagram illustrating the motion extraction, tail trajectory freezing, and mirror-based counter-evidence processing proposed in this invention. Figure 3 This diagram illustrates the accounting deduction, return pledge continuation, and chain break write restriction processing proposed in this invention. Detailed Implementation

[0021] The present invention will now be described in further detail with reference to the accompanying drawings. These drawings are simplified schematic diagrams, illustrating only the basic structure of the invention, and therefore only show the components relevant to the invention.

[0022] refer to Figures 1-3 A smart classroom equipment collaborative management system based on edge computing includes: The action escort module is used to embed the actions of the devices to be coordinated into the STSGCN spatiotemporal synchronization graph, and bind the action source time slice, expected effective time slice, device node, classroom resource node, classroom control target, and alternative device action; STSGCN is a spatiotemporal graph structure built on a spatiotemporal synchronization graph convolutional network, which is established locally by edge computing nodes. Within the same time slice, connections are established according to device nodes, classroom resource nodes, and classroom control targets. Connections are established between adjacent time slices according to consecutive time slices. After a device node receives an action from a device to be coordinated, the action of the device to be coordinated enters the time slice position between the time slice from the time slice from which the action originates and the time slice from which it is expected to take effect. The device nodes in the STSGCN spatiotemporal synchronization diagram represent the nodes of controlled devices in the smart classroom, which originate from classroom devices connected to edge computing nodes; lights, curtains, projectors, air conditioners, and fresh air systems correspond to different device nodes; The trail freezing module is used to generate an effective trail based on the actions of the devices to be coordinated, and freeze the reverse device actions under the same classroom resource node within the effective trail. Freezing means stopping reverse device actions from writing to the same classroom resource node within the effective tail period, and resuming reverse device actions from writing to the same classroom resource node when the expected effective time slice is reached; The mirror proof module is used to construct non-execution propagation paths for the actions of the devices to be coordinated, and to synchronously deduce the actions of the devices to be coordinated within the STSGCN spatiotemporal synchronization diagram. The actions of the devices to be coordinated that change the classroom control objective from not being achieved to being achieved are retained as valid device actions. The resource shifting module is used to rearrange the valid device actions that compete for the same classroom resource node according to the effective trail, forming a staggered shifting sequence. The accounting and deduction module is used to issue staggered shift sequence, read action feedback, deduct the action feedback in reverse along the effective trail to the time slice of the action source, and generate completed accounting, incomplete accounting, and reverse accounting. The re-push continuation module is used to re-push valid equipment actions that have not been completed or have been reversed back to the time slice of the action source, and to enable alternative equipment actions to continue the classroom control target. The Disconnect Write Blocking module is used to cut off the propagation path between the same device node and the classroom resource node when incomplete or reverse reconciliation is continuously generated on the same device node, while opening the secure shutdown path, the anomaly reporting path, and the manual takeover path.

[0023] In this embodiment, the action escort module embeds the actions of the device to be coordinated into the STSGCN spatiotemporal synchronization graph, specifically including: Read the device node corresponding to the action of the device to be coordinated, and mark the time slice where the device node is located as the time slice from which the action originates; The actions of the devices to be coordinated are the device control actions that the edge computing nodes prepare to write into the STSGCN spatiotemporal synchronization map, which originate from the classroom control target; when the classroom control target is that the teaching display is available, the action of the devices to be coordinated is the projection start action; when the classroom control target is lighting adaptation, the action of the devices to be coordinated is the lighting adjustment action and the curtain opening and closing action; when the classroom control target is thermal environment adaptation, the action of the devices to be coordinated is the air conditioning adjustment action; when the classroom control target is ventilation adaptation, the action of the devices to be coordinated is the fresh air adjustment action. Based on the lag of the action taking effect on the device node, the time slice following the time slice from which the action originates is marked as the expected time slice. Action lag is the interval between the time slice from the action source to the time slice from which the action feedback can be read on the device node. The action lag table is stored in the edge computing node. The lighting adjustment action is 1 time slice, the curtain opening and closing action is 3 time slices, the projector start action is 5 time slices, the air conditioning adjustment action is 6 time slices, and the fresh air adjustment action is 4 time slices. Push the actions of the devices to be coordinated into the time slice between the time slice of the action source and the expected effective time slice; Link the actions of the devices to be coordinated to the classroom resource nodes; The classroom resource node is the node in the STSGCN spatiotemporal synchronization diagram that carries the object of the equipment action contention, originating from the object affected by the equipment action; the lighting adjustment action and the curtain opening and closing action are linked to the lighting resource node; the projector start action is linked to the display resource node; the air conditioning adjustment action is linked to the thermal environment resource node; the fresh air adjustment action is linked to the ventilation resource node; Link classroom resource nodes to classroom control targets; The classroom control objective is the classroom state that the edge computing node needs to achieve within the current time slice, with values ​​including teaching display availability, lighting adaptation, thermal environment adaptation, and ventilation adaptation. Mark the actions of devices that are to be coordinated but have the same classroom control objective but different device nodes as alternative device actions.

