Bridge cable anchoring alloy casting device
Through the combination of mold casting method and air-cooling channel, the solidification sequence of the alloy cast body is controlled, which solves the problems of anchor preheating damage and uncontrollable alloy solidification sequence in the existing technology, and realizes the density and sequential solidification of the alloy cast body. .
Patent Information
- Application Number
- CN202420005531.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-02
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2034-01-02
AI Technical Summary
The existing hot-cast anchor process for bridge cable anchoring has problems such as preheating damage to the anchor, uncontrollable alloy solidification sequence, and prone to shrinkage cavity defects and gravity segregation.
The mold casting method is used to control the alloy solidification sequence by setting up cooling brackets and temperature measurement devices. Air-cooling channels and insulation heating measures are used to form the temperature gradient of the alloy casting body to ensure that the alloy is sequenced from the bottom, center, and top to the gate and riser. solidification.
It avoids shrinkage defects in the alloy casting body, ensures the compactness of the alloy casting body, and ensures the solidification sequence through temperature measurement and monitoring.
Smart Images

Figure CN221790974U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a bridge cable anchoring alloy casting device, belonging to the technical field of bridge cables. Background Art
[0002] The anchors at both ends of the parallel steel wire cables used for bearing loads in long-span bridges are generally anchored by hot-cast anchors or cold-cast anchors. The hot-cast anchor is a low-melting-point zinc-based alloy that is cast into the anchor. After the alloy solidifies, it bonds with the high-strength steel wire to form an alloy anchor casting, thereby achieving the anchoring of the high-strength steel wire.
[0003] According to the design principle of zinc alloy casting process, a reasonable casting process should make the casting solidify in sequence, with the part far away from the gate or riser solidifying first, and the solidification order gradually approaching the gate or riser position to avoid shrinkage defects. The existing casting method of cable hot-cast anchor generally adopts the direct pouring method of cable anchor. The casting process is relatively extensive. The molten alloy is cast from the rear end of the anchor. After casting, the natural air cooling method is adopted. Shrinkage compensation casting is performed at the rear end of the anchor before the alloy solidifies. There is no temperature control process measure in the process. The existing process has the following disadvantages: 1) The anchor needs to be preheated to a high temperature, which damages the appearance coating of the anchor; 2) The solidification order of the alloy after casting is uncontrollable. For larger cable anchors, due to the rapid heat dissipation and cooling of the periphery, it is easy to cause the periphery of the cast alloy to solidify first, and the middle part to solidify later, which is easy to cause shrinkage defects due to insufficient shrinkage compensation; 3) The cooling time is long, which is easy to cause gravity segregation, making the internal composition of the casting uneven. Utility Model Content
[0004] The technical problem to be solved by the utility model is to provide a bridge cable anchor alloy casting device in response to the above-mentioned prior art, adopt a mold casting method, based on the alloy phase change principle, by setting cooling measures, control the alloy solidification sequence, thereby solving the problems existing in the above-mentioned prior art.
[0005] The technical solution adopted by the utility model to solve the above-mentioned problem is: a bridge cable anchor alloy casting device, including a casting mold assembly and a cooling bracket, the cooling bracket is arranged below the casting mold assembly; the casting mold assembly includes a mold body, the inner cavity of the mold body matches the inner cavity of the anchor cup, the large end of the inner cavity of the mold body is provided with a large end sealing plate, and the small end of the inner cavity of the mold body is provided with a small end sealing plate; the top of the mold body is provided with a gate, the top of the large end sealing plate is provided with a riser, and the gate and the riser are respectively connected to the inner cavity of the mold body.
[0006] The cooling bracket is arranged below the lower half of the mold body, and an air cooling channel is formed between the cooling bracket and the outer surface of the lower half of the mold body. An air supply port is provided at one end of the cooling bracket, and an air outlet is provided at the other end; the air supply port and the air outlet are respectively connected to the cooling channel.
[0007] The mold body is a left and right split structural member with a central vertical parting surface.
[0008] A plurality of heat dissipation strips arranged throughout the length of the mold body are arranged on the outer surface of the lower half of the mold body, and the plurality of heat dissipation strips are evenly distributed in the circumferential direction.
