Energy storage device for generator load test

Through the energy storage device for the generator load test, the power of the test ship is stored and reused, which solves the problem of power waste, improves the power utilization rate, and provides uninterrupted power supply during grid maintenance or failure.

CN221806553UActive Publication Date: 2024-10-01HUDONG ZHONGHUA SHIPBUILDINGGROUP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323409949.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-13
Publication Date
2024-10-01
Estimated Expiration
2033-12-13

AI Technical Summary

Technical Problem

The power generated during the ship generator load test is wasted by the dry load box and cannot be effectively utilized, resulting in resource waste and low power utilization.

Method used

An energy storage device for generator load testing is designed, including a power supply module, a test ship, an external power box, a load test and energy storage power station, and a comprehensive control unit. Part of the power of the test ship is output to the energy storage through the comprehensive control unit. The module charges and outputs another part of the power to the dry load box and adjustable reactance to achieve power storage and reuse.

Benefits of technology

It realizes the storage and reuse of generator load test power, improves power utilization, and stores power during valley hours of the power grid and releases it during peak hours, providing short-term high-power uninterrupted power supply to ensure factory power supply.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221806553U_ABST
    Figure CN221806553U_ABST
Patent Text Reader

Abstract

The utility model provides an energy storage device for a generator load test, and the device comprises a power supply module which is used for providing power; the test ship comprises a generator, a distribution board switch, a first output switch and a mobile control computer; an electric box is hung outside the ship body and connected with a test ship; the load test and energy storage power station is respectively connected with the power supply module and the external electric box of the ship body, the load test and energy storage power station comprises an energy storage module and a test module, the energy storage module is used for charging and discharging, the test module comprises a dry type load box and an adjustable reactor, and the dry type load box is connected with the adjustable reactor; and the comprehensive control unit is used for outputting one part of power of the test ship to the energy storage module for charging and outputting the other part of power of the test ship to the dry type load box and the adjustable reactor when the generator load test is carried out. Through the technical scheme of the invention, the electric power generated by the generator load test can be stored and reused, and economic benefits are generated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the technical field of energy storage devices, and in particular relates to an energy storage device for generator load testing. Background Art

[0002] As modern ships have an increasing demand for electricity, the capacity of the generator has increased in order to meet the demand for electricity on board. During the outfitting stage of the ship at the dock, the capacity of the load required for the generator load test has also increased, and the electricity generated by the load test is wasted by the dry load box. Summary of the invention

[0003] This application aims to solve or improve the above technical problems.

[0004] To this end, an embodiment of the present application provides an energy storage device for generator load testing.

[0005] To achieve the above-mentioned purpose, the present application provides an energy storage device for generator load test, including: a power supply module for providing power; a test ship, including a generator and a switch on a distribution board, a first output switch and a mobile control computer, the generator and the switch on the distribution board are connected to the first output switch; a hull external plug-in electric box, connected to the test ship, the hull external plug-in electric box including an external plug-in electric box switch and a control cable channel, the external plug-in electric box switch is connected to the first output switch, the control cable channel is used to connect to the mobile control computer, and the external plug-in electric box switch receives the control signal of the integrated control unit through the control cable channel; load The test and energy storage power station are respectively connected to the power supply module and the external hanging electric box. The load test and energy storage power station includes an energy storage module and a test module. The energy storage module is used for charging and discharging. The test module is connected to the energy storage module. The test module includes a dry load box and an adjustable reactance. The dry load box is connected to the adjustable reactance. The integrated control unit is respectively connected to the load test and energy storage power station and the external hanging electric box. The integrated control unit is used to output part of the power of the test ship to the energy storage module for charging when conducting a generator load test, and output another part of the power of the test ship to the dry load box and the adjustable reactance.

[0006] The energy storage device for load test of generator provided by the present application includes a power supply module, a test ship, an external electric box, a load test and energy storage power station and an integrated control unit. The power supply module is used to provide power. The test ship includes a generator and a switch of a distribution board, a first output switch and a mobile control computer. When a load test of the generator is required, the test personnel operate the entire energy storage power station device through a human-machine interface computer to conduct the test. The external electric box of the hull is used to provide a safe ship-shore power / control connection. It is composed of an external electric box switch and a control cable channel. The control cable channel connects the dock connection module and the mobile control computer on the ship. At the same time, the external electric box switch also receives and executes the control signal of the integrated control unit through the control cable channel. The load test and energy storage power station are respectively connected to the power supply module and the external electric box of the hull. The load test and energy storage power station include an energy storage module and a test module. The energy storage module is used for charging and discharging. The test module is connected to the energy storage module. The test module includes a dry load box and an adjustable reactance. The dry load box is connected to the adjustable reactance. The integrated control unit is respectively connected to the load test and energy storage power station and the hull external hanging electric box. The integrated control unit is used to output part of the power of the test ship to the energy storage module for charging when the generator load test is carried out, and output the other part of the power of the test ship to the dry load box and the adjustable reactance. Through the technical scheme of the present application, the power generated by the generator load test can be stored and reused. And it can store electricity when the power grid is in the valley, and release electricity when it is peak, so as to improve the utilization rate. It can also be used as a short-term high-power uninterruptible power supply to ensure the power supply of the factory when the power grid is under maintenance or failure.