[0024] When there are at least two device nodes corresponding to the same classroom control target, the edge computing node marks the different device actions of the device nodes as alternative device actions.

[0025] In this embodiment, the generation of an effective trail in the trail freezing module specifically includes: Mark consecutive time slices between the source time slice of the action and the expected effective time slice as effective trails; The effective trail is the set of consecutive time slices from the time slice of the action source to the expected effective time slice of the action of the device to be coordinated. Read the actions of the devices to be coordinated that are connected to the same classroom resource node within the effective trail; Mark the actions of devices that require coordination but have opposite classroom control objectives as reverse device actions; The opposite classroom control objectives are when the actions of two devices to be coordinated form opposite control directions on the same classroom resource node. The values ​​include light enhancement and light reduction, temperature increase and temperature decrease, ventilation enhancement and ventilation reduction, and display on and display off. Stop reverse device actions from writing to the same classroom resource node within the effective trail; Upon reaching the expected effective time, the reverse device action is restored to write to the same classroom resource node.

[0026] In this embodiment, the mirroring and counter-evidence module constructs a non-execution propagation path for the actions of the device to be coordinated, specifically including: Extract the time slice interval between the time slice from the time slice of the action source to the expected effective time slice of the device to be coordinated; Mark time slice intervals as propagation segments; The propagation segment is the set of time slices in which the actions of the devices to be coordinated participate in the propagation of the STSGCN spatiotemporal synchronization diagram between the time slice of the action source and the expected effective time slice. Remove the writes to the device node and classroom resource node by the actions of the device to be coordinated within the propagation segment; The deletion write preserves the device node and classroom resource node within the propagation segment, and clears the write content generated by the actions of the device to be coordinated on the device node and classroom resource node; Mark the propagation segment after the action of the device to be coordinated is deleted as not to execute the propagation path; The propagation path is not executed because it is the propagation fragment that is deleted after the action of the device to be coordinated is written. The non-execution propagation path and the actions of the devices to be coordinated will be synchronously simulated within the STSGCN spatiotemporal synchronization diagram. Read the classroom control target achievement status within the expected effective time slice for actions of devices that do not execute propagation paths and those that need to be coordinated; The classroom control target achievement status includes achieved and unachieved; the achievement status is determined according to the feedback content of the classroom resource nodes; teaching display availability is achieved when the display resource node returns to an available status; lighting adaptation is achieved when the feedback value from the lighting resource node enters the target lighting range; thermal environment adaptation is achieved when the feedback value from the thermal environment resource node enters the target temperature range; ventilation adaptation is achieved when the feedback value from the ventilation resource node enters the target ventilation range; if the corresponding range is not entered, it is marked as unachieved; the target lighting range is 300lx to 500lx, the target temperature range is 22℃ to 26℃, and the target ventilation range is a carbon dioxide concentration not exceeding 1000ppm; when the display resource node returns to an available status, the teaching display availability is marked as achieved; Mark the actions of devices that do not perform the propagation path, fail to achieve the classroom control objective, and are awaiting collaborative device actions as valid device actions.