[0009] A temperature measuring and collecting device is also provided, which includes a temperature measuring couple and a thermometer; the large-end sealing plate is provided with a symmetrically arranged temperature measuring hole group, and any of the temperature measuring hole groups includes a plurality of vertically spaced temperature measuring holes, the temperature measuring couple is provided in the temperature measuring hole, and the temperature measuring couple is respectively connected to the thermometer.
[0010] The distance between two adjacent temperature measuring holes in the same group is not less than 30 mm, and the distance between the temperature measuring hole at the bottom and the bottom of the large end sealing plate is not more than 5 mm.
[0011] Compared with the prior art, the utility model has the advantages of: a bridge cable anchoring alloy casting device,
[0012] 1) The mold body adopts a left and right split structure with a vertical parting surface. The gate and riser are set above the vertical parting surface to facilitate demolding.
[0013] 2) The riser is located on the top of the large end plugging plate and does not occupy the cone working surface of the alloy casting, thus reducing the workload of cleaning the cone surface.
[0014] 3) The lower half of the mold body is air-cooled and combined with insulation and heating measures for the upper half of the mold body, the gate and the riser, the alloy casting forms a temperature gradient from the lower part, center, upper part to the gate and riser of the alloy body, and solidifies in this order, avoiding the formation of shrinkage holes in the alloy casting and ensuring the density of the alloy casting.
[0015] 4) The temperature gradient of the alloy casting can be monitored by the temperature measuring couple and the thermometer to ensure the solidification sequence of the alloy casting. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 This is a schematic diagram of a bridge cable anchoring alloy casting device according to an embodiment of the utility model;
[0017] Figure 2 It is a cross-sectional view of the mold;
[0018] Figure 3 for Figure 1 Detailed side view of the middle mold;
[0019] Figure 4 This is a schematic diagram of the installation of a bridge cable anchoring alloy casting device according to an embodiment of the utility model;
[0020] Figure 5This is the structural diagram of the bridge cable anchorage;
[0021] In the figure, 1 is an alloy anchor body, 2 is an anchor cup, 3 is a cable, 4 is a large end plugging plate, 401 is a riser, 402 is a temperature measuring hole, 5 is a casting mold assembly, 501 is a mold body, 502 is a gate, 503 is a heat dissipation strip, 6 is a small end plugging plate, 7 is a cooling bracket, 701 is an air supply port, 702 is an air outlet, 703 is an air cooling channel, 8 is an alloy casting body, 801 is a gate residual material, 802 is a riser residual material, 9 is a temperature measuring couple, and 10 is a thermometer. DETAILED DESCRIPTION
[0022] The present invention will be described in further detail below in conjunction with the accompanying drawings.
[0023] like Figure 1 , 2 As shown in Figure 3, a bridge cable anchoring alloy casting device in this embodiment includes a casting mold assembly 5 and a cooling bracket 7. The casting mold assembly 5 includes a mold body 501, and the inner cavity of the mold body 501 matches the conical inner cavity of the anchor cup 2. A large end sealing plate 4 is provided at the large end of the inner cavity of the mold body 501, and a small end sealing plate 6 is provided at the small end of the inner cavity of the mold body 501. The mold body is a left and right split structural member with a central vertical parting surface. A gate 502 is provided at the top of the mold body 501, and a riser 401 is provided at the top of the large end sealing plate 4. The gate 502 and the riser 401 are respectively connected to the inner cavity of the mold body 501. The cooling bracket 7 is installed on the lower half of the mold body 501, and the cooling bracket 7 matches the lower half of the mold body 501, and an air cooling channel 703 is formed between the cooling bracket 7 and the outer surface of the lower half of the mold body 501. An air supply port 701 is provided at one end of the cooling bracket 7 and is connected to the cooling air supply pipe. The other end of the cooling bracket is provided with an air outlet 702, and the air supply port and the air outlet are respectively connected to the air cooling channel. The air in the cooling air supply pipe flows into the air cooling channel through the air supply port and then flows out through the air outlet.
