Integrated decarburization regeneration tower
By designing detachably connected multi-stage processing units and manhole structures, the problem of difficult installation or disassembly of structured packing in the decarbonization regeneration tower is solved, achieving convenient maintenance and higher processing capacity.
Patent Information
- Application Number
- CN202420230114.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-31
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2034-01-31
AI Technical Summary
In the existing technology, structured packing is a prefabricated module, which is difficult to install or disassemble inside the decarbonization regeneration tower, resulting in inconvenient maintenance and replacement.
An integrated decarbonization regeneration tower is designed. The tower body is equipped with multi-stage processing units. Each component is detachably connected, including the detachable first partition, the second partition and the distributor, the spray pipe and the spray head. The manhole can be removed to facilitate the installation or removal of structured packing, and liquid filling and draining pipes are set between the tank bottom and the tower body for easy operation.
It realizes the convenient installation and disassembly of regular packing, reducing the requirements for the absorption liquid pump. At the same time, the diameter of the tank bottom is larger than the diameter of the tower body to accommodate more absorption liquid, which improves the processing capacity and efficiency of the tower.
Smart Images

Figure CN221815720U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of biogas treatment, in particular to an integrated decarbonization regeneration tower. Background Art
[0002] Biogas is mainly composed of methane and carbon dioxide, and usually contains some other gases, such as nitrogen, oxygen, ammonia, hydrogen sulfide, etc. The main function of the decarbonization tower is to remove carbon dioxide from biogas and increase the concentration of methane in biogas, thereby increasing its calorific value and combustion efficiency, making it more suitable for use as an energy source.
[0003] After the biogas to be treated enters the decarbonization chamber, it passes upward through the packing layer in the tower body. At the same time, the absorbent sprayed by the sprayer, such as water or alkaline solution, is sprayed or flows from the sprayer at the top of the tower and passes downward through the packing layer. On the surface of the packing, the carbon dioxide tower is fully in contact with the liquid. The absorbent rich in carbon dioxide flows downward into the bottom of the tank and is discharged into the flash tower through the drain pipe. In the flash tower, the pressure is suddenly reduced to quickly release the gas dissolved in the absorption liquid. The absorption liquid is then sent to the regeneration tower to react with the packing to reduce the absorption liquid.
[0004] There are a lot of packing materials in the regeneration tower, such as plastic packing, metal packing or ceramic packing. The absorption liquid passes through the packing layer from top to bottom, fully contacts with the packing, and is thus reduced.
[0005] Among them, the packings used in the packed decarbonization tower include structured packings and random packings. Compared with random packings, the structured design of structured packings can optimize the use of space in the tower and improve the processing capacity per unit volume. Therefore, under the same processing efficiency, the height of the decarbonization regeneration tower using structured packings can be made lower, which saves costs and reduces the requirements for the absorption liquid pump.
[0006] However, structured packing is a prefabricated module, which is more convenient when it needs to be cleaned or replaced, but it is difficult to install or disassemble due to the internal structure of the decarbonization regeneration tower. Utility Model Content
[0007] The purpose of the utility model is to provide an integrated decarbonization regeneration tower to solve the problem that the structured filler in the prior art is a prefabricated module, which is more convenient when cleaning or replacement is needed, but is difficult to install or disassemble due to the internal structure of the decarbonization regeneration tower.
[0008] The technical solution adopted by the utility model is as follows: an integrated decarbonization regeneration tower, comprising a skirt seat, a tank bottom installed above the skirt seat, a tower body connected to the inner cavity of the tank bottom, an exhaust hole connected to the inner cavity of the tower body, a sprayer connected to the inner cavity of the tower body installed on the upper side of the tower body, a liquid replenishment pipe connected to the inner cavity of the tank bottom is arranged on one side of the tank bottom, a liquid discharge pipe connected to the inner cavity of the tank bottom is arranged on the other side of the tank bottom, and a sewage discharge pipe connected to the inner cavity of the tank bottom is arranged at the bottom of the tank bottom;
[0009] The tower body comprises a plurality of processing units, which are connected in sequence. A first partition, a second partition and a distributor are arranged in sequence from bottom to top in each processing unit through a detachable connection. A receiving cavity for receiving structured packing is formed between the first partition and the second partition. A manhole connected to the inner cavity of the processing unit is installed on the side of the processing unit above the distributor.
[0010] The sprayer comprises a spray pipe and a spray head. The spray pipe is installed with the spray head after penetrating the inner wall of the tower body along the longitudinal direction. The spray pipe and the spray head are detachably connected.
[0011] The first partition plate and the second partition plate each include a plurality of unit partition plates, the unit partition plates are installed by detachable connection, and the distributor includes a plurality of unit dispersers, the unit dispersers are installed by detachable connection;
[0012] The maximum outer dimensions of the unit partition and the unit disperser are smaller than the diameter of the manhole, so that the first partition, the second partition and the distributor can be separated and passed through the manhole.
