High-strength main shaft structure of double-support transmission system
By designing a double-support transmission system on the main shaft of the wind turbine, using the cooperation of through holes and blind holes and the elliptical curve structure, the problem of stress concentration on the main shaft is solved, the strength and stability of the main shaft are improved, and the efficient operation of the wind turbine is ensured.
Patent Information
- Application Number
- CN202323573171.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-27
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2033-12-27
AI Technical Summary
The main shaft of the wind turbine is prone to stress concentration when it bears increased loads, leading to strength failure and fatigue damage, limiting the efficient application of wind turbines.
A high-strength spindle structure of a double-support transmission system is designed. The spindle is provided with a hub connection port, a transition shaft section, a front installation section and a rear installation section along the axis direction, and through holes and blind holes are provided around the hub connection port. , using the cooperation of the external connector and the internal connector to reduce the pitch circle diameter of the flange hole of the hub connection port, increase the elliptical curve of the transition shaft section, and improve the strength of the transition shaft section.
It effectively alleviates the stress concentration of the main shaft, improves the strength of the main shaft, and ensures the stability and reliability of the wind turbine.
Smart Images

Figure CN221823969U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of wind power generation, in particular to a high-strength main shaft structure of a double-support transmission system. Background Art
[0002] The main shaft of a wind turbine is one of the key components for transmitting loads in the unit. Its main function is to transmit the driving torque generated by the wind load acting on the blades to the speed-increasing gearbox, and at the same time transmit other loads such as the axial thrust and bending moment generated by the wind rotor to the bearing seat, nacelle and tower through the main shaft bearing rollers. The main shaft is one of the most complex components in a wind turbine. The rationality and safety of its design are directly related to the stability and reliability of the entire unit.
[0003] At present, wind turbines are gradually becoming larger, and the loads on the units are increasing accordingly, which puts higher requirements on the reliability of the main shaft. The long-term existence of stress concentration areas on the main shaft structure will cause strength damage and fatigue damage to the main shaft, limiting the efficient application of wind turbines.
[0004] Therefore, how to effectively alleviate the stress concentration of the spindle and improve the strength of the spindle is a technical problem that technical personnel in this field currently need to solve. Utility Model Content
[0005] The utility model aims to provide a high-strength main shaft structure of a double-support transmission system, which can effectively alleviate the stress concentration of the main shaft and improve the strength of the main shaft.
[0006] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0007] A high-strength main shaft structure of a double-support transmission system is used to transfer the load of a wheel hub to a front bearing, a rear bearing and a speed-increasing gearbox. The high-strength main shaft structure is provided with a wheel hub connection port, a transition shaft section, a front mounting section and a rear mounting section in sequence along its own axial direction. A through hole and a blind hole are provided in the circumference of the wheel hub connection port. An outer connecting member and an inner connecting member are respectively penetrated through the through hole and the blind hole so that the wheel hub can be installed on the wheel hub connection port. An elliptical curve is provided on the side of the transition shaft section close to the wheel hub connection port for bearing the load. The front mounting section and the rear mounting section are respectively used to install the front bearing and the rear bearing.
[0008] Preferably, the through holes and the blind holes are evenly distributed along the circumference of the hub connection port, the numbers of the through holes and the blind holes correspond one to one, and the through holes are located outside the blind holes.
[0009] Preferably, a bearing shoulder is provided at one end of the front installation section away from the rear installation section, the front bearing is provided with an inner ring, and the bearing shoulder is fitted to the end face of the inner ring for positioning the inner ring.
[0010] Preferably, a groove structure is provided at the bottom of one side of the bearing shoulder close to the front mounting section, and the groove structure includes a first circular arc segment, a second circular arc segment and an elliptical arc segment connected to each other, so as to reduce the contact area between the bearing shoulder and the inner ring.
[0011] Preferably, the second circular arc segment and the elliptical arc segment are concentrically arranged, and the elliptical arc segment is one quarter of the ellipse.
