Prefabricated building engineering foundation pit supporting structure

Through the rapid splicing of the prefabricated bottom plate and side baffles and the design of the lifting mechanism, the problems of complicated installation and lack of water-retaining function of the foundation pit support structure in the existing technology are solved, and the effects of rapid installation and effective water-retaining are achieved.

CN221810590UActive Publication Date: 2024-10-08GUANGDONG HUIJIN CONSTRUCTION ENGINEERING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202322976689.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-08-07
Publication Date
2024-10-08
Estimated Expiration
2034-08-07

AI Technical Summary

Technical Problem

The existing foundation pit support structure of construction projects is not easy to assemble quickly, the installation process is complicated and lacks water-retaining function, so it cannot effectively block water in the foundation pit of construction projects.

Method used

The structure of the prefabricated bottom plate and prefabricated side baffles is adopted, and the positioning columns and slots are used for quick splicing. The lifting mechanism and spring buckles are used to quickly lift and fix the water baffles, and the guide components are combined to ensure the effective blocking of the water baffles.

Benefits of technology

It realizes the rapid installation and disassembly of the foundation pit support structure, has a water-blocking function, and can quickly block water in the foundation pit according to needs, improving construction efficiency and stability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221810590U_ABST
    Figure CN221810590U_ABST
Patent Text Reader

Abstract

The prefabricated building engineering foundation pit supporting structure comprises a prefabricated bottom plate and a prefabricated side baffle, positioning stand columns are symmetrically and fixedly arranged at the top of the prefabricated bottom plate, a first inserting groove and a second inserting groove are formed in the bottom and the top of the side baffle respectively, and a grouting channel is formed in one side of the first inserting groove in a penetrating mode; a threaded sleeve can be driven to ascend and descend by rotating a threaded rod clockwise or anticlockwise through a rotating wheel on the lifting mechanism, the threaded sleeve can drive a water baffle to ascend and descend, opening and closing can be rapidly carried out, water in a building engineering foundation pit can be rapidly blocked according to requirements, different use requirements can be met, and the practicability is high. The prefabricated bottom plate and the prefabricated side baffles can be quickly spliced through the positioning stand columns and the first inserting grooves, installation and construction are convenient, concrete grout is injected into inner cavities of the first inserting grooves through the grouting channels, the positioning stand columns and the first inserting grooves can be fixedly bonded through the concrete grout, and the splicing and installation stability is high.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of foundation pit support, in particular to a prefabricated construction engineering foundation pit support structure. Background Art

[0002] The foundation pit support of construction projects is a support, reinforcement and protection measure for the side walls of the foundation pit and the surrounding environment to ensure the safety of underground structure construction and the surrounding environment of the foundation pit. In the prior art, foundation pit support is usually supported by pile support, underground continuous wall support, cement retaining wall support and other support methods. The utility model with application number 202020639017.2 discloses a prefabricated construction project foundation pit support structure, including a foundation pit body and an articulated holder. A protective frame body is constructed on the inner surface of the foundation pit body, and the foundation pit body is used to limit and fix the protective frame body one by a positioning anchor, and an articulated holder is fixed on the surface of the protective frame body one. The utility model is provided by the foundation pit body A protective frame body 2 is installed through the top surface of the foundation, and the top of the foundation pit body is limited and fixed by positioning piles to avoid side collapse of the top of the foundation pit. At the same time, the positioning piles can be adjusted according to the position of the fixing rod in the slide slot, and the positioning piles can be effectively limited and fixed; an L-shaped protective frame body 1 is fixedly installed at the side end of the foundation pit body by positioning anchors, and two groups of hinged brackets are provided on the surface of the protective frame body 1, which can effectively support the foundation pit and avoid collapse. However, the foundation pit support structure of the construction project is not easy to assemble quickly, the installation process is complicated, and it does not have a water retaining function. It cannot block water in the foundation pit of the construction project as required, and has poor practicality.

[0003] Currently, no effective solution has been proposed for the problems in the related technologies. Utility Model Content

[0004] In view of the problems in the related technology, the utility model proposes a prefabricated construction engineering foundation pit support structure to overcome the above technical problems existing in the existing related technology.

[0005] To this end, the specific technical solutions adopted by the utility model are as follows:

[0006] A prefabricated construction engineering foundation pit support structure includes a prefabricated bottom plate and a prefabricated side baffle plate, wherein positioning columns are symmetrically fixed on the top of the prefabricated bottom plate, and a first slot and a second slot are respectively opened at the bottom and top of the side baffle plate, a grouting channel is penetrated on one side of the first slot, and a frame is inserted through the inner cavity of the second slot, a water baffle plate is connected to the frame through a lifting mechanism, guide components are symmetrically arranged on both sides of the water baffle plate, a fixing hole is arranged on one side of the top of the side baffle plate, and a spring buckle is arranged on the outer side of the bottom end of the frame.

