Building waste resource utilization smashing device

By designing the crushing box, dust collection system and guide structure in the construction waste resource recycling device, the problem of inconvenient feeding and dust is solved, the effect of convenient feeding and dust removal is achieved, and the efficiency of resource utilization and work are improved. Security.

CN221832452UActive Publication Date: 2024-10-15XINJIANG QIANTAI ENVIRONMENTAL PROTECTION TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420137581.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-19
Publication Date
2024-10-15
Estimated Expiration
2034-01-19

AI Technical Summary

Technical Problem

The existing construction waste resource recycling device lacks a guide structure for loading construction waste, which makes loading inconvenient and easily raises dust when loading, affecting human health.

Method used

A device including a crushing box, a pair of roller crushing wheels, a reduction motor, a transmission wheel, a feed hopper, a dust removal port, a protective plate, a dust suction channel, an explosion-proof vacuum cleaner and a collection box is designed to generate negative pressure through the dust suction channel to absorb dust. , and facilitate the guidance and collection of construction waste through inclined plates and material boxes.

Benefits of technology

It realizes the convenient loading of construction waste and the collection of dust, improves the safety of staff and the stable operation of equipment, and enhances the resource utilization efficiency of construction waste.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221832452U_ABST
    Figure CN221832452U_ABST
Patent Text Reader

Abstract

The utility model discloses a building waste resource utilization smashing device which comprises a smashing box, a roller crushing wheel is arranged in the smashing box, an output shaft of the roller crushing wheel penetrates through the smashing box and is fixedly connected with a gear motor, and the gear motor is fixedly connected with the smashing box. According to the building waste crushing device, the crushing box, the double-roller crushing wheel, the gear motor and the transmission wheel are matched, building waste can be crushed, a worker can conveniently add the building waste into the crushing box through the feeding hopper, negative pressure can be generated at a dust removal opening through the cooperation of the dust collection channel, the anti-explosion dust collector and the collection box, and the dust removal effect is improved. And through cooperation of a protection plate and a communication opening, a dust removal opening can be protected, the situation that building waste penetrates through the dust removal opening and collides with a dust collection channel during discharging is avoided, and therefore the device can operate stably.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of resource utilization of construction waste, in particular to a construction waste resource utilization crushing device. Background Art

[0002] Nowadays, my country's infrastructure projects are in full swing, which has triggered a large demand for construction materials. However, when carrying out infrastructure projects, the reuse of a large amount of construction waste materials generated by the demolition of the original buildings has gradually become a trend. This can not only reduce the supply gap of construction raw materials, but also achieve local material acquisition and reduce transportation costs.

[0003] After searching, the Chinese patent application No. 202121929569.8 discloses a device for recycling and utilizing construction waste resources. The patent provides a device for recycling and utilizing construction waste resources, including: a box body, a feed port and a discharge port. The top upper surface of the box body is fixedly connected with a feed port, and the bottom of the box body is provided with a discharge port. It also includes: a crushing roller, a mounting hole, a position adjustment device, a rotating device and a supporting device. The surface of the box body is symmetrically provided with mounting holes, and the surfaces of the two mounting holes are symmetrically equipped with crushing rollers. The surface of the box body is fixedly connected with a position adjustment device, and the two crushing rollers are rotatably installed with the position adjustment device. The surface of the box body is fixedly connected with a supporting device below one of the mounting holes, and one end of the two crushing rollers is fixedly connected with a rotating device, and the rotating device is fixedly connected to the supporting device. This device for recycling and utilizing construction waste resources is adaptable and can adapt to the crushing of waste concrete of different block sizes.

[0004] Although the above patent is capable of crushing waste concrete of different block sizes, in actual use, the feed port of the patent is directly opened on the top of the box, lacking a guide structure for loading construction waste, thereby reducing the convenience of loading. In addition, when loading the feed port, dust is easily raised, and the dust floats in the air and can be inhaled into the lungs by the human body, affecting health, thereby reducing practicality to a certain extent.