[0027] In this embodiment, the propagation path and the actions of the devices to be coordinated will be synchronously simulated within the STSGCN spatiotemporal synchronization diagram, specifically including: The time frame from which the action originates is used as the starting point for deduction; Maintain the write state after the action of the cooperating device is deleted without executing the propagation path; The write status after the collaborative device action is deleted is retained by the device node and classroom resource node, and the status after the write content generated by the collaborative device action on the device node and classroom resource node is cleared. The write operations of the device node and classroom resource node corresponding to the action of the device to be coordinated are retained in the propagation segment. The non-execution propagation path and the actions of the devices awaiting coordination will be extrapolated along the effective trail to the expected effective time slice; The write content of the device nodes and classroom resource nodes is deduced from the effective trail along the continuous time slice; During the expected effective time slice, read the classroom control target achievement status for those who do not execute the propagation path and the classroom control target achievement status for those who need to coordinate the action of the equipment. If the propagation path is not achieved and the collaborative device action achieves the classroom control objective, the collaborative device action will be marked as a valid device action.

[0028] In this embodiment, the resource shifting module forms a staggered shifting sequence, specifically including: Read the valid device actions that are competing for the same classroom resource node; Contesting the same classroom resource node requires at least two valid device actions to be attached to the same classroom resource node; the edge computing node reads the number of valid device actions attached to the lighting resource node, display resource node, thermal environment resource node and ventilation resource node respectively. When the number is at least two, the corresponding valid device actions are marked as valid device actions contesting the same classroom resource node. Arrange the time slices according to the expected effective time of effective equipment operation; For valid device actions whose effective trails overlap, the action source time slice of the latter valid device action is moved to the adjacent time slice after the expected effective time slice of the former valid device action. Overlapping active trails occur when the active trails of two active device actions contain the same consecutive time slice; the preceding active device action is the active device action with the earlier expected active time slice, and the following active device action is the active device action with the later expected active time slice. The effective trail of the next valid device action is determined by re-determining the time slice from the source of the action after the movement. Preserve the sequence of valid device actions where the trailing traces do not overlap; The results of arranging the effective device actions and the retained order after the effective tail is redefined are marked as a staggered shift sequence.

[0029] In this embodiment, the reconciliation module reconciles the action feedback along the effective trail back to the time slice from the action source, specifically including: Issue the staggered shift sequence; Read the action feedback during the expected effective time slice corresponding to the effective device action; Action feedback consists of the device node feedback content and classroom resource node feedback content read within the expected effective time slice after a valid device action is issued. The effective trail is traced back from the expected effective time slice to the time slice where the action originated. Reverse rebate is to return the motion feedback to the motion source time slice in reverse order of the time slices within the effective trail; The motion feedback is matched to the valid device action within the time slice from which the motion originates; When the action feedback achieves the classroom control target, the effective equipment action is marked as completed and accounted for. When the action feedback is contrary to the classroom control objective, the effective equipment action is marked as reversed. If the action feedback does not meet the classroom control target and does not belong to reverse accounting, the valid equipment action will be marked as incomplete accounting.

[0030] In this embodiment, the activation of alternative equipment actions to continue classroom control targets in the return-to-classroom continuation module specifically includes: Read valid device actions marked as incomplete or reversed reconciliation; The effective equipment action is traced back to the time slice from which the action originated; The return push is a reverse time slice sequence along the effective trail, which returns the valid equipment actions that have not been completed and have been reversed to the time slice from which the action originated; When the effective equipment action stops in the time slice of the action source, it re-enters the staggered shift sequence under the same classroom resource node; Re-entering the staggered shift sequence refers to the order in which the same effective equipment actions re-participate in the same classroom resource node after the return to the shift. Read the alternative device action bound to the valid device action; Bind alternative device actions to classroom control targets and classroom resource nodes that are valid device actions; Mark the expected effective time segment according to the action lag of the alternative equipment action; The alternative equipment action is pushed into the time slice between the action source time slice and the expected effective time slice to continue the classroom control target.

[0031] The classroom control target that follows is to read the alternative device action and bind the alternative device action to the classroom control target of the effective device action, and enter the time slice between the action source time slice and the expected effective time slice.

