Building pouring box transportation equipment

By designing adjustable positioning frames and stable components in the construction pouring box transportation equipment, the problem that different sizes of pouring boxes require different specifications of transportation equipment is solved, improving the practicability of the equipment and ensuring the stability of the pouring box.

CN221794653UActive Publication Date: 2024-10-01李万明
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323164259.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-11-23
Publication Date
2024-10-01
Estimated Expiration
2033-11-23

AI Technical Summary

Technical Problem

Existing construction pouring box transportation equipment requires transportation equipment of different specifications, resulting in high transportation costs and the inability to adjust the size of the transportation equipment according to the size of the pouring box, which reduces the practicality of the equipment.

Method used

A construction pouring box transportation equipment including a transport carrier plate, a positioning frame, a limit slider, an adjustment stud and a stabilizing component is designed. By adjusting the spacing of the positioning frame and tightening the screw sleeve, the limit components of the transportation equipment are adjusted. Adjust and secure the building pouring box with stable components such as fixed splints and anti-slip rubber pads.

Benefits of technology

It is possible to adjust the limit components of the transportation equipment according to the size of the building pouring box, which improves the practicality of the transportation equipment. The stability of the pouring box during transportation is ensured by the stable components, and the risk of falling out due to bumps is avoided.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221794653U_ABST
    Figure CN221794653U_ABST
Patent Text Reader

Abstract

The utility model discloses building pouring box transportation equipment which comprises a transportation carrying plate, a traction hanging frame is arranged on one side of the transportation carrying plate, and universal moving wheels are evenly arranged at the bottom of the transportation carrying plate. The adjusting assemblies are arranged between the bottoms of the positioning frames and the conveying carrying plate, the distance between the positioning frames is adjusted in the opposite direction or the reverse direction according to the size of a building pouring box needing to be conveyed in the using process, meanwhile, the limiting sliding blocks slide in the reserved grooves, the positioning frames are limited and stabilized, deflection of the positioning frames is avoided, and the conveying efficiency is improved. Meanwhile, the adjusting stud moves in the reserved groove, after the positioning frame is adjusted to the size suitable for the building pouring box needing to be transported, the adjusting stud is sleeved with the fastening screw sleeve from the lower portion and tightened, and the purpose of stabilizing the positioning frame can be achieved; therefore, the effect of correspondingly adjusting the limiting component of the transportation equipment according to the size of the building pouring box is achieved, and the practicability of the transportation equipment is further improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of transportation equipment, in particular to a construction pouring box transportation equipment. Background Art

[0002] The building pouring box is a tool used to make concrete pouring foundations. It can help architects and engineers quickly make high-quality foundation structures. Different concrete pouring foundations require different building pouring boxes. When pouring concrete foundations, transportation equipment is required to transport the building pouring box to the designated construction area.

[0003] However, during the application of existing construction pouring box transportation equipment, different specifications of transportation equipment are required due to the different sizes of construction pouring boxes, which leads to increased transportation costs. There is a technical problem that the size specifications that the transportation equipment can transport cannot be adjusted according to the size specifications of the construction pouring boxes to improve the practicality of the equipment. Utility Model Content

[0004] In order to overcome the shortcomings of the prior art, the utility model provides a construction pouring box transportation equipment, which can solve the technical problem that different sizes of construction pouring boxes require the use of transportation equipment of different specifications, thereby increasing transportation costs, and that the size specifications that can be transported by the transportation equipment cannot be adjusted according to the size specifications of the construction pouring boxes to improve the practicality of the equipment.

[0005] In order to solve the above technical problems, the utility model provides the following technical solutions: a construction casting box transportation equipment, including a transportation carrier, a traction hanger is provided on one side of the transportation carrier, universal moving wheels are evenly provided on the bottom of the transportation carrier, positioning frames are provided on both sides and both ends of the top of the transportation carrier, a limiting column is provided on one side of the top of the positioning frame, a limiting slider is provided on the bottom of the positioning frame, reserved grooves are provided on both sides and both ends of the interior of the transportation carrier, an adjusting stud is provided at the bottom end of the limiting slider, the bottom end of the adjusting stud passes through the interior of the reserved groove, a fastening screw sleeve is provided on the outside of the adjusting stud near the bottom end, and a stabilizing component is provided on one side of the positioning frame.