[0012] Preferably, a first groove and a second groove are respectively provided at both ends of the rear installation section, and a radial distance between the first groove and the second groove and the rear installation section is 2-3 mm.
[0013] Preferably, the front mounting section and the front bearing are interference fit, and the rear mounting section and the rear bearing are interference fit.
[0014] Preferably, the transition shaft segment further includes a third circular arc tangent to the elliptical curve, and the third circular arc is connected to the bearing shoulder.
[0015] Preferably, the height of the groove structure in the radial direction of the high-strength main shaft structure is one third of the end surface height of the bearing shoulder.
[0016] Preferably, a wind wheel locking disk is provided on the outer periphery of the hub connection port, and a gear box connection port for connecting to a speed increasing gear box is provided on the end of the high-strength main shaft structure away from the hub connection port. The high-strength main shaft structure, the bearing shoulder and the wind wheel locking disk are an integrated structure.
[0017] Compared with the above-mentioned background technology, the high-strength main shaft structure of the double-support transmission system provided by the utility model is used to transfer the load of the wheel hub to the front bearing, the rear bearing and the speed-increasing gearbox. The high-strength main shaft structure is provided with a wheel hub connecting port, a transition shaft section, a front mounting section and a rear mounting section in sequence along its own axial direction. A through hole and a blind hole are provided in the circumference of the wheel hub connecting port. The external connecting part and the internal connecting part are respectively penetrated through the through hole and the blind hole so that the wheel hub can be installed in the wheel hub connecting port. An elliptical curve is provided on the side of the transition shaft section close to the wheel hub connecting port for bearing the load. The front mounting section and the rear mounting section are used to install the front bearing and the rear bearing respectively.
[0018] Specifically, the wheel hub is installed from two end faces using external connecting parts and internal connecting parts, that is, the internal connecting part is passed through the blind hole from the wheel hub side, and the external connecting part is passed through the through hole from the rear end face of the wheel hub connecting port, so that the wheel hub can be installed on the wheel hub connecting port. By setting the blind hole and the through hole, the pitch circle diameter of the flange hole of the wheel hub connecting port is reduced, thereby ensuring that the elliptical curve of the transition shaft section is smoother, effectively improving the strength of the transition shaft section, and being able to effectively alleviate the stress concentration of the main shaft and improve the strength of the main shaft. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings in the following description are only embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.
[0020] Figure 1 A schematic diagram of the structure of a high-strength main shaft structure provided by an embodiment of the utility model;
[0021] Figure 2 for Figure 1 Structural cross-sectional view of
[0022] Figure 3 A schematic diagram of the structure of the through hole and the blind hole provided in the embodiment of the utility model;
[0023] Figure 4 A structural cross-sectional view of a bearing shoulder provided by an embodiment of the utility model;
[0024] Figure 5 A structural cross-sectional view of a first groove and a second groove provided in an embodiment of the utility model;
[0025] Figure 6 This is a structural cross-sectional view of a transition shaft section provided in an embodiment of the utility model.
[0026] in:
[0027] 100-hub connection port, 110-through hole, 120-blind hole, 130-wind wheel locking disc, 140-gear box connection port;
[0028] 200-transition axis segment, 210-elliptical curve, 220-third arc;
[0029] 300-front installation section;
[0030] 400-rear mounting section, 410-first groove, 420-second groove;
[0031] 500-bearing shoulder, 510-groove structure, 511-first arc segment, 512-second arc segment, 513-elliptical arc segment. DETAILED DESCRIPTION
[0032] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0033] In order to enable those skilled in the art to better understand the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0034] In the description of the present invention, it should be understood that the terms "top", "bottom", "front" and "back" etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the positions or elements referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation of the present invention.
[0035] The utility model aims to provide a high-strength main shaft structure of a double-support transmission system, which can effectively alleviate the stress concentration of the main shaft and improve the strength of the main shaft.
