Split type decarbonization tower
By dividing the decarbonization tower body into multiple sections and adopting detachable connection and feeding pipe designs, the problem of insufficient manholes in small-diameter decarbonization towers is solved, convenient packing cleaning and replacement is achieved, and the strength and handling of the tower body are improved. efficiency.
Patent Information
- Application Number
- CN202420230117.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-31
- Publication Date
- 2024-10-08
- Estimated Expiration
- 2034-01-31
AI Technical Summary
The existing small-diameter decarbonization tower cannot install a manhole, making it difficult for personnel to enter, which makes it more troublesome when cleaning and replacing the packing.
A split-type decarbonization tower is designed. The tower body is divided into multiple sections. The design of detachable connections and feeding pipes facilitates personnel entry and cleaning and replacement of packing. The diameter of the tank bottom is larger than the diameter of the tower body to accommodate more absorption liquid, and Ensure uniform gas flow through the design of the sprayer and air inlet pipe.
It achieves unitized processing of the decarbonization tower and convenient packing cleaning and replacement, improves the strength and processing efficiency of the tower body, and ensures effective cleaning and replacement of the packing.
Smart Images

Figure CN221808467U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of biogas treatment, in particular to a split decarbonization tower. Background Art
[0002] Biogas is mainly composed of methane and carbon dioxide, and usually contains some other gases, such as nitrogen, oxygen, ammonia, hydrogen sulfide, etc. The main function of the decarbonization tower is to remove carbon dioxide from biogas and increase the concentration of methane in biogas, thereby increasing its calorific value and combustion efficiency, making it more suitable for use as an energy source.
[0003] The working principle of the decarbonization tower is to separate gases by utilizing the physical or chemical adsorption characteristics of different gases. In the physical adsorption process, molecular sieves, activated carbon or other porous materials are usually used as adsorbents, which can selectively adsorb carbon dioxide without adsorbing methane.
[0004] Compared with the traditional spray decarbonization tower, the packed decarbonization tower is more efficient. The packed decarbonization tower is filled with a large amount of packing materials, such as plastic packing, metal packing or ceramic packing. The biogas passes through the packing layer from bottom to top and fully contacts with the absorption liquid flowing from top to bottom, thereby removing carbon dioxide.
[0005] Among them, the packings used in the packed decarbonization tower include regular packings and random packings. These packings need to be cleaned and replaced regularly, but the diameter of the manhole used to enter the decarbonization tower is required to be no less than 450㎜. If a decarbonization tower with a diameter of less than 600㎜ is installed with a 450㎜ manhole, the strength of the tower body will be greatly reduced. Therefore, a small diameter decarbonization tower is difficult to enter, and it is more troublesome to clean and replace the packing. Utility Model Content
[0006] The utility model aims to provide a split decarbonization tower, which is used to solve the problem in the prior art that a small-diameter decarbonization tower cannot be installed with a manhole, making it difficult for personnel to enter, and it is troublesome to clean and replace the filler.
[0007] The technical solution adopted by the utility model is as follows: a split decarbonization tower, comprising a skirt seat, a tank bottom installed above the skirt seat, a tower body connected to the inner cavity of the tank bottom, an exhaust hole connected to the inner cavity of the tank bottom, an air inlet pipe connected to the inner cavity of the tower body, a sprayer connected to the inner cavity of the tower body, a liquid discharge pipe connected to the inner cavity of the tank bottom, a sewage discharge pipe connected to the inner cavity of the tank bottom;
[0008] The tower body includes multiple branch pipes, each of which is provided with a first partition, a second partition and a distributor in sequence from bottom to top, a receiving cavity for accommodating fillers is formed between the first partition and the second partition, and feeding pipes connected to the receiving cavity are installed at the upper and lower ends of the receiving cavity on the outside of the branch pipe along its meridian direction.
[0009] Furthermore, the branch pipes are connected via flanges;
[0010] The first baffle, the second baffle and the distributor are detachably connected;
[0011] The sprinkler includes a sprinkler pipe which penetrates the inner wall of the tower body along the longitudinal direction and is then equipped with a sprinkler head, and the sprinkler pipe and the sprinkler head are connected by bolts;
[0012] The first partition and the second partition each include a plurality of unit partitions, the unit partitions are installed by bolt connection, and the distributor includes a plurality of unit dispersers, the unit dispersers are installed by bolt connection;
[0013] The maximum outer dimensions of the unit partition and the unit disperser are smaller than the diameter of the branch pipe.
[0014] Furthermore, the diameter of the tank bottom is greater than the diameter of the tower body.