[0006] As a preferred technical solution of the utility model, the limit sliding block is embedded in the interior of the reserved groove, and the limit sliding block can slide in the reserved groove.

[0007] As a preferred technical solution of the utility model, the transport carrier is circular and the positioning frame is L-shaped.

[0008] As a preferred technical solution of the utility model, four groups of universal movable wheels are provided, and the universal movable wheels are distributed in a ring shape at the bottom of the transport carrier.

[0009] As a preferred technical solution of the utility model, the stabilizing component includes a fixed splint, which is arranged on the inner side of the positioning frame, an adjusting rod is arranged at the middle position of one side of the fixed splint, a through hole is arranged on the inner side wall of the positioning frame, an adjusting sleeve is movably connected to the outer side of the positioning frame, and an anti-slip rubber pad is arranged on the other side of the fixed splint.

[0010] As a preferred technical solution of the utility model, one side of the adjusting rod passes through the through hole and the inside of the adjusting sleeve, the outside of the adjusting rod is provided with an external thread, and the inside of the adjusting sleeve is provided with an internal thread matching the external thread.

[0011] Compared with the prior art, the utility model can achieve the following beneficial effects:

[0012] 1. By arranging an adjustment component between the bottom of the positioning frame and the transport carrier, the spacing of the positioning frame is adjusted in the opposite direction or in the opposite direction according to the size of the building casting box to be transported during use, and the limit slider slides in the reserved groove to limit and stabilize the positioning frame to prevent the positioning frame from deflecting. At the same time, the adjustment stud moves in the reserved groove. When the positioning frame is adjusted to a size suitable for the building casting box to be transported, the fastening screw sleeve is sleeved on the outside of the adjustment stud from below and tightened, so as to achieve the purpose of stabilizing the positioning frame, thereby achieving the effect of adjusting the limiting component of the transportation equipment according to the size of the building casting box, and further improving the practicality of the transportation equipment;

[0013] 2. By arranging a stabilizing component on one side of the positioning frame, when in use, the building pouring box is hoisted between the positioning frames on the transport carrier and is limited from the inside of the pouring box by a limiting column, and then the adjusting sleeve is rotated. When the adjusting sleeve rotates, the adjusting rod is driven to move toward each other through a threaded connection and the fixed splints are pushed to move toward each other to clamp and fix the building pouring box. At the same time, the anti-slip rubber pad is pushed to fit tightly against the outer wall of the building pouring box, thereby achieving further stabilization of the building pouring box to avoid the box body moving up and down and falling out of the equipment due to bumpy roads during transportation, thereby ensuring the stability of the building pouring box during transportation. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a three-dimensional structural schematic diagram of the utility model;

[0015] Figure 2 This is a bottom-up three-dimensional structural schematic diagram of the utility model;

[0016] Figure 3 This is a front view structural schematic diagram of the utility model;

[0017] Figure 4 For the utility model Figure 1 Enlarged structural diagram at A in the middle.

[0018] Among them: 1. Transport carrier; 2. Universal moving wheel; 3. Positioning frame; 4. Towing bracket; 5. Reserved groove; 6. Anti-slip rubber pad; 7. Limiting column; 8. Fixed splint; 9. Through hole; 10. Adjusting rod; 11. Adjusting stud; 12. Fastening screw sleeve; 13. Limiting slider; 14. Adjusting sleeve. DETAILED DESCRIPTION

[0019] In order to make the technical means, creative features, purpose and efficacy of the utility model easy to understand, the utility model is further described below in conjunction with specific embodiments, but the following embodiments are only preferred embodiments of the utility model, not all. Based on the embodiments in the implementation mode, other embodiments obtained by those skilled in the art without creative work are all within the scope of protection of the utility model. The experimental methods in the following embodiments are conventional methods unless otherwise specified, and the materials, reagents, etc. used in the following embodiments are all commercially available unless otherwise specified.