[0007] In addition, the technical solution provided by this application may also have the following additional technical features:

[0008] In some technical solutions, optionally, the energy storage device for generator load testing further includes: a dock connection module for connecting the power supply module and the test vessel.

[0009] In this technical solution, the energy storage device for generator load test also includes a dock connection module, which is used to connect the power supply module and the test ship. The fixed shore-based load system reduces the equipment lifting and installation process on the ship, and reduces the manpower and material resources of the construction.

[0010] In some technical solutions, optionally, the dock connection module includes a dock electrical box, a power cable and a communication cable, and the dock electrical box is connected to the hull external electrical box and the test module through the power cable and the communication cable.

[0011] In this technical solution, the dock connection module consists of several dock electrical boxes, power cables, and communication cables. Its function is to provide a fixed connection point on the dock for connecting ship-shore power / communication. Its number and layout can be adjusted according to the specific berthing number of the dock.

[0012] In some technical solutions, optionally, the power supply module includes a power supply station side switch, a user transformer, a user side switch, a user bus and a user branch switch, and the power supply station side switch, the user transformer, the user side switch, the user bus and the user branch switch are connected in sequence.

[0013] In this technical solution, the power supply module includes a power supply station side switch, a user transformer, a user side switch, a user bus and a user branch switch. The power supply station side switch, the user transformer, the user side switch, the user bus and the user branch switch are connected in sequence, and their function is the original power supply structure of the shipyard.

[0014] In some technical solutions, optionally, the energy storage module includes a power bus, an input switch, a charger of the energy storage power station, a unidirectional diode of the energy storage power station, a DC bus, a battery, an inverter, a synchronous / load regulator and a second output switch. The power bus, the input switch, the charger of the energy storage power station, the unidirectional diode of the energy storage power station, the DC bus, the battery, the inverter, the synchronous / load regulator and the second output switch are connected in sequence, the power bus is connected to the user bus, and the second output switch is connected to the power bus.

[0015] In this technical solution, the energy storage module includes a power bus, an input switch, a charger of the energy storage power station, a unidirectional diode of the energy storage power station, a DC busbar, a battery, an inverter, a synchronous / load regulator and a second output switch. The integrated control unit controls the working status of each part through the power station control bus.

[0016] In some technical solutions, optionally, the test module also includes a ship power input switch, a ship power bus, an input control bus, a load adjustable charger, and a DC output unidirectional diode. The ship power input switch is connected to the dock connection module, and the ship power input switch, the ship power bus, the load adjustable charger, and the DC output unidirectional diode are connected in sequence. The DC output unidirectional diode is connected to the battery, and the ship power bus is also respectively connected to the dry load box and the adjustable reactance.

[0017] In this technical solution, the test module also includes a ship power input switch, a ship power bus, an input control bus, a load adjustable charger, and a DC output unidirectional diode. The ship power input switch is connected to the dock connection module, the ship power input switch, the ship power bus, the load adjustable charger, and the DC output unidirectional diode are connected in sequence, the DC output unidirectional diode is connected to the battery, and the ship power bus is also connected to the dry load box and the adjustable reactance.

[0018] In some technical solutions, optionally, when the generator load test is not required and when the electricity consumption is low, the power provided by the power supply module is transmitted through the power supply station side switch, user transformer, user side switch, user bus, power bus, input switch to reach the energy storage power station's own charger for power conversion, and the battery is charged through the energy storage power station's unidirectional diode and DC bus.

[0019] In this technical solution, when there is no need to conduct a generator load test and during low electricity consumption periods, the low-priced electricity from the power supply bureau passes through the power supply bureau-side switch, user transformer, user-side switch, user bus, original energy storage power station power bus, input switch, and finally reaches the energy storage power station's own charger for power conversion, and is charged through the energy storage power station's unidirectional diode and DC busbar to store the valley electricity.

[0020] In some technical solutions, optionally, when the generator load test is not required and during peak power consumption, the battery is discharged, and the power is transmitted to the inverter through the DC bus to transform the voltage level, and the grid is connected through the synchronous / load regulator and the second output switch.