[0007] Preferably, the prefabricated base plate is provided with a connecting socket and a connecting plug at the front and rear ends respectively.

[0008] Preferably, the guide assembly consists of a guide chute and a guide slider, and the guide chute and the guide slider are respectively arranged on the inner side of the side baffle and on both sides of the water baffle.

[0009] Preferably, a reinforcing steel bar is fixed on the top of the positioning column.

[0010] Preferably, the spring buckle comprises a spring column, one end of which is fixedly connected to a bayonet pin.

[0011] Preferably, the bayonet pin is movably inserted and arranged on the outer side of the bottom end of the frame, and the bayonet pin matches the fixing hole.

[0012] Preferably, the lifting mechanism includes a threaded rod, and the threaded rod is rotatably inserted into the frame through a bearing, a rotating wheel is fixedly provided on the top of the threaded rod, a threaded sleeve is sleeved on the outer side of the threaded rod, and the threaded sleeve is fixedly provided on the rear surface of the water baffle.

[0013] The beneficial effects of the utility model are as follows: 1. The threaded sleeve can be driven to rise and fall by rotating the threaded rod clockwise or counterclockwise through the rotating wheel on the lifting mechanism, and the threaded sleeve can drive the water retaining plate to rise and fall, so that the gate can be opened and closed quickly, and the water in the foundation pit of the construction project can be quickly blocked according to the needs, which can meet different usage needs;

[0014] 2. The prefabricated bottom plate and the prefabricated side baffle can be quickly spliced ​​through the positioning column and the first slot, and the installation and construction are convenient. Concrete slurry is injected into the inner cavity of the first slot through the grouting channel, and the positioning column and the first slot can be fixed and bonded through the concrete slurry. The splicing installation has high stability. By setting a spring buckle, the spring buckle is inserted into the fixing hole to quickly fix the frame. The spring buckle can be pressed out of the fixing hole to quickly disassemble the frame, and the installation is convenient. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0016] Figure 1 It is a structural diagram of a prefabricated construction engineering foundation pit support structure according to an embodiment of the utility model;

[0017] Figure 2 It is a cross-sectional view of a prefabricated construction engineering foundation pit support structure according to an embodiment of the utility model;

[0018] Figure 3 It is a structural diagram of a lifting mechanism of a prefabricated construction engineering foundation pit support structure according to an embodiment of the utility model;

[0019] Figure 4 It is an enlarged view of point A of a prefabricated construction engineering foundation pit supporting structure according to an embodiment of the utility model.

[0020] In the figure:

[0021] 1. Prefabricated bottom plate; 2. Prefabricated side baffle; 3. Positioning column; 4. First slot; 5. Second slot; 6. Grouting channel; 7. Rack; 8. Lifting mechanism; 9. Water baffle; 10. Fixing hole; 11. Spring buckle; 12. Connecting socket; 13. Connecting plug; 14. Guide slide; 15. Guide slide block; 16. Reinforcement steel bar; 17. Spring column; 18. Pin; 19. Threaded rod; 20. Rotating wheel; 21. Threaded sleeve. DETAILED DESCRIPTION

[0022] To further illustrate each embodiment, the present invention provides drawings, which are part of the disclosure of the present invention and are mainly used to illustrate the embodiments. They can be used in conjunction with the relevant descriptions in the specification to explain the operating principles of the embodiments. With reference to these contents, ordinary technicians in the field should be able to understand other possible implementation methods and advantages of the present invention. The components in the figures are not drawn to scale, and similar component symbols are generally used to represent similar components.

[0023] According to an embodiment of the utility model, a prefabricated construction engineering foundation pit supporting structure is provided.