[0036] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0037] See also Figure 1 and Figure 2 The present embodiment provides a high-strength main shaft structure of a double-support transmission system, which is used to transfer the load of the wheel hub to the front bearing, the rear bearing and the speed-increasing gearbox. The high-strength main shaft structure is provided with a wheel hub connection port 100, a transition shaft section 200, a front mounting section 300 and a rear mounting section 400 in sequence along its own axial direction. A through hole 110 and a blind hole 120 are provided in the circumference of the wheel hub connection port 100. The outer connecting member and the inner connecting member are respectively penetrated through the through hole 110 and the blind hole 120 so that the wheel hub can be installed on the wheel hub connection port 100. An elliptical curve 210 is provided on the side of the transition shaft section 200 close to the wheel hub connection port 100 for bearing the load. The front mounting section 300 and the rear mounting section 400 are respectively used to install the front bearing and the rear bearing.
[0038] Among them, the external connecting parts and the internal connecting parts are specifically bolts adapted to the through hole 110 and the blind hole 120, that is, the through hole 110 and the blind hole 120 are both bolt holes. The difference is that the through hole 110 runs through the front end face and the rear end face of the hub connection port 100, while the blind hole 120 is only a bolt hole with a certain depth at the front end face.
[0039] It should be noted that the transition shaft section 200, the front mounting section 300, and the rear mounting section 400 of the high-strength main shaft structure usually bear large loads transmitted from the wheel hub in the radial and axial directions. The lower or root area of the transition shaft section 200, the front mounting section 300, and the rear mounting section 400 of the main shaft is a stress concentration area.
[0040] Specifically, the wheel hub is installed from two end faces by using an external connecting member and an internal connecting member, that is, the internal connecting member is passed through the blind hole 120 from the wheel hub side, and the external connecting member is passed through the through hole 110 from the rear end face of the wheel hub connecting port 100, so that the wheel hub can be installed on the wheel hub connecting port 100. By setting the blind hole 120 and the through hole 110, the pitch circle diameter of the flange hole of the wheel hub connecting port 100 is reduced, thereby ensuring that the elliptical curve 210 of the transition shaft segment 200 is smoother, effectively improving the strength of the transition shaft segment 200, and being able to effectively relieve the stress concentration of the main shaft and improve the strength of the main shaft.
[0041] See also Figure 3 Preferably, the through holes 110 and the blind holes 120 are evenly distributed along the circumference of the hub connection port 100 , the numbers of the through holes 110 and the blind holes 120 correspond one to one, and the through holes 110 are located outside the blind holes 120 .
[0042] It can be understood that the through holes 110 and the blind holes 120 are evenly distributed along the circumference of the hub connection port 100, and the number of the through holes 110 and the blind holes 120 corresponds to each other. The specific number of the through holes 110 and the blind holes 120 can be adjusted according to actual conditions as long as the above-mentioned purpose can be achieved. In addition, the through holes 110 are located outside the blind holes 120, which can ensure that the elliptical curve 210 of the transition shaft segment 200 is smoother.
[0043] See also Figure 4 Preferably, a bearing shoulder 500 is provided at one end of the front mounting section 300 away from the rear mounting section 400, the front bearing is provided with an inner ring, and the bearing shoulder 500 is fitted to the end face of the inner ring for positioning the inner ring.
[0044] In this embodiment, a bearing shoulder 500 is provided at one end of the front mounting section 300 facing away from the rear mounting section 400, that is, the bearing shoulder 500 is arranged adjacent to the front mounting section 300 and is located between the front mounting section 300 and the transition shaft section 200. The front mounting section 300 cooperates with the inner ring of the front bearing, and the end face of the bearing shoulder 500 can fit with the end face of the inner ring of the front bearing for positioning the inner ring.
[0045] Preferably, a groove structure 510 is provided at the bottom of one side of the bearing shoulder 500 close to the front mounting section 300. The groove structure 510 includes a first circular arc segment 511, a second circular arc segment 512 and an elliptical arc segment 513 connected to each other, and is used to reduce the contact area between the bearing shoulder 500 and the inner ring.