[0021] In this technical solution, during peak power consumption, the battery discharges and transmits power to the inverter through the DC bus to convert it into a voltage level corresponding to the normal factory power consumption, and synchronizes the load regulator and the second output switch for grid-connected operation.

[0022] In some technical solutions, optionally, when a generator load test is required, the electric energy in the battery is output to the factory power supply through an inverter for discharge, and the power of the test ship is transmitted to the ship power input switch through the external power box and the dock connection module, and the power of the test ship is divided into two paths through the ship power bus; one of the paths is sent to the load adjustable charger to charge the battery through the DC output unidirectional diode and the DC busbar, and at the same time discharges to the factory power grid through the inverter; the other path is output to the adjustable reactance and / or dry load box.

[0023] In this technical solution, when the generator load test is required, the electric energy in the battery needs to be discharged through the inverter to the factory power supply, and the shipboard power is transmitted to the ship power input switch through the shipboard external plug-in box and the dock connection module, and the shipboard power is divided into two paths through the ship power bus. One path is sent to the load adjustable charger to charge the battery through the DC output unidirectional diode and the DC busbar, and at the same time, it is discharged to the factory power grid through the inverter. The purpose of this is to solve the power conversion between different frequencies and different voltage levels. The main purpose of this path is that when the generator is subjected to a long-term load test, since the amount of change required for the test is not large, it can be used for energy storage and immediate use. The other path is output to the adjustable reactance / dry load box. The function of this path is to temporarily increase the maximum load of the entire energy storage device when the generator test requires a load that exceeds the power station energy storage and synchronous use to meet the load requirements. Since the power factor of the load adjustable charger may be very high and cannot be changed, an adjustable reactance is required to make real-time adjustments to meet the requirements of the test load. For some test items with frequent load changes or intermittent power supply, such as generator static / dynamic test, the test time is not long but the change is large. At this time, it is not suitable to use a charger to charge the battery to collect energy. A conventional load box is required for the test. Dry load box + adjustable reactance can meet the needs at this time.

[0024] In some technical solutions, optionally, there are multiple generators and distribution board switches, and multiple terminal power boxes.

[0025] In this technical solution, there are multiple generators and distribution board switches, and multiple terminal electrical boxes.

[0026] The beneficial effects brought by the present application are as follows: the electricity generated by the load test of the generator can be stored and reused. It can also store electricity when the power grid is in the off-peak period and release electricity when it is in the peak period, thereby improving the utilization rate. It can also be used as a short-term high-power uninterruptible power supply to ensure the power supply of the factory when the power grid is under maintenance or failure.

[0027] Additional aspects and advantages of the present application will become apparent in the following description or will be learned through practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] The above and / or additional aspects and advantages of the present application will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which:

[0029] Figure 1 This is a schematic structural diagram of an energy storage device for generator load testing according to an embodiment of the present application.

[0030] in, Figure 1The corresponding relationship between the reference numerals and component names in the figure is:

[0031] 10: Energy storage device for generator load test; 100: Test ship; 110: Power supply module; 112: Generator and switchboard switch; 114: First output switch; 116: Mobile control computer; 120: External electrical box; 122: External electrical box switch; 124: Control cable channel; 130: Load test and energy storage power station; 140: Energy storage module; 150: Test module; 160: Integrated control unit; 170: Dock connection module; 172: Dock electrical box; 174: Power cable; 176: Communication cable; 182: Power supply bureau side switch; 184: User transformer; 186 : User side switch; 188: User bus; 190: User branch switch; 200: Power bus; 202: Input switch; 204: Energy storage power station own charger; 206: Energy storage power station unidirectional diode; 208: DC bus; 210: Battery; 212: Inverter; 214: Synchronous / load regulator; 216: Second output switch; 220: Ship power input switch; 222: Ship power bus; 224: Input control bus; 226: Load adjustable charger; 228: DC output unidirectional diode; 230: Dry load box; 232: Adjustable reactance; 234: Power station control bus. DETAILED DESCRIPTION

[0032] In order to make the purpose, technical solutions and advantages of this application clearer, the technical solutions in the embodiments of this application will be clearly and completely described below in conjunction with the drawings in the embodiments of this application. Obviously, the described embodiments are part of the embodiments of this application, not all of the embodiments. Based on the embodiments in this application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0033] Refer to the following Figure 1 An energy storage device for generator load testing according to some embodiments of the present application is described.