[0024] Embodiment 1

[0025] like Figure 1-4As shown, according to an embodiment of the utility model, a prefabricated construction engineering foundation pit support structure includes a prefabricated bottom plate 1 and a prefabricated side baffle plate 2. A positioning column 3 is symmetrically fixed on the top of the prefabricated bottom plate 1. A first slot 4 and a second slot 5 are respectively opened at the bottom and the top of the side baffle plate 2. A grouting channel 6 is penetrated on one side of the first slot 4. The prefabricated bottom plate 1 and the prefabricated side baffle plate 2 can be quickly spliced ​​through the positioning column 3 and the first slot 4. After the splicing is completed, concrete slurry is injected into the inner cavity of the first slot 4 through the grouting channel 6. The positioning column 3 and the first slot 4 can be fixed and bonded through the concrete slurry. The splicing installation has high stability. A frame 7 is inserted into the inner cavity of the second slot 5. A water retaining plate 9 is connected to the frame 7 through a lifting mechanism 8. Guide plates 9 are symmetrically provided on both sides of the water retaining plate 9. To the assembly, a fixing hole 10 is provided on one side of the top of the side baffle 2, and a spring buckle 11 is provided on the outer side of the bottom end of the frame 7. The spring buckle 11 is inserted into the fixing hole 10 to quickly fix the frame 7, and the frame 7 can be quickly disassembled by pressing the spring buckle 11 out of the fixing hole 10. The front and rear ends of the prefabricated bottom plate 1 are respectively provided with connecting sockets 12 and connecting plugs 13. The prefabricated bottom plates 1 can be quickly spliced ​​in pairs through the connecting sockets 12 and the connecting plugs 13. The guide assembly is composed of a guide slide 14 and a guide slider 15, and the guide slide 14 and the guide slider 15 are respectively arranged on the inner side of the side baffle 2 and on both sides of the water baffle 9. The water baffle 9 can be guided and limited by the guide slide 14 and the guide slider 15, so that the water baffle 9 can be smoothly lifted and lowered.

[0026] Embodiment 2

[0027] like Figure 1-4As shown, according to an embodiment of the utility model, a prefabricated construction engineering foundation pit supporting structure includes a prefabricated bottom plate 1 and a prefabricated side baffle plate 2. A positioning column 3 is symmetrically fixed on the top of the prefabricated bottom plate 1. A first slot 4 and a second slot 5 are respectively opened at the bottom and the top of the side baffle plate 2. A grouting channel 6 is penetrated on one side of the first slot 4. The prefabricated bottom plate 1 and the prefabricated side baffle plate 2 can be quickly spliced ​​through the positioning column 3 and the first slot 4. After the splicing is completed, concrete slurry is injected into the inner cavity of the first slot 4 through the grouting channel 6. The positioning column 3 and the first slot 4 can be fixed and bonded through the concrete slurry. The splicing installation has high stability. A frame 7 is inserted into the inner cavity of the second slot 5. A water baffle plate 9 is connected to the frame 7 through a lifting mechanism 8. Guide components are symmetrically arranged on both sides of the water baffle plate 9. A fixing hole 10 is provided on one side of the top of the plate 2, and a spring buckle 11 is provided on the outer side of the bottom end of the frame 7. The spring buckle 11 is inserted into the fixing hole 10 to quickly fix the frame 7, and the frame 7 can be quickly disassembled by pressing the spring buckle 11 out of the fixing hole 10. A reinforcing steel bar 16 is fixedly provided on the top of the positioning column 3, and the reinforcing steel bar 16 can improve the bonding strength of the concrete slurry to the positioning column 3. The spring buckle 11 includes a spring column 17, and a bayonet 18 is fixedly connected to one end of the spring column 17. The bayonet 18 is movably interspersed and arranged on the outer side of the bottom end of the frame 7, and the bayonet 18 matches the fixing hole 10. The spring buckle 11 is inserted into the fixing hole 10 to quickly fix the frame 7, and the spring buckle 11 is pressed out of the fixing hole 10 to quickly disassemble the frame 7.