[0032] The above-mentioned replacement device action binding, marking of expected effective time slices and push processing are executed when a replacement device action is read; when no replacement device action is read, the edge computing node sends the corresponding valid device action to the disconnection write-prohibition module for continuous anomaly judgment.

[0033] In this embodiment, the disconnection and write-blocking module cuts off the propagation path between the same device node and the classroom resource node, specifically including: Read incomplete and reverse reconciliations generated by the same device node within two consecutive expected effective time slices; Two consecutive expected effective time slices are two adjacent expected effective time slices corresponding to the same device node; If the same device node generates incomplete reconciliation or reverse reconciliation within two consecutive expected effective time slices, the same device node will be marked as a write-prohibited device node; Write-prohibited device nodes are those that are stopped from writing actions to collaborative devices to classroom resource nodes. Stop the write-blocking device node from writing the device to be coordinated to the classroom resource node; Block the valid device actions corresponding to the write-prohibited device node from entering the staggered shift sequence; Enable the secure shutdown path, anomaly reporting path, and manual takeover path for write-prohibited device nodes.

[0034] The safe shutdown path is the path where the edge computing node stops the write-prohibited device node from continuing to write actions to the device to be coordinated, and keeps the write-prohibited device node in a stopped state; the anomaly reporting path is the path where the edge computing node records the write-prohibited device node, classroom resource node, two consecutive expected effective time slices, incomplete reconciliation, and reverse reconciliation; the manual takeover path is the path where the edge computing node receives the manual takeover instruction after stopping the write action of the device to be coordinated corresponding to the write-prohibited device node.

[0035] In this implementation, the secure shutdown path, anomaly reporting path, and manual takeover path corresponding to the write-prohibited device node are specifically included as follows: Read the classroom resource node and the time slice of the action source corresponding to the write-prohibited device node; Bind the secure shutdown path to the classroom resource node corresponding to the write-disabled device node; Binding is used to establish a mapping between secure shutdown paths and classroom resource nodes within edge computing nodes; Bind the anomaly reporting path to the continuously generated incomplete reconciliation and reverse reconciliation of write-prohibited device nodes; After the abnormal reporting path is bound, the edge computing node records the write-prohibited device node, two consecutive expected effective time slices, incomplete reconciliation, and reverse reconciliation. Bind the manual takeover path to the time slice of the action source corresponding to the write-protected device node; After the manual takeover path is bound, the edge computing node receives the manual takeover instruction in the time slice of the action source; During the periods when the safe shutdown path, the abnormal reporting path, and the manual takeover path are open, the actions of the devices to be coordinated corresponding to the write-prohibited device nodes are stopped from writing to the classroom resource nodes; The open period is the time slice range after the three paths are bound and the write-prohibited device node retains the write-prohibited device node mark; The valid device actions corresponding to the write-blocked device node are entered into the staggered shift sequence.

[0036] Example 1: To verify the feasibility of this invention in practice, it was applied to a smart classroom equipment collaborative management scenario. In this scenario, an edge computing node was set up, connecting to lighting, curtains, projectors, air conditioning, and fresh air systems. The classroom control objectives included the availability of teaching displays, lighting adaptation, thermal environment adaptation, and ventilation adaptation. Under traditional control methods, each device executes commands in the order they are received. Lighting adjustment, curtain opening / closing, projector activation, air conditioning adjustment, and fresh air adjustment actions tend to be written to the corresponding classroom resource nodes within similar time slices. Lighting adjustment and curtain opening / closing actions easily compete for lighting resource nodes, while air conditioning adjustment and fresh air adjustment actions often cause conflicting adjustment rhythms due to delayed activation. Some actions may not have reached their expected activation time slice before a new round of opposite actions enters the execution queue, resulting in delayed display state switching, repeated lighting adjustments, and conflicting activation rhythms between air conditioning and fresh air adjustment actions.