[0005] Therefore, it is necessary to modify the crushing device in the above patent to effectively prevent the lack of a guiding structure for feeding construction waste, thereby reducing the convenience of feeding. In addition, when feeding the feed port, dust is easily raised, and these dusts float in the air and can be inhaled into the lungs by the human body, affecting the health of the body. Utility Model Content

[0006] In order to solve the problems raised in the above-mentioned background technology, the purpose of the utility model is to provide a construction waste resource utilization and crushing device, which has the advantages of being able to guide the loading of construction waste, thereby facilitating the staff to load it, and being able to remove the dust, and being able to collect the dust for subsequent reuse, solving the problem of lack of a guiding structure for loading construction waste, thereby reducing the convenience of loading. In addition, when loading at the feed port, dust is easily raised, and the dust floats in the air and will be inhaled into the lungs by the human body, affecting the health of the body.

[0007] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a construction waste resource utilization crushing device, comprising a crushing box, wherein a pair of roller crushing wheels are arranged inside the crushing box, an output shaft of the pair of roller crushing wheels passes through the crushing box and is fixedly connected to a reduction motor, and the reduction motor is fixedly connected to the crushing box, the other end of the pair of roller crushing wheels passes through the crushing box and is sleeved with a transmission wheel, and the two transmission wheels are transmission-connected by a transmission belt, a feed hopper is fixedly connected to the top of the crushing box, a dust removal port is provided on one side of the inner wall of the feed hopper, a protective plate is fixedly connected to the surface of the dust removal port, a connecting port is provided at the bottom of the protective plate, and the connecting port is connected to the dust removal port, a dust suction channel is connected to the other end of the dust removal port, an explosion-proof dust collector is arranged on the inner wall of the dust suction channel, the output end of the explosion-proof dust collector is connected to a collection box, a slide groove is provided inside the collection box, and the top of the slide groove is connected to the output end of the explosion-proof dust collector, and a collection drawer is slidably connected inside the slide groove.

[0008] As a preferred embodiment of the utility model, an inclined plate is fixedly connected to the interior of the crushing box, and the inclined plate is located below the double-roll crushing wheel, a discharge port is opened on the front of the crushing box, and the discharge port is used in conjunction with the inclined plate, and a material box is arranged on the front of the crushing box, and the material box is located below the discharge port.

[0009] As a preferred embodiment of the utility model, a plurality of leakage holes are provided on the top of the inclined plate, a collecting groove is provided on one side of the crushing box, a material drawer is slidably connected to the interior of the collecting groove, and the material drawer is used in conjunction with the leakage holes.

[0010] As a preferred embodiment of the present invention, a baffle frame is fixedly connected to the front side of the crushing box, and the baffle frame is located on the surface of the discharge port.

[0011] As a preferred embodiment of the present invention, a pressure relief port is provided on the front of the collection box, and the pressure relief port is communicated with the slide slot, and a dustproof net is provided inside the pressure relief port.

[0012] As a preferred embodiment of the present invention, an interception net is fixedly connected to the bottom of the communication port.

[0013] Compared with the prior art, the beneficial effects of the utility model are as follows:

[0014] 1. The utility model can crush construction waste by cooperating with a crushing box, a double-roll crushing wheel, a reduction motor and a driving wheel, and can use a feed hopper to facilitate workers to add construction waste into the crushing box. Through the cooperation of a dust suction channel, an explosion-proof vacuum cleaner and a collection box, negative pressure can be generated at the dust removal port, thereby absorbing dust and collecting it in a collection drawer for subsequent use. The dust removal port can be protected by the cooperation of a protective plate and a connecting port to prevent construction waste from passing through the dust removal port and colliding with the dust suction channel when unloading, thereby enabling the device to operate stably.

[0015] 2. The utility model facilitates the guidance of the crushed construction waste by arranging the inclined plate, the discharge port and the material box, preventing the construction waste from being retained inside the crushing box, thereby facilitating the subsequent use of the construction waste by the staff. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of the structure of the utility model;

[0017] Figure 2 It is a three-dimensional schematic diagram of another viewing angle of the structure of the utility model;

[0018] Figure 3 It is a partial cross-sectional three-dimensional schematic diagram of the rear view of the structure of the utility model;

[0019] Figure 4 For this utility model Figure 3 A is an enlarged schematic diagram.

