Conveying device for steel structural part spraying production line
By designing a transmission device system driven by chain drive and servo motor, the problem that traditional conveying devices are difficult to meet the needs of the steel structure parts spraying production line has been solved, and efficient transmission and spraying operations of steel structure parts have been achieved, cost and control difficulty have been reduced, and in Stable operation in harsh environments.
Patent Information
- Application Number
- CN202322992186.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-07
- Publication Date
- 2024-09-24
- Estimated Expiration
- 2033-11-07
AI Technical Summary
The traditional belt transmission device is difficult to meet the high requirements for the conveyor device of the steel structure parts spraying production line. Especially in the spraying process of large and complex steel structure parts, it is difficult to achieve effective lateral movement, vertical lifting and spraying operation processes.
A conveyor system including a main line conveyor, a loading conveyor and a unloading conveyor is designed. It adopts chain drive and servo motor drive to realize the lateral movement, vertical lifting and spraying operations of steel structural parts through series and parallel connection. process, simplifying the structural layout and control methods.
It realizes efficient transmission and spraying of steel structural parts, reduces production costs and control difficulty, and can operate effectively in harsh environments. It has a simple structure, high transmission power and strong load-bearing capacity.
Smart Images

Figure CN221753682U
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of steel processing, in particular to a conveying device for a steel spraying production line. Background Art
[0002] As an important basic material in the national economy, steel is the most widely used in production, and its annual consumption is huge. During the use and storage of steel, it is very easy to rust due to environmental influences. Therefore, after the steel is produced into steel structural parts, it needs to be sprayed with paint for rust prevention. With the increasing standardization and serialization of steel structural parts production, the spraying of steel structural parts has shifted from traditional manual spraying or semi-automatic spraying by mechanical equipment to fully automated spraying on production lines. Due to the large size and complex structure of steel structural parts, the conveying device has high requirements during the spraying process of the production line. Traditional belt transmission devices are difficult to meet the working requirements. Therefore, the utility model designs a conveying device for the steel structural parts spraying production line. Summary of the invention
[0003] The purpose of the utility model is to provide a conveying device for a steel structure spraying production line. On the one hand, the steel structure is conveyed to a longitudinal main line conveying device by setting up upper and lower material conveying devices that can realize lateral movement and vertical lifting; on the other hand, the main line conveying devices connected in series run through the entire spraying production line to complete the spraying operation process of the steel structure.
[0004] The utility model will achieve the above purpose through the following technical solutions:
[0005] A conveying device for a steel structure spraying production line mainly comprises a main line conveying device, a loading conveying device and a unloading conveying device.
[0006] The main line conveying device includes a feeding conveying group, a spraying conveying group, and a feeding conveying group. The feeding conveying group includes a support frame, a first chain, a support plate, a first driving shaft, and a first driven shaft. The first driving shaft is arranged at one end of the support frame, and the first driven shaft is arranged at the other end of the support frame; the first driving shaft and the first driven shaft are also fixedly installed with a first sprocket and a second sprocket, and the first chain is connected between the first sprocket and the second sprocket. The support plate is fixedly installed on the first chain, and the support plate array is distributed on the first chain. The first driving shaft is also fixedly connected to the side of the support frame extending out of the first driving shaft, and the first driven shaft is also fixedly connected to the side of the support frame extending out of the first driven shaft. The feeding conveying groups are arranged in series, and a second chain is also connected between the fourth sprocket on the driven shaft of the front feeding conveying group and the third sprocket on the driving shaft of the rear feeding conveying group; the third sprocket of the driving shaft of the first group of feeding conveying groups is also connected to the first driving device through the third chain, and the first driving device is fixedly connected to the support frame.
[0007] The basic structures of the spraying conveying group and the unloading conveying group are the same as those of the loading conveying group, and scanning, spraying, drying and other equipment are arranged between the conveying groups.
[0008] The feeding conveyor device includes a material rack, a material rack assembly, a second drive device, and a third drive device. The material rack is arranged at one end of the material rack assembly, and the other end is arranged between the feeding conveyor groups. The second drive device and the third drive device are arranged between the material rack assemblies to provide power for the feeding conveyor device.