[0037] In this embodiment, the edge computing node establishes an STSGCN spatiotemporal synchronization map locally, connecting device nodes, classroom resource nodes, and classroom control targets within the same time slice, and connecting adjacent time slices as consecutive time slices. After a collaborative device action enters the system, the edge computing node reads the device node corresponding to the action, marks the time slice where the device node is located as the action source time slice, and then determines the expected effective time slice according to the action lag table. The lighting adjustment action is 1 time slice, the curtain opening / closing action is 3 time slices, the projector start action is 5 time slices, the air conditioning adjustment action is 6 time slices, and the fresh air adjustment action is 4 time slices. The collaborative device action is pressed between the action source time slice and the expected effective time slice, and is matched to the corresponding classroom resource node. The lighting adjustment action and the curtain opening / closing action are matched to the lighting resource node, the projector start action is matched to the display resource node, the air conditioning adjustment action is matched to the thermal environment resource node, and the fresh air adjustment action is matched to the ventilation resource node.

[0038] When multiple devices to be coordinated enter the same control cycle, the edge computing node first generates an effective trail. The effective trail covers the continuous time slice between the time slice from the source of the action and the expected effective time slice. If a device action to be coordinated that is coupled to the same classroom resource node and has the opposite control direction is read within the effective trail, the system marks the opposite action as a reverse device action and stops writing the reverse device action to the same classroom resource node within the effective trail. This process ensures that device actions that have not yet formed feedback will not be prematurely overwritten by the opposite action. Taking lighting adaptation as an example, when the lighting enhancement action is still within the effective trail, the curtain blocking action will not be directly written to the same lighting resource node until the expected effective time slice is reached, at which point the system will resume writing the reverse device action.

[0039] The mirroring verification module is used to determine whether the actions of the devices to be coordinated truly contribute to achieving the classroom control goals. Edge computing nodes extract the time slice interval between the source time slice of the action and the expected effective time slice, marking this interval as a propagation segment. Within this propagation segment, the writes of the actions of the devices to be coordinated to the device nodes and classroom resource nodes are deleted, forming a non-executed propagation path. The edge computing nodes synchronously extrapolate the non-executed propagation path and the propagation segment retaining the actions of the devices to be coordinated to the expected effective time slice, and read the classroom control goal achievement status for each. If the non-executed propagation path indicates failure, but the propagation segment retaining the actions of the devices to be coordinated indicates achievement, the system marks the actions of the devices to be coordinated as valid device actions. This process filters out duplicate actions that do not contribute to goal achievement and reduces invalid writes entering subsequent scheduling.

[0040] The resource shifting module reads the valid device actions that are contending for the same classroom resource node. Contending for the same classroom resource node requires at least two valid device actions to be associated with that node. The edge computing node reads the number of valid device actions corresponding to the lighting resource node, display resource node, thermal environment resource node, and ventilation resource node, respectively. If the number is not less than two, the corresponding valid device action is marked as a contending device action for the same classroom resource node. The system arranges the valid device actions according to their expected effective time slices. If the effective trails of two valid device actions contain the same consecutive time slice, the time slice from which the action of the later valid device action originates is moved to an adjacent time slice after the expected effective time slice of the earlier valid device action. The effective trail of the later valid device action is then re-determined, ultimately forming a staggered shifting sequence.

[0041] After the staggered shift sequence is issued, the reconciliation module reads the action feedback from the expected effective time slices corresponding to each valid device action. The action feedback consists of feedback from the device node and feedback from the classroom resource node. Following the reverse time slice sequence of the effective trail, the system reverses the action feedback back to the action's source time slice and reconciles it to the corresponding valid device action within that time slice. When the action feedback meets the classroom control objective, it is marked as reconciliation complete; when the action feedback is opposite to the classroom control objective, it is marked as reverse reconciliation; when the action feedback does not meet the classroom control objective and is not a reverse reconciliation, it is marked as incomplete reconciliation. This reconciliation method returns the result to the action's source location, facilitating the differentiation between action failure, feedback delay, and reverse write interference.

[0042] The re-application continuation module processes valid device actions that have not been fully reconciled or have been reversed. After a valid device action returns to its source time slice along the effective trail, it stops re-entering the staggered shift sequence under the same classroom resource node. If there are at least two device nodes corresponding to devices awaiting coordination under the same classroom control target, the edge computing node reads the bound alternative device action; if no alternative device action is found, the edge computing node sends the corresponding valid device action to the disconnected write-prohibition module for continuous anomaly judgment; if an alternative device action is found, it is bound to the original valid device action's classroom control target and classroom resource node, and then a new expected effective time slice is marked according to the action lag of the alternative device action. Taking lighting adaptation as an example, when a lighting adjustment action has not been fully reconciled, the system reads the curtain opening / closing action under the same target as the alternative device action, pushes it between the source time slice and the expected effective time slice, and continues the lighting adaptation target continuation.