[0015] Furthermore, a tank bottom manhole is installed on the side of the tank bottom.
[0016] Furthermore, the air inlet pipe penetrates the inner wall of the tower body along the longitudinal direction and then extends into the inner cavity thereof, the end of the air inlet pipe extending to the inner cavity of the tower body is closed, and the part of the air inlet pipe extending to the inner cavity of the tower body is opened downward.
[0017] Furthermore, a wire mesh demister is installed on the tower body between the exhaust hole and the sprinkler.
[0018] Furthermore, a thermal insulation layer is provided on the outside of the tower body.
[0019] In summary, due to the adoption of the above technical solution, the beneficial effects of the utility model are:
[0020] 1. The utility model divides the tower body of the decarbonization tower into multiple sections to realize unitized processing. When it is necessary to put random fillers into the accommodating chamber, the feeding pipe arranged at the upper end of the accommodating chamber is opened, and the feeding pipe arranged at the lower end of the accommodating chamber is closed, and the random fillers are put into the accommodating chamber through the feeding pipe at the upper end of the accommodating chamber;
[0021] When the random filler needs to be cleaned or replaced and needs to be discharged, the feeding pipe at the lower end is opened, and the random filler in the accommodating cavity is discharged through the feeding pipe at the lower end;
[0022] 2. The tower body in the utility model is a split structure, and each section of the branch pipe is connected in a detachable manner. When the structured packing of the accommodating cavity needs to be cleaned or replaced, the branch pipe is first disassembled, and then the inside of each of the branch pipes is entered through the opening of the branch pipe, and the first partition, the second partition, the distributor, the spray pipe and the spray head are removed, and the structured packing can be easily cleaned or replaced;
[0023] 3. The diameter of the tank bottom in the utility model is larger than the diameter of the tower body, so that more absorption liquid can be accommodated;
[0024] 4. In the utility model, the end of the air inlet pipe extending to the inner cavity of the tower body is closed, and the portion of the air inlet pipe extending to the inner cavity of the tower body is opened downward. After the biogas enters the tower body through the air inlet pipe, the portion extending to the inner cavity of the tower body is opened downward so that the biogas is ejected downward under the action of gas pressure after entering the tower body, and moves upward again after losing power. Compared with the direct upward ejection or ejection along the meridian direction of the tower body, it can maintain its uniform fluid distribution. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a structural schematic diagram of the utility model;
[0026] Figure 2 It is a structural schematic diagram of the first partition and the second partition in the utility model;
[0027] Figure 3 It is a structural schematic diagram of the distributor in the utility model.
[0028] Description of reference numerals:
[0029] 1. Skirt; 2. Tank bottom; 3. Drain pipe; 4. Drain pipe; 5. Tower body; 5 1. First baffle; 5 2. Second baffle; 5 3. Distributor; 5 4. Branch pipe; 5 5. Feeding pipe; 6. Wire mesh demister; 7. Pressure gauge; 8. Exhaust hole; 9. Spray pipe; 10. Spray head; 11. Air inlet pipe; 1 2. Manhole at the bottom of the tank. DETAILED DESCRIPTION
[0030] In order to make the purpose, technical scheme and advantages of the embodiments of the utility model clearer, the technical scheme in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Generally, the components of the embodiments of the utility model described and shown in the drawings here can be arranged and designed in various different configurations.
[0031] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the present invention to be protected, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0032] Example 1
[0033] Figure 1 As shown: a split decarbonization tower, comprising a skirt 1, a tank bottom 2 is installed above the skirt 1, a tower body 5 connected to the inner cavity of the tank bottom 2 is arranged above the tank bottom 2, an exhaust hole 8 connected to the inner cavity is arranged on the top of the tower body 5, an air inlet pipe 11 connected to the inner cavity is arranged on the lower side of the tower body 5, a sprayer connected to the inner cavity is installed on the upper side of the tower body 5, a liquid discharge pipe 3 connected to the inner cavity is arranged on the side of the tank bottom 2, and a sewage discharge pipe 4 connected to the inner cavity is arranged at the bottom of the tank bottom 2;
[0034] After the biogas to be treated enters the tower body 5 through the air inlet pipe 11, it passes upward through the packing layer in the tower body 5. At the same time, the absorbent sprayed by the sprayer, such as water or alkaline solution, is sprayed or flows from the sprayer at the top of the tower body 5 and passes downward through the packing layer. On the surface of the packing, the carbon dioxide tower is fully in contact with the liquid. The absorbent rich in carbon dioxide flows downward into the tank bottom 2 and is discharged through the drain pipe 3 and then sent to the regeneration unit. The decarbonized biogas moves upward to the top of the tower body 5 and is discharged from the exhaust hole 8 to enter the next process. A pressure gauge 7 for monitoring the internal pressure of the tower body 5 is installed on the outside of the tower body 5.