[0009] The rack assembly includes a base, a main beam, a scissor assembly, a lifting assembly, and a transmission assembly. The scissor assemblies are arranged in an array between the base and the main beam, and the scissor assembly includes a first connecting rod, a second connecting rod, and a pulley. One end of the first connecting rod is hinged to the base, and the other end is hinged to a pulley, and the pulley is slidably connected to the main beam. The middle of the first connecting rod is also hinged to the middle of the second connecting rod. One end of the second connecting rod is hinged to the main beam, and the other end is hinged to the slider. The scissor assembly array is distributed between the base and the main beam.
[0010] The lifting assembly includes a commutator, a transmission screw, and a guide rail slider device. The commutator is fixedly installed in the middle of the base, and the output end of the commutator is fixedly connected to the transmission screw; the two ends of the transmission screw are hinged to the base, and the transmission nut of the transmission screw is fixedly connected to the slider of the guide rail slider device, and the guide rail of the guide rail slider device is fixedly installed on the base. The transmission nut and the guide rail slider device are distributed in an array on the base and connected to the scissor assembly to realize the lifting of the main beam.
[0011] The transmission assembly is arranged in the middle of the side of the base and the main beam, and the transmission assembly includes a third connecting rod, a fourth connecting rod, a fifth sprocket, a sixth sprocket, a seventh sprocket, an eighth sprocket, a ninth sprocket, a tenth sprocket, an eleventh sprocket, a fourth chain, a fifth chain, and a second driving shaft. One end of the third connecting rod is hinged to the base, and the other end is hinged to one end of the fourth connecting rod; the other end of the fourth connecting rod is hinged to the main beam; a fifth sprocket is also arranged at the hinge position of the third connecting rod and the base, a sixth sprocket is also arranged at the hinge position of the third connecting rod and the fourth connecting rod, and a seventh sprocket is also arranged at the hinge position of the fourth connecting rod and the main beam. The second driving shaft is hinged to the main beam, and the eighth sprocket and the ninth sprocket are fixedly connected at both ends thereof. The third connecting rod and the fourth connecting rod are arranged symmetrically, and the fourth chain passes through the fifth sprocket, the sixth sprocket, the seventh sprocket, and the eighth sprocket in sequence to form a chain transmission closed loop. The tenth sprocket and the eleventh sprocket are arranged on both sides of the main beam respectively, and the fifth chain passes around the ninth sprocket, the tenth sprocket and the eleventh sprocket in sequence to form a chain transmission closed loop.
[0012] The second driving device includes a first servo motor, a first reducer, a first transmission shaft, and a twelfth sprocket. The power output end of the first servo motor is fixedly connected to the input end of the first reducer. The first reducer is fixed to the ground. The first reducer is a single-input and dual-output reducer, and its output end is fixedly connected to the first transmission shaft. The first transmission shaft vertically passes through the entire feeding conveyor device. The first transmission shaft is connected to the material rack assembly through a bearing support. The first transmission shaft is also provided with a twelfth sprocket in an array, and the twelfth sprocket is meshed with the fourth chain. The second driving device is connected to the transmission assembly to realize the lateral transmission of the steel structure by the feeding conveyor device.
[0013] The third driving device includes a second servo motor, a second reducer, and a second transmission shaft. The power output end of the second servo motor is fixedly connected to the input end of the second reducer, the second reducer is fixed to the ground, the second reducer is a single-input and dual-output reducer, and its output end is fixedly connected to the second transmission shaft. The second transmission shaft vertically passes through the entire feeding conveyor device, and the second transmission shaft is connected to the commutator of the lifting assembly. The third driving device is connected to the lifting assembly to realize the vertical lifting of the steel structure by the feeding conveyor device.
[0014] The structure, function and arrangement of the unloading conveying device are the same as those of the loading conveying device. After the steel structure completes the spraying, drying and other operation processes, it is transported out of the production line through the unloading conveying device.