[0043] The write-blocking module handles consecutively abnormal device nodes. When the same device node generates incomplete or reverse reconciliation within two consecutive expected effective time slices, the edge computing node marks the device node as a write-blocking device node, stops the write-blocking device node from writing pending collaborative device actions to the classroom resource node, and blocks the entry of the corresponding valid device actions into the staggered shift sequence. The system provides a secure shutdown path, an anomaly reporting path, and a manual takeover path. The secure shutdown path is bound to the classroom resource node corresponding to the write-blocking device node; the anomaly reporting path records the write-blocking device node, two consecutive expected effective time slices, incomplete and reverse reconciliation; and the manual takeover path receives manual takeover instructions during the time slice from which the action originates.

[0044] During the verification process, the edge computing node processed a total of 3200 actions from devices to be coordinated, including 760 lighting adjustment actions, 620 curtain opening and closing actions, 480 projector start actions, 740 air conditioning adjustment actions, and 600 fresh air ventilation adjustment actions. The comparison method used a direct dispatching method based on the order of receipt. This embodiment employs a combination of processing methods including effective trail freezing, mirroring verification, resource shifting, settlement deduction, return of collateral, and disconnection write prohibition. Statistical results show that this embodiment significantly improves the control target achievement rate, reverse action suppression, settlement accuracy, number of manual takeover triggers, and success rate of alternative action continuation.

[0045] Table 1: Comparison of Data on the Implementation of Collaborative Management of Smart Classroom Equipment

[0046] The data in the table above reflects the operational differences of this invention in the collaborative management of smart classroom devices. The success rate of success for replacement device actions only counts valid device actions with binding relationships to replacement device actions. The control target achievement rate increased from 88.6% to 96.8%, indicating that effective trail freezing and mirror verification can reduce invalid actions entering subsequent processes, thus preserving the effective device actions that truly drive the achievement of classroom control targets. The proportion of overlapping effective trail actions decreased from 18.4% to 6.1%, and the number of reverse action rewrites decreased from 42.6 per thousand actions to 9.8, indicating that reverse writes under the same classroom resource node were suppressed, and the staggered shifting sequence formed a relatively stable time-slice isolation for resource contention actions.

[0047] The accuracy of action feedback matching also reflects the closed-loop effect. The accuracy rate of action feedback matching improved from 82.7% to 95.4%, the rate of incomplete matching decreased from 11.8% to 4.3%, and the rate of reverse matching decreased from 5.6% to 1.2%. This change indicates that after the action feedback is matched backward along the effective trail to the time slice of the action source, the system can more accurately distinguish between completed matching, incomplete matching, and reverse matching, reducing the misjudgment of feedback delay as action failure. The success rate of alternative equipment action continuation improved from 73.5% to 91.2%, indicating that the return-press continuation module can reliably call alternative equipment actions under the same classroom control target when the original effective equipment action is abnormal.

[0048] The changes brought about by the write-blocking mechanism are mainly reflected in the ability to handle anomalies. The number of manual takeover triggers decreased from 7.4 per thousand actions to 2.1, the false action issuance rate decreased from 6.9% to 1.5%, and the average target achievement time fragments decreased from 5.7 to 4.1. These results indicate that write-blocked device nodes are promptly blocked after consecutive incomplete or reverse reconciliations. The safe shutdown path, anomaly reporting path, and manual takeover path can separate abnormal device nodes from the staggered shift sequence, preventing abnormal actions from being repeatedly written to classroom resource nodes.

[0049] The above description is only a preferred embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Any equivalent substitutions or modifications made by those skilled in the art within the scope of the technology disclosed in the present invention, based on the technical solution and inventive concept of the present invention, should be covered within the scope of protection of the present invention.

