On-line filling skid-mounted device for multi-scale temporary plugging agent for fracturing
By designing a multi-scale temporary plugging agent online filling device, the problems of cumbersome temporary plugging agent filling operations and equipment waste in the existing technology are solved, the fracturing process is simplified and the equipment cost is reduced, and the construction efficiency and sealing efficiency are improved. Block reliability.
Patent Information
- Application Number
- CN202323140874.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-21
- Publication Date
- 2024-09-24
- Estimated Expiration
- 2033-11-21
AI Technical Summary
The existing temporary plugging agent filling method has problems such as cumbersome operation, equipment waste and pollution, especially during multiple disassembly and assembly and high-pressure pipeline operations, which affects construction efficiency and safety.
An online filling device for multi-scale temporary plugging agents for fracturing is designed, including a standpipe, a branch pipe, a mixing agitator, an automatic loading machine and a baller. It is controlled by a high-pressure gate valve to realize large and small scale temporary plugging agents. Automatic filling and mixing, simplifying the filling process.
It achieves a simple structural design, strong sealing reliability during the filling process, simplifies the fracturing process, saves equipment costs and construction costs, and improves construction efficiency.
Smart Images

Figure 00000000_0000
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of oil and gas field development, in particular to an online filling skid for a multi-scale temporary plugging agent for fracturing. Background Art
[0002] Temporary plugging and diversion fracturing can plug the original fractures, realize fracture diversion, form new fractures, thus forming a complex fracture network system, increase the fracture drainage area, and achieve the purpose of increasing production.
[0003] During the fracturing process of oil and gas wells, the purpose of layered fracturing can be achieved by injecting temporary plugging agents into the wellbore. For the layered fracturing operation of open hole horizontal wells, multiple injections of temporary plugging agents are conducive to achieving the purpose of multiple fractures in the section. At present, there are three main process methods for injecting temporary plugging agents on the ground. One is to connect a vertical short section at an appropriate position on the high-pressure manifold, the end of the short section is the inlet for injecting temporary plugging agents, and connect a section of upper pressure release pipeline to the high-pressure manifold close to the wellhead. When the temporary plugging agent is injected from the vertical short section, an equal amount of fracturing fluid needs to be discharged from the pressure-proof pipeline. The second is to use a sand mixer to achieve the purpose of injecting temporary plugging agents. The process method is that when the temporary plugging agent needs to be injected, stop the pump, open the low-pressure discharge pipeline of the sand mixer, usually a black nylon pipeline, pour out the residual fracturing fluid first, and then pour in the temporary plugging agent mixture, connect the nylon hose union to the discharge outlet, and usually need a nylon pipeline to hold the required temporary plugging amount. The second is to install the temporary plugging agent in the oil pipe in advance, and when the temporary plugging agent needs to be added, connect the oil pipe to the high-pressure manifold. When more temporary plugging agent is needed, the oil pipe must be disassembled and installed multiple times, and injection must be done multiple times.
[0004] The existing temporary plugging agent filling method has the following disadvantages: First, since it completely relies on the impact force generated by pouring the temporary plugging agent mixture from the vertical short section and its own gravity to drive the liquid stored in the high-pressure manifold, the force is insufficient, and the temporary plugging agent often has a suction problem when pouring. If the amount of temporary plugging agent added at one time is large, the addition device cannot meet the required vertical short section height, and there are problems such as cumbersome multiple filling operations. The second method does not require additional equipment, but the water hose of the sand mixer must be disassembled before operation, and temporary plugging agent must be added after the residual liquid is discharged, and then the nylon pipeline must be connected to the sand mixer. The operation is cumbersome, and the nylon pipeline must be disassembled and assembled many times during a fracturing operation. Because the nylon water hose can withstand a limited pressure, when the high-concentration temporary plugging agent is filled in the water hose, the sand mixer starts to supply liquid, and the fracturing truck starts. In this process, due to the poor flow of the high-concentration temporary plugging agent, a temporary temporary plugging effect is formed in the water hose between the sand mixer and the fracturing pump truck. When the pressure increases to a certain level, it is easy to burst the low-pressure pipeline, affecting the construction progress, damaging equipment, wasting temporary plugging agent, and polluting the workplace. The third method requires multiple disassembly and assembly of high-pressure pipelines and oil pipes, which is cumbersome and does not meet safety regulations. The oil pipe needs to be moved manually, which is labor-intensive. The temporary plugging agent is easy to flow out during the operation, and the site is easy to be polluted.
[0005] Therefore, for the injection process of multi-scale temporary plugging agents, it is necessary to develop new online injection technology of multi-scale temporary plugging agents for fracturing, so as to facilitate temporary plugging fracturing construction, improve construction efficiency and simplify the injection process. Utility Model Content
[0006] The technical problem to be solved by the utility model is to provide an online filling skid for a multi-scale temporary plugging agent for fracturing, which effectively overcomes the defects of the prior art.