[0024] Two groups of symmetrically arranged temperature measuring holes are provided on the large end plugging plate 4. Each temperature measuring hole group includes a plurality of temperature measuring holes 402. The plurality of temperature measuring holes are arranged vertically at intervals. The spacing between adjacent temperature measuring holes is not less than 30 mm. The distance between the bottom temperature measuring hole and the bottom of the large end plugging plate is not more than 5 mm. A temperature measuring couple 9 is provided in each temperature measuring hole, and the temperature measuring couple is connected to a thermometer 10.
[0025] A method for casting a zinc-based multi-element alloy material for bridge cable anchoring comprises the following steps:
[0026] Step 1: preparing a zinc-based multi-component alloy melt in a melting furnace, wherein the chemical composition of the zinc-based multi-component alloy melt includes, by mass percentage, Al: 5.0-9.0%, Cu: 0.8-1.2%, Mg: 0-0.02% and Ti: 0.05-0.15% or RE: 0-0.01%, and the rest is Zn and unavoidable impurities.
[0027] The components of the above impurities include, by mass percentage: Pb: 0-0.005%, Sn: 0-0.002%, Cd: 0-0.005% and Fe: 0-0.05%.
[0028] The dosage of the ingredients is calculated according to the theoretical dosage and theoretical burn-out rate. The order of ingredient smelting is Al-Cu-Zn-Mg, and then titanium-containing master alloy or RE is added for melting. The zinc-based multi-element alloy solution is stirred, slag is removed, and samples are taken for alloy composition inspection.
[0029] The titanium-containing master alloy is one or more of aluminum-titanium, zinc-aluminum-titanium or zinc-titanium alloy.
[0030] The zinc-based multi-element alloy of the present application contains an appropriate amount of Al, which can improve the fluidity of the alloy and facilitate the casting process; a small amount of Cu and Mg can improve the strength and intergranular corrosion resistance of the alloy; Ti or RE can refine the grains, thereby improving the strength and hardness of the alloy and obtaining better creep resistance.
[0031] Step 2: The anchor cup 2 with a conical inner cavity is installed on the cable 3. At the end of the cable 3, a steel wire rope section with a length equivalent to the conical cavity of the anchor cup 2 is measured. The end of the rope section is separated so that the net distance between each steel wire is 3 to 12 mm.
[0032] Step 3: If Figure 4 As shown, the casting mold assembly 5 is assembled and installed on the cable body section treated with steel wire separation.
[0033] Step 4: preheat the assembled casting mold assembly 5 and the cable body section at a preheating temperature of 200-300°C.
[0034] Step 5: Install a cooling bracket 7 below the mold body. The cooling bracket 7 matches the lower half of the mold body 501 , and an air cooling channel 703 is formed between the cooling bracket 7 and the outer surface of the lower half of the mold body 501 .
[0035] Step 6: The prepared zinc-based multi-component alloy melt is continuously poured into the inner cavity of the mold body through the pouring port until the zinc-based multi-component alloy melt overflows the riser. During casting, the temperature of the zinc-based multi-component alloy melt should be controlled to be 30 to 80°C higher than the liquidus line.
[0036] Step 7: The air supply port supplies air to cool the outer surface of the lower half of the mold body, so that the zinc-based multi-element alloy melt located in the lower half of the mold body solidifies before the zinc-based multi-element alloy melt in the center of the mold body, so as to avoid the formation of shrinkage cavities in the center of the casting body. The outer surface of the upper half of the mold body, the gate and the riser are insulated or heated to form a temperature gradient from the bottom, the center, the top to the gate and the riser of the alloy casting body, and solidification is carried out in this order to avoid the formation of shrinkage cavities in the alloy casting body, and in this process, the zinc-based multi-element alloy melt is poured into the gate and the riser.
[0037] Thermocouples are used to measure the temperature changes during the solidification process of zinc-based multi-element alloy melt after casting, and then monitor the temperature gradient of the alloy casting body.
[0038] Step 8: After the zinc-based multi-element alloy melt of the pouring gate and the riser solidifies and cools, the air supply port stops supplying air for cooling, and the casting mold assembly is disassembled to form an alloy casting body 8 with riser residue 801 and pouring gate residue 802.
[0039] Step 9: If Figure 5 As shown, the gate residue and riser residue attached to the alloy casting are removed, and the surface is polished to form an alloy anchor body 1 that matches the inner cavity of the cable anchor cup.