Claims

1. A smart classroom equipment collaborative management system based on edge computing, characterized in that, include: The action escort module is used to embed the actions of the devices to be coordinated into the STSGCN spatiotemporal synchronization graph, and bind the action source time slice, expected effective time slice, device node, classroom resource node, classroom control target, and alternative device action; The trail freezing module is used to generate an effective trail based on the actions of the devices to be coordinated, and freeze the reverse device actions under the same classroom resource node within the effective trail. The mirror proof module is used to construct non-execution propagation paths for the actions of the devices to be coordinated, and to synchronously deduce the actions of the devices to be coordinated within the STSGCN spatiotemporal synchronization diagram. The actions of the devices to be coordinated that change the classroom control objective from not being achieved to being achieved are retained as valid device actions. The resource shifting module is used to rearrange the valid device actions that compete for the same classroom resource node according to the effective trail, forming a staggered shifting sequence. The accounting and deduction module is used to issue staggered shift sequence, read action feedback, deduct the action feedback in reverse along the effective trail to the time slice of the action source, and generate completed accounting, incomplete accounting, and reverse accounting. The re-push continuation module is used to re-push valid equipment actions that have not been completed or have been reversed back to the time slice of the action source, and to enable alternative equipment actions to continue the classroom control target. The Disconnect Write Blocking module is used to cut off the propagation path between the same device node and the classroom resource node when incomplete or reverse reconciliation is continuously generated on the same device node, while opening the secure shutdown path, the anomaly reporting path, and the manual takeover path.

2. The smart classroom equipment collaborative management system based on edge computing according to claim 1, characterized in that, The action escort module embeds the actions of the device to be coordinated into the STSGCN spatiotemporal synchronization graph, specifically including: Read the device node corresponding to the action of the device to be coordinated, and mark the time slice where the device node is located as the time slice from which the action originates; Based on the lag of the action taking effect on the device node, the time slice following the time slice from which the action originates is marked as the expected time slice. Push the actions of the devices to be coordinated into the time slice between the time slice of the action source and the expected effective time slice; Link the actions of the devices to be coordinated to the classroom resource nodes; Link classroom resource nodes to classroom control targets; Mark the actions of devices that are to be coordinated but have the same classroom control objective but different device nodes as alternative device actions.

3. The smart classroom equipment collaborative management system based on edge computing according to claim 2, characterized in that, The tail freezing module generates effective tails, specifically including: Mark consecutive time slices between the source time slice of the action and the expected effective time slice as effective trails; Read the actions of the devices to be coordinated that are connected to the same classroom resource node within the effective trail; Mark the actions of devices that require coordination but have opposite classroom control objectives as reverse device actions; Stop reverse device actions from writing to the same classroom resource node within the effective trail; Upon reaching the expected effective time, the reverse device action is restored to write to the same classroom resource node.

4. The smart classroom equipment collaborative management system based on edge computing according to claim 1, characterized in that, The mirroring counter-evidence module constructs a non-execution propagation path for the actions of the device to be coordinated, specifically including: Extract the time slice interval between the time slice from the time slice of the action source to the expected effective time slice of the device to be coordinated; Mark time slice intervals as propagation segments; Remove the writes to the device node and classroom resource node by the actions of the device to be coordinated within the propagation segment; Mark the propagation segment after the action of the device to be coordinated is deleted as not to execute the propagation path; The non-execution propagation path and the actions of the devices to be coordinated will be synchronously simulated within the STSGCN spatiotemporal synchronization diagram. Read the classroom control target achievement status within the expected effective time slice for actions of devices that do not execute propagation paths and those that need to be coordinated; Mark the actions of devices that do not perform the propagation path, fail to achieve the classroom control objective, and are awaiting collaborative device actions as valid device actions.

