Water pump control system for hydrogeological water pumping test
By designing a water pump control system for hydrogeological pumping tests, including water level sensors, submersible pumps, overflow valves, flow meters and control instruments, the problem of pumping volume and rate control errors in pumping tests was solved, and automatic monitoring and automatic adjustment were realized. Improved test accuracy and data availability.
Patent Information
- Application Number
- CN202420960496.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-07
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2034-05-07
AI Technical Summary
In existing hydrogeological pumping tests, there are errors and fluctuations in the control of pumping volume and rate, resulting in inaccurate flow meter measurement values and affecting the collection of test data.
A water pump control system for hydrogeological pumping tests is designed, including a water level sensor, a submersible pump, a relief valve, a flow meter, a buffer tank, a pressure gauge and a control instrument. It realizes automatic monitoring and pumping adjustment through a regulating valve and a recorder. It is set On a mobile cart for easy movement and use.
It realizes automatic monitoring and automatic adjustment of pumping test parameters, improves the accuracy of the test and the real-time and visualization of the data, avoids the impact of water flow impact on the flow meter, and ensures the availability of test data.
Smart Images

Figure CN221824027U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of geological exploration, in particular to a water pump control system for a hydrogeological pumping test. Background Art
[0002] Hydrogeological parameters are indicators that reflect the hydrogeological performance of aquifers or permeable layers, and provide a basis for evaluating groundwater resources, predicting mine water inflow, and determining mine drainage plans. Nowadays, pumping tests are often used to obtain hydrogeological parameters. At the same time, pumping tests can also determine the characteristic curve and actual water inflow of pumping wells, evaluate the water richness of aquifers, infer and calculate the maximum water inflow and unit water inflow of wells, determine the influence radius, reasonable well spacing, the shape of the drop funnel and its expansion, and better understand the hydraulic connection between groundwater, surface water, groundwater systems in karst areas and different aquifers. The pumping test pumps water out through a submersible pump and monitors the water level through a water level sensor. When the pumping volume is too large, the overflow valve is used to reflux to keep the water level unchanged. In the existing pumping test, the water level sensor data is manually observed to manually control the return valve in real time to adjust the amount of pumping to ensure that the water level required by the hydrogeological pumping test is constant. There are errors and fluctuations in the amount of water pumped and the rate control. At the same time, the impact of water flow will also cause errors in the measurement value of the flow meter, affecting the collection of test data. Utility Model Content
[0003] In view of the defects of the above-mentioned prior art, the technical problem to be solved by the utility model is to provide a water pump control system for hydrogeological pumping tests which can realize automatic monitoring of various parameters of the pumping test and automatic adjustment of the pumping, while avoiding inaccurate data recorded by the flow meter.
[0004] In order to solve the above technical problems, the utility model adopts the following technical solutions: a water pump control system for hydrogeological pumping tests, including a water level sensor, a submersible pump, an overflow valve and a flow meter, the overflow valve is arranged on the return pipe branched between the submersible pump and the flow meter, and a regulating valve is arranged on the main pipe between the return pipe and the flow meter, and also includes a buffer tank, a pressure gauge, a control instrument and a recorder, the regulating valve and the flow meter are electrically connected to the control instrument respectively, and the water level sensor and the control instrument are electrically connected to the recorder respectively; the buffer tank is arranged between the submersible pump and the regulating valve to buffer the extracted water flow, and the pressure gauge is arranged in the main pipe between the buffer tank and the regulating valve and is located after the return pipe.
[0005] Preferably, the buffer tank, pressure gauge, regulating valve, control instrument, flow meter and recorder are all arranged on a mobile cart for easy movement.
[0006] Preferably, the mobile cart is an aluminum alloy frame with brake wheels at the bottom.
[0007] Preferably, the capacity of the buffer tank is 50L.