[0013] Furthermore, the diameter of the tank bottom is greater than the diameter of the tower body.
[0014] Furthermore, a tank bottom manhole is installed on the side of the tank bottom.
[0015] Furthermore, a wire mesh demister is installed on the tower body between the exhaust hole and the sprinkler.
[0016] Furthermore, a thermal insulation layer is provided on the outside of the tower body.
[0017] In summary, due to the adoption of the above technical solution, the beneficial effects of the utility model are:
[0018] 1. The tower body in the utility model is an integrated design, but multiple processing units are arranged in the tower body. The components in each processing unit are connected in a detachable manner. When it is necessary to install or remove the structured packing of the accommodating cavity, the first partition, the second partition, the distributor, the spray pipe and the spray head are removed, and the structured packing can be conveniently installed or removed.
[0019] 2. The diameter of the tank bottom in the utility model is larger than the diameter of the tower body, so that more absorption liquid can be accommodated. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a structural schematic diagram of the utility model;
[0021] Figure 2 It is a structural schematic diagram of the first partition and the second partition in the utility model;
[0022] Figure 3 It is a structural schematic diagram of the distributor in the utility model.
[0023] Description of reference numerals:
[0024] 1. Skirt; 2. Tank bottom; 3. Drain pipe; 4. Sewage pipe; 5. Tower body; 5 1. First partition; 5 2. Second partition; 5 3. Distributor; 5 4. Manhole; 6. Wire mesh demister; 7. Pressure gauge; 8. Exhaust hole; 9. Spray pipe; 10. Spray head; 11. Liquid replenishment pipe; 1 2. Manhole at the bottom of the tank. DETAILED DESCRIPTION
[0025] In order to make the purpose, technical scheme and advantages of the embodiments of the utility model clearer, the technical scheme in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Generally, the components of the embodiments of the utility model described and shown in the drawings here can be arranged and designed in various different configurations.
[0026] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the present invention to be protected, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0027] Example 1
[0028] Figure 1 As shown: an integrated decarbonization regeneration tower, comprising a skirt 1, a tank bottom 2 is installed above the skirt 1, a tower body 5 connected to the inner cavity of the tank bottom 2 is arranged above the tank bottom 2, an exhaust hole 8 connected to the inner cavity of the tower body 5 is arranged on the top, a sprayer connected to the inner cavity of the tower body 5 is installed on the upper side of the tower body 5, a liquid replenishment pipe 11 connected to the inner cavity of the tank bottom 2 is arranged on one side, a liquid discharge pipe 3 connected to the inner cavity of the tank bottom 2 is arranged on the other side, and a sewage discharge pipe 4 connected to the inner cavity of the tank bottom 2 is arranged at the bottom;
[0029] The liquid to be reduced is sprayed or flows in from the sprinkler at the top of the tower body 5, and passes through the packing layer downward. On the surface of the packing, the absorption liquid fully contacts the packing to achieve reduction. The reduced absorbent flows downward into the tank bottom 2, is discharged through the drain pipe 3, and is sent to the regeneration unit. The gas generated during the reduction process moves upward from the top of the tower body 5 and is discharged from the exhaust hole 8. The pressure gauge 7 installed on the outside of the tower body 5 and connected to its inner cavity can detect the internal pressure of the detector. In order to compensate for the loss of the absorbent and maintain its performance, a liquid replenishment pipe 11 is installed on the tank bottom 2 to replenish the absorption liquid into the tower in time.
[0030] The tower body 5 includes multiple processing units, which are connected in sequence. A first partition 51, a second partition 52 and a distributor 53 are sequentially arranged from bottom to top in each processing unit through a detachable connection. A receiving cavity for receiving structured packing is formed between the first partition 51 and the second partition 52. A manhole 54 connected to the inner cavity of the processing unit is installed above the distributor 53 on the side of the processing unit.
[0031] The sprinkler comprises a sprinkler pipe 9 and a sprinkler head 10. The sprinkler pipe 9 penetrates the inner wall of the tower body 5 along the longitudinal direction and is then installed with the sprinkler head 10. The sprinkler pipe 9 and the sprinkler head 10 are detachably connected.
[0032] Through the detachable connection method, when the structured packing of the accommodating chamber needs to be installed or disassembled, the person enters each processing unit through the manhole 54, removes the first partition 51, the second partition 52, the distributor 53, the spray pipe 9 and the spray head 10, and then the structured packing can be conveniently installed or disassembled.
