Down-the-hole hammer pipe-following drilling device

By connecting the pipe shed steel pipe to the drill pipe, and using the puller to synchronously drive the steel pipe into the borehole, the problem of hole position deviation when the steel pipe is inserted during tunnel construction is solved, and construction efficiency and consistency are improved.

CN221823710UActive Publication Date: 2024-10-11CHINA ROAD & BRIDGE
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420033754.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-08
Publication Date
2024-10-11
Estimated Expiration
2034-01-08

AI Technical Summary

Technical Problem

During the construction of tunnel pipe sheds, when drilling reaches the designed depth and the rod is withdrawn and then the steel pipe sleeve is inserted, hole position deviation is likely to occur, which affects construction efficiency.

Method used

The steel pipe of the pipe shed is connected to the drill rod of the drilling tool, and the steel pipe is synchronously driven into the drilling hole through the puller to avoid hole position deviation when the steel pipe is inserted after the drilling tool is drilled first.

Benefits of technology

It realizes the simultaneous entry of steel pipes, avoids hole position deviation, improves construction efficiency, reduces hole collapse, air leakage, and buried drill phenomena, and completes drilling and pipe jacking at one time, saving work efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221823710U_ABST
    Figure CN221823710U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of highway tunnel construction devices, in particular to a down-the-hole hammer pipe-following drilling device. Comprising an eccentric drill bit, a pipe shoe, a first steel pipe sleeve and a drill rod, the front end of the drill rod is connected with the eccentric drill bit, and the front end of the first steel pipe sleeve and the pipe shoe are in threaded connection and are coaxially arranged. When the drill rod drills holes, the steel pipe shed is synchronously driven to advance, the hole position deviation problem that the drill rod drills holes firstly and then retreats, and the steel pipe shed retreats is solved, and the construction efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of highway tunnel construction devices, in particular to a down-the-hole hammer and pipe drilling device. Background Art

[0002] The construction of a large pipe shed in a tunnel is an important part of the initial support of weak surrounding rock. It is generally used for the penetration and reinforcement of the entrance and exit of the tunnel or the loose and weak geological areas of the surrounding rock of the tunnel body. The conventional construction method is as follows: first, a reinforced concrete circumferential sleeve arch is cast at the cross section of the tunnel as the supporting structure of the pipe shed. Steel casings are set at a certain interval along the axis of the arch in the circumferential sleeve arch as drilling guide pipes; during construction, the drill rod enters the surface of the surrounding rock through the guide pipe to start drilling. When the drilling reaches the designed depth, the drill rod is withdrawn, and then the steel pipe sleeve is inserted into the pipe hole (the steel pipe sleeve is generally a seamless steel pipe with a diameter of 108mm); continue the above method to drill holes one by one in the circumferential direction of the tunnel until all the steel pipe sleeves are inserted to form a pipe shed structure.

[0003] In the process of building a pipe shed in the prior art, when the drilling hole reaches the designed depth, it is necessary to withdraw the rod and then insert the steel pipe sleeve into the pipe hole. When the drill bit is withdrawn, the steel pipe may be inserted into the pipe hole, resulting in hole position deviation, which affects the construction efficiency. Summary of the invention

[0004] In the existing tunnel pipe shed construction, when building the pipe shed, the drill tool is first used to drill a hole and then withdrawn, and the steel pipe sleeve is inserted into the pipe hole. After the drill tool is withdrawn, the steel pipe sleeve is inserted again, which will cause the problem of hole position deviation.

[0005] In order to solve the problems existing in the prior art, the utility model provides a new technical idea, namely, connecting the steel pipe of the pipe rack with the drill rod of the drilling tool. When the drilling tool is drilling a hole, the steel pipe of the pipe rack is brought in at the same time, avoiding the problem of the drilling tool drilling first and the steel pipe moving in later. This form of synchronous follow-up avoids the problem of hole position deviation when the steel pipe moves in later, and at the same time improves construction efficiency.

[0006] The above technical objectives of the utility model are achieved through the following technical solutions:

[0007] A down-the-hole hammer and pipe drilling device comprises an eccentric drill bit, a pipe shoe, a first steel pipe sleeve and a drill rod, wherein the front end of the drill rod is connected to the eccentric drill bit, the front end of the first steel pipe sleeve is threadedly connected to the pipe shoe and coaxially arranged, and is characterized in that a puller for pulling a pipe rack steel pipe is provided on the drill rod.

[0008] The pipe-roof steel pipe is provided with a bulge, a groove is provided in the bulge, and the groove is communicated with the pipe-roof steel pipe.

[0009] Furthermore, the retractor comprises a first retracting rod, a second retracting rod and a rotating shaft, the rotating shaft is on the inner wall of the protrusion, and the first retracting rod and the second retracting rod rotate around the rotating shaft.

[0010] The first pulling rod extends into the groove of the protrusion, and the second pulling rod is provided with a first bent hook.

[0011] A pulling rod three is arranged on the drill rod, and a bending hook two matching with the bending hook one is arranged on the pulling rod three.

[0012] Compared with the prior art, the beneficial effects of the utility model are embodied in:

[0013] The device is provided with a puller, through which the pipe-roof steel pipe is connected to the drill rod, and the pipe-roof steel pipe is driven to enter synchronously while the drill rod is drilling, thereby avoiding the problem of hole position deviation of the pipe-roof steel pipe when entering after the drill tool drills a hole. Synchronous entry will not cause hole collapse, air leakage, and drill burial during the drilling process, and drilling and pipe jacking can be completed at one time. There is no need to withdraw the drill tool and then carry out pipe jacking, thus saving work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a schematic diagram of the overall structure of the utility model.