[0007] The technical solution of the utility model to solve the above technical problems is as follows:
[0008] An online filling skid for a multi-scale temporary plugging agent for fracturing comprises a skid-mounted carrier and a fracturing pipeline installed on the skid-mounted carrier, the fracturing pipeline is connected to a multi-scale temporary plugging agent filling system, one end of the fracturing pipeline is used for connecting to a fracturing vehicle, and the other end is used for connecting to a Christmas tree wellhead, and the multi-scale temporary plugging agent filling system is used for inputting temporary plugging agents of different scales into the fracturing pipeline.
[0009] On the basis of the above technical solution, the present invention can also be improved as follows.
[0010] Furthermore, the multi-scale temporary plugging agent filling system includes a vertical pipe, a branch pipe, a mixer, an automatic temporary plugging agent feeder and a ball thrower. The vertical pipe is vertically connected to the upper part of the fracturing pipeline, one end of the branch pipe is connected to the middle section of the vertical pipe, and the other end is connected to the discharge port of the mixer. The discharge port of the automatic temporary plugging agent feeder is close to or connected to the feed port of the mixer, and is used to feed the mixer. The upper end of the vertical pipe is connected, and the upper and lower ends of the vertical pipe are respectively provided with a first control valve and a second control valve, and the end of the branch pipe connected to the vertical pipe is provided with a third control valve.
[0011] Furthermore, the branch pipe is connected to a pump body.
[0012] Furthermore, the above-mentioned ball pitcher is an electric ball pitcher.
[0013] Furthermore, the mixing agitator is a mixing tank.
[0014] Furthermore, the above-mentioned automatic temporary plugging agent feeding machine is a hoist.
[0015] Furthermore, the first control valve, the second control valve and the third control valve are all high-pressure gate valves.
[0016] Furthermore, a feed valve is provided at one end of the branch pipe connected to the mixing agitator.
[0017] The beneficial effects of the utility model are as follows: the structural design is simple and reasonable, and multi-scale temporary plugging agents are used to temporarily plug the perforations, the plugging reliability is strong, the crack end diversion is achieved, and new fractures are opened; the two processes of temporary plugging agent filling process and fracturing construction process of conventional temporary plugging fracturing are simplified into one process flow, and the online filling of temporary plugging agents with large-sized temporary plugging balls and a large number of small-sized temporary plugging agents in the fracturing process is achieved, which saves fracturing equipment such as fracturing pump trucks and sand mixing trucks, and reduces equipment investment costs and construction operation costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a schematic structural diagram of the online filling skid of the multi-scale temporary plugging agent for fracturing of the utility model.
[0019] In the accompanying drawings, the components represented by the reference numerals are listed as follows:
[0020] 1. Fracturing pipeline; 2. Christmas tree wellhead; 31. Vertical pipe; 32. Branch pipe; 33. Mixer; 34. Automatic feeder for temporary plugging agent; 35. Ball thrower; 36. First control valve; 37. Second control valve; 38. Third control valve; 39. Pump body; 40. Feed valve. DETAILED DESCRIPTION
[0021] The principles and features of the present invention are described below in conjunction with the accompanying drawings. The examples given are only used to explain the present invention and are not used to limit the scope of the present invention.
[0022] Example: Figure 1 As shown, the online filling skid of the multi-scale temporary plugging agent for fracturing of this embodiment includes a skid-mounted carrier and a fracturing pipeline 1 installed on the skid-mounted carrier, and the fracturing pipeline 1 is connected to a multi-scale temporary plugging agent filling system. One end of the fracturing pipeline 1 is used to connect to a fracturing vehicle A, and the other end is used to connect to a Christmas tree wellhead 2. The multi-scale temporary plugging agent filling system is used to input temporary plugging agents of different scales into the fracturing pipeline 1.
[0023] In this embodiment, the skid-mounted carrier may be a conventional skid-mounted vehicle frame or other carriers that are convenient for transportation.