[0015] Compared with the prior art, the outstanding advantages of the utility model are:
[0016] 1. The utility model is a steel structure spraying production line. The power input of the upper and lower material conveying devices of the conveying device adopts a parallel mode, and the power input of the main line conveying device adopts a series mode, and both adopt a single drive device. Its structural layout is simple and does not require a complicated control method. While ensuring the work requirements, it effectively reduces the production cost and the difficulty of operation.
[0017] 2. The utility model provides a steel structure spraying production line with a simple structure and a chain drive working mode. It has a large power transmission, a strong carrying capacity, and a small transmission size under the same working conditions. At the same time, for the spraying production line, it can effectively cope with harsh environments such as high temperature, humidity, dust, and pollution. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 This is one of the structural schematic diagrams of a conveying device for a steel structure spraying production line described in the utility model.
[0019] Figure 2 This is one of the schematic diagrams of the mainline conveyor structure of a conveyor for a steel structure spraying production line described in the utility model.
[0020] Figure 3 This is the second structural schematic diagram of the mainline conveying device of the conveying device for the steel structure spraying production line described in the utility model.
[0021] Figure 4 This is one of the schematic diagrams of the structure of the feeding and conveying group of a conveying device for a steel structure spraying production line described in the utility model.
[0022] Figure 5 This is one of the structural schematic diagrams of a loading conveying device of a conveying device for a steel structure spraying production line described in the utility model.
[0023] Figure 6 This is one of the schematic diagrams of the material rack assembly structure of a conveying device for a steel structure spraying production line described in the utility model.
[0024] Figure 7 This is the second schematic diagram of the material rack assembly structure of a conveying device for a steel structure spraying production line described in the utility model. Implementation
[0025] The following is attached Figures 1 to 7 The technical solution of the utility model is further illustrated with embodiments.
[0026] Comparison Figure 1 The conveying device used in the steel structure spraying production line mainly includes a main line conveying device 1, a loading conveying device 2, and a unloading conveying device 3.
[0027] Comparison Figure 2 , Figure 3 , Figure 4The main line conveying device 1 includes a feeding conveying group 10, a spraying conveying group 11, and a feeding conveying group 12. The feeding conveying group 10 includes a support frame 101, a first chain 102, a support plate 103, a first driving shaft 104, and a first driven shaft 105. The first driving shaft 104 is hinged at one end of the support frame 101 through a first rotating pair 301 and a second rotating pair 302, and the first driven shaft 105 is hinged at the other end of the support frame 101 through a third rotating pair 303 and a fourth rotating pair 304; the first driving shaft 104 is also fixedly mounted with a first sprocket 106, and the first driven shaft 105 is also fixedly mounted with a second sprocket 107, the first chain 102 is meshed with the first sprocket 106 through a first gear pair 305, and is meshed with the second sprocket 107 through a second gear pair 306, and the first chain 102 is fixedly mounted with a support plate 103, and the support plates 103 are distributed in an array on the first chain 102. The side of the first driving shaft 104 extending out of the support frame 101 is also fixedly connected to the third sprocket 108, and the side of the first driven shaft 104 extending out of the support frame 101 is also fixedly connected to the fourth sprocket 109. The feeding and conveying groups 10 are arranged in series, and the second chain 110 is meshed between the fourth sprocket 109 of the front feeding and conveying group 10 and the third sprocket 108 of the rear feeding and conveying group 11 through the third gear pair 307 and the fourth gear pair 308; the third sprocket 108 of the first feeding and conveying group 11 is also meshed with the third chain 111 through the fifth gear pair 309, and the third chain 111 is connected to the first driving device 112, and the first driving device 112 is fixedly connected to the support frame 101.
[0028] Comparison Figure 2 The basic structures of the spraying conveying group 11 and the unloading conveying group 12 are the same as those of the loading conveying group 10, and scanning, spraying, drying and other equipment are arranged between the conveying groups.
[0029] Comparison Figure 5 The feeding conveyor device 2 includes a material rack assembly 20, a material rack 21, a second drive device 22, and a third drive device 23. The material rack 21 is provided at one end of the material rack assembly 20, and the other end is arranged between the feeding conveyor groups 10. The second drive device 22 and the third drive device 23 are arranged between the material rack assembly 20 to provide power for the feeding conveyor device 2.