[0015] Figure 2 For this utility model Figure 1 Enlarged view of part A.

[0016] Figure 3 For this utility model Figure 1 Enlarged view of part B.

[0017] Figure 4 It is a structural schematic diagram of the utility model in which a drill rod pulls the steel pipe of a pipe rack forward.

[0018] Figure 5 It is a structural schematic diagram of the utility model when the drill rod is withdrawn from the drilling hole.

[0019] Figure 6 It is a schematic diagram of the structure of the retractor of the utility model.

[0020] The marks in the figure respectively represent: 1. eccentric drill bit; 2. pipe shoe; 3. first steel pipe sleeve; 4. drill rod; 5. pulling rod one; 6. pulling rod two; 7. rotating shaft; 8. bump; 9. pulling rod three; 10. bending hook one; 11. bending hook two; 12. groove. Implementation

[0021] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0022] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In addition, in the description of the present invention, the meaning of "several" is two or more, unless otherwise clearly and specifically defined.

[0023] See also Figure 1-6 The utility model of the down-the-hole hammer and pipe drilling device comprises an eccentric drill bit 1, a pipe shoe 2, a first steel pipe sleeve and a drill rod 4. The front end of the drill rod 4 is connected to the eccentric drill bit 1, and the front end of the first steel pipe sleeve is threadedly connected to the pipe shoe 2 and coaxially arranged.

[0024] As an example, the outer diameter of the front end of the pipe shoe 2 gradually decreases toward the front, that is, the front end of the pipe shoe 2 is tapered.

[0025] Furthermore, the drill rod 4 is provided with a puller for pulling the steel pipe of the pipe rack.

[0026] Optionally, a bulge 8 is provided on the pipe-roof steel pipe, a groove 12 is provided in the bulge 8, and the groove 12 is communicated with the pipe-roof steel pipe.

[0027] Similarly, it should be noted that in the present application, the retractor includes a retracting rod 1 5 , a retracting rod 2 6 and a rotating shaft 7 , and the rotating shaft 7 is on the inner wall of the protrusion 8 , and the retracting rod 1 5 and the retracting rod 2 6 rotate around the rotating shaft 7 .

[0028] Furthermore, the pulling rod 1 5 extends into the groove 12 of the protrusion 8 , and the pulling rod 2 6 is provided with a bent hook 10 .

[0029] In addition, a pulling rod three 9 is provided on the drill rod 4, and a bending hook two 11 matching the bending hook one 10 is provided on the pulling rod three 9.

[0030] In a specific example of the present invention, the second pulling rod 6 is shorter than the first pulling rod 5.

[0031] In the above technical solution, the length of the groove 12 is greater than the length of the pulling rod 5, and the pulling rod 5 can extend into the pipe-roof steel pipe through the groove 12.

[0032] It can be understood that when the hook 10 on the pulling rod 2 6 moves forward, it hooks and pulls the hook 2 11 on the pulling rod 3 9, so that the drill rod 4 drives the pipe-roof steel pipe forward. After drilling to a certain depth, the drill rod 4 withdraws from the borehole backward. At this time, the hook 10 on the pulling rod 2 6 is disengaged from the hook 2 11 on the pulling rod 3 9, preventing the drill rod 4 from bringing out the pipe-roof steel pipe when withdrawing from the borehole.

[0033] The use process of the device when used in tunnel large pipe shed construction is as follows:

[0034] During drilling, the eccentric drill bit 11 reaches the rock layer to drill. During the drilling process, the drill rod 44 and the eccentric drill bit 11 continue to move forward. While the drill rod 4 moves forward, it drives the pipe-roof steel pipe forward until it reaches the specified depth and withdraws the drill rod 4. At this time, the pipe-roof steel pipe is left in the borehole.

[0035] The above shows and describes the basic principle, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only preferred embodiments of the utility model and are not used to limit the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which shall fall within the scope of the utility model to be protected. The scope of protection claimed by the utility model is defined by the attached claims and their equivalents.

Claims

1. A down-the-hole hammer and pipe drilling device, comprising an eccentric drill bit (1), a pipe shoe (2), a first steel pipe sleeve (3) and a drill rod (4), wherein the front end of the drill rod is connected to the eccentric drill bit (1), the front end of the first steel pipe sleeve (3) is threadedly connected to the pipe shoe (2) and is coaxially arranged, and characterized in that: The drill rod is provided with a puller for pulling the steel pipe of the pipe rack.

2. A down-the-hole hammer and pipe drilling device according to claim 1, characterized in that: A convex block (8) is provided on the pipe-roof steel pipe, a concave groove (12) is provided in the convex block (8), and the concave groove (12) is communicated with the pipe-roof steel pipe.

3. A down-the-hole hammer and pipe drilling device according to claim 2, characterized in that: The retractor comprises a retracting rod 1 (5), a retracting rod 2 (6) and a rotating shaft (7); the rotating shaft (7) is on the inner wall of the protrusion (8); the retracting rod 1 (5) and the retracting rod 2 (6) rotate around the rotating shaft (7).

4. A down-the-hole hammer and pipe drilling device according to claim 3, characterized in that: The first pulling rod (5) extends into the groove (12) of the protrusion (8), and the second pulling rod (6) is provided with a bent hook (10).

5. A down-the-hole hammer and pipe drilling device according to claim 4, characterized in that: The drill rod (4) is provided with a pulling rod three (9), and the pulling rod three (9) is provided with a curved hook two (11) matching the curved hook one (10).