[0024] The specific steps are as follows:
[0025] Step 1: Connect the fracturing and device surface process pipelines, and close the temporary plugging agent filling system;
[0026] Step 2: Perform the first-stage fracturing construction. After the first-stage fracturing construction is completed, stop the pump (the fracturing truck stops running);
[0027] Step 3: First, add a large-scale temporary plugging agent (temporary plugging balls and a small amount of large temporary plugging particles) into the fracturing pipeline 1 through the multi-scale temporary plugging agent injection system, then start the fracturing vehicle, and send the temporary plugging balls into the wellbore through the fracturing pipeline 1 at a displacement of 1.5 to 2 cubic meters per minute. Stop the pump after the pumping liquid volume is 2 to 3 cubic meters;
[0028] Step 4: Add a small-scale temporary plugging agent through the multi-scale temporary plugging agent filling system, start the fracturing truck, and send the temporary plugging agent mixture into the wellbore at a displacement of 1.5-2 cubic meters per minute. After pumping 2-3 cubic meters of liquid, increase the fracturing fluid displacement to 3-6 cubic meters per minute, and start to replace the first-level temporary plugging agent (the temporary plugging ball is the first-level temporary plugging agent). After the first-level temporary plugging agent is pushed to the horizontal perforations and the wellhead area, and the wellhead pressure climbing response appears and the pressure changes steadily, increase the fracturing fluid displacement by 10-20 cubic meters per minute and start the second-level fracturing. In this way, fracturing is carried out step by step and the temporary plugging agents required for each level are injected. Stop the pump after the construction is completed.
[0029] The whole device has a simple and reasonable structural design. It uses multi-scale temporary plugging agents to temporarily plug perforations, with strong plugging reliability, realizes crack diversion at the seam end, and opens new fractures. The two processes of temporary plugging agent filling and fracturing construction in conventional temporary plugging fracturing are simplified into one process flow, realizing online filling of large-sized temporary plugging balls and a large number of small-sized temporary plugging agents in the fracturing process, saving fracturing equipment such as fracturing pump trucks and sand mixing trucks, and reducing equipment investment costs and construction operation costs.
[0030] As a preferred embodiment, the multi-scale temporary plugging agent filling system includes a vertical pipe 31, a branch pipe 32, a mixer 33, an automatic temporary plugging agent loader 34 and a ball thrower 35. The vertical pipe 31 is vertically connected to the upper part of the fracturing pipeline 1. One end of the branch pipe 32 is connected to the middle section of the vertical pipe 31, and the other end is connected to the discharge port of the mixer 33. The discharge port of the automatic temporary plugging agent loader 34 is close to or connected to the feed port of the mixer 33, so as to feed the mixer 33. The upper end of the vertical pipe 31 is connected, and the upper and lower ends of the vertical pipe 31 are respectively provided with a first control valve 36 and a second control valve 37. The end of the branch pipe 32 connected to the vertical pipe 31 is provided with a third control valve 38.
[0031] In the above embodiment, a large-scale temporary plugging agent (temporary plugging balls and a small amount of large temporary plugging particles) is injected through the ball thrower 35, and a small-scale temporary plugging agent is injected through the mixer 33 and the branch pipe 32. The details are as follows:
[0032] Step 1: Connect the fracturing and device surface process pipelines, close the second control valve 37 at the lower end of the vertical pipe 31 in the temporary plugging agent filling system, and load an appropriate amount of temporary plugging balls into the ball dispenser 35;
[0033] Step 2: Perform the first stage fracturing construction. After the first stage fracturing construction is completed, stop the pump;
[0034] Step 3: close the third control valve 38, open the first control valve 36 and the second control valve 37, the temporary plugging ball falls into the high-pressure pipeline by its own gravity, and start the fracturing truck, send the temporary plugging ball into the wellbore through the fracturing pipeline 1 at a displacement of 1.5-2 cubic meters / minute, and stop the pump after the pumping liquid volume is 2-3 cubic meters;
[0035] Step 4: By closing the first control valve 36, opening the third control valve 38, and opening the second control valve 37, the uniform mixture of the small-scale temporary plugging agent and the fracturing fluid stirred by the mixer 33 is pumped into the fracturing pipeline 1. After it is completely completed, the third control valve 38 is closed, and the fracturing vehicle is started. The temporary plugging agent mixture is sent into the wellbore at a displacement of 1.5 to 2 cubic meters per minute. After the pumping liquid volume is 2 to 3 cubic meters, the fracturing fluid displacement is increased to 3 to 6 cubic meters per minute, and the first-stage temporary plugging agent is replaced. After the first-stage temporary plugging agent is pushed to the horizontal perforations and the well entry area, and the wellhead pressure climbing response appears and the pressure changes steadily, the displacement of the fracturing fluid is increased by 10 to 20 cubic meters per minute to start the second-stage fracturing. In this way, fracturing is carried out step by step and the temporary plugging agent required for each stage is injected. The pump is stopped after the construction is completed.