[0008] The beneficial effects of the utility model are as follows: by adding recorders and control instruments to monitor and adjust pumping and reflux, automatic monitoring of various parameters of the pumping test and automatic adjustment of pumping are realized, and the monitored data are real-time and visualized; at the same time, due to the automatic monitoring, the data has the characteristics of continuity, which greatly improves the accuracy of the pumping test; by setting a buffer tank to buffer the pumped water flow, it is avoided that the water flow rate after being pumped is too large, which will impact the flow meter and cause inaccurate recorded data; at the same time, a pressure gauge is provided to observe the water pressure of the main line to ensure the availability of the test data. When the pressure gauge fluctuates in a large range, this group of data is unavailable and it is necessary to re-test and collect data. BRIEF DESCRIPTION OF THE DRAWINGS
[0009] Figure 1 It is a schematic diagram of the structure of the utility model;
[0010] In the figure: 1-water level sensor, 2-submersible pump, 3-buffer tank, 4-overflow valve, 5-pressure gauge, 6-regulating valve, 7-flow meter, 8-control instrument, 9-recorder, 10-return pipe. DETAILED DESCRIPTION
[0011] In order to better understand the improvements made by the present invention relative to the prior art, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.
[0012] like Figure 1 As shown, a water pump control system for hydrogeological pumping test mainly consists of a water level sensor 1, a submersible pump 2, an overflow valve 4, a flow meter 7, a buffer tank 3, a pressure gauge 5, a control instrument 8 and a recorder 9. In order to facilitate mobility and be suitable for hydrogeological pumping tests at different locations, the buffer tank 3, the pressure gauge 5, the regulating valve 6, the control instrument 8, the flow meter 7 and the recorder 9 are all arranged on a mobile cart. The mobile cart is preferably an aluminum alloy frame, and a brake wheel is provided at the bottom.
[0013] The overflow valve 4 is arranged on the return pipe 10 branching between the submersible pump 2 and the flow meter 7, and a regulating valve 6 is arranged on the main pipe between the return pipe 10 and the flow meter 7. The regulating valve 6 and the flow meter 7 are electrically connected to the control instrument 8, respectively, and the water level sensor 1 and the control instrument 8 are electrically connected to the recorder 9, respectively. The recorder 9 records the water level data recorded by the water level sensor 1 at all times and transmits the water level data to the control instrument 8. The control instrument 8 controls the opening and closing size of the regulating valve 6 according to the set flow rate to adjust the pumping amount of the submersible pump 2 and the overflow valve 4 so that the water output reaches a stable state, so as to ensure that the flow required by the hydrogeological pumping test remains constant, and records the detection data of the flow meter 7.
[0014] To avoid excessive water flow rate after being pumped out, which may impact the flow meter and cause inaccurate recorded data, a buffer tank 3 is provided between the submersible pump 2 and the regulating valve 6 to buffer the pumped water flow. The capacity of the buffer tank 3 is preferably 50L. At the same time, a pressure gauge 5 is provided in the main pipe between the buffer tank 3 and the regulating valve 6, and the pressure gauge 5 is located behind the return pipe 10. The pressure gauge 5 observes the water pressure of the main pipe to ensure the availability of the test data. When the pressure gauge fluctuates too much, the data set is unavailable and the test data needs to be collected again.
[0015] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A water pump control system for a hydrogeological pumping test, comprising a water level sensor (1), a submersible pump (2), an overflow valve (4) and a flow meter (7), wherein the overflow valve (4) is arranged on a return pipe (10) branched between the submersible pump (2) and the flow meter (7), and a regulating valve (6) is arranged on the main pipe between the return pipe (10) and the flow meter (7), characterized in that: It also comprises a buffer tank (3), a pressure gauge (5), a control instrument (8) and a recorder (9); the regulating valve (6) and the flow meter (7) are respectively electrically connected to the control instrument (8); the water level sensor (1) and the control instrument (8) are respectively electrically connected to the recorder (9); the buffer tank (3) is arranged between the submersible pump (2) and the regulating valve (6) to buffer the pumped water flow; the pressure gauge (5) is arranged in the main pipe between the buffer tank (3) and the regulating valve (6) and is located behind the return pipe (10).
2. A water pump control system for hydrogeological pumping test according to claim 1, characterized in that: The buffer tank (3), the pressure gauge (5), the regulating valve (6), the control instrument (8), the flow meter (7) and the recorder (9) are all arranged on the mobile cart.
3. A water pump control system for hydrogeological pumping test according to claim 2, characterized in that: The mobile cart is an aluminum alloy frame with brake wheels at the bottom.
4. A water pump control system for hydrogeological pumping test according to claim 1, characterized in that: The capacity of the buffer tank (3) is 50L.