[0030] Comparison Figure 6 , Figure 7The rack assembly 20 includes a base 201, a main beam 202, a scissor assembly 203, a lifting assembly 204, and a transmission assembly 205. The scissor assembly 203 is arranged in an array between the base 201 and the main beam 202, and the scissor assembly 203 includes a first connecting rod 206, a second connecting rod 207, and a pulley 208. One end of the first connecting rod 206 is hinged to the base 201 through the fifth rotational pair 310, and the other end is hinged to the pulley 208 through the sixth rotational pair 311. The pulley 208 is slidably connected to the main beam 202. The middle of the first connecting rod 206 is also hinged to the middle of the second connecting rod 207 through the seventh rotational pair 312. One end of the second connecting rod 207 is hinged to the main beam 202 through the eighth rotational pair 313, and the other end is hinged to the slider 213 through the ninth rotational pair 314. The scissor assembly 203 is arranged in an array between the base 201 and the main beam 202.
[0031] Comparison Figure 6 , Figure 7 The lifting assembly 204 includes a commutator 209, a transmission screw 210, and a guide rail slider device 211. The commutator 209 is fixedly installed in the middle of the base 201, and the output end of the commutator 209 is fixedly connected to the transmission screw 210; the two ends of the transmission screw 210 are respectively hinged to the base 201 through the tenth rotation pair 315 and the eleventh rotation pair 316, the transmission nut 212 of the transmission screw 210 is fixedly connected to the slider 213 of the guide rail slider device 211, and the guide rail 214 of the guide rail slider device 211 is fixedly installed on the base 201. The transmission nut 212 and the guide rail slider device 211 are distributed in an array on the base 201, and are connected to the scissor assembly 203 to realize the lifting of the main beam 202.
[0032] Comparison Figure 6 , Figure 7The transmission assembly 205 is arranged in the middle of the side of the base 201 and the main beam 202, and the transmission assembly 205 includes a third connecting rod 215, a fourth connecting rod 216, a fifth sprocket 217, a sixth sprocket 218, a seventh sprocket 219, an eighth sprocket 220, a ninth sprocket 221, a tenth sprocket 222, an eleventh sprocket 223, a fourth chain 224, a fifth chain 225, and a second driving shaft 226. One end of the third link 215 is hinged to the base 201 through the twelfth rotational pair 317, and the other end is hinged to one end of the fourth link 216 through the thirteenth rotational pair 318; the other end of the fourth link 216 is hinged to the main beam 202 through the fourteenth rotational pair 319; a fifth sprocket 217 is also provided at the hinged position of the third link 215 and the base 201, a sixth sprocket 218 is also provided at the hinged position of the third link 215 and the fourth link 216, and a seventh sprocket 219 is also provided at the hinged position of the fourth link 216 and the main beam 202. The second driving shaft 226 is hinged to the main beam 202 through the fifteenth rotational pair 320, and the eighth sprocket 220 and the ninth sprocket 221 are fixedly connected at both ends thereof. The third connecting rod 215 and the fourth connecting rod 216 are arranged symmetrically, and the fourth chain 224 passes through the fifth sprocket 217, the sixth sprocket 218, the seventh sprocket 219, and the eighth sprocket 220 in sequence to form a chain transmission closed loop. The tenth sprocket 222 and the eleventh sprocket 223 are respectively hinged on both sides of the main beam 202 through the sixteenth rotation pair 321 and the seventeenth rotation pair 322, and the fifth chain 225 passes through the ninth sprocket 221, the tenth sprocket 222, and the eleventh sprocket 223 in sequence to form a chain transmission closed loop.