[0034] like Figure 1As shown, an embodiment of the first aspect of the present application provides an energy storage device 10 for load testing of a generator, comprising: a power supply module 110 for providing power; a test vessel 100, comprising a generator and a switch board 112, a first output switch 114 and a mobile control computer 116, wherein the generator and the switch board 112 are connected to the first output switch 114; a hull external plug-in electric box 120, connected to the test vessel 100, the hull external plug-in electric box 120 comprising an external plug-in electric box switch 122 and a control cable channel 124, the external plug-in electric box switch 122 is connected to the first output switch 114, the control cable channel 124 is used to be connected to the mobile control computer 116, and the external plug-in electric box switch 122 receives a control signal of the integrated control unit 160 through the control cable channel 124; load testing and storage The energy station 130 is connected to the power supply module 110 and the external hull electric box 120 respectively. The load test and energy storage station 130 includes an energy storage module 140 and a test module 150. The energy storage module 140 is used for charging and discharging. The test module 150 is connected to the energy storage module 140. The test module 150 includes a dry load box 230 and an adjustable reactance 232. The dry load box 230 is connected to the adjustable reactance 232; the comprehensive control unit 160 is connected to the load test and energy storage station 130 and the external hull electric box 120 respectively. The comprehensive control unit 160 is used to output part of the power of the test ship 100 to the energy storage module 140 for charging when performing a generator load test, and output another part of the power of the test ship 100 to the dry load box 230 and the adjustable reactance 232.

[0035] The energy storage device 10 for generator load test provided in this embodiment includes a power supply module 110, a test ship 100, an external electric box 120, a load test and energy storage power station 130 and an integrated control unit 160. The power supply module 110 is used to provide power. The test ship 100 includes a generator and a switch 112 for a distribution board, a first output switch 114 and a mobile control computer 116. When a generator load test is required, the test personnel operate the entire energy storage power station device through a human-machine interface computer to conduct the test. The external electric box 120, which is used to provide a safe ship-shore power / control connection, is composed of an external electric box switch 122 and a control cable channel 124, wherein the control cable channel 124 is connected to the dock connection module 170 and the mobile control computer 116 on board, and the external electric box switch 122 also receives and executes the control signal of the integrated control unit 160 through the control cable channel 124. The load test and energy storage power station 130 is connected to the power supply module 110 and the hull external hanging electric box 120 respectively. The load test and energy storage power station 130 includes an energy storage module 140 and a test module 150. The energy storage module 140 is used for charging and discharging. The test module 150 is connected to the energy storage module 140. The test module 150 includes a dry load box 230 and an adjustable reactance 232. The dry load box 230 is connected to the adjustable reactance 232. The integrated control unit 160 is connected to the load test and energy storage power station 130 and the hull external hanging electric box 120 respectively. The integrated control unit 160 is used to output a part of the power of the test ship 100 to the energy storage module 140 for charging when performing the generator load test, and output another part of the power of the test ship 100 to the dry load box 230 and the adjustable reactance 232. Through the technical solution of the present application, the power generated by the generator load test can be stored and reused. In addition, the power can be stored when the power grid is in the valley, and the power can be released at the peak to improve the utilization rate. It can also be used as a short-term high-power uninterruptible power supply to ensure factory power supply during power grid maintenance or failure.

[0036] In some embodiments, the generator load test energy storage device 10 may further include a dock connection module 170, which is used to connect the power supply module 110 and the test vessel 100. The fixed shore-based load system reduces the equipment lifting and installation process on the ship, and reduces the manpower and material resources of the construction.

[0037] In some embodiments, optionally, the dock connection module 170 is composed of a plurality of dock electrical boxes 172, power cables 174, and communication cables 176, and its function is to provide a fixed connection point on the dock for connecting ship-shore power / communications. The number and arrangement of the modules can be adjusted according to the specific number of berthing at the dock.

[0038] In some embodiments, optionally, the power supply module 110 includes a power supply station side switch 182, a user transformer 184, a user side switch 186, a user bus 188 and a user branch switch 190. The power supply station side switch 182, the user transformer 184, the user side switch 186, the user bus 188 and the user branch switch 190 are connected in sequence, and their function is the original power supply structure of the shipyard.

[0039] In some embodiments, optionally, the energy storage module 140 includes a power bus 200, an input switch 202, an energy storage power station's own charger 204, an energy storage power station's unidirectional diode 206, a DC bus 208, a battery 210, an inverter 212, a synchronous / load regulator 214 and a second output switch 216, and the integrated control unit 160 controls the working status of each part through the power station control bus 234.

[0040] In some embodiments, optionally, the test module 150 further includes a ship power input switch 220, a ship power bus 222, an input control bus 224, a load adjustable charger 226, and a DC output unidirectional diode 228. The ship power input switch 220 is connected to the dock connection module 170, the ship power input switch 220, the ship power bus 222, the load adjustable charger 226, and the DC output unidirectional diode 228 are connected in sequence, the DC output unidirectional diode 228 is connected to the battery 210, and the ship power bus 222 is also connected to the dry load box 230 and the adjustable reactance 232, respectively.

