Precise positioning structure for PC column

Through the combination of laser level and special alignment tools, the precise positioning of PC columns is achieved, which solves the problem of low efficiency and inaccurate positioning of PC columns in prefabricated buildings, and improves construction efficiency and progress.

CN221799236UActive Publication Date: 2024-10-01THE THIRD CONSTR OF CHINA CONSTR EIGHTH ENG BUREAU
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202323451336.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-18
Publication Date
2024-10-01
Estimated Expiration
2033-12-18

AI Technical Summary

Technical Problem

In prefabricated buildings, the hoisting and positioning of PC columns is inefficient and inaccurate. Conventional methods are difficult to achieve precise positioning, which affects the construction progress.

Method used

A laser level is combined with a special alignment tool to control the straightness of the PC column, and a reflector and a special alignment tool are used to achieve precise positioning of the PC column. The cross-sectional size of the special alignment tool is the same as the PC column, and the preset Leave the steel bars to be welded and fixed through the holes to ensure accurate docking.

Benefits of technology

It improves the precise positioning control of PC column hoisting, solves the problem of low positioning efficiency and inaccuracy, and significantly improves construction efficiency and progress.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221799236U_ABST
    Figure CN221799236U_ABST
Patent Text Reader

Abstract

The utility model discloses a PC column accurate positioning structure which comprises a lower-layer PC column arranged below a structural floor slab and a to-be-installed PC column arranged above the structural floor slab, a laser level meter is fixedly arranged above the structural floor slab, and a special centering tool is arranged between the to-be-installed PC column and the lower-layer PC column. The special centering tool is provided with holes corresponding to the reserved steel bars of the lower-layer PC columns, the reserved steel bars of the lower-layer PC columns penetrate through the holes, the reserved steel bars of the to-be-installed PC columns and the reserved steel bars of the lower-layer PC columns coincide through the holes of the special centering tool and are welded and fixed, and the positions of the reserved steel bars of the to-be-installed PC columns are observed through the reflectors arranged between the two PC columns. The positioning device has the characteristics of high precision and simplicity in operation, can convert a visual inspection mode into a hoisting construction method, improves the accurate positioning control of PC column hoisting, and solves the problems that the PC column hoisting positioning efficiency is low, the positioning is inaccurate, and repeated adjustment and deviation correction are frequently needed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction, in particular to a PC column precise positioning structure. Background Art

[0002] In the environment of advocating high-quality and efficient construction, prefabricated buildings have a bright future. At present, cast-in-place (partial) or prefabricated reinforced concrete beams, columns, and slabs are more commonly used. A new frame structure system is used to connect beams, slabs, columns, and nodes into a whole through the post-cast reinforced concrete part. This system is in line with the development direction of building industrialization and the spirit of building a conservation-oriented society. This prefabricated building structure system has gradually been widely used in the construction of the construction industry, greatly shortening the construction cycle, making the prefabricated construction method widely used. In prefabricated buildings, the conventional PC column hoisting positioning efficiency is low and the positioning is inaccurate, and repeated adjustments and corrections are often required, which seriously affects the PC column hoisting efficiency and causes the on-site construction progress to lag behind. Therefore, high-efficiency and precise positioning technology is also a major problem that needs to be solved during the construction process:

[0003] Since the conventional positioning and hoisting method is based on visual observation by workers, it is difficult to accurately align the filling sleeve at the lower end of the PC column with the reserved steel bars at the lower layer, making it difficult to accurately and efficiently position;

[0004] During the PC column hoisting construction process, when the PC column is hoisted to the bottom and connected with the reserved steel bar connection position of the lower PC column, the workers' line of sight is blocked and they cannot use the traditional visual method to locate it, and the accurate positioning of the hoisting cannot be guaranteed. As a result, the PC column is repeatedly hoisted and aligned, and the hoisting positioning depends entirely on probabilistic and rough positioning, resulting in low hoisting efficiency. Utility Model Content

[0005] The utility model aims to address the deficiencies of the prior art and provides a PC column precise positioning structure, comprising a lower PC column arranged below a structural floor and a PC column to be installed above the structural floor, a laser level is fixedly arranged above the structural floor, a laser emitted by the laser level is kept on the same vertical plane as a side surface of the PC column to be installed, a special centering tool is arranged between the PC column to be installed and the lower PC column, the cross-sectional size of the special centering tool is the same as the cross-sectional size of the PC column to be installed, a hole corresponding to the reserved steel bars of the lower PC column is opened on the special centering tool and the reserved steel bars of the lower PC column pass through, the reserved steel bars of the PC column to be installed overlap with the reserved steel bars of the lower PC column through the opening of the special centering tool and are welded and fixed, and the position of the reserved steel bars of the PC column to be installed is observed by a reflector arranged between the two PC columns.

[0006] Preferably, the special centering tool is made of a steel plate, which is cut into two pieces at a central position and actively connected by a spring.

[0007] Preferably, the four corners of the special centering tool are provided with steel bar heads of vertical steel plates, and the special centering tool is fixedly mounted on the structural floor through the steel bar heads.

[0008] Preferably, after the lifting operation of the PC column to be installed is completed, the verticality is checked by leaning a 2m ruler against the side of the PC column to be installed.

[0009] To sum up, the utility model has the following beneficial effects: as a precise positioning device for PC columns in prefabricated buildings, the utility model first has the characteristics of high precision and simple operation, can transform the visual method into a hoisting construction method, improve the precise positioning control of PC column hoisting, and at the same time solve the problems of low efficiency and inaccurate positioning of PC column hoisting, which often require repeated adjustments and corrections, thereby improving the hoisting efficiency of PC columns and effectively ensuring the progress of on-site construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0010] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0011] Figure 1 It is a schematic diagram of the structure and use of the utility model;

[0012] Figure 2 It is a structural schematic diagram of the special centering tool of the utility model.