[0046] In addition, a groove structure 510 is provided at the bottom of one side of the bearing shoulder 500 close to the front mounting section 300. The setting of the groove structure 510 effectively reduces the contact area between the bearing shoulder 500 and the inner ring end face, thereby helping to reduce the stress concentration phenomenon at the root of the front mounting section 300.
[0047] The groove structure 510 includes a first arc segment 511 , a second arc segment 512 and an elliptical arc segment 513 connected to each other. The first arc segment 511 connects the end surface of the bearing shoulder 500 and the second arc segment 512 .
[0048] Preferably, the second circular arc segment 512 and the elliptical arc segment 513 are concentrically arranged, and the elliptical arc segment 513 is one quarter of the ellipse.
[0049] It can be understood that the second circular arc segment 512 and the elliptical arc segment 513 are preferably arranged concentrically, and the elliptical arc segment 513 is preferably a quarter of an ellipse.
[0050] It should be noted that the size relationship between the second circular arc segment 512 and the elliptical arc segment 513 can be adjusted according to actual conditions as long as the above purpose can be achieved.
[0051] See also Figure 5 Preferably, a first groove 410 and a second groove 420 are respectively provided at both ends of the rear installation section 400, and the radial distance between the first groove 410 and the second groove 420 and the rear installation section 400 is 2-3 mm.
[0052] In this embodiment, a first groove 410 and a second groove 420 are respectively provided at both ends of the rear installation section 400 to effectively alleviate the stress concentration phenomenon of the rear installation section 400. The radial distance between the first groove 410 and the second groove 420 and the rear installation section 400 is preferably 2-3 mm.
[0053] Preferably, the front mounting section 300 and the front bearing are interference fit, and the rear mounting section 400 and the rear bearing are interference fit.
[0054] It should be noted that the front mounting section 300 and the front bearing are preferably interference fit, and the rear mounting section 400 and the rear bearing are preferably interference fit. The specific fit tolerance can be adjusted according to actual conditions and is not specifically limited here, as long as the above purpose can be achieved.
[0055] See also Figure 6 Preferably, the transition shaft segment 200 also includes a third arc 220 tangent to the elliptical curve 210 , and the third arc 220 is connected to the bearing shoulder 500 .
[0056] It can be understood that the transition shaft segment 200 includes an elliptical curve 210 and a third circular arc 220 , the third circular arc 220 is tangent to the elliptical curve 210 and the third circular arc 220 is connected to the bearing shoulder 500 .
[0057] Preferably, the height of the groove structure 510 in the radial direction of the high-strength main shaft structure is one third of the end surface height of the bearing shoulder 500 .
[0058] In this embodiment, the groove structure 510 is approximately C-shaped. To ensure the reliability of the inner ring positioning, the height of the groove structure 510 in the radial direction of the high-strength main shaft structure is about one-third of the end face height of the bearing shoulder 500. The specific shape and size of the groove structure 510 can be adjusted according to actual conditions to achieve the above-mentioned purpose.
[0059] Preferably, a wind wheel locking plate 130 is provided on the outer periphery of the hub connection port 100, and a gear box connection port 140 for connecting to a speed increasing gear box is provided at one end of the high-strength main shaft structure away from the hub connection port 100, and the high-strength main shaft structure, the bearing shoulder 500 and the wind wheel locking plate 130 are an integrated structure.
[0060] In this embodiment, a wind wheel locking disk 130 is provided on the outer periphery of the hub connection port 100. The function of the wind wheel locking disk 130 is to lock the high-strength main shaft structure under special circumstances. When the high-strength main shaft structure needs to be locked, the wind wheel locking pin is pushed into the wind wheel locking hole. The wind wheel locking disk 130 and the main shaft are integrated into one design to reduce assembly steps.
[0061] In addition, a gearbox connection port 140 for connecting a speed-increasing gearbox is provided at one end of the high-strength main shaft structure away from the hub connection port 100 , and is used for installing the speed-increasing gearbox and transmitting the driving torque.