[0041] In some embodiments, optionally, when the generator load test is not required and during the off-peak hours, the low-priced electricity from the power supply bureau passes through the power supply bureau-side switch 182, the user transformer 184, the user-side switch 186, the user bus 188, the original energy storage power station power bus 200, the input switch 202, and finally reaches the energy storage power station's own charger 204 for power conversion, and is charged through the energy storage power station's unidirectional diode 206 and the DC bus 208 to store the off-peak electricity.

[0042] In some embodiments, optionally, during peak power consumption, the battery 210 discharges and transmits power to the inverter 212 through the DC bus 208 to convert the power into a voltage level corresponding to normal factory power consumption, and the synchronization / load regulator 214 and the second output switch 216 are connected to the grid for operation.

[0043] In some embodiments, optionally, when a generator load test is required, the electric energy in the battery 210 needs to be first output to the factory power supply through the inverter 212 for discharge, and the shipboard power is transmitted to the ship power input switch 220 through the shipboard external plug-in power box 120 and the dock connection module 170, and the shipboard power is divided into two paths through the ship power bus 222. One path is sent to the load adjustable charger 226 to charge the battery 210 through the DC output unidirectional diode 228 and the DC busbar 208, and at the same time, it is discharged to the factory power grid through the inverter 212. The purpose of this is to solve the power conversion between different frequencies and different voltage levels. The main purpose of this path is that when the generator is subjected to a long-term load test, since the amount of change required for the test is not large, it can be used for energy storage and immediate use. The other path is output to the adjustable reactance 232 / dry load box 230. The function of this path is to temporarily increase the maximum load of the entire energy storage device when the load required for the generator test exceeds the power storage and synchronous use of the power station to meet the load demand. Since the power factor of the load adjustable charger may be very high and cannot be changed, an adjustable reactance is needed to make real-time adjustments to meet the test load requirements. For some test items with frequent load changes or intermittent power supply, such as generator static / dynamic tests, the test time is not long but the change is large. At this time, it is not appropriate to use a charger to charge the battery 210 to collect energy. A conventional load box is required for the test. The dry load box 230 + adjustable reactance 232 can meet the needs at this time.

[0044] In some embodiments, optionally, there are multiple generators and distribution board switches 112 , and there are multiple dock electrical boxes 172 .

[0045] like Figure 1 As shown, according to a specific embodiment of the generator load test provided by the present application, the energy storage device 10 is composed of a power supply module 110, a test vessel 100, an external hull electrical box 120, a dock connection module 170, and a load test and energy storage power station 130.

[0046] The original power supply form consists of a power supply bureau side switch 182, a user transformer 18435KV / 10KV, a user side switch 186, a user bus 188, and several user branch switches 190.

[0047] The test vessel 100 is composed of a plurality of onboard generators and a switchboard 112 , a first output switch 114 , and a mobile control computer 116 .

[0048] The external electrical box 120 is composed of an external electrical box switch 122 and a control cable channel 124, wherein the control cable channel 124 is connected to the dock connection module 170 and the mobile control computer 116 on board the ship. At the same time, the external electrical box switch 122 also receives the control signal of the integrated control unit 160 through the control cable channel 124.

[0049] The dock connection module 170 is composed of several dock electrical boxes 172, power cables 174 and communication cables 176. Its function is to provide a fixed connection point on the dock for connecting ship-shore power / communication. Its number and layout can be adjusted according to the specific berthing number of the dock.

[0050] The load test and energy storage power station 130 consists of the original energy storage power station and the newly added parts.

[0051] The original energy storage power station is composed of a power bus 200, an input switch 202, an energy storage power station own charger 204, an energy storage power station unidirectional diode 206, a DC bus 208, a battery 210, an inverter 212, a synchronous / load regulator 214, and a second output switch 216. The integrated control unit 160 controls the working state of each part through the power station control bus 234.

[0052] The newly added parts are composed of a ship power input switch 220 , a ship power bus 222 , an input control bus 224 , a load adjustable charger 226 , a DC output unidirectional diode 228 , a dry load box 230 , and an adjustable reactance 232 .

[0053] The dry load box 230 should be able to meet all the test requirements of a single machine (including but not limited to the static characteristics of the generator, the dynamic characteristics of the generator, etc.). The dry load box 230 should be part of the energy storage power station and controlled by the energy storage power station.