[0035] In order to allow personnel to enter, a manhole will be installed on the body of the decarbonization tower, and in order to facilitate the passage of personnel, the diameter of the manhole shall not be less than 450㎜. However, compared with a decarbonization tower with a diameter greater than 600㎜, if a decarbonization tower with a diameter less than 600㎜ is installed with a 450㎜ manhole, the strength of the tower body will be greatly reduced.
[0036] Therefore, the tower body 5 includes a plurality of branch pipes 54, each of which is provided with a first partition plate 51, a second partition plate 52 and a distributor 53 from bottom to top. A receiving cavity for receiving fillers is formed between the first partition plate 51 and the second partition plate 52. A feeding pipe 55 communicating with the receiving cavity is installed at the upper and lower ends of the receiving cavity on the outer side of the branch pipe 54 along the meridian direction thereof.
[0037] The tower body 5 of the decarbonization tower is divided into multiple sections 54 to achieve unitized processing. When it is necessary to put random fillers into the accommodating chamber, the feeding pipe 55 arranged at the upper end of the accommodating chamber is opened, and the feeding pipe 55 arranged at the lower end of the accommodating chamber is closed, and the random fillers are put into the accommodating chamber through the feeding pipe 55 at the upper end of the accommodating chamber;
[0038] When the random filler needs to be cleaned or replaced and needs to be discharged, the feeding pipe 55 at the lower end is opened, and the random filler in the accommodating cavity is discharged through the feeding pipe 55 at the lower end.
[0039] Example 2
[0040] The difference between this embodiment and embodiment 1 is that due to the structured design of the regular packing, the regular packing can usually provide a larger gas-liquid contact area than the random packing, thereby improving the mass transfer efficiency. However, compared with the manhole that is suitable for the entry and exit of personnel, the feeding pipe 55 is difficult to achieve personnel entry and exit, and thus it is difficult to clean or replace the regular packing. Therefore, the branch pipes 54 are connected by flanges, so that it is convenient for personnel to enter the interior from the pipe mouth of the branch pipe 54.
[0041] Furthermore, the first baffle 51, the second baffle 52 and the distributor 53 are connected by bolts, so that they can be easily disassembled.
[0042] The sprinkler comprises a sprinkler pipe 9 and a sprinkler head 10. The sprinkler pipe 9 penetrates the inner wall of the tower body 5 along the longitudinal direction and is then installed with the sprinkler head 10. The sprinkler pipe 9 is connected to the sprinkler head 10 by bolts.
[0043] Through the detachable connection method, when the packing of the accommodating cavity needs to be cleaned or replaced, the flange connection between the branch pipes 54 is disconnected, thereby facilitating entry into each branch pipe 54, and the first partition plate 51, the second partition plate 52, the distributor 53, the spray pipe 9 and the spray head 10 are removed, and the regular packing in the branch pipe 54 can be conveniently cleaned or replaced.
[0044] Due to the use requirements of the first partition 51, the second partition 52, the distributor 53, the spray pipe 9 and the spray head 10, their overall size is consistent with the diameter of the tower body 5. Therefore, after the first partition 51, the second partition 52, the distributor 53, the spray pipe 9 and the spray head 10 are removed and need to be taken out through the pipe mouth of the branch pipe 54, the first partition 51, the second partition 52, the distributor 53, the spray pipe 9 and the spray head 10 cannot pass through the pipe mouth of the branch pipe 54.
[0045] Therefore, the first partition plate 51 and the second partition plate 52 each include a plurality of unit partition plates, and the unit partition plates are installed by bolt connection, and the distributor 53 includes a plurality of unit dispersers, and the unit dispersers are installed by bolt connection;
[0046] Furthermore, the maximum external dimensions of the unit partition and the unit disperser are smaller than the diameter of the branch pipe 54 , so that the first partition 51 , the second partition 52 and the distributor 53 can be separated and passed through the branch pipe 54 .
[0047] Example 3
[0048] The difference between this embodiment and the first embodiment is that the diameter of the tank bottom 2 is larger than the diameter of the tower body 5, so that more absorption liquid can be accommodated.
[0049] Example 4
[0050] The difference between this embodiment and the first embodiment is that a tank bottom manhole 12 is installed on the side of the tank bottom 2, so as to facilitate entering the tank bottom 2 for maintenance.