[0020] Example

[0021] Please refer to Figure 1-4 As shown, the utility model provides a construction pouring box transport device, comprising a circular transport carrier 1, a traction hanger 4 is arranged on one side of the transport carrier 1, universal moving wheels 2 are evenly arranged on the bottom of the transport carrier 1, four groups of universal moving wheels 2 are arranged, and the universal moving wheels 2 are distributed in a ring shape at the bottom of the transport carrier 1, and the universal moving wheels 2 can be used to drive the device to move to transport the construction pouring box, and "L"-shaped positioning frames 3 are arranged on both sides and both ends of the top of the transport carrier 1, and a limiting column 7 is arranged on one side of the top of the positioning frame 3, and the position of the limiting column 7 is positioned by the positioning frame 3, and the front, back, left, and right positions of the construction pouring box are clamped from the inside by the limiting column 7 to limit the construction pouring box on the device;

[0022] As a further implementation of this embodiment, Figure 1 , Figure 2 and Figure 3The bottom of the positioning frame 3 is provided with a limit slide block 13, and reserved grooves 5 are provided on both sides and both ends of the interior of the transport carrier plate 1. The limit slide block 13 is embedded in the interior of the reserved groove 5, and the limit slide block 13 can slide in the reserved groove 5, driving the limit slide block 13 to move toward or in the reverse direction in the reserved groove 5, so as to adjust the spacing of the positioning frame 3 toward or in the reverse direction according to the size of the building casting box to be transported, and the positioning frame 3 is limited and stabilized to prevent the positioning frame 3 from deflecting. The bottom end of the limit slide block 13 is provided with an adjusting stud 11, and the bottom end of the adjusting stud 11 passes through the interior of the reserved groove 5, and a fastening screw sleeve 12 is provided near the bottom end of the adjusting stud 11. After the positioning frame 3 is adjusted to the size of the building casting box to be transported, the fastening screw sleeve 12 is sleeved on the outside of the adjusting stud 11 from below and tightened, so as to achieve the purpose of stabilizing the positioning frame 3, thereby realizing the effect of adjusting the limiting component of the transportation equipment according to the size of the building casting box, and further improving the practicality of the transportation equipment.

[0023] When in use, the spacing of the positioning frame 3 is adjusted in the opposite direction according to the size of the building pouring box to be transported, and the limiting slider 13 slides in the reserved groove 5 to limit and stabilize the positioning frame 3 to prevent the positioning frame 3 from deflecting. At the same time, the adjusting stud 11 moves in the reserved groove 5. When the positioning frame 3 is adjusted to the size of the building pouring box to be transported, the fastening screw sleeve 12 is sleeved on the outside of the adjusting stud 11 from below and tightened, so that the positioning frame 3 can be stabilized, thereby adjusting the position spacing of the limiting column 7 according to the size of the pouring box;

[0024] As a further implementation of this embodiment, Figure 1-4 As shown, a stabilizing component is arranged on one side of the positioning frame 3, and the stabilizing component includes a fixing splint 8, and the fixing splint 8 is arranged on the inner side of the positioning frame 3, and an adjusting rod 10 is arranged at the middle position of one side of the fixing splint 8, and a through hole 9 is arranged on the inner side wall of the positioning frame 3, and an adjusting sleeve 14 is movably connected to the outer side of the positioning frame 3, and one side of the adjusting rod 10 passes through the through hole 9 and the inside of the adjusting sleeve 14, and an external thread is arranged on the outside of the adjusting rod 10, and an internal thread matching the external thread is arranged on the inner side of the adjusting sleeve 14. By rotating the adjusting sleeve 14, the adjusting rod 10 can be driven to move toward each other through the threaded connection and the fixing splint 8 can be pushed to move toward each other to clamp and fix the building casting box, and an anti-skid rubber pad 6 is arranged on the other side of the fixing splint 8, and the anti-skid rubber pad 6 is pushed to fit tightly on the outer side wall of the building casting box, so as to further stabilize the building casting box to avoid the box body from moving up and down and falling out of the equipment when it reaches a bumpy road section during transportation, thereby ensuring the stability of the building casting box during transportation;