[0054] The energy storage device 10 for generator load test can receive power from the national grid at 10KV / 50HZ, or power from the ship at 6.6KV / 60HZ. When there is no generator load test, the energy storage power station can use low-cost electricity to store energy at night and release it during the day, generating certain economic benefits.

[0055] Specifically, the generator load test energy storage device 10 is divided into five parts:

[0056] The first part: includes the original power supply form, namely the power supply station side switch 182, factory transformer, low-voltage side switch, user bus 188, and user switch. Its function is the original power supply structure of the shipyard.

[0057] Part II: The required test ship 100 power supply form, including the generator main switch and the load main switch, and a portable human-machine interface control computer that controls the entire energy storage device. When a generator load test is required, the test personnel use the human-machine interface computer to operate the entire energy storage power station device for testing.

[0058] The third part: the external electrical box 120, which is used to provide a safe ship-shore power / control connection. It consists of an external electrical box switch 122 and a control cable channel 124. The control cable channel 124 is connected to the dock connection module 170 and the mobile control computer 116 on board. At the same time, the external electrical box switch 122 also receives and executes the control signal of the integrated control unit 160 through the control cable channel 124.

[0059] Part 4: The dock connection module 170 consists of several dock electrical boxes 172, power cables 174, and communication cables 176. Its function is to provide a fixed connection point on the dock for connecting ship-shore power / communication. Its number and layout can be adjusted according to the specific number of berthing at the dock.

[0060] Part V: Load Test and Energy Storage Station 130 consists of the original energy storage station and the newly added parts.

[0061] The original energy storage power station is composed of a power bus 200, an input switch 202, an energy storage power station own charger 204, an energy storage power station unidirectional diode 206, a DC bus 208, a battery 210, an inverter 212, a synchronous / load regulator 214, and an output switch. The integrated control unit 160 controls the working state of each part through the power station control bus 234.

[0062] The newly added parts are composed of a ship power input switch 220 , a ship power bus 222 , an input control bus 224 , a load adjustable charger 226 , a DC output unidirectional diode 228 , a dry load box 230 , and an adjustable reactance 232 .

[0063] When there is no ship that needs to conduct generator load test, the energy storage power station works in the original mode, namely:

[0064] During the low electricity consumption period, the low-priced electricity from the power supply bureau will pass through the power supply bureau side switch 182, the user transformer 18435KV / 10KV, the user side switch 186, the user bus 188, the original energy storage power station power bus 200, the input switch 202, and finally reach the energy storage power station's own charger 204 for power conversion, and then charge the battery 210 through the energy storage power station's unidirectional diode 206 and DC bus 208 to store the electricity during the low electricity consumption period.

[0065] During peak power consumption, the battery 210 discharges and transmits power to the inverter 212 through the DC bus 208 to convert the power into a voltage level corresponding to normal factory power consumption, and synchronizes the load regulator 214 and the second output switch 216 for grid-connected operation.

[0066] When a generator load test is required, the electric energy in the battery 210 must first be discharged through the inverter 212 to the factory electricity, and the shipboard power must be transmitted through the external power box 120 and the dock connection module 170 to the ship power input switch 220, and the shipboard power must be divided into two paths through the ship power bus 222.

[0067] One of the paths is sent to the load adjustable charger 226, and then passes through the DC output unidirectional diode 228 and the DC busbar 208 to charge the battery 210, and at the same time passes through the inverter 212 to discharge to the factory power grid, so as to solve the problem of power conversion between different frequencies and voltage levels. The main purpose of this path is that when the generator is subjected to a long-term load test, since the change required for the test is not large, it can be used for energy storage and immediate use.

[0068] The other output is to the adjustable reactance 232 / dry load box 230. The function of this output is:

[0069] When the generator test requires a load that exceeds the power station's energy storage and synchronous use, the maximum load of the entire energy storage device is temporarily increased to meet the load demand.

[0070] Since the power factor of the load-adjustable charger may be very high and cannot be changed, an adjustable reactance is required to make real-time adjustments to meet the test load requirements.

[0071] For some test items with frequent load changes or intermittent power supply, such as generator static / dynamic test, the test time is not long but the change is large. At this time, it is not suitable to use a charger to charge the battery 210 to collect energy. A conventional load box is required to conduct the test. The dry load box 230 + adjustable reactance 232 can meet the needs at this time.

[0072] The following is a plan designed based on the actual needs of a certain unit to illustrate the feasibility of the plan.

[0073] The average power consumption of a shipyard during working days is 250,000KW / h, the peak power load is 40,000KW / h, the maximum power generation of ship generators is 32,250KVA, cos=0.8, 25,800KW, the capacity of a single generator is 5,375KVA, cos=0.8, 4,300KW, and there are 6 generators in total. The ship power voltage is 6.6KV / 60HZ; the low-voltage side voltage of the power supply bureau transformer is 10KV / 50HZ.