[0062] It should be noted that, in this specification, relational terms such as first and second are merely used to distinguish one entity from other entities, but do not necessarily require or imply any actual relationship or order between these entities.
[0063] The various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.
[0064] The above is a detailed introduction to the embodiments provided by the utility model. This article uses specific examples to illustrate the principles and implementation methods of the utility model. The description of the above embodiments is only used to help understand the method and core ideas of the utility model. It should be pointed out that for ordinary technicians in this technical field, without departing from the principles of the utility model, the utility model can also be improved and modified, and these improvements and modifications also fall within the scope of protection of the claims of the utility model.
Claims
1. A high-strength main shaft structure of a double-support transmission system, used to transfer the load of the wheel hub to the front bearing, the rear bearing and the speed increasing gearbox, characterized in that: The high-strength main shaft structure is provided with a hub connection port (100), a transition shaft section (200), a front installation section (300) and a rear installation section (400) in sequence along its own axial direction; a through hole (110) and a blind hole (120) are provided in the circumference of the hub connection port (100); an external connecting member and an internal connecting member are respectively passed through the through hole (110) and the blind hole (120) so that the hub can be installed on the hub connection port (100); an elliptical curve (210) is provided on a side of the transition shaft section (200) close to the hub connection port (100) for bearing the load; the front installation section (300) and the rear installation section (400) are respectively used for installing the front bearing and the rear bearing.
2. The high-strength main shaft structure of the double-support transmission system according to claim 1 is characterized in that: The through holes (110) and the blind holes (120) are evenly distributed along the circumference of the hub connection port (100), the numbers of the through holes (110) and the blind holes (120) correspond one to one, and the through holes (110) are located outside the blind holes (120).
3. The high-strength main shaft structure of the double-support transmission system according to claim 1 is characterized in that: A bearing shoulder (500) is provided at one end of the front mounting section (300) away from the rear mounting section (400), the front bearing is provided with an inner ring, and the bearing shoulder (500) is fitted to the end surface of the inner ring for positioning the inner ring.
4. The high-strength main shaft structure of the double-support transmission system according to claim 3 is characterized in that: A groove structure (510) is provided at the bottom of one side of the bearing shoulder (500) close to the front mounting section (300), and the groove structure (510) includes a first circular arc segment (511), a second circular arc segment (512) and an elliptical arc segment (513) connected to each other, and is used to reduce the contact area between the bearing shoulder (500) and the inner ring.
5. The high-strength main shaft structure of the double-support transmission system according to claim 4 is characterized in that: The second circular arc segment (512) and the elliptical arc segment (513) are concentrically arranged, and the elliptical arc segment (513) is one quarter of an ellipse.
6. The high-strength main shaft structure of the double-support transmission system according to claim 1, characterized in that: A first groove (410) and a second groove (420) are respectively provided at both ends of the rear installation section (400); the radial distance between the first groove (410) and the second groove (420) and the rear installation section (400) is 2-3 mm.
7. The high-strength main shaft structure of the double-support transmission system according to claim 1, characterized in that: The front mounting section (300) and the front bearing are interference fit, and the rear mounting section (400) and the rear bearing are interference fit.
8. The high-strength main shaft structure of the double-support transmission system according to claim 3, characterized in that: The transition shaft section (200) further comprises a third circular arc (220) tangent to the elliptical curve (210), and the third circular arc (220) is connected to the bearing shoulder (500).
9. The high-strength main shaft structure of the double-support transmission system according to claim 4, characterized in that: The height of the groove structure (510) in the radial direction of the high-strength main shaft structure is one third of the end surface height of the bearing shoulder (500).
10. The high-strength main shaft structure of the double-support transmission system according to claim 3, characterized in that: A wind wheel locking disk (130) is provided on the outer periphery of the hub connection port (100); a gear box connection port (140) for connecting to the speed increasing gear box is provided at one end of the high strength main shaft structure away from the hub connection port (100); the high strength main shaft structure, the bearing shoulder (500) and the wind wheel locking disk (130) are an integrated structure.