[0033] Due to the use requirements of the first partition 51, the second partition 52, the distributor 53, the spray pipe 9 and the spray head 10, their overall size is consistent with the diameter of the tower body 5. However, if the diameter of the manhole 54 is set to be consistent with the diameter of the tower body 5, the strength of the tower body 5 will be greatly weakened. Therefore, the diameter of the manhole 54 is usually half of the diameter of the tower body 5. Therefore, after the first partition 51, the second partition 52, the distributor 53, the spray pipe 9 and the spray head 10 are removed and need to be taken out through the manhole 54, the first partition 51, the second partition 52, the distributor 53, the spray pipe 9 and the spray head 10 cannot pass through the manhole 54.
[0034] Therefore, the first partition 51 and the second partition 52 each include a plurality of unit partitions, and the unit partitions are installed by detachable connections, and the distributor 53 includes a plurality of unit dispersers, and the unit dispersers are installed by detachable connections;
[0035] Furthermore, the maximum external dimensions of the unit partition and the unit disperser are smaller than the diameter of the manhole 54 , so that the first partition 51 , the second partition 52 and the distributor 53 can be separated and passed through the manhole 54 .
[0036] Example 2
[0037] The difference between this embodiment and the first embodiment is that the diameter of the tank bottom 2 is larger than the diameter of the tower body 5, so that more absorption liquid can be accommodated.
[0038] Example 3
[0039] The difference between this embodiment and the first embodiment is that a tank bottom manhole 12 is installed on the side of the tank bottom 2, so as to facilitate entering the tank bottom 2 for maintenance.
[0040] Example 4
[0041] The difference between this embodiment and embodiment 1 is that a wire mesh demister 6 is installed on the tower body 5 between the exhaust hole 8 and the sprinkler. During the decarbonization process, CO2 and other gases will contact with the liquid and be absorbed. This process may generate a large amount of bubbles and foam. The wire mesh demister 6 can effectively separate these bubbles from the liquid and reduce the formation of foam.
[0042] Example 5
[0043] The difference between this embodiment and embodiment 1 is that a heat-insulating layer is provided on the outer side of the tower body 5 to maintain the temperature inside the tower body 5 and improve the processing efficiency.
[0044] Obviously, the above embodiments of the present invention are merely examples for the purpose of clearly illustrating the present invention, and are not intended to limit the implementation methods of the present invention. For those skilled in the art, various obvious changes, readjustments and substitutions can be made without departing from the scope of protection of the present invention. It is not necessary and impossible to list all implementation methods here. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention shall be included in the scope of protection of the claims of the present invention.
Claims
1. An integrated decarbonization regeneration tower, characterized in that: The invention comprises a skirt seat (1), a tank bottom (2) is installed above the skirt seat (1), a tower body (5) is arranged above the tank bottom (2) and is connected to the inner cavity thereof, an exhaust hole (8) is arranged at the top of the tower body (5) and is connected to the inner cavity thereof, a sprayer is arranged on the upper side of the tower body (5) and is connected to the inner cavity thereof, a liquid replenishing pipe (11) is arranged on one side of the tank bottom (2) and is connected to the inner cavity thereof, a liquid drain pipe (3) is arranged on the other side of the tank bottom (2) and is connected to the inner cavity thereof, and a sewage drain pipe (4) is arranged at the bottom of the tank bottom (2) and is connected to the inner cavity thereof; The tower body (5) comprises a plurality of processing units, which are connected in sequence. A first partition (51), a second partition (52) and a distributor (53) are arranged in sequence from bottom to top in each processing unit through a detachable connection. A receiving cavity for receiving structured packing is formed between the first partition (51) and the second partition (52). A manhole (54) connected to the inner cavity of the processing unit is installed above the distributor (53) on the side of the processing unit. The sprayer comprises a spray pipe (9) and a spray head (10); the spray pipe (9) penetrates the inner wall of the tower body (5) along the longitudinal direction and is then provided with the spray head (10); the spray pipe (9) and the spray head (10) are detachably connected. The first partition (51) and the second partition (52) each include a plurality of unit partitions, and the unit partitions are installed by detachable connection; the distributor (53) includes a plurality of unit dispersers, and the unit dispersers are installed by detachable connection; The maximum outer dimensions of the unit partition and the unit disperser are smaller than the diameter of the manhole (54).
2. The integrated decarbonization regeneration tower according to claim 1, characterized in that: The diameter of the tank bottom (2) is greater than the diameter of the tower body (5).
3. The integrated decarbonization regeneration tower according to claim 2, characterized in that: A tank bottom manhole (12) is installed on the side of the tank bottom (2).
4. The integrated decarbonization regeneration tower according to claim 2, characterized in that: A heat-insulating layer is arranged on the outer side of the tower body (5).
5. The integrated decarbonization regeneration tower according to claim 4, characterized in that: A wire mesh demister (6) is installed on the tower body (5) between the exhaust hole (8) and the sprinkler.