[0020] In the figure: 1. crushing box; 2. roller crushing wheel; 3. reduction motor; 4. driving wheel; 5. feed hopper; 6. dust removal port; 7. protective plate; 8. connecting port; 9. dust suction channel; 10. explosion-proof vacuum cleaner; 11. collection box; 12. slide; 13. collection drawer; 14. inclined plate; 15. discharge port; 16. material box; 17. leakage hole; 18. collection trough; 19. material drawer; 20. baffle frame; 21. pressure relief port; 22. dust net; 23. interception net. DETAILED DESCRIPTION

[0021] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0022] like Figures 1 to 4As shown, the utility model provides a construction waste resource utilization crushing device, including a crushing box 1, a pair of roller crushing wheels 2 are arranged inside the crushing box 1, the output shaft of the pair of roller crushing wheels 2 passes through the crushing box 1 and is fixedly connected to a reduction motor 3, and the reduction motor 3 is fixedly connected to the crushing box 1, the other end of the pair of roller crushing wheels 2 passes through the crushing box 1 and is sleeved with a transmission wheel 4, and the two transmission wheels 4 are connected in transmission through a transmission belt, a feed hopper 5 is fixedly connected to the top of the crushing box 1, a dust removal port 6 is opened on one side of the inner wall of the feed hopper 5, a protective plate 7 is fixedly connected to the surface of the dust removal port 6, a connecting port 8 is opened at the bottom of the protective plate 7, and the connecting port 8 is connected to the dust removal port 6, the other end of the dust removal port 6 is connected to a dust suction channel 9, an explosion-proof dust collector 10 is arranged on the inner wall of the dust suction channel 9, the output end of the explosion-proof dust collector 10 is connected to a collection box 11, a chute 12 is opened inside the collection box 11, and the top of the chute 12 is connected to the output end of the explosion-proof dust collector 10, and a collection drawer 13 is slidably connected inside the chute 12.

[0023] refer to Figure 1 and Figure 3 An inclined plate 14 is fixedly connected to the inside of the crushing box 1, and the inclined plate 14 is located below the double-roll crushing wheel 2. A discharge port 15 is opened on the front of the crushing box 1, and the discharge port 15 is used in conjunction with the inclined plate 14. A material box 16 is arranged on the front of the crushing box 1, and the material box 16 is located below the discharge port 15.

[0024] As a technical optimization solution of the utility model, the arrangement of the inclined plate 14, the discharge port 15 and the material box 16 facilitates the guidance of the crushed construction waste to prevent it from being retained inside the crushing box 1, thereby facilitating the subsequent use of the construction waste by the staff.

[0025] refer to Figure 3 A plurality of leakage holes 17 are provided on the top of the inclined plate 14 , a collecting groove 18 is provided on one side of the crushing box 1 , a material drawer 19 is slidably connected inside the collecting groove 18 , and the material drawer 19 is used in conjunction with the leakage holes 17 .

[0026] As a technical optimization solution of the utility model, by setting a plurality of leakage holes 17, collection troughs 18 and material drawers 19, the crushed construction waste can be classified and collected, thereby improving the utilization rate of the construction waste.

[0027] refer to Figure 1 and Figure 2 A baffle frame 20 is fixedly connected to the front of the crushing box 1 , and the baffle frame 20 is located on the surface of the discharge port 15 .

[0028] As a technical optimization solution of the present invention, the blocking frame 20 can block the movement trajectory of the construction waste passing through the discharge port 15 to prevent it from splashing out of the material box 16 under the action of inertia.

[0029] refer to Figure 1 and Figure 2 A pressure relief port 21 is provided on the front of the collecting box 11 , and the pressure relief port 21 is communicated with the chute 12 , and a dustproof net 22 is provided inside the pressure relief port 21 .

[0030] As a technical optimization solution of the utility model, by setting the pressure relief port 21, the air pressure inside the slide 12 can be kept balanced, thereby ensuring the normal operation of the explosion-proof vacuum cleaner 10, and by setting the dustproof net 22, the material drawer 19 can be prevented from overflowing through the pressure relief port 21.

[0031] refer to Figure 4 The bottom of the connecting port 8 is fixedly connected with an interception net 23 , and the diameter of the interception net 23 is larger than the diameter of the dustproof net 22 .

[0032] As a technical optimization solution of the present invention, the interception net 23 can be provided to prevent un-crushed construction waste from entering the connecting port 8 , thereby protecting the dust removal port 6 .