[0040] Step 10: After the alloy anchor body is cooled to room temperature, the anchor cup 2 is shifted onto the alloy anchor body 1, the anchor cup is fixed on a workbench, and the large end surface of the alloy anchor body is subjected to top pressing.
[0041] In the above step three, the inner cavity size of the mold body is designed according to the conical inner cavity size of the anchor cup, and the shrinkage rate of the alloy is taken into account and enlarged. The shrinkage rate is 0.5-5% or according to the actual measured value.
[0042] In the above step three, a plurality of circumferentially evenly distributed heat dissipation strips are provided on the outer surface of the lower half of the mold body to increase the heat dissipation area and achieve a better heat dissipation effect.
[0043] 1) The alloy anchor body of the present application adopts a zinc-based multi-element alloy component. A small amount of Mg improves the alloy strength and intergranular corrosion resistance; Ti or RE refines the grains, thereby improving the alloy strength and hardness and obtaining better creep resistance.
[0044] 2) The mold body adopts a left and right split structure with a vertical parting surface, and the gate and riser are set above the vertical parting surface to facilitate demolding.
[0045] 3) The riser is located on the top of the large end plugging plate and does not occupy the cone working surface of the alloy casting, thus reducing the workload of cleaning the cone surface.
[0046] 4) The lower half of the mold body is air-cooled and combined with insulation and heating measures for the upper half of the mold body, the gate and the riser, the alloy casting forms a temperature gradient from the lower part, center, upper part to the gate and riser of the alloy body, and solidifies in this order, avoiding the formation of shrinkage holes in the alloy casting and ensuring the density of the alloy casting.
[0047] 5) The temperature gradient of the alloy casting can be monitored by the temperature measuring couple and the thermometer to ensure the solidification sequence of the alloy casting.
[0048] In addition to the above embodiments, the present invention also includes other implementation modes. Any technical solutions formed by equivalent transformation or equivalent replacement should fall within the protection scope of the claims of the present invention.
Claims
1. A bridge cable anchoring alloy casting device, characterized in that: It includes a casting mold assembly and a cooling bracket, and the cooling bracket is arranged below the casting mold assembly; the casting mold assembly includes a mold body, the inner cavity of the mold body matches the inner cavity of the anchor cup, the large end of the inner cavity of the mold body is provided with a large end sealing plate, and the small end of the inner cavity of the mold body is provided with a small end sealing plate; a gate is provided on the top of the mold body, and a riser is provided on the top of the large end sealing plate, and the gate and riser are respectively connected to the inner cavity of the mold body.
2. A bridge cable anchoring alloy casting device according to claim 1, characterized in that: The cooling bracket is arranged below the lower half of the mold body, and an air cooling channel is formed between the cooling bracket and the outer surface of the lower half of the mold body. An air supply port is provided at one end of the cooling bracket, and an air outlet is provided at the other end; the air supply port and the air outlet are respectively connected to the cooling channel.
3. The bridge cable anchoring alloy casting device according to claim 1 is characterized in that: The mold body is a left and right split structural member with a central vertical parting surface.
4. The bridge cable anchoring alloy casting device according to claim 1, characterized in that: A plurality of heat dissipation strips arranged throughout the length of the mold body are arranged on the outer surface of the lower half of the mold body, and the plurality of heat dissipation strips are evenly distributed in the circumferential direction.
5. The bridge cable anchoring alloy casting device according to claim 1, characterized in that: A temperature measuring and collecting device is also provided, which includes a temperature measuring couple and a thermometer; the large-end sealing plate is provided with a symmetrically arranged temperature measuring hole group, and any of the temperature measuring hole groups includes a plurality of vertically spaced temperature measuring holes, the temperature measuring couple is provided in the temperature measuring hole, and the temperature measuring couple is respectively connected to the thermometer.
6. A bridge cable anchoring alloy casting device according to claim 5, characterized in that: The distance between two adjacent temperature measuring holes in the same group is not less than 30 mm, and the distance between the temperature measuring hole at the bottom and the bottom of the large end sealing plate is not more than 5 mm.