[0051] Example 5
[0052] The difference between this embodiment and embodiment 1 is that the air inlet pipe 11 passes through the inner wall of the tower body 5 along the meridian direction and then extends into the inner cavity of the tower body 5. The end of the air inlet pipe 11 extending to the inner cavity of the tower body 5 is closed, and the part of the air inlet pipe 11 extending to the inner cavity of the tower body 5 is opened downward. After the biogas enters the tower body 5 through the air inlet pipe 11, the part extending to the inner cavity of the tower body 5 is opened downward so that the biogas is ejected downward under the action of gas pressure after entering the tower body 5, and moves upward again after losing power. Compared with directly ejecting upward or along the meridian direction of the tower body 5, it can maintain its uniform fluid distribution.
[0053] Example 6
[0054] The difference between this embodiment and the first embodiment is that a wire mesh demister 6 is installed on the tower body 5 between the exhaust hole 8 and the sprinkler to prevent debris from moving upward and blocking the exhaust hole 8 .
[0055] Example 7
[0056] The difference between this embodiment and embodiment 1 is that a heat-insulating layer is provided on the outer side of the tower body 5 to maintain the temperature inside the tower body 5 and improve the processing efficiency.
[0057] Obviously, the above embodiments of the present invention are merely examples for the purpose of clearly illustrating the present invention, and are not intended to limit the implementation methods of the present invention. For those skilled in the art, various obvious changes, readjustments and substitutions can be made without departing from the scope of protection of the present invention. It is not necessary and impossible to list all implementation methods here. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention shall be included in the scope of protection of the claims of the present invention.
Claims
1. A split decarbonization tower, characterized in that: The invention comprises a skirt seat (1), a tank bottom (2) mounted above the skirt seat (1), a tower body (5) connected to an inner cavity of the tank bottom (2) arranged above the tank bottom (2), an exhaust hole (8) connected to the inner cavity of the tower body (5) arranged at the top, an air inlet pipe (11) connected to the inner cavity of the tower body (5) arranged at the lower side of the tower body (5), a sprayer connected to the inner cavity of the tower body (5) arranged at the upper side of the tower body (5), a liquid discharge pipe (3) connected to the inner cavity of the tank bottom (2) arranged at the side of the tank bottom (2), and a sewage discharge pipe (4) connected to the inner cavity of the tank bottom (2) arranged at the bottom of the tank bottom (2); The tower body (5) comprises a plurality of branch pipes (54), each of which is provided with a first partition plate (51), a second partition plate (52) and a distributor (53) in sequence from bottom to top, a receiving cavity for receiving fillers is formed between the first partition plate (51) and the second partition plate (52), and a feeding pipe (55) communicating with the receiving cavity is installed at the upper and lower ends of the receiving cavity on the outer side of the branch pipe (54) along the longitudinal direction thereof.
2. A split decarbonization tower according to claim 1, characterized in that: The branch pipes (54) are connected via flanges; The first baffle (51), the second baffle (52) and the distributor (53) are detachably connected; The sprinkler comprises a sprinkler pipe (9) and a sprinkler head (10). The sprinkler pipe (9) penetrates the inner wall of the tower body (5) along the longitudinal direction and is then provided with the sprinkler head (10). The sprinkler pipe (9) and the sprinkler head (10) are connected by bolts. The first partition plate (51) and the second partition plate (52) each include a plurality of unit partition plates, and the unit partition plates are installed by bolt connection. The distributor (53) includes a plurality of unit dispersers, and the unit dispersers are installed by bolt connection. The maximum outer dimensions of the unit partition and the unit disperser are smaller than the diameter of the branch pipe (54).
3. A split decarbonization tower according to claim 1, characterized in that: The diameter of the tank bottom (2) is greater than the diameter of the tower body (5).
4. A split decarbonization tower according to claim 1, characterized in that: The air inlet pipe (11) passes through the inner wall of the tower body (5) along the longitudinal direction thereof and then extends into the inner cavity thereof; the end of the air inlet pipe (11) extending to the inner cavity of the tower body (5) is closed, and the portion of the air inlet pipe (11) extending to the inner cavity of the tower body (5) is open downward.
5. A split decarbonization tower according to claim 3, characterized in that: A tank bottom manhole (12) is installed on the side of the tank bottom (2).
6. A split decarbonization tower according to claim 4, characterized in that: A heat-insulating layer is arranged on the outer side of the tower body (5).
7. A split decarbonization tower according to claim 6, characterized in that: A wire mesh demister (6) is installed on the tower body (5) between the exhaust hole (8) and the sprinkler.