[0033] The working principle and use process of the utility model are as follows: when the staff uses the crushing device to crush the construction waste, firstly, the device is connected to the external power supply, and then the reduction motor 3 and the explosion-proof vacuum cleaner 10 are started, and then the construction waste can be directly added to the feed hopper 5. At this time, when the construction waste falls into the crushing box 1, a certain amount of dust will be generated, and the suction force of the explosion-proof vacuum cleaner 10 can make the dust removal port 6 produce a certain negative pressure, so that the dust can be sucked into the dust suction channel 9 and recovered into the collection drawer 13 for subsequent use. At this time, the pressure relief port 21 can keep the air pressure inside the chute 12 balanced, and the dustproof net 22 can prevent the material in the material drawer 19 from overflowing through the pressure relief port 21. At the same time, the reduction motor The roller crushing wheel 2 is driven to rotate by the driving wheel 4 and the transmission, so that the roller crushing wheel 2 can crush the construction waste, and then the crushed construction waste falls onto the inclined plate 14. At this time, the construction waste with a smaller volume passes through the leak hole 17 and falls into the material drawer 19 for centralized collection, while the construction waste with a larger volume slides out of the discharge port 15 along the inclined plate 14 and falls into the material box 16 for centralized collection. At this time, the blocking frame 20 can block the movement trajectory of the construction waste passing through the discharge port 15 to prevent it from splashing out of the material box 16 under the action of inertia. When the construction waste is crushed, the construction waste in the collection drawer 13, the material box 16 and the material drawer 19 is taken out and can be recycled.

[0034] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0035] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A construction waste resource utilization crushing device, comprising a crushing box (1), Features: A pair of roller crushing wheels (2) are arranged inside the crushing box (1), the output shaft of the pair of roller crushing wheels (2) passes through the crushing box (1) and is fixedly connected to a reduction motor (3), and the reduction motor (3) is fixedly connected to the crushing box (1), the other end of the pair of roller crushing wheels (2) passes through the crushing box (1) and is sleeved with a transmission wheel (4), and the two transmission wheels (4) are connected in transmission through a transmission belt, the top of the crushing box (1) is fixedly connected to a feed hopper (5), one side of the inner wall of the feed hopper (5) is provided with a dust removal port (6), and the surface of the dust removal port (6) is fixedly connected to A protective plate (7) is provided, a connecting port (8) is provided at the bottom of the protective plate (7), and the connecting port (8) is connected to a dust removal port (6), the other end of the dust removal port (6) is connected to a dust suction channel (9), an explosion-proof dust collector (10) is provided on the inner wall of the dust suction channel (9), the output end of the explosion-proof dust collector (10) is connected to a collection box (11), a slide groove (12) is provided inside the collection box (11), and the top of the slide groove (12) is connected to the output end of the explosion-proof dust collector (10), and a collection drawer (13) is slidably connected inside the slide groove (12).

2. A construction waste resource utilization crushing device according to claim 1, Features: The crushing box (1) is fixedly connected to an inclined plate (14) inside, and the inclined plate (14) is located below the roller crushing wheel (2); the crushing box (1) is provided with a discharge port (15) on the front, and the discharge port (15) is used in conjunction with the inclined plate (14); the crushing box (1) is provided with a material box (16) on the front, and the material box (16) is located below the discharge port (15).

3. A construction waste resource utilization crushing device according to claim 2, Features: A plurality of leakage holes (17) are provided on the top of the inclined plate (14), a collecting groove (18) is provided on one side of the crushing box (1), a material drawer (19) is slidably connected inside the collecting groove (18), and the material drawer (19) is used in conjunction with the leakage holes (17).

4. A construction waste resource utilization crushing device according to claim 2, Features: A baffle frame (20) is fixedly connected to the front of the crushing box (1), and the baffle frame (20) is located on the surface of the discharge port (15).

5. A construction waste resource utilization crushing device according to claim 1, Features: A pressure relief port (21) is provided on the front of the collection box (11), and the pressure relief port (21) is communicated with the slide groove (12), and a dustproof net (22) is provided inside the pressure relief port (21).

6. A construction waste resource utilization crushing device according to claim 1, Features: An interception net (23) is fixedly connected to the bottom of the communication port (8).