[0074] According to the generator load test requirements, the total test time is approximately 24 hours, divided into 3 days, with 8 hours of testing per day.

[0075] The first day is a load test for three generators, which are connected in parallel and carried out simultaneously. The test duration, i.e. the load amount at each level, is shown in Table 1:

[0076] Table 1 Test duration and load at each level

[0077]

[0078] Calculated from this table, the total energy for the day is:

[0079] 4300KW×3 units×((25%+50%+75%)×0.5 hours+100%×2 hours+110%×0.5 hours)=42570KW

[0080] Since the peak output energy is 4300×3×110% and the duration is 0.5 hours, the maximum instantaneous carrying capacity is 4300×3×110%÷0.5 hours=28380KW / h. Taking redundancy into consideration, the short-term maximum load carrying capacity is 30000KW (cos=0.8), and the maximum current=wherein: the load adjustable charger and the dry load box 230 provide active power consumption, and the maximum carrying capacity is 15000KW / h, calculated at three-phase 6600V (cos=1), and the maximum current=1312.2A; the adjustable reactance 232 provides reactive power consumption, and the maximum carrying capacity=22500Kva / h. At the same time, the power of the inverter 212 is taken from the battery 210 and the variable charger, and its maximum bearing capacity=5000KW / h.

[0081] In summary, considering the daily factory consumption of 25,000 KW / h, the charging rate of the battery 210, and the need for off-peak use, the required capacity of the battery 210 is 20,000 KW / h (20,000 kWh)

[0082] How it works:

[0083] When the generator load test is required, the entire energy storage power station is in a state of absorbing the generator energy. Since the factory's demand for electricity is variable, the power of the marine generator is also variable.

[0084] When the generator output power is less than 5000KW, the adjustable charger is adjusted to perform variable load operation, and the output of the inverter 212 is output in parallel with the power supply bureau power to supply electricity to the factory. At this time, the battery 210 is not charged.

[0085] When 15000KW>generator output power>5000KW, the adjustable charger operates at full load, and the load of the inverter 212 changes according to the factory load, consuming a portion of the energy, and the remaining energy is used to charge the battery 210.

[0086] When the generator power is greater than 15000KW, the adjustable charger works at full load, and the load of the inverter 212 changes according to the factory load, consuming part of the energy, and the remaining energy is used to charge the battery 210. At the same time, the dry load box 230 is started to consume the energy that the adjustable charger cannot consume.

[0087] When the battery 210 is fully charged, the energy consumption of the generator can only be consumed by the power of the dry load box 230 + the inverter 212. At this time, the load receiving capacity of the entire energy storage power station will decrease.

[0088] The adjustable reactance 232 provides reactive power adjustment for the entire power grid according to load requirements.

[0089] When there is no generator load test, the energy storage power is in the normal working mode, that is, at the off-peak electricity price at night, the power of the power supply bureau charges the battery 210 through the switch, the energy storage self-owned charger, and the diode; at the peak electricity price, the battery 210 is discharged, and the power is connected to the grid in parallel through the inverter 212 synchronization / load regulator 214 and the switch for use by the factory, generating certain economic benefits.

[0090] The above is a preferred implementation of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present application. These improvements and modifications should also be regarded as the scope of protection of the present application.

[0091] In this application, the terms "first", "second", and "third" are used for descriptive purposes only and are not to be understood as indicating or implying relative importance; the term "plurality" refers to two or more, unless otherwise expressly defined. Terms such as "installed", "connected", "connected", and "fixed" should be understood in a broad sense. For example, "connected" can be a fixed connection, a detachable connection, or an integral connection; "connected" can be a direct connection or an indirect connection through an intermediate medium. For those of ordinary skill in the art, the specific meanings of the above terms in this application can be understood according to the specific circumstances.

[0092] In the description of the present application, it should be understood that the terms "upper", "lower", "front", "rear", etc., indicating directions or positional relationships are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the system or module referred to must have a specific direction, be constructed and operated in a specific orientation, and therefore, should not be understood as a limitation on the present application.

[0093] In the description of this specification, the description of the terms "one embodiment", "some embodiments", "specific embodiments", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.

[0094] The above are only preferred embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.