[0033] Comparison Figure 5 , Figure 6 , Figure 7 The second driving device 22 includes a first servo motor 227, a first reducer 228, a first transmission shaft 229, and a twelfth sprocket 230. The power output end of the first servo motor 227 is fixedly connected to the input end of the first reducer 228. The first reducer 228 is fixed to the ground. The first reducer 228 is a single-input and dual-output reducer, and its output end is fixedly connected to the first transmission shaft 229. The first transmission shaft 229 vertically passes through the entire feeding conveyor 2. The first transmission shaft 229 is connected to the material rack assembly 20 through a bearing support. The first transmission shaft 229 is also arrayed with a twelfth sprocket 230, and the twelfth sprocket 230 is meshed with the fourth chain 224. The second driving device 22 is connected to the transmission assembly 205 to realize the lateral transmission of the steel structure by the feeding conveyor 2.
[0034] Comparison Figure 5 , Figure 7The third driving device 23 includes a second servo motor 231, a second reducer 232, and a second transmission shaft 233. The power output end of the second servo motor 231 is fixedly connected to the input end of the second reducer 232. The second reducer 233 is fixed to the ground. The second reducer 232 is a single-input and dual-output reducer, and its output end is fixedly connected to the second transmission shaft 233. The second transmission shaft 233 vertically passes through the entire feeding conveyor 2, and the second transmission shaft 232 is connected to the commutator 209 of the lifting assembly 204. The third driving device 23 is connected to the lifting assembly 204 to realize the vertical lifting of the steel structure by the feeding conveyor 2.
[0035] Comparison Figure 5 , Figure 6 , Figure 7 The structure, function and arrangement of the unloading conveying device 3 are the same as those of the loading conveying device 2. After the steel structure completes the spraying and drying process, it is transported out of the production line through the unloading conveying device 3.
[0036] The specific working conditions of the conveyor device used in the steel structure spraying production line are as follows:
[0037] Comparison Figures 1 to 7 First, at the loading and conveying device 2 station, the third driving device 23 controls the lifting assembly 204 to lower the main beam 202 to a height lower than the material rack 21; the staff transports the steel structure to the material rack 21 by a forklift. Then, the lifting assembly 204 raises the main beam 202, and the steel structure is lifted; further, the transmission assembly 205 transfers the steel structure to the loading and conveying group 10, and the lifting assembly 204 lowers the main beam 202 to a height lower than the loading and conveying group 10, completing the loading operation of the steel structure; the main line transmission device 1 transfers the steel structure for scanning, spraying, drying and other processes; the steel structure is transferred to the unloading conveying group 12 position, and the steel structure is transferred to the material rack 21 by the opposite action of the loading and conveying group 10, and the forklift transfers the steel structure to other stations.
[0038] Except for the technical features described in the specification, all other technical features are known technologies to those skilled in the art.
Claims
1. A conveying device for a steel structure spraying production line, mainly comprising a main line conveying device, a loading conveying device, and a unloading conveying device, characterized in that: The main line conveying device includes a loading conveying group, a spraying conveying group, and a unloading conveying group; The loading and conveying group includes a support frame, a first chain, a support plate, a first driving shaft, and a first driven shaft. The first driving shaft is arranged at one end of the support frame, and the first driven shaft is arranged at the other end of the support frame; the first driving shaft and the first driven shaft are also fixedly mounted with a first sprocket and a second sprocket, and the first chain is connected between the first sprocket and the second sprocket, and the support plate is fixedly mounted on the first chain, and the support plate array is distributed on the first chain; the first driving shaft extending out of the support frame is also fixedly connected to the third sprocket, and the first driven shaft extending out of the support frame is also fixedly connected to the fourth sprocket; the loading and conveying groups are arranged in series, and the second chain is also connected between the fourth sprocket on the driven shaft of the front loading and conveying group and the third sprocket on the driving shaft of the rear loading and conveying group; the third sprocket of the driving shaft of the first group of the loading and conveying group is also connected to the first driving device through the third chain, and the first driving device is fixedly connected to the support frame; The basic structures of the spraying conveying group and the unloading conveying group are the same as those of the loading conveying group, and scanning, spraying and drying equipment are arranged between the conveying groups.
2. A conveying device for a steel structure spraying production line according to claim 1, characterized in that: The loading and conveying device includes a material rack, a material rack assembly, a second drive device, and a third drive device; a material rack is provided at one end of the material rack assembly, and the other end is arranged between the loading and conveying groups, and the second drive device and the third drive device are arranged between the material rack assembly.