[0013] In the figure: 1. Laser level; 2. Reflector; 3. Special centering tool; 4. Steel bar head; 5. Hole; 7. Spring; 8. Structural floor. DETAILED DESCRIPTION

[0014] The technical solution of the utility model is described in detail below with reference to the accompanying drawings, but the protection scope of the utility model is not limited to the embodiments.

[0015] Reference Figure 1The utility model provides a PC column precise positioning structure, comprising a lower PC column arranged below a structural floor 8 and a PC column to be installed above the structural floor 8, a laser level 1 is fixedly arranged above the structural floor 8, the laser emitted by the laser level 1 is kept on the same vertical plane as one side of the PC column to be installed, a special centering tool 3 is arranged between the PC column to be installed and the lower PC column, the cross-sectional size of the special centering tool 3 is the same as the cross-sectional size of the PC column to be installed, a hole 5 corresponding to the reserved steel bar of the lower PC column is opened on the special centering tool 3 and the reserved steel bar of the lower PC column passes through, the reserved steel bar of the PC column to be installed overlaps with the reserved steel bar of the lower PC column through the opening 5 of the special centering tool 3 and is welded and fixed, and the position of the reserved steel bar of the PC column to be installed is observed by a reflector 2 arranged between the two PC columns, and after the lifting operation of the PC column to be installed is completed, the verticality of the PC column to be installed is checked by leaning against the side of the PC column to be installed with a 2m ruler.

[0016] The utility model includes a laser level 1, a reflector 2, a special centering tool 3, and a 2m ruler. First, the approximate position of the PC column to be installed is measured by guiding the building axis, and then the laser level 1 is used to control the straightness of the PC column to be installed. After the preparation of the previous working conditions is completed, the PC column to be installed is hoisted. During the hoisting process, the position of the PC column to be installed is observed and adjusted in real time, so that one side of the PC column to be installed and the laser emitted by the laser level 1 are kept in the same vertical plane. When the PC column is lowered to the bottom and connected with the reserved steel bars of the lower column, the special centering tool 3 is used in combination with the reflector 2 used by the worker to quickly and accurately position the PC column to be installed, and the PC column positioning and hoisting operation is carried out efficiently. After the PC column hoisting operation is completed, the 2m ruler is used to check the verticality. The special centering tool 3 is made of 4mm steel plate welded together. The size of the steel plate is cut according to the cross-sectional size of the PC column, and then a hole 5 is opened on the cut steel plate (the diameter of the hole 5 is half the diameter of the reserved steel bar of the lower column). The position of the hole 5 corresponds to the reserved steel bar of the lower layer. Finally, the steel plate is cut into two pieces in the center. The two cut steel plates are actively connected by a spring 7 and can be disassembled and recycled after use.

[0017] Preferably, the four corners of the special centering tool 3 are provided with steel bar heads 4 of vertical steel plates, and the special centering tool 3 is fixedly mounted on the structural floor 8 through the steel bar heads 4 to ensure that the position of the special centering tool 3 does not change during positioning.

[0018] The construction method of the utility model is as follows:

[0019] 1. Measure and lay out a line flush with one side of the hoisted PC column according to the building axis, and then use an ink fountain to pop out the line on the floor;

[0020] 2. Set up the laser level 1 according to the measured through line, adjust the laser level 1 to the center, and then turn on the laser level 1. The laser level 1 emits a beam;

[0021] 3. During the process of hanging piles to install PC columns, the column side and the light beam are controlled in real time to remain in the same vertical plane;

[0022] 4. When the hoisting height of the PC column to be installed drops to the root, the worker uses a reflector 2 to observe the reserved grouting sleeve position at the bottom of the column and combines it with a special centering tool 3 for rapid and accurate positioning.

[0023] As mentioned above, although the present invention has been represented and described with reference to specific preferred embodiments, it should not be interpreted as a limitation of the present invention itself. Various changes in form and details may be made without departing from the spirit and scope of the present invention defined in the appended claims.

Claims

1. A PC column precise positioning structure, comprising a lower PC column arranged below a structural floor and a PC column to be installed above the structural floor, characterized in that: A laser level is fixedly installed above the structural floor, and the laser emitted by the laser level is maintained on the same vertical plane as one side of the PC column to be installed. A special centering tool is arranged between the PC column to be installed and the lower PC column. The cross-sectional size of the special centering tool is the same as the cross-sectional size of the PC column to be installed. The special centering tool is provided with holes corresponding to the reserved steel bars of the lower PC column and for the reserved steel bars of the lower PC column to pass through. The reserved steel bars of the PC column to be installed overlap with the reserved steel bars of the lower PC column through the holes of the special centering tool and are welded and fixed, and the position of the reserved steel bars of the PC column to be installed is observed by a reflector arranged between the two PC columns.

2. A PC column precise positioning structure according to claim 1, characterized in that: The special centering tool is made of a steel plate, which is cut into two pieces at the center position and is actively connected by a spring.

3. A PC column precise positioning structure according to claim 2, characterized in that: The four corners of the special centering tool are provided with steel bar heads of vertical steel plates, and the special centering tool is fixedly mounted on the structural floor through the steel bar heads.

4. The PC column precise positioning structure according to claim 3, characterized in that: After the lifting operation of the PC column to be installed is completed, the verticality is checked by leaning a 2m ruler against the side of the PC column to be installed.