[0028] Embodiment 3

[0029] like Figure 1-4As shown, according to an embodiment of the utility model, a prefabricated construction engineering foundation pit supporting structure comprises a prefabricated bottom plate 1 and a prefabricated side baffle plate 2. A positioning column 3 is symmetrically fixed on the top of the prefabricated bottom plate 1. A first slot 4 and a second slot 5 are respectively opened at the bottom and the top of the side baffle plate 2. A grouting channel 6 is penetrated on one side of the first slot 4. The prefabricated bottom plate 1 and the prefabricated side baffle plate 2 can be quickly spliced ​​through the positioning column 3 and the first slot 4. After the splicing is completed, concrete slurry is injected into the inner cavity of the first slot 4 through the grouting channel 6. The positioning column 3 and the first slot 4 can be fixed and bonded through the concrete slurry. The splicing installation has high stability. A frame 7 is inserted into the inner cavity of the second slot 5. A water baffle plate 9 is connected to the frame 7 through a lifting mechanism 8. Guide components are symmetrically arranged on both sides of the water baffle plate 9. A fixing hole 10 is provided on the side, and a spring buckle 11 is provided on the outer side of the bottom end of the frame 7. The spring buckle 11 is inserted into the fixing hole 10 to quickly fix the frame 7. The spring buckle 11 can be quickly clamped and fixed by pressing the spring buckle 11 out of the fixing hole 10 to quickly disassemble the frame 7. The lifting mechanism 8 includes a threaded rod 19, and the threaded rod 19 is rotatably inserted and arranged on the frame 7 through a bearing. A rotating wheel 20 is fixedly provided on the top of the threaded rod 19, and a threaded sleeve 21 is sleeved on the outer side of the threaded rod 19, and the threaded sleeve 21 is fixedly provided on the rear surface of the water retaining plate 9. The threaded rod 19 can be driven to rise and fall by rotating the rotating wheel 20 on the lifting mechanism 8 clockwise or counterclockwise. The threaded sleeve 21 can drive the water retaining plate 9 to rise and fall, and the gate can be opened and closed quickly, and the water in the foundation pit of the construction project can be quickly blocked according to needs.

[0030] In summary, with the help of the above-mentioned technical scheme of the utility model, when the device is in use, the prefabricated bottom plate 1 and the prefabricated side baffle plate 2 can be quickly spliced ​​through the positioning column 3 and the first slot 4. After the splicing is completed, concrete slurry is injected into the inner cavity of the first slot 4 through the grouting channel 6, and the positioning column 3 and the first slot 4 can be fixed and bonded by the concrete slurry. The spring clip 11 is inserted into the fixing hole 10 to quickly fix the frame 7, and the spring clip 11 is pressed out of the fixing hole 10 to quickly disassemble the frame 7. The threaded sleeve 21 can be driven to rise and fall by rotating the threaded rod 19 clockwise or counterclockwise through the rotating wheel 20 on the lifting mechanism 8. The threaded sleeve 21 can drive the water retaining plate 9 to rise and fall, and the gate can be opened and closed quickly. The water in the foundation pit of the construction project can be quickly blocked according to needs. The water retaining plate 9 can be guided and limited by the guide slide groove 14 and the guide slider 15, so that the water retaining plate 9 can be smoothly lifted and lowered.

[0031] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A prefabricated foundation pit support structure for a construction project, comprising a prefabricated bottom plate (1) and a prefabricated side baffle plate (2), characterized in that: The top of the prefabricated bottom plate (1) is symmetrically fixed with positioning columns (3); the bottom and top of the side baffle (2) are respectively provided with a first slot (4) and a second slot (5); one side of the first slot (4) is provided with a grouting channel (6); the inner cavity of the second slot (5) is provided with a frame (7); the frame (7) is connected with a water baffle (9) via a lifting mechanism (8); guide components are symmetrically provided on both sides of the water baffle (9); a fixing hole (10) is provided on one side of the top of the side baffle (2); and a spring buckle (11) is provided on the outer side of the bottom end of the frame (7).

2. A prefabricated construction engineering foundation pit support structure according to claim 1, characterized in that: The front and rear ends of the prefabricated bottom plate (1) are respectively provided with a connecting socket (12) and a connecting plug block (13).

3. The prefabricated construction engineering foundation pit support structure according to claim 2, characterized in that: The guide assembly is composed of a guide chute (14) and a guide slide block (15), and the guide chute (14) and the guide slide block (15) are respectively arranged on the inner side of the side baffle (2) and on both sides of the water baffle (9).

4. The prefabricated construction engineering foundation pit support structure according to claim 3, characterized in that: A reinforcing steel bar (16) is fixedly provided on the top of the positioning column (3).

5. The prefabricated construction engineering foundation pit support structure according to claim 4, characterized in that: The spring buckle (11) comprises a spring column (17), one end of which is fixedly connected to a latch pin (18).

6. The prefabricated construction engineering foundation pit support structure according to claim 5, characterized in that: The bayonet pin (18) is movably inserted and arranged on the outer side of the bottom end of the frame (7), and the bayonet pin (18) matches the fastening hole (10).

7. The prefabricated construction engineering foundation pit support structure according to claim 5, characterized in that: The lifting mechanism (8) comprises a threaded rod (19), and the threaded rod (19) is rotatably inserted and arranged on the frame (7) through a bearing, a rotating wheel (20) is fixedly arranged on the top of the threaded rod (19), a threaded sleeve (21) is sleeved on the outer side of the threaded rod (19), and the threaded sleeve (21) is fixedly arranged on the rear surface of the water baffle (9).