[0025] When in use, the building pouring box is hoisted between the positioning frames 3 on the transport carrier 1 and is limited from the inside of the pouring box by the limiting column 7, and then the adjusting sleeve 14 is rotated. When the adjusting sleeve 14 rotates, the adjusting rod 10 is driven to move toward each other through the threaded connection and the fixed clamping plate 8 is pushed to move toward each other to clamp and fix the building pouring box. At the same time, the anti-slip rubber pad 6 is pushed to fit tightly against the outer wall of the building pouring box, so that the side wall of the building pouring box is firmly clamped between the fixed clamping plate 8 and the limiting column 7;

[0026] Specific working principle:

[0027] When using the construction pouring box transportation equipment, first adjust the spacing of the positioning frame 3 in the opposite direction according to the size of the construction pouring box to be transported, and at the same time, the limit slider 13 slides in the reserved groove 5 to limit and stabilize the positioning frame 3 to prevent the positioning frame 3 from deflecting, and at the same time, the adjustment stud 11 moves in the reserved groove 5. After the positioning frame 3 is adjusted to the size of the construction pouring box to be transported, the fastening screw sleeve 12 is sleeved on the outside of the adjustment stud 11 from below and tightened, so that the positioning frame 3 can be stabilized, and then the construction pouring box is hoisted on the transportation carrier 1, and the wall panel of the construction pouring box is clamped into the positioning frame 3. The frame 3 and the limiting column 7 are used to clamp the front, rear, left and right positions of the building pouring box from the inside by using the limiting column 7 to limit the building pouring box on the equipment, and then the adjusting sleeve 14 is rotated. When the adjusting sleeve 14 rotates, it drives the adjusting rod 10 to move toward each other through the threaded connection and pushes the fixed clamping plate 8 to move toward each other to clamp and fix the building pouring box. At the same time, the anti-slip rubber pad 6 is pushed to fit tightly against the outer wall of the building pouring box, so as to stabilize the building pouring box on the equipment, and then the equipment is connected to the traction vehicle through the traction bracket 4. The traction vehicle tows the equipment through the universal movable wheel 2 to facilitate the equipment to move to transport the building pouring box.

[0028] The above shows and describes the basic principle, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only preferred examples of the utility model and are not used to limit the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection of the utility model is defined by the attached claims and their equivalents.

Claims

1. A construction pouring box transport device, comprising a transport carrier plate (1), Features: A traction bracket (4) is arranged on one side of the transport carrier (1), universal movable wheels (2) are evenly arranged on the bottom of the transport carrier (1), positioning frames (3) are arranged on both sides and both ends of the top of the transport carrier (1), a limiting column (7) is arranged on one side of the top of the positioning frame (3), a limiting slider (13) is arranged on the bottom of the positioning frame (3), reserved grooves (5) are arranged on both sides and both ends of the inside of the transport carrier (1), an adjusting stud (11) is arranged at the bottom end of the limiting slider (13), the bottom end of the adjusting stud (11) passes through the inside of the reserved groove (5), a fastening screw sleeve (12) is arranged on the outside of the adjusting stud (11) near the bottom end, and a stabilizing component is arranged on one side of the positioning frame (3).

2. A construction pouring box transport device according to claim 1, Features: The limiting sliding block (13) is embedded in the interior of the reserved groove (5), and the limiting sliding block (13) can slide in the reserved groove (5).

3. A construction pouring box transport device according to claim 1, Features: The transport carrier (1) is circular, and the positioning frame (3) is L-shaped.

4. A construction pouring box transport device according to claim 1, Features: Four groups of universal movable wheels (2) are provided, and the universal movable wheels (2) are distributed in a ring shape at the bottom of the transport carrier plate (1).

5. A construction casting box transportation device according to claim 1, Features: The stabilizing component comprises a fixing splint (8), the fixing splint (8) is arranged on the inner side of the positioning frame (3), an adjusting rod (10) is arranged at the middle position of one side of the fixing splint (8), a through hole (9) is arranged on the inner side wall of the positioning frame (3), an adjusting sleeve (14) is movably connected to the outer side of the positioning frame (3), and an anti-slip rubber pad (6) is arranged on the other side of the fixing splint (8).

6. A construction casting box transport device according to claim 5, Features: One side of the adjusting rod (10) passes through the through hole (9) and the inside of the adjusting sleeve (14); the outside of the adjusting rod (10) is provided with an external thread, and the inside of the adjusting sleeve (14) is provided with an internal thread matching the external thread.