Claims

1. An energy storage device for generator load testing, characterized in that: include: A power supply module (110), used for providing power; A test vessel (100) comprises a generator and a switchboard (112), a first output switch (114) and a mobile control computer (116), wherein the generator and the switchboard (112) are connected to the first output switch (114); An external hull electric box (120) connected to the test vessel (100), the external hull electric box (120) comprising an external hull electric box switch (122) and a control cable channel (124), the external hull electric box switch (122) being connected to the first output switch (114), the control cable channel (124) being used to be connected to the mobile control computer (116), and the external hull electric box switch (122) receiving a control signal from an integrated control unit (160) through the control cable channel (124); A load test and energy storage power station (130) is respectively connected to the power supply module (110) and the hull external hanging electric box (120); the load test and energy storage power station (130) comprises an energy storage module (140) and a test module (150); the energy storage module (140) is used for charging and discharging; the test module (150) is connected to the energy storage module (140); the test module (150) comprises a dry load box (230) and an adjustable reactance (232); the dry load box (230) is connected to the adjustable reactance (232); The integrated control unit (160) is connected to the load test and energy storage power station (130) and the hull-mounted power box (120) respectively. The integrated control unit (160) is used to output a portion of the power of the test ship (100) to the energy storage module (140) for charging when performing a generator load test, and output another portion of the power of the test ship (100) to the dry load box (230) and the adjustable reactance (232).

2. The energy storage device for generator load test according to claim 1, characterized in that: Also includes: A dock connection module (170) is used to connect the power supply module (110) and the test vessel (100).

3. The energy storage device for generator load test according to claim 2, characterized in that: The dock connection module (170) comprises a dock electrical box (172), a power cable (174) and a communication cable (176); the dock electrical box (172) is connected to the ship's external electrical box (120) and the test module (150) via the power cable (174) and the communication cable (176).

4. The energy storage device for generator load test according to claim 3, characterized in that: The power supply module (110) comprises a power supply station side switch (182), a user transformer (184), a user side switch (186), a user bus (188) and a user branch switch (190); the power supply station side switch (182), the user transformer (184), the user side switch (186), the user bus (188) and the user branch switch (190) are connected in sequence.

5. The energy storage device for generator load test according to claim 4, characterized in that: The energy storage module (140) comprises a power bus (200), an input switch (202), a charger (204) of the energy storage station, a unidirectional diode (206) of the energy storage station, a DC busbar (208), a battery (210), an inverter (212), a synchronous / load regulator (214) and a second output switch (216); the power bus (200), the input switch (202), the charger (204) of the energy storage station, the unidirectional diode (206) of the energy storage station, the DC busbar (208), the battery (210), the inverter (212), the synchronous / load regulator (214) and the second output switch (216) are connected in sequence; the power bus (200) is connected to the user bus (188), and the second output switch (216) is connected to the power bus (200).

6. The energy storage device for generator load test according to claim 5, characterized in that: The test module (150) further includes a ship power input switch (220), a ship power bus (222), an input control bus (224), a load-adjustable charger (226), and a DC output unidirectional diode (228). The ship power input switch (220) is connected to the dock connection module (170). The ship power input switch (220), the ship power bus (222), the load-adjustable charger (226), and the DC output unidirectional diode (228) are connected in sequence. The DC output unidirectional diode (228) is connected to the battery (210). The ship power bus (222) is also respectively connected to the dry load box (230) and the adjustable reactance (232).

7. The energy storage device for generator load test according to claim 6, characterized in that: When the generator load test is not required and during the off-peak period of electricity consumption, the power provided by the power supply module (110) passes through the power supply station side switch (182), the user transformer (184), the user side switch (186), the user bus (188), the power bus (200), and the input switch (202) to reach the energy storage power station's own charger (204) for power conversion, and is charged to the battery (210) through the energy storage power station's unidirectional diode (206) and the DC busbar (208).

8. The energy storage device for generator load test according to claim 7, characterized in that: When the generator load test is not required and during peak power consumption, the battery (210) is discharged, and the power is transmitted to the inverter (212) through the DC busbar (208) to transform the voltage level, and the grid-connected operation is carried out through the synchronization / load regulator (214) and the second output switch (216).

9. The energy storage device for generator load test according to claim 6, characterized in that: When a generator load test is required, the electric energy in the battery (210) is output to the factory power supply through the inverter (212) for discharge, and the power of the test ship (100) is transmitted to the ship power input switch (220) through the ship external power box (120) and the dock connection module (170), and the power of the test ship (100) is divided into two paths through the ship power bus (222); One path is sent to the load adjustable charger (226) to charge the battery (210) through the DC output unidirectional diode (228) and the DC busbar (208), and at the same time, is discharged to the factory power grid through the inverter (212); The other path is output to the adjustable reactance (232) and / or the dry load box (230).

10. The energy storage device for generator load test according to any one of claims 3 to 9, characterized in that: The number of the generator and the switchboard (112) is plural, and the number of the dock power boxes (172) is plural.