3. A conveying device for a steel structure spraying production line according to claim 2, characterized in that: The rack assembly includes a base, a main beam, a scissor assembly, a lifting assembly, and a transmission assembly; the scissor assemblies are arranged in an array between the base and the main beam, and the scissor assembly includes a first connecting rod, a second connecting rod, and a pulley; one end of the first connecting rod is hinged on the base, and the other end is hinged to a pulley, the pulley is slidably connected to the main beam, and the middle of the first connecting rod is also hinged to the middle of the second connecting rod; one end of the second connecting rod is hinged to the main beam, and the other end is hinged to a slider, and the scissor assemblies are arranged in an array between the base and the main beam; The lifting assembly includes a commutator, a transmission screw, and a guide rail slider device; the commutator is fixedly installed in the middle of the base, and the output end of the commutator is fixedly connected to the transmission screw; the two ends of the transmission screw are hinged to the base, the transmission nut of the transmission screw is fixedly connected to the slider of the guide rail slider device, and the guide rail of the guide rail slider device is fixedly installed on the base; the transmission nut and the guide rail slider device are distributed in an array on the base and connected to the scissor assembly to realize the lifting of the main beam; The transmission assembly is arranged in the middle of the side of the base and the main beam, and the transmission assembly includes a third connecting rod, a fourth connecting rod, a fifth sprocket, a sixth sprocket, a seventh sprocket, an eighth sprocket, a ninth sprocket, a tenth sprocket, an eleventh sprocket, a fourth chain, a fifth chain, and a second driving shaft. One end of the third connecting rod is hinged to the base, and the other end is hinged to one end of the fourth connecting rod; the other end of the fourth connecting rod is hinged to the main beam; a fifth sprocket is also arranged at the hinge position between the third connecting rod and the base, and a fifth sprocket is also arranged at the hinge position between the third connecting rod and the fourth connecting rod. A sixth sprocket is provided, and a seventh sprocket is also provided at the hinge position of the fourth connecting rod and the main beam. The second driving shaft is hinged to the main beam, and the eighth sprocket and the ninth sprocket are fixedly connected at both ends thereof respectively; the third connecting rod and the fourth connecting rod are symmetrically arranged, and the fourth chain passes around the fifth sprocket, the sixth sprocket, the seventh sprocket and the eighth sprocket in sequence to form a chain transmission closed loop, the tenth sprocket and the eleventh sprocket are respectively arranged on both sides of the main beam, and the fifth chain passes around the ninth sprocket, the tenth sprocket and the eleventh sprocket in sequence to form a chain transmission closed loop.
4. A conveying device for a steel structure spraying production line according to claim 2, characterized in that: The second driving device includes a first servo motor, a first reducer, a first transmission shaft, and a twelfth sprocket; the power output end of the first servo motor is fixedly connected to the input end of the first reducer, the first reducer is fixed to the ground, the first reducer is a single-input and dual-output reducer, and its output end is fixedly connected to the first transmission shaft; the first transmission shaft vertically passes through the entire loading and conveying device, the first transmission shaft is connected to the material rack assembly through a bearing support, and the first transmission shaft is also provided with a twelfth sprocket in an array, the twelfth sprocket is meshed with the fourth chain, and the second driving device is connected to the transmission assembly to realize the lateral transmission of the steel structure by the loading and conveying device.
5. The conveying device for a steel structure spraying production line according to claim 2, characterized in that: The third driving device includes a second servo motor, a second reducer, and a second transmission shaft; the power output end of the second servo motor is fixedly connected to the input end of the second reducer, the second reducer is fixed to the ground, the second reducer is a single-input and dual-output reducer, and its output end is fixedly connected to the second transmission shaft; the second transmission shaft vertically passes through the entire loading and conveying device, and the second transmission shaft is connected to the commutator of the lifting assembly; the third driving device is connected to the lifting assembly to realize the vertical lifting of the steel structure by the loading and conveying device.
6. The conveying device for a steel structure spraying production line according to claim 1, characterized in that: The structure, function and arrangement of the unloading conveying device are the same as those of the loading conveying device.