[0036] It should be noted that: during use, different types of temporary plugging balls with an outer diameter of 13-50 mm can be added through steps 1-3 of the embodiment to achieve temporary plugging and diversion fracturing of the perforated holes. For repeated fracturing transformation of old wells and interlayer diversion fracturing conditions, a large amount of powdered and granular temporary plugging agents can be injected into the interlayer cracks according to step 4 of the embodiment, and then the plugging pressure is stabilized and pumped at a large displacement to achieve diversion fracturing of the interlayer cracks. When the blastholes are difficult to plug due to high ground stress under complex working conditions, step-by-step fracturing of the reservoir segment cluster can be achieved through steps 1-4 of the embodiment.
[0037] In this embodiment, a flange interface is provided at the upper end of the fracturing pipeline 1, and the lower end of the vertical pipe 31 is sealed and fixed to the flange interface. A flange interface is provided in the middle section of the vertical pipe 31, and one end of the branch pipe 32 is sealed and fixed to the flange interface on the vertical pipe 31.
[0038] As a preferred embodiment, a pump body 39 is connected to the branch pipe 32 .
[0039] In the above embodiment, the stirred small-scale temporary plugging agent is pumped into the fracturing pipeline 1 through the pump body 39, so that the temporary plugging agent is smoothly transported.
[0040] In this embodiment, the ball pitcher 35 may be a conventional electric ball pitcher, and the specific model may be flexibly adapted according to actual needs during use.
[0041] In this embodiment, the mixing agitator 33 adopts a mixing tank of the prior art, and any mixing tank can be used as long as it can mix the temporary plugging agent. The specific model can be flexibly adapted according to actual needs during use.
[0042] In this embodiment, the temporary plugging agent automatic feeder 34 adopts a prior art hoist or an automatic feeding winch. The discharge end of the temporary plugging agent automatic feeder 34 is located above the feed inlet of the mixer 33 to ensure normal feeding.
[0043] In this embodiment, the first control valve 36, the second control valve 37 and the third control valve 38 are all high-pressure gate valves, specifically hydraulically controlled high-pressure gate valves, which are products of the prior art. The specific models are flexibly adapted according to actual needs during use.
[0044] In this embodiment, a feed valve 40 is provided at one end of the branch pipe 32 connected to the mixer 33, and the feed valve 40 can be a gate valve.
[0045] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0046] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present utility model, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0047] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0048] In the present utility model, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.
[0049] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the utility model. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.
[0050] Although the embodiments of the present invention have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limitations of the present invention. Ordinary technicians in the field can change, modify, replace and modify the above embodiments within the scope of the present invention.
Claims
1. An online filling skid for multi-scale temporary plugging agent for fracturing, characterized by: The invention comprises a skid-mounted carrier and a fracturing pipeline (1) installed on the skid-mounted carrier, wherein the fracturing pipeline (1) is connected to a multi-scale temporary plugging agent injection system, wherein one end of the fracturing pipeline (1) is used to connect to a fracturing vehicle, and the other end is used to connect to a wellhead (2) of an oil production tree, and the multi-scale temporary plugging agent injection system is used to input temporary plugging agents of different scales into the fracturing pipeline (1); the multi-scale temporary plugging agent injection system comprises a vertical pipe (31), a branch pipe (32), a mixing agitator (33), an automatic temporary plugging agent feeder (34) and a ball thrower (35), wherein the vertical pipe (31) is vertically connected to the fracturing vehicle. At the upper part of the pipeline (1), one end of the branch pipe (32) is connected to the middle section of the vertical pipe (31), and the other end is connected to the discharge port of the mixing agitator (33). The discharge port of the temporary plugging agent automatic feeder (34) is close to or connected to the feed port of the mixing agitator (33) for feeding the mixing agitator (33). The upper end of the vertical pipe (31) is connected. The upper end and the lower end of the vertical pipe (31) are respectively provided with a first control valve (36) and a second control valve (37). The end of the branch pipe (32) connected to the vertical pipe (31) is provided with a third control valve (38).
2. The online filling skid of a multi-scale temporary plugging agent for fracturing according to claim 1 is characterized by: The branch pipe (32) is connected to a pump body (39).
3. The online filling skid of a multi-scale temporary plugging agent for fracturing according to claim 1 is characterized by: The ball pitcher (35) is an electric ball pitcher.
4. The online filling skid of a multi-scale temporary plugging agent for fracturing according to claim 1 is characterized by: The mixing agitator (33) is a stirring tank.
5. The online filling skid of a multi-scale temporary plugging agent for fracturing according to claim 1, characterized in that: The temporary plugging agent automatic feeding machine (34) is a hoist.
6. The online filling skid of a multi-scale temporary plugging agent for fracturing according to claim 1, characterized in that: The first control valve (36), the second control valve (37) and the third control valve (38) are all high-pressure gate valves.
7. The online filling skid of a multi-scale temporary plugging agent for fracturing according to claim 1, characterized in that: A feed valve (40) is provided at one end of the branch pipe (32) connected to the mixing agitator (33).