5. The smart classroom equipment collaborative management system based on edge computing according to claim 4, characterized in that, The process of synchronously simulating the propagation path and the actions of the devices to be coordinated within the STSGCN spatiotemporal synchronization diagram specifically includes: The time frame from which the action originates is used as the starting point for deduction; Maintain the write state after the action of the cooperating device is deleted without executing the propagation path; The write operations of the device node and classroom resource node corresponding to the action of the device to be coordinated are retained in the propagation segment. The non-execution propagation path and the actions of the devices awaiting coordination will be extrapolated along the effective trail to the expected effective time slice; During the expected effective time slice, read the classroom control target achievement status for those who do not execute the propagation path and the classroom control target achievement status for those who need to coordinate the action of the equipment. If the propagation path is not achieved and the collaborative device action achieves the classroom control objective, the collaborative device action will be marked as a valid device action.

6. The smart classroom equipment collaborative management system based on edge computing according to claim 5, characterized in that, The resource shifting module forms a staggered shifting sequence, specifically including: Read the valid device actions that are competing for the same classroom resource node; Arrange the time slices according to the expected effective time of effective equipment operation; For valid device actions whose effective trails overlap, the action source time slice of the latter valid device action is moved to the adjacent time slice after the expected effective time slice of the former valid device action. The effective trail of the next valid device action is determined by re-determining the time slice from the source of the action after the movement. Preserve the sequence of valid device actions where the trailing traces do not overlap; The results of arranging the effective device actions and the retained order after the effective tail is redefined are marked as a staggered shift sequence.

7. The smart classroom equipment collaborative management system based on edge computing according to claim 6, characterized in that, The reconciliation module reconciles the action feedback along the trailing edge of the action to the time slice from which the action originated, specifically including: Issue the staggered shift sequence; Read the action feedback during the expected effective time slice corresponding to the effective device action; The effective trail is traced back from the expected effective time slice to the time slice where the action originated. The motion feedback is matched to the valid device action within the time slice from which the motion originates; When the action feedback achieves the classroom control target, the effective equipment action is marked as completed and accounted for. When the action feedback is contrary to the classroom control objective, the effective equipment action is marked as reversed. If the action feedback does not meet the classroom control target and does not belong to reverse accounting, the valid equipment action will be marked as incomplete accounting.

8. The smart classroom equipment collaborative management system based on edge computing according to claim 7, characterized in that, The re-enabling module enables alternative equipment actions to continue classroom control targets, specifically including: Read valid device actions marked as incomplete or reversed reconciliation; The effective equipment action is traced back to the time slice from which the action originated; When the effective equipment action stops in the time slice of the action source, it re-enters the staggered shift sequence under the same classroom resource node; Read the alternative device action bound to the valid device action; Bind alternative device actions to classroom control targets and classroom resource nodes that are valid device actions; Mark the expected effective time segment according to the action lag of the alternative equipment action; The alternative equipment action is pushed into the time slice between the action source time slice and the expected effective time slice to continue the classroom control target.

9. The smart classroom equipment collaborative management system based on edge computing according to claim 8, characterized in that, The broken link write-blocking module cuts off the propagation path between the same device node and the classroom resource node, specifically including: Read incomplete and reverse reconciliations generated by the same device node within two consecutive expected effective time slices; If the same device node generates incomplete reconciliation or reverse reconciliation within two consecutive expected effective time slices, the same device node will be marked as a write-prohibited device node; Stop the write-blocking device node from writing the device to be coordinated to the classroom resource node; Block the valid device actions corresponding to the write-prohibited device node from entering the staggered shift sequence; Enable the secure shutdown path, anomaly reporting path, and manual takeover path for write-prohibited device nodes.

10. The smart classroom equipment collaborative management system based on edge computing according to claim 9, characterized in that, The secure shutdown path, anomaly reporting path, and manual takeover path corresponding to the open write-prohibited device node specifically include: Read the classroom resource node and the time slice of the action source corresponding to the write-prohibited device node; Bind the secure shutdown path to the classroom resource node corresponding to the write-disabled device node; Bind the anomaly reporting path to the continuously generated incomplete reconciliation and reverse reconciliation of write-prohibited device nodes; Bind the manual takeover path to the time slice of the action source corresponding to the write-protected device node; During the periods when the safe shutdown path, the abnormal reporting path, and the manual takeover path are open, the actions of the devices to be coordinated corresponding to the write-prohibited device nodes are stopped from writing to the classroom resource nodes; The valid device actions corresponding to the write-blocked device node are entered into the staggered shift sequence.